C O M M U N I T Y I N F O R M A T I O N M E E T I N G
Please sign in!
Provide your email address if you would like to be kept
informed of project updates and meetings.
WELCOM
January 8, 20156:30 to 8:30 pm
Fort York
Pedestrian and Cycle Bridge
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
2/10
F O R M A T O F T H E M E E T I N G
Please feel free to review the Project Boards 1 - 9 at your own pace and speak with the teammembers stationed throughout the room.
Capturing Your Thoughts
What is important to you about the Fort York Pedestrian and CycleBridge?
There are 3 ways for you to provide us with feedback:
1. Provide your feedback on Post Itnotes directly onBoard 8.
2. Fill out a comment sheetand provide to the project teambefore you leave.
3. Send us an email at fortyorkbridge@buildtoronto.ca
1
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
3/10
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
4/10
Preliminary
DesignDetailed
DesignConstructionBid
BidConceptualDesign via
RFP
Detailed
DesignConstruction
TRADITIONAL METHOD
DESIGN/BUILD METHODAgency/Consultant
Contractor
Bid
LEGEND
Qualifi-
cations
Technical
Proposal
24 -30 months
36 - 42 months
D E S I G N - B U I L D M O D E L
What is a Design-Build Model?A project delivery method in which the design and construction services are contractedfrom a single entity known as the design-builder. This model gives the design-builderflexibility and the responsibility to design and construct based on a set of requirementsand a fixed budget.
How the Design-Build Model
Best Supports the Needs of
Fort York Pedestrian and Cycle
Bridge:
Single point of responsibility helps tominimize risks to the City.
Reduces the overall project time frame.
Provides opportunity for design innovationand budget management within technicalrequirements.
3
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
5/10
BUILDTORONTO
CitysWa
terfrontSecreta
ria
t
Design-Build
er
MMMGroupLimited
City ofToronto
P R O J E C T T E A M
MMM Group Limited, a leader in thetransportation industry, was retained byBUILD TORONTOas the Owners Advisor andresponsible for:
Community consultation process Design oversight Construction oversight Scheduling and management of the proje Quality checking of all work
4
The City of Toronto directed BUILDTORONTOto work with the Citys WaterfrontSecretariat on this project and is responsiblefor:
Input to the performance baserequirements
Assistance with evaluation Future maintenance
BUILD TORONTO, an independentdevelopment investment corporationestablished by the City of Toronto, isresponsible for:
Overall delivery of project Management of design-build process and
procedures
Reviewing and providing analysis ofRequest for Supplier Qualifications andRequest for Proposals
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
6/10
K E Y M I L E S T O N E S 5
RFSQ
Issued
Oct
14
RFP
Closes
Award of
Contract
Community
Information
Meeting(Design Concepts)
Constructio
Completed
Dec
19
Apr
30
Jun
Summer Spring
Construction
Start
Fall
RFSQ
Closes
Nov
17
Shortlisted
Bidders
Finalized
Dec
22
WE
ARE
HERE
Jan
8
Community
Information
Meeting(Updated Process)
RFP
Issued
Jan
15
Sept
Tentative
Community
Information
Meeting(Construction Information)
EA Addendum
Finalized
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
7/10
D E V E L O P M E N T O B J E C T I V E S
Development Objectives
Foster a new connection for communities aroundFort York
Deliver a visually appealing, functional bridgedesign
Focus on cost-effective design that falls within theCity of Torontos fixed project budget
Evoke high quality urban design while meeting alltechnical and quality requirements
Honour the history of Fort York and Garrison Creek
Take into consideration previous and current publiccomments
6
Project Challenges
Strict project budget
Complex timeline that is coordinated with the
surrounding development initiatives
Technical requirements (elevation, air rights
above rail, national historic site)
Construction over active rail lines andpedestrian/cyclist/vehicle interaction
Material selection to construct visuallyappealing bridge that compliments the
surroundings
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
8/10
|Desig
nVision
|
InnovativeIdeas|
|Con
structabi
lity |IntegrationofGoals|
|WithinBud
get|Cost
SavingsthroughInn
ovatio
n|
|Work
Schedu
le
|
ResourceM
anagem
ent|
|Consultat
i on&
Communicatio
n|
|Const
ructi
on
Managem
ent|
|Safe
tyand
Ris
kM
an
agem
en
t
|
Si
te
Challenges
|
|ValueforMoney|
DESIGN
PRICE
CONSTRUCTI
ON
PROJECT
M
ANAGEMENT
EVALUATION
CRITERIA
E V A L UAT I O N C R I T E R I A
The three proposals will be evaluatedagainst the established criteria by aCommittee comprised of members fromboth the City and private sector.
A weighting system will be applied inorder to ensure that the key developmentobjectives of connectivity, visual appealand high quality urban design are achievedwithin the fixed budget.
7
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
9/10
SOUTH STANLEY PARK
EXTENSION
TO BE DEVELOPED AS A SMALL
MUNICIPAL PARK EXTENDING
STANLEY PARK ON THE
IMMEDIATE NORTHBARRIER-FREE
PEDESTRIAN AND
CYCLING PATH
BRIDGE LANDING/ RAMP
BASE PARK CONDITIONS
PROPOSED RAMP
SYSTEM WHICH
ANTICIPATES A BASE
PARK LAYOUT
ORDNANCE PARK
BRIDGE OVER RAIL
CORRIDOR
PROJECT CONTEXT
W H AT I S I M P O R TA N T T O Y O U ? 8
-
8/10/2019 Fort York Bridge-Display Boards for Jan 8 Meeting
10/10
N E X T S T E P S 9
THANK YOUFOR ATTENDING TODAYS
COMMUNITY INFORMATION MEETING
BUILD TORONTO
fortyorkbridge@buildtoronto.ca
416.981.3889
200 King Street W, Suite 200
Toronto, ON, M5H 3T4Please go online and visit the website
fortyorkbridge.mmm.ca
CONTACT
The next Community Information Meeting is planned for June 2015.
Please make sure we have your email addressif you want to be kept informed.