1 Alternative Final Closure System Using Synthetic Turf Berkeley County Solid Waste Management Facility SC SWANA Spring Conference May 7, 2014 Alternative Final Closure System Using Synthetic Turf Presented By: Mark Schlievert, PG Steve Lamb, PE Director of Solid Waste Vice President Berkeley County Water and Sanitation SCS Engineers 222 Oakley Plantation Drive 2520 Whitehall Park Drive Moncks Corner, SC 29461 Charlotte, North Carolina 843-719-2380 704-504-3107 [email protected] [email protected]

Upload: others

Post on 09-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

1

Alternative Final Closure System Using Synthetic Turf

Berkeley County Solid Waste Management Facility

SC SWANA Spring Conference

May 7, 2014

Alternative Final Closure System Using Synthetic Turf

Presented By:

Mark Schlievert, PG Steve Lamb, PEDirector of Solid Waste Vice PresidentBerkeley County Water and Sanitation SCS Engineers222 Oakley Plantation Drive 2520 Whitehall Park DriveMoncks Corner, SC 29461 Charlotte, North Carolina843-719-2380 [email protected] [email protected]

Page 2: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

2

Alternative Final Closure System Using Synthetic Turf

Outline• Introduction• Background• Permitting• Engineering• Construction• Construction quality assurance• A 24-month monitoring period

Introduction

Page 3: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

3

Background

• The Facility is located at 2277 Highway 52 in Moncks Corner, South Carolina.

• The Facility includes a closed unlined landfill, C&D landfill, and a Subtitle D landfill.

Background

• Working with SCDHEC for approval 3 years prior to starting construction.

• Several Meetings with SCDHEC, AGRU, Closure Turf, (Now Watershed), and BCWS.

• Construction Started April, 2013 completed in January, 2014, many weather delays

Page 4: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

4

Background

The primary reasons for closure include:

• Increased landfill gas collection, • Reduce odors,• Improved stormwater quality• Reduced cover maintenance.

• Cost savings of @ $50,000 up front.• Long term savings on maintenance• Increase LFG collection• Traditional cap would require re-sloping.• Earthquakes - stability

Page 5: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

5

Permitting

• Permitted as an alternate long-term cover system

• Inspections for 2 years and then, if all requirements are met, approved as a cap– 6 inspection events: end of 3rd month; end of 6th

month; end of 12th month; end of 18th month & end of 24th month. Inspections will be completed by Watershed/AGRU

Page 6: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

6

Permitting

Agru America Closure Turf® Final Cover System.

Sand ballast.Artificial grass attached to geotextile fabric.Agru 50-mil LLDPE Super Gripnetliner with spikes down.

18-inch thick Compacted Soil Barrier.

Permitting Issues Raised by DHEC

• Durability of Closure Turf• Longevity of Material• Management of Excess Gas Pressures• Placement and Maintenance of Gas Wells• Accessibility to Areas of the Cap (Without

Damaging Closure Turf)• Replacement of Closure Turf• Condition of Closure Turf during 30-year Post-

Closure Period

Page 7: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

7

Permitting Issues Raised by DHEC

• Weather Conditions (Effects of Freeze-Thaw Conditions & UV)

• Effectiveness of Sand Broadcast on Closure Turf• Run-Off Conditions and Adequacy of Storm Water

Management System• Settlement and Ponding• Other Biological Concerns (Mold & Mildew of the

Material Due to Moisture)• Slope Stability• Cost-Benefit of Closure Turf vs. Standard Subtitle

D Cap

PermittingStep 1 – Submitted response to 14 DHEC questions.Step 2 - Revised Closure Plan which included:• Final closure design drawings.• Engineering calculations supporting the proposed

stormwater management controls• Construction Quality Assurance Plan• Monitoring and Inspection Plan

Page 8: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

8

Permitting - Cover

An infiltration comparison between the permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic Evaluation of Landfill performance (HELP) Model.

Permitting - CoverFor the prescribed cover system

• 69.15% of rain was removed via evapotranspiration. Lateral drainage via the geocomposite accounted for 18.71%.

The proposed Closure Turf system

• relies more heavily on the lateral drainage layer where 81.64% of the precipitation is removed.

Based on the HELP model analysis, the proposed Intermediate Alternative Final Cover is equivalent to the current permitted final cover system in regards to infiltration potential.

Page 9: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

9

Engineering

• Stormwater Management• Stability• Landfill Gas Management

Engineering - Stormwater

• Off landfill areas - Evaluate existing basins and channels

• On Landfill closure area –– Tack on berms– Down chute pipes– Hydrobinder

Page 10: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

10

Engineering - Stormwater

Engineering - Stormwater

Page 11: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

11

Stormwater Pipe Outlet

Engineering - Stability

• Wind uplift• Sand ballast• Veneer failure

Page 12: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

12

Cap Failure

Slope Failure

Page 13: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

13

NOT GOOD

Mid-slope Anchor Trench

Page 14: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

14

Engineering – Landfill Gas

Landfill gas (LFG) controls were installed directly beneath the 50-mil LLDPE geomembrane liner.

LFG controls include:

• A 1-foot wide Advanedge® pipe (gas strip) with 30-ft wide geocomposite/geotextile layer.

• Horizontal spacing of the gas strip - 100 to 200 feet.

• Existing LFG extraction wells

• Toe Drain

Engineering – Landfill Gas

Page 15: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

15

Engineering – Landfill Gas

Construction

• Site Preparation• Compacted Soil Barrier• Landfill Gas Strips• Geomembrane Liner• Synthetic Turf• Sand Infill

Page 16: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

16

Access bridge from the main road to the work area

Existing liner system exposed for a tie in

Page 17: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

17

Compacting Soil Liner

Soil Barrier Thickness Measurement

Page 18: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

18

Completed soil barrier layer

Rats with wings.

Page 19: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

19

Tie-in area at toe of slope

Installing geomembrane

Page 20: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

20

Installing turf

Page 21: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

21

A finished view of the turf before sand is applied

Sample of the sand applied to the turf

Page 22: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

22

An example of the sand applicator in use

Application of the hydro-binder in the channels before hydration

Page 23: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

23

Brushing of sand into the turf

Post Construction MonitoringThe purpose of this Monitoring and Inspection Plan is to:• Define the inspection, testing, and monitoring

activities to evaluate the performance of the Synthetic Turf System.

• Define performance period for monitoring activities.• Provide performance requirements and specifications

of the Synthetic Turf System.• Define reporting requirements. • Confirm the synthetic turf system will perform in

accordance with the requirements of this project.

Page 24: Alternative Final Closure System Using Synthetic Turf · permitted final cover system and the proposed intermediate alternative final cover system was conducted using the Hydrologic

24

What would we do differently next time?

• Modify mid-slope anchor trench• Try to avoid stormwater pipes• Install FML panels lengthwise in channel

inlet to avoid birdbaths• Steeper slopes on tack-on berms

Questions