While BCA tries to highlight the major points of submission requirements, BCA cannot take into account all the special cases in other regulatory agencies as well as the changing technology. Updated versions will continue to be issued to address and incorporate on-going feedback in an open, collaborative process. All readers of this provisional guide are encouraged to submit feedback to BCA CORENET. No part of these materials should be copied, reproduced or published in any form by any means whatsoever electronic or mechanical including photocopy or by way of any information storage or retrieval system nor should the material be disclosed to other parties without the express written authorisation of Building and Construction Authority. Information and contents set forth in this document are subject to changes and will be released as updates in subsequent version.
Building and Construction Authority
5 Maxwell Road #16-00 Tower Block MND Complex
Singapore 069110 www.bca.gov.sg
BBIIMM --SSuubbmmiissssiioonn GGuuiiddeelliinnee
ffoorr AArrcchhiitteeccttuurraall DDiisscciipplliinnee
We shape a safe, high quality, sustainable and friendly built environment.
e
Version Revision Date Summary of Changes Remarks
3.0 Aug 08 Released to Pilot Sites
3.5 Jan 10 Re-specification of BIM submission file format to different regulatory agencies
Removal of Appendix D on Naming Convention of BIM Objects
Amendments of URA requirements (Section 2.2)
Addition of requirements from following regulatory agencies:
i) BCA CD Shelter; ii) LTA; iii) HDB; and iv) JTC
Official Release
Copyright © 2010 Building and Construction Authority
For further comments or questions, please write to:
CORENET BIM Team
Building and Construction Authority
5 Maxwell Road
#16-00 Tower Block MND Complex
Singapore 069110
BIM Submission Guideline for Architectural Discipline
i
CONTENTS CONTENTS ................................................................................................................................. i
TABLES .................................................................................................................................... iii
FIGURES ................................................................................................................................... iii
1. Introduction ............................................................................................. 11.1. Purpose of Document ................................................................................................ 1
1.2. Scope ......................................................................................................................... 1
2. General Requirements ........................................................................... 22.1. Deliverable Format ..................................................................................................... 2
2.2. Model Scale ............................................................................................................... 3
2.3. Model Orientation and Site Configuration .................................................................. 3
2.4. Standard Naming of File and Drawing Views ............................................................ 3
2.5. Annotations and Dimensions ..................................................................................... 5
2.6. Last Saved Model or Last Saved View ...................................................................... 5
2.7. Model for Addition and Alteration Works/ Re-submission ......................................... 6
3. High-Level Modelling Requirements (Optional) ................................... 8
Appendix A Specific Submission Requirements ...................................... 10A-1 BCA Submission Requirements ............................................................................... 10
1. Building Plan (BP) ............................................................................................... 10
2. CD Shelter (HS/SS) ............................................................................................ 14
A-2 URA Submission Requirements .............................................................................. 19
1. General Requirements for All URA Submissions ................................................ 19
2. GFA Calculation Plan .......................................................................................... 21
3. Proposal /Diagrammatic Plan for Subdivision of Lands/Strata Subdivision
Buildings .............................................................................................................. 25
4. Landscape Plan ................................................................................................... 25
A-3 NEA-CBPU and PUB Submission Requirements .................................................... 26
1. Development Control .......................................................................................... 26
2. Building Plan on Pollution Control ....................................................................... 29
3. Building Plan on Environmental Health ............................................................... 31
4. Detailed Plan on Sewerage Works (Proposed Sewer/ Sewer Diversion Works) 33
5. Detailed Plan on Sanitary Works (for Sanitary Plumbing & Drainage System/
Sewer Connection) .............................................................................................. 35
6. Detailed Plan on Sewerage M&E Works ............................................................ 36
7. Detailed Plan on Drainage Works – Main Development Submission ................. 37
8. Detailed Plan on Drainage Works – Proposed Roadside Drain/ Culvert ............ 39
BIM Submission Guideline for Architectural Discipline
ii
9. As-built Plan for TOP/CSC – Proposed Sewer/ Pumping Mains/ Sewer/ Pumping
Main Diversion Works ......................................................................................... 41
10. As-built Plan for TOP/CSC – Sanitary Works (Sanitary Plumbing & Drainage
System/ Sewer Connection) ................................................................................ 43
11. As-built Plan for CSC – Proposed Roadside Drain/ Culvert ............................. 45
12. As-built Plan for CSC – Pumped Drainage System at Basement ..................... 47
13. As-built Plan for CSC – Internal Drain with Deviations ..................................... 47
14. Certified Survey Plan for CSC – Development in the Vicinity of/ Affected by
Drainage Reserve ............................................................................................... 48
15. URA Approved Sub-division Plan for CSC – for Site Affected by Drainage
Reserve ............................................................................................................... 49
A-4 FSSD Submission Requirements ............................................................................ 50
1. General Requirements for All FSSD Submissions .............................................. 50
2. Air-Conditioning, Mechanical Ventilation and Fire Protection Works .................. 53
A-5 NParks Submission Requirements .......................................................................... 55
1. General Requirements for all NParks Development Application (DC)
Submissions ........................................................................................................ 55
2. General Requirements for NParks Building Plan (BP) Submissions (excluding
external works submissions) ............................................................................... 58
3. General Requirements for NParks Certificate of Statutory Completion (CSC)
Submissions (excluding external works submissions) ........................................ 61
A-6 LTA Submission Requirements ............................................................................... 63
1. General Requirements for LTA/DBC (RAIL) ....................................................... 63
2. LTA/DBC (Rail) – Development Proposal in Railway Protection Zone ............... 63
3. LTA/DBC (Rail) – Building Proposal in Railway Protection Zone ....................... 64
4. LTA/DBC (Rail) – Engineering Work Proposal in Railway Protection Zone ....... 65
5. LTA/DBC (Rail) – Certified Survey Plan ............................................................. 65
6. LTA/DBC (Rail) – Development Proposal in Railway Corridor ........................... 66
7. LTA/DBC (Rail) – Building Proposal in Railway Corridor .................................... 66
8. LTA/DBC (Rail) – Engineering Work Proposal in Railway Corridor .................... 67
9. General Requirements for LTA/DBC (Roads & Transport) ................................. 68
10. General Requirements for LTA/DBC (Vehicle Parking) .................................... 69
A-7 HDB Submission Requirements .............................................................................. 71
A-8 JTC Submission Requirements ............................................................................... 72
Appendix B Standard Certifications for Building Works .......................... 73B-1 BCA: Qualified Person’s Endorsements .................................................................. 73
B-2 URA: Qualified Person’s Endorsements .................................................................. 76
B-3 FSSD: Qualified Person’s Endorsements ................................................................ 78
Appendix C Step-by-Step Guide Preparing for BIM Submission ............. 81
BIM Submission Guideline for Architectural Discipline
iii
C-1 Users of Autodesk Revit .......................................................................................... 81
C-2 Users of Graphisoft ArchiCAD and Other 3D Modelling Tools ................................ 84
ACKNOWLEDGEMENTS ....................................................................................................... 90
GLOSSARY OF ACRONYMS USED ..................................................................................... 92
TABLES Table 1 Accepted file format in BIM submission for regulatory approval .................................. 2
Table 2 Naming convention for each 3D model or BIM file submitted ...................................... 3
Table 3 Naming convention for each drawing view .................................................................. 4
Table 4 Colours used for A&A project ....................................................................................... 6
Table 5 Table format of Data of Household Shelter ................................................................ 17
Table 6 Table format of Data of Apartment Units & Data of Storey Shelter ........................... 18
Table 7 Table format of Gross Floor Area Summary .............................................................. 23
Table 8 Table format for summary of existing trees/ single stem palms (for DC Submission) 57
Table 9 Table format for summary of existing trees/ single stem palms (for BP Submission) 60
FIGURES Figure 1 Schematic diagram showing the steps in preparing the 3D CAD model for
submission ................................................................................................................. 3
Figure 2 Sample of new erection project with name of plan indicated at the bottom ............... 5
Figure 3 Sample of A&A project / project for re-submission (plan and 3D views) .................... 7
Figure 4 Sample of project for re-submission (plan view for storey with no amendments) ...... 7
Figure 5 Sample of site plan view in BIM model ..................................................................... 10
Figure 6 Sample floor plan with indication of platform levels and room tags ......................... 11
Figure 7 Sample of floor plan with elevation and section line or marker (highlighted in BLUE)
.................................................................................................................................. 12
Figure 8 Sample of elevation or sectional view ...................................................................... 12
Figure 9 Sample of layout view with QP’s declaration and company’s profile (BCA BP
submission) .............................................................................................................. 13
Figure 10 Sample floor plan with setback distance envelop .................................................. 14
Figure 11 Sample floor plan with trellis ................................................................................... 15
Figure 12 Sample floor plan with down-hang beam ............................................................... 15
Figure 13 Sample of CD Shelter declaration endorsement with standard approval stamp .... 17
Figure 14 Sample of layout view with QP’s declaration and company’s profile (URA
submission) .............................................................................................................. 21
Figure 15 Sample floor plan view (a close-up) with space boundary (in BLUE) for GFA
calculation ................................................................................................................ 22
Figure 16 Sample of layout view with QP’s declaration and company’s profile (FSSD BP
submission) .............................................................................................................. 53
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 1
1. Introduction 1.1. Purpose of Document
The objective of this Document is to assist qualified persons (QPs) in developing
BIM models to meet new requirements of Building Information Model (BIM)
submission. It describes the requirements and guidance for creating BIM with
specific object types, associated properties and presentation format to the following
regulatory agencies for visual processing:
a. Building and Construction Authority (BCA)
b. Urban Redevelopment Authority (URA)
c. National Environment Agency (NEA)
d. Public Utility Board (PUB)
e. Fire Safety and Shelter Department (FSSD)
f. National Parks Board (NParks)
g. Land Transport Authority (LTA)
h. Housing and Development Board (HDB)
i. JTC Corporation
1.2. Scope This submission guideline contains a list of requirements written in a concise form to
guide QPs in preparing BIM submission to the above mentioned regulatory
agencies. It is by no means an exhaustive list of requirements of the building works
which must be complied with when making a building plan or planning submission.
The items in this Standard Guideline may also be amended or revoked when new
written laws come into force. For more information or enquiries on the specific
submission requirements, please consult the appropriate regulatory agency above.
CAD vendors and retailers have developed their own application dependent user
manuals. These user manuals should be read carefully as this Document cannot
take into account all the special features of individual BIM application. For any
submission requirements mentioned in the Appendices that require customisations
to a certain extent, QPs are also advised to make reference to the training materials
distributed or to consult the respective software vendor for any enquiries on the
application. If there are contradictions between this submission guideline and
vendor’s instructions, BCA BIM team shall be contacted for clarification.
Note: The respective regulatory agency reserves the right to reject and request for necessary correction of any required deliverables or formats that do not meet the requirements.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 2
2. General Requirements
2.1. Deliverable Format QPs are required to submit BIM saved in the file format, as summarised in Table 1,
upon submission to each of the above mentioned regulatory agencies.
Table 1 Accepted file format in BIM submission for regulatory approval
Regulatory Agencies Accepted File Format for BIM Submission Remarks 1) All BIM submissions to URA a. A single BIM in the native format 1
i. Autodesk Revit (.rvt); or :
ii. Graphisoft ArchiCAD (.pla) b. A single light-weighted file format, as
published from the similar BIM native file: i. DWF (.dwf); or ii. PDF (.pdf)
For Major project (e.g. phase condominium development), separate BIM native files can be submitted for each building block. However, a SITE BIM file linking all the buildings should be submitted.
2) BIM submissions to other regulatory agencies:
a. BCA; b. CBPU; c. PUB; d. FSSD; e. NParks; f. LTA; g. HDB (if any); and h. JTC
a. A single light-weighted file format, as published from the similar BIM native file:
i. DWF (.dwf); or ii. PDF (.pdf)
The respective regulatory agency reserves the right to request BIM native file for verification, ONLY if necessary.
All drawing views below should be compiled in a single DWF/PDF file. Refer to
Appendix C for detailed steps in publishing to DWF/PDF.
a. Plans, elevations, sections, layout views or sheets (refer to Appendix A
for specific requirements from each regulatory agency); and
b. A 3D model.
1 These are based on the IFC certified BIM applications that are commonly used by the local industry and are prepared for BIM submission to-date by going through a series of pilot runs with the authority. The accepted file format may be expanded when new BIM vendor(s) has met the requirements and ready for local BIM submission.
Note: All BIM e-submission through CORENET e-Submission System is limited to not more than 100MB per file per submission. If the file size is larger than 100MB, QPs are requested to deliver in CD-ROM to the respective agency.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 3
Figure 1 Schematic diagram showing the steps in preparing the 3D CAD model for submission
2.2. Model Scale All 3D CAD models or BIM submitted for approval have to be drawn in real size as
built (1:1) in metric scale.
2.3. Model Orientation and Site Configuration
The site, building model or its adjacent buildings should be drawn in the real
orientation or spatial coordinate system and with reference to Singapore Standard
Datum (>100M), rather than project reference level at zero ground.
2.4. Standard Naming of File and Drawing Views
File naming convention below (as modified from SS CP83 Part 3) should be used
for all project files submitted:
Sample:
Project ID Author Zone Version User-defined
M L P 1 _ A - 0 1 _ A -
Table 2 Naming convention for each 3D model or BIM file submitted
Name of Field Indicators Description Project Identification User defined field for the project Author A- Architect
C- Civil engineer E- Electrical engineer L- Land surveyor M- Mechanical engineer
Collect Submission Template from CORENET BIM Team
Eg.: Revit template (.rte); or ArchiCAD template (.tpl)
Design, Model & Customise Views Follow submission requirements
Submission to Agencies (i) ONE BIM (.rvt or .pla) + DWF/ PDF; or (ii) ONE DWF/ PDF
**Refer to Table 1
Pre-check & Save File Save native file & export views to DWF/
CORENET Environment:
STEP
1
STEP
2
STEP
3
STEP
4
BIM Environment:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 4
N- Equipment supplier S- Structural engineer T- Telecommunication/ Signal engineer V- Other disciplines X- Contractor
Zone (or Block) NN where, N: zone or block number e.g.: 01 for Block 1 A1 for Zone A1
-- For all blocks Version (Revision/ Submission)
A- 1st submission B- 2nd submission C- 3rd submission
User-defined (Optional) User defined code for in-house applications (optional field)
Within each DWF/PDF or BIM model (either RVT or PLA) submitted to the
regulatory agencies, all its related drawing views (plans, elevations, sections and 3D
views) and layouts (contain only data information such as qualified person’s
declarations and schedules) should follow the naming convention below:
Sample:
Agency Type of View View Name
B C A - _ F P _ 1 S ST T O R E Y
Table 3 Naming convention for each drawing view
Name of Field Indicators Description Agency BCA Building and Construction
Authority URA Urban Redevelopment
Authority CBPU Central Building Plan Unit PUB Public Utility Board FSSD Fire Safety and Shelter
Department NParks National Parks Board LTA Land Transport Authority HDB Housing and Development
Board Type of View SP Site Plan
FP Floor Plan FE Elevation FX Section DT Details 3D 3D View LV Layout View (should contain
only data information, e.g.: QP’s declarations and schedules)
View Name 1ST STOREY; or
Note: Follow the submission template provided and it should give you a guide to begin.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 5
2ND STOREY; or 3RD STOREY; or NTH
where, N: Storey’s number STOREY; or
LOWER ROOF; or ROOF MEZZANINE N where, N: Mezzanine’s number BASEMENT N where, N: Basement’s number ELEVATION N or N ELEVATION where, N: Directions
(e.g.: East, West, North, South; or 1, 2, 3, 4)
SECTION N where, N: Section’s number ARCHITECT’S DECLARATION; or ENGINEER’S DECLARATION; or QP’S DECLARATION SUMMARY OF GFA; or SUMMARY OF INCENTIVE GFA; or SUMMARY OF X
Where, X: Schedule’s Name
2.5. Annotations and Dimensions
Except for 3D model view, all other submitted views such as plans, elevations and
sections should be indicated clearly with the necessary annotations, dimensions,
scalebar and north point, as specified by the respective regulatory agency in
Appendix A. Within each of the model view, QPs are also required to include the
related name of view, as shown in Figure 2.
Figure 2 Sample of new erection project with name of plan indicated at the bottom
2.6. Last Saved Model or Last Saved View
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 6
Checking and approval from the regulatory agencies is based on the “Last Saved
Model”, together with the “Last Saved View” of site plans, floor plans, elevations and
sections submitted. Therefore, QPs are to ensure that the following items are
checked upon submission:
a. Maximum extent is saved for each drawing view;
b. No hidden objects or annotations;
c. Any link (3D model or BIM saved in other file) that is considered part of
the submission is bind as a single integrated BIM;
d. All other external references, irrelevant drawing layers, objects,
annotations, draft work and construction lines, which are not part of the
constructed building elements, are to be removed or purged upon
submission; and
e. No propriety fonts are used for annotations and all the fonts should be
legible; and
f. All objects and annotation in each phase were displayed in the last saved
view.
2.7. Model for Addition and Alteration Works/ Re-submission
(URA)/ Amendments The same BIM model (with changes incorporated to comply with the requirements)
should be used in resubmission (i.e. no shifting of spatial coordinate system in the
re-submitted model). The revised submission should be indicated clearly in the
name of BIM file submitted, following the format at Section 2.4.
For any plan of alteration or addition to an existing building, or, re-submission for
regulatory approval, all the building objects or elements should be demarcated
clearly by colours in Table 4 (in accordance with SS CP83 Part 5):
Table 4 Colours used for A&A project
Colour Usage Magenta Proposed elements Cyan Existing elements Yellow Deleted elements
Any building works which are to be deleted, removed or demolished must be shown
in dotted lines on the plans and presented in a manner that can be easily identified
or distinguished, as shown in Figure 3.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 7
Figure 3 Sample of A&A project / project for re-submission (plan and 3D views)
QPs should include a complete set of all related model views (plans, elevations,
sections and 3D views) in every submission, including the re-submission of
amendments. For any model view which contains NO amendments, a box indicating
that this is “For Reference ONLY” shall be placed on the top right corner of the
model view, and all its building objects or elements shall be demarcated with CYAN
colour, as shown in Figure 4.
Figure 4 Sample of project for re-submission (plan view for storey with no amendments)
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 8
3. High-Level Modelling Requirements (Optional) BIM is typically defined by a hierarchy of objects that contain the most intelligence to
catalog the physical and characteristics of design and construction. The 3D modelling as
practiced in the industry today normally contains only the 3D geometric objects, which
comprises the foundation of BIM, but lacking in a wide array of information associated
with each of these building elements and systems. For instance, walls are created using
the application’s Wall Tool, slabs using the Slab tool, and so on.
This section is not intended to prescribe a step-by-step method to create 3D BIM, but to
highlight best practices in creating 3D BIM enriched with information of objects or building
elements.
3.1. BIM Objects and Properties
In BIM environment, there are a few items that QPs should understand and are
advised to follow:
a. Objects and elements should be created using the designated toolset in
BIM application. For example, Slab tool should be used to draw floor
slabs only, but not the walls and columns. In cases where such tools are
not available, or they are limited in some way (e.g. some applications
cannot create sloped beam), the QPs should create a generic object that
can be assigned the correct Building Element type. The ability of BIM
applications to manage components and spaces with complex geometric
shapes varies, thus QPs are advised to work with their vendors to
understand the limitation and workaround, if any;
b. For a multi-storey building, the objects and building elements, such as
wall and column, should be split into level and drawn on floor-by-floor
basis. These elements should not span more than one storey and should
be trimmed to the bottom surface of the elements above (e.g. beam,
ceiling, floor slab, etc);
c. Objects are defined by their own properties or attributes. For example,
wall objects must include the “interior and exterior” property. Most BIM
applications will incorporate this, either as shared parameters or add-on
module, which may require the QPs to “set” the property value in some
cases. Please refer to respective vendor’s documentation for instructions
on how this property is set; and
d. In some BIM applications, certain properties of objects and building
elements are set using layers. For instance, separation between exterior
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 9
and interior walls is done using layers. QPs are encouraged to consult
their respective BIM vendor about drawing layer strategies that will
support drawing production and the BIM requirements outlined in this
submission guideline, and if or how these can impact the object
properties.
3.2. Spaces and Zones
Space is also a 3D object in BIM and normally represented in plan drawing view
with a room tag (Figure 5), while several spaces of similar function can be grouped
to form a zone. QPs are advised to follow the best practice recommended below:
a. The space is typically defined by the inside faces of its bound building
elements (e.g. walls, floors and ceilings). To align with the outer face of
the exterior walls (in accordance with URA requirements for GFA
calculation), QPs have to define the external boundary lines of either the
rooms or unenclosed spaces (e.g. balconies and terraces), using the
special tools provided by the BIM applications. QPs should consult the
vendors to learn the recommended method for creating space objects;
and
b. Spaces should be defined and modelled with a vertical extent from the
finished floor to the finished ceiling. If the spaces (e.g. balcony and
terrace) are unbounded by physical elements, the height should be set
equal to the height of adjacent spaces at the same building floor.
Note: A typical modelling error is to model the spaces with zero height.
Note: QPs must ensure that space object geometry is updated to maintain its alignment with the surrounding walls, floors or ceilings, if these space-bounding elements are moved.
Note: This section only applies to any BIM applications that use layers as the primary mechanism for filtering and structuring content.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 10
Appendix A Specific Submission Requirements
A-1 BCA Submission Requirements 1. Building Plan (BP)
1.1. All Floor Plan Views All floor plans (inclusive of site plan) should have the structural grid lines and
dimensions to show the total length or width of the building, as well as the distance
between structural columns. The boundary lines verged in RED should also be
included as shown in Figure 5.
1.2. Site Plan View
In specific, site plan shall show the following (also shown in Figure 5):
1.2.1. Building Outline The outline of building to be erected/ building in which works are to be
carried out.
1.2.2. Road Names Names of the adjacent roads and streets should be included.
1.2.3. Town Subdivision, Mukim and Lot Numbers The site plan shall annotate the number of lot and adjoining lots and the
Mukim or Town Subdivision number of the lot.
1.2.4. Dimensions There shall be indication of building setback and distance between the new
building to be erected or the building works to be carried out and its
adjacent lot boundary.
1.2.5. Ingress and Egress to the Site
Figure 5 Sample of site plan view in BIM model
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 11
1.3. Floor Plan View In specific, the floor plan shall show the following:
1.3.1. Platform Level Floor plans shall include the indication of drop or different leveling at the
rooms or spaces (as shown in Figure 6).
1.3.2. Room’s Tag Space objects are normally represented in plan drawing view with a room
tag, depending on the “tools” available in each BIM application. As shown in
Figure 6, each room should be tagged with clear annotation of:
a. the purpose of each room or space in the building;
b. the space to be air-conditioned or mechanically ventilated;
c. the toilet or parking lots for disabled people; and
d. the location of equipment, plant room and water tank room.
Figure 6 Sample floor plan with indication of platform levels and room tags
1.4. All Elevation and Section Views As shown in Figure 7 & 8, the elevation and section line(s) or marker(s) shall be
displayed on the floor plans. Every elevation or section view, whichever is relevant,
shall show the following:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 12
a. floor-to-floor height;
b. maximum building height in AMSL (Above Mean Sea Level);
c. height of ceiling;
d. headroom;
e. window sills;
f. staircase railing;
g. equipments; and
h. parapet walls.
Figure 7 Sample of floor plan with elevation and section line or marker (highlighted in BLUE)
Figure 8 Sample of elevation or sectional view
1.5. Layout Views or Sheets
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 13
Layout views or sheets are meant as a platform to deliver only data related
information. QPs should include the following items in the layout views or sheets:
1.5.1. Title Block As shown in Figure 9, the title block on the right hand side of the layout
sheet should contain the information of the project, such as submission
number, project information, company’s profile and revision number.
1.5.2. Qualified Person’s Declaration Declarations of each qualified person (refer to the Appendix B for QP’s
declaration required by each regulatory agency) from different discipline or
company should be included and created on separate layout sheets.
Figure 9 Sample of layout view with QP’s declaration and company’s profile (BCA BP submission)
Note: Follow the submission template provided and it should have all the approving stamp and declaration statements prepared for you.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 14
2. CD Shelter (HS/SS)
2.1. All Floor Plans Views Similar to Appendix A-1 Section 1.1.
2.2. Site Plan View Similar to Appendix A-1 Section 1.21-1.24.
2.3. Floor Plan View In specific, the floor plan shall show the following:
2.3.1. Platform Level Floor plans shall show the location of shelter/s and non-shelter/s and shall
also include the indication of drop or different leveling at the rooms or
spaces.
2.3.2. Room’s Tag Each room shall be tagged with clear annotation of the purpose of each
room or space in the building.
2.3.3. Setback Distance Envelop Setback distance envelop of shielding slab immediately above the shelter
under consideration shall be shown, i.e. if the shelter is located at the 1st
storey, the setback distance envelop shall be shown on the 2nd storey plan
(See Figure 10).
Figure 10 Sample floor plan with setback distance envelop
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 15
2.3.4. Steel/ RC Trellis Location and dimension of steel/RC trellis if it is introduced to make up for
shortfall in setback distance (See Figure 11).
Figure 11 Sample floor plan with trellis
2.3.5. Down-hang Beams Length of the down-hang beam if it is used to adopt a shorter setback
distance (See Figure 12).
Figure 12 Sample floor plan with down-hang beam
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 16
2.4. All Elevation and Section Views Similar to Appendix A-1 Section 1.4.
2.5. Detailed Plans and Sections of Shelter In specific, the detailed plans and sections of shelter shall show the following:
2.5.1. Plan of shelter a. Size of shelter, area and volume;
b. Wall thickness;
c. Door location/door size/door nib;
d. Ventilation sleeves location;
e. Fixtures in the shelter;
f. Routing and penetration of services;
g. Earth abutting the shelter;
h. Dimension of strengthen ceiling slab in front of shelter (for high-rise
development);
i. Size of rescue/blast hatch (for storey/staircase shelter);
j. RC shielding wall (for storey/staircase shelter); and
k. MV duct (for staircase shelter).
2.5.2. Sections of the shelter a. Ceiling slab, base slab, intermediate slab, staircase waist thickness;
b. Clear height of shelter;
c. Door position;
d. Height of ventilation sleeves;
e. Size of down-hang beam (if applicable);
f. Dimension and spacing of trellis (if applicable);
g. Dimension and thickness of strengthen ceiling slab in front of shelter
(for high-rise development); and
h. Indication of shelter and non-shelter compartments.
2.6. Layout Views or Sheets Layout views or sheets are meant as a platform to deliver only data related
information. QPs should include the following items in the layout views or sheets:
2.6.1. Title Block Similar to Appendix A-1 Section 1.5.1.
2.6.2. Standard Approval Stamp
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 17
Shelter plans shall bear the standard approval stamp on the right-hand
column on the layout sheet (See Figure 13). Please note the difference
from Appendix A-1 Section 1.5.
2.6.3. Qualified Person’s Declaration Refer to Appendix B for QP’s declaration required by each regulatory
agency.
Figure 13 Sample of CD Shelter declaration endorsement with standard approval stamp
2.6.4. Schedule or Table a. For development with household shelter/s, the following table shall be
included in the layout sheet.
Table 5 Table format of Data of Household Shelter
Data of Household Shelter Dwelling Unit
Type GFA of Unit
(m2) No. of HS Area of
HS (m2) No. of Square
Units # Volume of
HS (m3) Shelter Type*
*Legend Note: HA: HS Aboveground HB: HS Basement
# Applicable for HS which are trapezoidal
No. of square units (0.6m x 0.6m) used for the assessment of trapezoidal or L-shaped HS
For more details refer to Technical Requirements for HS
Note: Follow the submission template provided and it should have all the approving stamp and declaration statements prepared for you.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 18
b. For development with storey/staircase storey shelters, the following
tables shall be included in the layout sheet.
Table 6 Table format of Data of Apartment Units & Data of Storey Shelter
Data of Apartment Units Dwelling Unit Type GFA of Unit (m2) No. of Person
Data of Storey Shelter (including Staircase Storey Shelter)
Storey Unit Type
Total Nominal Occupancy (TNO)
Area of SS (m2) Volume of SS (m3) Shelter Type+ Required (TNO x 0.6m2)
Provided Required (TNO x 1.8m3)
Provided
+Legend SA: SS Aboveground SB: SS Basement
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 19
A-2 URA Submission Requirements 1. General Requirements for All URA Submissions
All floor plans (inclusive of site plan) should have the structural grid lines and dimensions
to show the total length or width of the building, as well as the distance between
structural columns (Figure 5).
1.1. Site Plan View In specific, the site plan shall show the following.
a. Cadastral based (with details of Lot Number, Lot Boundary etc) site plan
with a surrounding radius range of 10m to 50m shall be incorporated. If
this is not possible, applicants are to provide a cadastral key plan as an
insert or submit a scanned copy of cadastral key plan separately;
b. Site boundary should be indicated clearly in RED colour;
c. All building setbacks, building outline and basement outlines shall be
indicated;
d. All building plots, and area for communal use/open space for building
coverage and communal open space calculations shall be shown as
separate plots;
e. Parcels of land for vesting such as road widening and drainage reserve
etc shall be shown as separate plots;
f. Road reserve lines and drainage reserve lines shall be indicate clearly on
plan;
g. Existing ground levels for the subject site and adjoining sites immediately
across the common boundaries (more than 1m beyond the subject site) &
proposed platform levels shall be indicated;
h. Retaining walls or boundary wall , if any, shall be indicated;
i. Buffer zone provisions(Green buffer and physical buffer lines with
dimensions) and 2 m planting strip shall be indicated clearly;
j. Access arrangement, road name text, road centre lines, road kerbs and
road categories shall be indicated clearly; and
k. Plot boundaries and plot numbers of right of way/easement, parkway
reserve, if applicable, shall be indicated clearly.
1.2. Floor Plan View In specific, the floor plan shall show the following:
1.2.1. Platform Level
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 20
Floor plans shall include the indication of drop or different leveling at the
rooms or spaces (as shown in Figure 6).
1.2.2. Room’s Tag As shown in Figure 6, each room should be tagged with clear annotation of
the purpose of each room or space available.
1.3. Elevation and Section Views As shown in Figure 7 & 8, the elevation and section line(s) or marker(s) shall be
displayed on the floor plans. Every elevation or section view, whichever is relevant,
shall show the following:
a. Floor-to-floor height;
b. Maximum building height in AMSL (Above Mean Sea Level);
c. Basement protrusions, if any;
d. Lines of existing ground level; and
e. Retaining walls, if any.
1.4. Layout Views or Sheets QPs should include the following items in the layout views or sheets:
1.4.1. Title Block Similar to Appendix A-1 Section 1.5.1.
1.4.2. Qualified Person’s Declaration Refer to the Appendix B for QP’s declaration required by each regulatory
agency.
Note: Follow the submission template provided and it should have all the approving stamp and declaration statements prepared for you.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 21
Figure 14 Sample of layout view with QP’s declaration and company’s profile (URA submission)
2. GFA Calculation Plan Separate calculation plans/area plans and drawing views shall be provided for all the
required calculations. All calculations shall be based on the latest Handbook on Gross
Floor Area (http://www.ura.gov.sg/circulars/text/dcdgfahb_d0e4.htm)
2.1. Floor Plan View
.
In specific, the floor plan submitted for GFA approval shall include the following:
a. Area’s Tag showing the usage and floor area of each demarcated area
that are to be included in the GFA calculation. Boundary lines of the
Area’s tag shall follow the current GFA guidelines (e.g. to include the
thickness of external walls). To do this, QPs are required to define the
external boundary lines of either the areas or unenclosed spaces (e.g.
balconies and terraces), using the tools as provided by the BIM
applications (please refer to the vendors’ documentations on how this
can be done);
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 22
Figure 15 Sample floor plan view (a close-up) with space boundary (in BLUE) for GFA calculation
b. Service Ducts without floor slabs and voids shall be indicated clearly with
crosses;
c. If applicable, details calculations on quantum use and secondary use
shall be incorporated (please refer to latest Handbook on Gross Floor
Area (http://www.ura.gov.sg/circulars/text/dcdgfahb_d0e4.htm) for details
of these areas)
d. If applicable, details calculations on area to be computed over and above
the Master Plan allowable gross plot ratio shall be incorporated(please
refer to latest Handbook on Gross Floor
Area
;
(http://www.ura.gov.sg/circulars/text/dcdgfahb_d0e4.htm) for details
of these areas)
e. If applicable, detailed calculations on GFA exemption items shall be
incorporated (please refer to latest Handbook on Gross Floor
Area
;
(http://www.ura.gov.sg/circulars/text/dcdgfahb_d0e4.htm) for details
of these areas)
f. Detailed calculations on Building Coverage and Communal Open Space
shall be incorporated.
;
2.2. Schedule or Table A summary of GFA breakdown, GFA Exempted, Incentive GFA, Building
Coverage and Communal Open Space computations (as shown below) shall be
tabulated and dragged-and-dropped to the layout sheet before saving the BIM
native file and publishing to DWF/PDF for submission.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 23
Table 7 Table format of Gross Floor Area Summary
SUMMARY OF GROSS FLOOR AREA Blk No. Storey GFA
(m2) Breakdown of Gross Floor Area (m2)
Commercial Residential Hotel Industry Warehouse 1 Basement 1st Storey 2nd Storey 3rd Storey Roof Subtotal: 2 1st Storey 2nd Storey 3rd Storey Roof Subtotal:
Total: Quantum (%):
SUMMARY OF GFA EXEMPTED
Blk No. Storey GFA (m2)
Breakdown of Incentive* GFA Carpark Residual
Areas
Communal Landscaped
Areas Covered
Walkways Thru Block / Upp Level Linkages
Sky Terrace
1 Basement 1st 2nd 3rd Roof Subtotal:
2 Basement 1st 2nd 3rd Roof Subtotal:
Total:
SUMMARY OF INCENTIVE GFA
Blk No. Storey GFA (m2)
Breakdown of Incentive* GFA Eg.:
Balcony
1 Basement 1st 2nd 3rd Roof Subtotal:
2 Basement 1st 2nd 3rd Roof Subtotal:
Total:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 24
Site Coverage Computation 1. Site Area 0.00 sq.m
2. Plots to be Excluded
Road reserve 0.00 sq.m
Drainage reserve 0.00 sq.m
Others 0.00 sq.m
Total 0.00 sq.m
3. Net site area ( item1 - Total of item2 ) 0.00 sq.m
4. Site Coverage Area
Block 1 0.00 sq.m
Block 2 0.00 sq.m
Block 3 0.00 sq.m
Block 4 0.00 sq.m
Block 5 0.00 sq.m
Block 6 0.00 sq.m
Block 7 0.00 sq.m
Block 8 0.00 sq.m
Ancillary Building 0.00 sq.m
Club House 0.00 sq.m
ESS 0.00 sq.m
Guard House 0.00 sq.m
Car parking shed 0.00 sq.m
Total 0.00 sq.m
5. Proposed Site Coverage (%)
0.00%
Communal Open Space Computation
1. Net Site Area 0.00 sq.m
2. Items not counted as Communal Open Space Area
Buildings and other ancillary structures which are already included in site coverage
0.00 sq.m
Driveways & car parks 0.00 sq.m
Fire-engine hard-standing ground 0.00 sq.m
Voids at ground level overlooking basements (void space) 0.00 sq.m
Private enclosed space 0.00 sq.m
Total 0.00 sq.m
3. Communal Open Space (Net Site Area - Total of item 2) 0.00 sq.m
Site Coverage Area Net Site Area
X 100%
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 25
4. Communal Open Space (%)
0.00%
3. Proposal /Diagrammatic Plan for Subdivision of Lands/Strata
Subdivision Buildings The requirements are:
a. Existing lot boundaries shall be shown by dotted lines together with their lot
number shall be indicated on proposal plan;
b. Boundaries of land to be subdivided shall be indicated;
c. All proposed new lot boundaries with dimensions shall be indicated;
d. All building plots and parcels of land for vesting such as splay corner, road
widening, drainage reserve, etc shall be shown as separate plots
e. All building setback dimensions shall be indicated on proposal plan;
f. All plot boundaries and plot numbers for right of way/easement if applicable,
shall be indicated on proposal plan; and
g. Strata unit boundary shall be indicated on floor plans for strata subdivision.
4. Landscape Plan
4.1. Site or Floor Plan View In specific, the landscape plan is to be submitted with the application for
submission with covered communal landscaped area, landscaped deck or sky
terrace. The plan shall include the following:
a. Location and species of proposed small to medium size shade trees are to
be shown on plan;
b. A legend for the proposed trees shall be provided
c. Sections showing the depth of the planting beds;
d. All proposed green buffer/planting verges shall be indicated as tree planting
strip only;
e. Widths of all proposed planting provision provided shall be indicated; and
f. All slopes shall be shown on plan with standard symbols. The gradients of
all proposed slopes should also be clearly indicated.
Communal Open Space Area Net Site Area X 100%
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 26
A-3 NEA-CBPU and PUB Submission Requirements
The individual section below covers the specific presentation requirements necessary
for each of the drawing views submitted to CBPU and PUB at the various stages
below:
1. Development Control;
2. Building Plan on Pollution Control;
3. Building Plan on Environmental Health;
4. Detailed Plan on Sewerage Works (Proposed Sewer/ Sewer Diversion
Works);
5. Detailed Plan on Sanitary Works (for Sanitary Plumbing & Drainage
System/ Sewer Connection);
6. Detailed Plan on Sewerage M&E Works;
7. Detailed Plan on Drainage Works – Main Development Submission;
8. Detailed Plan on Drainage Works – Proposed Roadside Drain/ Culvert;
9. As-built Plan for TOP/CSC – Proposed Sewer/ Pumping Mains/ Sewer/
Pumping Main Diversion Works;
10. As-built Plan for TOP/CSC – Sanitary Works (Sanitary Plumbing &
Drainage System/ Sewer Connection);
11. As-built Plan for CSC – Proposed Roadside Drain/ Culvert;
12. As-built Plan for CSC – Pumped Drainage System at Basement;
13. As-built Plan for CSC – Internal Drain with Deviations;
14. Certified Survey Plan for CSC – Development in the vicinity of/ affected by
Drainage Reserve; and
15. URA Approved Sub-division Plan for CSC – for Site affected by Drainage
Reserve.
1. Development Control
1.1. Site Plan View In specific, all key plan, location plan and site plan of development control shall
show the following:
1.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
1.1.2. Location Plan a. Boundary of development site shall be edged RED; and
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 27
b. Outline of neighbouring development plots or buildings and MRT tracks,
within a 100m radius shall be shown.
1.1.3. Site Plan Layout of the site with boundary lines verged in RED.
a. Outline of adjacent buildings or structure;
b. Building setback from MRT track;
c. Existing sewers (including DTSS tunnels), pumping mains and
sewerage facilities, including their sizes, as reflected in
Sewerage Interpretation Plans, within 25m of development
boundary;
d. Building setback from sewers or pumping mains and setback
distance from structures or buildings;
e. Bin centre location and vehicular access;
f. Existing Drainage reserves, entrance culverts or roadside drains;
g. Proposed sewers or pumping mains or drains, sewer or
pumping main or drain diversion work, holding tank or sewage
treatment plant or pump sump;
h. Existing or proposed internal drains serving the development
site from summit points to its outlet connection to the existing or
proposed roadside drain or outlet drain; and
i. Existing road levels or ground levels at the outlet discharge point
of internal drains.
1.2. Floor Plan View In specific, all basement, 1st
1.2.1. Basement Plan
storey and higher storey plan of development control
shall show the following:
a. For industrial development, use of floor space for industrial processes or
activities;
b. Provision for pollution control equipment;
c. Toilets, refuse chute chambers, car washing bays, garage gully and oil
interceptor;
d. Food shops and grease traps;
e. Provision for pump sewerage system, if used water is generated;
f. All entrance or openings to the basement, platform levels, cut-off drains,
crest levels, threshold levels and drainage pump system;
g. Areas open to sky to be served by pumped drainage system; and
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 28
h. Bin centre and vehicular access to the bin centre.
1.2.2. First Storey Plan a. For industrial development, use of floor space for industrial processes or
activities;
b. Provision for pollution control equipment;
c. Bin centre and vehicular access to the bin centre;
d. Location of refuse chute chambers;
e. Existing, proposed and abandoned sewers, pumping mains, sewer
connection, including all their sizes, manholes, discharge chambers,
their top and invert levels, and their setback from buildings or structures;
f. The last inspection chamber, pipe size,the top and invert of the last IC
and connecting manhole;
g. Reinforced concrete trench for sewer that do not meet building setback
requirement;
h. Drainage reserve and its alignment and width;
i. Common drains and its alignment and flow of existing common drain
within the development site, layout of internal drainage system and
discharge point to the public drains and the drain size;
j. Proposed or existing platform level, adjacent road/ground levels at the
outlet discharge points of internal drains; and
k. Link to MRT station and /or existing building link to MRT station, if any.
1.2.3. Second Storey to Highest Storey Plan (for industrial buildings only) a. For industrial development, use of floor space for industrial processes or
activities; and
b. Provision for pollution control equipment.
1.3. Roof Plan View In specific, the roof plan of development control shall show the following:
a. For industrial buildings, location of flue gas stacks and chimneys;
b. Provision for pollution control equipment;
c. Private roof terraces, gardens, common areas, common staircases;
d. Refuse chute, refuse chute ventilation openings, maintenance access to
the refuse chute; and
e. Roof gutter or scupper drains (if any), parapet walls and railings.
1.4. Elevation View
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 29
In specific, the elevation view of development control shall show the following:
a. For industrial buildings, location of flue gas stacks and chimneys;
b. Provision for pollution control equipment;
c. Building height;
d. Sewer setback from building or structures;
e. Location of reinforced concrete trench;
f. Refuse chute ventilation openings, roof gutter or scupper drains (if any),
parapet walls, railings;
g. Bin centre and its height;
h. Drainage reserve, common drains, roadside or external drains, existing
and proposed boundary fence or walls; and
i. Structures closer than 2.0m from the edge of the Drainage Reserve.
2. Building Plan on Pollution Control
2.1. Site Plan View In specific, all key plan, location plan or site plan of pollution control shall show the
following:
2.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
2.1.2. Location Plan or Site Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings and MRT tracks,
within a 100m radius shall be shown.
2.2. Floor Plan View In specific, all basement, 1st storey and higher storey plan of pollution shall show
the following:
2.2.1. Basement Plan a. All details or processes inside the basement of the building;
b. Trade effluent drainage or piping system to collect and convey trade
effluent generated;
c. Location of trade effluent treatment plant;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 30
d. Location of trade effluent sampling sump or system and the
connection to the internal sanitary drainage system;
e. Open process areas which may cause contamination to rain water and
system to collect contaminated rain water and system of treatment
before discharge to open drain;
f. Types and locations of fuel burning equipment;
g. Locations of air pollution control equipment;
h. Containment facility for storage tanks;
i. Locations of toxic industrial water treatment and disposal facilities;
j. Containment facilities for generator; and
k. Car washing bays, garage gully or oil interceptor.
2.2.2. First Storey Plan a. All details or processes inside the first storey of the building;
b. Trade effluent drainage or piping system to collect and convey trade
effluent generated;
c. Location of trade effluent treatment plant;
d. Location of trade effluent sampling sump or system and the
connection to the internal sanitary drainage system;
e. Location of Last Inspection Chamber (includes pH monitoring and
discharge control system);
f. Open process areas which may cause contamination to rain water and
system to collect contaminated rain water and system of treatment
before discharge to open drain;
g. Types and locations of fuel burning equipment;
h. Locations of air pollution control equipment;
i. Containment facility for storage tanks;
j. Locations of toxic industrial water treatment and disposal facilities;
k. Containment facilities for generator; and
l. Air intake or exhaust points for mechanical ventilation system.
2.2.3. Second Storey to Highest Storey Plan a. All processes or activities inside the second to highest storey of the
building;
b. Trade effluent drainage or piping system to collect and convey trade
effluent generated;
c. Location of trade effluent treatment plant;
d. Location of trade effluent sampling sump or system and the
connection to the internal sanitary drainage system;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 31
e. Open process areas which may cause contamination to rain water and
system to collect contaminated rain water and system of treatment
before discharge to open drain;
f. Types and locations of fuel burning equipment;
g. Locations of air pollution control equipment;
h. Containment facility for storage tanks;
i. Locations of toxic industrial water treatment and disposal facilities; and
j. Air intake or exhaust points for mechanical ventilation system.
2.3. Roof Plan View In specific, the roof plan of pollution control shall show the following:
a. Location of chimneys for the dispersion of flue gases;
b. Types and locations of fuel burning equipment;
c. Stacks for the dispersion of exhaust gases;
d. Cooling towers location and its overflow or drain-off point; and
e. Locations of air pollution control equipment.
2.4. Elevation View In specific, the elevation of pollution control shall show the following:
a. Flue gas stacks and chimneys;
b. Types and locations of fuel burning equipment;
c. Building height;
d. Air pollution control equipment; and
e. Trade effluent treatment plant and toxic industrial water treatment and
disposal facilities.
3. Building Plan on Environmental Health
3.1. Site Plan View In specific, all key plan, location plan and site plan of environmental health shall
show the following:
3.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
3.1.2. Location Plan a. Boundary of development site shall be edged RED; and
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 32
b. Outline of neighbouring development plots or buildings and MRT tracks,
within a 100m radius shall be shown.
3.1.3. Site Plan Layout of the site with boundary lines verged in RED.
a. Neighbouring buildings;
b. Neighbouring clean and light industrial buildings (if any)
within 50m setback distance;
c. Overhead MRT within 35m setback distance from building or
structure; and
d. Bin centre and access, swimming pool and
restaurant/foodshops.
3.2. Floor Plan View In specific, the basement, 1st
3.2.1. Basement Plan
storey and higher storey floor plan of environmental
health shall show the following:
a. Refuse chute chambers and sanitary facilities or toilets; and
b. Food shops.
3.2.2. First Storey Plan a. MRT setback lines and distance;
b. Bin centre and access;
c. Swimming pool, open spa or jacuzzi;
d. Refuse chute chambers and sanitary facilities or toilets;
e. Food shop and its kitchen or food preparation area, outdoor
refreshment area (if any) and washing area, sanitary pipes, drip tray,
double floor slab, hood and flue system and grease trap; and
f. Common drain.
3.2.3. Second Storey to Highest Storey Plan a. Swimming pool and restaurant;
b. Refuse chute chambers and sanitary facilities or toilets; and
c. Food shop and its kitchen or food preparation area and washing area,
overhead sanitary pipes in food shop kitchens, drip tray, double floor
slab, hood and flue system.
3.3. Roof Plan View In specific, the roof plan of environmental health shall show the following:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 33
a. Location and ventilation openings for refuse chutes, common areas,
maintenance access to refuse chutes;
b. Roof gutter or scupper drains (if any), parapet walls or railing, permanent
and safe access to the roof gutters or roof scupper drains; and
c. Kitchen exhausts for foodshops.
3.4. Elevation View In specific, the elevation view of environmental health shall show the following:
a. Refuse chutes and their ventilation openings, roof gutters or scupper
drains (if any), parapet walls, railings;
b. Building height;
c. Bin centre; and
d. Proposed boundary fence or walls and common drain.
4. Detailed Plan on Sewerage Works (Proposed Sewer/ Sewer
Diversion Works)
4.1. Site Plan View In specific, all key plan and site plan of proposed sewer or sewer diversion works
shall show the following:
4.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
4.1.2. Site Plan Layout of the site with boundary lines verged in RED.
a. Proposed or existing sewer or pumping main or diversion,
and their setback distance from building or structures or
Drainage Reserve or neighbouring lot;
b. Reinforced concrete trench with removable slabs (annotated
on the plan) for existing or proposed sewer under building or
structures or with insufficient setback from building or
structures;
c. Invert or top and pipe size levels of the connecting
manhole(s); and
d. Provision of pump sump or holding tank or sewage treatment
plant.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 34
4.2. First Storey Floor Plan View In specific, the 1st
a. Proposed or existing sewer or pumping main or diversion, and their
setback distance from building or structures or Drainage Reserve or
adjacent lot;
storey floor plan of proposed sewer or sewer diversion works
shall show the following:
b. Reinforced concrete trench with removable slabs (annotated on the plan)
for existing or proposed sewer under building or structures or with
insufficient setback from building or structures;
c. Pipe size and invert or top levels of the connecting manhole(s); and
d. Provision of pump sump or holding tank or sewage treatment plant.
4.3. Elevation View In specific, the elevation view of sewer or sewer diversion works shall show the
following:
a. Headroom for overhanging structures or roof eaves above existing or
proposed sewer or pumping main;
b. Pipe size and invert levels of the existing or proposed sewer or pumping
mains and their setback distance from building or structures;
c. Reinforced concrete trench with removable slabs (annotated on the plan)
for existing or proposed sewer under building or structures or with
insufficient setback from building or structures;
d. Pipe size and invert or top levels of the connecting manhole(s);
e. Building height;
f. Proposed boundary fence or walls; and
g. Pump sump or holding tank or sewage treatment plant.
4.4. Longitudinal Section View In specific, the section view of sewer or sewer diversion works shall show the
following:
a. All existing or proposed manholes and sewers or pumping mains and its
materials, pipe sizes, distance, gradient and invert or top levels of
manhole with tumbling bay or backdrop connections (if any);
b. Method of laying and pipe haunching details; and
c. Headroom clearance of overhanging or overhead structures.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 35
5. Detailed Plan on Sanitary Works (for Sanitary Plumbing &
Drainage System/ Sewer Connection)
5.1. Site Plan View In specific, all key plan and site plan of sanitary plumbing and drainage system or
sewer connection shall show the following:
5.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
5.1.2. Site Plan Layout of the site with boundary lines verged in RED.
a. Sewer connection and its pipe size, the invert and top levels
of last inspection chamber and the connecting manhole;
b. Existing sewer or pumping main and their setback distance
from building or structures;
c. Reinforced concrete trench with removable slabs (annotated
on the plan) for existing or proposed sewer under building or
structures or with insufficient setback from building or
structures; and
d. Provision of pump sump or holding tank or sewage treatment
plant.
5.2. Floor Plan View In specific, the basement, 1st
5.2.1. Basement Plan
strorey and higher storey floor plan of sanitary
plumbing and drainage system or sewer connection shall show the following:
a. All sanitary appliances or fittings and internal sanitary plumbing and
drainage system;
b. Provision of Sewerage pumping system; and
c. Eating establishments and grease trap or sewage divertor, if any.
5.2.2. First Storey Plan a. All sanitary appliances or fittings or soil and vent stack(s) and their
connection to inspection chambers;
b. Internal sanitary drainage system and its connection to existing or
proposed sewer or manhole;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 36
c. Reinforced concrete trench with removable slabs (annotated on the
plan) for existing or proposed sewer under building or structures or
with insufficient setback from building or structures;
d. Invert and top levels of the connecting manhole(s);
e. Existing sewer or pumping main and their setback from building or
structure; and
f. Provision of pump sump or holding tank or sewage treatment plant.
5.2.3. Second Storey to Highest Storey Plan a. All sanitary appliances or fittings or soil and vent stack(s) and internal
sanitary plumbing and drainage system.
5.3. Roof Plan View In specific, the roof plan of sanitary plumbing and drainage system or sewer
connection shall show the following:
a. Used water ventilation stacks;
b. Roof garden and window openings of penthouse units; and
c. Potable water tank, if any.
5.4. Elevation View In specific, the elevation view of sanitary plumbing and drainage system or sewer
connection shall show the following:
a. Sanitary plumbing and drainage system within the premises connected to
the sewerage system;
b. Sewer connection and its pipe size, the last inspection chamber and the
connecting manhole;
c. Pipe size and invert or top levels of existing or proposed sewer or
pumping main, and the setback distance from building or structures;
d. Reinforced concrete trench with removable slabs; and
e. Pump sump, sewage ejector tank, holding tank or sewage treatment
plant.
6. Detailed Plan on Sewerage M&E Works
6.1. Electrical Floor Plan View In specific, the electrical drawings must be endorsed by LEW/ Electrical QP and
shall include the following:
a. Electrical Single Line Diagram;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 37
b. Electrical Control Schematic Diagram;
c. Electrical Panel Diagram; and
d. Float Switches or Electrodes Level Arrangement Diagram and the
description of their operations.
6.2. Mechanical Floor Plan and Section View In specific, the mechanical floor plan and sectional view shall show the following:
a. Dimension, size and material used for the equipments;
b. Pipe material and size;
c. Discharge point of the pump system;
d. Make and model of pump;
e. Centre line of RSJ;
f. Ventilation system;
g. Indicate the end point of vent pipe connection; and
h. Location of control panel.
7. Detailed Plan on Drainage Works – Main Development
Submission
7.1. Site Plan View In specific, all location plan and site plan of drainage works for main development
submission shall show the following:
7.1.1. Location Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings and MRT
tracks, within 100m radius shall be shown.
7.1.2. Site Plan Boundary of development site shall be edged in RED
a. Proposed platforms levels and road or ground levels at the
outlet discharge point of the internal drains;
b. Drainage reserves and common drains, which shall also be
dimensioned;
c. Lots or plot number of development;
d. The alignment, type, size and flow direction of the existing
roadside drain or outlet drain adjacent to the development
site and existing common drain, if any;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 38
e. Internal drains incorporating flow direction and outlet
discharge points connecting to the existing drains; and
f. If the development site is affected by common drain, the
following requirements are to be endorsed on site plan:
i. Surface runoff from the proposed site and all
neighbouring lots shall continue to be allowed to
discharge through the common drain within the
premises; and
ii. The owner shall be responsible for the maintenance of
the common drain within their premises.
7.2. Floor Plan View In specific, the basement and 1st
7.2.1. Basement Plan
storey floor plan of drainage works for main
development submission shall show or indicate the following:
a. Cut-off drains;
b. Crest level of entrances and openings comply with “Code of Practice
on Surface Water Drainage” and to indicate on plan;
c. Pumped drainage system complies with “Code of Practice on Surface
Water Drainage” to indicate on plan;
d. Proposed basement platform level, fronting and adjacent road levels
of development;
e. Details of pumped drainage system shall be submitted separately for
PUB C&W Department’s record;
f. The areas in meter square (m2
g. Underground linkage to MRT Station or underground linkage to
development having underground linkage to MRT Station.
) which are exposed to ingress of
rainwater; and
7.2.2. First Storey Plan a. Proposed platforms levels for all areas;
b. Drainage reserves which shall also be dimensioned;
c. Site boundary;
d. Road widening line and road levels;
e. Runoff from neighbouring lot and type, size of the common drain
affected by the development;
f. Proposed or existing drainage provided for runoff from neighbouring
lot;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 39
g. Internal drains incorporating flow direction and outlet discharge points
connecting to the external drains;
h. Outlets discharge points of the proposed or existing internal drains
connecting to the existing or proposed drains; and
i. Threshold level for all entrances or openings to the basement or
proposal linkage to underground MRT Station.
8. Detailed Plan on Drainage Works – Proposed Roadside Drain/
Culvert
8.1. Site Plan View All location plan and site plan of drainage works for proposed roadside drain or
culvert shall show or indicate the following:
8.1.1. Location Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings and MRT
tracks, within 100m radius shall be shown.
8.1.2. Site Plan Boundary of development site shall be edged RED.
a. Alignment and extent of proposed drain;
b. Highlight the proposed drain;
c. Summit point and direction of flow of proposed drain;
d. Width and type of proposed drain;
e. Road reserve or widening line or boundary line;
f. Drainage reserve lines with dimensions (if applicable);
g. Invert levels, top levels and road or ground levels;
h. Size and spacing of grating covers for closed drain; and
i. Drop inlet chambers and scupper drains.
8.2. Floor Plan View In specific, the 1st
a. Alignment and extent of proposed drain;
storey floor plan of drainage works for proposed roadside drain
or culvert shall show or indicate the following:
b. Highlight the proposed drain;
c. Summit point and direction of flow of proposed drain;
d. Width and type of proposed drain;
e. Road reserve or widening line or boundary line;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 40
f. Drainage reserve lines with dimensions (if applicable);
g. Invert levels, top levels and road or ground levels;
h. Size and spacing of grating covers for closed drain; and
i. Drop inlet chambers and scupper drains.
8.3. Cross Sectional View In specific, the cross section of drainage works for proposed roadside drain or
culvert shall show the following:
a. Boundary line or road reserve line and drainage reserve line, if applicable;
b. Clear width, minimum and maximum depth;
c. Type and size of Dry Weather Flow channel;
d. Type of safety railings, if applicable;
e. Thickness of walls, top and base slab;
f. Reinforced details and grade of concrete;
g. 300mm thick false bottom;
h. Weepholes, hardcore backing and geotextile;
i. Lean concrete and hardcore sub base;
j. Aluminum rungs, if applicable;
k. Cross fall of benching;
l. Cross section of ramp within maintenance access, if applicable;
m. Steel posts and chains across maintenance access, if applicable; and
n. Details of box drain connections within drainage reserve, if applicable.
8.4. Longitudinal Section View In specific, the longitudinal section of drainage works for proposed drain/ culvert
shall show the following:
a. Existing and proposed invert levels;
b. Soffit, coping, ground and road levels;
c. Extent, size and type of proposed drain or culvert;
d. Gradient and direction of flow of proposed drain or culvert;
e. Clear depth and chainages; and
f. Size and type of existing drain at both ends of the proposed drain or
culvert.
Slab Crossing Over Existing Drain shall show the following:
a. Cross section of proposed slab over drain;
b. Dimension clearance between cope of drain and soffit of slab;
c. Dimension clearance between pile cap or footing and drain-wall;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 41
d. Endorsement on maintenance and removal of slab by owner as and
when required by PUB;
e. Safety railings, if applicable;
f. Boundary line or road widening line;
g. Concrete paving on ground below the slab;
h. Cross fall of concrete paving; and
i. Show location of slab crossing on site or 1st
storey plan.
9. As-built Plan for TOP/CSC – Proposed Sewer/ Pumping Mains/
Sewer/ Pumping Main Diversion Works
9.1. Site Plan View In specific, all key plan and site plan of TOP/CSC sewer or pumping mains or
sewer or pumping main diversion works shall show the following:
9.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
9.1.2. Site Plan Layout of the site with boundary lines verged in RED.
a. Proposed or existing sewer or pumping main or diversion,
gradient, and their setback distance from building or
structures or Drainage Reserve or neighbouring lot;
b. Reinforced concrete trench with removable slabs (annotated
on the plan) for existing or proposed sewer under building or
structures or with insufficient setback from building or
structures;
c. Invert and top levels of the connecting manhole(s); and
d. Provision of pump sump or holding tank or sewage treatment
plant; and
e. Party maintaining.
9.2. First Storey Floor Plan View In specific, the 1st storey floor plan of TOP/CSC sewer or pumping mains or sewer
or pumping main diversion works shall show the following:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 42
a. Proposed or existing sewer or pumping main or diversion, gradient, and
their setback distance from building or structures or Drainage Reserve or
adjacent lot;
b. Reinforced concrete trench with removable slabs (annotated on the plan)
for existing or proposed sewer under building or structures or with
insufficient setback from building or structures;
c. Invert level of the connecting manhole(s); and
d. Provision of pump sump or holding tank or sewage treatment plant.
9.3. Elevation View In specific, the elevation view of TOP/CSC sewer or pumping mains or sewer or
pumping main diversion works shall show the following:
a. Headroom for overhanging structures or roof eaves above existing or
proposed sewer or pumping main;
b. Existing or Proposed Sewer or pumping mains setback distance from
building or structures;
c. Reinforced concrete trench with removable slabs (annotated on the plan)
for existing or proposed sewer under building or structures or with
insufficient setback from building or structures;
d. Invert level of the connecting manhole(s);
e. Building height;
f. Proposed boundary fence or walls; and
g. Pump sump or holding tank or sewage treatment plant.
9.4. Longitudinal Section View In specific, the longitudinal section view of TOP/CSC sewer or pumping mains or
sewer or pumping main diversion works shall show the following:
a. All existing or proposed manholes and sewers or pumping mains, pipe
sizes, material, pipe depth, gradient and platform levels, invert levels of
tumbling bay or backdrop connections to manholes;
b. Pipe haunching details and type of foundation;
c. Method of construction (jacking, open cut, etc); and
d. Headroom clearance of overhanging or overhead structures.
Colour Usage
Magenta Deviations (Compared to Building Plan) Cyan Existing (Compared to Building Plan) Yellow Demolished or Abandoned sewers or drainlines (Compared to Building Plan)
Note: Legend for sewers or pumping mains or drainlines as follows.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 43
10. As-built Plan for TOP/CSC – Sanitary Works (Sanitary
Plumbing & Drainage System/ Sewer Connection)
10.1. Site Plan View In specific, all key plan and site plan of TOP/CSC sanitary works shall show the
following:
10.1.1. Key Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings within 1km
radius shall be shown.
10.1.2. Site Plan Layout of the site with boundary lines verged in RED.
a. Sewer connection and its pipe size, the invert and top levels
of last inspection chamber and the connecting manhole;
b. Existing sewer or pumping main and their setback distance
from building or structures;
c. Reinforced concrete trench with removable slabs (annotated
on the plan) for existing or proposed sewer under building or
structures or with insufficient setback from building or
structures;
d. Invert and top levels of the connecting manhole(s);
e. Proposed sewer or diversion, existing sewer and their
setback from building or structure, adjacent lot and Drainage
Reserve;
f. Provision of pump sump or holding tank or sewage treatment
plant; and
g. Party maintaining.
10.2. Floor Plan View In specific, the basement, 1st
10.2.1. Basement Plan
storey and higher storey floor plan of TOP/CSC
sanitary works shall show the following:
a. Sanitary plumbing and drainage system within the premises
connected to the sewerage system;
b. Toilets, refuse chute chambers, car washing bays and garage gully;
c. Sewerage pumping system;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 44
d. Platform levels; and
e. Eating establishments and grease trap or sewage divertor, if any.
10.2.2. First Storey Plan a. Sanitary plumbing and drainage system and their gradient within the
premises connected to the sewerage system, sewer connection and
its pipe size, the last inspection chamber and the connecting manhole;
b. Double floor slab (including access opening) for sanitary pipes sited
over bedroom, living room, dining room and kitchen area;
c. Sewer connection and its gradient, the last inspection chamber and
the connecting manhole;
d. Sanitary facilities or toilets;
e. Sewer or pumping main, gradient, and setback distance from building
or structures;
f. Reinforced concrete trench with removable slabs (annotated on the
plan) for existing or proposed sewer under building or structures or
with insufficient setback from building or structures;
g. Invert and top levels of the connecting manhole(s);
h. Proposed sewer or diversion, existing sewer and their setback from
building or structure, adjacent lot and Drainage Reserve; and
i. Provision of pump sump or holding tank or sewage treatment plant.
10.2.3. Second Storey to Highest Storey Plan a. Sanitary plumbing and drainage system within the premises
connected to the sewerage system;
b. Double floor slab (including access opening) for sanitary pipes sited
over bedroom, living room, dining room and kitchen area; and
c. Sanitary facilities or toilets.
10.3. Roof Plan View In specific, the roof plan of TOP/CSC sanitary works shall show the following:
a. Sanitary pipes and potable water tank; and
b. Vent stacks, roof garden and window openings of penthouse units.
10.4. Elevation View In specific, the elevation view of TOP/CSC sanitary works shall show the following:
a. Sanitary plumbing and drainage system within the premises connected to
the sewerage system;
b. Double floor slab for sanitary pipes sited over bedroom, living room,
dining room and kitchen area;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 45
c. Sewer connection and its pipe size, the last inspection chamber and the
connecting manhole;
d. Platform levels;
e. Existing or Proposed sewer or pumping main, gradient, and setback
distance from building or structures;
f. Reinforced concrete trench with removable slabs; and
g. Pump sump or holding tank or sewage treatment plant.
Colour Usage
Magenta Deviations (Compared to Building Plan) Cyan Existing (Compared to Building Plan) Yellow Demolished or Abandoned sewers or drainlines (Compared to Building Plan)
11. As-built Plan for CSC – Proposed Roadside Drain/ Culvert
11.1. Site Plan View In specific, the location and site plan of CSC proposed roadside drain or culvert
shall show or indicate the following:
11.1.1. Location Plan a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings and MRT
tracks, within 100m radius shall be shown.
11.1.2. Site Plan Boundary of development site shall be edged RED.
a. Alignment and extent of proposed drain;
b. Highlight the proposed drain;
c. Summit point and direction of flow of proposed drain;
d. Width and type of proposed drain;
e. Road reserve or widening line or boundary line;
f. Drainage reserve lines with dimensions (if applicable);
g. Invert levels, top levels and road or ground levels;
h. Size and spacing of grating covers for closed drain; and
i. Drop inlet chambers and scupper drains.
11.2. First Storey Floor Plan View In specific, the 1st storey floor plan of CSC proposed roadside drain or culvert shall
show or indicate the following:
Note: Legend for sewers or pumping mains or drainlines as follows.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 46
a. Alignment and extent of proposed drain;
b. Highlight the proposed drain;
c. Summit point and direction of flow of proposed drain;
d. Width and type of proposed drain;
e. Road reserve or widening line or boundary line;
f. Drainage reserve lines with dimensions (if applicable);
g. Invert levels, top levels and road or ground levels;
h. Size and spacing of grating covers for closed drain; and
i. Drop inlet chambers and scupper drains.
11.3. Cross Sectional View In specific, the cross section of CSC proposed roadside drain or culvert shall show
the following:
a. Boundary line or road reserve line and drainage reserve line, if applicable;
b. Clear width, minimum and maximum depth;
c. Type and size of Dry Weather Flow channel;
d. Type of safety railings, if applicable;
e. Thickness of walls, top and base slab;
f. Reinforced details and grade of concrete;
g. 300mm thick false bottom;
h. Weepholes, hardcore backing and geotextile;
i. Lean concrete and hardcore sub base;
j. Aluminium rungs, if applicable;
k. Cross fall of benching;
l. Cross section of ramp within maintenance access, if applicable;
m. Steel posts and chains across maintenance access, if applicable; and
n. Details of box drain connections within drainage reserve, if applicable.
11.4. Longitudinal Section View In specific, the longitudinal section of CSC proposed roadside drain or culvert shall
show the following:
a. Existing and proposed invert levels;
b. Soffit, coping, ground and road levels;
c. Extent, size and type of proposed drain or culvert;
d. Gradient and direction of flow of proposed drain or culvert;
e. Clear depth and chainages; and
f. Size and type of existing drain at both ends of the proposed drain or
culvert.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 47
Colour Usage Magenta Deviations (Compared to Building Plan) Cyan Existing (Compared to Building Plan) Yellow Demolished or Abandoned sewers or drainlines (Compared to Building Plan)
12. As-built Plan for CSC – Pumped Drainage System at
Basement
12.1. Floor Plan View In specific, the basement and 1st
12.1.1. Basement Plan
storey plan of CSC pumped drainage system
shall show or indicate the following:
a. Storm water pump, storm water storage tank; and
b. Pipeline running from basement to outlet at 1st
12.1.2. First Storey Plan
storey surface drain.
a. Pipeline running from basement to outlet at 1st
storey surface drain.
12.2. Elevation View In specific, the elevation view of CSC pumped drainage system shall show the
following:
a. Storm water pump, storm water storage tank; and
b. Pipeline running from basement to outlet at 1st
storey surface drain.
Colour Usage Magenta Deviations (Compared to Building Plan) Cyan Existing (Compared to Building Plan) Yellow Demolished or Abandoned sewers or drainlines (Compared to Building Plan)
13. As-built Plan for CSC – Internal Drain with Deviations
13.1. Site Plan View In specific, the location and site plan of CSC internal drain with deviations shall
show or indicate the following:
13.1.1. Location Plan
Note: Legend for proposed roadside or culvert as follows:
Note: Legend for proposed roadside or culvert as follows:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 48
a. Boundary of development site shall be edged RED; and
b. Outline of neighbouring development plots or buildings and MRT
tracks, within 100m radius shall be shown.
13.1.2. Site Plan a. Internal drain deviations from the approved plan.
13.2. Floor Plan View In specific, the basement and 1st
13.2.1. Basement Plan
storey plan of CSC internal drain with deviations
shall show or indicate the following:
a. Internal drain deviations from the approved plan.
13.2.2. First Storey Plan a. Internal drain deviations from the approved plan.
Colour Usage
Magenta Deviations (Compared to Building Plan) Cyan Existing (Compared to Building Plan) Yellow Demolished or Abandoned sewers or drainlines (Compared to Building Plan)
14. Certified Survey Plan for CSC – Development in the Vicinity of/
Affected by Drainage Reserve
14.1. Site Plan View In specific, the site plan of certified CSC survey plan shall show or indicate the
following:
a. Proposed structure or foundation which is less than 300mm away from
the Drainage Reserve; and
b. Lots numbers of the drainage reserve, if affected.
14.2. Cross Section View In specific, the cross section view of certified CSC survey plan shall show or
indicate the followings.
a. Proposed structure or foundation which is less than 300mm away from
the Drainage Reserve.
Note: Legend for proposed roadside or culvert as follows:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 49
15. URA Approved Sub-division Plan for CSC – for Site Affected
by Drainage Reserve
15.1. Site Plan View In specific, the site plan of URA approved sub-division plan for CSC shall show or
indicate the followings.
a. Sub-division Plan with separate lot number; and
b. Certified Survey Plan (CP) with separate lot number.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 50
A-4 FSSD Submission Requirements 1. General Requirements for All FSSD Submissions
The plans submitted under section 23 (1) of the Fire Safety Act shall consist of a location
plan, a site plan, a floor plan of each storey, a roof plan of the building and sectional and
elevational drawings of the building. All dimension and grid shall be indicated clearly on
plans.
When publishing to DWF/PDF, all plans submitted under section 23 (1) of the Fire Safety
Act shall be set to the following scales:
a. Site plan — 1:500;
b. Key or location plan — 1:1000; and
c. Plan of a building — 1:100, except where the size of the building is too large
for the plan to be fit in the required standard size paper, the Commissioner
may allow the plan to be prepared to a scale not smaller than 1:200.
The scales and grid references shall be also indicated on all plans, sections and other
drawings.
1.1. Site Plan View The plans shall contain or clearly identify and show in distinct colours for the
following:
1.1.1. Location Plan a. the coloured location of the lot relative to neighbouring lots; and
b. the various roads constituting the access layout to the lot.
1.1.2. Site Plan a. the means of access to the site and to the perimeter of each building
for fire fighting vehicles and equipment;
b. distances between each building or fire safety works and the relevant
lot boundaries, other proposed or existing buildings or installations on
the site;
c. the location of existing and proposed internal fire-hydrants on the site;
and
d. any other feature on or in the vicinity of the site which is likely to be a
fire hazard or is likely to cause obstruction to fire fighting vehicles and
equipment and rescue operations.
Note: Refer to your vendor’s instructions manual or Appendix C for tips in doing so.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 51
1.2. Floor Plan & Roof Plan View The plans shall contain or clearly identify and show in distinct colours for the
following:
a. all room usage shall be indicated clearly on plan;
b. schematic drawings shall be included for the fire protection system
(fire zones);
c. location of all the fire alarm panels, control valves and breeching inlets
etc;
d. clear statements indicating the proposed or existing use of every part;
e. details of all openings and voids penetrating floors including their
usage, dimensions and the nature and arrangement of enclosing walls
and barricades;
f. clear statements indicating the design occupant load for that storey or
roof for which means of escape in case of fire have been provided in
accordance with the Fire Code;
g. the fire resistance ratings of all elements of structure, fire doors,
shutters, dampers and such other fire safety measures;
h. details of all means of escape to the external at ground level from
every part of the floor such as exit doors, corridors, passageways,
aisles, gangways, balconies, lobbies, ramps, exit passageways,
escape and fire fighting staircases and areas of refuge;
i. locations of all existing and proposed fire lifts, fire lift lobbies, the Fire
Command Centre, fire pumps, water tank rooms and generator rooms;
j. locations of all areas designated for the storage of flammable liquids
or gases, boiler rooms, transformer rooms and any other area of
special risk;
k. the types and extent of provision of fire detection and alarm systems
and voice communications systems;
l. clear statements indicating the type and ratings of all proposed or
existing portable fire extinguishers and their locations;
m. the type and extent of provision of hydraulic hosereels, sprinklers
systems, wet and dry rising mains and other fire extinguishing systems;
and
n. the type and extent of provision of smoke control and ventilation
systems and their related air or smoke shafts.
1.3. Elevation View
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 52
In specific, the elevation views submitted for FSSD approval shall include the
following:
a. the provisions of fireman access panels on the external walls and
claddings; and
b. the clear distance of the external wall from the fire fighting vehicles
and equipment access, lot boundary, adjacent buildings and other
structures.
1.4. Section View Cross-sectional views which are necessary to fully describe all details and
configurations of the proposed building or part thereof and of the proposed fire
safety works and shall include the following:
a. the full height of each storey and the depth of ceiling space;
b. details of all openings and voids penetrating floors including their
dimensions, usage and height of enclosing walls and barricades;
c. details of the junction between the roof and any compartment walls;
d. the dimensions of treads and rises of staircases;
e. the dimensions of openings in external walls;
f. the clear height of all structures or projections directly above the
access for fire fighting vehicles and equipment;
g. the clear distance of the external wall from the fire fighting vehicles
and equipment access, lot boundary, adjacent buildings and other
structures;
h. the types of materials used in and the thickness of all walls, floors,
roofs, ceilings, beams and other related parts of the building; and
i. enlarged details of curtain walling at the junction with the typical floor
slab to show the provision of fire stopping or fire cavity barriers.
1.5. Layout Views or Sheets QPs should include the following items in the layout views or sheets:
1.5.1. Title Block Similar to Appendix A-1 Section 1.5.1.
1.5.2. Qualified Person’s Declaration Refer to Appendix B for QP’s declaration required by regulatory agency.
Note: Such other details, particulars or information relating to the building or fire safety works as the Commissioner may require.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 53
Figure 16 Sample of layout view with QP’s declaration and company’s profile (FSSD BP submission)
2. Air-Conditioning, Mechanical Ventilation and Fire Protection
Works Plans to be submitted for air-conditioning, mechanical ventilation and fire protection
works shall include the following:
a. key features of the building in which the system is to be installed the
particulars listed in regulations 6 and 7;
b. a schematic diagram of the overall system showing clearly the key features
and their functions, relative locations in the building, lots, sizes, capacities
and other essential information including the air distribution design
arrangement in the case of air-conditioning and mechanical ventilation
systems;
c. the layout of the system on every floor plan showing clearly the various parts
and their functions, locations, arrangements, sizes, capacities and other
essential information;
d. necessary cross-sectional views as superimposed on the building or part
thereof to fully describe the details and configurations of the system;
Note: Follow the submission template provided and it should have all the approving stamp and declaration statements prepared for you.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 54
e. a colour scheme to clearly distinguish the various distinct parts of the system
and the different systems from one another;
f. for air-conditioning and mechanical ventilation systems such additional details
as:
(i) the volumetric rate of flow of air at each point of inlet and outlet of
each system including those serving protected staircases, exit
passageways, lobbies, areas of refuge, the Fire Command Centre,
fire pump rooms, generator rooms, rooms used for the storage of
flammable liquids or gas or other areas of special risk;
(ii) the location of fire compartment walls, floors and air shafts;
(iii) the location of fire dampers;
(iv) the location of smoke detectors; and
(v) the location and function of other fire precautionary features.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 55
A-5 NParks Submission Requirements 1. General Requirements for all NParks Development Application
(DC) Submissions
All floor plans (inclusive of site plan) should have the structural grid lines and dimensions
to show the total length of width of the building.
1.1. Site Plan View The site plan shall show the following:
a. Cadastral based (with details of lot numbers, lot boundary etc) site plan
with a surrounding radius of 10m to 50m shall be incorporated;
b. Names of the adjacent roads and streets;
c. Site boundary should be indicated clearly in RED colour;
d. All building setbacks. The outline of building to be erected/building in
which works are to be carried out; and the outlines of all proposed
basements in BROWN colour;
e. All building plots, and area of communal use/open space for building
coverage and communal open space calculations shall be shown as
separate plots;
f. Road reserve lines, drainage reserve lines, MRT lines, MRT protection
zones, if applicable, etc shall be indicated clearly on plan with dimensions;
g. Existing ground levels for the subject site and adjoining sites immediately
across the common boundaries and proposed platform levels;
h. Retaining walls, boundary wall and other proposed boundary fencings;
i. Existing and proposed buffer zone provision (Green buffer and physical
buffer lines with dimensions) and 2m wide peripheral planting strips;
j. Proposed gradients of green buffer and 2m peripheral planting strips;
k. Types of ancillary structures, with height and width, within the green
buffer or 2m peripheral planting strips;
l. All existing tree(s) (with tree species and girths) or single stem palm(s)
within the development boundary and within 10m from surrounding the
subject site;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 56
m. Existing tree(s), within the development boundary, to be retained should
be indicated clearly in GREEN colour, and existing tree(s) to be felled
should be indicated in YELLOW colour;
n. The proposed TREE PROTECTION ZONES (TPZ) for existing tree(s),
within the development, to be retained; the dimension (in radius) of each
TPZ is clearly indicated;
o. All existing roadside tree(s) or single stem palm(s) fronting the subject
site;
p. Existing roadside tree(s) or palm(s) to be retained should be indicated
clearly in GREEN colour, and existing roadside tree(s) or palms to be
felled should be indicated in YELLOW colour.
q. Crown spread of all existing trees within the development boundary,
especially those within the green buffer and 2m peripheral planting strips;
r. Access arrangement, road name text, road centre lines, road kerbs and
road categories;
s. Plot boundary and plot numbers of right of way/easement parkway
reserve, if applicable;
t. Planting strips (with dimensions) at open surface at grade car parks;
u. MRT setback lines and distance;
v. Existing and proposed underground services, for example: sewerage line,
newater pipes;
w. Ingress, egress to the site, access to bin centre and access to substation;
and
x. Proposed/existing structures (with dimensions) within green buffer and
2m wide peripheral planting verge.
1.2. Elevation and Cross Section Views The Elevation or cross section view shall show the following:
a. Floor-to-floor height;
b. Basement protrusions, if any;
c. Lines of existing ground level and proposed level;
d. Thickness of retaining wall, boundary wall or other type of boundary
fencing, wall base, soil depth;
e. Green buffer(s) (with dimension(s)) or/and 2m wide peripheral planting
strip;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 57
f. Existing tree(s) with existing level(s) and proposed level(s);
g. Boundary line, road reserve line or drainage reserve, if applicable;
h. Services underground /above ground level to be shown;
i. Dimensions of above mentioned elements; and
j. Existing and proposed gradients of green buffer or/and peripheral
planting strip.
1.3. Layout Views or Sheets
1.3.1. Title Block
Similar to Appendix A-1 Section 1.5.1.
1.4. Schedule or Table Table(s) shows:
a. The species and girth of all the existing trees(s)/single stem palm(s)
within the subject site boundary, on neighbouring lots and all the existing
roadside tree(s)/single stem palm(s) abutting the development site.
(Refer to Tables below)
Table 8 Table format for summary of existing trees/ single stem palms (for DC Submission)
Existing Trees/Single Stem Palms within Development Site Boundary Serial no Tree/Palm
Number Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal = < 1m
(a) > 1m (b)
Existing Trees/Single Stem Palms on Neighbouring Lots (Up to a Distance of 5m from the Development Site Boundary)
Serial no Tree/Palm Number
Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal = < 1m
(a) > 1m (b)
Existing Roadside Trees/Single Stem Palms Abutting The Development Site Boundary (Up to a distance of 10m on Both Sides of the Boundary)
Serial no Tree/Palm Number
Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal
= < 1m (a)
> 1m (b)
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 58
b. computation of ancillary structures that encroach into green buffer and
2m peripheral planting strip respectively;
c. Area and soil depth of sky rise/rooftop greenery at each storey, if
applicable;
d. Computation of public open space area in a conventional housing
development, if applicable; and
e. Parcels of land for vesting such as road widening, drainage reserve line
and public open space etc shall be shown as separate plots.
1.5. Sky rise/Rooftop Greenery or Vertical Greenery Boundaries of these greeneries are shaded in green lines.
2. General Requirements for NParks Building Plan (BP)
Submissions (excluding external works submissions)
All floor plans (inclusive of site plan) should have the structural grid lines and dimensions
to show the total length of width of the building.
2.1. Site Plan View The site plan shall show the following:
a. Cadastral based (with details of lot numbers, lot boundary etc) site plan
with a surrounding radius of 10m to 50m shall be incorporated;
b. Names of the adjacent roads and streets, with road category indicated;
c. Site boundary, road reserve line and drainage reserve line (if applicable)
should be indicated clearly in RED colours;
d. All building setbacks, the outline of building to be erected/building in
which works are to be carried out; and the outlines of all proposed
basements in BROWN colour;
e. All building plots, and area of communal use/open space for building
coverage and communal open space calculations shall be shown as
separate plots;
f. Parcels of land for vesting such as road widening, drainage reserve line
and public open space etc shall be shown as separate plots;
g. Road reserve lines, drainage reserve lines, MRT lines, MRT protection
zones, if applicable, etc shall be indicated clearly on plan with dimensions;
h. Existing ground levels for the subject site and adjoining sites immediately
across the common boundaries and proposed platform levels;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 59
i. Retaining walls, boundary wall and other proposed boundary fencings;
j. Buffer zone provision (Green buffer and physical buffer lines with
dimensions) and 2m wide peripheral planting strip;
k. Proposed gradients of green buffer and 2m peripheral planting strip;
l. Types of ancillary structures, with height and width, within the green
buffer or 2m peripheral planting strip;
m. All existing tree(s) (with tree species and girths) or single stem palm(s)
within the development boundary and within 10m radius surrounding the
subject site;
n. Existing tree(s), within the development boundary, to be retained should
be indicated clearly in GREEN colour, and existing tree(s) to be felled
should be indicated in YELLOW colour.
o. The proposed TREE PROTECTION ZONES (TPZ) for existing tree(s),
within the development, to be retained; the dimension (in radius) of each
TPZ is clearly indicated;
p. All existing roadside tree(s) or single stem palm(s) fronting the subject
site;
q. Existing roadside tree(s) or palm(s) to be retained should be indicated
clearly in GREEN colour, and existing roadside tree(s) or palms to be
felled should be indicated in YELLOW colour.
r. Crow spread of all existing trees within the development boundary,
especially those within the green buffer and 2m peripheral planting strip;
s. Access arrangement, road name text, road centre lines, road kerbs and
road categories;
t. Plot boundary and plot numbers of right of way/easement parkway
reserve, if applicable;
u. Planting strips (with dimensions) at open surface at grade car parks;
v. MRT setback lines and distance;
w. Existing and proposed underground services, for examples: sewerage
line, newater pipes; and
x. Ingress, egress to the site, access to bin centre and access to substation.
2.2. Elevation and Cross Section Views The Elevation or cross section view shall show the following:
a. Floor-to-floor height;
b. Basement protrusions, if any,
c. Lines of existing ground level and proposed level;
d. Thickness of retaining wall, boundary wall or other type of boundary
fencing, wall base, soil depth;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 60
e. Green buffer(s) (with dimension(s)) or 2m wide peripheral planting strip;
f. Existing tree(s) with existing level(s) and proposed level(s);
g. Boundary line, road reserve line or drainage reserve, if applicable; and
h. Existing and proposed gradients of green buffer or/and peripheral
planting strip.
2.3. Layout Views or Sheets
2.3.1. Title Block
Similar to Appendix A-1 Section 1.5.1.
2.4. Schedule or Table Table(s) shows:
a. the species and girth of all the existing trees(s)/single stem palm(s) within
the subject site boundary, on neighboring lots and all the existing
roadside tree(s)/single stem palm(s) abutting the development site.
(Refer to Tables below)
Table 9 Table format for summary of existing trees/ single stem palms (for BP Submission)
Existing Trees/Single Stem Palms within Development Site Boundary Serial no Tree/Palm
Number Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal = < 1m
(a) > 1m (b)
Existing Trees/Single Stem Palms on Neighbouring Lots (Up to a Distance of 5m from the Development Site Boundary)
Serial no Tree/Palm Number
Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal = < 1m
(a) > 1m (b)
Existing Roadside Trees/Single Stem Palms Abutting The Development Site Boundary (Up to a Distance of 10m on Both Sides of the Boundary)
Serial no Tree/Palm Number
Botanical Name of tree/palm
Girth Size Propose to remove
Propose to retain
Reasons for removal = < 1m
(a) > 1m (b)
b. computation of ancillary structures that encroach into green buffer and
2m peripheral planting strip respectively;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 61
c. Area and soil depth of sky rise/rooftop greenery at each storey, if
applicable.
d. Computation of public open space area in a conventional housing
development, if applicable; and
e. Parcels of land for vesting such as road widening, drainage reserve line
and public open space etc shall be shown as separate plots.
2.5. Skyrise/Rooftop Greenery or Vertical Greenery Boundaries of these greeneries are shaded in green lines, if applicable.
2.6. Tree Planting Plan The tree planting plan shall include the following:
a. Green buffer and 2m wide peripheral planting strip, with dimensions;
b. Location and species of proposed trees or palms;
c. A legend for the proposed trees or palms;
d. Types of ancillary structures with height and width shall be clearly shown;
and
e. All slopes (with gradients) shall be shown on plan with standard symbols.
3. General Requirements for NParks Certificate of Statutory
Completion (CSC) Submissions (excluding external works
submissions)
3.1. Site Plan As built site plan for CSC shall show the following:
a. Site boundary and the road reserve line in RED colour;
b. Basement line in BROWN colour;
c. All constructed building(s) and structures;
d. Underground/above-ground services;
e. green buffer, 2m peripheral planting strip and all ancillary structures
within the green buffer or w2m peripheral planting strip;
f. The locations, species and girth size of tree(s) or palm(s) planted on site;
g. Existing tree(s) or palm(s) retained at site with provided TPZ;
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 62
h. Ingress and egress to the site, access to bin centre and access to
substation, if applicable;
i. Road reserve lines and drainage reserve lines, if applicable; and
j. Retaining/boundary wall or other types of fencing.
3.2. Subdivision plan (for conventional housing development,
and Certified Survey Plan with lot numbers)
The subdivision plan approved by the Planning Authority, URA and the final
certified survey plan are to be submitted.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 63
A-6 LTA Submission Requirements 1. General Requirements for LTA/DBC (RAIL)
The individual section below covers the specific presentation requirements necessary for
each of the drawing views submitted to LTA (RAILS) at the various stages below: For development site within the Railway Protection Zone:
a. Development Proposal;
b. Building Proposal;
c. Engineering Work Proposal;
d. Certified Survey Plan; For development site within the Railway Corridor:
a. Development Proposal;
b. Building Proposal;
c. Engineering Work Proposal.
2. LTA/DBC (Rail) – Development Proposal in Railway Protection
Zone
2.1. Site Plan View In specific, all location and site plans of a development proposal shall show the
following:
2.1.1. Location Plan a. Boundary of development site shall be edged RED.
2.1.2. Site and Layout Plans a. Layout of the site with boundary lines verged in RED.
b. Standard declarations of Qualified Person as stipulated in Part II
Section 1 Clause 1.4.3 of the Code of Practice for Railway Protection;
c. Outline of buildings or structure;
d. Location and clearances of the proposed development proposal in
relation to the Rapid Transit System structures;
e. First, second and third reserve lines of the Rapid Transit System
structures (where applicable);
f. Basement outline (if any).
2.2. Section and Elevation Views In specific, the section and elevation views of the development proposal shall
show the following:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 64
a. Platform levels of the proposed development proposal;
b. Minimum clearance between proposed development proposal and the
nearest Rapid Transit System structures;
c. First, second and third reserve lines of the Rapid Transit System
structures (where applicable);
3. LTA/DBC (Rail) – Building Proposal in Railway Protection Zone
3.1. Site Plan View In specific, all location and site plans of a building proposal shall show the
following:
3.1.1. Location Plan a. Boundary of development site shall be edged RED.
3.1.2. Site and Layout Plans a. Layout of the site with boundary lines verged in RED.
b. Standard declarations of Qualified Person as stipulated in Part II
Section 1 Clause 1.4.3 of the Code of Practice for Railway Protection;
c. Outline of buildings or structure;
d. Location and clearances of the proposed building proposal in relation
to the Rapid Transit System structures;
e. First, second and third reserve lines of the Rapid Transit System
structures (where applicable);
f. Existing ground level and the proposed platform levels;
g. Basement outline (if any);
h. Discharge outlet from pump sump in basement (if any);
i. Main road and special landmarks.
3.2. Section and Elevation Views In specific, the section and elevation views of the building proposal shall show the
following:
a. Outline of building
b. Horizontal and vertical clear distances between the Rapid Transit System
structures and the proposed building;
c. First, second and third reserve lines of the Rapid Transit System
structures (where applicable);
d. Depth of basement (if any);
e. Details of proposed drainage system including discharge outlet (if any);
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 65
f. Proposed platform level if the building is connected or integrated with the
Rapid Transit System structures;
g. Affected drain lines and lightning protection system of the Rapid Transit
System structures.
4. LTA/DBC (Rail) – Engineering Work Proposal in Railway
Protection Zone
4.1. Site Plan View In specific, all plans of an engineering work proposal shall show the following:
4.1.1. Site and Layout Plans a. Layout of the site with boundary lines verged in RED.
b. Outline of buildings or structure;
c. Vertical and horizontal distances of the proposed engineering works
(site preparation, substructures and building construction works; etc.)
in relation to the Rapid Transit System structures;
d. First, second and third reserve lines of the Rapid Transit System
structures and the line of influence (where applicable);
4.2. Section and Elevation Views In specific, the section and elevation views of the engineering work proposal shall
show the following:
a. Horizontal and vertical clear distances between the Rapid Transit System
structures and the proposed engineering work;
b. First, second and third reserve lines of the Rapid Transit System
structures (where applicable);
5. LTA/DBC (Rail) – Certified Survey Plan
5.1. Site Plan View In specific, the certified survey plan shall show the following:
5.1.1. Site and Layout Plans a. Existing contours, horizontal alignments, chainages, co-ordinates,
levels and MRT reserve lines of the Rapid Transit System structures
(where applicable);
b. Boundary lines, lot number and the existing building structures (if any).
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 66
5.2. Section and Elevation Views In specific, the section and elevation views of the certified survey plan shall show
the following:
a. Vertical alignments, chainages, co-ordinates, levels and MRT reserve
lines of the Rapid Transit System structures (where applicable).
6. LTA/DBC (Rail) – Development Proposal in Railway Corridor
6.1. Site Plan View In specific, all location and site plans of a development proposal shall show the
following:
6.1.1. Location Plan a. Boundary of development site shall be edged RED.
6.1.2. Site and Layout Plan a. Layout of the site with boundary lines verged in RED.
b. Standard declarations of Qualified Person as stipulated in Part III
Section 1 Clause 1.3.3 of the Code of Practice for Railway Protection;
c. Outline of buildings or structure;
d. Location and clearances of the proposed development in relation to
the railway area and railway corridor;
e. Railway area and railway corridor;
f. Basement outline (if any).
6.2. Section and Elevation Views In specific, the section and elevation views of the development proposal shall
show the following:
a. Platform levels of the proposed development proposal;
b. Minimum clearance between proposed development proposal and the
railway area;
7. LTA/DBC (Rail) – Building Proposal in Railway Corridor
7.1. Site Plan View In specific, all location and site plans of a building proposal shall show the
following:
7.1.1. Location Plan
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 67
a. Boundary of development site shall be edged RED.
7.1.2. Site and Layout Plan a. Layout of the site with boundary lines verged in RED.
b. Standard declarations of Qualified Person as stipulated in Part III
Section 1 Clause 1.3.3 of the Code of Practice for Railway Protection;
c. Outline of buildings or structure;
d. Location and clearances of the proposed building proposal in relation
to the railway area and railway corridor;
e. Railway area and railway corridor;
f. Basement outline (if any);
g. Main road and special landmarks.
7.2. Section & Elevation Views In specific, the section and elevation views of the building proposal shall show the
following:
a. Outline of building
b. Horizontal and vertical clear distances between the railway area, railway
corridor and the proposed building;
c. Depth of basement (if any);
8. LTA/DBC (Rail) – Engineering Work Proposal in Railway
Corridor
8.1. Site Plan View In specific, all plans of an engineering work proposal shall show the following:
8.1.1. Site and Layout Plans a. Layout of the site with boundary lines verged in RED.
b. Outline of buildings or structure;
c. Vertical and horizontal distances of the proposed engineering works
(site preparation, substructures and building construction works; etc.)
in relation to the railway area and railway corridor;
d. Railway area and railway corridor.
8.2. Section and Elevation Views In specific, the section and elevation views of the engineering work proposal shall
show the following:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 68
a. Horizontal and vertical clear distances between the railway area, railway
corridor and the proposed engineering work;
b. Railway area and railway corridor.
9. General Requirements for LTA/DBC (Roads & Transport)
9.1. All Floor Plan Views Similar to Appendix A-1 Section 1.1.
9.2. Site Plan View In specific, site plan shall show the following (also shown in Figure 5):
9.2.1. Building Outline Similar to Appendix A-1 Section 1.2.1.
9.2.2. Road Names Similar to Appendix A-1 Section 1.2.2.
9.2.3. Town Subdivision, Mukim and Lot Numbers Similar to Appendix A-1 Section 1.2.3.
9.2.4. Dimensions There shall be indication of building setback, road reserve line and distance
between the new building to be erected or the building works to be carried
out and its adjacent lot boundary. Existing ground levels for the subject site
and adjoining sites immediately across the common boundaries (more than
1m beyond the subject site) & proposed platform levels shall be indicated;
Retaining walls or boundary wall, if any, shall be indicated. Buffer zone
provisions (Green buffer and physical buffer lines with dimensions) and 2 m
planting strip shall be indicated clearly; Distances between proposed
ingress/egress and the neighboring existing entrance access shall be
indicated.
9.2.5. Ingress and Egress to the Site The site plan shall show the proposed ingress & egress to the development
including pedestrian gates (if any). Corresponding levels such as existing
road edge levels, proposed level on top of entrance culvert & platform
levels within the development shall be indicated;
9.2.6. Road Related Facilities The site plan shall show the existing and proposed road related facilities
fronting the development site. Road related facilities such as street lighting
poles, OG boxes, linkways, pedestrian overhead bridge, taxi stand and
bus-stop, etc.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 69
9.2.7. Road and Drainage Reserve Parcels of land for vesting such as road widening and drainage reserve etc
shall be shown as separate plots. Road reserve lines and drainage reserve
lines shall be indicated clearly on plan.
9.3. Floor Plan View In specific, the floor plan shall show the following:
9.3.1. Platform Level
Similar to Appendix A-1 Section 1.3.1.
9.3.2. Room’s Tag Similar to Appendix A-1 Section 1.3.2.
9.3.3. Car Park Floor a. Service Ducts, equipments and any obstructions that may affect the
parking dimensions to be clearly indicated on plan; and b. All critical dimensions of the parking stalls, width of driveways, ramps,
parking aisle, circulation aisles, gradient, headroom clearance to be
clearly indicated on plan.
c. The parking stalls, loading & unloading spaces to be clearly indicated
and serially numbered by the type of parking.
d. The total number of parking lots provided to be indicated at the right
hand corner of each plan.
9.4. Elevation and Section Views Similar to Appendix A-1 Section 1.4.
9.5. Layout Views or Sheets 9.5.1. Title Block
Similar to Appendix A-1 Section 1.5.1.
10. General Requirements for LTA/DBC (Vehicle Parking)
10.1. All Floor Plan Views Similar to Appendix A-1 Section 1.1.
10.2. Site Plan View
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 70
In specific, site plan shall show the following (also shown in Figure 5):
10.2.1. Building Outline Similar to Appendix A-1 Section 1.2.1.
10.2.2. Road Names Similar to Appendix A-1 Section 1.2.2.
10.2.3. Town Subdivision, Mukim and Lot Numbers Similar to Appendix A-1 Section 1.2.3.
10.2.4. Dimensions There shall be indication of building setback, road reserve line and distance
between the new building to be erected or the building works to be carried
out and its adjacent lot boundary. Existing ground levels for the subject site
and adjoining sites immediately across the common boundaries (more than
1m beyond the subject site) & proposed platform levels shall be indicated;
Retaining walls or boundary wall , if any, shall be indicated. Buffer zone
provisions(Green buffer and physical buffer lines with dimensions) and 2
m planting strip shall be indicated clearly;
10.2.5. Ingress and Egress to the Site The site plan shall show the proposed ingress & egress to the development
including pedestrian gates (if any). Corresponding levels such as existing
road edge levels, proposed level on top of entrance culvert & platform
levels within the development shall be indicated;
10.2.6. Road and Drainage Reserve Parcels of land for vesting such as road widening and drainage reserve etc
shall be shown as separate plots. Road reserve lines and drainage reserve
lines shall be indicated clearly on plan.
10.3. Floor Plan View Similar to Appendix A-6 Section 9.3.
10.4. Elevation and Section Views Similar to Appendix A-1 Section 1.4.
10.5. Layout Views or Sheets 10.5.1. Title Block
Similar to Appendix A-1 Section 1.5.1.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 71
A-7 HDB Submission Requirements 1. Submission to HDBARCH
QPs are required to publish and compile the model views according to the BIM
submission requirements of URA, BCA-BPD and FSSD. Other details which cannot be
shown in BIM shall be submitted as 2D drawings (eg. additional details, annotations and
dimensions) and bound within the same BIM file.
2. Submission to HDBEME
QPs are required to publish and compile the model views according to the BIM
submission requirements of NEA-CBPU and PUB for sanitary works. Other details which
cannot be shown in BIM shall be submitted as 2D drawings (eg. additional details,
annotations and dimensions) and bound within the same BIM file.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 72
A-8 JTC Submission Requirements QPs are required to publish and compile the model views according to the BIM submission
requirements of URA, BCA and other relevant authorities/technical agencies that QPs are
submitting the proposal to. Other details which cannot be shown in BIM shall be submitted as
2D drawings (eg. additional details, annotations and dimensions) and bound within the same
BIM file.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 73
Appendix B Standard Certifications for Building Works
B-1 BCA: Qualified Person’s Endorsements 1. Building Plans Complying with Acceptable Solutions in Approved
Document I, (Name of qualified person)
(a) the preparation of these building plans are in accordance with the Building Control Regulations; and
, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that –
(b) the buildings/ building works shown on these plans are in accordance with the
provisions of the provisions of the Building Control Regulations and the acceptable solutions in the Approved Document.
2. Building Plans with Alternative Solutions – Sole Certification I, (Name of qualified person)
(a) the preparation of these building plans are in accordance with the Building Control Regulations; and
, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that –
(b) notwithstanding the deviation(s) from the acceptable solutions in the Approved
Document, the buildings/ building works shown on these plans are in accordance with the provisions of the Building Control Regulations and the performance requirements in Fifth Schedule therein.
3. Building Plans with Alternative Solutions – Joint Certification by Qualified Persons
I, (Name of 1st qualified person)
(a) the preparation of these building plans are in accordance with the Building Control Regulations; and
, hereby certify, subject to any waiver/ modification granted under section 6A of the Building Control Act (Cap 29), that –
(b) the buildings/ building works shown on these plans are in accordance with the
provisions of the Building Control Regulations.
I, (Name of 2nd qualified person), hereby certify that notwithstanding the deviations from the acceptable solutions in the Approved Document, the buildings/ building works shown on these plans meet the performance requirements in the Fifth Schedule of the Building Control Regulations.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 74
4. Alteration and Addition Works I, (Name of qualified person), hereby certify that I have inspected the existing building and investigated its overall structure and that, in my opinion, the building is capable of resisting the forces and moments which may be increased or altered by reason of the repairs, alterations or additions shown in the building plans.
5. Structural Works and Design Calculations Complying with Acceptable Solutions in Approved Document
Certification by Qualified Person In accordance with Regulation 9 of the Building Control Regulations, I (Name of qualified person for structural works)
2. I further certify that these detailed plans and design calculations are in reference to Project Ref. No.: ______________________.
, hereby submit the detailed structural plans and design calculations prepared by me and certify that they have been prepared in accordance with the provisions of the Building Control Regulations, the Building Control Act and any other written law pertaining to buildings and construction for the time being in force.
3. Total number of structural plans submitted: ____________ and total number of
pages of design calculations in this book: ______________. Certification by Accredited Checker I, (Name of accredited checker)
2. I further certify that these detailed structural plans and design calculations are in reference to Project Ref. No.: ___________________and the key structural elements are consistent with the layout shown in the building plans.
, hereby certify that I have carried out an evaluation, analysis and review of the detailed structural plans and design calculations presented herein and am satisfied that there are no inadequacies in the key structural elements.
3. Total number of structural plans checked: ____________ and total number of pages
of design calculations in this book: ______________. 4. I hereby declare that I have no professional or financial interest in the building works
shown in the plans as defined in section 18 of the Building Control Act (Cap 29).
6. Structural Works and Design Calculations with Alternative Solutions
Certification by Qualified Person In accordance with Regulation 9 of the Building Control Regulations, I, (Name of qualified person for structural works)
2. I further certify that these detailed structural plans and design calculations are in
, hereby submit the detailed structural plans and design calculations prepared by me and certify that they have been prepared in accordance with the provisions of the Building Control Regulations, the Building Control Act and any other written law pertaining to buildings and construction for the time being in force.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 75
reference to Project Ref. No.: __________________. 3. Total number of structural plans submitted: _____________ and total number of
pages of design calculations in this book: _______________. 4. Notwithstanding the deviation(s) from the acceptable solutions in the Approved
Document, the structural works shown on these plans are in accordance with the provisions of the Building Control Regulations and the performance requirements in Fifth Schedule therein.
Certification by Accredited Checker I, (Name of accredited checker)
2. I further certify that these detailed structural plans and design calculations are in reference to Project Ref. No.: _____________________ and the key structural elements are consistent with the layout shown in the building plans.
hereby certify that I have carried out an evaluation and review of the detailed structural plans and design calculations presented herein and am satisfied that there are no inadequacies in the key structural elements.
3. Total number of structural plans checked: ____________ and total number of pages
of design calculations in this book: ____________. 4. I hereby declare that I have no professional or financial interest in the building works
shown in the plans as defined in section 18 of the Building Control Act (Cap 29). 5. Notwithstanding the deviation(s) from the acceptable solutions in the Approved
Document, the structural works shown on these plans are in accordance with the provisions of the Building Control Regulations and the performance requirements in Fifth Schedule therein.
7. Standard Certification for Civil Defence Shelter Plans I, (Name of qualified person)
(a) the preparation of these civil defence shelter plans are in accordance with the Building Control Regulations; and
, hereby submit the detailed civil defence shelter plans *(and design calculations) prepared by me and certify that –
(b) the civil defence shelter works shown on these plans are designed in accordance
with the shelter technical requirements. 2. Total number of civil defence shelter plans submitted: _____________ and total
number of pages of design calculations: ______________. *Delete where not applicable
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 76
B-2 URA: Qualified Person’s Endorsements 1. Owner’s Consent
For all submissions:
I/ We, (Name of person e-signing the plan
(a) I/ We am/ are not the owner(s) of the land within the meaning of the term "owner" as defined in Section 2 of the Planning Act (Cap 232, 1998Ed); and
), hereby declare that –
(b) I/ We have shown this plan to the owner(s) of the land, and have obtained the
consent of the said owner(s) to submit this plan to the Competent Authority under the Planning Act (Cap 232, 1998Ed).
2. Drainage Interpretation Plan (DIP) and Road Line Plan (RLP) For new erection applications:
DRAINAGE INTERPRETATION I, (Name of architect/ professional engineer), confirm that the drainage details as shown in the relevant drawings in this file are in accordance with the current information provided by the Chief Engineer, Central Building Plan Unit, NEA.
ROAD LINE I, (Name of architect/ professional engineer), confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.
3. Subdivision Application I, (Name of surveyor) declare that the building layout tallies with the development approved plans registered as plan ( ) in DC/AP_ES______________ dated __________. I also declare that the setbacks shown on this plan do not deviate more than 3% of the setback as approved under the said development plans.
4. Strata Subdivision applications For strata subdivision applications, if diagrammatic plan is provided, the following
declaration shall be properly done by the surveyor:
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 77
1. I, (Name of surveyor)
certify that the strata unit layout is in accordance with the Building Plan approved on date: __________ under BP number: ____________.
2. I, (Name of surveyor)
declare that the strata unit excludes all common properties indicated and referred to in the planning permission granted by the Competent Authority under the Planning Act (Cap 232).
5. Conservation Projects – Architect’s Endorsement For projects involving conservation buildings, the following endorsements by Architect is to
be included:
ARCHITECT’S ENDORSEMENT FLUE Flues and vents shall be located either on the rear slope of the main roof or the rear secondary roofs or abutting the wall of the rear façade / rear service block within the rear court. The roof of the flue can be pitched or flat and shall not be higher than the ridge of the main roof. AIR-CONDITIONING The installation of air-conditioning units shall comply with the conservation guidelines. SIGNAGES Detailed drawings of signage design indicating the size, location, lettering typeface and method of support and illumination shall comply with the conservation guidelines and shall be submitted to the Building and Construction Authority (BCA) for licensing.
6. Conservation Projects – Engineer’s endorsement ENGINEER’S ENDORSEMENT As a qualified person, I agree with and endorse the alterations to the structure as shown on this plan and that they are generally in accordance with conservation principles and good engineering practice. Where further strengthening or additional structural members are required to support addition and alteration work, formal approval will be sought from the Competent Authority under Planning Act and Building Authority under Building Control Act prior to commencement of work on site.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 78
B-3 FSSD: Qualified Person’s Endorsements 1. Fire Safety Works Complying with Prescriptive Provisions in Fire
Code BUILDING PLAN (BP) I, (Name of qualified person) NRIC No./Passport No._________________, being a qualified person under the Fire Safety Act, hereby certify that the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act.
FIRE PROTECTION (FP) AND AIR-CONDITIONING/MECHANICAL VENTILATION PLAN I, (Name of qualified person) NRIC No./Passport No._________________, being a qualified person under the Fire Safety Act, hereby certify that the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act. I, (Name of qualified person) hereby certify that the proposed ______________ system has been designed in accordance with the provisions of (State the code used).
2. Fire Safety Works with Alternative Solution (Performance-based Fire Safety Engineering)
BUILDING PLAN (BP) – OPTION 1 To be completed by the qualified person who is a fire safety engineer and who prepares the plans of fire safety works which include any alternative solution, and the fire safety engineering report. I, (Name of qualified person)
(a) the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act; and
, NRIC No./Passport No._________________ being a qualified person and a fire safety engineer under the Fire Safety Act, hereby certify that
(b) the alternative solution in the plans, and the fire safety engineering report, satisfy
the fire performance requirements in the Fire Code, and comply with the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to any deviation or modification approved by the Commissioner.
BUILDING PLAN (BP) – OPTION 2
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 79
To be completed by a qualified person who is NOT a fire safety engineer and who prepares the plans of fire safety works, and prepares the alternative solution in the plans under the supervision of a fire safety engineer. I, (Name of qualified person)
(a) the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act; and
, NRIC No./Passport No. _________________ being a qualified person under the Fire Safety Act, hereby certify that
(b) the alternative solution in the plans adheres to the fire safety engineering report.
To be completed by the fire safety engineer who is not a qualified person and who supervises the preparation of the alternative solution in the plans of fire safety works, and prepares the fire safety engineering report. I, (Name of fire safety engineer), NRIC No./Passport No.______________ being a fire safety engineer under the Fire Safety Act, hereby certify that the alternative solution shown on these plans, and the fire safety engineering report, satisfy the fire performance requirements in the Fire Code, and comply with the provisions of the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to any deviation or modification approved by the Commissioner.
FIRE PROTECTION (FP) AND AIR-CONDITIONING/MECHANICAL VENTILATION PLAN – OPTION 1 To be completed by the qualified person who is a fire safety engineer and who prepares the plans of fire safety works which include any alternative solution, and the fire safety engineering report. I, (Name of qualified person)
(a) the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act; and
, NRIC No./Passport No._________________ being a qualified person and a fire safety engineer under the Fire Safety Act, hereby certify that
(b) the alternative solution in the plans, and the fire safety engineering report, satisfy
the fire performance requirements in the Fire Code, and comply with the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to any deviation or modification approved by the Commissioner.
I, (Name of qualified person) hereby certify that the proposed ______________ system has been designed in accordance with the provisions of (State the code used).
FIRE PROTECTION (FP) AND AIR-CONDITIONING/MECHANICAL VENTILATION PLAN – OPTION 2 To be completed by a qualified person who is NOT a fire safety engineer and who prepares the plans of fire safety works, and prepares the alternative solution in the plans under the supervision of a fire safety engineer.
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 80
I, (Name of qualified person)
(a) the fire safety works as shown on these plans have been designed in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to modifications or waivers under section 27 of the Fire Safety Act; and
, NRIC No./Passport No. _________________ being a qualified person under the Fire Safety Act, hereby certify that
(b) the alternative solution in the plans adheres to the fire safety engineering report.
I, (Name of qualified person) hereby certify that the proposed ______________ system has been designed in accordance with the provisions of (State the code used).
To be completed by the fire safety engineer who is not a qualified person and who supervises the preparation of the alternative solution in the plans of fire safety works, and prepares the fire safety engineering report. I, (Name of fire safety engineer), NRIC No./Passport No.______________ being a fire safety engineer under the Fire Safety Act, hereby certify that the alternative solution shown on these plans, and the fire safety engineering report, satisfy the fire performance requirements in the Fire Code, and comply with the provisions of the Fire Safety Act and any regulations made thereunder, the relevant codes of practice and design guidelines, subject to any deviation or modification approved by the Commissioner.
3. Addition and Alteration Works I, (Name of qualified person) in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations hereby certify that the Minor Addition/Alteration works have been satisfactorily completed on date: _______ ; and I certify that the addition / alteration works do not affect the existing fire protection system in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations; or I certify that the addition / alteration works as shown in these drawings affected the existing *sprinkler / automatic fire alarm systems and I have supervised the works on site to ensure that the said system(s) have been modified in accordance with Regulation 4(5) of the Fire Safety (Building Fire Safety) Regulations. *include whichever is applicable
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 81
Appendix C Step-by-Step Guide Preparing for BIM Submission
DWF/PDF files are significantly smaller than the native files, making them easy to send
through e-Submission. After the modelling is completed and all the necessary building
information such as annotations, dimensions and etc (as specified by the respective
regulatory agency) are added on the relevant drawing views, QPs are required to publish the
drawing views as DWF/PDF (both 2D and 3D). The steps below will serve as a detailed guide
to QPs in preparing the DWF/PDF file, with the use of different BIM tools.
C-1 Users of Autodesk Revit
PART I: To export 2D drawing views and 3D model views into a single DWF file
In the Project Browser, multiple select all the model
views (plans, elevations & sections) meant for
submission.
Right click and select Properties.
Note: The following step-by-step guide is prepared based on Autodesk Revit Architecture v2010 and Autodesk Design Review v2010.
2
Tips: Hold on to Ctrl key while selecting the multiple views.
1
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 82
Under the Graphics Section, select the Hidden Line as
Model Graphics Style.
Click OK.
Click Export DWF. The Export dialog opens.
On the View/Sheet Set tab, select In Session
View/Sheet Set from the Export list.
Select All Views and Sheets in the Model from the
Shown in list.
Select the views and sheets to export, including a 3D
model view.
Click the DWF Properties tab, select Export Object Data
for both Element Properties & Rooms and Areas in A
Separate Boundary Layer.
Select the Graphics Settings as Use Standard Format.
Click the Print Setup button below.
10
11
Tips: If you are exporting a single view, select Current View/Sheet Only from Export list.
7
4
9
8
6
5
Note: For 2D DWF, ensure that all drawing views are published in Hidden Line mode, such that the DWF remains as vector line.
3
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 83
In the Print Setup dialog, choose Sheet Size, Paper
Placement, Zoom, and other settings. Then click OK.
Back to the DWF Export Settings dialog, click Export.
(Optional: Click the Project Information tab before
exporting, if one wishes to edit the project metadata)
Navigate to the target folder and name the DWF file
according to standard naming convention at Section
2.4.
Click Export.
PART II: Pre-check DWF file before submission
Open the previously saved DWF file using Autodesk
Design Review.
Note: Re-arrange the list of model views, if they are not in a correct order of sequence, such that the drawings are presented in a manner you want. Make sure that both 2D drawing views and a 3D model view is saved into a single DWF file for submission.
15
Note: Select the Files of type as DWF Files (*.dwf) and check the box at the bottom of the dialog to combine selected views and sheets into a single dwf file (as highlighted in the diagram).
14
13
Note: Under the Paper Size, select paper size; Paper Placement as Center; and Zoom to 100% size (as highlighted in the diagram). The rest shall be kept as the default settings.
12
16
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 84
C-2 Users of Graphisoft ArchiCAD and Other 3D Modelling Tools
PART I: To publish 2D PDF
In the Navigator, multiple select all the model views
(plans, elevations & sections) meant for submission.
Click on Settings at the bottom of Navigator.
Select the Scale, then click OK.
Note: The following step-by-step guide is prepared based on Graphisoft ArchiCAD v12 and Adobe Acrobat Pro Extended v9.0.
Note: QPs are requested to select the Scale in 1:100, 1:1000
3
2
Tips: Hold on to Ctrl key while selecting the multiple views.
1
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 85
Click Document menu Publisher Publish. The
Publish dialog opens.
Click Publishing Properties.
Navigate to the directory where you want to save the
PDF file, then click OK.
6
5
4
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 86
Back to the Publish dialog and select the relevant
drawing folder prepared for submission.
Click on Page Options.
Select the Paper Size, then click OK.
Back to the Publish dialog and click on Document
Options. Select the Scale as Original and change
other settings, if necessary. Then click OK.
Note: Make sure that PDF is chosen as the Format and the option Merge to one PDF file is selected. Also select the option “Selected Items” at the bottom right.
8
Tips: It is advised to set the Paper Size as A1 or A0, so that the drawings can fit into the paper with scale as specified in step 3 above.
8
7
7
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 87
Choose of the dialog and click Publish once confirmed.
A processing dialog will be shown as follows.
PART II: To publish 3D PDF
Open the 3D model view.
Click View 3D View Mode 3D Window Settings.
Make sure that the 3D Engine is set to use OpenGL
and the mode is Shading.
Click the Options button.
Uncheck "Textures", and "Customize Feedback Speed
in Frames Per Second". Then click Ok twice.
13
12
11
10
9
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 88
Launch the Acrobat Pro Extended, click File Create
PDF From 3D Capture.
Click the Settings button, click the OpenGL tab, and
set the capture units to match the 3D model. Edit
other 3D capture settings as necessary, and then click
OK.
Back to Graphisoft ArchiCAD, activate the 3D model
view, and then press the Print Screen on your
keyboard.
PART III: Combine 2D drawing views and 3D model views in a single PDF file
With the 3D PDF model opened, select File
Combine Merge Files Into A Single PDF. Then add
the 2D PDF file and click Combine Files.
Note: Make sure that both 2D drawing views and a 3D model view is saved into a single PDF file for submission.
17
Note: After the initial capture with a CAD application, you can simply start Acrobat 3D, open the 3D file in the CAD application, and press the Print Screen key to capture.
16
15
Note: The first time you capture from a particular CAD application, you must restart the CAD application before you can capture.
14
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 89
Click to expand the browser.
Select the individual 2D drawing view or 3D model
view. Right click and select Number Pages. In the
Prefix of Page Numbering dialog, rename the view’s
name according to standard naming convention at
Section 2.4. Then click OK. (Repeat the step on
remaining views)
Click File Save As to save the file according to the
standard file naming convention at Section 2.4.
Click Advanced Extend Features in Adobe Reader.
When prompted, click Save Now to replace the
existing file with additional features.
20
Note: QPs are required to follow this step to allow the extended features (eg. dimensioning and commenting) in Adobe Reader for regulatory officers.
21
Note: Re-arrange the list of model views, if they are not in a correct order of sequence, such that the drawings are presented in a manner you want.
19
18
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 90
ACKNOWLEDGEMENTS The development of this BIM Submission Guideline has been a collaborative effort among a
cadre of very knowledgeable consultants, vendors and processing officers from different
regulatory agencies. Significant contributors are listed below:
Building and Construction Authority Building Plan & Management Division, Building Plan Department
Special Functions Division, Civil Defence Shelter Engineering Department
Corporate Development Division, Information Technology Department
Urban Redevelopment Authority Development Control Group, Development Control, Enforcement and IT Support
National Environment Agency Pollution Control Department, Central Building Plan Unit
Public Utility Board Catchment and Waterways Department
Water Reclamation (Network) Department
Ministry of Home Affair Fire Safety and Shelter Department, Fire Safety Consultation Branch
Singapore Civil Defence Force, Technology Department
Land Transport Authority Development & Building Control Division
National Parks Board Parks & Tree Regulatory Section
Housing and Development Board Building Quality Department
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 91
JTC Corporation Land Planning Division
Participating Organisations and Vendors Autodesk Asia Pte Ltd
Consoft Asia Pte Ltd
BIM Submission Guideline for Architectural Discipline
Copyright © 2010 Building and Construction Authority. All Rights Reserved. 92
GLOSSARY OF ACRONYMS USED Following are the acronyms and abbreviations used in this submission guideline with their full
definitions:
No. Terms Definitions
1. A&A Acronym for Addition and Alteration works
2. AMSL Acronym for Above Mean Sea Level
3. BIM Acronym for Building Information Model
4. CAD Acronym for Computer Aided Design
5. CSC Acronym for Certificate of Statutory Completion
6. DWF A type of file format known as Design Web Format
7. PDF Acronym for Portable Document Format
8. GFA Acronym for Gross Floor Area
9. Legend A list of the various building components and annotations used in a project
10. LEW Acronym for Licensed Electrical Worker
11. M&E Acronym for Mechanical and Electrical
12. QP Acronym for Qualified Person
13. RVT A type of file format known for Autodesk Revit
14. PLA An archival file format known for Graphisoft ArchiCAD
15. SS CP Acronym for Singapore Standard Code of Practice
16. Sheet/
Layout
The drawing composition environment of a CAD file.
This is the actual printing or “layout” environment where the Model Space
is viewed and fitted within a drawing border.
17. Schedule A tabular display of information, extracted from the properties of elements
in a project
18. SIP Acronym for Sewerage Interpretation Plan
19. TOP Acronym for Temporary Occupation Permit
20. View Orientation of the project model from the point of a viewer, such as floor
plan view, elevation view, section view and 3D view