formato sena ingles 2013 veim boot
Post on 14-Aug-2015
44 Views
Preview:
TRANSCRIPT
Dirección GeneralDirección de Formación Profesional
NATIONAL SERVICE OF LEARNING
FORM FORMATION`S PROJECT
Name:Yohan Estiven Gomez CastañoGrade: 9A
Direction Web: YOHITAN1999Tel: 3217330050
1.1 Educational Institution: I.E.T.I Simona Duque
1.2 MUNICIPALITY:
Marinilla
1.2 Name of the project: VEIM-BOTT
1.3 Training Program that responds to
1.4 Estimated time of execution of the project (months):
Estimated 5 months
1.5Companies or institutions that take part in his formulation or financing : (if exist)
none
1.7 Key words of search Transport-mobility-production-sensors
2. Structure of the Project2.1 Approaching the Problem
make our VEIM-BOOT work in airports2.2 Justification of TheProject
This Project is done in order to show how well the line follow robot and its application in everyday life for the implementation in the transport and theReduction of cost in the factories.
2.3 General objetive
Develop a black line follower robot that allows the transport of products for better performance and economy
2.4 Specific objetive:
1. Improve the quality of life of people through the creation of artifacts that optimize the production and quality of the products of the company2. Look for materials that are friendly to the environmental and improve the economy
2.5 scope2.5.1 Beneficiaries of TheProject
airports and transport many loads at the same time
2.5.2 ImpactSocial
Economic Will have a positive Economic impact that will reduce costs an increase profits
Enviro mental Will have a positive environmental impact that its composition will be environmentally friendly
Technological Technological impact will improve the economy and innovator in the field of robotics
2.5.3 Restrictions or associated risks:
Could be at risk in terms of the height of the sensors and this would make Reading the line
2.5.4. Products or results of the project
Improve transportation of goods within large factories and optimizes the quality of the products and will reduce high costs
2.6:Innovation/ Technological management
The project addresses a need of the productive sectoryes/no
NO
The project improves the process / product / service exists?.yes/no
YES
The project involves the use of new techniques and process technologies
yes/noYES
The end products are susceptible to industrial protection and / or copyright
yes/noNO
The products obtained in the project can be positioned in the market.
yes/noYES
2.7 Productive assessment
With the development of the project can meet the need for a potential customer.
yes/no
YES
Feasibility of project business planYES
3. Planning
3.1 PROCESS STAGES 3.2
ACTIVITIES OF THE
PROJECT
3.3. RESULTS OF LEARNING(a partirof the program of formation)
3.4 ASSOCIATE COMPETITION
DESCRIPTION OF THE ACTIVITY TEACHERSTHAT TAKE PART
HOURS EVIDENCES
Fase 1: Fundamentación
PHASE 2:formulación
PHASE 3:DIAGNOSTIC
4 PHASE:ANALYSIS AND CONSTRUCTION OF THE
PROPOSAL
5 PHASE:
top related