cinema management system

Post on 09-Jan-2017

211 Views

Category:

Software

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CINEMA MANAGEMENT SYSTEMSoft-Touch Groupwww.softtouch.com

TEAM MEMBERS Hasnain Shah (Requirement Analyst) Arsalan Ali (Designer) Asad Riaz (Coder) Malik Farhan (Testing) Anam Shakil (Maintenance)

PROJECT INTRODUCTION History Problem Solution

MOTIVATION

TIME SCHEDULE Starting Date 1st November Requirement Analysis 2-3 Days Design 4-5 Days Coding 10 Days Testing 2 Days Ending Date 25 November

REQUIREMENT ANALYSIS Visit to A Cinema Group Meeting Traditional Vs Modern Needs

DESIGN Prototype Design (Coding) Login Software Outlook User Friendly Attractive Fulfill Requirements

CODING Link List Functions Graphics File Handling Structures

TESTING Bugs Errors Fulfill All Requirements Complexity Integrated Testing Unit Testing

TECHNICAL SPECIFICATION Login File Handling Updating Store Retrieve Deletion

TECHNICAL SPECIFICATION Search by Name Search by Seat Total Income of the day

CONCLUSION Easily Manageable No More Repetition No need of Extra Work No more Manually Work Online Booking Security

top related