02 drilling preparation ui 15 sep 2007
TRANSCRIPT
![Page 1: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/1.jpg)
By
R. Harry EddyarsoPT. SARIPARI PERTIWI ABADI
15 September 2006
“KMI Goes to Campus Program”Komunitas Migas Indonesia – Universitas Indonesia
![Page 2: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/2.jpg)
1. Rig Type Including Rig Lay-Out Diagram (for Land Rig & Swamp Barge)
2. Rig Size Calculation
3. Torque & Drag Calculation
4. Casing / Liner Design & Cementing Procedures
5. Wellhead Design & Installation
6. Mud Engineering & Design
7. Directional Drilling Plan & Drill String Design
8. Drilling Hydraulic Optimization
9. Bit Selection
10.Formation Evaluation (Logging, Coring)
11.BOP Stack Diagram & Well Control Procedures
12.Drill Stem Testing Procedures, Well Stimulation and or Well Completion
13.Health, Safety, Environment
14.Emergency Response Plan (ERP)
15. Etc
![Page 3: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/3.jpg)
![Page 4: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/4.jpg)
![Page 5: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/5.jpg)
![Page 6: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/6.jpg)
![Page 7: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/7.jpg)
![Page 8: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/8.jpg)
![Page 9: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/9.jpg)
![Page 10: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/10.jpg)
Closest location between fault and well path at depth –3064’ tvdss
Closest distance from the fault = 95 mtr.Fault position error bar = 30 mtr.Drilling target radius = 50 ft.
![Page 11: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/11.jpg)
Open Hole Logging Package:
1. Resistivity / Sonic
2. Density / Porosity
3. Core Sampling
4. Dipmeter
5. RFT
6. Velocity Survey
Cased Hole Logging Package:
1. CBL/VDL/CET
![Page 12: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/12.jpg)
Net to Gross map
GrossNet
Net
B-29A2 Net to Gross Map
![Page 13: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/13.jpg)
![Page 14: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/14.jpg)
![Page 15: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/15.jpg)
![Page 16: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/16.jpg)
![Page 17: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/17.jpg)
![Page 18: 02 drilling preparation ui 15 sep 2007](https://reader034.vdocuments.site/reader034/viewer/2022042517/58827da41a28ab24788b5d97/html5/thumbnails/18.jpg)