Innovative timber buildings – including cross laminated timber and laminated veneer lumberLiam Dewar, Director - Eurban Limited UKNew design concepts using engineered timber products are promising to increase sustainability and construction efficiency. Cross laminated timber (CLT) and laminated veneer lumber (LVL) are appearing in multi-level building designs of 10 storeys and more.

TRANSCRIPT

Innovative Timber Buildings

Liam DewarDirector, Eurban

Liam Dewar

Innovative TimberBuildings

WHY TIMBER BUILDINGS?

BRENDELAND & KRISOFFERSON ARKITEKTER

WHOLE-LIFE CARBON

EMBODIED CARBON STORED CARBON

LOWER(THROUGH SUBSTITUTION)

+

EMBODIED CARBONMATERIAL SUBSTITUTION

IMAGE © WWW IMAGE © PRIMARY INDUSTRIES & RESOURCES

EMBODIED CARBONMATERIAL SUBSTITUTION

BRENDELAND & KRISOFFERSON ARKITEKTER

STORED CARBONWHAT SHALL WE DO WITH PLANTATION TREES?

STORED CARBONMANY USES = NO WASTAGE

STORED CARBONAPPLICATION / LIFE EXPECTANCY

TIMBER USE LIFE EXPECTANCY

Fuel Wood 1 year

Packaging 2 years

Wood Products 10 years

Books 25 years

Furniture 30 years

Woodfibre Insulation 60 years

Timber Structure 80 years

STORED CARBONTIMBER STRUCTURES

80 YEARS

WHY SOLID TIMBER BUILDINGS?

WHOLE-LIFE CARBON

EMBODIED CARBON STORED CARBON OPERATIONAL CARBON

LOWER LOWER

HIGHER

LOWER EMBODIED CARBON THROUGH STRUCTURAL REDUNDANCY =

DURABILITY

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGES © PROGETTO SOFIE

SEISMIC TESTING, TSUKUBA, JAPAN

LOWER EMBODIED CARBON THROUGH ROBUSTNESS = DURABILITY

HIGHER STORED CARBONUSED TO OFFSET MORE EMBODIED CARBON

SOURCE: HOW BAD ARE BANANAS?

ITEM CARBON FOOTPRINT TIMBER

Night in a hotel 25 kg CO2e 0.03 m3

Laptop computer 720 kg CO2e 0.9 m3

Flight – London to Adelaide return 5.7 t CO2e 7.2 m3

Average 40-year-old UK citizen 789 t CO2e 1,001 m3

Average 40-year-old Australian citizen 1,578 t CO2e 2,002 m3

OPERATIONAL CARBONFOR COMFORT & HEALTH

LOWER OPERATIONAL CARBONTHROUGH THERMAL STABILITY

MATERIAL THERMAL MASS STABILITY ACTIVITY

c.ρ (kJ/m2K) λ / c.ρ (cm2/s) √ λ .c.ρ (kJ/m2K/s)

Solid Timber 1,008 12

0.36

Water 4,190 141.56

Brickwork 990 440.66

Concrete 2,640 682.18

SIP Panel (EPS) 24 167 0.03

Air 1 2,500 0.01

LOWER OPERATIONAL CARBON THROUGH MOISTURE STABILTY

The impact of hygroscopic materials (the ability of a material to absorb water from the air) is more effective than mechanical ventilation (0.5 ac / h)

SOURCE: RAKENNUSLEHTI, VTT, 2000

SOLID TIMBER MATERIALS

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE ©

LOG CONSTRUCTION NEW-BUILD HOUSE, GRISONS, CH

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © GION A. CAMINADA

LOG CONSTRUCTIONNEW-BUILD HOUSE, GRISONS, CH

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © GION A. CAMINADA

LOG CONSTRUCTION NEW-BUILD SCHOOL, GRISONS, CH

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © GION A. CAMINADA

BRETTSTAPELPLANAR ELEMENTS - DOWELLED

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE ©

BRETTSTAPELLOW-TEC MANUFACTURE

BRETTSTAPEL NARROW WIDTH

BRENDELAND & KRISOFFERSON ARKITEKTER

BRETTSTAPEL EXTERNAL RACKING BOARD

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM PLANAR ELEMENTS - GLUED

CROSSLAM PLANAR ELEMENTS - GLUED

Thickness: Typically 50-400mm

CROSSLAM INDUSTRIAL MANUFACTURE

IMAGES © FINNFOREST MERK

CROSSLAM WALLS

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM FLOORS & ROOFS

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM DIMENSIONAL STABILITY

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM SIMPLICITY - CONNECTIONS

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM SIMPLICITY - AIRTIGHTNESS

BRENDELAND & KRISOFFERSON ARKITEKTER

CROSSLAM SIMPLICITY – INTERFACES

BRENDELAND & KRISOFFERSON ARKITEKTER

BENEFITSSIMPLICITY - FIT-OUT

SOLID TIMBER CONSTRUCTION

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © KLH MASSIVBAU

SOLID TIMBER CONSTRUCTIONPROCESS-DRIVEN – A B C

MATERIAL SUPPLY INSTALLATIONTIMBER DESIGN

SOLID TIMBER CONSTRUCTIONA - TIMBER DESIGN

TIMBER DESIGN

TIMBER DESIGNTIMBER & VALUE ENGINEERING

BRENDELAND & KRISOFFERSON ARKITEKTER

TIMBER DESIGN CNC INPUT DATA & INSTALLATION DRAWINGS

BRENDELAND & KRISOFFERSON ARKITEKTER

SOLID TIMBER CONSTRUCTIONB - MATERIAL SUPPLY

INSTALATION

MATERIAL SUPPLYFOREST COVER

IMAGE © THOMAS STONEY BRYANS

MATERIAL SUPPLY MATERIAL SOURCE

SOLID TIMBER CONSTRUCTIONC - INSTALLATION

INSTALLATION QUALITY ASSURANCE

CASE STUDIES

IMAGE © KARAKUSEVIC CARSON

SUNKEN HOUSE LONDON, UK

IMAGE © ED REEVE

SUNKEN HOUSE STRUCTURAL CONCEPT

SUNKEN HOUSE COMPONENT MODEL

SUNKEN HOUSE COMPONENT MODEL

SUNKEN HOUSE COMPONENT MODEL

SUNKEN HOUSE MATERIALS

SUNKEN HOUSE GROUNDWORKS

IMAGE © ED REEVE

SUNKEN HOUSE GROUNDWORKS

IMAGE © ED REEVE

SUNKEN HOUSE INSTALLATION - SITE

IMAGE © ED REEVE

SUNKEN HOUSE INSTALLATION

SUNKEN HOUSE INSTALLATION

SUNKEN HOUSE INSTALLATION

SUNKEN HOUSE INSTALLATION

SUNKEN HOUSE ROOF PANELS

BRENDELAND & KRISOFFERSON ARKITEKTER

SUNKEN HOUSE ROOF PANELS

SUNKEN HOUSE INSTALLATION - ROOF

SUNKEN HOUSE INSTALLATION - ROOF

BRENDELAND & KRISOFFERSON ARKITEKTER

SUNKEN HOUSE INSTALLATION - ROOF

BRENDELAND & KRISOFFERSON ARKITEKTER

SUNKEN HOUSE DETAIL - ROOF

BRENDELAND & KRISOFFERSON ARKITEKTER

SUNKEN HOUSE DETAIL - ROOF

SUNKEN HOUSE DETAIL - ROOFLIGHT

BRENDELAND & KRISOFFERSON ARKITEKTER

SUNKEN HOUSE EPDM ROOFING

SUNKEN HOUSE TIMBER CLADDING

IMAGE © ED REEVE

SUNKEN HOUSE TIMBER CLADDING

IMAGE © ED REEVE

SUNKEN HOUSE TIMBER CLADDING

IMAGE © ED REEVE

SUNKEN HOUSE TIMBER CLADDING

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © ED REEVE

SUNKEN HOUSE KITCHEN / DINING

IMAGE © ED REEVE

SUNKEN HOUSE CIRCULATION

IMAGE © ED REEVE

SUNKEN HOUSE STUDIO

BRENDELAND & KRISOFFERSON ARKITEKTER

IMAGE © ED REEVE

SUNKEN HOUSE PROJECT DATA

BRENDELAND & KRISOFFERSON ARKITEKTER

CLIENTPrivate

ARCHITECTAdjaye Associates

GROUNDWORKSWallace Contractors

TIMBER ENGINEERCarbon Eng

FLOOR AREA150 m2

INSTALLATION PERIOD1 week

MATERIALS USEDCrosslam / Glulam / Hemp Insulation

STORED CARBON58 t CO2e

DARTINGTON SCHOOL DEVON, UK

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL DESIGN CONCEPT – FLAT-PACK

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL DESIGN CONCEPT -CLUSTER

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL COMPONENT MODEL – CLUSTER 3

DARTINGTON SCHOOL GROUNDWORKS – PRECEDENT

BRE MODULAR CLASSROOM

DARTINGTON SCHOOL GROUNDWORKS

IMAGES © WHITE DESIGN

DARTINGTON SCHOOL TIMBER FLOOR SLAB

DARTINGTON SCHOOL INSTALLATION

DARTINGTON SCHOOL INSTALLATION

DARTINGTON SCHOOL INSTALLATION

DARTINGTON SCHOOL INSTALLATION

DARTINGTON SCHOOL INSTALLATION

DARTINGTON SCHOOL INSTALLATION

IMAGES © WHITE DESIGN

DARTINGTON SCHOOL WINDOWS & DOORS

DARTINGTON SCHOOL WINDOWS & DOORS

DARTINGTON SCHOOL WOODFIBRE INSULATION

BRENDELAND & KRISOFFERSON ARKITEKTER

DARTINGTON SCHOOL WOODFIBRE INSULATION

DARTINGTON SCHOOL WOODFIBRE INSULATION

DARTINGTON SCHOOL WOODFIBRE INSULATION

IMAGES © WHITE DESIGN

DARTINGTON SCHOOL WOODFIBRE INSULATION

IMAGES © WHITE DESIGN

DARTINGTON SCHOOL WOODFIBRE INSULATION

BRENDELAND & KRISOFFERSON ARKITEKTER

DARTINGTON SCHOOL TIMBER CLADDING

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL TIMBER CLADDING

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL CLASSROOM

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL CLASSROOM

DARTINGTON SCHOOL EXTERNAL

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL EXTERNAL

IMAGE © WHITE DESIGN

DARTINGTON SCHOOL PROJECT DATA

CLIENTDevon Country Council

ARCHITECTWhite Design

GROUNDWORKS ENGINEERRamboll

TIMBER ENGINEERCarbon Eng

MAIN CONTRACTORInterserve

BASIC BUILD COST£1,800 / m2

FLOOR AREA2,030 m2

INSTALLATION PERIOD12 weeks

MATERIALS USEDCrosslam / Glulam / Woodfibre Insulation

STORED CARBON600 t CO2e

ENVIRONMENTAL RATINGBREEAM Excellent

ESTIMATED WATER USE4.3 m3 / pupil / year

WAINGELS COLLEGE BERKSHIRE, UK

IMAGE © HUFTON + CROW

WAINGELS COLLEGE DESIGN CONCEPT – NATURAL DAYLIGHT

IMAGE © SHEPPARD ROBSON

WAINGELS COLLEGE DESIGN CONCEPT – CENTRAL COURTYARD

IMAGE © SHEPPARD ROBSON

WAINGELS COLLEGE DESIGN CONCEPT – CENTRAL COURTYARD

IMAGES © SHEPPARD ROBSON

WAINGELS COLLEGE DESIGN CONCEPT – OPEN PLAN

IMAGE © SHEPPARD ROBSON

WAINGELS COLLEGE LIGNATUR FLOOR & ROOF CASSETTES

WAINGELS COLLEGE COMPONENT MODEL

WAINGELS COLLEGE COMPONENT DRAWINGS - WALLS

WAINGELS COLLEGE COMPONENT DRAWINGS - FLOOR

WAINGELS COLLEGE COMPONENT DRAWINGS – ROOF

WAINGELS COLLEGE COMPONENT DRAWINGS

WAINGELS COLLEGE GROUNDWORKS

BRENDELAND & KRISOFFERSON ARKITEKTER

WAINGELS COLLEGE INSTALLATION

WAINGELS COLLEGE INSTALLATION

WAINGELS COLLEGE INSTALLATION

WAINGELS COLLEGE INSTALLATION

WAINGELS COLLEGE FLOOR CASSETTES

WAINGELS COLLEGE FLOOR CASSETTES

WAINGELS COLLEGE FLOOR CASSETTES

IMAGE © HUFTON + CROW

WAINGELS COLLEGE ROOF CASSETTES

WAINGELS COLLEGE ROOF CASSETTES

WAINGELS COLLEGE ROOF CASSETTES

IMAGE © HUFTON + CROW

WAINGELS COLLEGE BESPOKE TRUSS

IMAGE © SHEPPARD ROBSON

WAINGELS COLLEGE BESPOKE TRUSS

WAINGELS COLLEGE BESPOKE TRUSS

3.5m

WAINGELS COLLEGE BESPOKE TRUSS - ASSEMBLY HALL

IMAGE © HUFTON + CROW

WAINGELS COLLEGE CIRCULATION

IMAGE © HUFTON + CROW

WAINGELS COLLEGE CIRCULATION

IMAGE © HUFTON + CROW

WAINGELS COLLEGE RENDER / TIMBER CLADDING

IMAGE © HUFTON + CROW

WAINGELS COLLEGE TIMBER CLADDING

IMAGE © HUFTON + CROW

WAINGELS COLLEGE TIMBER CLADDING

IMAGE © HUFTON + CROW

WAINGELS COLLEGE PROJECT DATA

CLIENTWokingham Borough Council

ARCHITECTSheppard Robson

GROUNDWORKS ENGINEERRamboll

TIMBER ENGINEERCarbon Eng

MAIN CONTRACTORWillmott Dixon

BASIC BUILD COST£2,200 / m2

FLOOR AREA12,925 m2

INSTALLATION PERIOD36 weeks

MATERIALS USEDCrosslam / Glulam / Lignatur Cassettes

STORED CARBON2,285 t CO2e

ENVIRONMENTAL RATINGBREEAM Excellent

BRIDPORT HOUSELONDON, UK

BRIDPORT HOUSEDESIGN CONCEPT

IMAGE © KARAKUSEVIC CARSON

BRIDPORT HOUSEBRIEF REQUIREMENT - UNDERGROUND SEWER

BRIDPORT HOUSEDESIGN CONCEPT

IMAGE © KARAKUSEVIC CARSON

BRIDPORT HOUSEDESIGN CONCEPT - STRUCTURE

IMAGES © KARAKUSEVIC CARSON

BRIDPORT HOUSEBRIEF REQUIREMENT – UNIT MIX

BRIDPORT HOUSESTRUCTURAL CONCEPT - LOAD TRANSFER

BRIDPORT HOUSE STRUCTURAL CONCEPT - LOAD TRANSFER

BRIDPORT HOUSE STRUCTURAL CONCEPT - STRENGTH /

SETTLEMENT

BRIDPORT HOUSE STRUCTURAL CONCEPT - STRENGTH /

SETTLEMENT

IMAGE © WILMOTT DIXON

BRIDPORT HOUSE STRUCTURAL CONCEPT - STRENGTH /

SETTLEMENT

IMAGE © WILMOTT DIXON

BRIDPORT HOUSESTABILITY

BRIDPORT HOUSECOMPONENT MODEL

BRIDPORT HOUSEINSTALLATION - SITE

IMAGE © KARAKUSEVIC CARSON

BRIDPORT HOUSEINSTALLATION

IMAGE © WILMOTT DIXON

BRIDPORT HOUSEINSTALLATION

IMAGE © WILMOTT DIXON

BRIDPORT HOUSEWEEK 1

BRIDPORT HOUSEWEEK 6

BRIDPORT HOUSEWEEK 8

BRIDPORT HOUSEWEEK 10

BRIDPORT HOUSE FIT-OUT - SCREED

IMAGE © WILMOTT DIXON

BRIDPORT HOUSEFIT-OUT

IMAGE © WILMOTT DIXON

BRIDPORT HOUSEWINDOWS

IMAGES © WILMOTT DIXON

BRIDPORT HOUSEBRICK CLADDING

BRIDPORT HOUSE PROJECT DATA

CLIENTHackney Borough Council

ARCHITECTKarakusevic Carson

GROUNDWORKS ENGINEERPeter Brett Associates

TIMBER ENGINEERCarbon Eng

MAIN CONTRACTORWillmott Dixon

BASIC BUILD COST£1,400 / m2

FLOOR AREA4,154 m2 (41 dwellings)

INSTALLATION PERIOD10 weeks = 40% less than traditional

MATERIALS USEDCrosslam

STORED CARBON1,200 t CO2e

OPERATIONAL CARBON73.4 t CO2e / year

ENVIRONMENTAL RATINGCHS Level 4

FUTURE AUSTRALASIALOCAL MATERIALS

FUTURE AUSTRALASIALOCAL PROJECTS

FUTURE AUSTRALASIA

FUTURE AUSTRALASIA

Innovative Timber Buildings

Liam DewarDirector, Eurban, UK

Questions?