Booker T. Washington High School

Design Update

Date: 06/02/2015 Presenter: Jim Hepburn Fanning Howey / House+Partners Architects

2

•  Description of the Fault –  Impact on Current Design – Review of Current Site plans

•  New Site Plan – Revised Building Layout – 2-Story Neighborhood – Design and Construction Schedule

•  Discussion

Agenda

6

Current Overall Floor Plan

7

Current Overall Floor Plan

Relocated Child Care

8

Current Overall Floor Plan

Create 2-Story Neighborhood

9

Current Overall Floor Plan

Relocate Neighborhood And CTE

Solution Advantages • All buildings are north of

the fault line. • Utilizes existing design

components. • Allows completion of the

new buildings prior to demolishing of the existing school.

•  Least disruptive to existing school schedule and activities.

• Current track and football field may be retained, as proposed in current documents.

Preliminary Design ( In Development )

12

Preliminary Design ( In Development )

13

Preliminary Design ( In Development )

14

Preliminary Design ( In Development )

15

Preliminary Design ( In Development )

Thank you

Date: 06/02/2015 Presenter: Jim Hepburn Fanning Howey / House+Partners Architects