ROGELIO B. GUINIR JR. Present Address: Purok 7 Upper Magsaysay, Bayombong, Nueva Vizcaya
3700 Philippines
Email Address: Jaycl15@yahoo.com
Contact No.+639364774935
Passport Number: EC5099097
Fin No.G5285040T
Apllied Position:Project Engineer/ Site Engineer
OBJECTIVES:
To seek advancement and growth in my chosen field of profession and to carry out duties and
responsibilities exemplary performance that my service will be great contribution to the company.
QUALIFICATION: SketchUp 3D Operator
CADD Operator (Architectural, Plumbing, Electrical, Mechanical and Fire Protection)
Knowledgeable in Microsoft Word and Excel
Knowledgeable in Sanitary / Plumbing, Fire Protection and Electrical Works
With background on vertical and horizontal construction and estimates
Can work with minimum supervision and can handle pressure
EDUCATIONAL ATTAINMENT: Tertiary Level: Bachelor of Science in Civil Engineering
2000-2009 Nueva Vizcaya State University
Bayombong, Nueva Vizcaya`
Date Graduate: April 21, 2009
Secondary Level: Saint Mary’s High School
1996-2000 Dupax del Sur, Nueva Vizcaya
Elementary Level: Cabaruguis Elementary School
1991-1996 Luna Cabaruguis, Quirino
1.
Project Engineer April 25, 2016 to Up-to Present
Project: Paseo De Roxas Corner Ayala Avenue, Makati City
Philippines
Job Description
1. Perform such other duties and responsibilities as required by the project in general.
2. Responsible for entire project cycle including design, development, implementation and project
completion.
3. Supervising/monitoring and delegation of works and by issuing that all priorities are made as per
plan and specification of works.
4. Prepare and give leveling for drainage canal, slab & columns before casting
5. Submit daily accomplishment report for the actual site condition.
6. Prepare shop drawing and request for approval to consultant
7. Check safety issues on site and compliance with to our maincontractor
8. Implement work as per design and submit a proposal incase conflicts arises in actual construction for
designers’ approval.
9. Coordinate with other trade sub-contractor for the execution of work
10. Inspection of materials installed on site and verify plan if followed according to specification details
11. Prepare for inspection of sanitary plumbing and fire protection before installation on works
12. Attend meeting to the management reporting the status of work on site
13. Review development plans for compliance with adopted engineering standards and good
Engineering practices.
14. Work requires willingness to work a flexible schedule.
2.
Site Engineer
December 19, 2015 to February 06, 2016
Project: Tuas Terminal Reclamation Works
Tuas Singapore
Job Description
1. Perform such other duties and responsibilities as required by the project in general.
2. Responsible for entire project cycle including design, development, implementation and project
completion.
3. Supervising/monitoring and delegation of works and by issuing that all priorities are made as per plan
and specification of works.
4. Prepare and give leveling for drainage canal, slab & columns before casting
5. Submit daily accomplishment report for the actual site condition.
6. Prepare shop drawing and quantity of materials
7. Check safety issues on site and compliance with the subcontractors
8. Implement work as per design and submit a proposal incase conflicts arises in actual construction for
designers’ approval.
9. Coordinate with other trade sub-contractor for the execution of work
10. Check the reinforced installed on site and verify dimension spacing as per plan detail for the design
11. Summit daily of number of quantity materials installed on site
12. Inspection of materials installed on site and verify plan if followed according to specification details
13. Prepare for inspection of steel column before installation on works
14. Everyday attend meeting to the management reporting the status of work on site
15. Prepare construction schedule following the schedule of general construction works.
16. Review development plans for compliance with adopted engineering standards and good
Engineering practices.
3.
Site Engineer
March 28, 2014 – December 18, 2015
ERECTION “BUROH CRESCENT” OF A 9-STOREY MULTIPLE-USER GENERAL INDUSTRIAL DEVELOPMENT WITH TEMPORARY
ANCILLARY STAFF CANTEEN AND OTHER ANCILLARY FACILITIES (TOTAL: 100 FACTORY UNITS AND 1 CANTEEN) ON
LOTS 00529V, 02387M, 02388W AND 04637N MK 06 AT
BUROH CRESCENT (BOONLAY PLANNING AREA)
Jan.26, 2014-March 27, 2014 Erection “Horizon” Of a 8-Storey Multiple-User clean and light industry comprising 287 ramp-up factory units
with temporary staff canteen on lot 05911L MK13 at Woodlands Close, Woodlands Avenue 12 and
Woodlands Drive 64 ( Woodlands Planning Area )
May 25, 2012-Jan.25, 2014 ERECTION ” PRIMZ BIZHUB” OF A 9-STOREY MULTIPLE-USER CLEAN AND LIGHT INDUSTRIAL DEVELOPMENT WITH
MEZZANINE FLOOR AT 1ST STOREY COMPRISING 380 FLATTED FACTORY UNITS AND ANCILLARY STAFF CANTEEN ON
LOT 05890L MK13 AT WOODLANDS CLOSE, WOODLANDS DRIVE64, AND WOODLANDS AVENUE 12 (WOODLANDS
PLANNING AREA)
Job Description 1. Receives instruction from the MEP supervisor on all priority works to be performed.
2. Perform such other duties and responsibilities as required by the project in general.
3. As-built drawing regarding on conflict installation base on as per plan in architectural
4. Implement work as per design and submit a proposal incase conflicts arises in actual construction
for designers’ approval.
5. Verifies lay-out of all plumbing fixtures and its alignment.
6. Prepare drawing and estimate, bill of materials and specification of the plan.
7. Coordinate with other trade sub-contractors for the execution of work.
8. Monitoring and delegation of works and by issuing that all priorities are made as per plan and
specification of works.
9. Responsible for entire project cycle including design, development, implementation and project
completion.
10. Prepare drawing section and Update the plan for plumbing layout and plumbing fixtures.
11. Review development plans for compliance with adopted engineering standards and good
engineering practices.
12. Conduct surveys to gather field data
13. Prepare and interpret Auto Cad blueprints, schematic drawings, layouts and other visual aids.
14. Prepare and give leveling for drainage canal, slab & columns before casting
15. Work requires willingness to work a flexible schedule.
4.
Engineering Aide II
June 19,2011 to Up to its completion – (2CL) Wangal Elementary School, Kasibu, Nueva Vizcaya
August 15,2011 to Up to its completion – (2CL) Binugawan Elementary School, Kasibu, Nueva Vizcaya
September 22,2011 to Up to its completion – (2CL) Bacneng Elementary School, Sta.Fe, Nueva Vizcaya
June 25, 2012 to Up to its completion – (2CL) Balete Elementary School, Diadi, Nueva Vizcaya
Job Description
1. Supervision/monitoring and delegation of works and by issuing that all priorities are made as per plan
and specification of works.
2. Preparing of sketch/detailed plan & specification of work.
3. Conduct inspection of layout the dimension of the building, establish finish floor line from natural
grade line base on architectural plan.
4. Inspect & check materials delivered on site to insure that all materials delivery conforms to
specification.
5. Recorded number utilized construction materials, personnel and equipment
6. Prepare quantity computation base on physical accomplishment to plan for final billing
7. Check laid forms of rebar, isolated footing, reinforced concrete column, ground floor slab, beams,
wall footing, laying CHB and all scope of work in accordance to plan.
8. Submit weekly accomplishment and quincenal project report.
9. Recorded and quantify day-to-day activities
10. Prepared as-built drawing regarding on conflict installation base on as per plan in architectural
11. Prepare drawing and estimate, bill of materials and specification of the plan.
5.
Project Engineer January 19, 2011 – March 30, 2011
Project: One Ecome Center, Mall of Asia, Pasay City
Job Description: 1. Prepare the material estimate particularly used in the preparation of the site development include area drain,
manhole, curve inlet, storm drain and open canal.
2. Preparation letters to the project director for every concern we raise especially with regards to variation quotations,
requisition, permits, and delays in work schedule.
3. Direct supervision and monitoring of work installation of hot and cold water lines, sanitary sewer lines, waste lines,
storm drain lines, soil and vent stacks.
4. Implement work as per design and submit a proposal incase conflicts arises in actual construction for designers’
approval.
5. Coordinate with other trade sub-contractors for the execution of work.
6. Attend a weekly coordination meeting with the project management group, general contractor and trade
contractor.
7. Prepare a plan of work activities for the coming week based on the general project work schedule to serve as
guide to the foreman in the carrying out of various works.
8. Always find time with warehouse about the stock levels of delivered materials to know if there is already a need
to request materials. This also includes regular inspection including cost proposal.
6.
Quality Control Engineer January 18, 2010 – January 18, 2011
Project: The Infinity tower
Lot 3,25th& 26th Street, Bonifacio Global City, Taguig City
Job Description: 1. Conducts verification of lay-out and location of all plumbing fixtures in accordance to plan.
2. Witness and conduct inspection of sanitary pipes and perforated pipes.
3. Verifies lay-out of all plumbing fixtures and its alignment.
4. Conduct inspection of all plumbing fixtures water closet, lavatory, kitchen sink, and all types of floor drain.
5. Inspection lay-out of perforated pipes prior to installation, conduct inspection of water lines for pressure test and
conduct inspection of sanitary pipes for gravity test and its flow test.
6. Supervision/monitoring and delegation of works to subordinates by insuring that all priorities are made as per
general construction schedule.
7. Attending management meeting and coordinates with other contractors regarding conflicts of installation and
preparing recommendation and proposal to avoid repetition of same mistake in future installation.
8. Teach all workers to read key plan layout for proper piping installation and issued memoranda to workers to
improved their performances and working habits.
9. Implement the existing Company Rules and Programs as well as the Client’s Rules and Regulations.
10. Preparing / conducting gravity test, hydrostatic test and pressure test
11. Preparing daily man power report and scope of work
12. Received instructions from the Project in-Charge on all priority work to be performed.
13. Prepare construction schedule following the schedule of general construction works.
14. Estimate additional works and including cost proposal.
7.
Project Engineer November 25, 2009 – December 30, 2009
Project: District VI Hospital Project
New Panaderos St. Sta. Ana, Manila
Job Description: 1. Preparing of sketch / detailed Plan, Specification and Scope of work
2. Assist of paper works and Up-dating Submittals log
3. Received instructions from the project manager on all priority work to be performed.
4. Prepare construction schedule following the schedule of general construction works.
5. Monitor daily accomplishment of workers to determine their performance as being Planned and
targeted by the head office.
6. Prepare and summit materials requisition to the head office for delivery to site.
7. Performed or assume the responsibility of project manager in case of absence of the Project
manager.
8.
Assistant Project Engineer January 06, 2009 – October 15, 2009
Project: The Beacon Tower Project
Chino Roces Ave., cor. Arnaiz Ave., Makati City
Job Description:
1. Supervision/monitoring and delegation of works to subordinates by insuring that all priorities are made
as per general construction schedule.
2. Inspect and study materials requisition and delivery to insure that all materials delivered conform to specification
and sufficient enough to complete the targeted floor levels per month to minimize over stocking.
3. Attending management meeting and coordinates with other contractors regarding conflicts of installation and
preparing recommendation and proposal to avoid repetition of same mistake in future installation.
4. Teach all workers to read key plan layout for proper piping installation and issued memoranda to workers to
improved their performances and working habits.
5. Implement the existing Company Rules and Programs as well as the Client’s Rules and Regulations.
6. Preparing of sketch / detailed Plan, Specification and Scope of work
7. Assist of paper works and Up-dating Submittals log
8. Preparing accomplished weekly report
9. Received instructions from the project engineer on all priority work to be performed.
10. Prepare construction schedule following the schedule of general instruction works.
11. Monitor daily accomplishment of workers to determine their performance as being
Planned and targeted by the head office.
12. Prepare and submit materials requisition to the head office for delivery to site.
13. Submit weekly / monthly accomplishment to the project engineer for the purposes of Progress billing.
14. Performed or assume the responsibility of project-in-in charge in case of absence of the Project
engineer.
SEMINARS ATTENDED
Certificate of Commendation
September 08, 2010
Infinity at fort Project Site
Fort Bonifacio, Taguig City, Philippines.
Basic Occupational Safety and Health Seminar
Jan.24,31 to Feb.7,14 & 21,2009 – (40 hrs.)
Exchange Regency Project Site
Mandaluyong City.
2nd Luzon Regional Conference and Trade Exhibit
Theme:” Plumbing Engineers: A Global Technocrat”
October 17 – 18, 2008
Hotel Supreme Convention Plaza
Magsaysay Avenue, Baguio City.
Lecture Series on RA 9184 & IRR of the National Building Code
March 15, 2008
Engineering Annex
Nueva Vizcaya State University
Bayombong, Nueva Vizcaya.
Business Planning and Simple Bookkeeping
August 09, 2008
University Mini – Theater
Nueva Vizcaya State University Bayombong, Nueva Vizcaya.
PERSONAL PARTICULARS Birth Date: January 05, 1982
Birth Place: Dupax del Sur, Nueva Vizcaya
Age: 34 yrs. old
Gender: Male
Citizenship: Filipino
Height: 5’ 7”
Weight: 140.8 lbs.
Religion: Roman Catholic
Civil Status: Married
Spoken Language: English, Tagalog, Ilocano, Isinai
CHARACTER REFERENCES:
Mary Mariano
Daycare School Teacher Purok 07 Upper Magsaysay Bayombong, Nueva Vizcaya
Phone No.+639367908827
Relvin B. Aggasid Purok 07 Upper Magsaysay Bayombong, Nueva Vizcaya
Phone No.+639269523598
Randy B. Guinir Forman Site Supervisor
ASD Engineering Construction Pte. Ltd.
Phone No.+639262747935/+6584214496