amendment no.-4 work: setting up of 1 gw land based solar
TRANSCRIPT
S.No Cl.No Description as per Bid Document Amendment Done/may be read as
1 Annex VII of Appendix I of
RFQ
Annex VII New updated Annex VII replaced and attached.
2 Connectivity: Overview of
the Framework of RFQ
Projects having capacity more than 50
MW ................. Annexure-VII of RFQ.
Following para is added:
Details of various packages are provided in Annexure-VII of RFQ. Solar projects in a
package are to be connected to CTU/STU/DVC as per connectivity mentioned in
package details in Annexure-VII of RFQ.
For packages where CTU/STU is mentioned against connectivity in Annexure-VII of
RFQ, the bidder shall review the applicable state/central regulations and policies
towards connectivity of the project. The bidder can either directly connect at CTU or can
bring power to CTU through Connectivity at STU. However the tariff has to be quoted at
CTU periphery at the injection point inclusive of all statutory taxes, duties, levies and
cess applicable/levied on the project & sale of electricity and also includes all applicable
transmission charges and losses of CTU/STU, RLDC/SLDC charges upto the CTU etc.
Amendment No.-4Work: Setting up of 1 GW Land Based Solar PV Power plant in Railway Land under Tariff Based Competitive Bidding
NIT No.: REMCL/CO/Solar/1GW dtd. 29.04.2020
3 Project Configuration:
Overview of the
Framework of RFQ
The term “Project” shall have the
.................to the Bidder (after issue of
LOA).
Bidder can quote for one or more package. Bid evaluation and reverse auction will be
conducted package wise.
There are two types of Packages. Packages having land parcels with potential capacity
greater than or equal to 50 MW at a single site.
State wise packages having a number of land parcels with potential capacity less than
50 MW at a single site.
S.No Cl.No Description as per Bid Document Amendment Done/may be read as
Project Configuration:
Overview of the
Framework of RFQ
a. The Project may consist of any
number of solar plants (of minimum 5
MW).
b. A single tariff shall be quoted by the
Bidder in its response to RfQ for each 50
MW and above projects connected to
CTU (Location wise), and for each state
for projects below 50 MW projects
connected to STU, irrespective of the
number of Projects and each Project
configuration.
c. A Single Power Purchase Agreement
shall be signed with the designated
Nodal Railway for each Project of over
50 MW, and for each state for projects
less than 50 MW. The SPD shall be
responsible for obtaining Connectivity
and Long Term Open Access (LTA) for
each Project.
Following points are to be noted in this regard:
a) The package may consist of any number of land parcels.
b) A single tariff shall be quoted by the bidder in its response to RFQ/RFP for all the
packages irrespective of the package configuration.
(i) Solar projects in a package are to be connected to CTU/STU/DVC as per connectivity
mentioned in package details in Annexure-VII of RFQ. For such packages tariff has to be
quoted at Interconnection point/Metering point/Delivery point at CTU/STU/DVC as
applicable.
(ii) For packages where CTU/STU is mentioned against connectivity in Annexure-VII of
RFQ, the bidder shall review the applicable state/central regulations and policies
towards connectivity of the project. The bidder can either directly connect at CTU or can
bring power to CTU through Connectivity at STU. However the tariff has to be quoted at
CTU periphery at the injection point inclusive of all statutory taxes, duties, levies and
cess applicable/levied on the project & sale of electricity and also includes all applicable
transmission charges and losses of CTU/STU, RLDC/SLDC charges upto the CTU etc.
REMCL will advise the rates of transmission charges/losses for evacuation of power as
applicable 15 days prior to bid due date for determination of their bid tariff.
Any differential arising from revision of STU Transmission charges & losses thereafter
shall be payable or recoverable as the case may be by the Railways. Evaluation will be
done based on landed tariff at CTU inclusive of all taxes and duties quoted by bidders.
c) Packages wise Power Purchase Agreement shall be signed by Nodal Zonal Railway for
each state. PPA may signed at Zonal HQ Level or Division level as decided by Nodal
Zonal Railway. Nodal Zonal Railway for each package is provided Annexure-VII of RFQ.
Nodal Zonal Railway for each package is provided at Annexure-VII of RFQ. The SPD
shall be responsible for obtaining connectivity and Long Term Open Access (LTA) for
each project.
4
S.No Cl.No Description as per Bid Document Amendment Done/may be read as
5 Cl. 6.6 of Section-6
(Miscellenious) of RFQ
Connectivity with the CTU /STU:-Refer
RFQ clause 1.1.1 (f) above.
Connectivity with the CTU /STU:-Refer RFQ clause 1.2.4 above.
6 New para added as (iv) in
Clause No. 1.8 (B) (2) of
Section-1: Introduction of
RFP
Not given Following new para added as (iv) in Clause No. 1.8 (B) (2) of Section-1:
Introduction of RFP:-
(iv) For packages where CTU/STU is mentioned against connectivity in Annexure-VII of
RFQ, the bidder shall review the applicable state/central regulations and policies
towards connectivity of the project. The bidder can either directly connect at CTU or can
bring power to CTU through Connectivity at STU. However the tariff has to be quoted at
CTU periphery at the injection points inclusive of all statutory taxes, duties, levies and
cess applicable/levied on the project & sale of electricity and also includes all applicable
transmission charges and losses of CTU/STU, RLDC/SLDC charges upto the CTU etc.
For these packages where CTU/STU is mentioned against connectivity in Annexure-VII
of RFQ, injection point at CTU periphery will be considered for energy accounting and
metering purpose. Monthly billing will be done based on concerned RLDC, REA account.
REMCL will advise the rates of transmission charges/losses for evacuation of power as
applicable 15 days prior to bid due date for determination of their bid tariff.
Bidders have to use these rates of transmission charges/losses for calculation of landed
tariff at CTU periphery in Appendix-I Annexure-1A of RFP.
Evaluation of these packages shall be done based on the landed tariff at CTU periphery.
Bidders to quote the landed tariff at CTU periphery in the price bid in Appendix-I
Annexure-I of RFP.
Any differential arising from revision of STU Transmission charges & losses and any
other charge (if applicable) upto injection point at CTU periphery thereafter shall be
payable or recoverable as the case may be by the Railways. Evaluation will be done
based on landed tariff at CTU inclusive of all taxes and duties quoted by bidders.
S.No Cl.No Description as per Bid Document Amendment Done/may be read as
7 New para added in Clause
No. 1.1.1 of Section-1:
Introduction of RFQ
Not given Following new para added in third para of Clause No. 1.1.1 of Section-1: Introduction of
RFQ:-
For packages 3 to 14 also refer to Cl. 1.0 (iii) of Annex-VII of RFQ.
8 Cl. 23.1 of Article 23 of
PPA
The Procurer’s obligation to pay to the
SPD the Tariff Payments, in accordance
with this Article, shall commence from
the date on which Commissioning
Certificate issued in accordance with
this Agreement. All amounts payable by
the Parties under this Agreement,
including the Tariff Payments, shall be
in Indian Rupees.
The Procurer’s obligation to pay to the SPD the Tariff Payments, in accordance with this
Article, shall commence from the date on which Commissioning Certificate is issued in
accordance with this Agreement or start of power flow on open access at Railway
load centres after grant of LTA from CTU/STU as applicable, whichever is later. All
amounts payable by the Parties under this Agreement, including the Tariff Payments,
shall be in Indian Rupees.
9 Cl.2.27 of RFQ- Capacity
Utilisation Factor (CUF)
The CUF of the Solar PV project through
this bidding document shall not be less
than 17%.
The CUF of the Solar PV project through this bidding document shall not be less than
21%.
10 16.2.1.1 of PPA- Criteria
for Generation
The declared annual CUF shall in no
case be less than 17%.
The declared annual CUF shall in no case be less than 21%.
11 Financial Bid (BOQ) Financial Bid (BOQ) Updated Financial Bid (BOQ) uploaded on NIC portal.
Annexure-VII of RFQ
1.0 Information related to packages
(i) Bidder can quote for one or more package. Bid evaluation and reverse auction will be conducted package
wise. Please refer to Project Configuration in overview of frame work of RFQ.
(ii) Tentative survey reports of packages are uploaded on CPP portal at
https://etenders.gov.in/eprocure/app. The actual site conditions may differ in comparison to the
information stated in the survey report. Hence, before acting on any such information, the bidder is
advised to undertake site visits and verify the information before bidding for the project and get
necessary information first hand. Contact details of Zonal Railway personnel is provided as Annexure-VII
A for co-ordination for site visits.
(iii) In some packages, part of Railways vacant land parcels have some hindrances. The Possible Capacity (in
MW) indicated against such packages and land parcels within package may change after removal of these
hindrances. Such hindered locations have been indicated in the tentative survey reports. Railways will
make efforts to remove such hindrances from vacant land.
Possible capacity of such packages and land parcels within a package may vary after removal of
hindrances. For these package (i.e. Package no.3,4,5,6,7,8,9,10,11,12,13 & 14) Railway/REMCL reserves
the right to increase/decrease the bidder(s) allocated capacity upto ±25% of the contracted capacity at its
sole discretion herein after referred as contracted capacity.
(iv) Connectivity of packages (i.e. STU, CTU, DVC etc.) is indicated against each package. Tentative
connectivity details of nearest STU/CTU are provided in the survey reports for reference purposes only
and the bidder has to verify the bay availability and other necessary details before bidding. These
connectivity details are indicative and bidder may evacuate the power as per his own survey.
(v) For packages where CTU/STU is mentioned against connectivity in Annexure-VII of RFQ, the bidder shall
review the applicable state/central regulations and policies towards connectivity of the project. The
bidder can either directly connect at CTU or can bring power to CTU through Connectivity at STU.
However the tariff has to be quoted at CTU periphery at the injection points inclusive of all statutory
taxes, duties, levies and cess applicable/levied on the project & sale of electricity and also includes all
applicable transmission charges and losses of CTU/STU, RLDC/SLDC charges upto the CTU etc.
For these packages where CTU/STU is mentioned against connectivity in Annexure-VII of RFQ, injection
point at CTU periphery will be considered for energy accounting and metering purpose. Monthly billing
will be done based on concerned RLDC, REA account.
REMCL will advise the rates of transmission charges/losses for evacuation of power as applicable 15
days prior to bid due date for determination of their bid tariff.
Bidders have to use these rates of transmission charges/losses for calculation of landed tariff at CTU
periphery in Appendix-I Annexure-1A of RFP.
Evaluation of these packages shall be done based on the landed tariff at CTU periphery. Bidders to quote
the landed tariff at CTU periphery in the price bid in Appendix-I Annexure-I of RFP.
Any differential arising from revision of STU Transmission charges & losses and any other charge (if
applicable) upto injection point at CTU periphery thereafter shall be payable or recoverable as the case
may be by the Railways. Evaluation will be done based on landed tariff at CTU inclusive of all taxes and
duties quoted by bidders.
Bid Packages for sites in DL States
i. Land parcels with potential capacity greater than or equal to 50 MWat a single site(Total – 1042 MW)
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 1: Bihar, Sonpur, MadrauniGobindpurKausli
i. Bihar Katareah (BJU-
KIR) Near Katareah station
Yes 1 329 82 STU STU NBPDCL
132/33/11kV S/S at Naugachia
Total 1 329 82
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 2: Chhattisgarh, WRS Complex, Raipur
i. Chhattisgarh WRS COMPLEX Yes 1 331 83 CTU
CTU PGCIL 400 kV S/S ii. Chhattisgarh WRS COMPLEX Yes 1 105 26
Total 2 436 109
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 3: Gujarat, Vadodara I
i. Gujarat
Champaner Road (CPN)-
Panimines (PNN) Closed
Section
Yes 1 320 80 STU/CTU
STU: GETCO 66/11 kV S/Sat Shivrajpur
CTU: PGCIL 765/400 kV GIS S/S at
Vadodara
Total 1 320 80
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 4: Gujarat, Bhavnagar I
i. Gujarat Botad Jasdan Yes 1 340 85 STU/CTU
STU: GETCO 66/11 kV S/S at Talej
CTU: PGCIL 440/220 kV S/S at
Surrendranagar
Total 1 340 85
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 5: Gujarat, Bhavnagar II
i. Gujarat Bhavnagar-
Mahuva (NG) Yes 1 560 140 STU/CTU
STU: GETCO 66/11 kV S/S at Talej
CTU: PGCIL 765/400 kV GIS S/S at
Vadodara
Total 1 560 140
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 6: Gujarat, Ahmedabad I
i. Gujarat
Ex Patan (Khalipur)-
Kakoshi closed MG section
Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/Sat Jangral
CTU: PGCIL 440/200 kV GIS S/S at Pirana
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx. Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 7: Gujarat, Ahmedabad II
i. Gujarat Gandhidham Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/S at Gandhidham
CTU: PGCIL 440/200 kV GIS S/S at Pirana
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 8: Gujarat, Vadodara II
i. Gujarat Jhagadiya (JGI)-Netrang (NET) Closed Section
Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/S at Netrang
CTU: PGCIL 765/400 kV GIS S/S at Vadodara
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 9: Gujarat, Rajkot I
i. Gujarat MVI-Ghatila
closed section Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/S at Vejalpur
CTU: PGCIL 440/220 kV S/S at Morbi
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW) Connectivity
Nearest Substation for reference
purposes
Package 10: Gujarat, Rajkot II
i. Gujarat Than-Chotila closed section
Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/S at Than
CTU: PGCIL 440/220 kV S/S at Bhachau
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 11: Gujarat, Rajkot III
i. Gujarat Hadmatiya-
Jodiya Closed Section
Yes 1 200 50 STU/CTU
STU: GETCO 132 kV S/S at Dhrol
CTU: PGCIL 440/220 kV S/S at Bhachau
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 12: Gujarat, Bhavnagar III
i. Gujarat Joravar
Nagar-Sayla Yes 1 200 50 STU/CTU
STU: GETCO 66 kV S/S at Sayla
CTU: PGCIL 440/220 kV S/S at Bhachau
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx. Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 13: Rajasthan, Jaipur
i. Rajasthan
Dabla-Singhana
(Old closed siding land)
Yes 1 380 95 STU STU of RRVPN
Mehada132 kV S/S
Total 1 380 95
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 14: Madhya Pradesh, Ratlam
i. Madhya Pradesh
Ujjain-Agar Closed section
Yes 1 200 50 STU STU of 132/33 kV S/S at
Ghosla
Total 1 200 50
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for reference
purposes
Package 15: West Bengal, Adra, Purulia
i. West Bengal Adra Yes 1 205 51 DVC DVC (400/220)
Total 1 205 51
ii. Land parcels with potential capacity less than 50 MW at a single site(Total – 657 MW)
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 16: Bihar, Various districts
i. Bihar
Mansi (MNE- KIR)(KM 110/9-10
to KM 113/7 - 8 UP side-track),
Sonpur
Yes 1 20 5 STU STU at NBPDCL
132/33/11 kV S/S at Khagaria
ii. Bihar
Kursela(KUE- THB)on the left hand side-track,
Sonpur
Yes 1 20 5 STU STU at NBPDCL
132/33/11 kV S/S at Naugachia
iii. Bihar
Kursela(KUE- THB)on the left & right hand side-track, Sonpur
Yes 1 170 43 STU STU at NBPDCL
132/33/11 kV S/S at Naugachia
iv. Bihar Garhara (BJU-
GHZ) LAL BAGH, Sonpur
Yes 1 82 21 STU STU at NBPDCL
132/33/11 kV S/S at Begusarai
Total 4 292 74
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 17: Gujarat, Various districts
i. Gujarat Dahod, Ratlam Yes 1 90 23 STU GETCO 132/33 kV
S/S near Dahod
ii. Gujarat
Chanasma-Harij closed MG section, Ahmedabad
Yes 1 172 43 STU STU of GETCO 66/11 kV S/S at
Chanasma
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 17: Gujarat, Various districts
iii. Gujarat Bhuj (old Bhuj
area), Ahmedabad
Yes 1 60 15 STU STU of GETCO 66/11 kV S/S at
Asambiya
iv. Gujarat Thaltej,
Ahmedabad Yes 1 40 10 STU
STU of GETCO 66/11 kV S/S near
plot
v. Gujarat
Jambusar (JMB)-Kavi
(KVI) Closed Section,
Vadodara
Yes 1 183 46 STU STU of GETCO 220/66kV S/S at
Gavasad
vi. Gujarat Ningala-
Gadhada, Bhavnagar
Yes 1 46 11 STU STU of GETCO 66/11 kV S/S at
Gadhada
vii. Gujarat Kunkavav-
Derdi, Bhavnagar
Yes 1 40 10 STU STU of GETCO 66/11 kV S/S at
Derdi
viii. Gujarat Kunkavav-Bagasara, Bhavnagar
Yes 1 139 35 STU STU of GETCO 66/11 kV S/S at
Kunkavav
ix. Gujarat
Dungar-Victor,
Bhavnagar
Yes 1 45 11 STU STU of GETCO 66/11 kV S/S at
Dungar
x. Gujarat
Mahuva-Mahuva Bundar,
Bhavnagar
Yes 1 22 5 STU STU of GETCO 66/11 kV S/S at
Mahuva Nesawad
Total 10 837 209
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 18: Karnataka, Various districts
i. Karnataka
Chikkaballapur---
Manchesetahalli @ KM
47/200-49/600, Bengaluru
Yes 1 30 7 STU STU with 66/11 kV
S/S at Ramnagaram
ii. Karnataka
Chikkaballapur----
Manchesetahalli @ KM
48/000-49/600, Bengaluru
Yes 1 27 7 STU STU with 66/11 kV
S/S at Ramnagaram
iii. Karnataka Ballari—
Hosapete, Hubballi
Yes 1 21 5 STU STU of KEB with
110/11 kV S/Snear site
Total 3 78 19
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 19: Madhya Pradesh, Various districts
i. Madhya Pradesh
Ratlam Yes 2 45 11 STU MPPTCL 220/132 kV S/S at Ratlam
ii. Madhya Pradesh
BPL/BINA-- Bina west
colony, Bhopal Yes 1 27 7 STU
MPPTCL 220/132 kV S/S near the site
iii. Madhya Pradesh
BPL/VPJ-MKC section (km
1150/70-1152/30), Bhopal
Yes 1 28 7 STU MPPTCL 132/66 kV
S/S at Biaora
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 19: Madhya Pradesh, Various districts
iv. Madhya Pradesh
JBP/ BEHR Km 1116/300
to km 1120/500 RH side (KTE to
Singrauli section), Jabalpur
Yes 1 31 8 STU MPPTCL 132 kV S/S
at Katni
v. Madhya Pradesh
JBP/ BEHR-- VST-CT J km 1164/400 to km 1165/100
RH side BEHR (KTE to Singrauli section), Jabalpur
Yes 1 21 5 STU MPPTCL 132 kV S/S
at Barhi
vi. Madhya Pradesh
JBP/ BEHR Km 1256/0
to1265/900 LH side, Jabalpur
Yes 1 73 18 STU 400 kV S/S at
JNSTPP
vii. Madhya Pradesh
JBP/ NU- Km 914/0 to 915/0
DN side Narsinghpur(J
BP to ET section), Jabalpur
Yes 1 37 9 STU MPPTCL 220 kV S/S
at Narsinghpur
viii. Madhya Pradesh
NG-ET (Amla Railway Colony), Nagpur
Yes 1 24 6 STU MPPTCL 33 kV S/S
at Jambada
Total 9 286 71
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 20: Maharashtra, Various districts
i. Maharashtra
KWV (CNHL Old RFP Training Centre), Solapur
Yes 1 80 20 STU STU 132 kV at
Karmala
ii. Maharashtra Barshi (Barshi Yard), Solapur
Yes 1 25 6 STU STU 220/132 kV at
Barshi
iii. Maharashtra GIP DAM
Kakole Ambernath
No 1 22 5 STU
iv. Maharashtra Nanded: DRM
Complex Yes 1 39 10 STU
STU 132/33 kV substation at Jangao
wadi
v. Maharashtra Nanded: Mirkhel
Yes 1 18 4.5 STU STU 132kV
substation at Elichpur
vi. Maharashtra Nanded: Hingoli
Yes 1 30 7.5 STU STU 132/33 kV
substation at Kamtha
Total 6 214 53
S.No State Site Name
Survey undertake
n
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 21: Punjab, Various districts
i. Punjab
LDH-TWB / GKX --- Ghalkalan
station (station side), Ferozepur
Yes 1 13 3 STU STU of PSPCL 66/11
kV S/S at Dugru
ii. Punjab
LDH-TWB / GKX --- Ghalkalan
station (opposite station side),
Yes 1 9 2 STU STU of PSPCL 66/11
kV S/S at Dugru
S.No State Site Name
Survey undertake
n
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 21: Punjab, Various districts
Ferozepur
Total 2 22 5
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 22: Rajasthan, Various districts
i. Rajasthan
Bundi Station, Kota
Yes 1 26 7 STU
STU of RRVPNL 132/66 kV S/S on Chittorgarh Bundi
road
ii. Rajasthan
Mandalgarh Station, Kota
Yes 1 25 6 STU
STU of RRVPNL 220/132 kV & 132/33
kV S/S at Mandalgarh
iii. Rajasthan ParsoiStation,
Kota Yes 1 25 6 STU STU of RRVPNL
132/33 kV substation at Katunda
iv. Rajasthan Tilwara, Jodhpur
Yes 1 28 7 STU STU of JVVNL of 33/11 kV S/S at
Jasol
v. Rajasthan Balotra (Balotra -
Pachpadara), Jodhpur
Yes 1 175 44 STU STU of JVVNL 132
kV S/S at pachpadra
vi. Rajasthan Samdari -
Bhakari Siding, Jodhpur
Yes 1 20 5 STU STU of RRVPNL of 132/33 kV S/S at
Samadari
vii. Rajasthan Ratangarh -
Bikaner Section, Bikaner
Yes 1 22 5 STU STU ofRRVPNL 220 kV S/S at Ratangarh
viii. Rajasthan Ratangarh - Yes 1 43 11 STU STU ofRRVPNL 220
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 22: Rajasthan, Various districts
Bikaner SRDR Section, Bikaner
kV S/S at Ratangarh
ix. Rajasthan
BTI-SGNR/HMK-1.5km far from
station, Sri Ganganagar
Yes 1 40 10 STU STU of JVVNL 33/11 kV S/S at Hindu Mal
Kot
Total 9 404 101
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 23: Uttar Pradesh, Various districts
i. Uttar
Pradesh
UMB-SRE / SRE --- Rifle ground
near hakikat Yes 1 37 9 STU
UPPTCL 220/33 kV S/S at Saharanpur
ii. Uttar
Pradesh
Shamli DLI-SQML MNZ- SRE at load
alignment 30rn x 800m
Yes 1 44 11 STU UPPTCL 220/33 kV S/S at Saharanpur
iii. Uttar
Pradesh
MB- RMR KGF yard near Got
Rly. Stn . Yes 1 49 12 STU
220 kV S/S at Majhola
(Moradabad)
iv. Uttar
Pradesh
MB - LKO RAC Premnagar West
Colony, Roza Yes 2 110 28 STU
UPPTCL 220/132 kV S/S at Shahjahanpur
v. Uttar
Pradesh Atarra, Banda
Yes 1 21 5 STU UPPTCL 132 kV S/S
at Atarra
vi. Uttar
Pradesh
Bharwa Sumerpur, Hamirpur
Yes 1 19 5 STU UPPTCL 132 kV S/S
at Sumerpur
S.No State Site Name Survey
undertaken
No. of Sites
Approx.Area
available (acre)
Possible Capacity
(MW)
Connectivity
Nearest Substation for
reference purposes
Package 23: Uttar Pradesh, Various districts
vii. Uttar
Pradesh Bhira Kheri,
Lucknow Yes 1 11 3 STU
UPPTCL 132/33 kV S/S at Pallia
viii. Uttar
Pradesh
Bakulha- Suraimanpur (old stations),
Varanasi
Yes 1 186 46 STU UPPTCL 220/132 kV
S/S at Arah
ix. Uttar
Pradesh
Madhosingh-Chilhghat, Varanasi
Yes 1 25 6 STU UPPTCL 132/33 kV
S/S at Aurai
Total 10 502 125
SN Zonal Railway/PU Designation Mob No.
1 CR CEE/EEM 8828110302
2 ER CESE 9002020302
CEGE 9771425302Dy.CEE/TRD 9771425308
4 ECoR CEE/EEM 84558813005 NR CEGE 97176303086 NCR CEE/EEM 9794835312
7 NER CEGE 9794840302
8 NWR CEGE 9001195301
CEE/EEM 9957550304
Dy.CEE(PS) 9864089126
10 WR CEE/EEM 9004490325
11 WCR CEE/EEM 941331730112 SR CETE 900316030413 SWR CETE 9731665302
CEGE 9701370302
Dy.CEE (Planning) 9701370308
15 SER CEGE 9002080305
16 SECR CEE/EEM 9752475310
Annexure VII A of RFQ
14 SCR
Ref: Railway Board mandate for utilization of vacant unused Railway Land for setting up of 3GW solar plants over IR.
Sub: List of Nodal Officers for assisting KPMG/Prospective bidders on survey land parcels and providing other details regarding land parcels and providing other details regarding land parcels.
3 ECR
NFR9
Annexure I A of Appendix I of RFP
(Landed Tariff calculation for packages where connectivity is mentioned as CTU/STU i.e. Package 3 to 12)
SN Description of Charges Pkg-3 Pkg-4 Pkg-5 Pkg-6 Pkg-7 Pkg-8 Pkg-9 Pkg-10 Pkg-11 Pkg-12
(A) Ex-bus Tariff at generator bus: (A) (in Rs./kWh)
(B) STU Transmission Charges (if applicable): B
(in Rs./kWh)
(C) STU Transmission Losses (if applicable): C1
(in %)
C2 (in Rs./kWh)= [{(A+B)/(1- C1 %)}- (A+B)]
(D) CTU Injection Losses (if applicable): D1 (in %)
D2 (in Rs./kWh)= [{(A+B+ C2)/(1- D1 %)}- (A+B+ C2)]
(E) Tariff at CTU periphery injection point : E=A+B+ C2+D2
Note: REMCL will advise the rates of Transmission Charges/Losses for Sr. No. (B), C1 of (C) & D1 of (D) as applicable 15 days prior to bid due date.