all in one 3 sem

Upload: rokmenas01

Post on 06-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 All in one 3 sem

    1/14

    4508 2376 16

    5921200

    59216 2384 16

    5921200

    59216 2384 16

    5921200

    59216 2384 16

    592

    1200592

    4816736

    912

    736

    16

    2389.6

    10.4592

    1200592

    16 2376 16450

    1 09 7 1 81 2 1 09 0 31 85 1 21 2 8 95 4

    17988

    912

    3963

    912

    325

    9633

  • 8/3/2019 All in one 3 sem

    2/14

    DWREF.REF.

    AN

    -12(205)22

    1North1

    AN-9(205)191E

    ast1

    AN-9(205)19 2

    West1

    AN-12(205)22

    2South1

    IN IN

    IN

    IN

    IN

    IN IN

    IN IN

    IN IN

    IN IN

    ININ

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN X5 Working area200

    12m3/h3,5m/s vellocity

    IN

    IN

    IN

    IN

    IN

    X2 Canteen3151238m3/h

    ,5m/s velocity

    X16 Productionarea315mm1735 m3/h6,5 m/2 velocity

    X1 Office toilet125205m3/h

    ,5m/s

    X6 Changign rooms250783m3/h

    ,5 m/s velocity

    IN

    X2 Painting room3151720 m3/h6,5 m/s velocity

    Office area - 2062 m3/hCanteen - 2476 m3/hOffice toilet - 205 m3/hChanging rooms - 4700m3/hProd. are - 26 025 m3/hPainting room - 3441 m3/h

    Total: 38 909 m3/h

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX EX

    EX

    EX

    EX

    EX

    EX

    EX EX

    EX

    EX EX

    EXEX

    EX EX

    EXEX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    EX

    IN

    EX

    EX

    EX

    ININ

    ININ

    Working area

    281.72 m2

    Canteen68.64m2

    Changing rooms 133.2 m2

    Productionarea 1986.6m2

    EX

    X20 Productionarea3151369m3/h

    ,5m/2 velocity

    EX

    EX

    EX

    EX

    EX

    X1 Office toilet125205m3/h

    ,5m/s

    X14 Changingrooms160335m3/h

    ,5m/s velocity

    X4 Paintingroom200860m3/h6,5 m/svelocity

    X5 Canteen200

    95m3/h,5m/s velocity

    X6 Working area160343m3/h

    ,5m/s velocity

    Technical room 44.69 m2

    Painting room 86.9m2

    IN EXPipe goes up throught theechnical room ceiling up to

    factory ceiling

    All the pipes in the production areaare up to the factory ceiling. In otherrooms like changing room, canteen,working area etc. pipes goes up tothat room ceiling

    Pipe goes down into thepainting room

    Ventilation unit:AERO Modulaggregat From EXHAUSTO

    4.69 m2

    Directors office29.14 m2

    3.8 m2

    Toilet 5.7 m2

    3.7 m2

    9.39 m2

    PROJECT:

    SUBJECT:

    DRAWN BY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITYCO LLEGE

    SCHOOLOFTECHNOLOGYAND BUSINESS-

    1 : 100

    Windows and Door Factory

    Ventilation plan

    Rokas Ostasevicius

    09/28/11

    AN-11(325)25

    CAHS31

    Horsens

    AN-11(325)25

    1 : 100Groundfloor ventilation plan

    315

    315

    630

    800

    800

    800

    1000

    1000

    315

    315

    315

    315

    315

    315

    315

    315

    315

    315

    400

    400

    315

    315

    315

    315

    315

    400

    315

    315

    315

    315

    400

    315

    315

    315

    315

    315

    315

    315

    400

    500

    500

    315

    315

    400

    500

    630

    630 1000800

    200

    200

    315 315

    400

    315

    400

    400

    315

    315

    400

    500

    630

    630

    160

    160

    315

    250

    160

    1250

    400

    315

    500

    500

    630

    160

    160

    315 400 400

    400

    500

    500

    160

    160

    160

    630

    400315160

    630

    1250

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODUCED

    BY

    AN

    AUTO

    DESK

    STUDENTPRODU

    CT

    PRODUCEDBYANAUTODESKSTUDENTPRODUCT

    PR

    ODUC

    EDBYANAUTOD

    ES

    KS

    TUDENTPRO

    DUCT

  • 8/3/2019 All in one 3 sem

    3/14

    DWREF.REF.

    AN-12(205)22

    1North1

    AN-9(205)191E

    a

    st1

    AN-9(205)19 2

    West1

    AN-12(205)22

    2

    South1

    30.0

    5

    34.49 38.5

    14.6

    6

    70.5

    17.8

    4

    5

    6

    61.99

    6.0

    1

    24

    12.23

    101.52

    31.9

    5

    19.2

    9

    19.2

    5

    165.1

    8

    614.08

    Legend:

    TTS4 13.35

    Address:Sletten 41, Holstebro 7500All the dimensions are in metres.Plot area: 14219 m

    Factory area:2432 mOffice area: 427 mPlot ratio: 20% which is smaller tha

    2

    -0.145 level

    2

    2

    Perimeter drainRain water

  • 8/3/2019 All in one 3 sem

    4/14

    02 Groundfloor,terrain0

    III

    03 1 Floor3000

    IV

    05 Roof9600

    V

    00 Foundation-900

    I

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    RoofTTS9150

    V

    Office roof6000

    IV

    Food forfoudation-1200

    I

    0.000

    0.800

    6.800

    9.5989.600

    10.611

    4.657

    3.000

    2.113 2.145

    0.00

    5.217

    3.165

    -0.710

    2.652

    3.700

    1 : 50

    Detail1 SectionA-A Rokas

    Factory roof :U-valueActual: 0.15 W/m2kDemand:Fire requirementActual: R30Demand:

    ConstructionRoofing feltInsulation 150mmTTS element/Waffle plate

    AN-15(215)29

    AN(210 01)21

    Factory floor:U-value

    Actual: 0,15W/m2kDemand:Fire requirementActual: EI30Demand:Construction

    Concrete slab 100mmRadon barrierInsulation 150mm

    Office U-valueActual:DemanFire reqActual:Deman

    Office external wall:U-valueActual: 0,15 W/m2kDemand:Fire requirementsActual: R30Demand:

    Construction12.5 mm Gypsum12.5 mm OSB plate45 mm insulation45x45 mm battensDPM250 mm insulation45x250 mm rafterRoof anchorWindboard

    Distance strips/ventilationExterior cladding

    Factory external wall:U-valueActual: 0,25 w/m2kDemand:Fire requirementActual: R30Demand:

    ConstructionOutter concrete layer 100mmInsulation 200mmConcrete 150mm

    OfficU-vaActuaDemFire rActuaDem

  • 8/3/2019 All in one 3 sem

    5/14

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031 Floor3000

    IV031Floor3000

    IV

    V

    363

    3400

    100.0002Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031Floor3000

    IV031 Floor3000

    IV

    15 16

    Section7

    ---Section7

    ---

    2250

    3400

    1812

    2142

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031 Floor3000

    IV031Floor3000

    IV

    Officeroof6000

    IVOfficeroof6000

    IV

    1000

    6184

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031 Floor3000

    IV031 Floor3000

    IV

    Officeroof6000

    IVOfficeroof6000

    IV

    2400

    6184

    PROJECT:

    SUBJECT:

    DRAWNBY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOL OF TECHNOLOGY AND BUSINESS -

    1 :2 0

    VIAWindowsandDoor Factory

    Summerywoodelementsslopingwall

    RokasOstasevicius

    11/17/11

    AN-15(205 01)40

    31

    Horsens

    AN-15(205 01)4

    1 : 20

    summery wooden elements 2

    1 : 20

    Summery wooden elements 1

    1 : 20Summery wooden elements 5

    1 : 20Summery wooden elements 4

    Number ofelements: 5

    Number of elements: 1

    Number of elements: 1

    Module 4 Module 5 Module 6

  • 8/3/2019 All in one 3 sem

    6/14

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031 Floor3000

    IV031 Floor3000

    IV

    I

    363

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031Floor3000

    IV031Floor3000

    IV

    22

    1000

    3184

    02Groundfloor,terrain0

    III02Groundfloor,terrain0

    III

    031Floor3000

    IV031 Floor3000

    IV

    1819

    2400

    3184

    1212

    1212

    02Groundfloor,t0

    III02Groundfloor,terrain0

    III

    031 Floor3000

    IV031Floor3000

    IV

    1718

    2400

    3184

    PROJECT:

    SUBJECT:

    DRAWNBY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOL OF TECHNOLOGY AND BUSINESS -

    1 :2 0

    VIAWindowsandDoor Factory

    Summerywoodelements

    RokasOstasevicius

    11/17/11

    AN-15(205 01)39

    31

    Horsens

    AN-15(205 01)3

    1 : 20

    Summery wooden elements 8

    1 : 20

    Summery wooden elements 7

    1 : 20

    Summery wooden elements 6

    1 : 20

    Summery wooden elements

    Number of elements: 1 Number of elements: 1 Number of elements: 4

    Module 1 Module 2 Module 3

  • 8/3/2019 All in one 3 sem

    7/14

    Page 1 of 2

    17.11. 2011

    Tender Application Form

    Project: VIA Windows & Doors

    Contract: Trade Contract

    Tender form: Restricted Tendering without prequalification. Invited tendering.

    The undersigned would hereby, and in accordance with the specifications and drawing of the

    tender document of 17.11.2011 offer to execute the aforementioned contract to fixed price and

    time for the following sum exclusive VAT:

    Tender sum transferred from page 2

    exclusive VAT kr. ..

    Written in kr .

    The following letter of corrections are received and are a part of the bid: no. 1 dated .

    no. 2 dated .

    no. 3 dated .

    In case you have received letters of corrections this must be stated here that you have taken this into consideration.

  • 8/3/2019 All in one 3 sem

    8/14

    Page 2 of 2

    17.11.2011

    The individual work in the contract are priced as follows:

    1. Wooden prefabricated elements

    1.1 External walls

    1.11 External walls, module 1 kr.

    1.12 External walls, module 2 kr.

    1.13 External walls, module 3 kr.

    1.14 External walls, module 4 kr.

    1.15 External walls, module 5 kr.

    1.16 External walls, module 6 kr.

    1.2 Installation of external walls

    1.21 External walls, module 1 kr.

    1.22 External walls, module 2 kr.

    1.23 External walls, module 3 kr.

    1.24 External walls, module 4 kr.

    1 25 E t l ll d l 5 k PRODUCED BY AN AUTODESK STUDENT PRODUCT

  • 8/3/2019 All in one 3 sem

    9/14

    -

    -

    --- -

    -

    -

    1

    1

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    9

    10

    10

    11

    11

    12

    12

    13

    13

    14

    14

    15

    15

    16

    16

    17

    17

    18

    18

    19

    19

    0

    0

    1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    9

    30

    30

    31

    31

    32

    32

    33

    33

    34

    34

    35

    35

    A A

    B B

    C C

    D D

    E E

    F F

    G G

    H H

    I I

    J J

    36

    36

    1 (9atc)

    2(6a)

    3 (6a)

    88(6a)

    5 (1at) 6 (2a) 7 (1at) 8 (6a) 9 (1at) 10 (2a) 11 (1at ) 12 (6a) 13 (1at ) 14 (2a) 15 (1at ) 16 (7a) 17 (1at ) 18 (2a) 19 (1at ) 0 (6a) 1 (1at) 2 (6a) 3 (1at) 4 (2a) 5 (1at) 6 (4a) 7 (3at) 8 (6a) 9 (1at) 30 (2a) 31 (1at ) 32 (6a) 33 (1at ) 34 (6a) 35 (1at ) 36 (2a) 37 (8at c)

    38(7a)

    39(6a)

    40(2a)

    41(6a)

    42(6a)

    43(6a)

    44(2a)

    45(6a)

    46(7a)

    47 (9atc)48 (2a)49 (1at)50 (6a)51 (1at)52 (2a)53 (1at)54 (6a)55 (1at)56 (6a)57 (1at)58 (7a)59 (1at)60 (6a)61 (1at)61 (6a)62 (5at)63 (6a)64 (1at)65 (2a)66 (1at)67 (6a)68 (1at)69 (2a)70 (1at)71 (6a)72 (1at)73 (2a)74 (1at)75 (7a)76 (1at)77 (2a)78 (1at)79 (6a)80 (8atc)

    87(2a)

    86(6a)

    85(6a)

    84(7a)

    83(2a)

    82(6a)

    81(6a)

    1AT 2A 3AT 4A 5AT 6A 7A 8ATC 9ATC

    PROJECT:

    SUBJECT:

    DRAWN BY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOL OF TECHNOLOGYAND BUSINESS-

    1 : 100

    VIA windows and doors

    Erection plan

    Rokas Ostasevicius

    12/25/11

    FPNx34(205)006

    31

    FPNx34(205)006

    1 : 100

    Ground Floor1

    1 : 100

    Section12

    NORTH

    WEST

    EAST

    SOUTHLayout of the elements Corner connection Temporary bracing Temporary bracing must be placeddirectly upon erection and must notbe removed until the building is stable.All elements must be equipped with double support.The support are fixed to the elements and into the floor, with bolts.

    TOTALELEMENTS: 88

    TOTALDIFFERENT ELEMENTS: 9

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    P

    RODUCED

    BY

    AN

    AUTO

    DESK

    STUDENTPRODU

    CT

    PRODUCEDBYANAUTODESKSTUDENTPRODUCT

    PR

    ODUCED

    BY

    AN

    AUTOD

    ESK

    STUDENTPRODUC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

  • 8/3/2019 All in one 3 sem

    10/14

    1AT

    500

    2384

    6500

    2A

    3001784300

    2384

    500

    1275

    5225

    500

    400

    4000

    2500

    3AT

    1984

    2384

    4A

    400

    3000

    4000

    2384

    1984

    6A

    500

    6500

    23847A

    744912728

    500

    4355

    2145

    2384

    500

    6500

    8ATC2902

    9ATC

    500

    6500

    2902

    1AT

    500

    2384

    6500

    2A

    3001784300

    2384

    500

    1275

    5225

    5AT

    500

    4387

    2113

    439 1512 433

    2384

    6A

    500

    6500

    23847A

    744912728

    500

    4355

    2145

    2384

    500

    6500

    8ATC2902

    9ATC

    500

    6500

    2902 6A

    500

    6500

    2384

    2A

    3001784300

    2384

    500

    1275

    5225

    7A

    744912728

    500

    4355

    2145

    2384

    2A

    3001784300

    2384

    500

    1275

    5225

    6A

    500

    6500

    23847A

    744912728

    500

    4355

    2145

    2384

    PROJECT:

    SUBJECT:

    DRAWN BY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOL OF TECHNOLOGY AND BUSINESS -

    1 : 50

    VIA windows and doors

    Amount of elements

    Rokas OStasevicius

    12/25/11

    FPNx34(205)005

    31

    FPNx34(205)005

    1 : 50

    1AT1

    1 : 50

    2A2

    NORTH ELEVATION

    1 : 50

    3AT3

    1 : 50

    4A4 1 : 50

    6A5 1 : 50

    7A6 1 : 50

    8 ATC7 1 : 50

    9ATC8

    15 stk 7stk 1stk 1stk 8stk 1stk 1stk 1stk

    SOUTH ELEVATION

    1 : 50

    Copy of 1AT9

    1 : 50

    Copy of 2A10

    1 : 50

    Copy of 5AT11 1 : 50

    Copy of 6A12 1 : 50

    Copy of 7A13

    1 : 50

    Copy of 8 ATC14 1 : 50

    Copy of 9ATC15

    16stk 6stk 1stk 9stk 1stk 1stk 1stk

    1 : 50

    Copy (2) of 6A16

    WEST ELEVATION

    2stk 6stk 1stk1 : 50

    Copy (2) of 2A17 1 : 50

    Copy (2) of 7A18

    EAST ELEVATION

    1 : 50

    Copy (3) of 2A19 1 : 50

    Copy (3) of 6A20 1 : 50

    Copy (3) of 7A21

    2stk 5stk 2stk

    TOTAL ELEMENTS: 88

    TOTAL DIFFERENT ELEMENTS: 9

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    P

    RODUCED

    BY

    AN

    AUTO

    DESK

    STUDENTPRODU

    CT

    PRODUCEDBYANAUTODESKSTUDENTPRODUCT

    PR

    ODUCED

    BY

    AN

    AUTOD

    ESK

    STUDENTPRODUC

    T

  • 8/3/2019 All in one 3 sem

    11/14

    7 5 5 0 1 8 0

    400

    600

    600

    600

    600

    600

    600

    600

    600

    600

    348

    230

    1200

    1200

    900

    1200

    1200

    217

    2930

    3217

    Thedistancesbetween

    pfeiferboxes

    ,

    themeasurementsaretakenfrom

    wiretowire

    .

    SPA-N-0

    6-3

    80

    SPA-1-1

    0-3

    60

    7000

    651

    6147

    202

    Totalhightoftheelement

    Totalhightoftheelement

    Thickness of different layers

    108

    252

    439

    TPA-F

    X

    liftinganchor,

    pitchingreinforcement,

    additionalreinforecement

    forpull

    A505

    Total thickness

    B

    Insulation

    Concrete

    SPA-N-06-380

    SPA-1-10-360

    TPA-FX 17,0-40

    Pitching reinforcement

    Additional reinforcement for pull

    Colour boundry

    Form impression (smooth)

    Exposed

    Rough cast

    No demand

    LEGEND:

    202

    6147

    651

    140 1052 1052 140

    90 300 3 02 3 00 602 300 90

    230

    300

    2394

    150

    2554

    300

    219

    85 1814 85Horizontal TPA-FX 17,0-40 lifting anchors

    TTS bottom cut outs

    TTS top cut outs

    SPA-N-06-380

    SPA-1-10-360

    SPA-1-1

    0-3

    60

    1680

    2788

    1679

    230

    1200

    1200

    900

    1200

    1200

    217

    VerticalTPA-F

    X17

    ,0-4

    0liftingancho

    rs

    SPA-N-0

    6-3

    80

    5177

    970

    384

    7000

    520 142 1061 142 520

    3276

    3724

    1192 1192Center of gravity Y axis

    TTScuto

    ut

    CenterofgravityXaxis

    A

    B

    384Total element width

    Totalelementhig

    ht

    Hightdifferencebetweenlayers

    A

    B

    650

    75 250 180

    505

    150

    10117

    75

    10

    0 5

    0 120 310

    75 50 180

    505

    180

    2

    50

    75

    505

    30

    53

    74

    53

    55

    45

    30

    8

    PROJECT:

    SUBJECT:

    DRAWN BY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOLOF TECHNOLOGYANDBUSINESS-

    Asindicated

    Tendering

    element drawing

    Rokas Ostasevicius

    01/03/12

    FPNx34(205)002

    31

    FPNx34(205)002

    cross section

    1 : 203

    Element

    1 : 10Details

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

  • 8/3/2019 All in one 3 sem

    12/14

    I

    455

    25

    410

    20

    101

    AN-15(2ET)35

    4

    11

    12 13 14 15 16

    17

    18

    20

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODU

    CED

    BY

    AN

    AUTO

    ESK

    STUDENTPRODUCT

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

  • 8/3/2019 All in one 3 sem

    13/14

    1

    Vof TT

    9150 V

    ANxx9(xxx)20

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRODU

    CED

    BY

    AN

    AUTO

    ESK

    STUDENTPRODUCT

    AN-15(205 01)41

  • 8/3/2019 All in one 3 sem

    14/14

    400

    13

    13

    45

    250

    13

    45

    22

    8

    4

    PROJECT:

    SUBJECT:

    DRAWN BY:

    SCALE:

    CLASS:

    DATE:

    UNIVERSITY COLLEGE

    SCHOOL OF TECHNOLOGY AND BUSINESS -

    1 : 5

    VIA Windows and Door Factory

    Connection between wooden wall elements

    Rokas Ostasevicius, Svanur Thor Brandsson

    11/17/11

    AN-15(205 01)41

    31

    Horsens

    ( )

    1 : 5

    Connection between wooden wall elements

    14

    1. 12.5 mm Gypsum2. 12.5 mm OSB plate3. 45 mm insulation4. 45x45 mm battens5. DPM6. 250 mm insulation7. 45x250 mm rafter

    8. Roof anchor9. Windboard10. Distance strips11. Exterior cladding12. Glue for wood13. Sikaflex14. ETB15. Ventilation gap16. Roof anchor

    1 2 3/4 5 67

    9

    1011

    13

    12

    15

    16