inspection test plan for civil works

Post on 13-Jul-2016

1.394 Views

Category:

Documents

159 Downloads

Preview:

Click to see full reader

DESCRIPTION

inspection test plan for civil works

TRANSCRIPT

  

CONTRA

CONTRA

QP EXTE

DOCUM

DOCUM

No. 

 

ACT NUMBER 

ACT TITLE   

ERNAL TRANSM

MENT NUMBER 

MENT TITLE 

CODE  1  –REQUIRED)

ITTAL REFERENC

QP C

APPROVED  – 

C

GC12

EPIC 

CE   EDM

3513

INSP

COMMENTS

MAY  PROCEE

COMMENT

2105200 

FOR UPGRADAT

/GC12105200/E

3‐M3GE‐1‐25‐00

ECTION AND TE

ED  (RE‐SUBMISS

TS RESOL

TION OF AC UPS

EXT/TN/0510 

01 

ST PLAN FOR CIV

SION  DOCUME

UTION SH

QP 

 UNITS IN NGL3,

DAT

DOC

VIL WORKS 

ENT SUBMITTED

HEET[ CRS

PROJECT NUMB

, MESAIEED 

TE 

CUMENT REVISI

CONTRACTO

D FOR AFC STAM

 ] 

BER  3

3

ION  2

OR RESPONS

MPING/SIGNATU

P

 

 

3513 

30‐Oct‐2013 

SE

RE 

Page 1 of 1 

1 EXCAVATION WORKS

1.1 Setting out AFC Drawing 3513-M3GE-1-50-0001 Site Survey Report Site Super visor/Engr.

1.2 Expolortary Excavation Approved Procedure Site Super visor/Engr. W M

1.3 Excavation Approved Procedure Site survey Report Site Super visor/Engr.

1.4Compaction Specifications 3513-M3GE-1-50-0004 FD test Report Q.C Engineer W/H

Sub Contractor

1.5 Compaction Test Specifications 95% Compaction FD test Report Q.C Engineer H W/H W/H

2 BLINDING CONCRETE SRC152.1 Visual Inspection AFC Drawing 3513-M3GE-1-50-0004 Survey Coordinates, Levels, Third party FD Test Report Q.C Engineer H W M

2.2Compaction Test Specifications FD Test Report Q.C Engineer W/H

Sub Contractor

2.3Inspection for Pouring Site Inspection

After Reviewing Third party Test report

Inspection Request Site Super visor/Engr. H H/W H/W

2.4

Concrete Pouring Mix no 3513-MS-CIV-0001SRC15-NS25G60C15

MAR/Delivery Ticket Q.C Engineer H H/W H/W

Cl less than 500 mg/l

CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

INSPECTION TEST PLAN FOR CIVIL WORKS

RAY PROJECTS /

DOPETSl.No Activity Report

Test/Inspection Activity

RemarksAcceptance Criteria Drawing No ParametersVerifying

DocumentsResponsibility QP

2.5 Curing Water test report

Cl - less than 500 mg/l , SO3 - less than 1000 mg/l, Alkali carbonates &bicarbonates - less than 500 mg/l , TDS -less than 2000mg/l , Ph - 6.5 to 9

Water test report Site Super visor/Engr. H W

3 CONCRETE PROTECTION

3.1Application of Bitumen

Primer Specifications Ref:3513-MS-

CIV-0003 3513-M3GE-1-14-0008

After completion Visual Inspection

Material Approval (Poly Prime SB)

Site Super visor/Engr. H W M

3.2Laying of Bitumen Sheet

Specifications Ref:3513-MS-CIV-0003

3513-M3GE-1-14-0008After completion Visual

Inspection Material Approval (Bitustick XL

1.6mm thick)Site Super visor/Engr. M M M

3.3Screeding

Specifications Ref:3513-MS-CIV-0003

3513-M3GE-1-14-0008After completion Visual

Inspection AFC 3513-M3GE-1-50-0004 Site Super visor/Engr. H W M

3.4Installation of Bitu board

Specifications Ref:3513-MS-CIV-0003

3513-M3GE-1-14-0008After completion Visual

Inspection Material Approval (Bituboard

FS 4mm thick)Q.C Engineer

DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 2 OF 6

CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

INSPECTION TEST PLAN FOR CIVIL WORKS

RAY PROJECTS /

DOPETSl.No Activity Report

Test/Inspection Activity

RemarksAcceptance Criteria Drawing No ParametersVerifying

DocumentsResponsibility QP

4

CONCRETE WORKS FOR

FOUNDATIONS C40

4.1 Form work Installation AFC Drawing

3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

Verifi the Dimensons , Supports and Shuttering Oil for smooth

finishAFC Drawing Site Super visor/Engr. H/W W M

4.2 Fabrication of Rebars Bar Bending Schedule

3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

AFC Drawing Site Super visor/Engr. H/W W M

4.3 Rebar Installation AFC Drawing

3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003,

Bar Bending Schedule along with AFC drawings

Site Super visor/Engr. H/W W M

,3513-M3GE-1-51-0004

4.4 Anchor bolt installation Locations NA AFC Drawings Site Super visor/Engr. H/W W M

4.5 Inspection for Pouring AFC Drawings / Specifi.

3513-M3GE-1-50-0004, 3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

Survey Report,Dimenson Check,Level Check

Inspection Request Q.C Engineer H H/W H/W

4.6Inspection of ReadyMix

ConcreteMix No

Flakiness Index - Max 30 Elongation Index - Max 35 Acid Soluble Chloride-Max 0.03 Acid Soluble Sulphate-Max 0.3 MSS - Max 15 los Angeles Abrasion - max 30

MAR for C40 / Delivery Ticket Q.C Engineer H H/W H/W

4.7

Concrete Pouring Mix Design/specification 3513-MS-CIV-0001Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40-40N/MM2

MAR for C40 / Delivery Ticket Q.C Engineer H H/W H/W

4.8

Removal of form work Specification/Cube test

report

Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40-40N/MM2

Inspection Request / min 24hrs from concrete poured

Q.C Engineer M M M

4.9 Inspection of surface Smooth Surface Surface Neat and Clean Visual Inspection Site Super visor/Engr. H H/W W

4.10 Concrte protection Specifications Ref

no:3513MS-CIV-0003 Specifications Site Super visor/Engr. H W M

4.11

Back Filling Back Filling Specifications 3513-M3GE-1-50-0004

Sulphate - less then 2.5 g/L, Max.Size of material 50mm, Plasticity index <11%, Liquid limit <40 %, Organic matter <12%

FD test Report Q.C Engineer W M M

DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 3 OF 6

CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

INSPECTION TEST PLAN FOR CIVIL WORKS

RAY PROJECTS /

DOPETSl.No Activity Report

Test/Inspection Activity

RemarksAcceptance Criteria Drawing No ParametersVerifying

DocumentsResponsibility QP

5CONCRETE WORKS C40

5.1Compaction of floor area Compaction test

Test Report Should be 95% Compaction

FD test Report Q.C Engineer H W M

5.2 Form works for pannels Dimension

3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

Verifi the Dimensons , Supports and Shuttering Oil for smooth

finishAFC Drawings Site Super Visor/Engr. M M M

5.3 Reinforcement works AFC drawings

3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

Bar Bending Schedule along with AFC drawings

Site Super Visor/Engr. H/W W M

5.4 Inspection for Pouring AFC Drawings/Specification

3513-M3GE-1-50-0005, 3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002, 3513-M3GE-1-51-0003, 3513-M3GE-1-51-0004

Survey Report,Dimenson Check,Level Check

Inspection Request Q.C Engineer H H/W H/W

Concrete Pouring Mix Design / Specification 3513-MS-CIV-0001Min Comp.strength after 28 daysSRC15-15N/MM2 OPC40- Delivery Ticket/ RFI Q C Engineer H W M

5.5Concrete Pouring Mix Design / Specification 3513 MS CIV 0001 daysSRC15 15N/MM2 OPC40

40N/MM2Delivery Ticket/ RFI Q.C Engineer H W M

5.6 Isolation Joints Specification3513-M3GE-1-51-0001, 3513-M3GE-1-51-0002

Material Approval ( Flexcel board)

Site Super Visor/Engr. H H/W W

6 BLOCK WORKS

6.1 Procurement of Blocks Com. Strength 7 N/mm2 Test Report Q.C Engineer R M M

6.2 Inspection of Blocks Com. Strength Dimension, Pouracity, Test Report Q.C Engineer H H/W W

6.3 Laying of Blocks Visual Inspection 3513-M3GE-1-71-0005 Line and level AFC Drawings Site Super Visor/Engr. W W M

Concrete Filling AFC drawings 3513-M3GE-1-71-0005 AFC Drawing/Speci. Site Super Visor/Engr. M

7 PLASTERING

7.1Preparation of Surface Visual Inspection

Surface Cleaning and preparation

Specifications Site Super Visor/Engr. H W M

7.2 Installation of Blockmesh Specifications Ref : 3513-MS-

CIV-00043513-M3GE-1-71-0005, 3513-M3GE-1-14-0008

After Completion of Visual Inspection

AFC Drawings Site Super Visor/Engr. H W M

7.3 Installation of AnglebeadSpecifications Ref : 3513-MS-

CIV-00043513-M3GE-1-71-0005, 3513-M3GE-1-14-0008

After Completion of Visual Inspection

AFC Drawings Site Super Visor/Engr. H W M

7.4Rough Plaster

Specifications Ref : 3513-MS-CIV-0004

3513-M3GE-1-71-0005After Completion of Visual

Inspection Approved Procedure Site Super Visor/Engr. H H/W W

7.5Plastering Visual Inspection 3513-M3GE-1-71-0005

After Completion of Visual Inspection

Specifications Site Super Visor/Engr. H W W/M

7.6

Curing Water test report

Cl - less than 500 mg/l , SO3 - less than 1000 mg/l, Alkali carbonates &bicarbonates - less than 500 mg/l , TDS -less than 2000mg/l , Ph - 6.5 to 9

Specifications Site Super Visor/Engr. M M

DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 4 OF 6

CONTRACT NO. GC12105200 EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

INSPECTION TEST PLAN FOR CIVIL WORKS

RAY PROJECTS /

DOPETSl.No Activity Report

Test/Inspection Activity

RemarksAcceptance Criteria Drawing No ParametersVerifying

DocumentsResponsibility QP

8 WALL PAINTING

8.1 Inspection of Surfaces Visual Inspection Specifications Site Super Visor/Engr. H W M

8.2 Inspection for Moisture Specifications 3513-M3GE-1-71-0005 Moisture content less than 4% Field Tests Q.C Engineer H W M

8.3Application of Primer

Specifications Ref :3513-MS-CIV-0007

3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M

8.4 Application of Puttyfiller Specifications Ref :3513-MS-CIV-0007

3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M

8.5 Application of Primer Specifications Ref :3513-

MS-CIV-00073513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M

8.6 Application of First coat Specifications 3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M

8.7 Application of 2nd Coat Specifications 3513-M3GE-1-71-0005 Material Appr./Procedure Q.C Engineer H W M

9

INSTALALTION OF DOORS & WINDOWS

9.1 Verification of opening size Dimension/AFC Drawings 3513-M3GE-1-71-0001, 3513-M3GE-1-71-0002

AFC Drawings Site Super Visor/Engr.

9.2 Fabrication Specifications AFC Drawings Site Super Visor/Engr. M M M

9.3 Installation Specifications AFC Drawings Site Super Visor/Engr. H W M

3513-M3GE-1-69-00019.4 Opening Directions AFC Drawings

3513 M3GE 1 69 0001, 3513-M3GE-1-69-0002, 3513-M3GE-1-69-0003

AFC Drawings Site Super Visor/Engr. H/W W M

9.5 Sealent application Visual Inspection Material Approvals Q.C Engineer M M M

9.6 Installation of hardwares Specifications 3513-M3GE-1-14-0008 Materials Approvals Q.C Engineer M M M

10 FLOOR COATING

10.1 Prepration of Surfaces Smooth Surface 3513-M3GE-1-14-0008 Approved Procedure Site Super Visor/Engr. M M

10.2 Application of Primer Specifications 3513-M3GE-1-14-0008 Material Approvals Q.C Engineer H/W W M

10.3 Application of Coating Specifications 3513-M3GE-1-14-0008 Material Approval Q.C Engineer H/W W M

Prepared by: PREMNATHReviewed by: KARUPPIAH Approved by:

W-Witness, H-Hold,R-Review,M-Monitoring, TP-Third Party

DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 5 OF 6

Date : RFI No :

Discipline: Civil Mechanical Electrical Instrumentation commissioning

Location:

Doc. /Drawing No: Rev:

Rev:

Rev:

Date of Inspection: Time of Inspection:

Description of activities for Inspection:

1. Site Engineer:

Date:

EPCI FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

GC12105200

Name: Signature:

REQUEST FOR INSPECTION (RFI)

Date:

2. Contractor QA/QC Comments:

Date:

Approved Approved with Comments Rejected

3. QP comments:

Date:

DOPET/An Civil/RFI . Rev 0 - 27.10.13

Name: Signature:

Name: Signature:

Name: Signature:

DOC. NO. 3513-M3GE-1-25-0001 REV. A PAGE 6 OF 6