UNIVERSITY OF THE EAST
RECTO, MANILA
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
“PROPOSED TWO – STOREY RESIDENTIAL
BUILDING WITH ROOF DECK”
CONSTRUCTION METHOD AND PROJECT MANAGEMENT
NCE 514 – CE1
SUBMITTED BY:
AQUINO, ROSEMAY T.
20110109574
SUBMITTED TO:
ENGR. MARYCON A. SERRANO
24 MARCH 2015
ACKNOWLEDGMENT
It would not have been possible to write this project without the help and support of the kind
people of whom it is possible to give particular mention here.
Above all, I would like to thank God for the guidance He has providing me throughout this work,
for the wisdom He is giving me, and for giving knowledge as well.
I would like to thank Engr. Jefferson A. Lachica, Owner of JLachica Construction and Consultancy,
who guided me and had given me the knowledge I needed to finish this work.
I would also like to express sincere appreciation to young and beautiful Professor, Engr. Marycon
A. Serrano, who has supported the students throughout this work with patience and knowledge. The
students know that it wouldn’t have been possible to finish this requirement without the Professor’s great
supervision.
Finally, I thank my parents for the support throughout all studies at University of the East – Manila
and for providing a home in which to complete the project.
TABLE OF CONTENTS
I. Project Description .................................................................................................................................... 1
II. Construction Drawings .................................................................................................................... 2 – 16
III. Bill of Quantities ......................................................................................................................... 17 – 107
IV. Schedules ................................................................................................................................... 108 – 112
4.1 Gantt Chart ............................................................................................................................. 108
4.2 Manpower Schedule .............................................................................................................. 109
4.3 Equipment Schedule ............................................................................................................... 110
4.4 Precedence Network ............................................................................................................. 111
4.5 S – Curve ................................................................................................................................. 112
V. Work Methodogy Statement ................................................................................................ 113 – 127
VI. Appendix .................................................................................................................................. 128 – 136
6.1 Resume ......................................................................................................................... 128 – 131
6.2 Computation for Labor ............................................................................................. 132 – 136
6.3 Rates Used .................................................................................................................. 132 – 136
PROJECT DESCRIPTION
Name: Proposed Two – Storey Residential Building with Roof Deck
Lot Area: 240 square meters
Floor Area: 400.948875 square meters
Location: Guiguinto, Bulacan
Engineer: Engr. Jefferson A. Lachica
Owner: Carolina Rosales and Rowena Rosales
GANTT CHART
MANPOWER SCHEDULE
MANPOWER SCHEDULE
MANPOWER WEEKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Carpenter 2 2 3 3 6 6 6 6 6 6 4 4 4 4
Mason 2 2 4 4 4 4 4 6 6 6 6 4 4
Electrician 3 2 3 3 1 1 1 2 2
Plumber 2 2 2 3 3 3 2 2
Welder 3 3 3 3 4 4 2
Painter 6 6 6 6
Steelman 2 2 3 3 5 6 6 6 6 6 3
Helper / Laborer 5 7 7 10 10 10 10 10 8
Others:
Surveyor 1
Survey Aid 1
TOTAL: 3 5 7 14 18 23 27 32 34 37 38 29 25 20 21 11
EQUIPMENT SCHEDULE
EQUIPMENT SCHEDULE
EQUIPMENTS WEEKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Mini - Excavator 1 1 1 1
Plate Compactor 1 1
Concrete Mixer 1 1 1 1 1 1 1 1 1
Concrete Vibrator 1 1 1 1 1 1 1 1 1
Welding Machine 2 2 2
Rebar Cutter 2 2 2 2 2 2 2 2 2 2
Rebar Bender 2 2 2 2 2 2 2 2 2 2
Grinder 2 2 2 2 2 2
Compressor 2 2 2 2
TOTAL: 5 5 6 6 6 6 10 8 10 8 4 4 6 4 2
PRECEDENCE NETWORK
S – CURVE
ROSEMAY T. AQUINO 4 Davao Street Bago Bantay, Quezon City
Contact Numbers: 0905-9332013 239-2712/982-8163
E-mail Address: rosemay.aquino07@gmail.com
OBJECTIVE To increase my knowledge, skills and experience in the applications of Civil Engineering in the
industry and gain an insight on how the industry works as a preparation of my future career.
ELIGIBILITY
7th HONORABLE MENTION 1st YEAR and 2nd YEAR – 2nd SEMESTER
Quezon City Academy University of the East – Manila Batch 2010 – 2011 Academic Half – Scholar
S.Y. 2011 – 2012
EDUCATIONAL ATTAINMENT
Tertiary Education: University of the East - Manila
Bachelor of Science in Civil Engineering
S.Y. 2011 – Present
Secondary Education: Quezon City Academy 1144 Epifanio delos Santos Avenue, Quezon City S.Y. 2007 - 2011
Primary Education: Bago Bantay Elementary School
Bago Bantay, Quezon City S.Y. 2001 - 2007
WORK EXPERIENCE
CASHIER @ MOA Arena’s VIP RESTAURANT BBMarciano Catering Services 52 Road 2, Pag-asa, Quezon City
Tel. (02) 929-8291 April 2014 – May 2014
ASSISTANT BANQUET MANAGER BBMarciano Catering Services
52 Road 2, Pag-asa, Quezon City Tel. (02) 929-8291 December 17, 2011 – April 2013
PERSONAL INFORMATION
Birthday : December 10, 1994
Age : 20 years old Gender : Female Height : 4’ 11”
Civil Status : Single Religion : Methodist / Born Again Christian Skills : Knowledgeable in Microsoft office
(i.e. Excel, Word, PowerPoint, Publisher, etc.) : Skilled in some Design / Engineering software
(i.e. AutoCAD, Google Sketchup, Solid Edge) : Have good negotiating skills.
: Has the ability to attend good customer relation and has good communication skills
TRAININGS/SEMINARS ATTENDED ENGINEERING SEMINAR 2015
Safe and Sound: An Engineering Checklist on Redefining Safety February 07, 2015
University of the Philippines – Los Baños JPICE STUDENT’S SEMINAR
Building Supremacy February 02, 2015 University of the East – Manila
THE ROTARACT SERVICE AND LEADERSHIP JOURNEY
Rotaract Club of San Francisco Del Monte – Malaya Achievers January 15, 2015 Bluepoint Building Kamuning, Quezon City
INFRASTRUCTURE SOLUTIONS FOR SUSTAINING THE ENVIRONMENT AND PROFESSIONS
November 26, 2014 University of the East – Manila
ENGINEERS ON SCENE A Civil Engineering Specialization Congress November 21, 2013
University of the East – Manila
NATIONAL CIVIL ENGINEERING SYMPOSIUM 2013 September 06, 2013
University of the Philippines – Diliman
AFFILIATIONS ACES PICE
Treasurer (S.Y. 2015 – 2016) University of the East – Manila 2219 CM Recto Avenue Sampaloc, Manila
YOUTH PROFESSIONAL CIRCLE
Word of Hope Christian Family Church EDSA, Quezon City May 13, 2014 – Present
CHOIR, MUSIC MINISTRY
Word of Hope Christian Family Church EDSA, Quezon City March 2011 – August 2013
CHARACTER REFERENCES
ENGR. MARK ANTHONY L. ESCOBER
Instructor, College of Engineering University of the East – Manila 09178046486
ENGR. MARYCON A. SERRANO Instructor, College of Engineering
University of the East – Manila 09175527595
ENGR. REGINALD G. MORA Instructor, College of Engineering
University of the East – Manila 09275560762
I hereby certify that the above information is true and correct to the best of my
knowledge and belief.
____________________ ROSEMAY T. AQUINO
COMPUTATION FOR LABOR and RATES USED
ACTIVITY QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS
I. MOBILIZATION AND DEMOBILIZATION 1.00 lot 1 20 112
II. SURVEY WORKS 1.00 lot 40 2 7
III. SITE CLEARING 1.00 lot 1 2 3
IV. EARTHWORKS
Excavation 213.22 cu.m. 0.255 10 17
Gravel Bedding 5.48 cu.m. 9.46 2 4
Lean Concrete 1.19 cu.m. 9.46 2 3
Soil Poisoning 261.90 sq.m. - 4 3
Backfill 275.38 cu.m. 1.22 5 3
Earthfill 120.00 cu.m. 1.22 4 3
Compaction 118.61 cu.m. 7 3 7
V. CIVIL STRUCTURAL WORKS
Form Works
79
Footing 29.68 sq.m. 1 5 13
Columns 208.98 sq.m. 0.85 4 24
Footing Tie Beam 61.88 sq.m. 1 7 5
Wall Footing 26.60 sq.m. 1 5 3
Slab on Grade 110.32 sq.m. 1.2 10 2
Suspended Slab 115.96 sq.m. 1.2 9 7
Stairs 14.05 sq.m. 1.2 5 7
Beams and Girders 75.67 sq.m. 0.65 7 11
Roof Beams 73.14 sq.m. 0.65 8 4
Septic Tank 2.40 sq.m. 1.2 5 3
COMPUTATION FOR LABOR and RATES USED
ACTIVITY QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS
Form Works
Footing 47.35 kgs. 10 3 14
Columns 3,314.06 kgs. 10 4 24
Footing Tie Beam 789.12 kgs. 10 3 15
Wall Footing 229.35 kgs. 10 3 3
Slab on Grade 965.50 kgs. 10 5 3
Suspended Slab 965.50 kgs. 10 5 10
Stairs 186.00 kgs. 10 4 6
Wall 6,614.21 kgs. 10 10 25
Beams and Girders 1,494.49 kgs. 10 9 5
Roof Beams 1,413.84 kgs. 10 8 4
Septic Tank 44.3907042 kgs. 10 4 3
Concrete Works 33
Footing 27.42 cu.m. 0.665 5 3
Columns 10.51 cu.m. 1.1 4 8
Footing Tie Beam 6.19 cu.m. 0.765 5 4
Wall Footing 3.33 cu.m. 0.765 5 2
Slab on Grade 11.0324375 cu.m. 1.262 4 2
Suspended Slab 11.8081875 cu.m. 0.986 2 4
Stairs 0.83 cu.m. 0.2 2 4
Beams and Girders 5.27 cu.m. 1.262 3 2
Roof Beams 4.70 cu.m. 1.262 3 2
Septic Tank 3.84 cu.m. 0.2 3 2
Structural Steel Works 5,308.88 kgs. 20 5 10
COMPUTATION FOR LABOR and RATES USED
ACTIVITY QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS
VI. ARCHITECTURAL WORKS
Masonry Works
CHB Laying 1,167.29 sq.m. 6.4 12 25
Plastering 1,167.29 sq.m. 7.5 14 21
Floor Topping 141.51 sq.m. 1.33 4 21
Ceiling Works 424.52 sq.m. 2.4 3 21
Tile Works
Supply and Installation of 200 x 200 Lavatory Counter Tiles 13.00 sq.m. 3.2 3 7
Supply and Installation of 300 x 300 Toilet Wall Tiles 123.23 sq.m. 3.2 5 14
Supply and Installation of 600 x 600 Floor Tiles 141.51 sq.m. 2.67 6 25
Supply and installation of 150 x 900 Vinyle Planks 71.66 sq.m. 4 4 7
Painting Works
Wall Painting (Semi Gloss Latex in Roller Finish) 1,743.05 sq.m. 7 3 28
Ceiling Painting (Flat Latex in Roller Finish) 424.52 sq.m. 8 2 21
Painting of Doors (Enamel Paint in Roller Finish) 36.96 sq.m. 7 2 7
Doors and Windows 43.00 sets 4 4 7
Carpentry Works 1 lot - 3 14
Metal Works 1 lot - 5 21
VII. ELECTRICAL WORKS
Roughing - ins 1 lot - 5 27
Wires and Cables 1 lot - 4 21
Fixtures and Devices 1 lot - 3 7
Testing and Commissioning 1 lot - 3 7
COMPUTATION FOR LABOR and RATES USED
ACTIVITY QUANTITY UNIT UNIT/MH NO. OF WORKERS NO. OF DAYS
VIII. PLUMBING AND SANITARY WORKS
Roughing - ins 1 lot - 8 34
Fixtures and Devices 1 lot - 6 7
Testing and Commissioning 1 lot - 3 14
IX. THERMAL AND MOISTURE PROTECTION 218.75 sq.m. 9 7
X. SITE DEVELOPMENT WORKS
Fence and Posts 1 lot - 8 28
Lights 1 lot - 4 7
Gates 2 sets - 4 21
SCHEDULES
APPENDIX