cinema management system
TRANSCRIPT
CINEMA MANAGEMENT SYSTEMSoft-Touch Groupwww.softtouch.com
TEAM MEMBERS Hasnain Shah (Requirement Analyst) Arsalan Ali (Designer) Asad Riaz (Coder) Malik Farhan (Testing) Anam Shakil (Maintenance)
PROJECT INTRODUCTION History Problem Solution
MOTIVATION
TIME SCHEDULE Starting Date 1st November Requirement Analysis 2-3 Days Design 4-5 Days Coding 10 Days Testing 2 Days Ending Date 25 November
REQUIREMENT ANALYSIS Visit to A Cinema Group Meeting Traditional Vs Modern Needs
DESIGN Prototype Design (Coding) Login Software Outlook User Friendly Attractive Fulfill Requirements
CODING Link List Functions Graphics File Handling Structures
TESTING Bugs Errors Fulfill All Requirements Complexity Integrated Testing Unit Testing
TECHNICAL SPECIFICATION Login File Handling Updating Store Retrieve Deletion
TECHNICAL SPECIFICATION Search by Name Search by Seat Total Income of the day
CONCLUSION Easily Manageable No More Repetition No need of Extra Work No more Manually Work Online Booking Security