curriculum problem project

Post on 23-Feb-2016

234 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Curriculum Problem Project

TRANSCRIPT

Curriculum Final ProjectSara Tedesco

1Monday, December 5, 2011

Reflection3 components of curriculum

CCSS

2Monday, December 5, 2011

Research of Curriculum

6th grade math

Interviews of teachers (regular and SPED) and Administrators

Strand 11: Estimating Solutions to Problems

3Monday, December 5, 2011

DataYear Overall Regular

EducationSpecial

Education2006 74 81 19

2007 75 80 29

2008 65.8 70 24

2009 70.6 73 40

2010 59.6 63 13

2011 57.3 61 7

4Monday, December 5, 2011

Move to the CCSS

Crosswalk of current curriculum with CCSS

From Strand Land to Core Instruction

Embedded mathematical practices

5Monday, December 5, 2011

CCSS Math Practices

1. Make sense of problems and persevere in solving them.

2. Reason abstractly and quantitatively.

3. Construct viable arguments and critique the reasoning of others.

4. Model with mathematics.

*5. Use appropriate tools strategically.

*6. Attend to precision.

7. Look for and make use of structure.

8. Look for and express regularity in repeated reasoning.

6Monday, December 5, 2011

Research “A common instructional framework that guides curriculum, teaching, assessment, and learning climate, combining specific expectations for student learning with specific strategies and materials to guide teaching assessment (pg. 3).”

From “Ensuring What is Tested is Taught”

“Based on your analysis of such research and your analysis of your own and your colleagues’ knowledge of students and the community, you will eventually select a model to use. Become fully informed about it through reading, visitations, and discussions and seek out any staff development you might need (pg. 108).”

From “Developing a Quality Curriculum” chapter by Allan Glatthorn

7Monday, December 5, 2011

Proposed Plan of Action

10 release days for affected math teachers per school year to rewrite curriculum and assessments.

7 meetings with RESC consultant over two years to improve teaching methods and variety of teaching models.

Attend Coteaching workshops as teams.

8Monday, December 5, 2011

Change Process

Step 1-- Create a sense of urgency

Step 2-- Pulling together a guiding team

Step 3-- Develop the change plan and strategy

Step 4-- Communicate for understanding and buy in

Step 5-- Empowering others to act

Step 6-- Produce short term wins

Step 7-- Don't let up

Step 8-- Create a new culture

9Monday, December 5, 2011

Evaluation Process

Curriculum aligned to CCSS

Rewritten school based assessments

Increased variety of lesson formats in coteaching model

Increases in standard test scores

10Monday, December 5, 2011

top related