Decisions for the Week Ending 9th October 2020
Alresford Parish Council No Determinations Ardleigh Parish Council No Determinations Beaumont Parish Council No Determinations Bradfield Parish Council No Determinations Brightlingsea Town Council
20/01092/FUL Approval - Full 06.10.2020 Delegated Decision
Mr Ashley Bell Single storey side and rear extension.
4 Upper Park Road Brightlingsea Colchester Essex CO7 0JP
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan; Drawing No. 785:01 Reason - For the avoidance of doubt and in the interests of proper planning.
20/01169/LUPROP Application Withdrawn 06.10.2020 Delegated Decision
Mr Andrew Conroy
Proposed removal of existing small summer house and construction of log cabin (or similar structure) annexe within curtilage of rear garden to provide an additional 2 bedrooms, shower room/wc and kitchenette facility for family members (use to be wholly ancillary to main house).
6 Walnut Way Brightlingsea Colchester Essex CO7 0LJ
Clacton-on-Sea
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
2
Decisions for the Week Ending 9th October 2020
19/01266/FUL Approval - Full 05.10.2020 Delegated Decision
Bilaman Limited Use of existing Coach House as a 1 bedroom dwelling and the erection of a terrace of 3 no. dwelling houses, each with associated gardens and parking facilities (including alterations to the layout and parking of/for the existing care home).
10 Connaught Gardens East Clacton On Sea Essex CO15 6HY
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: 1928/2 E Amended Block Plan 1928/6 Amended Floor Plans and Front Elevation 1928/7 Amended Side and Rear Elevations 1928/8 Coach House Floor Plan and Elevations Reason - For the avoidance of doubt and in the interests of proper planning. 03 No above ground works shall take place until there has been submitted to and approved, in
writing, by the Local Planning Authority a scheme of hard and soft landscaping works for the site, which shall include any changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837:2012 Trees in relation to design, demolition and construction."
Reason - In order to enhance and soften the appearance of the development in the interests of visual
amenity and The Gardens Special Character Area. 04 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - To ensure the adequate implementation and maintenance of the approved landscaping
scheme for a period of five years in the interests of the special character of the area and the quality of the development.
05 Notwithstanding the provisions of Article 3, Schedule 2 Part 1 Classes A, B, C, D and E of the
Town and Country Planning (General Permitted Development) (England) Order 2015 (or any
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
3
Decisions for the Week Ending 9th October 2020
Order revoking and re-enacting that Order with or without modification), there shall be no additions or alterations to the dwellings or their roofs, nor shall any buildings, enclosures, swimming or other pool be erected except in accordance with drawings showing the design and siting of such additions and/or building(s) which shall previously have been submitted to and approved, in writing, by the local planning authority.
Reason - It is necessary for the Local Planning Authority to be able to consider and control further
development in the interests of visual amenity and residential amenities. 06 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of fences, gates, walls or other means enclosures, shall be erected forward of the new build dwellings hereby approved except in accordance with drawings showing the design and siting of such enclosures which shall previously have been submitted to and approved, in writing, by the Local Planning Authority by way of a planning application.
Reason - In the interests of visual amenity and highway safety. 07 All new parking areas and areas of hardstanding shall be made of porous materials, or
provision shall be made to direct run-off water from the hard surface to a permeable or porous area within the site area.
Reason - In the interests of sustainable development and to minimise the risk of surface water
flooding. 08 The removal of any vegetation for site access/site clearance shall only be carried out outside
of the bird nesting season (March to August inclusive). Reason - To ensure the protection of birds potentially nesting on site. 09 No unbound material shall be used in the surface treatment of the vehicular access/ driveway
throughout. Reason - To avoid displacement of loose material onto the highway in the interests of highway safety. 10 There shall be no discharge of surface water onto the Highway. Reason - To prevent hazards caused by water flowing onto the highway and to avoid the formation of
ice on the highway in the interest of highway safety. 11 No development shall take place, including any ground works or demolition, until a
Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority.
The Construction Method Statement shall provide for: - safe access to/from the site; - the parking of vehicles of site operatives and visitors; - the loading and unloading of plant and materials; - the storage of plant and materials used in constructing the development; - wheel washing facilities; - measures to control the emission of dust and dirt during demolition and construction; - a scheme for recycling/disposing of waste resulting from demolition and construction works; - details of hours of deliveries relating to the demolition and construction of the development;
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
4
Decisions for the Week Ending 9th October 2020
- details of hours of site clearance and construction; - a scheme to control noise and vibration during the demolition and construction phase,
including details of any piling operations. The approved Construction Method Statement shall be adhered to throughout the construction period
for the development. Reason - To ensure that on-street parking of construction vehicles in the adjoining streets does not
occur, to ensure that loose materials and spoil are not brought out onto the highway in the interests of highway safety and to ensure working conditions are sympathetic to residential amenities.
12 Each vehicular parking space shall have minimum dimensions of 2.9 metres x 5.5 metres,
while each tandem vehicular parking space shall have minimum dimensions of 2.9 metres x 11 metres to accommodate two vehicles. The proposed development shall not be occupied until such time as the vehicle parking area indicated on the approved plans (including the allocated spaces for the care home), including any parking spaces for the mobility impaired, has been hard surfaced, sealed and marked out in parking bays. The vehicle parking area and associated turning area shall be retained in this form at all times. The vehicle parking shall not be used for any purpose other than the parking of vehicles that are related to the use of the development unless otherwise agreed with the Local Planning Authority.
Reason - To encourage the use of garages and parking spaces for their intended purpose and to
discourage on-street parking, in the interests of highway safety. 13 Prior to the occupation of any of the proposed dwellings, the proposed private drive shall be
widened/ constructed to a width of 5.5 metres for at least the first 6 metres from the back of Carriageway / Footway / Highway Boundary and provided with an appropriate dropped kerb crossing of the footway.
Reason - To ensure that vehicles can enter and leave the highway in a controlled manner and to
ensure that opposing vehicles can pass clear of the limits of the highway, in the interests of highway safety.
14 The Cycle / Powered Two-wheeler parking shall be provided in accordance with the EPOA
Parking Standards. The approved facility shall be secure, convenient, covered and provided prior to occupation and retained at all times.
Reason - To ensure appropriate cycle / powered two-wheeler parking is provided in the interest of
highway safety. 15 Rainwater goods shall be of black painted or powder-coated metal and shall be permanently
maintained as such. Reason - In the interests of the visual amenity and the quality of the development in the setting of a
non-designated heritage asset. 16 No above ground works shall be commenced until precise details of the manufacturer and
types and colours of the external facing and roofing materials to be used in construction have been submitted to and agreed, in writing, by the Local Planning Authority. Such materials as may be agreed shall be those used in the development. Materials shall be to match those existing materials of the Coach House
Reason - In the interests of the visual amenity and the quality of the development in the setting of a
non-designated heritage asset.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
5
Decisions for the Week Ending 9th October 2020
17 Prior to any above ground works, drawings to a scale of not less than 1: 20 fully detailing the
new windows, doors and their surrounds shall be submitted to and approved in writing by the Local Planning Authority. Such details shall include materials, cross sections for glazing bars, sills, heads (as applicable), method of opening and method of glazing. The approved works shall be installed/carried out in complete accordance with the approved details unless otherwise agreed in writing by the Local Planning Authority.
Reason - In the interests of the visual amenity and the quality of the development in the setting of a
non-designated heritage asset. Elmstead Market Parish Council No Determinations Frating Parish Council No Determinations Frinton & Walton Town Council
20/00881/FUL Approval - Full 05.10.2020 Delegated Decision
Mr S & Mrs K Watcham
Variation of condition 17 of application 18/02063/FUL to adjust elevation drawings to record minor revisions and the erection of outbuilding to plot 2.
Great Holland Nurseries Church Lane Great Holland Essex CO13 0JS
01 The approved scheme of landscaping shown on drawing no. 77 A shall be implemented not
later than the first planting season following commencement of the development (or within such extended period or phased arrangement as the Local Planning Authority may allow) and shall thereafter be retained and maintained for a period of five years. Any plant material removed, dying or becoming seriously damaged or diseased within five years of planting shall be replaced within the first available planting season and shall be retained and maintained.
Reason - To ensure the effective implementation of the approved landscaping scheme, in the
interests of visual amenity. 02 The approved screen walls and fences, as shown on drawing no. 77 A, shall be erected prior
to the dwellings to which they relate being first occupied and thereafter be retained in the approved form.
Reason - To ensure a satisfactory development of the site in the interests of amenity and the
conservation area setting. 03 Prior to the first occupation of the proposed dwellings, the proposed vehicular access shall be
reconstructed to a width of 5.5m and shall be provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.
Reason - To ensure that all vehicles using the private drive access do so in a controlled manner and
to ensure that opposing vehicles may pass clear of the limits of the highway, in the interests of
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
6
Decisions for the Week Ending 9th October 2020
highway safety. 04 No unbound materials shall be used in the surface treatment of the proposed vehicular access
within 6m of the highway boundary. Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
highway safety. 05 Prior to the proposed access for any dwelling on the proposed development being brought
into use, a 1.5m. x 1.5m. pedestrian visibility splay, relative to the highway boundary, shall be provided on both sides of that access and shall be maintained in perpetuity free from obstruction clear to ground. These splays must not form part of the vehicular surface of the access.
Reason - To ensure adequate intervisibility between drivers of vehicles using the proposed access
and pedestrians in the adjoining highway, in the interests of highway safety. 06 Prior to the occupation of the proposed development the vehicular turning/parking areas, as
shown on approved drawing no. 71 C, shall be provided within the site and shall be maintained free from obstruction in perpetuity.
Reason - To ensure that vehicles using the site access may enter and leave the highway in a forward
gear and adequate parking provision is provided, in the interests of highway safety. 07 Any gates erected at the vehicular access shall be inward opening only and shall be recessed
a minimum of 6m. from the nearside edge of carriageway of the existing road. Reason - To ensure that vehicles using the access may stand clear of the carriageway whilst those
gates are being opened/closed, in the interests of highway safety. 08 Prior to first occupation of the proposed development, a (communal) recycling/bin/refuse
collection point shall be provided within 25m of the highway boundary or adjacent to the highway boundary and additionally clear of all visibility splays at accesses.
Reason - To minimise the length of time a refuse vehicle is required to wait within and cause
obstruction of the highway, in the interests of highway safety. 09 Construction work shall be carried out in accordance with the Construction Method Statement
document (dated 31st October 2016) and within associated drawing no. 78, as approved under planning reference 17/00031/DISCON.
Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety. 10 At the completion of the construction phase, the adjacent PRoW, Footpath No 4 (Great
Holland) shall be resurfaced and compacted with recycled road planings or a similar material and all obstructing vegetation removed from site to provide a minimum clear width of 1.5m and also clear to a height of 2.0m across the entire sites western boundary to the footpath.
Reason - To ensure the continued safe passage of pedestrians on the definitive right of way. 11 The removal of any vegetation from the site shall only be carried out outside of the bird
nesting season (March to August inclusive). Reason - To ensure the protection of birds potentially nesting on site.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
7
Decisions for the Week Ending 9th October 2020
12 All external illumination shall only be installed in accordance with the details stipulated in
sections 3.18 to 3.21 of the 'Ecological Management and Mitigation Plan', as prepared by Liz Lord Ecology and approved under planning reference 17/00031/DISCON.
Reason - To ensure adequate safeguarding of the amenity of nearby properties, protected species
and prevent the undesirable, disruptive and disturbing effects of light pollution. 13 The development shall be carried out in accordance with the protection species mitigation
measures/recommendations as set out in the submitted 'Ecological Management and Mitigation Plan', as prepared by Liz Lord Ecology and approved under planning reference 17/00031/DISCON.
Reason - To preserve and enhance the biodiversity of the site. 14 The hereby approved development shall take place fully in accordance with the tree/hedgerow
protection measures set out in the submitted Arboricultural Impact Assessment and the accompanying Tree Protection Plan (Ref no. - TPSarb5161214 TSCP) (prepared by Tree Planning Solutions dated 9th May 2015).
Reason - In order to suitably protect the existing trees/hedges on the boundaries of the site for the
benefit of the character and appearance of the surrounding area and the ecology of the site. 15 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of fences, walls or other enclosures, shall be erected on the site except in accordance with drawings showing the design and siting of such enclosures which shall previously have been submitted to and approved, in writing, by the Local Planning Authority by way of a planning application.
Reason - In the interests of visual amenity and to preserve the character of the surrounding area and
the setting of the adjacent Grade II* Listed All Saints Church. 16 Notwithstanding the provisions of Article 3, Schedule 2 Part 1 Classes A, B and E of the Town
and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), there shall be no additions to the dwellings, nor shall any buildings, enclosures, swimming or other pool be erected except in accordance with drawings showing the design and siting of such additions or building(s) which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Reason - It is necessary for the Local Planning Authority to be able to consider and control further
development in order to ensure that development would not adversely impact on the setting of the conservation area and the Grade II* Listed All Saints Church.
17 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing No's. 153C Site Plan and Block Plan 71C Block Plan (showing access details) 72C Plot 2 - Proposed Ground Floor Plan 73C Plot 2 - Proposed First Floor Plan 74C Amended Plot 2 - Proposed Front Elevation 75D Amended Plot 2 - Proposed West Elevation 76D Amended Plot 2 - Proposed East Elevation
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
8
Decisions for the Week Ending 9th October 2020
85D Amended Plot 2 - Proposed Rear Elevation 80B Plot 1 - Proposed Ground Floor Plan 81C Plot 1 - Proposed First Floor Plan 82C Amended Plot 1 - Proposed Front Elevation 83C Amended Plot 1 - Proposed Rear Elevation 84D Amended Plot 1 - Proposed East and West Elevation 152B Outbuilding - Proposed Floor Plan and Elevations 77A Landscaping Plan Reason - For the avoidance of doubt and in the interests of proper planning.
20/01063/FUL Approval - Full 06.10.2020 Delegated Decision
Simon Meek Proposed single storey rear extension.
76 Pole Barn Lane Frinton On Sea Essex CO13 9NH
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing 01, revision B; received 5th October 2020. Reason - For the avoidance of doubt and in the interests of proper planning.
20/01068/FUL Approval - Full 05.10.2020 Delegated Decision
Mr and Mrs Wright
Proposed hipped to gable ends for loft conversion including 1no. rear window, 1no. flat roof side dormer and 3no. velux roof lights.
25 Upper Second Avenue Frinton On Sea Essex CO13 9LP
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan: 01 revision B received 25th September 2020. Reason - For the avoidance of doubt and in the interests of proper planning. 03 Any window or roof light to the northern or southern roof slope shall be obscure glazed and
retained as such. Notwithstanding the Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, (or any Order revoking and re-enacting that Order with or without modification), no window or roof light shall be created above ground floor level, other than as hereby approved, except in accordance with drawings showing the design and position of such window or roof light which shall previously have been
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
9
Decisions for the Week Ending 9th October 2020
submitted to and approved, in writing, by the Local Planning Authority. Reason- In the interest of the residential amenity of occupiers of neighbouring property, in
accordance with Policy QL11 of the adopted Local Plan and Policy SPL3 of the emerging Local Plan.
20/01104/FUL Approval - Full 05.10.2020 Delegated Decision
Mr Akers Proposed single storey rear extension.
23 Sadlers Close Kirby Cross Frinton On Sea Essex CO13 0QB
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan; Drawing No. HPA.005 and HPA.006. Reason - For the avoidance of doubt and in the interests of proper planning. Great Bentley Parish Council
20/00864/DETAIL Approval - Reserved Matters/Detailed 07.10.2020
Hills Building Group
Amendments to Layout relating to plots 7, 8, 12, 31, 32, 35, 37, 38 and 39; Boundary conditions and realignments, Site entrance wall added; and Appearance and Scale relating to Plot 8 (approved under 16/01912/DETAIL).
Land at Admirals Farm Heckfords Road Great Bentley Essex CO7 8RS
01 All changes in ground levels, hard landscaping, planting, seeding or turfing shown the
approved landscaping details drawing nos. 16.2030.01.I, 16.2030.02. S, 16.2030.03. Q, 16.2030.04. R, 16.2030.05. Q and 16.2030.06. Q shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - To ensure the implementation of the approved scheme and adequate maintenance of the
landscaping for a period of five years in the interests of the character of the conservation area. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans:
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
10
Decisions for the Week Ending 9th October 2020
- 16.2030.01.I - 16.2030.02. S - 16.2030.03. Q - 16.2030.04. R - 16.2030.05. Q - 16.2030.06. Q - 3522-A-0015 P11 Site Layout Plan - 3522-E-0002-P02 Site Location Plan - 3522-E-0103-P01 Garage Type 1 - 3522-E-0104-P01 Garage Type 2 - 3522-E-0801-P01 HT8 4BH - HBG/SK/V10 Reason - For the avoidance of doubt and in the interests of proper planning.
20/00903/OUT Approval - Outline 07.10.2020
Miss Clara Spicer - CALA Homes (NHC)
Variation of condition 15 of 14/01750/OUT to remove part of clause (ii) which states "the widening of Heckfords Road at its junction with the A133".
Land at Station Field Plough Road Great Bentley Essex CO7 8LG
01 The development hereby permitted shall be carried out in accordance with the Location Plan
No. EG004-LP01 Revision B. Reason - For the avoidance of doubt. 02 The maximum number of dwellings to be contained in the development shall be 150 and
maximum amount of gross internal B1 business space shall be 2,700 square metres. Reason - For the avoidance of doubt. 03 All structural landscaping shall be carried out during the first planting and seeding season
(October - March inclusive) following the commencement of the development and other landscaping in a phased arrangement as may be agreed in writing by the local planning authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the local planning authority agrees in writing to a variation of the previously approved details.
Reason - To secure the implementation of the approved landscaping scheme in the interests of visual
amenity. 04 The development shall be constructed in full accordance with the phasing plan (drawing no.
1645/10 and Cala Homes Letter dated 2th October 2017) as approved under planning reference 17/01681/DISCON.
Reason - In the interests of visual and residential amenity. 05 In order to reflect the requirements of Network Rail, no more than 25 dwellings shall be
occupied so long as Footpath FP8 level crossing (also referred to as E45) remains open. Any
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
11
Decisions for the Week Ending 9th October 2020
additional dwellings may not be occupied until such time as this rail crossing has been closed and a footpath diversion has been provided or a bridge or other possible measures to be agreed by the Council in writing are in place.
Reason - In the interests of health and safety. 06 No development shall commence until a Landscape and Public Open Space Management
Plan including a lighting strategy, long-term design objectives, management responsibilities and maintenance schedules for all landscaped areas has been submitted to and approved, in writing, by the Local Planning Authority. The Landscape and Public Open Space Management Plan so approved shall be carried out in accordance with the details and timescales to be contained in that document.
Reason - To secure the successful implementation of the approved landscaping and open spaces in
the interests of visual amenity. 07 No development shall commence until a foul water strategy has been submitted to and
approved in writing by the local planning authority. No dwellings shall be occupied until the works have been carried out in accordance with the foul water strategy so approved.
Reason - In the interests of amenity. 08 No development shall commence until details of a surface water drainage works shall have
been submitted to and approved in writing by the Local Planning Authority. The submitted details shall:
a) include measures to minimise the risk of flooding during the construction works; and b) provide information about the design storm period and intensity, the method employed to delay
and control the surface water discharged from the site and the measures taken to prevent pollution of the receiving groundwater and/or surface waters; and
c) include a timetable for its implementation; and d) provide a management and maintenance plan for the lifetime of the development which shall
include the arrangements for adoption by any public authority or statutory undertaker and any other arrangements to secure the operation of the scheme throughout its lifetime.
No building shall be occupied until the works have been implemented in accordance with the
approved details. Reason - To avoid the risks associated with surface water flooding. 09 The development shall be carried out in full accordance with the findings and
recommendations of the Phase II Site Appraisal (P7820 - dated March 2017) as approved under planning reference 19/00126/DISCON.
Reason - To address the potential for any land contamination issues in the interests of health and
safety. 10 No occupation of the development shall take place until the following have been completed in
accordance with details that shall have first been submitted to and approved in writing by the Local Planning Authority:
i) A priority junction off Plough Road to provide access to the site as shown in principle on the
planning application drawings; and ii) 2no. traffic islands with illuminated bollards and high level beacons at the right turn lane at the
A133 and Heckfords Road junction; and
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
12
Decisions for the Week Ending 9th October 2020
iii) Two new bus stops adjacent the proposal site access off Plough Road or upgrading of existing bus stops with the highest frequency of services which would serve the development. For either option, stops shall be provided or upgraded to current Essex County Council specification.
No dwelling within the development shall be first occupied until such time as all facilities identified in
a), b) and c) above have been provided in accordance with details so approved. Reason - In the interests of highway safety. 11 Prior to occupation of the development, the Developer shall be responsible for the provision,
to the first owner of each dwelling on the site, a Residential Travel Information Pack for sustainable transport, approved by the Local Planning Authority, in consultation with Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator.
Reason - To promote the use of sustainable transport options. 12 The development shall be carried out in full accordance with the findings and
recommendations contained within the Ecological Assessment (as prepared by Ethos Environmental Planning - dated August 2018) as approved under planning reference 19/00125/DISCON.
Reason - In the interests of biodiversity. 13 No phase of development shall commence until a Construction Method Statement has been
submitted to and approved, in writing, by the Local Planning Authority for that particular phase. The statement shall include details of:
i) the parking of vehicles of site operatives and visitors; and ii) the loading and unloading of plant and materials; and iii) storage of plant and materials used in constructing the development; iv) wheel and under-body washing facilities; and v) hours of construction Reason - In the interests of highway safety and residential amenity. 14 The hereby permitted development shall not be occupied until a fibre optic broadband
connection installed on an open access basis and directly accessed from the nearest exchange, incorporating the use of resistant tubing, has been installed at the site, in accordance with details that shall be submitted and approved, in writing, by the Local Planning Authority. If the applicant is unable to achieve this standard of connection, and can evidence through consultation that this would not be possible, practical or economically viable an alternative superfast (i.e. will provide speeds greater than 24mbps) wireless service will be considered acceptable.
Reason - In the interests of residential amenity of future residents. Great Bromley Parish Council No Determinations Great Oakley Parish Council No Determinations
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
13
Decisions for the Week Ending 9th October 2020
Harwich Town Council
20/00759/LBC Approval - Listed Building Consent 09.10.2020 Delegated Decision
Jennifer Monks Reinstate internal wall. Dovercourt Hall Hall Lane Dovercourt Harwich Essex CO12 3TD
01 The works hereby permitted shall begin before the expiration of three years from the date of
this consent. Reason - To comply with the requirements of Section 18(1) of the Planning (Listed Buildings and
Conservation Areas) Act 1990, as amended by the Planning and Compulsory Purchase Act 2004.
02 The development hereby permitted shall be carried out in accordance with the following
approved plans: -Proposed Elevation Scanned 08 July 2020 -Applicant Email with Section Drawing Scanned 05 Oct 2020 -Floor Plan Scanned 08 July 2020 Reason - For the avoidance of doubt and in the interests of proper planning.
20/01028/FUL Approval - Full 05.10.2020 Delegated Decision
Mr and Mrs D Goff
Proposed single storey rear and side extension.
359 Main Road Harwich Essex CO12 4DN
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan; Drawing No. 359 MR. HAR/07/2020/04 Reason - For the avoidance of doubt and in the interests of proper planning.
20/01031/LBC Approval - Listed Building Consent 07.10.2020 Delegated Decision
Mr Nick May Proposed partial external redecoration.
26 Kings Head Street Harwich Essex CO12 3EE
01 The works hereby permitted shall begin before the expiration of three years from the date of
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
14
Decisions for the Week Ending 9th October 2020
this consent. Reason - To comply with the requirements of Section 18(1) of the Planning (Listed Buildings and
Conservation Areas) Act 1990, as amended by the Planning and Compulsory Purchase Act 2004.
02 The development hereby permitted shall be carried out in accordance with the following
approved plan and document: - Drawing No. 747/REDEC/1 - Agents Email confirming materials - Scanned 23 Sept 2020 Reason - For the avoidance of doubt and in the interests of proper planning. Lawford Parish Council
20/00930/FUL Approval - Full 09.10.2020 Delegated Decision
Mr Joel Ivell Proposed first floor extension over garage and low level roof alterations with the addition of roof lights and bi fold doors.
Eastbrae Hungerdown Lane Lawford Manningtree Essex CO11 2JN
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan: - Drawing no. GI/11 PROPOSED NORTH ELEVATION - Drawing no. GI/12 PROPOSED ROOFLINE PLAN - Drawing no. GI/7 PROPOSED GROUND FLOOR PLAN - Drawing no. GI/8 PROPOSED FIRST FLOOR PLAN - Drawing no. GI/10 AMENDED PROPOSED EAST ELEVATION -Drawing no. GI/9 AMENDED PROPOSED SOUTH ELEVATION Reason - For the avoidance of doubt and in the interests of proper planning. Little Bentley Parish Council No Determinations Little Bromley Parish Council No Determinations Little Clacton Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
15
Decisions for the Week Ending 9th October 2020
20/00703/FUL Approval - Full 09.10.2020 Delegated Decision
Mr & Mrs Edwards
Proposed dormer loft conversion.
19 Hazelwood Crescent Little Clacton Clacton On Sea Essex CO16 9PB
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing Number HPA.006 Revision E, HPA.002 Revision B and HPA.005 Revision D.
Reason - For the avoidance of doubt and in the interests of proper planning. 03 Prior to occupation of the development hereby approved, the external facing of the side
dormer shall match in colour, texture and form the cladding material used on the front and rear gables of 19 Hazelwood Crescent, Little Clacton and shall thereafter be permanently retained in this approved form.
Reason - In the interests of visual amenity. 04 Notwithstanding the provisions of Article 3, Schedule 2, Part 1 of the Town and Country
Planning (General Permitted Development) Order 1995 (or any Order revoking and re-enacting that Order with or without modification), the southernmost window on the western elevation shall be glazed in obscure glass before the development hereby permitted is first occupied and shall thereafter be permanently retained in this approved form.
Reason - To protect the privacy and amenities of the occupiers of the adjoining property. Little Oakley Parish Council
20/00342/FUL Approval - Full 06.10.2020 Delegated Decision
Tocia Properties Ltd
Proposed erection of 5 single storey three bedroom dwellings.
Land to The South West of Hammond Drive Ramsey Harwich Essex CO12 5EJ
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans (including materials details):
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
16
Decisions for the Week Ending 9th October 2020
Drawing No.: 6061-SK10 Revision A - Amended Proposed Site Plan Drawing No.: 6061-004 - Plots 1 - 5 Proposed House Types, Elevations and Materials Drawing No.: 6061-005 - Plots 1 - 3 Proposed Garage Plans, Elevations and Materials Drawing No.: 6061-006 - Plots 4 and 5 Proposed Garage Plans, Elevations and Materials Reason - For the avoidance of doubt and in the interests of proper planning. 03 No above ground works shall take place until there has been submitted to and approved, in
writing, by the Local Planning Authority a scheme of hard and soft landscaping works for the site, which shall include any changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837:2012 Trees in relation to design, demolition and construction."
Reason - In order to enhance and soften the appearance of the development in the interests of visual
amenity and the character of the area. 04 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - To ensure the adequate implementation and maintenance of the approved landscaping
scheme for a period of five years in the interests of the character of the area and the quality of the development.
05 Notwithstanding the provisions of Article 3, Schedule 2 Part 1 Classes A, B, C, D and E of the
Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), there shall be no additions or alterations to the dwellings or their roofs, nor shall any buildings, enclosures, swimming or other pool be erected except in accordance with drawings showing the design and siting of such additions and/or building(s) which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Reason - It is necessary for the Local Planning Authority to be able to consider and control further
development in the interests of visual amenity and residential amenities. 06 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of fences, gates, walls or other means enclosures, shall be erected forward of the dwellings hereby approved except in accordance with drawings showing the design and siting of such enclosures which shall previously have been submitted to and approved, in writing, by the Local Planning Authority by way of a planning application.
Reason - In the interests of visual amenity and highway safety. 07 All new parking areas and areas of hardstanding shall be made of porous materials, or
provision shall be made to direct run-off water from the hard surface to a permeable or porous area within the site area.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
17
Decisions for the Week Ending 9th October 2020
Reason - In the interests of sustainable development and to minimise the risk of surface water
flooding. 08 The removal of any vegetation for site access/site clearance shall only be carried out outside
of the bird nesting season (March to August inclusive). Reason - To ensure the protection of birds potentially nesting on site. 09 As per drawing no. 617.19.04 Rev. L no unbound material shall be used in the surface
treatment of the vehicular access/ driveway throughout. Reason - To avoid displacement of loose material onto the highway in the interests of highway safety. 10 Prior to occupation of the development a 1.5 metre x 1.5 metre pedestrian visibility splay, as
measured from and along the highway boundary, shall be provided on both sides of the vehicular access. Such visibility splays shall be retained free of any obstruction in perpetuity. These visibility splays must not form part of the vehicular surface of the access.
Reason - To provide adequate inter-visibility between the users of the access and pedestrians in the
adjoining public highway in the interest of highway safety. 11 Prior to occupation of the development the vehicular access shall be constructed at right
angles to the highway boundary and to the existing carriageway in accordance with the approved Site Layout Plan Drawing 6061-SK10 Rev A and should incorporate the following detail:
- The access road being constructed as a 5.5m wide shared use route with 6m radii kerbs at the bell
mouth, tapering down to a lesser width. - A straight section of carriageway to be provided from the entrance junction for 6 metres. Reason - To ensure that vehicles can enter and leave the highway in a controlled manner in the
interest of highway safety. 12 There shall be no discharge of surface water onto the Highway. Reason - To prevent hazards caused by water flowing onto the highway and to avoid the formation of
ice on the highway in the interest of highway safety. 13 No development shall take place, including any ground works or demolition, until a
Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority.
The Construction Method Statement shall provide for: - safe access to/from the site; - the parking of vehicles of site operatives and visitors; - the loading and unloading of plant and materials; - the storage of plant and materials used in constructing the development; - wheel washing facilities; - measures to control the emission of dust and dirt during demolition and construction; - a scheme for recycling/disposing of waste resulting from demolition and construction works; - details of hours of deliveries relating to the demolition and construction of the development; - details of hours of site clearance and construction; - a scheme to control noise and vibration during the demolition and construction phase,
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
18
Decisions for the Week Ending 9th October 2020
including details of any piling operations. The approved Construction Method Statement shall be adhered to throughout the construction period
for the development. Reason - To ensure that on-street parking of construction vehicles in the adjoining streets does not
occur, to ensure that loose materials and spoil are not brought out onto the highway in the interests of highway safety and to ensure working conditions are sympathetic to residential amenities.
14 Each vehicular parking space shall have minimum dimensions of 2.9 metres x 5.5 metres,
while each tandem vehicular parking space shall have minimum dimensions of 2.9 metres x 11 metres to accommodate two vehicles. All single garages should have a minimum internal measurement of 7m x 3m. All garages and parking spaces shall be provided prior to the occupation of the dwellings hereby approved and retained this approved form unless otherwise agreed in writing by the Local Planning Authority.
Reason - To encourage the use of garages and parking spaces for their intended purpose and to
discourage on-street parking, in the interests of highway safety. Manningtree Town Council No Determinations Mistley Parish Council
20/00812/FUL Approval - Full 07.10.2020 Delegated Decision
Fiona Reid Replacement of low level boundary fencing, gates and internal and external perimeter fencing with new weldmesh fencing.
Mistley Norman C of E Primary School Remercie Road Mistley Manningtree Essex CO11 1LS
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: -Drawing No. 3198/2/SD04 - Proposed Site Layout Plan -Drawing No. 3198/2/SD05 - Proposed Perimeter Fencing Elevations -Drawing No. 3198/2/SD06 - Proposed External/Internal Fencing Elevations Reason - For the avoidance of doubt and in the interests of proper planning. 03 If, during the erection of the fence, it becomes necessary for any of the boundary hedges to
be removed to facilitate the works then replacement planting at the same place, of such size and species and shall be planted, in accordance with details which shall be agreed in writing by the Local Planning Authority. If any part of the hedge subsequently dies or diseased within
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
19
Decisions for the Week Ending 9th October 2020
a period of 5 years from the completion of the development shall be replaced in the next planting season with others of a similar size and species unless the Local Planning Authority gives written consent to any variation.
Reason - To ensure the presence of boundary hedges are retained as they are considered essential
to enhance the character of the development.
20/01051/FUL Approval - Full 05.10.2020 Delegated Decision
Mr James Fowler Proposed single storey front porch extension.
The Wagon New Road Mistley Manningtree Essex CO11 2AP
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 01 The development hereby permitted shall be carried out in accordance with the following
approved plan; Drawing No. 02 A Reason - For the avoidance of doubt and in the interests of proper planning.
20/01287/AGRIC Determination prior approval not required 08.10.2020 Delegated Decision
Mr Fairley Proposed agricultural reservoir.
New Hall Clacton Road Horsley Cross Manningtree Essex CO11 2NU
Ramsey & Parkeston Parish Council No Determinations St Osyth Parish Council
20/01094/COUNOT Determination prior approval not required 05.10.2020 Delegated Decision
Mr William Timmis - Primal Combat Academy
Change of use of barn to D2 Assembly and Leisure - with the intention of use as a Martial Arts gym.
Norwood Lodge Barn Bentley Road Weeley Clacton On Sea Essex CO16 9BX
01 Development must begin within a period of 3 years starting with the prior approval date.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
20
Decisions for the Week Ending 9th October 2020
02 Prior to commencement of the hereby approved use full details of operating times and any proposed measures such as sound insulation to reduce noise from the Martial Arts gym shall have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details which shall remain/be maintained for the lifetime of the use.
Reason - To ensure that nearby noise sensitive premises do not suffer a loss of amenity. Tendring Parish Council No Determinations Thorpe-le-Soken Parish Council
20/01233/TPO Approval - Full 05.10.2020 Delegated Decision
Yew Tree - Reduce height by 1m.
Hollies New Thorpe Avenue Thorpe Le Soken Clacton On Sea Essex CO16 0LP
01 The work should be undertaken before the expiration of 2 years from the date of this
permission. 02 All work authorised by this consent shall be undertaken in a manner consistent with British
Standard 3998 (2010) :-Tree Work - Recommendations or with any similar replacement standard.
Thorrington Parish Council No Determinations Weeley Parish Council
20/00525/FUL Non Determination Appeal 05.10.2020 Committee Decision
PSCS Ltd Proposed 3 bed bungalow with associated parking.
Land adjacent 3 Bentley Road Weeley Clacton On Sea Essex CO16 9DT
20/01175/FUL Application Withdrawn 08.10.2020 Delegated Decision
Mr Dan Baldwin - Friendly Homes Ltd
Variation of condition 2 of planning approval 19/01738/FUL to increase the overall length of the building by 1m to improve the internal layout.
College House Clacton Road Weeley Heath Clacton On Sea Essex CO16 9DZ
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
21
Decisions for the Week Ending 9th October 2020
Wix Parish Council No Determinations Wrabness Parish Council No Determinations