AMADEUSAMADEUSTraffic Management Approval System for the AMA
Doris Stroh (Network Traffic Control Manager)
Auckland Motorways
� Start 1 Oct 2008 – 10 year contract to operate and maintain the Auckland Motorway network
� Led by NZTA in conjunction with Fulton Hogan, Beca, Opus Fulton Hogan, Beca, Opus International Consultants, Resolve Group and Armitage Systems Ltd
� 220 km of motorway, with some areas of 200,000 vehicles per day and over 140 structures
OBJECTIVES
We will manage and deliver the maintenance andoperation of our network to:
� Maximising the efficiency of the motorway and wider Auckland transport network
� Deliver excellent service to our customers and stakeholders� Create a positive legacy� Deliver value for money� Grow our people
Values
Core to behaviour, we will
� Put safety first and everything else second� Recognise that we can all make a difference� Be prepared to challenge ourselves and others� Welcome change for the good� Work hard� Work smart
AMA Challenge
1. AMA – Key Performance Indicators (KPI)
Communications Team� Customer and Stakeholder driven Organisation
Traffic Operations Team� Optimised Throughput - Delays due to road closures (TTM)� Optimised Throughput – Congestion � Reliability (of travel time)
Challenges for the TMC Team
� 40 Mobile Rolling closures
� 40 Semi Static closures
� 35 shoulder closures
� 20 lane closures
Contributors:• 3 (soon 5) Major Capital Projects on SH16• 2 Capital Projects around Auckland• Maintenance work from the AMA
2008
Cu
sto
me
rs
• Be informed at all times
• No Congestion due to road works
• Less closures
Co
ntr
act
ors
•User friendly system
•Bigger working windows
Co
ntr
act
ors
•Bigger working windows
TM
C T
ea
m
• User friendly system
• Happy customers
• Happy contractors
What can we do ?
AMADEUS
Overview of the systemWeb-application hosted at the AMAAccess at http://amadeus.org.nzAllows organisations (e.g. contractors) to place a formal request to put closures out on the AMA networkUser Based SecuritySSL Security
Default Home Page
Different states of a TMP
Daily programme
Traffic Operations Centre – Integration
Traffic Operations Centre integration
JTOC integration
Map View
Closure Activation Report
The near Future
Before AMA
9pm – 5am
CIA - Prototype
Create Stability
Current System
Variable standards of
Advanced logging of closures
Variable standards of forward works planning
Contractors not working together
50 – 60 closures day / night
No Value for money
Difficult to advise customers
Customers get stuck in congestion
Frustrated customer
Forward works planning together
Fewer closures
Value for money
Customers informed in advance
Planned journey
Happy Customer
Map View – need to change to other map
Map View
TMP 15000SH 1 Barrier Cleaning
Sun 9/01/2011 – Thu 13/01/201121:00 – 5:00 Full closure
TMP 15000SH 1 Barrier Cleaning
Sun 9/01/2011 – Thu 13/01/201121:00 – 5:00 Full closure
2008
Cu
sto
me
rs
• Be informed at all times
• No Congestion due to road works
• Less closures
Co
ntr
act
ors
• Bigger working windows
Co
ntr
act
ors
• Bigger working windows
• User friendly system
TM
C T
ea
m
• User friendly system
• Happy customers
• Happy contractors