By

R. Harry EddyarsoPT. SARIPARI PERTIWI ABADI

15 September 2006

“KMI Goes to Campus Program”Komunitas Migas Indonesia – Universitas Indonesia

1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)

2. Rig Size Calculation

3. Torque & Drag Calculation

4. Casing / Liner Design & Cementing Procedures

5. Wellhead Design & Installation

6. Mud Engineering & Design

7. Directional Drilling Plan & Drill String Design

8. Drilling Hydraulic Optimization

9. Bit Selection

10.Formation Evaluation (Logging, Coring)

11.BOP Stack Diagram & Well Control Procedures

12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion

13.Health, Safety, Environment

14.Emergency Response Plan (ERP)

15. Etc

Closest location between fault and well path at depth –3064’ tvdss

Closest distance from the fault = 95 mtr.Fault position error bar = 30 mtr.Drilling target radius = 50 ft.

Open Hole Logging Package:

1. Resistivity / Sonic

2. Density / Porosity

3. Core Sampling

4. Dipmeter

5. RFT

6. Velocity Survey

Cased Hole Logging Package:

1. CBL/VDL/CET

Net to Gross map

GrossNet

Net

B-29A2 Net to Gross Map