Scott W. Randall Managing Director, PlusAlpha Risk/BMC,LLC September 12, 2012. Barrier and Project Interface Management The Keys to Making New Offshore Regulations, Standards and Practices Effective. Regulations and Standards Post-Macondo Include :. - PowerPoint PPT Presentation

TRANSCRIPT

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

Barrier and Project Interface Management

The Keys to Making New Offshore Regulations, Standards and Practices Effective

Scott W. Randall Managing Director, PlusAlpha

Risk/BMC,LLCSeptember 12, 2012

PlusAlpha Risk

Regulations and StandardsPost-Macondo Include:

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

THE BOW-TIE SYSTEM INTEGRATES THE COMMON ELEMENTS

Effective Implementation of Post-Macondo Barrier Standards Faces the following risk management challenges:

1. Lack of a Unifying Link between RP75, RP96 and BUL97

2. Poor Communication of Risk Information at the Interfaces

  

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

HOW DO THESE WORK TOGETHER TO MAKE A DIFFERENCE?

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

Well Control Problem AreasAcross the Project Life Cycle

RISK MANAGEMENT ACTIVITIES

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

• The Barrier Approach– Accepted Internationally (ISO 17776)– Highlighted throughout the Macondo Investigation– Important Part of the proposed Deepwater well design

and construction standard (API RP96)• Annex A

– Facilitated through the Bow-Tie Diagram

Making It Effective: One Idea

PlusAlpha Risk

BOW-TIE SYSTEM PROVIDES A COMMON LANGUAGE

Pre Concept

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

SIMPLIFIED WELL CONTROL BOW-TIE

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

ONE EXAMPLE OF INTEGRATION

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

EXAMPLE OF JSA SEMS IMPLEMENTATION

PlusAlpha Risk

PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com lrandalls@plusalpharisk.coml+832.298.4380

ONE EXAMPLE OF INTEGRATION

PlusAlpha Risk

CONCLUSION

Interface Management toolkit, including the Interface Management Plan Responsibility Matrix, Interface Register.

PlusAlpha Risk

PMI Process Industry SIG; Houston, Texas USA Scott Randall, PlusAlpha Risk Management Solutions, LLC randalls@plusalpharisk.com