Christchurch Transportation Planning Post Feb 2011 Earthquake. Presented by Andrew Metherell. Contents. Introduction Land Use Available Data Estimating Changes Modelling The CTM Application and Results. Where is Christchurch?. Christchurch Statistics. Population: 415,000 - PowerPoint PPT Presentation

TRANSCRIPT

Christchurch Transportation Planning Post Feb 2011 Earthquake

Oceania Cube User Conference 2011

Presented by Andrew Metherell

Contents

Introduction Land Use

Available Data Estimating Changes

Modelling The CTM Application and Results

Oceania Cube User Conference 2011

Where is Christchurch?

Oceania Cube User Conference 2011

Christchurch Statistics

Population: 415,000 Households: 150,000 Total Area: 1,425 km2

Oceania Cube User Conference 2011

The Earthquakes

Oceania Cube User Conference 2011

~1,200 road surface defects >50,000 road surface defects

Oceania Cube User Conference 2011

The Effects

Roads closed, CBD shut Households, business, schools

and shops re-located Traffic increases on key routes Increased travel time Reduced trip reliability

Oceania Cube User Conference 2011

The Responses

“Get Christchurch Moving” – Emergency Response “Keep Christchurch Moving” Review of Forward Capital Works Programme

Utilise Christchurch Transportation Model (CTM)

Oceania Cube User Conference 2011

The Model

Land use based, various forecast years Person-based travel Strategic network representation Wide geographic area Daily travel calculations

Oceania Cube User Conference 2011

Christchurch Transportation Model

Land Use Data

Results

Network Data

Policy Assumptions

Oceania Cube User Conference 2011

Modelling Plan Immediate effects covered by emergency response

6 month post EQ (2011) Compare pre and post EQ travel demand changes Confirm observed change in travel patterns

5 years hence, 2016 various rates of recovery to CBD Identify recovery travel demand changes Test forward work programme effects

Long term, 2026 and 2041, assume full recovery (for now)

Oceania Cube User Conference 2011

Land Use – Available Data

Post Redirections

Residential “stickers” (red/yellow/green)

Local knowledge Transport planners Real estate experts

Oceania Cube User Conference 2011

Household Postal Redirections

As of 12 April 2011 64% redirects

remain with City

• FROM• TO

Oceania Cube User Conference 2011

Net Postal Redirections

3,700 redirects from (red)

2,400 redirects to (green)

Excludes PO boxes

Oceania Cube User Conference 2011

“Stickers”/Placards

What do the three colours mean? RED – Do not enter a red placarded building

because it is unsafe YELLOW – Buildings suitable for restricted access

until issues are resolved GREEN – Building accessed and no structural

hazards apparent

Oceania Cube User Conference 2011

Residential “Sticker” Status Red or yellow stickers 5,750 households “lost”

Oceania Cube User Conference 2011

Land Use – Estimating Changes

Determine overall net loss (pop/HHs) Determine geographic distribution

Reductions But increases in some areas

With CBD closed, where will business (& jobs) be?

Oceania Cube User Conference 2011

Net Loss – Population / HHs

Population loss 10,000 Christchurch

Estimate household reduction from population (2.6 ppl/hh)

3,800 less households

Oceania Cube User Conference 2011

Geographic Distribution

Household loss areas Residential sticker status Postal redirection

Vacant residential land Where will people move to? Zoned “vacant” residential land Some in damaged areas

Oceania Cube User Conference 2011

CBD Job Loss

Main job loss in CBD Unemployment likely

to rise (so fewer jobs overall)

Pre-quake 55,900 Post-quake 30,900

CBD Fringe-50%*

Pre=8,100Post=4,900

CBD Outer-10%

Pre=25,100Post=24,400

Oceania Cube User Conference 2011

Job changes around the city

Oceania Cube User Conference 2011

AIRPORTAIRPORT

CBDCBD

PORTPORT

Existing Major Business Areas

Oceania Cube User Conference 2011

Roads of National Significance

Modelling – Scenarios EvaluatedLA

ND

US

E

2011 2016 Onwards

Pre Post Initial RoNS Full RoNS

Pre

Post

2011

Post

Pre2016

Pre2026

Pre2041

4 Stage Model Run

Assignment only, fixed demands

Oceania Cube User Conference 2011

Forecast Post-Quake Changes

2011 Daily DemandINCREASE

DECREASE

Oceania Cube User Conference 2011

Future Network Implementation – Initial RoNS 2016 Daily Demand

Change with Initial Road of National Significance (CSM1 and Western Corridor)

INCREASEDECREASE

Oceania Cube User Conference 2011

Initial RoNS – Congestion Relief

Land use: 2016 Post-QuakeNetwork: 2011 Post-Quake

Land use: 2016 Post-QuakeNetwork: 2011 Initial RoNS

Oceania Cube User Conference 2011

Outcomes

CTM useful in post earthquake planning

Traffic forecasts consistent with post quake counts

Able to demonstrate initial RoNs required

Oceania Cube User Conference 2011