Asset Standards Authority Update to IRSE NSW | 1

Asset Standards Authority Update to Institution of Railway Signal Engineers (IRSE)

Australasia – Sydney Local Meeting Jim Modrouvanos, Director

28 May 2015

Asset Standards Authority Update to IRSE NSW | 2

Scope

• ASA purpose and organisation

• Work priorities and progress

• Future challenges, changes and goal

• Questions

Asset Standards Authority Update to IRSE NSW | 3 28 May 2015

Our organisation, purpose and tasks

Asset Standards Authority Update to IRSE NSW | 4

New Minister – Hon. Andrew Constance MP

Hon. Andrew Constance MP

Minister for Transport

and Infrastructure

Hon. Duncan Gay MLC

Minister for Roads,

Maritime and Freight

Asset Standards Authority Update to IRSE NSW | 5

TfNSW

Asset Standards Authority Purpose, priorities and progress | 5

Asset Standards Authority Update to IRSE NSW | 6

ASA’s Policy and Regulation team

Policy

and

Regulation

ASA Maritime

Management Centre

Centre for Road Safety

National Strategic Review &

Policy Initiatives

Efficiency & Effectiveness

Safety & Quality

Corporate Planning &

Performance

Asset Standards Authority Update to IRSE NSW | 7

ASA organisation details

Item Detail Comment

Location Chatswood 12 Help Street

Located near the Chatswood Interchange

Organisational Staff - 125 A branch of the Policy and Regulation Division of

Transport for NSW

Asset Standards Authority Update to IRSE NSW | 8

Our people

28 May 2015

Asset Standards Authority Update to IRSE NSW | 9

ASA leadership

Asset Standards Authority Update to IRSE NSW | 10

ASA engineering team

Asset Standards Authority Update to IRSE NSW | 11

ASA Signals and Control Systems team

Peter McGregor Lead Engineer

Greg Hockings Principal Engineer

Electronic Systems

Omer Saricilar Principal Engineer

Control Systems

Daniel Oakes Principal Engineer

Technical Standards

Russell Freeman Principal Engineer

Mechanical

Dave Nolan Principal Engineer

Signalling Systems

Paul Zammit Principal Engineer

Signals Assurance

Asset Standards Authority Update to IRSE NSW | 12

ASA – beyond standards to whole of life assurance

• “Making it clearer and simpler”

– for Transport Cluster

– for Supply Chain

• Collaborating and supporting

TfNSW to be an informed and

efficient asset owner

– whole of life assurance

– asset management

– standards

– risk based decision making

• Facilitate increased private sector

participation and capability

• Transport Values and Customer

focus

Asset Standards Authority Update to IRSE NSW | 13

Role and products

• TfNSW is asset owner/custodian

• Operations and maintenance contracted out

• ASA works on behalf of the asset owner/custodian

• Authority defined under ASA Charter

Asset Standards Authority Update to IRSE NSW | 14

Many pieces to build….but do they make sense?

Scale of TfNSW’s Network

Network • 43000 lane km of state roads

• 1505km of electrified overhead

• 1763km of mainline track

• 24 Bus Depots

• 1 Shipyard

• 10 Train Maintenance Centres

• 1 Light Rail Maintenance Centre

• 9321 Bridges

• 370 Stations, 14 Stops, 107

Wharves & Jetties

• Plus bus stops, substations,

transmission lines, cctv, lifts,

culverts, seawalls, passenger info

Fleet • 2124 buses

• 1947 train carriages (144 diesel

and 1803 electric)

• 13 light rail vehicles (65

carriages)

• 30 ferries

• Plus vessels/watercraft, road

vehicles, trailers, locomotives,

wagons, track machines and

plant

• $10A4bnsset St

anin

da rds as

Aseuthori

tsty Update to IRSE NSW | 15

Asset Standards Authority Update to IRSE NSW | 16

Providing TfNSW with assurance

• Engineering decisions

• Obligations to the owner

• Industry service providers

• Deployment of TfNSW protocols

• Enabling O&M efficiencies and effectiveness

TfNSW Asset Life Cycle Model

Asset Standards Authority Update to IRSE NSW | 17

Assuring TfNSW across all modes

Asset Standards Authority Update to IRSE NSW | 18

Our work priorities and progress

28 May 2015

Asset Standards Authority Update to IRSE NSW | 19

Authorised Engineering Organisation (AEO)

0.0

1.0

2.0

3.0

4.0

5.0

EngineeringManagement

CompetencyManagement

ConfigurationManagement

QualityManagement

SystemsEngineering

Maturity ratings summary

Documented Average Deployed Average Combined Average Highest average

Asset Standards Authority Update to IRSE NSW | 20

Industry engagement - sharing and listening

Industry • Updates, guidance, thought leadership and awareness

Briefings • Two to four per year to 150+

Industry • Discuss and dissect key topics from industry briefings

Round Tables • Two to four per year to approx 60+

Industry • Large technical audiences

• Detailed and application-specific technical Seminars learnings and contemporary subject matter

Technical • Capture and share knowledge and experience

Forums • 20-30 attendees tailored to the subject matter

Asset Standards Authority Update to IRSE NSW | 21

Signals & Control System industry engagement

Technical Forums

• 2014 - • May – “Design”

• Sep – “Control Systems”

• 2015 - • April “Maintenance and access”

• Specialist areas (ATP/ETCS, Control systems, interface to rolling stock)

Technical Committees

• 2014 to 15 – RISSB Train Control Systems and Infrastructure Standing committee

Asset Standards Authority Update to IRSE NSW | 22

Standards - ASA business activities

• Alignment to international standards (ISO)

• Commitment to a national approach

• RISSB relationship

– Board position

– Method of alignment to classifications (national / state)

– Joint development agreement

• NWRL / SRT

• Light Rail

• Ferries

• Roads

Asset Standards Authority Update to IRSE NSW | 23

Standards - ASA signals and control systems

• Signals and Control Systems standards:

– Found in strong position at ASA commencement

– Strong legacy due to previous diligent management!

• Current work:

– Reviewing Design process and ETCS Lv2 onboard

– Priorities on combined service routes,

Asset Standards Authority Update to IRSE NSW | 24

Standards – monitoring popular documents

Train Operating Conditions

Manual – General Instructions

Circuit Design Standards

Signal Design Principles

Train Operating Conditions

Manual – Division Pages

Train Operating Conditions

Manual – Track Diagrams

Track Geometry and Stability

Asset Standards Authority Update to IRSE NSW | 25

ASA website – quick links to popular docs

Asset Standards Authority Update to IRSE NSW | 26

Change to Signals - ASA website – Signals and

Control Systems

Asset Standards Authority Update to IRSE NSW | 27

Future challenges, changes and goal

28 May 2015

Asset Standards Authority Update to IRSE NSW | 28

Our challenges ahead

• Managing growth

• Integrating across a changing

TfNSW landscape

• Supporting TfNSW procurement

• Benefits realisation

• Industry capability & capacity

Asset Standards Authority Update to IRSE NSW | 29

Our challenges ahead

• Sydney Rapid Transit (NWRL)

• Light Rail

• Professional development

• More work but different work

Asset Standards Authority Update to IRSE NSW | 30

Our challenges ahead

• ATCS ETCS Level 2

• Stakeholder and sponsor

• Constructability – limited

possession access - work at

night?

• Digital and data railway to give

better customer outcomes

Asset Standards Authority Update to IRSE NSW | 31

Future TfNSW structure

Asset Standards Authority Update to IRSE NSW | 32

The complete picture – a work in progress…

YOU?

Asset Standards Authority Update to IRSE NSW | 33

Questions?

28 May 2015

Asset Standards Authority Update to IRSE NSW | 34

ASA contacts Name Position Contact

Jim Modrouvanos Director Jim.Modrouvanos@transport.nsw.gov.au

John Paff A/Chief Engineer John.Paff@transport.nsw.gov.au

Mark Smith Principal Manager, Industry &

Technical Development

Mark.C.Smith@transport.nsw.gov.au

Peter McGregor Lead Engineer – Signals &

Control Systems

Peterj.mcgregor@transport.nsw.gov.au

Russell Freeman Principal Engineer

Mechanical

Russell.Freeman@transport.nsw.gov.au

Greg Hockings Principal Engineer

Electronic Systems

Gregory.Hockings@transport.nsw.gov.au

Dave Nolan Principal Engineer

Trackside Systems

David.Nolan@transport.nsw.gov.au

Daniel Oakes Principal Engineer

Technical Standards

Daniel.Oakes@transport.nsw.gov.au

Asset Standards Authority Update to IRSE NSW | 35

ASA contacts Name Position Contact

Omer Saricilar Principal Engineer

Control Systems

Omer.Saricilar@transport.nsw.gov.au

Paul Zammit Principal Engineer

Signals Assurance

Paul.Zammit@transport.nsw.gov.au

top related