cv_ubcoskuner august-2015

6
Page 1 of 6 CURRICULUM VITAE AUGUST, 2015 Personal Data: Name : Uğur Bekir Family Name : COŞKUNER Profession : Mechanical Engineer Born : March 27, 1951 Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university) Foreign Language : English (Fluent written and spoken) Nationality : Turkish Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25 Çankaya/ANKARA/TURKIYE Phone : + 90 (312) 236 46 65 Mobile Phone : + 90 532 525 87 97 E-mail : [email protected] [email protected] Web : http://www.ubc-engineering.com Work experience and references: March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd. As Founder and Company Manager The Company UBC was established in march, 2009 to provide out source consulting and engineering services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and commissioning of the electromechanical equipment of hydro-power plants. The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro Power Plants are as follows ; Plant optimization, defining of the equipment data and characteristics, Preparing of the technical specification for E-M equipment, Bidding negotiations, Preparing of contract document, Engineering, design and project works, Manufacturing of the equipment, FAT factory acceptance tests, Erection and installation of E-M equipment, Field tests and commissioning works,

Upload: ugur-bekir-coskuner

Post on 29-Jan-2018

250 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV_UBCOSKUNER AUGUST-2015

Page 1 of 6

CURRICULUM VITAE AUGUST, 2015 Personal Data: Name : Uğur Bekir Family Name : COŞKUNER Profession : Mechanical Engineer Born : March 27, 1951 Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university) Foreign Language : English (Fluent written and spoken) Nationality : Turkish Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25 Çankaya/ANKARA/TURKIYE Phone : + 90 (312) 236 46 65 Mobile Phone : + 90 532 525 87 97 E-mail : [email protected]

[email protected] Web : http://www.ubc-engineering.com Work experience and references: March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd. As Founder and Company Manager The Company UBC was established in march, 2009 to provide out source consulting and engineering services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and commissioning of the electromechanical equipment of hydro-power plants. The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro Power Plants are as follows ;

− Plant optimization, defining of the equipment data and characteristics, − Preparing of the technical specification for E-M equipment, − Bidding negotiations, − Preparing of contract document, − Engineering, design and project works, − Manufacturing of the equipment, − FAT factory acceptance tests, − Erection and installation of E-M equipment, − Field tests and commissioning works,

Page 2: CV_UBCOSKUNER AUGUST-2015

Page 2 of 6

− Field ministry acceptance and performance tests, − Due diligence reports for all investment and operational stages of the hydro-power plants, − Maintenance and repair works for the plants in operation,

The reference hydro-power plants are given in below tables ;

No NAME OF HEPP UNIT OUTPUTS

INSTALLED OUTPUT

LOCATION OF THE

PROJECT OWNER PHASE ELECTROMECHANICAL

CONTRACTOR

1. BOYABAT DAM AND HEPP 3 X 170 MW 510 MW TURKIYE

BOYABAT ENERJİ

DOĞAN /DOĞUŞ/UNIT IN OPERATION ANDRITZ/AUSTRIA

2. YEDIGOZE DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE

SIEMENS TURKIYE

3. CEVİZLİ HEPP 2 X 50 MW 100 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE SIEMENS TURKIYE

4. KALKANDERE 2 X 22 MW 44 MW TURKIYE SANKO HOLDING UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE

5. ALPASLAN-2 DAM and HEPP

2X 116.7 MW +

2 X 31,3 MW

296.12 MW

TURKIYE ENERJİSA IN OPERATION ALSTOM-FRANCE

6. ASLANCIK DAM AND HEPP 2 x 60 MW 120 MW TURKIYE

ASLANCIK ELEKTRİK DOĞAN/DOĞUŞ/ ANADOLU GRUP

IN OPERATION RAINPOWER NORWAY

7. ULUABAT DAM AND HEPP 2 X 50 MW 100 MW TURKIYE AK ENERJİ IN OPERATION VOITH-AUSTRIA

SIEMENS TURKIYE

8. DARICA HEPP 2 X 49 MW 98 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION VOITH-AUSTRIA SIEMENS TURKIYE

9. BUCAKKIŞLA 2 X 26 MW 52 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION ANDRITZ / FRANCE

10. PARAVANI (GÜRCİSTAN) 2X47 MW 94 MW GEORGIA

GEORGIAN URBAN ENERGY ANADOLU GROUP

IN OPERATION ALSTOM/ SPAIN

11. AKOCAK HEPP

2 X 40 MW 80 MW TURKIYE AKENERJI UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE

12. FEKE-1 HEPP 2 X16,5 MW 33 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA

13. FEKE-2 HEPP 2 X 35.5 MW 70 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA

14. BURÇ BENDI HEPP 3 X 9,3 MW 27,9 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA

15. HIMMETLI HEPP 2 X 16 MW 32 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA

16. GÖKKAYA HEPP 2 X 17 MW 34 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA

17. BULAM HEPP 2 X 3.5 MW 7 MW TURKIYE AKENERJI IN OPERATION KÖSSLER AUSTRIA

18.

ERIC-1 DAM and

MAIN HEPP +

ECO HPP

2 X74,25 MW +

1 X 3.88 MW 152.38 MW TURKIYE PALMET

ENERJI E&m CONTRACT WAS SIGNED ZEFU / CHINA

19. ERIC-2

MAIN HEPP +

ECO HEPP

2 X 25.7 MW +

1 X 1.87 MW 53.27 MW TURKIYE PALMET

ENERJI Bidding Negotiations

Page 3: CV_UBCOSKUNER AUGUST-2015

Page 3 of 6

No NAME OF HEPP UNIT OUTPUTS

INSTALLED OUTPUT

LOCATION OF THE

PROJECT OWNER PHASE ELECTROMECHANICAL

CONTRACTOR

20. ERIC-3

MAIN HEPP +

ECO HEPP

2 X 22.86 MW +

1 X 1.86 MW

47,58 MW TURKIYE PALMET ENERJI Bidding Negotiations

21. ERIC-4

MAIN HEPP +

ECO HEPP

2 X 29.37 MW +

1 X 1.61 MW

60,35 MW TURKIYE PALMET ENERJI

E&m CONTRACT WAS SIGNED ZEFU / CHINA

22. SAMİ SOYDAM DAM and HEPP 2X 66,1 MW 132.2 MW TURKIYE ZORLU

HOLDING Bidding Negotiations

23. TEPEKIŞLA DAM and HEPP

2 x 34 MW +

12 MW 80 MW TURKIYE SANKO

HOLDING UNDER INSTALLATION ALSTOM SIEMENS TURKIYE

24. ARAKALI HEPP

2 x 4.7 MW 24 MW

GEORGIA GEORGIAN URBAN ENERGY AĞAOĞLU HOLDING

BIDDING NEGOTIATIONS

25.

ABULI HEPP

2 X12 MW 9,4 MW

26. BUCAKKIŞLA 2 x 20.3 MW 40,6 MW TURKIYE BİLGİN ELEKTRİK UNDER INSTALLATION ANDRITZ FRANCE

27. ERENLER 2 x 23.4 MW 46,8 MMW TURKIYE ENERJİSA IN OPERATION DONGFANG CHINA

28. KUMKÖY 2 x 5.98 MW 11,96 MW TURKIYE AES/USA & ENTEK IN OPERATION HARBİN (KEM) CHINA

29. KIRIKDAĞ HES 2X 8.9 MW 17,8 MW TURKIYE ÖZENİR ENERJİ IN OPERATION ANDRITZ FRANCE

30. BAYRA HEPP 2X 4,6 MW 9,2 MW

TURKIYE ARSAN GROUP

IN INSTALLATION GEBBERT / AUSTRIA

31. KAYAKÖPRÜ-1 HEPP

2X16,2 W 33,4 MW

IN OPERATION

CCOEC CHINA AYKEN TURKIYE ATES TURKIYE

32. KAYAKÖPRÜ-2 HEPP

2X 5,3 MW 10,6 MW

33. KIRAN HEPP

2X 4,9 MW 9,8 MW

34. KÖPRÜBAŞI HEPP

2X 7,7 MW 15,4 MW

35. HORYAN HEPP 2X 2,8 MW 5,6 MW 36. KIY HEPP 2 X 12 MW 24 MW ANDRITZ / FRANCE

ANDRITZ / TURKIYE 37. ÇAĞLAYAN HEPP 2X3,5 MW 7 MW TURKIYE IN OPERATION GHE / AUSTRIA

38. SIRAKONAKLAR HES 2X 6.2 MW 12,4 MW TURKIYE 2M ENERJI IN OPERATION ANDRITZ FRANCE ANDRITZ TURKIYE

39. ÇAMBAŞI 3x16.5 W 49,5 MW TURKIYE ENERJISA IN OPERATION VOITH-SIEMENS 40. KUŞAKLI 2 X 11 MW 22 MW TURKIYE ENERJISA

IN OPERATION ANDRITZ FRANCE

41. KIZILAĞAC 2x 3.5 MW 7 MW TURKIYE SANKO HOLDİNG IN OPERATION CWTW- CHINA KESIR-TURKIYE

42. KOÇLU 2 x 19 MW 38 MW TURKIYE SANKO HOLDİNG IN OPERATION ALSTOM-SPAIN SIEMENS-TURKIYE

43. EBRU 2X15.5 W 31 MW TURKIYE AES – USA & ENTEK IN OPERATION YUNG-HE

44. HAMZALI

2 X 8.5 MW 17 MW

TURKIYE ENSO AVUSTRIA IN OPERATION VOITH-INDAR

45. REŞADIYE 1

2 X 8 MW

16 MW

46. REŞADIYE 2

2 X 13.5 W 27 MW

47. REŞADIYE 3

2 X 11.5 MW 23 MW

48. KEPEZKAYA

2 x 14.8 MW 29,6 MW

TURKIYE AES - USA & ENTEK

IN OPERATION HARBIN (KEM) 49.

DAMLAPINAR

2 x 8.6 MW 17,2 MW

50. KULP-IV 2 X 8,6 MW 17,2 MW

Page 4: CV_UBCOSKUNER AUGUST-2015

Page 4 of 6

May,2005 – March,2009 As Free Lancer and Solution Partner of HD - Hidrodizayn Engineering, Consultancy and Civil Works Ltd. Providing the consultancy and engineering services for the electromechanical equipment of hydropower plants including the preparation of technical specifications, Bidding documents, technical negotiations, evaluation of the Bid and Owner’s engineering services for basic design & drawings, manufacturing, erection and commissioning works, for the following Owners and Hydro Power Plants;

POWER PLANT OUTPUT (MW) CLIENT PROGRESS STAGE CONTRACTOR

YEDİGÖZE 2 X 158 SANKO HOLDING In operation ALSTOM-SIEMENS TR CEVİZLİK 2 X 50 SANKO HOLDING In operation ALSTOM-SIEMENS TR KALKANDERE 2 x 22 SANKO HOLDING In operation KAYALAR 2 x 16.5 SANKO HOLDING Bidding SELİN -1 2 x 3.5 SANKO HOLDING Bidding ULUABAT 2 X 50 AK ENERJİ In operation VOITH-SIEMENS TR AKOCAK 2 X 40 AK ENERJİ In operation VOITH-SIEMENS TR FEKE - 1 2 x 16.5 AK ENERJİ Manufacturing ECIDI- ZEFU/CHINA FEKE -2 2 X 35.5 AK ENERJİ In operation ECIDI- ZEFU/CHINA BURÇ 3 X 9.3 AK ENERJİ In operation ECIDI- ZEFU/CHINA BULAM 2 X 3.5 AK ENERJİ In operation KÖSSLER HIMMETLI 2 X16 AK ENERJİ In erection GÖKKAYA 2 x 17 AK ENERJİ In erection GÜNDER 2 X 15.5 AKKANAT HOLDING In erection ANDRITZ (VATECH) DAMLA - 2 AKKANAT HOLDING Bidding KAYAKOPRU -1 2 X 16.2 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KAYAKOPRU -2 2 X 5.3 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KIRAN 2 X 4.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA CEVİZ 2 X 3.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KÖPRÜBAŞI 2 X 7.7 ARSAN İNŞ. In erection CCOEC-KEM /CHINA HORYAN 2 X 2.8 ARSAN İNŞ. In erection CCOEC-KEM /CHINA

2003, october-2005, may - As Free Lancer 2002 – 2003, October - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC

As Consultant of General Manager

1988 – 2002 Head of Project Department - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC Responsible for the technical coordination and scheduling of the works, engineering, design, project, manufacturing, erection and commissioning works of Power Plants undertaken and realized by TEMSAN as given below,

Page 5: CV_UBCOSKUNER AUGUST-2015

Page 5 of 6

POWER PLANT OUTPUT (MW) OWNER PROGRESS STAGE CONTRACTOR

BATMAN 3 X 62+5.7 DSİ In Operation TEMSAN-NOELL

DİCLE 2 X 55 DSİ In Operation TEMSAN-VOITH-RESITA

KRALKIZI 2 X 46 DSİ In Operation TEMSAN-ELIN-VOITH

KÜRTÜN 2 X 40 DSİ In Operation TEMSAN-ELIN-VOITH

SUATUĞURLU 1 X 25 DSİ In Operation TEMSAN-VOITH-RESITA

ÇAMLIGÖZE 2 X 16 DSİ In Operation TEMSAN-VOITH-RESITA

KUZGUN 3 X 6.8 +2.2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT

TERCAN 3 X 5 DSİ In Operation TEMSAN-ALSTOM-JEUMONT

BEYKÖY 3 X 6.2 DSİ In Operation TEMSAN-ELIN-VOITH

MERCAN 3 X 6 DSİ In Operation TEMSAN-ALSTOM-JEUMONT

KEPEZ II 3 X 3.5 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT

IVRIZ 2 X 0.5 DSİ In Operation TEMSAN-HITZINGER

HOŞAP 2 X 2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT

KOÇKÖPRÜ 2 X 2.2 DSİ In Operation TEMSAN-JEUMONT

1987 - 1988 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC

As Project Manager 1983 - 1987 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC

As Design Manager - Hydraulic design works for francis turbines - Preparation of the general layout and the technical specification for electromechanical equipment of HEPP. 1979 - 1983 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC

As Chief Engineer - Preparation of the feasibility report of the Steam Boilers Factory (for thermal power plants) and the documents for license agreement and general layout of the machinery and equipment. 1978 - 1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)

As Chief engineer For site erection of Soma B Thermal Power Plant 2 x 165 MW 1977 - 1978 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) Technical training on manufacturing, erection and maintenance of the equipment of Thermal Power Plant in Finland and Czechoslovakia ( current name is Republic of Slovakia)

Page 6: CV_UBCOSKUNER AUGUST-2015

Page 6 of 6

1976 -1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Responsible engineer Operational and maintenance works for Soma A Thermal Power Plant. 1974 - 1976 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Maintenance engineer Soma A Thermal Power Plant. THE FIELD OF EXPERTISE FOR HEPP:

For the hydro-power plants; − Plant optimization, defining of data and characteristics, − Preparing of the technical specification for e-m equipment, − Bidding negotiations, − Preparing of contract document − Engineering, design and project works − Manufacturing of the equipment − FAT factory acceptance tests − Erection of equipment − Field tests and commissioning works − Field ministry acceptance and performance tests − Operation, maintenance and repair works for the plants

EDUCATION: UNIVERSITY OF GAZI 1973 A.D.M.M.A Mechanical Engineering ADDITIONAL INFORMATION:

- License for motor vehicle. - Free for Traveling - Free for office,workshop and site works

HOBBIES AND INTERESTS: - Music : Classics and Contemporary - Reading : Philosophy, Science Fiction - Fresh Water Aquarium : Discus care