cv_ubcoskuner august-2015
Post on 29-Jan-2018
250 Views
Preview:
TRANSCRIPT
Page 1 of 6
CURRICULUM VITAE AUGUST, 2015 Personal Data: Name : Uğur Bekir Family Name : COŞKUNER Profession : Mechanical Engineer Born : March 27, 1951 Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university) Foreign Language : English (Fluent written and spoken) Nationality : Turkish Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25 Çankaya/ANKARA/TURKIYE Phone : + 90 (312) 236 46 65 Mobile Phone : + 90 532 525 87 97 E-mail : ubc@ubcmuhendislik.com
ubcoskuner@superonline.com Web : http://www.ubc-engineering.com Work experience and references: March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd. As Founder and Company Manager The Company UBC was established in march, 2009 to provide out source consulting and engineering services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and commissioning of the electromechanical equipment of hydro-power plants. The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro Power Plants are as follows ;
− Plant optimization, defining of the equipment data and characteristics, − Preparing of the technical specification for E-M equipment, − Bidding negotiations, − Preparing of contract document, − Engineering, design and project works, − Manufacturing of the equipment, − FAT factory acceptance tests, − Erection and installation of E-M equipment, − Field tests and commissioning works,
Page 2 of 6
− Field ministry acceptance and performance tests, − Due diligence reports for all investment and operational stages of the hydro-power plants, − Maintenance and repair works for the plants in operation,
The reference hydro-power plants are given in below tables ;
No NAME OF HEPP UNIT OUTPUTS
INSTALLED OUTPUT
LOCATION OF THE
PROJECT OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
1. BOYABAT DAM AND HEPP 3 X 170 MW 510 MW TURKIYE
BOYABAT ENERJİ
DOĞAN /DOĞUŞ/UNIT IN OPERATION ANDRITZ/AUSTRIA
2. YEDIGOZE DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE
SIEMENS TURKIYE
3. CEVİZLİ HEPP 2 X 50 MW 100 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE SIEMENS TURKIYE
4. KALKANDERE 2 X 22 MW 44 MW TURKIYE SANKO HOLDING UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE
5. ALPASLAN-2 DAM and HEPP
2X 116.7 MW +
2 X 31,3 MW
296.12 MW
TURKIYE ENERJİSA IN OPERATION ALSTOM-FRANCE
6. ASLANCIK DAM AND HEPP 2 x 60 MW 120 MW TURKIYE
ASLANCIK ELEKTRİK DOĞAN/DOĞUŞ/ ANADOLU GRUP
IN OPERATION RAINPOWER NORWAY
7. ULUABAT DAM AND HEPP 2 X 50 MW 100 MW TURKIYE AK ENERJİ IN OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
8. DARICA HEPP 2 X 49 MW 98 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION VOITH-AUSTRIA SIEMENS TURKIYE
9. BUCAKKIŞLA 2 X 26 MW 52 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION ANDRITZ / FRANCE
10. PARAVANI (GÜRCİSTAN) 2X47 MW 94 MW GEORGIA
GEORGIAN URBAN ENERGY ANADOLU GROUP
IN OPERATION ALSTOM/ SPAIN
11. AKOCAK HEPP
2 X 40 MW 80 MW TURKIYE AKENERJI UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE
12. FEKE-1 HEPP 2 X16,5 MW 33 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
13. FEKE-2 HEPP 2 X 35.5 MW 70 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
14. BURÇ BENDI HEPP 3 X 9,3 MW 27,9 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
15. HIMMETLI HEPP 2 X 16 MW 32 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA
16. GÖKKAYA HEPP 2 X 17 MW 34 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA
17. BULAM HEPP 2 X 3.5 MW 7 MW TURKIYE AKENERJI IN OPERATION KÖSSLER AUSTRIA
18.
ERIC-1 DAM and
MAIN HEPP +
ECO HPP
2 X74,25 MW +
1 X 3.88 MW 152.38 MW TURKIYE PALMET
ENERJI E&m CONTRACT WAS SIGNED ZEFU / CHINA
19. ERIC-2
MAIN HEPP +
ECO HEPP
2 X 25.7 MW +
1 X 1.87 MW 53.27 MW TURKIYE PALMET
ENERJI Bidding Negotiations
Page 3 of 6
No NAME OF HEPP UNIT OUTPUTS
INSTALLED OUTPUT
LOCATION OF THE
PROJECT OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
20. ERIC-3
MAIN HEPP +
ECO HEPP
2 X 22.86 MW +
1 X 1.86 MW
47,58 MW TURKIYE PALMET ENERJI Bidding Negotiations
21. ERIC-4
MAIN HEPP +
ECO HEPP
2 X 29.37 MW +
1 X 1.61 MW
60,35 MW TURKIYE PALMET ENERJI
E&m CONTRACT WAS SIGNED ZEFU / CHINA
22. SAMİ SOYDAM DAM and HEPP 2X 66,1 MW 132.2 MW TURKIYE ZORLU
HOLDING Bidding Negotiations
23. TEPEKIŞLA DAM and HEPP
2 x 34 MW +
12 MW 80 MW TURKIYE SANKO
HOLDING UNDER INSTALLATION ALSTOM SIEMENS TURKIYE
24. ARAKALI HEPP
2 x 4.7 MW 24 MW
GEORGIA GEORGIAN URBAN ENERGY AĞAOĞLU HOLDING
BIDDING NEGOTIATIONS
25.
ABULI HEPP
2 X12 MW 9,4 MW
26. BUCAKKIŞLA 2 x 20.3 MW 40,6 MW TURKIYE BİLGİN ELEKTRİK UNDER INSTALLATION ANDRITZ FRANCE
27. ERENLER 2 x 23.4 MW 46,8 MMW TURKIYE ENERJİSA IN OPERATION DONGFANG CHINA
28. KUMKÖY 2 x 5.98 MW 11,96 MW TURKIYE AES/USA & ENTEK IN OPERATION HARBİN (KEM) CHINA
29. KIRIKDAĞ HES 2X 8.9 MW 17,8 MW TURKIYE ÖZENİR ENERJİ IN OPERATION ANDRITZ FRANCE
30. BAYRA HEPP 2X 4,6 MW 9,2 MW
TURKIYE ARSAN GROUP
IN INSTALLATION GEBBERT / AUSTRIA
31. KAYAKÖPRÜ-1 HEPP
2X16,2 W 33,4 MW
IN OPERATION
CCOEC CHINA AYKEN TURKIYE ATES TURKIYE
32. KAYAKÖPRÜ-2 HEPP
2X 5,3 MW 10,6 MW
33. KIRAN HEPP
2X 4,9 MW 9,8 MW
34. KÖPRÜBAŞI HEPP
2X 7,7 MW 15,4 MW
35. HORYAN HEPP 2X 2,8 MW 5,6 MW 36. KIY HEPP 2 X 12 MW 24 MW ANDRITZ / FRANCE
ANDRITZ / TURKIYE 37. ÇAĞLAYAN HEPP 2X3,5 MW 7 MW TURKIYE IN OPERATION GHE / AUSTRIA
38. SIRAKONAKLAR HES 2X 6.2 MW 12,4 MW TURKIYE 2M ENERJI IN OPERATION ANDRITZ FRANCE ANDRITZ TURKIYE
39. ÇAMBAŞI 3x16.5 W 49,5 MW TURKIYE ENERJISA IN OPERATION VOITH-SIEMENS 40. KUŞAKLI 2 X 11 MW 22 MW TURKIYE ENERJISA
IN OPERATION ANDRITZ FRANCE
41. KIZILAĞAC 2x 3.5 MW 7 MW TURKIYE SANKO HOLDİNG IN OPERATION CWTW- CHINA KESIR-TURKIYE
42. KOÇLU 2 x 19 MW 38 MW TURKIYE SANKO HOLDİNG IN OPERATION ALSTOM-SPAIN SIEMENS-TURKIYE
43. EBRU 2X15.5 W 31 MW TURKIYE AES – USA & ENTEK IN OPERATION YUNG-HE
44. HAMZALI
2 X 8.5 MW 17 MW
TURKIYE ENSO AVUSTRIA IN OPERATION VOITH-INDAR
45. REŞADIYE 1
2 X 8 MW
16 MW
46. REŞADIYE 2
2 X 13.5 W 27 MW
47. REŞADIYE 3
2 X 11.5 MW 23 MW
48. KEPEZKAYA
2 x 14.8 MW 29,6 MW
TURKIYE AES - USA & ENTEK
IN OPERATION HARBIN (KEM) 49.
DAMLAPINAR
2 x 8.6 MW 17,2 MW
50. KULP-IV 2 X 8,6 MW 17,2 MW
Page 4 of 6
May,2005 – March,2009 As Free Lancer and Solution Partner of HD - Hidrodizayn Engineering, Consultancy and Civil Works Ltd. Providing the consultancy and engineering services for the electromechanical equipment of hydropower plants including the preparation of technical specifications, Bidding documents, technical negotiations, evaluation of the Bid and Owner’s engineering services for basic design & drawings, manufacturing, erection and commissioning works, for the following Owners and Hydro Power Plants;
POWER PLANT OUTPUT (MW) CLIENT PROGRESS STAGE CONTRACTOR
YEDİGÖZE 2 X 158 SANKO HOLDING In operation ALSTOM-SIEMENS TR CEVİZLİK 2 X 50 SANKO HOLDING In operation ALSTOM-SIEMENS TR KALKANDERE 2 x 22 SANKO HOLDING In operation KAYALAR 2 x 16.5 SANKO HOLDING Bidding SELİN -1 2 x 3.5 SANKO HOLDING Bidding ULUABAT 2 X 50 AK ENERJİ In operation VOITH-SIEMENS TR AKOCAK 2 X 40 AK ENERJİ In operation VOITH-SIEMENS TR FEKE - 1 2 x 16.5 AK ENERJİ Manufacturing ECIDI- ZEFU/CHINA FEKE -2 2 X 35.5 AK ENERJİ In operation ECIDI- ZEFU/CHINA BURÇ 3 X 9.3 AK ENERJİ In operation ECIDI- ZEFU/CHINA BULAM 2 X 3.5 AK ENERJİ In operation KÖSSLER HIMMETLI 2 X16 AK ENERJİ In erection GÖKKAYA 2 x 17 AK ENERJİ In erection GÜNDER 2 X 15.5 AKKANAT HOLDING In erection ANDRITZ (VATECH) DAMLA - 2 AKKANAT HOLDING Bidding KAYAKOPRU -1 2 X 16.2 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KAYAKOPRU -2 2 X 5.3 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KIRAN 2 X 4.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA CEVİZ 2 X 3.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KÖPRÜBAŞI 2 X 7.7 ARSAN İNŞ. In erection CCOEC-KEM /CHINA HORYAN 2 X 2.8 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
2003, october-2005, may - As Free Lancer 2002 – 2003, October - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Consultant of General Manager
1988 – 2002 Head of Project Department - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC Responsible for the technical coordination and scheduling of the works, engineering, design, project, manufacturing, erection and commissioning works of Power Plants undertaken and realized by TEMSAN as given below,
Page 5 of 6
POWER PLANT OUTPUT (MW) OWNER PROGRESS STAGE CONTRACTOR
BATMAN 3 X 62+5.7 DSİ In Operation TEMSAN-NOELL
DİCLE 2 X 55 DSİ In Operation TEMSAN-VOITH-RESITA
KRALKIZI 2 X 46 DSİ In Operation TEMSAN-ELIN-VOITH
KÜRTÜN 2 X 40 DSİ In Operation TEMSAN-ELIN-VOITH
SUATUĞURLU 1 X 25 DSİ In Operation TEMSAN-VOITH-RESITA
ÇAMLIGÖZE 2 X 16 DSİ In Operation TEMSAN-VOITH-RESITA
KUZGUN 3 X 6.8 +2.2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
TERCAN 3 X 5 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
BEYKÖY 3 X 6.2 DSİ In Operation TEMSAN-ELIN-VOITH
MERCAN 3 X 6 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
KEPEZ II 3 X 3.5 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
IVRIZ 2 X 0.5 DSİ In Operation TEMSAN-HITZINGER
HOŞAP 2 X 2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
KOÇKÖPRÜ 2 X 2.2 DSİ In Operation TEMSAN-JEUMONT
1987 - 1988 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Project Manager 1983 - 1987 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Design Manager - Hydraulic design works for francis turbines - Preparation of the general layout and the technical specification for electromechanical equipment of HEPP. 1979 - 1983 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Chief Engineer - Preparation of the feasibility report of the Steam Boilers Factory (for thermal power plants) and the documents for license agreement and general layout of the machinery and equipment. 1978 - 1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Chief engineer For site erection of Soma B Thermal Power Plant 2 x 165 MW 1977 - 1978 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) Technical training on manufacturing, erection and maintenance of the equipment of Thermal Power Plant in Finland and Czechoslovakia ( current name is Republic of Slovakia)
Page 6 of 6
1976 -1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Responsible engineer Operational and maintenance works for Soma A Thermal Power Plant. 1974 - 1976 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Maintenance engineer Soma A Thermal Power Plant. THE FIELD OF EXPERTISE FOR HEPP:
For the hydro-power plants; − Plant optimization, defining of data and characteristics, − Preparing of the technical specification for e-m equipment, − Bidding negotiations, − Preparing of contract document − Engineering, design and project works − Manufacturing of the equipment − FAT factory acceptance tests − Erection of equipment − Field tests and commissioning works − Field ministry acceptance and performance tests − Operation, maintenance and repair works for the plants
EDUCATION: UNIVERSITY OF GAZI 1973 A.D.M.M.A Mechanical Engineering ADDITIONAL INFORMATION:
- License for motor vehicle. - Free for Traveling - Free for office,workshop and site works
HOBBIES AND INTERESTS: - Music : Classics and Contemporary - Reading : Philosophy, Science Fiction - Fresh Water Aquarium : Discus care
top related