Scott W. Randall Managing Director, PlusAlpha Risk/BMC,LLC September 12, 2012. Barrier and Project Interface Management The Keys to Making New Offshore Regulations, Standards and Practices Effective. Regulations and Standards Post-Macondo Include :. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/1.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
Barrier and Project Interface Management
The Keys to Making New Offshore Regulations, Standards and Practices Effective
Scott W. Randall Managing Director, PlusAlpha
Risk/BMC,LLCSeptember 12, 2012
![Page 2: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/2.jpg)
PlusAlpha Risk
Regulations and StandardsPost-Macondo Include:
![Page 3: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/3.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
THE BOW-TIE SYSTEM INTEGRATES THE COMMON ELEMENTS
Effective Implementation of Post-Macondo Barrier Standards Faces the following risk management challenges:
1. Lack of a Unifying Link between RP75, RP96 and BUL97
2. Poor Communication of Risk Information at the Interfaces
![Page 4: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/4.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
HOW DO THESE WORK TOGETHER TO MAKE A DIFFERENCE?
![Page 5: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/5.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
Well Control Problem AreasAcross the Project Life Cycle
RISK MANAGEMENT ACTIVITIES
![Page 6: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/6.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
• The Barrier Approach– Accepted Internationally (ISO 17776)– Highlighted throughout the Macondo Investigation– Important Part of the proposed Deepwater well design
and construction standard (API RP96)• Annex A
– Facilitated through the Bow-Tie Diagram
Making It Effective: One Idea
![Page 7: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/7.jpg)
PlusAlpha Risk
BOW-TIE SYSTEM PROVIDES A COMMON LANGUAGE
Pre Concept
![Page 8: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/8.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
SIMPLIFIED WELL CONTROL BOW-TIE
![Page 9: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/9.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
ONE EXAMPLE OF INTEGRATION
![Page 10: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/10.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
EXAMPLE OF JSA SEMS IMPLEMENTATION
![Page 11: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/11.jpg)
PlusAlpha Risk
PlusAlpha Risk Management Solutions, LLC lwww.PlusAlphaRisk.com [email protected]+832.298.4380
ONE EXAMPLE OF INTEGRATION
![Page 12: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/12.jpg)
PlusAlpha Risk
CONCLUSION
Interface Management toolkit, including the Interface Management Plan Responsibility Matrix, Interface Register.
![Page 13: Barrier and Project Interface Management](https://reader035.vdocuments.site/reader035/viewer/2022081507/56815b46550346895dc92352/html5/thumbnails/13.jpg)
PlusAlpha Risk
PMI Process Industry SIG; Houston, Texas USA Scott Randall, PlusAlpha Risk Management Solutions, LLC [email protected]
QUESTIONS?
for more information contact:Scott Randall
[email protected]+832-298-4380