    INSPECTION REQUEST FORM FOR PILING WORKS (DRIVEN PILE) NO:

    Unless otherwise approved,this inspection request form shall be submitted during

    the daily morning meeting among LTA,Contractor and QP(S)

    Contractor: Project:

    To: Date:

    LTA Time:

    The work described below has been inspected by our Site Engineer and is complete

    and ready for your inspection. A checklist is attached overleaf.

    Location

    Checked and Requested By:

    Chainage

    Activity

    Drawings Used for Construction

    Other Description Contractor's PM Name & Signature

    work approved to start:__________________

    INITIAL INSPECTION DECISION BY QP(S)

    We have inspected the above referenced works and found them acceptable. You may proceed.

    However, please return the completed checklist upon completion of the remaining work.

    You cannot proceed. Please carry out corrective works as noted on the checklist and

    submit a fresh request for inspection.

    Other comments:

    RTO/RE Name & Signature/ Date

    FINAL INSPECTION DECISION BY QP(S)

    __________________________________

    LTA

    __________________________________

    QP(S) Name& Signature/Date

    work approved to start:_______________ work completed on:_______________________

    The above process for request for inspection of work by Contractor and approval by Qp(S) is noted.

    LTA's Representative/date/time

    SAMWOH CORPORATION PTE LTD SK E & C

    ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA

    GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL

    ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND

    ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

    The meeting noted that the information provided by the Contractor is adequate/not adequate*.

    QP(S) may proceed Request Rejected

    work completed on:________________________

  • 7/27/2019 IR Driven Piling

    2/2

    Location:

    S/No Description of Works Checked by Confirmed by

    Contractor QP(S)1 Check setting out

    2 Check pegged position of individual pile

    3 Check services plan

    4 Locate services with cable detector and digging trial trench

    5 Check mill certificate

    6 Check whether coating on pile is required

    7 Check set specified

    8 Check certificate of fitness of piling machine and service crane

    9 Check certificate of crane operator

    10 Check piling frame and crane located on firm bases

    11 Check pile dimensions

    12 Check pile defects

    13 Check verticality of piles

    14 Check welding requirement for joints and plates

    15 Check set and calculate working load

    16 Check risen piles

    17 Check eccentricity of individual pile

    18 Check cut-off level of pile

    19 Take sample for testing

    20 Check sufficient temporary traffic devices if lane

    closure is required

    21 Others

    CHECKLIST FOR PILING WORKS (DRIVEN PILE) NO:

    Date,Time: Chainage: