como w.l.l. has been continually building · como w.l.l. has been continually building values since...
TRANSCRIPT
COMO W.L.L. has been continually building values since its foundation.
Quality, Technology and Adaptability have been the foremost values adopted by the company. The concern for quality is nurtured at every level.
Being at the technological forefront of our business has further strengthened this commitment to excellence.
Our workforce is not only highly qualified but also highly adaptable. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience.
COMO Construction offers a full range of construction services. The project teams
maintain a strong foundation of trust and mutual respect generated through positive relationships with clients, architects, engineers, contractors, subcontractors and suppliers. A company-wide policy e n c o u r a g i n g s h a re d p e r fo r m a n c e responsibility ensures the highest degree of professional service and results on all projects undertaken.
Since its foundation, the company has been producing outstanding records in a wide range of construction works. From develo pment, the company has a rich experience in these fields.
The Company has built a base of loyal clients on the strength of our reputation for service and competitive costing. COMO’s success in the construction sector is due in part to our commitment to teamwork.
Introduction
The mission of COMO is to build on our reputation for integrity, excellence, experience and leadership as one of Qatar’s finest construction organization by:
• Continuously improving thequality of our work and services.
• Constantly striving to exceed eachclient’s expectations.
• Maintaining our dedication to thehighest moral principles.
• Providing our people with achallenging, secure and safeenvironment in which to achieveour objectives.
Our Mission
Construction Services
Construction :Civil
Architectural
SectorsOil & Gas Industry
Chemical PlantsSewage Treatment Plants
Water Pump StationsSub Station
Power PlantsMarine Works
Industrial Buildings
Certi� ed ISO Company
Certi� ed ISO Company
Facility Management Services
Facility Management
Waste Management
HVAC, MEP
Land sccape Management
Security
STP, O&M
Clients :COMO Construction is building a wide range of projects for a diverse client base. Each project encompasses both the high quality and value that COMO brings to each of its buildings. These projects include Industrial buildings, control buildings, sub stations, pump stations etc..
Client - Qatar Petroleum/Shaqab Abela (Central Food Processing Unit project)
Central Food Processing Unit is undertaken by Qatar Petroleum. It is a Fully Automatic kitchen which can provide meals for 120,000 people every day.
Client - Ras Girtas Power Co. (IWPP Project)
Qatar General Electricity and Water Corporation “KAHRAMAA” and its partners have signed, Ras Girtas (previously Ras Laffan “c”) Water and Power Project contracts worth QR 14 billion (approximately $ 3.85 billion)Since inception, Kahramaa has operated as an independent corporation on a commercial basis with a total capital of four billion Qatari Riyals.
Client - Qafco-5 Expansion Project
QAFCO-5 is set to bolster QAFCO’s position as world-class producer of fertilizer and the world’s largest single site urea producer. The planned expansion will add 1.1 million MT of ammonia and 1.1 million MT of urea to the Company’s annual production capacity thus boosting ammonia production by 55% to 3.1 million MT per annum and urea production 40% to 4 million MT annually.
Client - Barwa Real Estate
Facility Management
Full facilities management Service Contract on Barwa Real Estate Co. with built up area of 584,706 sq. m, of 62 buildings. Each building will house 64 apartments 1984 in total, located in West Saliya of South Doha.
Client - CFE - Mideast
Civil Structure Works for 1 Day Emergency Lagoon (Lagoon 1) under the main contract - Doha North Sewerage Treatment and associated works CP682/1. A water treatment tank of total area of 67,500 sq.m. and volume 405,000 m3 that can hold 90,000,000 gallon of water.
Safety
Como achieve a milestone on January 2011 with 20,000,000 man hours without a lost time incident.
Simply put, COMO applies a “Zero Harm” philosophy to all of our operations. We are committed creating an environment that makes safety our number one priority while conducting our business. This is reflected in our Corporate Values Statement which states the principles under which we operate.
Achieving “Zero Harm” is no small undertaking. In an industry that is often driven by deadlines, maintaining the discipline to pre-plan and integrate safety into all activities requires diligence. Our policies and procedures mandate the planning of tasks so that they become
ingrained as habits. Safety is always paramount before executing any activity. We continuously monitor and improve
our policies, procedures and behaviors using inspections, self-audits a n d t h e i m p l e m e ntation of industry best practices. COMO emplo yees from every branch participate in industry o rg a n i z at i o n s w i t h the goal of assisting in the development of new best practices for
integration into our operations. Safety training is provided at all levels of the company.
Both employees and suppliers can expect an environment that is true to the belief that everyone has the right to return home safely at the end of the workday.
Current Projects
No. Place of Work Project Name Client Work Trade Contract value
1 Umm Salal, QatarDoha North Sewage Treatment Plant
CFE Middle EastCivil Structural Works (Sub Stations)
10.87 Million
2 Umm Barkah, QatarTemporary Package Treatment Plant
PROTEC (Ashghal) Civil & Structural Work 5 Million
3Ras Laffan Industrial City
Chlorine Doixide Dosing System
ISIA S.p.A (RGPC) Civil Construction Work 0.6 Million
4 Doha, QatarFacility Management Services
BARWAFacility Management Services
8.21 Million
5 Doha, Qatar Facility Management Service Qatar National BankFacility Management Services
12 Million
6 Mesaieed, QatarSupply, Installation and Maintenance of Site Facilities work for Doha Port Project
MEDCOSite Facilities and Accommodation Facilities
45 Million
7 Doha, Qatar Food FactoryShaqab Abela Catering Company
Turn-key project 72 Million
Finished Projects
No.Client Name, Name of Project
Plant Capacity & LocationClient
ContractValue (QR.)
Construction Period
1 Screed Removal work Hamad Medical City Fit-out Work , Doha, Qatar. Hyundai E&C 0.8 Million Jun. 2011 - Oct. 2011
2Structural & Architectural Work QAFCO -V Urea Ammonia Expansion Project , Mesaieed, Qatar.
Hyundai E&C (QAFCO)
52 Million Sept. 2008 - Feb. 2011
3Civil , Strural & Architectural Work IWPP Package A Ras Laffan Industrial City, Ras Laffan, Qatar.
Hyundai E&C (Ras Girtas)
100 Million Jun. 2008 - Mar. 2011
4 ACTS Laboratory Turn-key project , Ras Laffan, Qatar. ACTS 0.31 Million Mar. 2008 - Jul. 2008
5 MEP Works Extension of Audio Visual System , Doha, Qatar. Techno Q 0.23 Million Feb. 2010 - Jun. 2010
6Civil & Structural Construction of Temporary Classrooms in French School , West Bay, Qatar.
Lycee Bonaparte 0.5 Million Jul. 2009 - Jan. 2010
7 Construction of Ware House , Al Khor, Qatar.Shaqab Abela Catering Co.
3.23 Million Jan. 2010 - Dec. 2010
8 Renovations & Alterations of Asian Games Accommodation , Doha, Qatar. ASHGHAL 26.30 Million Nov. 2007 - Aug. 2009
9 Drywalls & ceiling installation in Barwa Accommodation , Doha, Qatar. Seavron 0.79 Million Feb. 2009 - Dec. 2009
10 Finishing Works Business Management School , Al Khor, Qatar. Education City 0.273 Million Jul. 2008 - Aug. 2008
11 Construction & MEP Works Accommodation Block , Al Khor, Qatar. Strabag 5.56 Million Apr. 2008 - Aug. 2008
12 Construction & MEP Works Mess Hall 500 sqm, Ras Laffan, Qatar. Strabag 0.52 Million Mar. 2008 - Apr. 2009
13 Construction & MEP Works Mess Hall 3,000 sqm , Ras Laffan, Qatar. Flour Mideast Ltd. 2.80 Million Feb. 2008 - Mar. 2009
14 Construction & MEP Works Al Huda Bakery , Ras Laffan, Qatar.Shaqab Abela Catering Co.
1.42 Million Completed in 2008
15 Warehouse & Cold Storage , Al Khor, Qatar. Just Organic 1.32 Million Completed in 2008
16 Design, Delivery & Installation of Kitchen , Ras Laffan, Qatar. Dodsal AKG 0.795 Million Completed in 2008
17 Design, MEP & Finishing Recreational Facilities , Al Sailiyah, Qatar. American Base 1.98 Million Completed in 2008
18Supply, Delivery & Commissioning works for Kitchen & Mess Hall , Ras Laffan, Qatar.
Al Jaber & Partners 2.0 Million Completed in 2007
30 Supply, Delivery & Commissioning works for Mess Hall , RasLaffan, Qatar. Dodsal AKG 1.12 Million Completed in 2007
20 Supply, Delivery & Commissioning works for Domestic Kitchen, Mesaieed, Qatar. Mesaieed Housing 1.12 Million Completed in 2007
21Design,Construction & Installation works for Central Food Processing Unit project ,Ras Laffan,Qatar.
Qatar Petroleum 72.00 Million 2006 -2009
22Doha North Sewage Treatment Plant, Structural Works for Emergency Lagoon (Lagoon 1) ,Umm Salal, Qatar.
CFE Middle East 24.59 Million Jan. 2010-Sept. 2012
23 Qatar Foundation, Migrant Worker Housing Modular Building Project.Virgenia Commen-wealth University,
2.1 Million May 2011-June 2012
24 Sea Water Intake Desalination Plant, Civil Works, Umm Baab, Qatar. PROTEC 3.34 Million Sept. 2011-Sept. 2012
25 Chlorine Doixide Dosing System, Civil Construction Work, Ras Abu Fontas, Qatar. ISIA S.p.A (QEWC) 1.12 Million Feb. 2012-May 2012
26Chlorine Doixide Dosing System, Civil Construction Work, Ras Laffan Industrial City, Qatar.
ISIA S.p.A (RLPC) 0.35 Million Jan. 2012-May 2012
A B
C D
comoCommercial Registration
A B
C D
comoCommercial Registration
C
comoSigning Authority
A B
D
comoMunicipality Registration
A B
C D
A B
C D
comoChamber of Commerce Membership
z
C
OM
PAN
Y O
RG
AN
IZA
TIO
N C
HA
RT
imth
i….
M
echa
nica
l
Plum
bing
&
Dra
inag
e
Proj
ects
Dev
elop
men
t M
anag
er
P
roje
cts
Man
ager
A
dmin
istr
atio
n M
anag
er
Gen
eral
Man
ager
Pers
onal
A
sst.
to
GM
Fina
nce
Cons
truc
tion
M
ange
r
Ca
mp
4
HSE
M
anag
er
QA
/QC
HR
&
Tra
nspo
rt
Man
ager
Mat
eria
l M
anag
emen
t M
anag
er
Seni
or
Doc
umen
t Co
ntro
ller
Tech
nica
l O
ffic
e
MEP
Se
rvic
e A
ccou
nts
in
Char
ge
Al K
hor
Ca
mp
Safe
ty
Supe
rvis
ors
Safe
ty
Off
icer
s
Si
te Q
A/Q
C H
R
Off
icer
Tr
ansp
ort
M
ain
Stor
e
Purc
hasi
ng &
M
ater
ial
Han
dlin
g
Cam
p M
anag
er
Plan
t &
Eq
uipm
ent
Te
nder
ing
Doc
umen
t Co
ntro
ller
Land
Su
rvey
ors
D
raug
htsm
an
Qua
ntit
y Su
rvey
ors
Es
tim
atio
n
Plan
ning
&
Sche
dulin
g
El
ectr
ical
Acc
ount
ant
Ass
t.
Acc
ount
ant
Ca
mp
5
Pr
ojec
ts
Company Organization Chart
Trades / Categories PersonsSenior
EngineersSite
EngineersSite
SupervisorsSkilledWorkers Labour Total
Site EngineeringCivil 2 5 3 10Electrical / MEP 1 1 1 3Projects Managers 1 1QA/QC 1 1Construction Manager 1 1
Sub total 3 3 6 4 0 0 16Engineering supportTechnical office Coordinator 1 1Auto cad draftsmen 3 3Surveyor 2 2Surveyors Assistant 3 3Senior Estimator / Planner 1 1Quantity Surveyor 3 3Senior QA/QC 1 1
Sub total 14 14Construction site staffHSE Manager 1 1Safety officers 4 4Nurse 1 1Security officers 2 2Shuttering carpenters 5 40 45Steel fixers 3 22 25Masons 4 53 57Welder 4 4Pipe fitters 2 2Plumbers 6 6Electricians 2 5 7Scaffolders 1 5 6Painters 1 5 6Drivers 13 13Plant operators 2 2Riggers 1 1Mechanic (heavy plant) 1 1Mechanic (vehicles) 1 1Mechanic (generators) 1 1Storemen 1 3 4General labour 4 13 17Site maintenance staff 2 2 4
Sub total 8 23 166 13 210Office staffGeneral Manager 1 1Admin Manager 1 1Admin Officer 3 3Projects DevelopmentManager
11
PRO 1 1Document controllers 2 2
STAFF LEVELS
Trades / Categories PersonsSenior
EngineersSite
EngineersSite
SupervisorsSkilledWorkers Labour Total
STAFF LEVELS
1 1Training officer 1 1Human resources 4 4Purchasing Coordinator 1 1Purchasing officer 3 3Accounts 4 4IT technician 2 2Sectretaries 1 1
Sub total 26 0 0 0 0 0 26Facility ManagementProject Managers 2 2Site services manager 1 1Operation manager 1 1Maintenance manager 1 1Admin Manager 1 1Civil engineer 1 10 4 15Electrical engineer 1 4 6 11Mechanical engineer 5 16 21HVAC engineer 6 6 31 43Electricians 4 29 33Plumbers 2 13 15Painters 2 5 7Masons 1 6 7Security officers 2 15 17Safety officers 2 3 5Labour 73 73House keeping 4 12 16Office administration 7 7Call Centre staff 2 2Carpenter 2 9 11Fabricator 1 1Steel fixers 1 1Cad Operator 1 1Gardener 2 14 16Facilities Supervisor 7 7IT technician 2 2Store Keeper 4 4General Technician 7 7Drivers 22 22
Sub total 38 1 18 60 160 73 350
616Total manpower
CENTRAL FOOD PROCESSING UNIT- RAS LAFFAN (QATAR PETROLEUM)
Como has completed all the MEP installation including the design of the substation, t ransformer, and low voltage panels, domestic and sewage water line, equipment installation etc. according to ES Standards and NFPA.
Central Food Processing Unit Projecta t R a s L a f f a n I n d u s t r i a l C i t y
Central Food Processing Unit Projecta t R a s L a f f a n I n d u s t r i a l C i t y
Ras Laffan Industrial City
IWPP ProjectConstructions
Fire Station Building
Fire StationC-IWPP Project - Ras Laffan
Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan
Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan
Gas Turbine Building Ground Floor Slab.C-IWPP Project Ras Laffan
Gas Turbine Building Electrical Room.C-IWPPProjectRas Laffan
Gate House.C-IWPP Project - Ras Laffan
Electronics & Electrical BuildingC-IWPP Project - Ras Laffan
Local Electrical Building.C-IWPP Project - Ras Laffan
Gas Turbine Building.C-IWPP Project - Ras Laffan
Gate House.C-IWPP Project - Ras Laffan
Local Electrical Building.C-IWPP Project - Ras Laffan
Fire Station Building.C-IWPP Project - Ras Laffan
Gas Turbine Building - Electrical Room.C-IWPP Project Ras Laffan
Gas Turbine Building - HVAC Accu. Floor.C-IWPP Project Ras Laffan
Gas Turbine Building - HVAC Accu Floor PadsC-IWPP Project - Ras Laffan
Gas Turbine Building - HVAC Room # 8. C-IWPP Project Ras Laffan
Electronic & Electrical Building.C-IWPP Project - Ras Laffan
Electronic & Electrical Building.C-IWPP Project - Ras Laffan
Fire Station Building.C-IWPP Project - Ras Laffan
Gas Turbine Building- HVAC Room # 2.C-IWPP Project Ras Laffan
Local Electrical Building.C-IWPP Project - Ras Laffan
C-IWPP Project - Ras Laffan
C-IWPP Project - Ras Laffan
C-IWPP Project - Ras Laffan
M e s a i e e d I n d u s t r i a l C i t y
QAFCO -5 Projec t
Utility Building.QAFCO-5 Project - Mesaieed
Utility Building.QAFCO-5 Project - Mesaieed
Utility Building.QAFCO-5 Project - Mesaieed
Utility Building. QAFCO-5 Project - Mesaieed
Utility Building.QAFCO-5 Project - Mesaieed
Utility Building. QAFCO-5 Project - Mesaieed
Utility Building.QAFCO-5 Project - Mesaieed
Cogen-2 BuildingQAFCO-5 Project Mesaieed
Scaffolding & Formwork System inUtility BuildingQAFCO-5 Project - Mesaieed
Amonia 5 & Urea 5.QAFCO-5 Project - Mesaieed
Job Yard.QAFCO-5 Project - Mesaieed
Job Yard.QAFCO-5 Project - Mesaieed
Pipe Rack Area.QAFCO-5 Project - Mesaieed
Pipe Rack Area.QAFCO-5 Project - Mesaieed
Utility Building. QAFCO-5 Project - Mesaieed
Form Work System.QAFCO-5 Project - Mesaieed
Cogen 2 Building.QAFCO-5 Project - Mesaieed
Cogen 2 Building.QAFCO-5 Project - Mesaieed
Blast Proof Concrete WallQAFCO-5 Project - Mesaieed
Blast Proof Concrete Wall Transformer Area (Cogen-2)
QAFCO-5 Project - Mesaieed
Utility BuildingQAFCO-5 Project - Mesaieed
Utility Building QAFCO-5 Project - Mesaieed
Blast Proof Concrete Wall - CCR-2QAFCO-5 Project - Mesaieed
Blast Proof Concrete Wall - CCR-2QAFCO-5 Project - Mesaieed
One day Emergency LagooncfE - Doha North Sewerage Treatment Plant
Lagoon - cfE - Doha North Sewerage Treatment Plant
D o h a N o r t h S e w e r a g e
Tr e a t m e n t P l a n t
LDP-northeast sideDoha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Lagoon -cfE - Doha North Sewerage Treatment Plant
Sub Stations
Sub Station - E
Sub Station - G
Odur control facility Sub Station
Substation - EcfE - Doha North Sewerage Treatment Plant
Substation - GcfE - Doha North Sewerage Treatment Plant
Substation - EcfE - Doha North Sewerage Treatment Plant
Substation - EcfE - Doha North Sewerage Treatment Plant
Temporar y Pack age Treatment Plant
U M M B A R K A H
Reception facilities - Umm Barkah - Temporary Package Treatment Plant
Receiving Tank - Umm Barkah - Temporary Package Treatment Plant
Receiving Tank - Umm Barkah - Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Receiving Tank - Umm Barkah - Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Platform - Umm Barkah Temporary Package Treatment Plant
Reception facilities - Umm Barkah Temporary Package Treatment Plant
Receiving Tank - Umm Barkah Temporary Package Treatment Plant
Receiving Tank - Umm Barkah Temporary Package Treatment Plant
Reception facilities - Umm Barkah Temporary Package Treatment Plant
Reception facilities - Umm Barkah Temporary Package Treatment Plant
Reception facilities - Umm Barkah Temporary Package Treatment Plant
Receiving Tank - Umm Barkah Temporary Package Treatment Plant
Receiving Tank - Umm Barkah Temporary Package Treatment Plant
Doha New Port ProjectMEDCO - Site Off ice & Camp Facil it ies
Doha New Port ProjectMEDCO - Site Off ice & Camp Facil it ies
Como did the all audio visual and electr ical insta l lat ion in Army College under the main contractor TECHNO Q and NASPAK. We executed all cable pulling, equipment installation, conduiting, cable tray installation and electrical works.
ABM Military CollegeShahania
Como CampsComo has six camps situated in Al-Khor.
Food Caterings
We are in partner with one of the market leader for catering service company, Shaqab Abela Catering Services. They have all the edge of technology to produce meals in huge quantities and serve end users such as professional centers, industries, hotels, restaurants, public institutions and labour camps.
Group of Companies
www.qdc.com.sa-qatar.com
Chapo Trading & Contractingwww.chapo-qatar.com
www.steelfab-qatar.com
www.shaqabcatering.com
www.qit-qatar.com