September, 2012
Construction Update– Rio Canoas
Energia
2
Concession Overview
Garibaldi Power Plant
Installed capacity - 177.9 MW
Physical Guarantee - 83.3 average MWh
70% of energy sold
Concession rights: 35 years
Triunfo won the concession in July 2010
Capex to date R$452 million
Located at Abdon Batista and Cerro Negro, Santa
Catarina state, Southern Brazil.
3
February 2011 September 2012
Rapid Transformation of Greenfield Site
4
Rio Canoas Energia – Garibaldi Power Plant
GENERATION CIRCUIT
5
Rio Canoas Energia – Garibaldi Power Plant
THE POWER HOUSE ASSEMBLY
6
Rio Canoas Energia – Garibaldi Power Plant
THE RIGHT BANK OF THE DAM
7
Rio Canoas Energia – Garibaldi Power Plant
THE RIGHT BANK OF THE DAM
8
Rio Canoas Energia – Garibaldi Power Plant
THE RIGHT BANK OF THE DAM