como w.l.l. has been continually building · como w.l.l. has been continually building values since...

Post on 07-Apr-2018

224 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

COMO W.L.L. has been continually building values since its foundation.

Quality, Technology and Adaptability have been the foremost values adopted by the company. The concern for quality is nurtured at every level.

Being at the technological forefront of our business has further strengthened this commitment to excellence.

Our workforce is not only highly qualified but also highly adaptable. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience.

COMO Construction offers a full range of construction services. The project teams

maintain a strong foundation of trust and mutual respect generated through positive relationships with clients, architects, engineers, contractors, subcontractors and suppliers. A company-wide policy e n c o u r a g i n g s h a re d p e r fo r m a n c e responsibility ensures the highest degree of professional service and results on all projects undertaken.

Since its foundation, the company has been producing outstanding records in a wide range of construction works. From develo pment, the company has a rich experience in these fields.

The Company has built a base of loyal clients on the strength of our reputation for service and competitive costing. COMO’s success in the construction sector is due in part to our commitment to teamwork.

Introduction

The mission of COMO is to build on our reputation for integrity, excellence, experience and leadership as one of Qatar’s finest construction organization by:

• Continuously improving thequality of our work and services.

• Constantly striving to exceed eachclient’s expectations.

• Maintaining our dedication to thehighest moral principles.

• Providing our people with achallenging, secure and safeenvironment in   which to achieveour objectives.

Our Mission

Construction Services

Construction :Civil

Architectural

SectorsOil & Gas Industry

Chemical PlantsSewage Treatment Plants

Water Pump StationsSub Station

Power PlantsMarine Works

Industrial Buildings

Certi� ed ISO Company

Certi� ed ISO Company

Facility Management Services

Facility Management

Waste Management

HVAC, MEP

Land sccape Management

Security

STP, O&M

Clients :COMO Construction is building a wide range of projects for a diverse client base. Each project encompasses both the high quality and value that COMO brings to each of its buildings. These projects include Industrial buildings, control buildings, sub stations, pump stations etc..

Client - Qatar Petroleum/Shaqab Abela (Central Food Processing Unit project)

Central Food Processing Unit is undertaken by Qatar Petroleum. It is a Fully Automatic kitchen which can provide meals for 120,000 people every day.

Client - Ras Girtas Power Co. (IWPP Project)

Qatar General Electricity and Water Corporation “KAHRAMAA” and its partners have signed, Ras Girtas (previously Ras Laffan “c”) Water and Power Project contracts worth QR 14 billion (approximately $ 3.85 billion)Since inception, Kahramaa has operated as an independent corporation on a commercial basis with a total capital of four billion Qatari Riyals.

Client - Qafco-5 Expansion Project

QAFCO-5 is set to bolster QAFCO’s position as world-class producer of fertilizer and the world’s largest single site urea producer. The planned expansion will add 1.1 million MT of ammonia and 1.1 million MT of urea to the Company’s annual production capacity thus boosting ammonia production by 55% to 3.1 million MT per annum and urea production 40% to 4 million MT annually.

Client - Barwa Real Estate

Facility Management

Full facilities management Service Contract on Barwa Real Estate Co. with built up area of 584,706 sq. m, of 62 buildings. Each building will house 64 apartments 1984 in total, located in West Saliya of South Doha.

Client - CFE - Mideast

Civil Structure Works for 1 Day Emergency Lagoon (Lagoon 1) under the main contract - Doha North Sewerage Treatment and associated works CP682/1. A water treatment tank of total area of 67,500 sq.m. and volume 405,000 m3 that can hold 90,000,000 gallon of water.

Safety

Como achieve a milestone on January 2011 with 20,000,000 man hours without a lost time incident.

Simply put, COMO applies a “Zero Harm” philosophy to all of our operations. We are committed creating an environment that makes safety our number one priority while conducting our business. This is reflected in our Corporate Values Statement which states the principles under which we operate.

Achieving “Zero Harm” is no small undertaking. In an industry that is often driven by deadlines, maintaining the discipline to pre-plan and integrate safety into all activities requires diligence. Our policies and procedures mandate the planning of tasks so that they become

ingrained as habits. Safety is always paramount before executing any activity. We continuously monitor and improve

our policies, procedures and behaviors using inspections, self-audits a n d t h e i m p l e m e ntation of industry best practices. COMO emplo yees from every branch participate in industry o rg a n i z at i o n s w i t h the goal of assisting in the development of new best practices for

integration into our operations. Safety training is provided at all levels of the company.

Both employees and suppliers can expect an environment that is true to the belief that everyone has the right to return home safely at the end of the workday.

Current Projects

No. Place of Work Project Name Client Work Trade Contract value

1 Umm Salal, QatarDoha North Sewage Treatment Plant

CFE Middle EastCivil Structural Works (Sub Stations)

10.87 Million

2 Umm Barkah, QatarTemporary Package Treatment Plant

PROTEC (Ashghal) Civil & Structural Work 5 Million

3Ras Laffan Industrial City

Chlorine Doixide Dosing System

ISIA S.p.A (RGPC) Civil Construction Work 0.6 Million

4 Doha, QatarFacility Management Services

BARWAFacility Management Services

8.21 Million

5 Doha, Qatar Facility Management Service Qatar National BankFacility Management Services

12 Million

6 Mesaieed, QatarSupply, Installation and Maintenance of Site Facilities work for Doha Port Project

MEDCOSite Facilities and Accommodation Facilities

45 Million

7 Doha, Qatar Food FactoryShaqab Abela Catering Company

Turn-key project 72 Million

Finished Projects

No.Client Name, Name of Project

Plant Capacity & LocationClient

ContractValue (QR.)

Construction Period

1 Screed Removal work Hamad Medical City Fit-out Work , Doha, Qatar. Hyundai E&C 0.8 Million Jun. 2011 - Oct. 2011

2Structural & Architectural Work QAFCO -V Urea Ammonia Expansion Project , Mesaieed, Qatar.

Hyundai E&C (QAFCO)

52 Million Sept. 2008 - Feb. 2011

3Civil , Strural & Architectural Work IWPP Package A Ras Laffan Industrial City, Ras Laffan, Qatar.

Hyundai E&C (Ras Girtas)

100 Million Jun. 2008 - Mar. 2011

4 ACTS Laboratory Turn-key project , Ras Laffan, Qatar. ACTS 0.31 Million Mar. 2008 - Jul. 2008

5 MEP Works Extension of Audio Visual System , Doha, Qatar. Techno Q 0.23 Million Feb. 2010 - Jun. 2010

6Civil & Structural Construction of Temporary Classrooms in French School , West Bay, Qatar.

Lycee Bonaparte 0.5 Million Jul. 2009 - Jan. 2010

7 Construction of Ware House , Al Khor, Qatar.Shaqab Abela Catering Co.

3.23 Million Jan. 2010 - Dec. 2010

8 Renovations & Alterations of Asian Games Accommodation , Doha, Qatar. ASHGHAL 26.30 Million Nov. 2007 - Aug. 2009

9 Drywalls & ceiling installation in Barwa Accommodation , Doha, Qatar. Seavron 0.79 Million Feb. 2009 - Dec. 2009

10 Finishing Works Business Management School , Al Khor, Qatar. Education City 0.273 Million Jul. 2008 - Aug. 2008

11 Construction & MEP Works Accommodation Block , Al Khor, Qatar. Strabag 5.56 Million Apr. 2008 - Aug. 2008

12 Construction & MEP Works Mess Hall 500 sqm, Ras Laffan, Qatar. Strabag 0.52 Million Mar. 2008 - Apr. 2009

13 Construction & MEP Works Mess Hall 3,000 sqm , Ras Laffan, Qatar. Flour Mideast Ltd. 2.80 Million Feb. 2008 - Mar. 2009

14 Construction & MEP Works Al Huda Bakery , Ras Laffan, Qatar.Shaqab Abela Catering Co.

1.42 Million Completed in 2008

15 Warehouse & Cold Storage , Al Khor, Qatar. Just Organic 1.32 Million Completed in 2008

16 Design, Delivery & Installation of Kitchen , Ras Laffan, Qatar. Dodsal AKG 0.795 Million Completed in 2008

17 Design, MEP & Finishing Recreational Facilities , Al Sailiyah, Qatar. American Base 1.98 Million Completed in 2008

18Supply, Delivery & Commissioning works for Kitchen & Mess Hall , Ras Laffan, Qatar.

Al Jaber & Partners 2.0 Million Completed in 2007

30 Supply, Delivery & Commissioning works for Mess Hall , RasLaffan, Qatar. Dodsal AKG 1.12 Million Completed in 2007

20 Supply, Delivery & Commissioning works for Domestic Kitchen, Mesaieed, Qatar. Mesaieed Housing 1.12 Million Completed in 2007

21Design,Construction & Installation works for Central Food Processing Unit project ,Ras Laffan,Qatar.

Qatar Petroleum 72.00 Million 2006 -2009

22Doha North Sewage Treatment Plant, Structural Works for Emergency Lagoon (Lagoon 1) ,Umm Salal, Qatar.

CFE Middle East 24.59 Million Jan. 2010-Sept. 2012

23 Qatar Foundation, Migrant Worker Housing Modular Building Project.Virgenia Commen-wealth University,

2.1 Million May 2011-June 2012

24 Sea Water Intake Desalination Plant, Civil Works, Umm Baab, Qatar. PROTEC 3.34 Million Sept. 2011-Sept. 2012

25 Chlorine Doixide Dosing System, Civil Construction Work, Ras Abu Fontas, Qatar. ISIA S.p.A (QEWC) 1.12 Million Feb. 2012-May 2012

26Chlorine Doixide Dosing System, Civil Construction Work, Ras Laffan Industrial City, Qatar.

ISIA S.p.A (RLPC) 0.35 Million Jan. 2012-May 2012

A B

C D

comoCommercial Registration

A B

C D

comoCommercial Registration

C

comoSigning Authority

A B

D

comoMunicipality Registration

A B

C D

A B

C D

comoChamber of Commerce Membership

z

C

OM

PAN

Y O

RG

AN

IZA

TIO

N C

HA

RT

imth

i….

M

echa

nica

l

Plum

bing

&

Dra

inag

e

Proj

ects

Dev

elop

men

t M

anag

er

P

roje

cts

Man

ager

A

dmin

istr

atio

n M

anag

er

Gen

eral

Man

ager

Pers

onal

A

sst.

to

GM

Fina

nce

Cons

truc

tion

M

ange

r

Ca

mp

4

HSE

M

anag

er

QA

/QC

HR

&

Tra

nspo

rt

Man

ager

Mat

eria

l M

anag

emen

t M

anag

er

Seni

or

Doc

umen

t Co

ntro

ller

Tech

nica

l O

ffic

e

MEP

Se

rvic

e A

ccou

nts

in

Char

ge

Al K

hor

Ca

mp

Safe

ty

Supe

rvis

ors

Safe

ty

Off

icer

s

Si

te Q

A/Q

C H

R

Off

icer

Tr

ansp

ort

M

ain

Stor

e

Purc

hasi

ng &

M

ater

ial

Han

dlin

g

Cam

p M

anag

er

Plan

t &

Eq

uipm

ent

Te

nder

ing

Doc

umen

t Co

ntro

ller

Land

Su

rvey

ors

D

raug

htsm

an

Qua

ntit

y Su

rvey

ors

Es

tim

atio

n

Plan

ning

&

Sche

dulin

g

El

ectr

ical

Acc

ount

ant

Ass

t.

Acc

ount

ant

Ca

mp

5

Pr

ojec

ts

Company Organization Chart

Trades / Categories PersonsSenior

EngineersSite

EngineersSite

SupervisorsSkilledWorkers Labour Total

Site EngineeringCivil 2 5 3 10Electrical / MEP 1 1 1 3Projects Managers 1 1QA/QC 1 1Construction Manager 1 1

Sub total 3 3 6 4 0 0 16Engineering supportTechnical office Coordinator 1 1Auto cad draftsmen 3 3Surveyor 2 2Surveyors Assistant 3 3Senior Estimator / Planner 1 1Quantity Surveyor 3 3Senior QA/QC 1 1

Sub total 14 14Construction site staffHSE Manager 1 1Safety officers 4 4Nurse 1 1Security officers 2 2Shuttering carpenters 5 40 45Steel fixers 3 22 25Masons 4 53 57Welder 4 4Pipe fitters 2 2Plumbers 6 6Electricians 2 5 7Scaffolders 1 5 6Painters 1 5 6Drivers 13 13Plant operators 2 2Riggers 1 1Mechanic (heavy plant) 1 1Mechanic (vehicles) 1 1Mechanic (generators) 1 1Storemen 1 3 4General labour 4 13 17Site maintenance staff 2 2 4

Sub total 8 23 166 13 210Office staffGeneral Manager 1 1Admin Manager 1 1Admin Officer 3 3Projects DevelopmentManager

11

PRO 1 1Document controllers 2 2

STAFF LEVELS

Trades / Categories PersonsSenior

EngineersSite

EngineersSite

SupervisorsSkilledWorkers Labour Total

STAFF LEVELS

1 1Training officer 1 1Human resources 4 4Purchasing Coordinator 1 1Purchasing officer 3 3Accounts 4 4IT technician 2 2Sectretaries 1 1

Sub total 26 0 0 0 0 0 26Facility ManagementProject Managers 2 2Site services manager 1 1Operation manager 1 1Maintenance manager 1 1Admin Manager 1 1Civil engineer 1 10 4 15Electrical engineer 1 4 6 11Mechanical engineer 5 16 21HVAC engineer 6 6 31 43Electricians 4 29 33Plumbers 2 13 15Painters 2 5 7Masons 1 6 7Security officers 2 15 17Safety officers 2 3 5Labour 73 73House keeping 4 12 16Office administration 7 7Call Centre staff 2 2Carpenter 2 9 11Fabricator 1 1Steel fixers 1 1Cad Operator 1 1Gardener 2 14 16Facilities Supervisor 7 7IT technician 2 2Store Keeper 4 4General Technician 7 7Drivers 22 22

Sub total 38 1 18 60 160 73 350

616Total manpower

CENTRAL FOOD PROCESSING UNIT- RAS LAFFAN (QATAR PETROLEUM)

Como has completed all the MEP installation including the design of the substation, t ransformer, and low voltage panels, domestic and sewage water line, equipment installation etc. according to ES Standards and NFPA.

Central Food Processing Unit Projecta t R a s L a f f a n I n d u s t r i a l C i t y

Central Food Processing Unit Projecta t R a s L a f f a n I n d u s t r i a l C i t y

Ras Laffan Industrial City

IWPP ProjectConstructions

Fire Station Building

Fire StationC-IWPP Project - Ras Laffan

Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan

Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan

Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan

Gas Turbine Building Electrical Room.C-IWPPProjectRas Laffan

Gate House.C-IWPP Project - Ras Laffan

Electronics & Electrical BuildingC-IWPP Project - Ras Laffan

Local Electrical Building.C-IWPP Project - Ras Laffan

Gas Turbine Building.C-IWPP Project - Ras Laffan

Gate House.C-IWPP Project - Ras Laffan

Local Electrical Building.C-IWPP Project - Ras Laffan

Fire Station Building.C-IWPP Project - Ras Laffan

Gas Turbine Building - Electrical Room.C-IWPP Project Ras Laffan

Gas Turbine Building - HVAC Accu. Floor.C-IWPP Project Ras Laffan

Gas Turbine Building - HVAC Accu Floor PadsC-IWPP Project - Ras Laffan

Gas Turbine Building - HVAC Room # 8. C-IWPP Project Ras Laffan

Electronic & Electrical Building.C-IWPP Project - Ras Laffan

Electronic & Electrical Building.C-IWPP Project - Ras Laffan

Fire Station Building.C-IWPP Project - Ras Laffan

Gas Turbine Building- HVAC Room # 2.C-IWPP Project Ras Laffan

Local Electrical Building.C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

M e s a i e e d I n d u s t r i a l C i t y

QAFCO -5 Projec t

Utility Building.QAFCO-5 Project - Mesaieed

Utility Building.QAFCO-5 Project - Mesaieed

Utility Building.QAFCO-5 Project - Mesaieed

Utility Building. QAFCO-5 Project - Mesaieed

Utility Building.QAFCO-5 Project - Mesaieed

Utility Building. QAFCO-5 Project - Mesaieed

Utility Building.QAFCO-5 Project - Mesaieed

Cogen-2 BuildingQAFCO-5 Project Mesaieed

Scaffolding & Formwork System inUtility BuildingQAFCO-5 Project - Mesaieed

Amonia 5 & Urea 5.QAFCO-5 Project - Mesaieed

Job Yard.QAFCO-5 Project - Mesaieed

Job Yard.QAFCO-5 Project - Mesaieed

Pipe Rack Area.QAFCO-5 Project - Mesaieed

Pipe Rack Area.QAFCO-5 Project - Mesaieed

Utility Building. QAFCO-5 Project - Mesaieed

Form Work System.QAFCO-5 Project - Mesaieed

Cogen 2 Building.QAFCO-5 Project - Mesaieed

Cogen 2 Building.QAFCO-5 Project - Mesaieed

Blast Proof Concrete WallQAFCO-5 Project - Mesaieed

Blast Proof Concrete Wall Transformer Area (Cogen-2)

QAFCO-5 Project - Mesaieed

Utility BuildingQAFCO-5 Project - Mesaieed

Utility Building QAFCO-5 Project - Mesaieed

Blast Proof Concrete Wall - CCR-2QAFCO-5 Project - Mesaieed

Blast Proof Concrete Wall - CCR-2QAFCO-5 Project - Mesaieed

One day Emergency LagooncfE - Doha North Sewerage Treatment Plant

Lagoon - cfE - Doha North Sewerage Treatment Plant

D o h a N o r t h S e w e r a g e

Tr e a t m e n t P l a n t

LDP-northeast sideDoha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Lagoon -cfE - Doha North Sewerage Treatment Plant

Sub Stations

Sub Station - E

Sub Station - G

Odur control facility Sub Station

Substation - EcfE - Doha North Sewerage Treatment Plant

Substation - GcfE - Doha North Sewerage Treatment Plant

Substation - EcfE - Doha North Sewerage Treatment Plant

Substation - EcfE - Doha North Sewerage Treatment Plant

Temporar y Pack age Treatment Plant

U M M B A R K A H

Reception facilities - Umm Barkah - Temporary Package Treatment Plant

Receiving Tank - Umm Barkah - Temporary Package Treatment Plant

Receiving Tank - Umm Barkah - Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah - Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Reception facilities - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Reception facilities - Umm Barkah Temporary Package Treatment Plant

Reception facilities - Umm Barkah Temporary Package Treatment Plant

Reception facilities - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Doha New Port ProjectMEDCO - Site Off ice & Camp Facil it ies

Doha New Port ProjectMEDCO - Site Off ice & Camp Facil it ies

Como did the all audio visual and electr ical insta l lat ion in Army College under the main contractor TECHNO Q and NASPAK. We executed all cable pulling, equipment installation, conduiting, cable tray installation and electrical works.

ABM Military CollegeShahania

Como CampsComo has six camps situated in Al-Khor.

Food Caterings

We are in partner with one of the market leader for catering service company, Shaqab Abela Catering Services. They have all the edge of technology to produce meals in huge quantities and serve end users such as professional centers, industries, hotels, restaurants, public institutions and labour camps.

Group of Companies

www.qdc.com.sa-qatar.com

Chapo Trading & Contractingwww.chapo-qatar.com

www.steelfab-qatar.com

www.shaqabcatering.com

www.qit-qatar.com

top related