Saudi Aramco Engineering Procedures (Index of Active SAEPs)

June 2006

Document

Title Current

Issue Previous

Issue

Next Planned Update

Index of Active SAEPs page 1 of 5

About SAEPs Saudi Aramco Engineering Procedures 5/31/2003 2/26/2003 3/1/2008SAEP-12 Project Execution Plan 8/31/2004 5/31/2000 9/1/2009SAEP-13 Project Environmental Impact Assessments 6/29/2005 6/30/2003 7/1/2010SAEP-14 Project Proposal 1/29/2003 6/28/2000 7/1/2003SAEP-15 Preparation of Restricted Vendor Lists for Process Automation Systems 6/30/2003 4/28/1999 71/2008SAEP-16 Project Execution Guide for Process Automation Systems 5/31/2003 5/29/2002 6/1/2008SAEP-20 Equipment Inspection Schedule 9/28/2005 1/29/2003 10/1/2010SAEP-21 Royalty/Custody Metering Facilities Execution Guide 5/3/12004 4/30/2003 6/1/2009SAEP-22 Tank Calibration Requirements 4/4/2006 New 4/4/2011SAEP-31 Corporate Equipment and Spare Parts Data Requirements 9/30/2003 8/31/1998 10/1/2008SAEP-32 Environmental Performance Assessment (EPA) Program 6/30/2003 2/26/2003 3/1/2008SAEP-50 Project Execution Requirements for Third Party Royalty/Custody Metering Systems 7/30/2003 12/1/1996 8/1/2008SAEP-103 Metric Units of Weights and Measures 4/30/2005 12/1/1996 5/1/2010SAEP-110 Saudi Aramco Standard Drawings 3/31/2004 6/30/2002 4/1/2009SAEP-119 Saudi Aramco Materials System Specifications 4/30/2005 5/31/2003 6/1/2008SAEP-120 Saudi Aramco Security Drawings 3/31/2004 11/30/1999 4/1/2009SAEP-121 Operating Instructions for New Facilities 8/31/2002 1/27/1998 9/1/2007SAEP-122 Project Records 7/31/2005 2/29/2004 3/1/2009SAEP-125 Preparation of Saudi Aramco Engineering Standards 5/31/2003 3/31/2003 4/1/2008SAEP-127 Security and Control of Saudi Aramco Engineering Data 6/30/2004 12/31/2002 1/1/2008SAEP-133 Instructions for the Development of "Regulated Vendors List" Engineering Standards 1/4/2006 6/29/2005 7/1/2010SAEP-134 Saudi Aramco Engineering Procedure Preparations 4/30/2003 New 5/1/2008SAEP-135 Saudi Aramco Process Automation System (PAS) Obsolescence Program 7/30/2003 New 8/1/2006SAEP-136 Saudi Aramco Management of Electric Equipment Obsolescence Program 6/30/2004 New 7/1/2009SAEP-140 Project Training Impact Assessment 5/31/2004 New 6/1/2009SAEP-201 Saudi Aramco Engineering Reports 3/31/2004 1/31/2001 4/1/2009

SAEP-301 Instructions for Establishing and Maintaining Mandatory Saudi Aramco Engineering Requirements 11/13/2005 6/29/2005 5/1/2007

SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engineering Requirement 10/12/2005 01/31/05 7/1/2007

SAEP-303 Engineering Reviews of Project Proposal and Detail Design Documentation 7/31/2002 12/31/1996 8/1/2007SAEP-305 Saudi Aramco Library Drawings 3/31/2004 11/30/1999 4/1/2009SAEP-306 Evaluating the Remaining Strength of Corroded Pipelines 6/29/2005 3/29/2000 7/1/2010SAEP-308 Plant Inspection Unit Reviews 5/31/2004 7/30/2003 6/1/2009

Saudi Aramco Engineering Procedures (Index of Active SAEPs)

June 2006

Document

Title Current

Issue Previous

Issue

Next Planned Update

Index of Active SAEPs page 2 of 5

SAEP-309 Inspection of Community and Operations Support Facilities 6/30/2004 4/30/2000 7/1/2009SAEP-310 Pipeline Repair and Maintenance 11/30/2005 1/29/2003 4/1/2006SAEP-311 Installation of Hot Tapped and Stopple Connections 12/28/2005 11/13/2005 12/1/2010SAEP-312 PLIDCO Weld+Ends Couplings 01/31/05 1/29/2003 2/1/2010SAEP-313 PLIDCO Split Sleeves 01/31/05 1/29/2003 2/1/2010SAEP-314 Use of PLIDCO Smith Pipeline Repair Clamps 01/31/05 1/29/2003 2/1/2010SAEP-316 Performance Qualification of Coating Personnel 11/13/2010 7/30/2003 8/1/2008SAEP-317 Testing and Inspection (T&I) of Shell and Tube Heat Exchangers 7/30/2003 3/29/2000 8/1/2008SAEP-318 Pressure Relief Valve Program Authorization for Installation, Deletion and Changes 10/31/2004 3/31/2003 11/1/2009SAEP-319 Pressure Relief Valves – Routine Test, Inspection, Quality Assurance and Regulation 10/31/2004 10/30/2002 11/1/2009SAEP-321 Performance Qualification Testing and Certification of Saudi Aramco Welders 6/30/2003 1/31/2000 7/1/2008SAEP-322 Performance Qualification Testing and Certification of Saudi Aramco Brazers 6/30/2003 1/31/2000 7/1/2008SAEP-323 Performance Qualification Testing of Contract Welders and Brazers 6/30/2003 1/31/2000 7/1/2008SAEP-324 Certification Review and Registration of Project Welders and Brazers 6/30/2003 1/31/2000 7/1/2008SAEP-325 Inspection Requirements for Pressurized Equipment 6/30/2004 3/31/2001 7/1/2009SAEP-327 Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels 5/31/2003 8/30/2000 6/1/2006SAEP-329 Project Close-Out Report 11/23/2005 3/31/2001 12/1/2010SAEP-332 Cathodic Protection Commissioning 5/31/2005 9/30/2002 6/1/2010SAEP-333 Cathodic Protection Monitoring 7/31/2004 11/28/2001 8/1/2009SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco Engineering & Vendor Drawings 1/4/2006 9/29/2004 1/1/2009SAEP-335 Boiler Condition Assessment 2/28/2005 1/28/2004 6/1/2009SAEP-339 Marine Dredging and Landfilling Approval and Permitting 12/29/2004 12/31/2000 1/1/2008SAEP-340 Air Quality Impact Analysis and Assessment 12/21/2005 1/30/2002 1/1/2011SAEP-341 Equipment Life Cycle Cost Procedure 3/15/2006 6/30/2001 3/15/2009SAEP-342 Engineering Drawings Emergency Delivery Plan 3/31/2004 1/29/2003 2/1/2008SAEP-343 Risk-Based Inspection (RBI) for In-Plant Static Equipment 12/14/2005 2/28/2005 1/1/2007SAEP-347 Supplying Material from Stockists 10/31/2004 7/31/2004 8/1/2006

SAEP-348 Chemical Cleaning, Disinfection, Post Treatment and Storage of Reverse Osmosis Membranes 7/31/2004 New 8/1/2009

SAEP-349 Advanced Process Control (APC) Systems 11/30/2004 New 12/1/2007SAEP-350 Regular Maintenance and Testing for Industrial Stationary Batteries 5/31/2004 New 6/1/2009SAEP-351 Bolted Flange Joints Assembly 4/30/2003 New 5/1/2006SAEP-352 Welding Procedures Review and Approval 5/31/2003 New 6/1/2008SAEP-354 High Integrity Protective Systems Design Requirements 10/29/2003 8/31/2003 9/1/2008

Saudi Aramco Engineering Procedures (Index of Active SAEPs)

June 2006

Document

Title Current

Issue Previous

Issue

Next Planned Update

Index of Active SAEPs page 3 of 5

SAEP-355 Field Metallography and Hardness Testing 2/29/2003 New 3/1/2009SAEP-357 Fiber Reinforced Plastic Grating Installation Guide 2/28/2005 New 3/1/2010SAEP-358 Management of Technologically Enhanced Naturally Occurring Radioactive Material

(NORM) 3/30/2005 New 5/1/2010

SAEP-360 Project Planning Guidelines 1/31/2006 New 1/31/2011SAEP-361 Storage, Handling and Installation of Weight-Coated Pipe 5/31/2005 New 6/1/2010SAEP-362 Hand-Applied Tape Wrapping of Buried Pipe 5/31/2005 New 6/1/2010SAEP-363 Pipeline Simulation Model Development and Support 1/25/2006 New 1/25/2009SAEP-364 Process Simulation Model Development and Support 1/25/2006 New 1/25/2009SAEP-1020 Capital Program Planning 6/30/2004 2/28/2001 7/1/2009SAEP-1021 Surveying Services Division Project Control 11/23/2005 12/31/2002 12/1/2006SAEP-1024 Chemical Cleaning of New Steam Generating Equipment1 7/31/2005 1/28/2004 8/1/2010SAEP-1025 Chemical Cleaning of Boilers 2/28/2005 1/28/2004 11/1/2009SAEP-1026 Boilers Lay-Up Procedures 2/28/2005 1/28/2004 3/1/2010SAEP-1027 Pressure Relief Valve Conventional and Balanced Types 7/31/2002 1/31/2001 8/1/2007SAEP-1028 Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Systems 1/28/2004 3/31/2003 4/1/2008SAEP-1050 Guideline for Disaster Recovery Plan Development for Decision Support System 10/26/2005 7/31/2000 11/1/2010SAEP-1101 Welding Test Supplement S01 SMAW, Carbon and Low Alloy Steel Pipe, Uphill 10/29/2003 4/30/2000 11/1/2008SAEP-1102 Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pipe, Downhill 10/29/2003 4/30/2000 11/1/2008SAEP-1103 Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided 10/29/2003 4/30/2000 11/1/2008SAEP-1104 Welding Test Supplement S04 for SMAW, Stainless Steel/Nickel, Backing 10/29/2003 4/30/2000 11/1/2008SAEP-1105 Welding Test Supplement S05 for SMAW, Nickel, Single Sided 10/29/2003 4/30/2000 11/1/2008SAEP-1106 Welding Test Supplement S06 for GTAW, Aluminum with Backing 10/29/2003 4/30/2000 11/1/2008SAEP-1107 Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainless Steel Pipe 10/29/2003 4/30/2000 11/1/2008SAEP-1108 Welding Test Supplement S08 for GTAW, Nickel 10/29/2003 4/30/2000 11/1/2008SAEP-1109 Welding Test Supplement S09 for GTAW, Aluminum, Single Sided 10/29/2003 4/30/2000 11/1/2008SAEP-1110 Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pipe 10/29/2003 4/30/2000 11/1/2008SAEP-1111 Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy Steel Pipe 10/29/2003 4/30/2000 11/1/2008SAEP-1112 Welding Test Supplement S12 for SMAW, Carbon Steel, Small Diameter 10/29/2003 4/30/2000 11/1/2008SAEP-1113 Welding Test Supplement S13 for FCAW, Carbon Steel 10/29/2003 8/31/2002 11/1/2008SAEP-1114 Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel Plate 10/29/2003 4/30/2000 11/1/2008SAEP-1115 Welding Test Supplement S15 for SMAW, Stainless Steel Lap 10/29/2003 4/30/2000 11/1/2008SAEP-1116 Welding Test Supplement S16 for SMAW Nickel Lap 10/29/2003 8/31/2002 11/1/2008SAEP-1117 Welding Test Supplement S17 for SMAW, Wet Welding 10/29/2003 12/31/2000 11/1/2008

Saudi Aramco Engineering Procedures (Index of Active SAEPs)

June 2006

Document

Title Current

Issue Previous

Issue

Next Planned Update

Index of Active SAEPs page 4 of 5

SAEP-1125 Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing 10/29/2003 4/30/2000 11/1/2008SAEP-1131 Pressure Relief Valve Program Use of Form 3099A-ENG, RV Authorization 10/31/2004 6/30/2002 11/1/2009SAEP-1132 Instructions for Using the Relief Valve Test Stand 8/31/2002 4/30/2000 9/1/2007SAEP-1133 Form 3750-ENG, Pressure Relieving Device Test Report 11/13/2005 7/31/2002 12/1/2008SAEP-1134 Relief Valve Technician Certification 7/31/2004 4/30/2000 8/1/2007SAEP-1135 On-Stream Inspection Administration 2/29/2004 8/31/1999 3/1/2009SAEP-1140 Qualification of Saudi Aramco NDT Personnel 2/15/2006 7/31/2004 2/15/2011SAEP-1141 Radiation Protection for Industrial Radiography 6/29/2005 12/31/1996 7/1/2010SAEP-1142 Qualification of Non-Saudi Aramco NDT Personnel 2/29/2004 9/30/2000 3/1/2009SAEP-1143 Radiographic Examination 5/29/2002 9/30/1998 6/1/2007SAEP-1144 Magnetic Particle Examination 10/12/2005 9/30/2001 11/1/2010SAEP-1145 Liquid Penetrant Examination 10/12/2005 9/30/2001 11/1/2010SAEP-1146 Manual Ultrasonic Thickness Testing 8/31/2004 5/30/2001 9/1/2007SAEP-1150 Inspection Coverage on Projects 6/30/2004 5/31/2004 6/1/2007SAEP-1152 Approval Procedure for Ready-Mixed Concrete Mix Design 3/30/2005 3/31/2002 4/1/2008SAEP-1154 Guidelines for Contractor's Quality Plan 3/31/2004 New 4/1/2005SAEP-1160 Process Controls for Capital Projects 6/7/2006 New 6/7/2011SAEP-1350 Design Basis Scoping Paper (DBSP) Preparation and Revision Procedure 3/20/2006 11/30/2005 4/1/2010SAEP-1510 RVL – Products Management Procedure 4/30/2003 3/31/1999 5/1/2006SAEP-1610 Preparation of Functional Specification Documents 2/28/2005 1/30/2002 2/1/2007SAEP-1622 Preparation of Technical Bid Evaluation Plan Document for Process Automation Systems 4/11/2006 2/28/2005 4/11/2011SAEP-1624 Preparation of System Design Documents 2/28/2005 1/30/2002 2/1/2007SAEP-1626 Configuration and Graphics Guidelines 2/28/2005 1/30/2002 2/1/2007SAEP-1628 Preparation of Integration Specifications Document 2/28/2005 1/30/2002 2/1/2007SAEP-1630 Preparation of Integration Test Procedure Document 2/28/2005 4/30/2002 2/1/2007SAEP-1634 Factory Acceptance Test 2/28/2005 4/30/2002 2/1/2007SAEP-1636 Installation and Checkout Plan 2/28/2005 1/30/2002 2/1/2007SAEP-1638 Site Acceptance Test Plan 4/30/2002 6/28/2000 5/1/2007SAEP-1640 Operating Instructions for Process Automation Systems 2/28/2005 1/30/2002 2/1/2007SAEP-1642 Maintenance Manual for Process Automation Systems 2/28/2005 1/30/2002 2/1/2007SAEP-1661 Waste Minimization Opportunity Assessments 1/31/05 11/30/2002 2/1/2010SAEP-1662 Cleaning of Heat Exchangers and Unfired Plant Equipment 1/31/05 1/28/2004 2/1/2010SAEP-3101 Equipment and Spare Parts Data Requirements for Contractor Procured Equipment 9/30/2003 8/31/1998 10/1/2008SAEP-3102 Equipment and Spare Parts Data Requirements for SAPMT Originated Requisitions 9/30/2003 8/31/1998 10/1/2008

Saudi Aramco Engineering Procedures (Index of Active SAEPs)

June 2006

Document

Title Current

Issue Previous

Issue

Next Planned Update

Index of Active SAEPs page 5 of 5

SAEP-3103 Equipment and Spare Parts Data Requirements for Proponent/MRO Originated Requisitions 9/30/2003 8/31/1998 10/1/2008