alex wyczalkowski mechanical option senior thesis presentation€¦ · senior thesis presentation....

39
alex wyczalkowski mechanical option senior thesis presentation april 15 2009

Upload: others

Post on 13-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • alex wyczalkowskimechanical option

    senior thesis presentationapril 15 2009

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    OVERVIEW

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Design Objectives

    Sustainability

    Comfort

    Economy

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Building OverviewStatsTotal SF: 50,590$11.1 million

    $219.40/SF$1.39 million mechanical cost

    $27.48/SF

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Waterside Mechanical

    VAV System

    Open Loop Ground Water Heat Transfer

    Heat Recovery Chiller

    Heating

    Boiler Added

    Cooling

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Variable Air Volume

    Conditioned Space

    AHU

    Chiller

    OA

    Return Air

    CWS

    Cooling Coil

    55F

    38F

    74F

    CWR

    52F

    36,000 CFM Variable Volume

    Conditioned Space

    AHU

    Heat Recovery Chiller

    OA

    Return Air

    HWS

    Heating Coil

    95F

    38F

    74F

    HWR

    52F

    36,000 CFM Variable Volume

    Natural Gas Boiler

    HeatingCooling

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Mechanical Redesign

    VAV

    • Variable air volume

    • Sensible and latent loads

    DOAS

    • Ventilation air• Latent loads• Radiant Panels

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Dedicated Outdoor Air SystemEnthalpy Wheel

    Conditioned Space

    DOASAHU

    Boiler Radiant Panel

    Return Air

    Hot Water

    Return Water

    Roof‐top Heat Pump

    42F

    140F

    70F

    Heat Pump

    OA

    100F

    5110 CFM Constant Volume

    Enthalpy Wheel

    Conditioned Space

    DOASAHU

    Main ChillerRadiant Panel

    OA

    Return Air

    Chilled Water

    Roof‐top Chiller

    42F

    56.5F

    74F

    Return Water 61.5F

    5110 CFM Constant Volume HeatingCooling

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Central Plant Considerations

    System SplitVentilation Air

    42F

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Central Plant Considerations

    System SplitVentilation Air

    42F

    Radiant Panels56.5F

    Boiler

    HP

    Heat Exchanger

    Ground Source Well

    Radiant Panels

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Boiler

    HP

    Heat Exchanger

    Ground Source Well

    Radiant Panels Central Plant Considerations

    System SplitVentilation Air

    42F

    Radiant Panels56.5F

    Hot Water TemperatureEfficiency vs. thermal stratificationRaise ΔT 

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    DOAS ‐ Comfort

    Proper VentilationNo mixed air

    Humidity ControlLatent and Sensible Loads Decoupled

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    DOAS ‐ Costs

    Added Costs Savings

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Piping

    Hot Water45 GPMPiping from original design adequate

    Chilled Water225 GPM

    Boiler

    HP

    Heat Exchanger

    Ground Source Well

    Radiant Panels

    Copper piping PEX Steel

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Piping

    Hot Water$9,060 savings

    Chilled Water($50,070) added

    Boiler

    HP

    Heat Exchanger

    Ground Source Well

    Radiant Panels

    Copper piping PEX Steel

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Radiant Panels

    Sensible LoadsCooling

    Interior and Perimeter42% of ceiling5°F ΔT

    HeatingPerimeter only40°F ΔT

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Radiant Panels

    Cooling17615 SF$13/SF

    Heating6,316 SF$2/SF additional

    ($241,620)

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Air Side System

    5110 CFM AHU $85,00015% of originalConstant Volume

    Enthalpy Wheel ($10,600)80% efficient

    Smaller Ductwork $15,600Terminal Unit Dampers $44,900High Induction Diffusers ($1,500)

    Conditioned Space

    AHU

    Chiller

    OA

    Return Air

    CWS

    Cooling Coil

    55F

    38F

    74F

    CWR

    52F

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    First Cost Analysis

    Total Mechanical Cost Cost/SF Redesign Savings Savings/SF

    Original $1,394,511 $27.56

    Redesign $1,537,814 $30.40 ($143,303) ($2.83)

    $0

    $50,000

    $100,000

    $150,000

    $200,000

    $250,000

    $300,000

    $350,000

    $400,000

    Original

    Diffusers

    Chiller Reduction

    FTU

    Enthalpy Wheel

    AHU

    Ductwork

    Piping

    Radiant Panels

    Redesign

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Ventilation Load Energy Savings

    Enthalpy WheelReduced load on AHU Chiller

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Ventilation Load Energy Savings

    Enthalpy WheelReduced load on AHU Chiller

    Yearly Heating: 202,000 kBTUYearly Cooling: 8,900 kBTU

    0

    20

    40

    60

    80

    100

    120

    1 3 5 7 9 11 13 15 17 19 21 23

    kBTU

    's

    Hour of Day

    January Day Ventilation Heating Load

    Original

    Redesign

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Ventilation Load Energy Savings

    0

    20

    40

    60

    80

    100

    120

    1 3 5 7 9 11 13 15 17 19 21 23

    kBTU

    's

    Hour of Day

    January Day Ventilation Heating Load

    Original

    Redesign

    15,100 kWh$1,208

    Yearly Savings

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Ventilation Load Energy Savings

    Cooling Load Peak Reduction70,640 BTU/hr

    Reduces Chiller Size5.9 Tons$5,900

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 3 5 7 9 11 13 15 17 19 21 23

    kBTU

    's

    Hour of Day

    August Day Ventilation Cooling Load

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Fan Energy

    Reduced Ventilation Air36,000 CFM  5,110 CFM

    Yearly Savings36, 130 kWh$2,890

    0

    10

    20

    30

    40

    50

    60

    kWh x 00

    0Yearly Fan Energy

    Original Redesign15730 kWh51860 kWh

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Total Yearly Savings

    $4,100 ($0.08/SF)$143,300 added cost ($2.83/SF)35 year payback

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Lighting Redesign

    Open Office Spaces

    Original

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Lighting Redesign

    Open Office Spaces

    Suspended Pendants1.02 W/SF

    Original

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Illumination from cubicle

    Task LightingSpace and Floor

    Tambient Lighting

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Illumination from cubicle

    Task LightingSpace and Floor

    Task and UplightsUplights

    Tambient Lighting

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    AGI analysis

    5 footcandles on floor30 footcandles on work plane

    Add 3W task lights

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    AGI analysis

    .50 W/SFHalf original load

    Good Ceiling Distribution

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Multiple Energy Savings

    Lighting Electricity$3,109/yr

    Cooling Load$506/yr

    Reduced Chiller Size$3400

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Adjusted Payback

    35 years  18.1 years

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Construction Phasing

    33% Unfinished Office Space

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Construction Phasing

    Large Costs ReduceRadiant PanelsPiping

    Savings UpfrontAHUChiller

    $0

    $50,000

    $100,000

    $150,000

    $200,000

    $250,000

    $300,000

    $350,000

    $400,000

    Original

    Diffusers

    Chiller Reduction

    FTU

    Enthalpy Wheel

    AHU

    Ductwork

    Piping

    Radiant Panels

    Redesign

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Construction Phasing

    Greatly Reduced First Cost$139,900  $66,100 ($1.31/SF)

    Slightly Reduced Savings$7,715  $5,170 ($0.10/SF)

    Payback12.8 years

    $0

    $50,000

    $100,000

    $150,000

    $200,000

    $250,000

    $300,000

    $350,000

    $400,000

    Original

    Diffusers

    Chiller Reduction

    FTU

    Enthalpy Wheel

    Series3

    Series2

    Series1

    Radiant Panels

    Redesign

    AHUDuctworkPiping

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Conclusions

    SustainabilityReduced Energy Usage:  1.91 kWh/SF/yr

    ComfortBetter VentilationBetter Humidity Control

    EconomyReasonable Payback: 12.8 years

  • INTRODUCTION

    DESIGN OBJECTIVES

    EXISTING CONDITIONS

    MECHANICAL REDESIGN

    ENERGY & COST ANALYSIS

    LIGHTING REDESIGN

    CONCLUSIONS

    Acknowledgements

    Thanks to:Sponsor: McKinstry

    Jon, Tom, Aaron, Erik, Phil, Bev

    Penn State FacultyProfessor Srebric and Freihaut

    Friends and FamilyBrad Sisenwain, Kanis Glaewketgarn – LightingHalina, Wojtek, Matt, Chris

  • mckinstry oregon headquarters�portland orOVERVIEWDesign ObjectivesBuilding OverviewWaterside MechanicalVariable Air VolumeMechanical RedesignDedicated Outdoor Air SystemCentral Plant ConsiderationsCentral Plant ConsiderationsCentral Plant ConsiderationsDOAS - ComfortDOAS - CostsPipingPipingRadiant PanelsRadiant PanelsAir Side SystemFirst Cost AnalysisVentilation Load Energy SavingsVentilation Load Energy SavingsVentilation Load Energy SavingsVentilation Load Energy SavingsFan EnergyTotal Yearly SavingsLighting RedesignLighting RedesignTambient LightingTambient LightingAGI analysisAGI analysisMultiple Energy SavingsAdjusted PaybackConstruction PhasingConstruction PhasingConstruction PhasingConclusionsAcknowledgementsQUESTIONS?