driving cme process innovation using lean six sigma

Post on 16-Oct-2021

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Driving CME Process Innovation Using Lean Six Sigma Methodologies Danielle Milbauer

Administrative Director, NYU Post-Graduate Medical School 212.263.5294 danielle.milbauer@nyumc.org

Raja Venkata Akunuru Director, Client Services, EthosCE and DLC Solutions 732.501.5526 rvenkata@dlc-solutions.com Jeremy C. Lundberg Chief Executive Officer, EthosCE and DLC Solutions 267.234.7401 jlundberg@dlc-solutions.com

Maria Mercado Registrar, NYU Post-Graduate Medical School 212.263.5295 maria.mercado@nyumc.org Sheila Moaleman Advertising Coordinator, NYU Post-Graduate Medical School 212.263.2984 sheila.moaleman@nyumc.org Reed Morgan RSS Coordinator, NYU Post-Graduate Medical School 212.263.8153 reed.morgan@nyumc.org Samantha Phillips Exhibits Coordinator, NYU Post-Graduate Medical School 212.263. 2885 samantha.phillips@nyumc.org

Disclosures •Danielle Milbauer- Planner and Presenter- reports no relevant financial relationships

•Raja Venkata Akunuru- Planner and Presenter- Director, Client Services, EthosCE, a LMS for providers in Continuing Education

• Jeremy C. Lundberg- Moderator- Chief Executive Officer, EthosCE, a LMS for providers in Continuing Education •Maria Mercado- Planner- reports no relevant financial relationships

•Sheila Moaleman- Planner- reports no relevant financial relationships

•Reed Morgan- Planner- reports no relevant financial relationships

•Samantha Phillips- Planner- reports no relevant financial relationships

3

Objectives

• Define the concept of Lean Six Sigma

• Describe the five steps involved in the Lean Six Sigma process

• Map the current and ideal state of a process

• Understand the constraints that drive the future state of a process

4

Presentation Title

5

Driving Process Innovation with Lean Six Sigma: The NYU Success Story

6

NYU: Where Were We? December 2011

Injury Employee Frustration

Redundancy Uncollected Debt

$65,000

7

NYU: What Did We Do? Lean Six Sigma: Rapid Improvement Event

8

NYU: Where Are We Now? January 2014

9

NYU: Where Are We Now? January 2014

No Injuries Drastically Reduced

Redundancy

Employee Satisfaction

No Uncollected

Debt 83%! Incorporating Interprofessional Education in CME

10

Lean Six Sigma The Perfect Union

Lean Concept

11

• Eliminate Wastes

• Anything that the customer is not willing to pay for

“Process improvement methodology that eliminates wastes”

Six Sigma Concept

12

• Quality

• Consistency

• Quality and cost of business inversely related

Quantitative process improvement methodology that targets to eliminate defects and increase process consistency.

Lean Six Sigma The Union

13

No Wastes +

Lean Six Sigma

No Defects

Lean Six Sigma

Better Faster Cheaper Process

=

“Quantitative set of tools and techniques to eliminate defects, wastes and increase process consistency and customer satisfaction”

Presentation Title

14

Lean Six Sigma Model for Business Process Excellence

Lean Six Sigma The five steps: DMAIC

15

Define

Measure

Analyze Improve

Control

Case Study

Please follow along with the case study you have been provided

16

Presentation Title

17

Step 1: Define Know where your bucks come from. Don’t try to fix the world!

18

DMAIC: Define Project Charter

Project Charter Problem Statement: Describe the pain point Scope: Set boundaries Goals: Be quantitative Team Members: Involve the right people

Project Mission:

Objectives:

Project Scope:

Charter Summary For:

Sponsor:

Team Leader(s):

Team Members:

Project Dates:

Champion:

Supportive Leadership:

Subject Matter Experts: A: B: C: D: E: F G: H:

Black Belt(s):

Monument(s):

Background/Problem Statement:

20

DMAIC: Define Project Charter Problem Statement: • Multiple agenda formats received in CE office • Lack of communication regarding agenda changes • Redundancy in agenda process • Employee satisfaction is low Scope: Receipt of original course agenda to agenda finalized for syllabus Goals: • Reduce FTE effort associated with agenda by 85% • Improve employee morale by 20% Team Members: Jon, Sasha, Peter, Course Director Champion: Danielle Milbauer and Raja Venkata Akunuru

Specific Measureable Achievable Realistic Time-bound

Presentation Title

21

Step 2: Measure Map it, Map it and Map it!

22

DMAIC: Measure

Pain point

Gather relevant stakeholders

Use appropriate process mapping tools

Map the current process

Stop

Start

“Measure” the process baseline

23

DMAIC: Measure Process Maps: Where do I begin? • Write down each step on a post-it note

• Remember: Every step counts! • i.e. Milk for your coffee

• Each person’s steps should be mapped in their own row • Don’t forget to include wait time as a step

24

DMAIC: Measure Decision Box

Decision

Collect more information

Proceed Yes

No

25

DMAIC: Measure Metrics Are Measured

Amount of Time Spent: 70 minutes

Total Amount Per Academic Year: 2,800 minutes or 5.83 business days

Number: 40 courses per year

Presentation Title

26

Step 3: Analyze The devil is in the details.

27

DMAIC: Analyze

Value Added

(VA)

Required

NVA

Non-Value Added (NVA)

Would the customer be willing to “pay” for this?

Waste! Refer to “Lean Six Sigma: 8 Wastes”

Can you complete the process without this step?

Presentation Title

28

Step 4: Improve Get the ball rolling.

29

DMAIC: Improve Step 1: Map the Ideal State

Step 2: Identify and discuss constraints

Step 3: Map the Future State

30

DMAIC: Improve Mapping the Ideal State: Brainstorming!

Tips: • Always keep your Value- added steps in mind • Start from scratch

• Forget about constraints!

DMAIC: Improve Getting from the Ideal to Future State

• Add constraints back into the process

31

32

DMAIC: Improve Creating a Future State

33

DMAIC: Improve Implementation Plan

34

DMAIC: Improve Improved Metrics Are Realized

Amount of Time Spent: 10 minutes

Amount of Time Saved: 60 minutes

Total Amount Saved Per Academic Year: 2,400 minutes or 5 business days

Presentation Title

35

Step 5: Control Remember Murphy’s Law.

36

DMAIC: Control

Today 6 months later

People Process Systems Customer requirements Business drivers

Change

We need to fix this!

37

DMAIC: Control

• Realize the current metrics

• Develop control plan • Indicates whether process is broken

• Conduct process reassessment checks

38

DMAIC: Control Process Improvement Continuum

Presentation Title

39

Questions?

top related