energy resource recovery account (erra) review of ... ·...

Post on 19-Aug-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Energy Resource Recovery Account (ERRA)Review Of Operations, 2018 Chapters I-VII

i.e.

e.g.

inter

alia

See

Table I-1 2018 Forecast & Recorded Fuel and Purchased Power Revenue Requirement

($000)

i.e.

e.g.

demonstrate

ooo

ooooo e.g.

ex post

ex ante

e.g.

e.g.

discretionary

e.g. e.g.

e.g.

e.g.

See

e.g.

Table II-2 Summary of 2018 Thermal Resource Incremental Bid Cost Exceptions

Table II-3 2017-2018 MSG Transition Cost Impacts

Table II-4 Background Summary of 2018 Resource Capacity and Awards

i.e

Table II-5 Summary of 2018 Day-Ahead Spot Electric Transactions

(Physical and Financial)

e.g.

Table II-6 Summary of 2018 Hour-Ahead Spot Electric Transactions

(Physical and Financial)

i.e.

e.g

Table II-7 Summary of 2018 Spot Gas Transactions

Figure III-1 Typical Hydroelectric Generating Station

e.g.,

i.e.,

Table III-8 SCE Large Hydro Powerhouses

available at

i.e.

i.e.

e.g.,

i.e.

i.e.

Table III-9 SCE Hydro – 2018 Recorded Hydro Production

i.e.,

i.e.,

i.e.

Table III-10 SCE Large Hydro – Equivalent Availability Factor (EAF)

i.e.,

i.e.

i.e.

Table III-11 SCE Large Hydro – Forced Outage Factor (FOF)

i.e.,

available at

e.g.,

i.e.

i.e

e.g.,

Table III-12 SCE Large Hydro – 2018 Scheduled Outages

i.e.

Table III-13 SCE Large Hydro – 2018 Unscheduled Outages

(Lasting Longer than 24 Hours on Units Greater Than 25MW)

e.g.

i.e.,

e.g.

e.g.

i.e.

Table IV-14 SCE Peakers - 2018 Generation and Starts

i.e.

Table IV-15 SCE Peakers - 2018 Fuel Usage & Cost

i.e.

i.e.

i.e.,

i.e.

Table IV-16 SCE Peakers - 2018 Reliability

e.g.,

available at

Table IV-17 SCE Peakers - 2018 Scheduled Outage Results

i.e.,

i.e.,

Table IV-18 SCE Peakers - 2018 Unscheduled Outages Exceeding 24hrs

i.e.,

i.e.

i.e.

Table IV-19 SCE Mountainview - 2018 Generation

Table IV-20 SCE Mountainview – 2018 Fuel Usage & Cost

i.e.

i.e.,

i.e.

i.e.

i.e.

i.e.

i.e.,

Table IV-21 SCE Mountainview - Availability Targets

i.e.

i.e.

i.e.

i.e.

i.e.

i.e.,

i.e.,

Table IV-22 SCE Mountainview - 2018 Availability

Table IV-23 SCE Mountainview – 2018 Reliability

i.e.,

i.e.

e.g.,

i.e

i.e

i.e.

Table IV-24 Mountainview – 2018 Scheduled Outage Extensions and Unscheduled Outages

(Lasting Longer than 24 Hours)

i.e

i.e.

i.e.,

i.e.

i.e

i.e.,

i.e.,

i.e

e.g

i.e

i.e

i.e.,i.e.,

i.e.,

i.e.,

i.e.,i.e.,

i.e.,

i.e.,i.e.,

i.e

i.e

i.e

e.g.,

i.e.,

i.e., i.e

i.e.,

i.e.,

i.e.,

i.e.,

i.e.

i.e.,

i.e

i.e

(i.e.,

Table V-25 Catalina Operations Diesel Fuel

2018 Recorded Delivered Diesel Costs

Table V-26 Catalina Operations Diesel Fuel

2018 Recorded Delivered Diesel Costs

Table V-27 Catalina Operation Propane Fuel

2018 Recorded Delivered Propane Costs

Table V-28 SCE-Owned Solar PV Plants

Id.

See generally

i.e.

i.e.,

i.e.

i.e.

i.e.

i.e.

i.e

See

i.e.

See

Table V-29 SCE Fuel Cells – 2018 Performance

Note 1: The UCSB fuel cell is an electric only fuel cell and does not provide any thermal output.

Table V-30 SCE Fuel Cell – 2018 Fuel Cell Usage and Cost

i.e.

Table VI-31 2018 Record Period Generation

Table VI-32 2012-2017 EAF and FOF Palo Verde Generation

Table VI-33 2018 Palo Verde Generation (Net MWh, 100% Share)

Table VI-34 2018 Palo Verde Unit 1 Scheduled/Unscheduled Shutdowns

See

available at

See

available at

Table VI-35 2018 Palo Verde Unit 2 Scheduled/Unscheduled Shutdowns

Table VI-36 2018 Palo Verde Unit 3 Scheduled/Unscheduled Shutdowns

Table VI-37 Nuclear Fuel Energy Production and Expense

Table VI-38 Typical Reload Nuclear Fuel Procurement Schedule – Months

e.g.

i.e.

available at

available at

See

See

available at

available at https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill id=201720180SB100.

inter alia

i.e.

See

Table VII-39 Conventional Projects Costs Recovered Through CAM and ERRA

January 2, 2018 Through December 31, 2018

See

force majeure

inter alia

Table VII-41 SCE BTM Contract Consents and Consents to Assignments

January 1, 2018 through December 31, 2018

Table VII-42 Contract Capacity Demonstrations

January 1, 2018 through December 31, 2018

Table VII-43 BTM Contracts that Terminated

January 1, 2018 Through December 31, 2018

Table VII-44 BTM Contracts that Achieved Commercial Operation

January 1, 2018 Through December 31, 2018

i.e.

Table VII-46 Conventional Projects that Began Operations January 1, 2018 Through December 31, 2018

Table VII-47 New Conventional and Natural Gas ContractsJanuary 1, 2018 Through December 31, 2018

Table VII-49 Conventional Contract Terminations

January 1, 2018 Through December 31, 2018

Table VII-50 Non-Coincident Contract Capacity Quantities and

Expiration Dates for SCE’s Major Inter-utility for 2018 Contract

See, e.g.

available at

Id.

Table VII-51 PURPA and CHP Contract Costs Recovered Through CAM and ERRA

Table VII-52 PURPA and CHP Contracts that Achieved Commercial Operation

January 1, 2018 Through December 31, 2018

Table VII-53 PURPA and CHP New Contracts Executed

January 1, 2018 Through December 31, 2018

Table VII-54 PURPA and CHP Contract Amendments and Letter Agreements

January 1, 2018 Through December 31, 2018

Table VII-55 CHP and PURPA Contract Consents and Consents to Assignments

January 1, 2018 Through December 31, 2018

force majeure

Table VII-56 PURPA and CHP Uncontrollable Force Claims Tendered and/or Pending

January 1, 2018 Through December 31, 2018

orce majeure

Table VII-57 PURPA and CHP Contract Terminations

January 1, 2018 Through December 31, 2018

Table VII-58 RPS Contracts that Achieved Commercial Operation

January 1, 2018 Through December 31, 2018

Table VII-59 New RPS Contracts Executed

January 1, 2018 Through December 31, 2018

Table VII-61 RPS Contract Consents and Consents to Assignments

January 1, 2018 Through December 31, 2018

Force Majeure

Table VII-62 RPS Uncontrollable Force Claims Tendered and/or Pending

January 1, 2018 Through December 31, 2018

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force Majeure

Force

Majeure

Force Majeure

Force Majeure

Force Majeure

Table VII-63 RPS Contract Terminations

January 1, 2018 Through December 31, 2018

Table VII-64 PURPA and RPS ACH Letter Agreements & Amendments

January 1, 2018 Through December 31, 2018

See

Table VII-65 CapPerformance Failures

January 1, 2018 Through December 31, 2018

Table VII-66 Projects That Failed to Submit Operation

and Efficiency Data for Calendar Year 2017

See

Table VII-67 Renewable Capacity Verifications

January 1, 2018 Through December 31, 2018

see

Table VII-68 RPS Active Monitoring

January 1, 2018 Through December 31, 2018

i.e.

e.g.

oo

Table VII-69 QF Legacy Amendment Energy Pricing Options

QF Legacy Amendment Energy Pricing Options

e.g.

e.g.

top related