interior design 29- 31 pothdowne street corks's] 3053 ... · interior design 29- 31 pothdowne...
Post on 21-Sep-2020
3 Views
Preview:
TRANSCRIPT
re Teehno Architecture
Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia
.61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou
PROJECT: TRIBE HOTEL COLLINGWOOD 14.12.18
TOWN PLANNING SUBMiSSION_REV
LIST OF CHANGES TO A3 TP DOCUMENT: pg 16 (Design Response - Bose Principles - Top levels), pg 27 (Proposed Level M10) S pg 28 (Proposed Level M11)
from TP document 24.08.18 have been removed as no longer applicable.
* changes to Al documentation set are as clouded
Page: 2 Contents Development Schedule updated
14 Design Response - Base Principles - Podium
•Item 17 - Additional windows
• Item 18 - Additional views and seating to
façade
16 Design Response - Bose Principles - Section • Item 8 - Reduction in overall building height
• New overshadowing path shown vs previous
17 Design Response - Proposed Massing New building mass shown
19 TP01- Site Analysis & Existing Conditions Lot Key Plan & clearer Title Boundary
20 TP10 - Demolition Plan Lot Key Plan & clearer Title Boundary
23 TP23 - Design Response • Updated roof plan shown
• Lot Key Plan & clearer Title Boundary
24 TP40 - Proposed Streetscape Views Neighbouring proposal S pedestrian link removed
25 TP20 - Proposed Ground Floor Plan
• Lot Key Plan & clearer Title Boundary
• New seating niche to façade
additional windows to open dining area
facade
• Lobby & corridor widths shown
26 TP21 - Proposed Level M1 Plan
• Updated skylight to Open dining Area
• Lobby S Corridor widths shown
• Lot Key Plan S clearer Title Boundary
27 TP22 - Proposed Levels M2-M8 Plan
• Updated skylight to Open dining Area
• Lobby & Corridor widths shown
• Lot Key Plan & clearer Title Boundary
28 TP28 - Proposed Roof Plan New Roof Plan with reduction in overall building height
29 TP26 - Typical Module Plans Internal room dimensions shown
31 TP41- Proposed Elevations - Sheet 1
• Overall building height reduced
• New seating niche to façade
• Additional windows to Open Dining Area
facade
• Podium wall heights shown
• Materials updated to reflect Materials
Legend
32 TP42 - Proposed Elevations - Sheet 2
• Overall building height reduced
• Materials updated to reflect Materials
Legend
• Title Boundary setbacks shown
33 TP43 - Proposed Elevations - Sheet 3
• Overall building height reduced
• Podium wall heights shown
• Materials updated to reflect Materials
Legend
34 TP44 - Proposed Elevations - Sheet 4
• Overall building height reduced
• Materials updated to reflect Materials
Legend
• Title Boundary setbacks shown
35 TP45 - Proposed Section
• Overall building height reduced
• Podium wall heights shown
• New overshadowing path shown vs previous
application
36-42 TP5O-TP56 - Shadow Diagrams
• Additional Hours of shadows shown. gam,
10am, llam, 12pm, 1pm, 2pm, 3pm
• Shadow extent of Town Planning
Submission (24.08.12) shown
43-46 Design Response - Perspective Renders V1, V2, V3, V4
• Overall building height reduced
• New seating niche to facade
• Additional windows to Open Dining Area
façade
•Neighbouring proposalS pedestrian link
removed
•V4 Perspective render from Wellington
Street
48 Tribe Hotels - Initiatives New Diagrams and descriptions
49-50 Tribe Hotels - Construction Methodology New Diagrams and descriptions
52 Tribe Hotels - Aesthetics New facade image to demonstrate facade articulation
Tribe Hotels
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street & 23-1+5 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 1+7 Ta Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
Image: TRIBE MODULAR Image: TRIBE PROCUREMENT & FIT-OUT
London
Paris manic!,
Barcelona . Newyork
Washington DC .
Stockholm
N
... ••• ... .......
Los Angeles •
PRO OFFICE
Tokyo
PRC San Francisco •
HEAD OFFICE
Jakarta
Sydney 1.1 w Melbourne
•Hobart • Auckland
Cape Town
Moscow
. ...... ..... ... ..
........ ...... ................ .... .... .................. ...... ...... '7"" ..... . "" ............................ : . ............
Tribe Design Principles
re Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
Tribe Hotels
Initiatives
Each module is capable of intermodal freight, via road, rail or skip enabling delivery anywhere across the globe.
Mark Peters, Founder, CEO rribe Hotel Group
The Tribe modules have been designed and engineered to ensure that there are no geographical boundaries. Ensuring cost effective intermodal transport of the modules was a fundamental principle applied to the concept. The modules can be easily transported via road, rail or ship to any hotel location across the globe.
Our established team in China delivers a consolidated approach to module manufacture and procurement of ancillary materials and building supply for our hotels. This central supply hub enables us to achieve a consistent level of quality, regardless of the hotel's location around the globe. Consistency and conformance to our quality benchmarks can be achieved regardless ofthe contractor's ability in any respective market that we wish to enter.
All manufacturing is conducted with stringent manufacturing processes and experienced personnel. The model provides significant cost savings and reduced construction times when compared with a traditional build method. Once construction commences, a Tribe Hotel may be operational within 12 months.
With economies of scale and a controlled factory environment, the manufacturing process ensures a higher level of quality and significant reductions in material wastage when compared with a traditional build method. All these benefits help to promote an affordable, cost efficient and sustainable outcome.
Tribe also provides an extensive procurement option for supply of fit-out solutions that facilitate high end Tribe environments at affordable prices. Including, but not limited to, common area fit-out, joinery, stone, signage, FF&E and artwork.
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 48
STAGE1. CONSTRUCTED IN SITU
STAGE 2. MODULE INSTALL
STAGE 3. MODULE COMMISSIONING & BUILDING COMPLETION
Tribe Hotels
Construction Methodology
Modular and prefabricated construction allows for greater efficiency, less wastage of natural materials and better quality control.
What is special about our buildings is that the fabrication has been so seamlessly integrated that it is difficult to find where the modular components start and stop.
■ Podium - Standard construction - Site responsive - Activated frontage - Authority compliant services
■ Transfer Slab - Standard construction - Engineered solution isolating module grid from FOH/BOH structure
111 Service Zone - Coordination zone and reticulation of services through consolidated transfer slab penetrations
- Fire rated - Service access to module risers
11 Modules - Modular hotel rooms components - Self-supporting structure - Fully fitted out with services and interiors
■ Roof Structure & Plant - Allows for reticulation space of module services - Integral screened plant platform
Core/Vertical Transportation - Standard construction - Tracing' element to modules
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street S 23-1+5 Waterloo Road. Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 49 Te Techn8 Architecture + Interior Design
29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
PROJECT ADDRESS CLIENT DRAWING Te
Tribe Collingwood PROJECT NO 18016
60-62 Langridge Street G 23-145 Waterloo Road, Collingwood (Proposed Lot A)
60 Langridge Street Pty Ltd
N/A SCALE DATE 19/12/2018 PAGE NO 50 Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
Diagram Customisable Opportunities
Room Module
Build Type: Purpose Built (Pre-fabricated)
Customisation Opportunities: External - 0% Internal - Aesthetic only
Room Window Shrouds
Build Type: Purpose Built (Pre fabricated)
Customisation Opportunities: - Limited variations - Material opportunities for complimentatyfascia surfaces/ local environments
Ground Floor / Podiums
Build Type: Traditional
Customisation Opportunities: External -100% Internal - 100%
Tribe Hotels
Construction Methodology
The hotel module comprises a purpose designed and factory built steel framed unit. The modules are fully fitted out and completed to a signature Tribe specification inclusive ofwindows, doors, floor and wall coverings and full bathroom hardware, prior to leaving the factory. All structural plumbing and electrical components are compliant to the applicable building standard.
Each module is capable of intermodal freight, making them easily deliverable to any destination worldwide. The rigidity in the steel framing and freight packing system allows for the finished hotel room modules to be delivered straight to site, locked into place, connected to services and opened as a complete hotel room, ready for use.
The ground floor (common area of the hotel) is constructed using traditional building methods and forms the base structure from which the modules are stacked. All lifts and stairwells also follow the traditional construction method. Common areas are fitted our through Tribe's established procurement platform.
The modules themselves form the structure and support of the building for each level over and above the ground floor. The modules are self-supporting with no additional infrastructure required. Consequently, concrete slabs are no longer needed to support and form the foundation of each floor, providing large savings to the overall build time and cost. The Tribe modules have been developed by combining the services ofleading architects, structural, mechanical and fire engineers, building surveyors and a group of award-winning interior designers.
Tribe Perth Entry
Tribe Perth
Typical shroud facade treatment
Tribe Hotels
Aesthetic
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 51 To Techne Architecture + Interior Design
29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
Tribe Perth
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street & 23-1+5 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 52 Te Techne Architecture + Interior Design
29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au
Ta Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.ou
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 53
Tribe Hotels
Common Areas
Entry r444,44444000,444444444.4 A Al AA• IAA ordirdriord
1
1
Perth Lounge
Dining
Design Accents
Corridor
Hotel Room
•
ti iv- .1.
ti As. ■••• +Yr •a-
Tribe Hotels
Hotel rooms
PROJECT Tribe Collingwood PROJECT NO 18016
ADDRESS 60-62 Langridge Street S 23-45 Waterloo Road, Collingwood (Proposed Lot A)
CLIENT 60 Langridge Street Pty Ltd
DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 54 Te Techne Architecture • Interior Design
29-31 Rathdowne Street Carlton 3053 Australia .61 (0) 3 9600 0222 techne.com.au
1 I I I I I 1 1 1 1 I I 1 I 1 1 1 I 1 1
Techne Architecture + Interior Design Pty Ltd 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 info@techne.com.au techne.com.au
A B N 40 127 720 745
top related