formato sena ingles 2013 veim boot

5
Dirección General Dirección de Formación Profesional NATIONAL SERVICE OF LEARNING FORM FORMATION`S PROJECT Name:Yohan Estiven Gomez CastañoGrade: 9A Direction Web: YOHITAN1999Tel: 3217330050 1.1 Educational Institution: I.E.T.I Simona Duque 1.2 MUNICIPALITY: Marinilla 1.2 Name of the project: VEIM-BOTT 1.3 Training Program that responds to 1.4 Estimated time of execution of the project (months): Estimated 5 months 1.5Companies or institutions that

Upload: sergio-1998

Post on 14-Aug-2015

44 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Formato sena ingles 2013 veim boot

Dirección GeneralDirección de Formación Profesional

NATIONAL SERVICE OF LEARNING

FORM FORMATION`S PROJECT

Name:Yohan Estiven Gomez CastañoGrade: 9A

Direction Web: YOHITAN1999Tel: 3217330050

1.1 Educational Institution: I.E.T.I Simona Duque

1.2 MUNICIPALITY:

Marinilla

1.2 Name of the project: VEIM-BOTT

1.3 Training Program that responds to

1.4 Estimated time of execution of the project (months):

Estimated 5 months

1.5Companies or institutions that take part in his formulation or financing : (if exist)

none

1.7 Key words of search Transport-mobility-production-sensors

Page 2: Formato sena ingles 2013 veim boot

2. Structure of the Project2.1 Approaching the Problem

make our VEIM-BOOT work in airports2.2 Justification of TheProject

This Project is done in order to show how well the line follow robot and its application in everyday life for the implementation in the transport and theReduction of cost in the factories.

2.3 General objetive

Develop a black line follower robot that allows the transport of products for better performance and economy

2.4 Specific objetive:

1. Improve the quality of life of people through the creation of artifacts that optimize the production and quality of the products of the company2. Look for materials that are friendly to the environmental and improve the economy

2.5 scope2.5.1 Beneficiaries of TheProject

airports and transport many loads at the same time

2.5.2 ImpactSocial

Economic Will have a positive Economic impact that will reduce costs an increase profits

Enviro mental Will have a positive environmental impact that its composition will be environmentally friendly

Technological Technological impact will improve the economy and innovator in the field of robotics

2.5.3 Restrictions or associated risks:

Could be at risk in terms of the height of the sensors and this would make Reading the line

2.5.4. Products or results of the project

Improve transportation of goods within large factories and optimizes the quality of the products and will reduce high costs

Page 3: Formato sena ingles 2013 veim boot

2.6:Innovation/ Technological management

The project addresses a need of the productive sectoryes/no

NO

The project improves the process / product / service exists?.yes/no

YES

The project involves the use of new techniques and process technologies

yes/noYES

The end products are susceptible to industrial protection and / or copyright

yes/noNO

The products obtained in the project can be positioned in the market.

yes/noYES

2.7 Productive assessment

With the development of the project can meet the need for a potential customer.

yes/no

YES

Feasibility of project business planYES

3. Planning

Page 4: Formato sena ingles 2013 veim boot

3.1 PROCESS STAGES 3.2

ACTIVITIES OF THE

PROJECT

3.3. RESULTS OF LEARNING(a partirof the program of formation)

3.4 ASSOCIATE COMPETITION

DESCRIPTION OF THE ACTIVITY TEACHERSTHAT TAKE PART

HOURS EVIDENCES

Fase 1: Fundamentación

PHASE 2:formulación

PHASE 3:DIAGNOSTIC

4 PHASE:ANALYSIS AND CONSTRUCTION OF THE

PROPOSAL

5 PHASE: