Energiarbete i praktiken PICASSO. Agneta Ring Environmental Manager BT Products AB. Bild från Klas. Klas Gustafsson VD Mjölby Svartådalen Energi AB. Verksamheten i Mjölby. BT Flygfoto 2003. PROJECT PICASSO. Target Tact time:1,8 min Capacity70.000 forklifts/ year, 2-shift - PowerPoint PPT Presentation

TRANSCRIPT

Energiarbete i praktikenPICASSO

Agneta RingEnvironmental ManagerBT Products AB

Klas GustafssonVDMjölby Svartådalen Energi AB

Bild från Klas

Verksamheten i Mjölby

BT Flygfoto 2003

PROJECT PICASSO

TargetTact time: 1,8 min

Capacity 70.000 forklifts/ year, 2-shift

SpecificationNew automated powder paint line.

For forklift parts from Riders sortiment.Total process time: ~3,5 h

Max weight: 1200 kgMax mess.: LxWxH 3200x1600x2300 mm

Colors: Black 2 automated booths (robots)Orange 1 automated booth (robots)

Special 1 booth (manual)