cement concrete road
Post on 23-Feb-2016
59 Views
Preview:
DESCRIPTION
TRANSCRIPT
CEMENT CONCRETE ROAD
The State Government have decided to give thrust to the scheme for construction of cement concrete roads in the villages in every nook and corner of the State with special focus on SC/ST/PVTG (Particularly Vulnerable Tribal Group) habitations.Fund Allocation: Block is treated as a unit. Fund will be allocated directly to the blocks each year equally.Flow of Funds: Funds from all sources to be aggregated. Scheme is implemented in convergence with other schemes like Biju KBK/
BRGF/ GGY/ TFC or any other scheme. Untied in nature and supplement to the programme and provide synergy and
convergence to the different development programmes. The labour cost – MGNREGS.
Target:
Certain number of villages will be taken up each year with an aim to cover all the villages under the scheme over a definite time frame with focus on habitations of weaker and most vulnerable social groups in convergence with other schemes.
Guidelines - Cement Concrete Road
Selection of villages:
B.D.O. is authorized to select the villages to be taken up:i. The villages/habitations inhabited by PVTGs with no coverage of C. C. Road -
1st preference. ii. PVTG villages partially covered with C. C. Roads – 2nd priority. iii. Villages inhabited by STs in majority with no coverage of C .C. Road.iv. ST villages partially covered with C. C. Roads. v. Villages of SC community with no coverage of C .C. Road.vi. SC villages partially covered with C. C. Roads.vii. Bigger habitation having no coverage of C.C. road – Next Priorityviii. In other habitations, the C. C. Roads should be planned for execution from the
ST/ SC basti towards the main habitation and not vice-versa.ix. The villages belonging to other category already covered with 500 metres or
more of C.C. Roads should not be ordinarily considered under this scheme.
Preparation of Annual Action Plan:a) BDO shall draw up a perspective plan by listing all the
habitations/villages GPwise for his block in the order of priority described above.
b) The annual action plan should be drawn up out of the perspective plan so prepared keeping in view the availability of resources. Only after coverage of all the habitations/villages mentioned in the category (i) above, category (ii) cases will be included in the plan. Same logic shall apply for category (iii) and subsequently, category (iv) and other villages.
c) List of projects finalized by the B.D.O. shall be submitted to the Collector for his approval.
d) Collector will draw up a holistic plan Block wise / G.P.wise taking into consideration the likely flow of fund under various schemes and possibility of convergence.
Preparation of Annual Action Plan (contd…):
e) Balance portion of the village can be taken up so as to achieve the target of 500 metre.
f) Complete transparency in the choice of project and location. Block Plan be made available in the website.
g) The Revenue village-wise fund entitlement based on population.
Population Fund entitlement of the village
0 to 500 3.00 Lakh
501 to 1000 5.00 Lakh
Above 1000 7.00 Lakh
Preparation of Annual Action Plan (contd…):
h) Every year, the Action Plan consisting the list of villages to be taken up,
population of the village with specific reference to PVTG, ST/SC and the project
cost for each project shall be prepared by B.D.O. following the procedure
prescribed above and submitted to Collector by 31st January to be considered
for the next financial year. Collector shall ensure approval of the action plan
based on the principles enunciated in para-5 above and communicate the
same to the respective block development officer latest by 28th/29th February.
i) As soon as the first instalment of the allocation is received by the blocks, they
should issue work orders to the already identified VLLs/ Gram Sanjojaks as per
the approved action plan for the year.
Implementing Agency: Panchayat Samiti. Execution of Work:
a. Executed either by Gram Sanjojak or through VLL selected by Palli Sabha.
b. Overall responsibility for implementation of the Scheme shall lie with Collector &
Project Director of the district.
c. DRDA shall furnish monthly progress report (MPR)
Social Audit: Social Audit and vigilance shall be encouraged at grass-roots level.
Collector of the district shall also prepare schedules of inspection which
prescribe the minimum number of field visits for each supervisory level
functionary and shall ensure that the inspection schedules are faithfully followed
by supervisory level functionaries.
Progress under CC Road upto March, 2011FINANCIAL ACHIEVEMENT• State Release - ` 75.00 Cr
• Total Funds Availabale - ` 75.00 Cr.
• Funds utilised - ` 39.05 Cr
• Percentage of utilisation - 52%
PHYSICAL ACHIEVEMENT• No. of works Taken up - 3016
• No. of works Completed - 1166
• Percentage of achievement - 39%
• Length of CC Road constructed - 244.42 Km.
Percentage of utilisation of TFA under CC Road during 2010-11
Jaga
tsin
ghpu
rBa
lang
irN
uapa
daSa
mba
lpur
Deog
arh
Jajp
urCu
ttack
Angu
lBa
rgar
hN
awar
angp
urBo
udh
Keon
jhar
Kala
hand
iDh
enka
nal
Sund
erga
rhJh
arsu
guda
Bhad
rak
Bala
sore
Ganj
amO
RISS
ASu
barn
apur
Gaja
pati
May
urbh
anj
Mal
kang
iriN
ayag
arh
Kend
rapa
raRa
yaga
daPu
riKo
rapu
tKa
ndha
mal
Khur
da
91 9084
8178
72 71 68 68 67 67 6562 61
57 56 54 53 52 52 50 48 47 45 44
26 2519
106 4
%
Percentage of Physical Achievements under CC Road during 2010-11
%
88 86 85
75 75
6459
57 57 56 5552
50 48 4743
40 39 39 37 36
2825
2017
14
84
0 0 0
Financial & Physical Achievements under CC Road during 2010-11Sl. No.
District Financial (` in Lakh) Physical (Projects in Nos.)Total Funds Available Expenditure % Taken up Completed % Length (In
Kms.)1Angul 191.08 130.86 68 64 38 59 5.502Balangir 334.40 301.93 90 155 132 85 19.773Balasore 286.62 151.19 53 102 53 52 2.524Bargarh 286.62 194.58 68 116 65 56 10.265Bhadrak 167.20 90.10 54 120 52 43 16.306Boudh 71.66 48.00 67 36 17 47 1.807Cuttack 334.39 237.84 71 183 137 75 14.208Deogarh 71.66 55.60 78 24 18 75 2.709Dhenkanal 191.08 115.70 61 80 32 40 5.78
10Gajapati 167.20 80.43 48 77 6 8 4.0211Ganjam 525.48 275.04 52 171 43 25 33.0012Jagatsinghpu
r 191.08 173.86 91 52 46 88 9.4713Jajpur 238.85 172.46 72 83 32 39 14.5214Jharsuguda 119.43 66.87 56 31 15 48 3.0815Kalahandi 310.51 191.22 62 131 75 57 9.7616Kandhamal 286.62 17.00 6 23 0 1.4017Kendrapara 214.97 56.12 26 30 6 20 5.9618Keonjhar 310.51 201.64 65 89 33 37 7.9319Khurda 238.85 9.00 4 150 0 20Koraput 334.39 32.00 10 102 14 14 3.3221Malkangiri 167.20 74.83 45 33 0 0 22Mayurbhanj 621.02 289.29 47 151 75 50 14.4623Nawarangpu
r 238.85 160.36 67 140 77 55 11.2224Nuapada 119.43 100.80 84 37 32 86 6.4425Nayagarh 191.08 84.09 44 77 13 17 4.7826Puri 262.74 51.03 19 481 18 4 1.4527Rayagada 262.74 65.99 25 60 17 28 3.4828Sambalpur 214.97 173.63 81 70 45 64 16.0529Subarnapur 143.31 71.80 50 44 16 36 0.5530Sundergarh 406.05 231.25 57 104 59 57 14.70
TOTAL 7499.99 3904.51 52 3016 1166 39 244.42
CLUSTER HOUSING
Financial & Physical achievements made (Cumulative up to end of April 2011)
Sl. No.
District Financial (` in Lakh) Physical Receipt
During the Year
Exp. upto end of the
month
Balance UC submitted
No. of quarters for which
funds released
No. of quarters taken up
No. of quarters
completed
No. of quarters
in progress
Quarter handed over to the H &
FW Deptt.
1 2 3 4 5 6 7 8 9 10 111Angul 77.70 77.70 0.00 19.92 16 16 16 0 162Bargarh 110.70 81.80 28.90 0.00 20 20 5 15 33Bhadrak 95.25 90.25 5.00 8.73 17 17 6 11 04Deogarh 47.10 45.00 2.10 0.00 9 9 8 1 45Dhenkanal 99.90 48.78 51.12 24.45 18 18 0 18 06Gajapati 248.96 219.39 29.57 104.13 52 52 43 9 20
7Jagatsinghpur 78.75 72.75 6.00 15.58 15 15 14 1 5
8Jajpur 30.90 30.90 0.00 0.00 6 6 6 0 09Kandhamal 716.33 378.35 337.98 11.49 150 132 14 118 9
10Keonjhar 579.96 519.65 60.31 433.23 114 114 84 30 6811Malkangiri 116.85 116.55 0.30 0.00 23 23 19 4 012Mayurbhanj 955.33 943.78 11.55 409.07 197 197 174 23 13113Nayagarh 26.25 26.25 0.00 26.25 5 5 5 0 514Sambalpur 373.76 364.14 9.62 176.03 77 77 69 8 6715Sundergarh 802.33 712.53 89.80 674.70 174 161 144 17 73
Total 4360.07 3727.82 632.25 1903.58 893 862 607 255 401
12TH F.C.A.
Percentage of utilisation of TFA upto April 2011 (since inception)D
henk
anal
Gaj
apat
i
Khu
rda
Puri
Suba
rnap
ur
Bal
angi
r
Bha
drak
Ken
drap
ara
Sund
erga
rh
Ang
ul
Bou
dh
Keo
njha
r
Deo
garh
Mal
kang
iri
Naw
aran
gpur
Sam
balp
ur
Kor
aput
May
urbh
anj
Nay
agar
h
Bal
asor
e
Ray
agad
a
Cut
tack
OR
ISSA
Kan
dham
al
Nua
pada
Jaga
tsin
ghpu
r
Kal
ahan
di
Jajp
ur
Bar
garh
Jhar
sugu
da
Gan
jam
100 100100 100100100 100100100 100 100100100100 10010099 99 99 99 98 98 98 98 98
9796
96 96
93
89
%
Percentage of U.C to Released Amount upto April 2011 (since inception)
%
May
urbh
anj
Naw
aran
gpur
Nay
agar
h
Kal
ahan
di
Sund
erga
rh
Bha
drak
Bal
angi
r
Gaj
apat
i
Mal
kang
iri
Jajp
ur
Sam
balp
ur
Ray
agad
a
Cut
tack
Deo
garh
Kan
dham
al
OR
ISSA
Nua
pada
Puri
Gan
jam
Khu
rda
Suba
rnap
ur
Keo
njha
r
Jaga
tsin
g...
Dhe
nkan
al
Bal
asor
e
Ang
ul
Jhar
sugu
da
Kor
aput
Bou
dh
Bar
garh
Ken
drap
ara
95 94 94 93 93 91 90 90 89 89 87 85 85 85 83 81 81 80 79 79 79 7973 73 71 69 69 68 65
61 60
Financial Achievements made under 12th FCA upto April 2011 (Since inception)Sl. No.
District Financial (` in lakh)Funds Released Expenditure % of expr UC submitted % UC to Released amount
1Angul 3451.87 3444.82 100 2392.03 692Balangir 4223.05 4223.05 100 3821.70 903Balasore 5022.35 4952.88 99 3590.27 714Bargarh 4373.85 4180.68 96 2671.44 615Bhadrak 3280.08 3280.07 100 2975.94 916Boudh 1018.21 1015.61 100 665.82 657Cuttack 5728.80 5634.62 98 4846.40 858Deogarh 947.16 944.20 100 801.06 859Dhenkanal 2945.16 2945.16 100 2150.06 73
10Gajapati 2325.92 2325.92 100 2103.36 9011Ganjam 7115.98 6332.37 89 5621.41 7912Jagatsinghpur 3271.24 3173.62 97 2391.32 7313Jajpur 4606.67 4408.01 96 4086.90 8914Jharsuguda 1259.57 1176.56 93 870.45 6915Kalahandi 4087.26 3934.17 96 3808.29 9316Kandhamal 2496.35 2447.44 98 2084.34 8317Kendrapara 3877.87 3872.88 100 2330.26 6018Keonjhar 4296.48 4285.48 100 3375.30 7919Khurda 3265.57 3265.57 100 2568.64 7920Koraput 3563.85 3536.20 99 2406.35 6821Malkangiri 1750.74 1744.21 100 1557.52 8922Mayurbhanj 6226.03 6174.15 99 5919.26 9523Nawarangpur 2708.44 2698.07 100 2557.00 9424Nuapada 1645.30 1607.74 98 1326.22 8125Nayagarh 3093.76 3059.02 99 2907.66 9426Puri 4107.17 4107.17 100 3295.31 8027Rayagada 2712.64 2668.81 98 2303.82 8528Sambalpur 2323.40 2314.27 100 2026.60 8729Subarnapur 1565.06 1565.06 100 1229.75 7930Sundergarh 4211.45 4204.21 100 3919.82 93
TOTAL 101501.29 99522.01 98 82604.29 81
Percentage of Physical achievements made upto April 2011 (since inception)
Bal
angi
rB
hadr
akD
eoga
rhD
henk
anal
Gaj
apat
iJh
arsu
guda
Khu
rda
Naw
aran
gpur
Suba
rnap
urA
ngul
Sund
erga
rhM
ayur
bhan
jB
alas
ore
Ray
agad
aK
endr
apar
aK
eonj
har
Sam
balp
urN
ayag
arh
Cut
tack
Kor
aput
Kan
dham
alB
oudh
Mal
kang
iriK
alah
andi
Puri
OR
ISSA
Bar
garh
Jaga
tsin
ghpu
rN
uapa
daG
anja
mJa
jpur
100 100 100 100100 100 100 100100 100100 100100 100100100 100 100100 100100 100 100 99 99 99 9998 98
87 87
%
Physical Achievements under 12th FCA upto April’11(since inception)Sl. No. District Project taken up Projects Completed %
1Angul 7256 7255 1002Balangir 3405 3405 1003Balasore 32754 32745 1004Bargarh 5486 5425 995Bhadrak 3560 3560 1006Boudh 1260 1256 1007Cuttack 5593 5581 1008Deogarh 864 864 1009Dhenkanal 1798 1798 100
10Gajapati 1559 1559 10011Ganjam 5539 4837 8712Jagatsinghpur 2321 2273 9813Jajpur 2596 2258 8714Jharsuguda 906 906 10015Kalahandi 2610 2595 9916Kandhamal 2915 2908 10017Kendrapara 1868 1867 10018Keonjhar 7281 7276 10019Khurda 1249 1249 10020Koraput 2503 2497 10021Malkangiri 850 846 10022Mayurbhanj 37369 37360 10023Nawarangpur 3954 3954 10024Nuapada 2339 2282 9825Nayagarh 2493 2489 10026Puri 1312 1303 9927Rayagada 15294 15287 10028Sambalpur 2184 2182 10029Subarnapur 1876 1876 10030Sundergarh 18863 18860 100
TOTAL 179857 178553 99
13th F.C.A.
Financial Achievements under 13th FCA upto March 2011 during 2010-11(` In Lakh)
Sl. No
District OB Funds Received during the year
Total Funds Available
Expenditure % of Exp. Balance
1 2 3 4 5 6 7 81Angul - 790.17 790.17 250.77 32 539.402Bolangir - 1058.31 1058.31 493.06 47 565.253Balasore - 1164.57 1164.57 338.92 29 825.654Bargarh - 942.24 942.24 0.00 0 942.245Bhadrak - 760.18 760.18 366.98 48 393.206Boudh - 245.02 245.02 5.18 2 239.847Cuttack - 1302.19 1302.19 445.67 34 856.528Deogarh - 222.98 222.98 78.38 35 144.609Dhenkanal - 753.32 753.32 112.83 15 640.49
10Gajapati - 546.65 546.65 0.30 0 546.3511Ganjam - 1854.42 1854.42 0.00 0 1854.4212Jagatsinghpur - 734.83 734.83 339.42 46 395.4113Jajpur - 1081.34 1081.34 147.89 14 933.4514Jharsuguda - 290.85 290.85 0.00 0 290.8515Kalahandi - 1056.13 1056.13 431.31 41 624.8216Kandhamal - 691.86 691.86 111.21 16 580.6517Kendrapara - 1006.05 1006.05 92.35 9 913.7018Keonjhar - 1169.92 1169.92 410.49 35 759.4319Khurda - 666.99 666.99 413.27 62 253.7220Koraput - 1054.36 1054.36 124.60 12 929.7621Malkangiri - 502.51 502.51 27.40 5 475.1122Mayurbhanj - 1901.47 1901.47 515.05 27 1386.4223Nawarangpur - 859.71 859.71 206.26 24 653.4524Nuapada - 409.56 409.56 13.58 3 395.9825Nayagarh - 675.26 675.26 246.61 37 428.6526Puri - 893.27 893.27 544.02 61 349.2527Rayagada - 794.70 794.70 81.75 10 712.9528Sambalpur - 607.46 607.46 165.43 27 442.0329Subarnapur - 367.79 367.79 34.00 9 333.7930Sundergarh - 1301.57 1301.57 0.00 0 1301.57
Total 0.00 25705.68 25705.68 5996.73 23 19708.95
STATE FINANCE COMMISSION AWARD
Percentage of utilisation of TFA under SFC upto March’11 during 2010-11
57
44
41 40
3534 32
29 2826
24
21 21 20 20 19 18 1816 15
1412 12 12 11
9 9 8 7 6 6
%
Percentage of physical achievements under SFC upto March’11 during 2010-11
89
75
6965 64 64 64
61
54 54 52 51 50 48 47 46 44 4442
3935 35 35
2825
1713 11
64 2
%
Financial & Physical achievements under SFC upto March 2011 during 2010-11Sl. No.
District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %
1Angul 437.84 193.52 44 106 79 752Balangir 852.31 162.65 19 171 109 643Balasore 612.58 70.78 12 157 84 544Bargarh 685.37 73.91 11 200 83 425Bhadrak 394.91 64.20 16 66 11 176Boudh 228.62 92.91 41 60 30 507Cuttack 1097.22 355.34 32 344 178 528Deogarh 196.42 66.00 34 46 21 469Dhenkanal 488.98 44.50 9 79 38 48
10Gajapati 316.03 93.15 29 141 55 3911Ganjam 1446.55 91.49 6 319 111 3512Jagatsinghpur 319.85 37.97 12 127 81 6413Jajpur 1040.64 214.25 21 250 134 5414Jharsuguda 456.53 95.00 21 9 1 1115Kalahandi 795.16 48.09 6 107 14 1316Kandhamal 472.27 31.90 7 48 2 417Kendrapara 812.90 111.50 14 208 91 4418Keonjhar 536.36 212.88 40 77 39 5119Khurda 810.62 198.19 24 83 21 2520Koraput 417.52 63.45 15 164 113 6921Malkangiri 247.20 69.96 28 41 25 6122Mayurbhanj 1144.37 210.57 18 201 89 4423Nawarangpur 345.89 40.36 12 67 19 2824Nuapada* 268.27 23.30 9 44 1 225Nayagarh 635.43 222.60 35 195 69 3526Puri 484.70 86.10 18 175 156 8927Rayagada 589.25 46.71 8 109 7 628Sambalpur 660.43 169.95 26 166 106 6429Subarnapur 369.15 209.40 57 74 48 6530Sundergarh 798.44 159.97 20 88 31 35
Total 17961.80 3560.60 20 3922 1846 47
Financial & Physical Achievements under SFC during April 2011 Sl. No.
District Financial (` in Lakh) Physical (No. of Projects)TFA Expenditure % Taken up Completed %
1Angul 244.32 0.00 0 27 0 02Balangir 689.66 0.00 0 62 0 03Balasore 541.80 0.00 0 73 0 04Bargarh 611.46 0.00 0 117 0 05Bhadrak 330.71 0.00 0 55 0 06Boudh 170.91 0.00 0 30 0 07Cuttack 741.88 0.00 0 166 0 08Deogarh 130.42 0.00 0 25 0 09Dhenkanal 444.48 0.00 0 41 0 0
10Gajapati 222.88 0.00 0 86 0 011Ganjam 1355.06 39.02 3 208 0 012Jagatsinghpur 281.88 0.00 0 46 0 013Jajpur 826.39 0.00 0 116 0 014Jharsuguda 361.53 0.00 0 8 0 015Kalahandi 747.07 0.00 0 93 0 016Kandhamal 440.37 0.00 0 46 0 017Kendrapara 701.40 0.00 0 117 0 018Keonjhar 329.22 0.00 0 38 0 019Khurda 612.43 0.00 0 62 0 020Koraput 354.07 1.00 0 51 0 021Malkangiri 177.24 0.00 0 16 0 022Mayurbhanj 936.05 0.00 0 112 0 023Nawarangpur 305.53 0.00 0 48 0 024Nuapada* 244.97 0.00 0 43 0 025Nayagarh 412.83 27.40 7 126 4 326Puri 398.60 0.00 0 19 0 027Rayagada 548.04 0.00 0 102 0 028Sambalpur 490.48 0.00 0 60 0 029Subarnapur 159.75 0.00 0 26 0 030Sundergarh 685.42 0.00 0 57 0 0
Total 14496.85 67.42 0 2076 4 0
RASTRIYA GRAM SWARAJ YOJANA(RGSY)
SUBMISSION OF UC OF RGSY SCHEMES RELATING TO GPS BUILDING IN REVISED UC FORMAT(Rs. In Lakh)
Sl. No. Name of the District Grant released UC submitted Balance UC to be submitted1 2 3 5 6
1ANGUL 6.00 6.00 0.002BALANGIR 23.25 23.25 0.003BALASORE 22.50 22.50 0.004BARGARH 10.50 10.50 0.005BHADRAK 12.00 12.00 0.006BOUDH 0.00 0.00 0.007CUTTACK 27.00 20.00 7.008DEOGARH 0.00 0.00 0.009DHENKANALA 16.50 16.50 0.00
10GAJAPATI 21.75 0.00 21.7511GANJAM 20.63 0.00 20.6312JAGAT SINGHPUR 3.75 0.00 3.7513JAJPUR 17.25 0.00 17.2514JHARSUGUDA 17.25 0.00 17.2515KALAHANDI 22.50 0.00 22.5016KANDHAMAL 0.00 0.00 0.0017KENDRAPADA 37.50 0.00 37.5018KEONJHAR 4.50 0.00 4.5019KHURDA 13.88 0.00 13.8820KORAPUT 24.75 0.00 24.7521MALKANGIRI 15.00 0.00 15.0022MAYURBHANJ 21.75 0.00 21.7523NABARANGPUR 53.25 53.25 0.0024NUAPADA 14.25 14.25 0.0025NAYAGARH 37.50 0.00 37.5026PURI 15.00 0.00 15.0027RAYAGADA 9.75 0.00 9.7528SAMBALPUR 18.00 0.00 18.0029SUBARNAPUR 6.00 0.00 6.0030SUNDERGARH 0.00 0.00 0.00
TOTAL 492.00 178.25 313.75
DISTRICT LEVEL VIGILANCE &
MONITORING COMMITTEE MEETING(DLVMC)
Details meetings of Distrct-level Vigilance & Monitoring Committee held during 2010-11
Sl. No Districts Dates of V &MC meeting conducted during 2010-111st Quarter 2nd Quarter 3rd Quarter 4th Quarter Remarks
1 Angul 05.06.10 05.10.10 02.02.11 2 Bargarh 11.07.10 3 Balasore 18.06.10 20.11.10 4 Bhadrak 07.04.10 17.09.10 06.10.10 5 Bolangir 02.09.10 19.01.11 6 Boudh 06.11.10 7 Cuttack 03.06.10 8 Dhenkanal 20.05.10 22.09.10 9 Deogarh Nil Nil Nil Nil
10 Ganjam 25.09.10 02.11.10 10.02.11 11 Gajapati 10.07.10 28.01.11 12 Jajpur 05.06.10 04.11.10 13 Jagatsinghpur 21.08.10 27.01.11 14 Jharsuguda 12.07.10 15 Kandhmal 09.04.10 20.11.10 16 Kalahandi Nil Nil Nil Nil 17 Khurdha 29.06.10 30.12.10 16.05.11 date fixed18 Koraput 09.09.10 19 Keonjhar 07.07.10
20 Kendrapada 08.04.10, 09.06.10 14.09.10
21 Mayurbhanj 18.06.10 12.05.11 date fixed22 Malkangiri 20.09.10 23 Nayagarh 03.07.10 24 Nabarangpur Nil Nil Nil Nil 25 Nuapada 05.04.10 26 Puri 18.06.10 19.01.11 27 Rayagada Nil Nil Nil Nil 28 Sambalpur Nil Nil Nil Nil 29 Sonepur 11.06.10 06.09.10 06.02.11 30 Sundargarh 08.07.10 12.01.11
• Timely submission of MPRs and other reports.
• C.B. & O.B. to be matched.
• Any change in the O.B. to be intimated and
prior permission to be obtained from the
Department.
ISSUES OF M.I.S
top related