consumer electronics industry user group update august 2010 stefanie kresse project manager
Post on 27-Mar-2015
235 Views
Preview:
TRANSCRIPT
Consumer Electronics Industry User GroupUpdate August 2010
Stefanie KresseProject Manager
© 2010 GS1
Merge into the new GS1 group
Overview of the Consumer Electronics‘ Activities
© 2010 GS1
Organizational Structure of the CE MO IUG
• Monthly conference calls:
each 3rd Monday at 13:00-14:00 CET, summer pause in August
• Participating MOs:
Australia, Austria, Belgium & Luxembourg, Brazil, Canada, China, Germany, Hong Kong, Italy,
Japan, Korea, New Zealand, Spain, UK, US
• Classical agenda:
• CE IUG Update
• MO activities with local CE industry
• Next Steps
© 2010 GS1
CE MO IUGCurrent Activities and Topics
• Collection and prioritization of the categorized business needs:1. Product Central Master Data
Finalization and distribution of the CTA in cooperation with the CE IUG Foundation of the new business needs group (BNG): Consumer Electronics Product Central Master Data BNG more information see next slides
2. EOL and Sustainability Creation of a draft CTA Further development needed
3. Reverse Logistics
4. Supply Chain Visibility and Integrated Process Optimization
5. Identification (SSCC)
© 2010 GS1
Organizational Structure of the IE CE IUG / CE PCMD BNG
• Bi-weekly conference calls:
each 2nd Tuesday at 14:00-15:00 CET, summer pause in August
shared conference calls of the CE IUG and the CE PCMD BNG
main focus depending on current topics
• Participating companies:
Best Buy, Commport Communications (IUG only), Encodex International, Flextronics
Instituto de Tecnologia, Hewlett-Packard, Kyonggi University, Media-Saturn, NXP
Semiconductors, Panasonic, RFID Alliance Corporation, SA2 Worldsync, Sony
Corporation, Sony Electronics Inc., Toshiba Corporation, Toshiba Logistics Corporation
• Participating MOs:
Australia, Austria, Brazil, Canada, China, Germany, Hong Kong, Italy, Japan, Korea,
Netherlands, New Zealand, Norway, Spain, Switzerland, Taiwan, UK, US
© 2010 GS1
CE Product Central Master Data Needs
• Defining rich data attributes, esp. for multichannel retailers and different purposes for the use of product data (such as listing, logistics, marketing, sales, on-shelf information, …)
• Tracking & Tracing at item/component level providing accurate and up-to-date product information
• Increasing the availability of relevant product information at low cost to retailers and consumers
• All supply chain partners identifying and describing products in the same way to reduce costs, data errors and inconsistencies
• Efficient way of collecting master data , e.g.
• in order to keep information automatically up-to-date (no complicated manual work)
• for marketing purposes and consumer information, e.g. for product comparisons on retailer websites
• Increasing the quality of master data – ideally provided by suppliers/manufacturers themselves referencing unique (GS1) identification keys and globally valid standards
© 2010 GS1
Goal of the CE PCMD BNG
Develop a standard with product specific attributes and a
classification system for the Consumer Electronics industry
to use the GDSN.
GDSN and Data Accuracy:
Output from this work group will be the global use of the GDSN for Consumer Electronic
products. The initiative aims to demonstrate that the GDSN is uniquely positioned to meet
current and emerging requirements for electronic product catalogue data.
© 2010 GS1
IE CE IUG / CE PCMD BNGCurrent Activities and Topics (1/2)
• Need of 3 co-chairs for the CE PCMD BNG
• Manufacturer:Paula Valério, Flextronics Instituto de Tecnologia, Brazil, www.flextronics.com Electrical engineer, since 2 years working for Flextronics, an electronics contract manufacturer based near Sao Paulo, Brazil. Co-chairing the “Tag, Label, Reader and Printer Performance (TLRPP)” working group
• Retailer:Thomas Trockel, Media-Saturn, Germany, www.media-saturn.de Working for Media-Saturn for 20 years, responsible for master data management since the beginning of this year Media-Saturn is the 2nd biggest CE retailer in the world and the biggest in Germany, with 840 stores in Europe, 60,000 employees and 19 billion € annual revenue.
• GS1 MO-representative: Carlos Ramos Aguilar, GS1 Mexico, www.gs1mexico.org Working in the standards development area in the department for GDSN solutions. GS1 Mexico is intensely acting in the field of GDS since 2008 and Carlos is responsible for coordinating this project.
© 2010 GS1
IE CE IUG / CE PCMD BNGCurrent Activities and Topics (2/2)
• Development of the Statement of Business Need (SBN) document, timeline:
• First draft:Stefanie Kresse until 09th August 2010
• Review of first draft and annotation:– Peter Alvarez until 16th August 2010, and then– Co-chairs until 23rd August 2010
• Distribution of the draft SBN to the CE IUG and reworking during the conference calls on 31st August and 14th September 2010
• Distribution of the draft to the GDSN User Group
• Finalization of the SBN during the GS1 Industry and Standards Event end of September 2010 in Amsterdam
• Entrance into the GSMP process
© 2010 GS1
GS1 Industry and Standards EventAmsterdam, September 2010
© 2010 GS1
GS1 Industry and Standards EventAmsterdam, September 2010 (1/3)
Topics for the F2F meeting in Amsterdam – Monday afternoon
Topic Person Time Minutes
27th September 2010, 02:00 – 05:30 pm (general CE IUG information)
Welcome and perspective of the CE sessions
Stefanie Kresse, GS1 GermanyIan Robertson, GS1 Global Office
02:00 – 02:15 15
Update of the current activities of the CE IUG
Ian Robertson, GS1 Global OfficeStefanie Kresse,GS1 Germany
02:15 – 02:45 30
Public PolicyEmilie Danel,GS1 Global Office
02:45 – 03:15 30
COFFEE BREAK 03:15 – 03:45 30Overview of regional CE activities MOs 03:45 – 04:30 45
GDSN OverviewBrian Bennet,GS1 Global Office
04:30 – 05:15 45
Closing of the day, outlook to the agenda of Tuesday
Stefanie Kresse, GS1 Germany
05:15 – 05:30 15
© 2010 GS1
GS1 Industry and Standards EventAmsterdam, September 2010 (2/3)
Topics for the F2F meeting in Amsterdam – Tuesday morning
Topic Person Time Minutes
28th September 2010, 09:00 – 12:30 am (PCMD session)Welcome and perspective of the agenda of the day
Stefanie Kresse, GS1 Germany
09:00 – 09:10 10
Experience in implementing GDSN in different industries
Scott Brown, GS1 USGrant Kille, SA2 Worldsync
09:10 – 09:55 45
PCMD Working sessionSBN – Current status and finalization
All 09:55 – 10:30 35
BREAK 10:30 – 11:00 30“Attributes for Consumer Electronics” – Planning of development phases –
All 11:00 – 11:45 45
SerialisationHenri Barthel,GS1 Global Office
11:45 – 12:15 30
Closing of the morning sessionStefanie Kresse,GS1 Germany
12:15 – 12:30 15
© 2010 GS1
GS1 Industry and Standards EventAmsterdam, September 2010 (3/3)
Topics for the F2F meeting in Amsterdam – Tuesday afternoon
Topic Person Time Minutes
28th September 2010, 01:30 – 05:30 pm (outlook, CE IUG work items)
Introduction Retail Value Chain IUG
Ian Robertson, GS1 Global OfficeAntonio Salto,Kraft FoodsDr. Gerd Wolfram,METRO Group
01:30 – 02:00 30
ONS RequirementsKevin Dean, GS1 Canada
02:00 – 02:30 30
CE Lifecycle Information Management with EPC and EPCIS
Dr. Tatsuya Inaba, AutoID Lab Japan
02:30 – 03:00 30
Q&A All 03:00 – 03:15 15BREAK 03:15 – 03:45 30
CE Business Needs – Possible next work items
Stefanie Kresse,GS1 Germany
03:45 – 04:00 15
EOL, Waste Management and eComAnders Grangard,GS1 Global Office
04:00 – 04:45 45
Next steps / open discussion All 04:45 – 05:15 30
ClosingStefanie Kresse,GS1 Germany
05:15 – 05:30 15
Contact Details
Stefanie Kresse
GS1 Germany
T +49 211 94714 311W www.gs1-germany.deE kresse@gs1-germany.de
top related