agile enterprise adoption and enterprise agile enterprise adoption and enterprise stage gates
DESCRIPTION
These slides show the changes that happen in the enterprise stage gate model as your Agile adoption moves up and matures in the organization.TRANSCRIPT
Agile Enterprise Adoption and Enterprise Stage Gates
Agile Continuum
Agile Enterprise Adoption
Waterfall Software Gates & Phases
Charter Define Design Code Accept Integrate Release
Current State – Waterfall
1
3 4
5
6
2
Charter Design Spec Code Accept-Test System-Test GA
1 2 3 4 5 6
Traditional Waterfall Development Phases and Gates
State 1 – Agile Teams in "Flow"
Agile Iterations inside of Traditional Gates
1
3 4
5
6
2
1 2 3 4 5 6
Charter Design Spec Code Accept-Test System-Test GA
State 1/2 – Agile Teams in Iteration "Pull"
Agile Internal releases inside of traditional gates
1
3 4
5
6
2
1 2 3 4 5 6
Charter Design Spec Internal Release Accept-Test System-Test GA
State 2 – Agile Team in release "Pull"
3.1/4.1
3.2/4.2
Agile Team with “n” Releases based on dependancy needs
1
5
6
2
1 2 5 6 7
State 3 – Agile Program in release "Pull"
3.1/4.1
3.2/4.2
Agile Program with “n” Releases based on governance needs
1
5
6
2
1 2 5 6 7
State 5 – Lean Program in "Innovate"
1/2
5
3.n/4.n
3.1/4/1
3.2/4.2
3.3/4.3
1/2
5 6
Lean Program with reduced gates and increased governance
Charter Agile Releases System-Test GA