ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2. JANUARY 21, 2014. PRESENTATION TOPICS. ALLEGAN COUNTY ROAD COMMISSION INFORMATION MILLAGE HISTORY & GUIDELINES FEDERAL AID PROJECTS 2013 PROJECTS & FINANCIAL INFORMATION 2014 PROPOSED PROJECTS DISCUSSION. ALLEGAN COUNTY ROADS & BRIDGES. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ALLEGAN COUNTYPRIMARY ROAD MILLAGE

AREA 2

JANUARY 21, 2014

Page 2: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

PRESENTATION TOPICS

• ALLEGAN COUNTY ROAD COMMISSION INFORMATION

• MILLAGE HISTORY & GUIDELINES

• FEDERAL AID PROJECTS

• 2013 PROJECTS & FINANCIAL INFORMATION

• 2014 PROPOSED PROJECTS

• DISCUSSION

Page 3: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ALLEGAN COUNTY ROADS & BRIDGES

• The Allegan County Road Commission is responsible for 1,797 miles of roadway and 148 bridges

– 512 Primary Miles• 478 miles paved (3 new miles in 2014)• 34 miles gravel

– 1285 Local Miles• 634 miles paved (4.25 new miles in 2013)• 651 miles gravel (67 miles seasonal, not snow plowed)

– 148 Bridges• 49 Primary System• 99 Local System• To be classified as a bridge the structure must have a

minimum span of 20’ and can be a combination of culverts.

Page 4: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ROAD COMMISSION / LOCAL REVENUESThe Road Commission receives revenue through the Michigan Transportation Fund (MTF) from fuel tax and vehicle registrations. This revenue is used to pay for operating and maintenance costs of the roads in Allegan County including payroll, utility costs, equipment and materials, etc.. MTF rates average $2,257.84 per mile of local road and $9,520.72 per mile of primary road.

In 2012 the Road Commission’s MTF revenue was $8,233,772. Federal and State funding acquired for roads and bridges totaled $2,639,616.

The Primary Millage raised $3,104,628 and township contributions added an additional $6,164,277 for primary roads (paved shoulders) and for preventative maintenance and improvements to the local road system.

In 2012, locally raised revenues in Allegan County totaled $9,268,905 and were higher than any other road commission in the state.

Page 5: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

69 70 69 70 70 70 71 71

65

60

5653

48 4850

0

10

20

30

40

50

60

70

80

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

NUMBER OF FULL TIME EMPLOYEES

Page 6: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

6,500,000

7,000,000

7,500,000

8,000,000

8,500,000

9,000,000

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

MICHIGAN TRANSPORTATION FUNDS

2012 revenues were 0.23% over the 10 year average

Page 7: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

WINTER MAINTENANCE EXPENSES

Page 8: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

HOT MIX ASPHALT COST CHANGES

YEAR 13A INCREASE CHANGE 3C INCREASE CHANGE 4C INCREASE CHANGE2005 $27.26 $24.59 $24.992006 $34.00 $6.74 24.72% $32.84 $8.25 33.55% $33.69 $8.70 34.81%2007 $39.38 $5.38 15.82% $37.76 $4.92 14.98% $39.90 $6.21 18.43%2008 $54.72 $15.34 38.95% $46.78 $9.02 23.89% $50.21 $10.31 25.84%2009 $46.91 -$7.81 -14.27% $45.70 -$1.08 -2.31% $49.56 -$0.65 -1.29%2010 $48.33 $1.42 3.03% $49.37 $3.67 8.03% $50.47 $0.91 1.84%2011 $44.14 -$4.19 -8.67% $42.35 -$7.02 -14.22% $44.83 -$5.64 -11.17%2012 $49.82 $5.68 12.87% $48.77 $6.42 15.16% $52.21 $7.38 16.46%2013 $53.22 $3.40 6.82% $52.73 $3.96 8.12% $54.47 $2.26 4.33%

95.23% 114.44% 117.97%INCREASE FROM 2005 TO 2013

Page 9: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ALLEGAN COUNTY MILLAGE HISTORY

• A one mill tax was first collected for bridge and culvert replacement on primary roads in 1968. From 1968-1982 there were 111 bridges and culverts replaced with the millage.

• In 1982 the millage language changed from bridge and culvert replacement to primary road resurfacing.

• In 2008 the language was revised again to include “preservation and preparation” along with resurfacing.

• 2014 is the 2nd year in the current six year millage. The millage renewal was approved in 2012 with a change from a five year period to a six year period to allow for renewal dates to coincide with regular elections.

Page 10: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

FINANCIAL GUIDELINES

• The millage revenue is split equally between six areas, each area containing four townships.

• About 30% of the tax collected is distributed to the cities and villages in Allegan County.

• The expenses and revenues for each area are carried through from year to year. This allows for larger projects resulting in lower costs through efficiency of scale.

• If the township agrees to pave existing gravel shoulders on the project, they are responsible for the cost of 2” of the asphalt times the width of the shoulder at the contracted unit price.

• The Road Commission develops a proposed plan for projects and meets with each area annually to discuss the proposal and review the previous year’s projects.

Page 11: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

SIX MILLAGE AREAS

Page 12: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

BRIDGES & CULVERTS REPLACED WITH MILLAGE 1968-1982

Page 13: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

RESURFACING MILLAGE PROJECT TOTALS 1983-2013

• From 1983-2013 the millage has raised $54,241,725 which has funded:

- 575.57 miles of paving (12.75 in 2013).*Some roads have been resurfaced multiple times.

- 54.84 miles of chip seal & fog coat (6.45 in 2013)

- 9.73 miles of crack sealing (2013)

- 11 large culvert replacements (0 in 2013)

• In 2013, four projects used millage funds to provide the local match for State and Federal funding.

Page 14: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ALL SEASON ROUTES

Page 15: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

FEDERAL & STATE AID PROJECTS

Page 16: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

PASER RATING GUIDLINESSurface Rating Visible Distress General Condition /

Treatment Measures 10 Excellent None New construction 9 Excellent None Recent overlay, like new. 8 Very Good No longitudinal cracks except reflection of paving joints.

Occasional transverse cracks, widely spaced (40' or greater).

Recent sealcoat or new road mix. Little or no maintenance required.

7 Good Very slight or no raveling, surface shows some traffic wear.

Longitudinal cracks (open 1/4") spaced due to reflection or paving joints.

Transverse cracks (open 1/4") spaced 10 feet or more apart, little or slight crack raveling.

No patching or very few patches in excellent condition.

First signs of aging. Maintain with routine crack filling.

6 Good Slight raveling (loss of lines) and traffic wear.

Longitudinal cracks (open 1/4" - 1/2") due to reflection and paving joints.

Transverse cracking (open 1/4" - 1/2") some spaced less than 10 feet.

Slight to moderate flushing or polishing.

Occasional patching in good condition.

Show signs of aging, sound structural condition. Could extend life with sealcoat.

5 Fair Moderate to severe raveling (loss of lines and coarse aggregate).

Longitudinal cracks (open 1/2") show some slight raveling and secondary cracks. First signs of longitudinal cracks near wheel path or edge.

Transverse cracking and first signs of block cracking. Slight crack raveling (open 1/2").

Extensive to severe flushing or polishing.

Some patching or edge wedging in good condition.

Surface aging, sound structural condition. Needs sealcoat or non-structural overlay.

4 Fair Severe surface raveling.

Multiple longitudinal and transverse cracking with slight raveling.

Block cracking (over 25 - 50% of surface).

Patching in fair condition.

Slight rutting or distortions (1" deep or less).

Significant aging and first signs of need for strengthening. Would benefit from recycling or overlay.

3 Poor Closely spaced longitudinal and transverse cracks often showing raveling and crack erosion.

Block cracking over 50% of surface.

Some alligator cracking (less than 25% of surface).

Patches in fair to poor condition.

Moderate rutting or distortion (1" or 2" deep).

Occasional potholes.

Need patching and major overlay or complete recycling.

2 Very Poor Alligator cracking (over 25% of surface).

Severe distortions (over 2" deep).

Extensive patching in poor condition.

Potholes.

Severe deterioration. Need reconstruction with extensive base repair.

1 Failed Severe distress with extensive loss of surface integrity. Failed. Needs total reconstruction.

Note: Individual pavements will not have all of the types of distress listed for any particular rating. They may have only one or two types.

Page 17: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

LATEST SURFACE RATINGS

Page 18: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

2013 PROJECTS

Page 19: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

MACC $119,389.61ACRCSaugatuck $9,315.00ACRC $6,141.36

SUB-TOTAL AREA 1 2.40 $173,094.02 $307,939.99Heath $150,000.00STP $972,190.00State D $104,390.002014 Millage $250,000.00ACRC $100,000.00

ACRC $772.97

SUB-TOTAL AREA 2 3.55 $318,859.81 $1,896,212.78

ACRC $80,609.76

3 2013 Wayland Patterson Road - North of M-179 Mill and Fill west lane N/A $7,795.53 $7,795.53

SUB-TOTAL AREA 3 6.81 $746,596.86 $827,206.62Ganges $46,500.00

ACRC $179,956.18

4 2013 Casco 102nd Avenue - 66th Street to 56th Street Crack, Chip Seal and Fog Coat 4.95 $157,818.42 $157,818.42

SUB-TOTAL AREA 4 6.28 $557,818.42 $784,274.60Small Urban $120,000.00

ACRC $20,000.00Cheshire $24,144.00

ACRC $1,341.01Cheshire $17,927.00Trowbridge $26,353.00ACRC $43,270.83

SUB-TOTAL AREA 5 6.34 $532,524.83 $785,560.67

ACRC $452.70

ACRC $21,450.12

SUB-TOTAL AREA 6 5.81 $611,678.59 $633,581.41GRAND TOTAL 31.19 $2,940,572.53 $2,294,203.54 $5,234,776.07

5 2013 Trowbridge 102nd Avenue - West of 26th Street Mill and Fill spot paving N/A $15,591.06 $15,591.06

Wayland 124th Avenue - 7th Street to Patterson Road Crack Seal 3.28 $10,784.00 $10,784.00

1 2013 Saugatuck Blue Star Highway - North of M-89 Mill and Fill west lane N/A $7,795.53 $7,795.53

$10,784.00 $10,784.00

Hopkins $808,627.09

$80,609.76

$366,496.68

5 2013 Cheshire 42nd Street - 102nd Avenue to 104th AvenueTop Course 28' wide HMA, 4C - 275#/syd 2' wide gravel shoulders

3 2013

$451,788.59

$1,577,352.97

$170,556.12

1 2013 Fillmore56th Street - 141st Avenue to Holland City

LimitsTop Course 32' wide HMA - 220 #/syd 2' wide topsoil shoulders 1.01 $33,742.69 $153,132.30

2

1

$134,845.97

$1,826,580.00Heath 38th Street - 128th Avenue to 134th Avenue

2013 SaugatuckLakeshore Drive & 130th Avenue - Washout

to Douglas City LimitsTop Course 24-28' wide HMA - 275 #/syd 2' wide topsoil shoulders 1.39 $131,555.80 $147,012.16

Federal Aid Reconstruction - Local Match (2013 & 2014) 3.00 $250,000.00

2 2013 Heath Taft Road - 124th Avenue to M-40Crush and Shape Base Course, 24' wide HMA - 165 #/syd Top Course, 24' wide HMA - 165 #/syd

5

$68,859.81

6 MartinMill and Fill Leveling Course, HMA - 220 #/syd Top Course, HMA - 220 #/syd

2013

Cheshire 108th Street - 40th Street to 1.5 miles west

2013 30th Street - Allegan City Limits to 118th Avenue

Allegan

Cheshire

$728,017.33

1.75 $155,520.53

6 2013 Martin

$21,902.82

116th Avenue - US-131 to the Martin Village Limits

2013

$226,456.18

$253,035.84

Top Course 28' wide HMA, 4C - 275#/syd 2' wide gravel shoulders

Otsego

5 2013 102nd Avenue - 38th Street to M-40 $278,945.85

$52,467.39

6 201321st Street & Jefferson Road - 102nd Avenue to M-89

Leveling Course, 30' wide, HMA - 220#/syd Top Course, 30' wide, HMA 4C - 165#/syd 2' wide gravel shoulders

2.15

$30,000.00

$430,338.47

5 2013

124th Avenue - 7th Street to Patterson Road Crack Seal 3.28

PRIMARY ROAD RESURFACING MILLAGE FUND 2013 PROJECTS

AREA YEAR TOWNSHIP PROJECT LOCATION TYPE OF WORK MILES

4

3

68th Street - 114th Avenue to Blue Star Highway

Renovation - clearing, ditching, trench and widen Base Course, $400,000.001.33 $626,456.18

Leveling Course, 30' wide, HMA - 220#/syd Top Course, 30' wide, HMA 4C - 165#/syd 0-3' wide gravel shoulders

18th Street - 128th Avenue to 135th Avenue

2013

0.55

Ganges

MILLAGE FUND COSTS

TOTAL COSTS TOWNSHIP & OTHER CONTRIBUTIONS

2013 3.53

0.38

$170,000.00

2.47

$171,008.82

Federal Aid Resurfacing - Small Urban 0.62

$69,632.78

$52,467.39Crack, Chip Seal and Fog Coat 1.50

$181,005.54

Page 20: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

2014 PROPOSED PROJECTS

Page 21: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

AREA 22014 PROPOSED PROJECTS

Page 22: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

ACRC $10,000.00STP $448,000.00Area 2 $125,000.00

SUB-TOTAL AREA 1 4.93 $525,000.00 $1,108,000.00Heath $150,000.00STP $972,190.00State D $104,390.00ACRC $100,000.00STP $448,000.00Area 1 $125,000.00

ACRC $50,000.00

SUB-TOTAL AREA 2 8.93 $885,000.00 $2,834,580.00Crush and shape existing HMA Hopkins $20,000.00Leveling Course 28' wide HMA, 3C - 220#/sydTop Course 28' wide HMA, 4C - 220 #/syd ACRC $10,000.00Leveling Course 30' wide HMA, 3C - 220 #/syd Dorr $5,500.00Top Course 30' wide HMA, 4C - 220 #/syd

3 2014 Wayland/Martin 124th Avenue - 7th Street to Patterson RoadChip Seal and Fog Coat

3.50 $50,000.00 $50,000.00

3 2014 Wayland 135th Avenue - Wayland C.L. to Patterson Road

Chip Seal and Fog Coat 4.50 $110,000.00 $110,000.00

Dorr $29,735.00Leighton $29,735.00STP $1,123,200.00State D $118,000.00CMAQ $357,632.00FHWA ER $243,974.00ACRC $200,000.00

SUB-TOTAL AREA 3 10.38 $645,000.00 $2,782,776.00

Crush and Shape existing HMALeveling Course Top Course ACRC $10,000.00

SUB-TOTAL AREA 4 2.00 $500,000.00 $510,000.00

5 2014 Allegan / Valley / Heath

Dumont Road/124th Avenue - M-89 to 122nd Avenue Crack Seal

3.25$20,000.00 $20,000.00

Allegan $18,000.00

ACRC $10,000.00Cheshire $14,500.00

ACRC $10,000.00SUB-TOTAL AREA 5 8.00 $390,000.00 $442,500.00

Otsego $27,000.00

ACRC $15,000.00

ACRC $10,000.00

6 2014 Martin / Wayland 124th Avenue - 7th Street to Patterson RoadChip Seal and Fog Coat

3.50 $50,000.00 $50,000.00

Small Urban $76,404.00

SUB-TOTAL AREA 6 6.86 $625,000.00 $753,404.00GRAND TOTAL 41.10 $3,570,000.00 $4,861,260.00 $8,431,260.00

3 2014

$260,000.00

$1,949,580.00

$300,000.00

Dorr / Leighton Division Street - 1,000' south of 146th Avenue to the Kent County Line

Federal Aid Reconstruction - Local Match 1.19 $200,000.00 $2,302,276.00

4 2014 CascoBlue Star Highway - N. Shore Drive to 1.0 mile north

5 2014 Allegan 33rd Street - 122nd Avenue north to end Top Course 30' wide HMA, 4C - 275#/syd

2014 Fillmore 48th Street - 136th Avenue to 142nd Avenue Federal Aid resurfacing - MACC 2.93 $125,000.00 $698,000.00

$25,000.00 $101,404.00

Hopkins $260,000.00

$2,137,776.00

$174,500.00

$100,000.00

$342,000.00

$10,000.00

$148,000.00

$375,000.00 $385,000.00

2014 Saugatuck Blue Star Highway - Saugatuck C.L. to I-196 Joint Repair N/A $150,000.00 $150,000.00

2

1

$583,000.00

$1,576,580.00Heath 38th Street - 128th Avenue to 134th Avenue

2014 Laketown 146th Avenue - 62nd Street to 60th StreetTop Course 30' wide HMA - 220 #/syd 2' wide gravel shoulders 2.00 $250,000.00 $260,000.00

Federal Aid Reconstruction - Local Match (2013 & 2014) 3.00 $250,000.00

1

2 2014 Monterey 128th Avenue - 34th Street to 30th Street Crack Seal

5

$10,000.00

6 Otsego Top Course, 26' wide, HMA, 4C - 275 #/syd 2' wide gravel shoulder

2014

2014109th/46th/108th - West township line to 1.5 miles west of 40th StreetCheshire

Cheshire

$230,000.00

0.75 $120,000.00

6 2014 Gun Plain

3.00

1.00

$128,404.00

16th Street - 108th Avenue to 112th Avenue2014

$10,000.00

$52,500.00

Top Course 28' wide HMA, 4C - 275#/syd 2' wide gravel shoulders

Gun Plain

5 2014 46th Street - 102nd Avenue to 104th Avenue $150,000.00

6 2014 Riverview Drive - Plainwell C.L. to 8th Street

Crush and Shape existing HMA surface Leveling Course, 30' wide, HMA - 220#/syd Top Course, 30' wide, HMA 4C - 220#/syd 2' wide gravel shoulders

0.73

$100,000.00

$250,000.00

10th Street - Plainwell C.L. to 106th Avenue Federal Aid resurfacing - Small Urban 0.63

2.00

1.00

Crack, Chip Seal and Fog Coat

PRIMARY ROAD RESURFACING MILLAGE FUND 2014 PROPOSED PROJECTS

AREA YEAR TOWNSHIP PROJECT LOCATION TYPE OF WORK MILES

4

3

102nd Avenue - 56th Street to 54th Street Wedge, Chip Seal and Fog Coat $125,000.001.00 $125,000.00

12th Street - 133rd Avenue to 135th Avenue

2014

2.00

Lee

MILLAGE FUND COSTS

TOTAL COSTS TOWNSHIP & OTHER CONTRIBUTIONS

2014 1.00

1

2 2014 Overisel 48th Street - 136th Avenue to 142nd Avenue 2.93 $125,000.00 $698,000.00Federal Aid resurfacing - MACC

3 2014 Dorr 146th Avenue - 18th Street to 1,000' east 0.19 $55,000.00 $60,500.00

2 2014 Monterey 30th Street - 132nd Avenue to 134th Avenue Culvert replacements, shoulder paving, resurfacing 1.00 $500,000.00 $550,000.00

Page 23: ALLEGAN COUNTY PRIMARY ROAD MILLAGE  AREA 2

AREA FUND BALANCES

1 $80,805.87 $479,705.17 $175,692.53 $384,818.512 $45,419.67 $479,705.17 $318,859.81 $206,265.033 $182,064.18 $479,705.17 $738,801.33 -$77,031.984 $116,128.84 $479,705.17 $557,818.42 $38,015.595 $147,005.59 $479,705.17 $569,401.16 $57,309.606 $174,963.78 $479,705.17 $611,678.59 $42,990.36

Totals $746,387.93 $2,878,231.02 $2,972,251.84 $652,367.11

1 $384,818.51 $487,000.00 $525,000.00 $346,818.512 $206,265.03 $487,000.00 $885,000.00 -$191,734.973 -$77,031.98 $487,000.00 $645,000.00 -$235,031.984 $38,015.59 $487,000.00 $500,000.00 $25,015.595 $57,309.60 $487,000.00 $390,000.00 $154,309.606 $42,990.36 $487,000.00 $625,000.00 -$95,009.64

Totals $652,367.11 $2,922,000.00 $3,570,000.00 $4,367.11

2013 Preliminary Balances

Area Final 2012 Balance Preliminary Revenues Preliminary Expenses Preliminary 2013 Balance

2014 Estimated Balances

Area Preliminary 2013 Balance Estimated Revenues Estimated Expenses Estimated 2014 Balance