agile enterprise adoption and enterprise agile enterprise adoption and enterprise stage gates
Post on 10-May-2015
1.806 Views
Preview:
DESCRIPTION
TRANSCRIPT
Agile Enterprise Adoption and Enterprise Stage Gates
Agile Continuum
Agile Enterprise Adoption
Waterfall Software Gates & Phases
Charter Define Design Code Accept Integrate Release
Current State – Waterfall
1
3 4
5
6
2
Charter Design Spec Code Accept-Test System-Test GA
1 2 3 4 5 6
Traditional Waterfall Development Phases and Gates
State 1 – Agile Teams in "Flow"
Agile Iterations inside of Traditional Gates
1
3 4
5
6
2
1 2 3 4 5 6
Charter Design Spec Code Accept-Test System-Test GA
State 1/2 – Agile Teams in Iteration "Pull"
Agile Internal releases inside of traditional gates
1
3 4
5
6
2
1 2 3 4 5 6
Charter Design Spec Internal Release Accept-Test System-Test GA
State 2 – Agile Team in release "Pull"
3.1/4.1
3.2/4.2
Agile Team with “n” Releases based on dependancy needs
1
5
6
2
1 2 5 6 7
State 3 – Agile Program in release "Pull"
3.1/4.1
3.2/4.2
Agile Program with “n” Releases based on governance needs
1
5
6
2
1 2 5 6 7
State 5 – Lean Program in "Innovate"
1/2
5
3.n/4.n
3.1/4/1
3.2/4.2
3.3/4.3
1/2
5 6
Lean Program with reduced gates and increased governance
Charter Agile Releases System-Test GA
top related