28 oktober 20152
Airfield safety
28 oktober 20153
Brief introduction NACO Aviation company of Royal HaskoningDHV together with InterVISTAS
Consulting Group
World leader in airport development for 66 years
Renowned multidisciplinary team of airport experts
Delivered solutions to over 550 airports in more than 100 countries
Create innovative and sustainable solutions
28 oktober 20154
More than 550 projects
●
●●
●●
●
●
●
● ●●●
●
●
●
●
●
●●●
●●●●
● ●●●●
●
●●
●
●●
●●
●
●●
●● ●
●●●
●●
●●●●
●
●
●●
●●
●●
● ●●
●●●●
●●
●
●
●
●●●●
●● ●
●●● ● ● ●
●●
●● ●
●●
●
●●
●●
●●
●●●●
●
●
●● ●● ●● ●●●●●●●● ●●●
●●
●
●●
●
●
●
28 oktober 2015
5
Aviation expertise
PPP Technical due diligence Commercial & Airport
City development Economics & market
analysis Air service development Border & security
services Airport process logistics
CONSULTANCY & STUDIES
PLANNING & DESIGN
DESIGN & ENGINEERING
REALIZATION & IMPLEMENTATION
Airside & landside design & engineering
Value engineeringGeometric & pavement
designTender documents &
assistanceConstruction phasing
Operational optimizationLand use planningMaster planningEnvironmental planningTerminal & facility designSimulationsSpecial airport systemsBaggage handling &
passenger security systems
Stakeholder engagement
Construction supervision
ORAT
28 oktober 20156
Airfield safety in design process Airfield (airside) safety is important when airport is in operation
Safety management systems in place
But airside safety starts already during design and construction phase:
Master Planning
Airfield Design
Site supervision
Part of RAMS
28 oktober 20157
Master Plan Operational safety taken into account at an early stage.
Optimise capacity but maintain safety
Plan for the correct Safety areas and obstacle free zones (RESA, Take off and landing surfaces, Inner horizontal, etc.)
In Master Plans we plan cross taxiways and RETs layouts such that the risk of Runway Incursions is minimized.
Limit surface water close to a runways to reduce bird nesting and roosting at the airfield. Minimize bird hazards.
RFF station location for compliant response times
28 oktober 20158
Obstacles
28 oktober 20159
Planning airside infrastructure
28 oktober 201510
Airfield Design Geometry design
Runways, taxiways, aprons Drainage
Provide solutions for low visibility conditions CAT I/II/III AGL designs A-AMGCS planning (example Taiwan attached)
Effective construction phasing to minimize impact on operations
Safety Areas Runway
Simulations
28 oktober 201511
Aerodrome Geometric Design
Pavement quantities:
Runways: 900.000 m² Taxiways: 3.000.000 m² Aprons: 1.200.000 m² Shoulders: 1.700.000 m² Roads: 800.000 m² Others: 400.000 m²
TOTAL 8.000.000 m2
28 oktober 201512
low visibility conditions CAT I/II/III AGL designs
28 oktober 201513
A-SMGCS Advanced Surface mMovement Guidance Control System
A system which provides the guidance to prevent accidental entrance of aircrafts on the ground to the runway and to keep safe distance between them at the airports with heavy air traffic or in poor visibility conditions.
This system intends to intensify collision prevention among aircrafts and vehicles on the ground and to improve the safety of surface movement and the efficiency of the air traffic at the airports which deals with increase of the air traffic in the future.
4 levels
28 oktober 201514
A-SMGCS
28 oktober 201515
Short runways
28 oktober 201516
Construction Phasing
28 oktober 201517
Safety areas
28 oktober 201518
Safety areas design
Perceel Politieacademie Perceel N302ASDA: 2.700 meterBestaande infrastructuur
Figuur 1: Visualisatie risico 1
RESA Take off climb Perceelgrens luchthaven
28 oktober 201519
Simulations CAST
28 oktober 201520
R&FF stations
28 oktober 201521
After completion
28 oktober 201522
Site Supervision Focus on operational safety during construction:
Examples: Aeronautical studies RWY rehabs on single RWY airports Dust Control FOD management Runway and taxiway incursion/area infringement control Off peak closures of RWYs and TWYs – inspections and handover procedures
28 oktober 201523
Construction issues Adverse weather conditions:
28 oktober 201524
Construction issues Bonding of existing layers could be a problem
28 oktober 201525
Runway incursions What is a Runway Incursion?
Any occurrence at an aerodrome involving the incorrect presence of an aircraft, vehicle or person on the protected area of a surface designated for the landing and take off of aircraft.
Number of serious incursions (cat A and B) decreasing
28 oktober 201527
Emergency flights
28 oktober 201528
Software Design programs
Civil 3D REVIT
Simulations Path Planner CAST
Sketch 3Ds SketchUp
Visulisations 3DStudioMax Lumion Oculus Rift
28 oktober 201529
NACO, your partner for creating innovative,sustainable and safe solutions for the development of the aviation sector.