implementation presentation
Post on 20-Jul-2015
52 Views
Preview:
TRANSCRIPT
We believe customers should be assisted in making
informed decisions about Product Lifecycle
Management
o Learn more about us and how we can help you implement a Product
Lifecycle Management (PLM) Platform tailored to support your business
model and focused on your business initiatives.
At zerowait-state.com
“PLM is in our DNA”
Zero Wait-State.
Implementation Products.
LoadState Description
Builder
GTIN
Compliance
Accelerator PLM AutofillGenerator
Product Governance & Compliance.
• Government and industry standards and
regulations are a permanent and ever changing
part of the business landscape. It is more important
than ever to be able to track and comply with these
mandates.
• Oracle’s Agile Product Governance and
Compliance (PG&C) allows organizations to
oversee the compliance of their products and
activities with standards and regulations. PG&C
links compliance data to the product record.
Product Governance & Compliance.
This allows companies…..
1. To track and maintain full compliance
2. To access regulatory information faster & provide auditors with accurate and transparent data.
3. To reduce the risk of interruption
4. To decrease product & operations cost
Key Features.
Hazardous materials compliance risk analysis and reports
Automated compliance validation and out of compliance detection whenever the product’s definition or supply chain changes
Policy and procedure documentation support and links
Support for industry data collection formats such as JGPSSI and IPC 1752
Compliance data linked to product record
Conflict Materials.What does it mean to your company?
It’s complicated legislation and there are many accounting firms and legal firms providing guidance. It applies to you if you are:
1. Listed with the S.E.C2. You manufacture products or
contract to manufacture products3. Your products contain conflict
minerals that are necessary to the functionality or production of that product for production year 2013.
4. Conflict Minerals are Tin, Tungsten, Tantalum and Gold
What you may be required to collect:
• Description of products that contain conflict minerals
• Facilities used to process those minerals
• Country of origin of those minerals
• Your efforts to determine the mine and the location of origin
You are required to file Form SD with the SEC on May 31st, 2014 and possibly a Conflict Mineral exhibit.
Compliance Initiative Process.
Check with your company’s legal department about any
ongoing activities for complying with the Dodd-Frank section
1502 filing requirements
If you have Agile PLM, let them know that the Agile PG
module is a good solution for storing the part declarations and
providing compliance with the legislation
If your company is already using Agile PG&C for RoHS
and/or REACH, or plans to in the future, you can
add/implement Conflict Minerals
Pre-Requisites
What ZWS Will Do.
• Zero Wait State will come on-site for a 2 day
workshop with your supply chain organization to
understand what you have in place now and what
you will need for compliance. • During that engagement, we can conduct an executive
briefing session so the executive team understands the
legislation, what it means to them, and any exemptions
that apply to their industry.
• We can discuss third party data gathering solutions
and how we work with them as well as our Supplier
Form Importer solution.
• Assembled a team of industry experts who specialize in PG&C
• Leverage automation tools to streamline importing information
• LoadState –Compliance Accelerator
• Ensure a quick and successful implementation experience
ZWS and Compliance.
Engineering Collaboration.
Zero Wait-State has a wealth of experience related to Engineering Collaboration (EC). Our engineers have been involved with engineering information management on the implementation and industry side for a decade. They are well versed in the challenges associated with the successful implementation of Oracle’s Agile PLM and the Engineering Collaboration module. There is no better team for the implementation, integration, migration and distribution of engineering information management systems.
• Designs integrated into product record• Access from native design applications• Mechanical and electronic CAD support• Design change management automation• View native CAD designs without the authoring tool• Live and offline design reviews
• ZWS is Oracle’s Go-To Partner for Engineering Collaboration
• ZWS is staffed with Engineering Resources that have experience with both CAD data Management and Enterprise PLM
• ZWS has an extensive track record implement Edge and Pro/Engineer/CREO
ZWS and EC.
LoadState.
In a Nutshell…LoadState is a tool that automates the process of
importing supplier information and disseminating
it throughout the PLM system. This saves time
and helps to avoid data entry errors.
Key Features.
• Reads, interprets, and imports regulatory
spreadsheet and custom spreadsheet
forms directly into Agile
• Validates the entered information, and
creates a declaration compliance status for
different specifications in Agile
• Attaches the original supplier submitted
form to the Agile declaration
Benefits.
• Avoid redundant data entry, and data
entry errors
• Use industry based or regulation
based excel forms
• Save time automating the import
process
• Increase workflow efficiency
Compliance Accelerator
Key Features.
• Builds an items description using attribute
information contained on the item.
• Attributes and associate value mappings
are kept in an excel spreadsheet.
• Spreadsheet can be check into Agile for
easy maintenance.
• Spreadsheet can be stored outside of Agile
• Descriptions can be set up to be updated
automatically or when DescriptionBuilder is
manually invoked.
Benefits.
• Saves time interpreting inconsistent
naming conventions.
• Makes it easier to find items in the
database by attribute values.
• Prevents and reduces user error and
confusion
Description Builder.
In a Nutshell…DescriptionBuilder builds an item’s description using attribute
information contained on the item. The attributes to use and
associate value mappings are kept in a spreadsheet matrix
checked into Agile for easy maintenance. Alternatively the
matrix may be stored outside of Agile for direct access in
order to boost performance.
PLM Autofill
In a Nutshell…The GTIN Generator process extension derives a unique Global Trade Identification Number (GTIN) from your product data and can generate the required Health Level 7 (HL7) Structured Product Labeling (SPL)-formatted submission data.
GTIN.Generator
top related