TRANSPORTATION SCHEDULING AND INVENTORY CONTROL OPTIMIZATIONTRANSPORTATION SCHEDULING AND INVENTORY CONTROL OPTIMIZATION
English version
Outline of the companyContext and objectivesTransportation optimization :
• Diagnosis
• Modeling& Solving methods
• IT development
• Test
Optimization of inventory control « Pallecon containers»Conclusion
Plan
2
L’Oréal is a world leader in the cosmetic industry. Founded in 1909 by Eugène Schueller to produce dyes hair.
l’Oréal product are sold in more than 130 countries . Its activities are essentially : product conception, manufacturing , packaging
and product sale. Its annual turnover is around 19,5 billion €. L’Oréal holds 40 plants in the world , with13 in France.
L’Oréal
3
Outline of the companyOutline of the company
Division Cosmetic Active:VichyRoche Posay
Vichy
Vichy plant holds 3 production unities.
4
Outline of the companyOutline of the company
Manufacturing of big size Manufacturing of small size
Subcontracting and flow management
The turnover related to the subcontracting activity represents 20% of the total activity.
Plant of Vichy- CAP
Logistic networkDistribution Plateforme Plants WholesalerSuppliers
Other plants
Creuzier le neuf
CAI (Centre Affaires International)
Subcontractor
Outline of the companyOutline of the company
Plant of VichyPlant of Vichy
Transport organized by Vichy’s plant
Transport organized by subcontractor
Transport organized by supplier
Transport organized by CAI
5
Outline of the companyContext and objectivesTransportation optimization related to subcontracting
activities:• Diagnosis• Modeling& Solving methods• IT development • Test
Optimization of inventory control « Pallecon containers»Conclusion
Plan
6
ContextContext and objectivesContext and objectives
7
Transport ManagementTransport Management Transfer containersTransfer containers
• Transportation scheduling is not rational
• Delay deliveries • No transportation cost control.
• Transportation scheduling is not rational
• Delay deliveries • No transportation cost control.
• Additional cost incurred by the use of the oldest type of containers.Losses of juice
• Additional cost incurred by the use of the oldest type of containers.Losses of juice
In 2008, the Vichy plant has undergone a complete restructuring project to meet the overall strategy of L’Oreal. Creating a unit specialized in subcontracting and flow management has allowed to identify various problems including those related to transportation management and transfer of containers
750.000€750.000€ 270.000€270.000€
Objectives According to the overall strategy of L’Oréal related to continuous
improvement, cost optimization and sustainable development various project have started
Vichy plant has initiated several projects in each production unit. In this context, my graduation project supports two main tasks:
8
Transportation scheduling Transportation scheduling Optimization of inventory control
Optimization of inventory control
• Cost optimization • Transportation
Rationalization
• Cost optimization • Transportation
Rationalization
• Cost optimization of containers
• Cost optimization of containers
Context and objectivesContext and objectives
Outline of the companyContext and objectivesTransportation optimization :
• Diagnosis
• Modeling& Solving methods
• IT development
• Test
Optimization of inventory control « Pallecon containers»Conclusion
Plan
9
CAI
Vichy
Fournisseur
Sous-traitant
Distributor CAI
Plant
Logistic network
DiagnosisTransportation scheduling
Vichy Plantsubcontractor
Vichy Plant CAI
Subcontractor Vichy Plant
Supplier Vichy Plant
Supplier Subcontractor
subcontractor CAI
CAI
Plant 10
Subcontractor
Supplier Subcontractor
Supplier
Diagnosis
Transportation Optimization
Integrated approach : Optimization Simultaneously of the all transportation costs.
Integrated approach : Optimization Simultaneously of the all transportation costs.
Sequential approach : Optimization sequentially of each transportation cost
Sequential approach : Optimization sequentially of each transportation cost
- Complicated approach
+ Exact optimum
- Complicated approach
+ Exact optimum
+ Approach less complicated
+ approximate optimum
+ Approach less complicated
+ approximate optimum
Sequential approach
Sequential approach
Focus on delivery to subcontractor
11
Origine Destination Montant PourcentageUsine Sous-traitant 245600 32%Usine CAI 92480 12%Sous-traitant Usine 172380 23%Fournisseur Usine 230870 30%Fournisseur Sous-traitant 5210 1%Sous-traitant CAI 18000 2%
Transportation scheduling
Currently, the transportation management of the items to subcontractors is done separately for each subcontractor. In consequence the transportation billing is established individually for each delivery.
The load rate is about 40%, which is considered a low performance or transportation organization
12
Diagnosis
CurentCurent
Transportation scheduling
Loss due to expeditions not grouped
Loss due to emergency
Theoretical load rate
Theoretical load rate
Suggestion:
Vehicle Routing
Suggestion:
Vehicle Routing
Factor degradation
Implementing vehicle routing approach consists to schedule the delivery routings starting from Vichy plant for delivering each subcontractor the quantity required on once without exceeding the capacity limit of the vehicle. The optimal schedule is that minimizing the transportation cost ( Distances).
13
ModelingTransportation scheduling
Vehicle Routing
Problem
Vehicle Routing
Problem
Using the following numeric variable
14
ModelingTransportation scheduling
The transportation scheduling become equivalent to solve a mathematical problem under Integer linear programming
: If the subcontractor i is delivered during the routing k
: If the subcontractor j is delivered after the subcontractor i
: Transportation cost between i and j
: Quantity required by the subcontractor i
M : Big number Q : Vehicle capacity
Minimize
Subject to following constraints (f.1)
(f.2)
(f.3).
(f.4)
(f.5)
(f.6)
Minimize
Subject to following constraints (f.1)
(f.2)
(f.3).
(f.4)
(f.5)
(f.6)
In the operations research studies, the integer linear model related to the vehicle routing problem is recognized as an NP-hard problem. Therefore, It’s essential to analyze the different approaches could be used for solving this optimization problem.
Aalgorithm Clarke and Wright15
Solving methods: BenchmarkTransportation scheduling
Program input :– List of subcontractors to delivery
– Quantities required for each subcontractor– Geographic position of each subcontractor– Vehicle Capacity
– The matrix of road allowed
Program Output:– Number of routing– The delivery sequence of each routing
The IT program I have developed under visual basic includes three parts :
16
IT development
Static dataStatic dataDynamic
dataDynamic
dataOptimization
AlgorithmOptimization
Algorithm
Loading dataLoading data Construction of optimal tours
Construction of optimal tours
Graphic displayGraphic display
Report findingsReport findings
Transportation scheduling
Les données statiques sont saisies dans un fichier Excel. Il comprend:– une feuille ( A) pour renseigner les positions géographiques des sous-traitants – et une feuille (B) pour renseigner les routes ouvertes entre les sous-traitants.
Feuille (A):Positions géographiques
Feuille (B) :Routes ouvertes
Les données dynamiques relatives aux quantités de livraison sont saisies au moment de l’exécution de l’application.
Association des sous-traitants
17
Planification des tournées
Développement Informatique: Données
Le menu de programme donne le choix aux utilisateurs de saisir les opérations de transport à planifier ou de changer certains paramètres.
Saisi des données dynamiques (la liste des sous-traitants à livrer ainsi que la quantité d’expédition par sous-traitant)
18
Planification des tournées
Développement Informatique: Interface
Après avoir saisi les expéditions et exécuté l’optimisation des tournées, la maquette des résultats s’affiche. Le graphique montre quels sont les sous–traitants livrés par chaque tournée. Les tournées sont bien distinguées par des couleurs différentes.
19
Planification des tournées
Développement Informatique: Affichage
Concernant la phase de test technique de l’algorithme développé, nous avons utilisé le fichier Excel reprenant les opérations de livraison Janvier – Aout 2010 lors du développement. Les simulation a montré que les distances parcourues pourraient être réduites par 24% avec une diminution de coût de 8%
Le développement de l’application est le début de tout un projet de réorganisation de transport. Actuellement, le transport est géré expédition par expédition. C’est pour cette raison que le passage en organisation de transport par des tournées nécessitera le lancement d’un chantier pour gérer ce changement en termes de méthodes de travail ainsi que de relation avec les transporteurs. Une réunion avec DHL a eu lieu pour préparer la phase de démarrage en mois de novembre
20
Planification des tournées
Test et résultats
Aperçu de l’entrepriseContexte et objectifsOptimisation du transport relatif à l’activité de sous-
traitanceDimensionnement du parc des containers des jus «
Pallecon »Conclusion
Plan
21
Dimensionnement du parc des containersDimensionnement du parc des containers
Analyse de l’existant
Usine Vichy Sous-traitant
Jus AC et MP
L’utilisation actuelle des containers Cubis Shutz coûte prés de 270.000 euros annuellement. L’usine a opté dernièrement pour une nouvelle génération des containers appelés Pallecon en substitution des Cubi Shuz.
L’objectif de la présente mission et d’élargir le maximum possible le champ d’utilisation des Pallecon et la détermination à du nombre optimal de Pallecon à commander.
Démarche suivie: .
11 22 33 44 22
afin d’estimer le nombre nécessaire de Pallecon à louer à un horizon moyen terme, nous avons mis comme hypothèse, que les transferts de l’année 2011 vont se reproduire durant l’année 2012. plus une marge de 4%
MoisEstimation du nombre
de Pallecon transférés aux ST
Janvier 384Février 321MARS 258AVRIL 250mai 191Juin 178Juillet 100Aout 78Septembre 73Octobre 238Novembre 274Décembre 315
La durée d’occupation moyenne d’un Pallecon est la durée entre la mise du jus en Pallecon et la date de retour du Pallecon vide à CAP, elle est estimée à deux mois.
23
Dimensionnement du parc des containersDimensionnement du parc des containers
Simulation
Comme les besoins mensuels de Pallecons ne sont pas identiques, il faut déterminer quelles sont les dates optimales de réception des Pallecon et quelles sont les quantités optimales des containers à commander.
En faisant la simulation des 6 scénarios possibles nous avons eu les résultats suivants :
Commande N °1 Commande N°2Coût de location
Date Quantité
Octobre 705 Avril 441 213827,2
Novembre 705 mai 512 223284,4
Décembre 705 Juin 589 233540,8
Janvier 705 Juillet 699 248192,8
Février 579 Aout 705 232208,8
Mars 508 Sept 705 222751,6
Il serait optimal de passer les commandes de location semestrielle en mois d’octobre et mois d’avril. Le gain estimé est d’environ de 55 000 euros ce qui représente 20 % par rapport au coût généré par l’utilisation des Cubis Shuz
24
Dimensionnement du parc des containersDimensionnement du parc des containers
Dimensionnement
Présentation de l’entreprisePérimètre du stageOptimisation du transport relatif à l’activité de sous-
traitanceDimensionnement du parc des containers des jus «
Pallecon »Conclusion
Plan
25
L’Optimisation du coût de transport et l’amélioration des conditions de la sous-traitance sont les sujets les plus centraux dans une UP de sous-traitance et de gestion de flux du groupe l’Oréal.
Rationalisation de transport:– Planification des tournés de livraison : Réduction de 24% des distances parcourues – Gestion des urgences
– Généralisation de l’approche aux autres flux
Converger les objectifs de la planification de la sous-traitance et les objectifs de la gestion de flux.