Alaskan Region Airport Improvement Program (AIP) FY 1982 - FY 2015
Obligated: Closed: Entitlement Discretionary TOTAL
Adak Island Adak (ADK)
3-02-0001-001-1999 3/24/1999 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $537,180 $0 $537,180
3-02-0001-002-2005 8/19/2005 5/4/2010 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
$0 $749,946 $749,946
3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Case 821 Loader & plow) (ST EQ SN)
$229,709 $0 $229,709
8/19/2005 12/19/2013 [Various Grnt] Acquire Friction Measuring Equipment (Grip Tester with tow vehicle) (ST EQ SR)
$82,080 $0 $82,080
3-02-0200-055-2006 8/17/2006 7/19/2013 [Various Grnt] Acquire Snow Removal Equipment (HS Tow Vehicle w/ Sweeper & Snow Plow) (ST EQ SN)
$641,827 $0 $641,827
3-02-0200-072-2009 9/24/2009 11/12/2014 [Various Grnt] Acquire Safety Equipment and/or Fencing Acquire Water Rescue Equipment (SA EQ RF)
$0 $100,000 $100,000
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Cupping Plow Attachment for Loader) (ST EQ SN)
$61,356 $0 $61,356
$1,552,152 $849,946 $2,402,098
Akhiok Akhiok (AKK)
3-02-0002-001-1985 9/10/1985 11/4/1988 Rehabilitate Runway 4/22 (RE RW IM) $745,899 $0 $745,899
3-02-0002-002-1994 5/27/1994 11/27/1995 Improve Snow Removal Equipment Building (ST BD SN)
$255,298 $0 $255,298
3-02-0002-003-1994 6/23/1994 9/23/1996 Acquire Snow Removal Equipment (ST EQ SN) $142,225 $0 $142,225
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
$40,000 $0 $40,000
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
$297,362 $0 $297,362
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 04/22 (Various Surface Maintenance) (RE RW IM)
$31,920 $0 $31,920
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 04/22 Akhiok Various Surface Maintenance (RE RW IM)
$85,120 $0 $85,120
$1,597,824 $0 $1,597,824
Akiachak Akiachak (Z13)
3-02-0345-001-1999 8/3/1999 8/27/2003 Conduct Airport Master Plan Study (PL PL MA) $382,101 $0 $382,101
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)
$8,512 $0 $8,512
3-02-0461-001-2009 6/12/2009 8/22/2013 Construct New Airport phase 1 (ARRA funded) (ST NA CO)
$0 $0 $0
3-02-0461-002-2010 3/25/2010 Construct New Airport Construct Airport Ph2 (ST NA CO)
$4,780,074 $7,000,000 $11,780,074
Monday, January 11, 2016 Page 1 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment Central Region Various SRE: Akiachak - Loader and Grader with Attachments (ST EQ SN)
9/27/2011 3/10/2015 $300,529 $0 $300,529
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Akiachak (Loader with Attachments) (ST EQ SN)
9/11/2012 $336,286 $0 $336,286
$5,807,502 $7,000,000 $12,807,502
Akiak Akiak (AKI)
3-02-0004-001-1998 Acquire Land for Development (ST LA DV) 5/26/1998 9/25/2002 $100,000 $0 $100,000
Acquire Snow Removal Equipment (ST EQ SN) 5/26/1998 9/25/2002 $200,000 $0 $200,000
Improve Snow Removal Equipment Building (ST BD SN)
5/26/1998 9/25/2002 $250,000 $0 $250,000
Improve Access Road (OT GT AC) 5/26/1998 9/25/2002 $196,888 $0 $196,888
Construct Taxiway (ST TW CO) 5/26/1998 9/25/2002 $160,000 $0 $160,000
Improve Runway Safety Area 03-21 (SA RW SF) 5/26/1998 9/25/2002 $477,500 $0 $477,500
Extend Runway 03-21 (ST RW IM)
Construct Apron (ST AP CO)
5/26/1998
5/26/1998
9/25/2002 $1,456,231
9/25/2002 $400,000
$0
$0
$1,456,231
$400,000
3-02-0004-002-2003 Construct Snow Removal Equipment Building (ST BD SN)
8/4/2003 8/17/2007 $571,708 $0 $571,708
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 03/21 (Various Surface Maintenance) (RE RW IM)
8/20/2009 12/19/2014 $16,031 $0 $16,031
$3,828,358 $0 $3,828,358
Akutan Akutan (KQA)
3-02-0346-001-1995 Rehabilitate Runway E/W (RE RW IM) 9/8/1995 9/25/1997 $0 $418,615 $418,615
Expand Apron (ST AP IM) 9/8/1995 9/25/1997 $0 $700,000 $700,000
Rehabilitate Apron (RE AP IM) 9/8/1995 9/25/1997 $0 $400,000 $400,000
3-02-0346-002-1999 Conduct Airport Master Plan Study (PL PL MA) 8/3/1999 9/12/2002 $74,751 $0 $74,751
3-02-0346-003-2000 Conduct Airport Master Plan Study (PL PL MA)
3-02-0346-004-2002 Conduct Airport Master Plan Study (PL PL MA)
8/24/2000
9/20/2002
8/25/2004
5/31/2006
$218,015
$0
$0
$1,197,991
$218,015
$1,197,991
3-02-0346-005-2004 Conduct Airport Master Plan Study (PL PL MA) 5/21/2004 6/26/2007 $6,459 $411,826 $418,285
3-02-0346-006-2006 Conduct Airport Master Plan Study (Phase 5, Complete EA) (PL PL MA)
9/1/2006 3/1/2011 $104,651 $0 $104,651
3-02-0005-001-2007 Construct New Airport (Environmental Studies) Phase 1 (ST NA CO)
8/8/2007 1/28/2013 $0 $986,259 $986,259
3-02-0346-007-2007 Conduct Airport Master Plan Study (PL PL MA)
3-02-0005-002-2010 Construct New Airport Phase 2 (part C) (ST NA CO)
5/22/2007
8/6/2010
7/8/2011 $291,393
12/24/2014 $9,000,000
$0
$11,000,000
$291,393
$20,000,000
3-02-0005-003-2011 Construct New Airport Phase 3 (ST NA CO) 8/25/2011 12/23/2014 $11,000,000 $0 $11,000,000
3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment Various Central Region SRE: Akutan - Grader, Plow Truck, and Loadeer with Attachments (ST EQ SN)
9/27/2011 3/10/2015 $809,474 $0 $809,474
3-02-0005-004-2012 Construct New Airport Phase 4 (ST NA CO) 6/28/2012 12/24/2014 $5,250,000 $0 $5,250,000
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Akutan (Towed Broom, Slide-in Sander, Loader with Attachments, Loader Mounted Snow-Blower) (ST EQ SN)
9/11/2012 $1,000,000 $0 $1,000,000
3-02-0005-005-2013 Construct New Airport Phase 5 (ST NA CO) 8/29/2013 12/24/2014 $5,250,000 $0 $5,250,000
3-02-0005-006-2014 Construct New Airport Phase 6 (ST NA CO) 6/10/2014 $5,250,000 $0 $5,250,000
Monday, January 11, 2016 Page 2 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0005-007-2015 Construct New Airport Phase 7 (ST NA CO) 8/5/2015 $5,000,000 $0 $5,000,000
$43,254,743 $15,114,691 $58,369,434
Alakanuk Alakanuk (AUK)
3-02-0332-001-1988 Improve Access Road (OT GT AC) 7/20/1988 8/9/1993 $100,000 $0 $100,000
Acquire Snow Removal Equipment (ST EQ SN) 7/20/1988 8/9/1993 $78,125 $0 $78,125
Construct Taxiway (ST TW CO) 7/20/1988 8/9/1993 $40,000 $0 $40,000
Construct Apron (ST AP CO) 7/20/1988 8/9/1993 $30,000 $0 $30,000
Improve Airport Drainage (ST OT IM) 7/20/1988 8/9/1993 $70,000 $0 $70,000
Improve Snow Removal Equipment Building (ST BD 7/20/1988 8/9/1993 $70,000 $0 $70,000 SN)
Install Runway Lighting (ST RW LI) 7/20/1988 8/9/1993 $111,000 $0 $111,000
Extend Runway 18/36 (ST RW IM) 7/20/1988 8/9/1993 $1,572,129 $307,543 $1,879,672
3-02-0332-002-1996 Conduct Airport Master Plan Study (PL PL MA) 9/12/1996 9/20/2000 $295,925 $0 $295,925
3-02-0440-001-2002 Construct New Airport (ST NA CO) 5/20/2002 1/24/2006 $5,596,264 $0 $5,596,264
3-02-0440-002-2007 Construct New Airport Phase 2 (Access Road & SREB) 9/6/2007 1/22/2013 $494,866 $5,885,922 $6,380,788 (ST NA CO)
3-02-0000-010-2008 Conduct aeronautical survey for WAAS approach (PL 6/13/2008 5/20/2014 $51,000 $119,870 $170,870 PL VI)
3-02-0440-003-2009 Construct New Airport Phase 3 (Subbase) (ST NA CO) 2/13/2009 1/28/2013 $2,214,959 $7,390,306 $9,605,265
3-02-0440-004-2011 Construct New Airport Phase 4 (Surfacing) (ST NA CO) 3/18/2011 12/19/2014 $4,511,963 $1,858,668 $6,370,631
$15,236,231 $15,562,310 $30,798,541
Aleknagik Aleknagik /New (5A8)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 15/33 Aleknagik 3/12/2010 12/9/2015 $38,304 $0 $38,304 Various Surface Maintenance (RE RW IM)
$38,304 $0 $38,304
Aleutians East Borough Aleutians East Borough Planning (@00H)
3-02-0804-001-2002 Conduct Metropolitan System Plan Study (PL PL ME) 8/27/2002 7/31/2006 $249,000 $0 $249,000
$249,000 $0 $249,000
Allakaket Allakaket (6A8)
3-02-0009-001-1987 Install Runway Lighting (ST RW LI) 7/28/1987 6/13/1991 $221,601 $0 $221,601
3-02-0009-002-1988 Acquire Land For Approaches (ST LA SZ) 6/30/1988 6/13/1991 $9,375 $0 $9,375
Extend Runway 17/35 (ST RW IM) 6/30/1988 6/13/1991 $116,364 $0 $116,364
Install Runway Lighting (ST RW LI) 6/30/1988 6/13/1991 $42,281 $0 $42,281
3-02-0009-003-1991 Conduct Airport Master Plan Study (PL PL MA) 9/5/1991 9/9/1997 $139,435 $0 $139,435
3-02-0009-004-1997 Construct Taxiway (ST TW CO) 6/12/1997 9/18/2001 $190,000 $0 $190,000
Install Runway Lighting (ST RW LI) 6/12/1997 9/18/2001 $256,300 $0 $256,300
Construct Runway 5/23 (ST RW CO) 6/12/1997 9/18/2001 $4,494,657 $0 $4,494,657
Improve Access Road (OT GT AC) 6/12/1997 9/18/2001 $511,080 $0 $511,080
Improve Snow Removal Equipment Building (ST BD 6/12/1997 9/18/2001 $540,000 $0 $540,000 SN)
Monday, January 11, 2016 Page 3 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0009-004-1997 6/12/1997 9/18/2001 Construct Apron (ST AP CO) $520,000 $0 $520,000
6/12/1997 9/18/2001 Acquire Land for Development (ST LA DV) $229,440 $0 $229,440
6/12/1997 9/18/2001 Acquire Land For Approaches (ST LA SZ) $70,560 $0 $70,560
3-02-0009-005-2009 6/12/2009 1/9/2012 Rehabilitate Runway 05/23 ARRA funded (RE RW IM) $0 $0 $0
3-02-0009-006-2009 8/10/2009 1/28/2013 Expand Apron expand apron (ST AP IM) $560,114 $0 $560,114
3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Allakaket (Loader with Attachments, Grader with Attachments) (ST EQ SN)
$638,922 $0 $638,922
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$70,125 $0 $70,125
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 05/23 (+08J) Various Surface Preservation Maintenance: Allakaket - Surface Repair, Dust Control (RE RW IM)
$244,921 $0 $244,921
$8,855,175 $0 $8,855,175
Ambler Ambler (AFM)
3-02-0354-001-1986 9/19/1986 12/20/1993 Improve Airport Drainage (ST OT IM) $75,000 $0 $75,000
9/19/1986 12/20/1993 Acquire Snow Removal Equipment (ST EQ SN) $81,854 $0 $81,854
9/19/1986 12/20/1993 Improve Snow Removal Equipment Building (ST BD SN)
$216,670 $0 $216,670
9/19/1986 12/20/1993 Acquire Land for Development (ST LA DV) $312,412 $0 $312,412
9/19/1986 12/20/1993 Extend Runway 18/36 (ST RW IM) $938,793 $57,910 $996,703
9/19/1986 12/20/1993 Install Runway Lighting (ST RW LI) $93,933 $0 $93,933
3-02-0354-002-1989 6/26/1989 11/16/1993 Construct Runway 9/27 (ST RW CO) $924,742 $0 $924,742
6/26/1989 11/16/1993 Improve Airport Drainage (ST OT IM) $55,014 $0 $55,014
6/26/1989 11/16/1993 Install Runway Lighting (ST RW LI) $73,186 $0 $73,186
3-02-0354-003-1991 8/21/1991 3/17/1993 Acquire Land for Development (ST LA DV) $70,437 $0 $70,437
8/21/1991 3/17/1993 Acquire Land For Approaches (ST LA SZ) $14,457 $0 $14,457
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)
$143,800 $0 $143,800
3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $300,000 $300,000
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)
$315,084 $0 $315,084
3-02-0354-004-2013 9/23/2013 Extend Runway 18/36 Phase 1 (ST RW IM) $0 $1,000,000 $1,000,000
9/23/2013 Rehabilitate Runway 09/27 (RE RW IM) $0 $3,059,764 $3,059,764
9/23/2013 Rehabilitate Runway 18/36 Rehabilitate Runway 18/36 (RE RW IM)
$0 $3,000,000 $3,000,000
3-02-0354-005-2014 7/11/2014 Extend Runway 18/36 Phase 2 (ST RW IM) $412,500 $0 $412,500
7/11/2014 Rehabilitate Runway 18/36 Phase 2 (RE RW IM) $6,574,032 $0 $6,574,032
7/11/2014 Construct Snow Removal Equipment Building (ST BD SN)
$2,437,500 $0 $2,437,500
7/11/2014 Rehabilitate Runway 09/27 Phase 2 (RE RW IM) $4,804,688 $0 $4,804,688
7/11/2014 Install Airport Beacons (SA OT VI) $100,000 $0 $100,000
7/11/2014 Rehabilitate Access Road (OT GT AC) $937,500 $0 $937,500
7/11/2014 Rehabilitate Apron Rehabilitate Apron (RE AP IM) $1,696,875 $0 $1,696,875
3-02-0354-006-2015 7/7/2015 Rehabilitate Runway 18/36 Phase 3 (RE RW IM) $1,220,000 $0 $1,220,000
7/7/2015 Rehabilitate Runway 09/27 Rehab runway ph3 (RE RW IM)
$1,217,899 $0 $1,217,899
$22,716,376 $7,417,674 $30,134,050
Monday, January 11, 2016 Page 4 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Anaktuvuk Pass Anaktuvuk Pass (AKP)
3-02-0012-001-1985 Acquire Land for Development 18/36 (ST LA DV)
3-02-0012-002-1986 Construct Apron (ST AP CO)
Acquire Land for Development (ST LA DV)
Construct Taxiway (ST TW CO)
3-02-0012-003-1998 Improve Snow Removal Equipment Building (ST BD SN)
Improve Access Road (OT GT AC)
Construct Apron (ST AP CO)
Construct Taxiway (ST TW CO)
Rehabilitate Runway 18-36 (RE RW IM)
3-02-0012-004-1999 Acquire Snow Removal Equipment (ST EQ SN)
3-02-0012-005-2003 Rehabilitate Runway 01-19 (Maintenance) (RE RW IM)
9/25/1985
9/10/1986
9/10/1986
9/10/1986
7/1/1998
7/1/1998
7/1/1998
7/1/1998
7/1/1998
8/6/1999
9/5/2003
4/17/1989 $143,577
4/9/1992 $31,826
4/9/1992 $0
4/9/1992 $16,033
9/27/2002 $561,000
9/27/2002 $325,000
9/27/2002 $602,278
9/27/2002 $50,000
9/27/2002 $2,786,000
9/5/2001 $361,932
9/17/2007 $100,000
$4,977,646
$6,455
$345,971
$194,063
$0
$0
$0
$0
$0
$0
$0
$0
$546,489
$150,032
$377,797
$194,063
$16,033
$561,000
$325,000
$602,278
$50,000
$2,786,000
$361,932
$100,000
$5,524,135
Anchorage Anchorage Float Plane Basin (+091)
3-02-0483-001-2007 Conduct Miscellaneous Study Airport Economic Options Study (PL PL MS)
7/25/2007 7/6/2011 $94,328
$94,328
$0
$0
$94,328
$94,328
Lake Hood (LHD)
3-02-0013-001-1989 Conduct Miscellaneous Study (PL PL MS)
3-02-0013-002-1990 Conduct Airport Master Plan Study (PL PL MA)
3-02-0013-003-1995 Construct Taxiway (ST TW CO)
Improve Access Road (OT GT AC)
Acquire Miscellaneous Land (ST LA MS)
Install Apron Lighting (ST AP LI)
3-02-0013-004-1996 Expand Apron (ST AP IM)
3-02-0013-005-2000 Rehabilitate Runway Lighting WE (RE RW LI)
3-02-0013-006-2001 Rehabilitate Taxiway (RE TW IM)
3-02-0013-007-2003 Improve Runway Safety Area 13/31 (SA RW SF)
3-02-0013-008-2003 Construct Apron E (Ph 1) (ST AP CO)
3-02-0013-009-2004 Construct Apron Reimbursement (ST AP CO)
3-02-0013-010-2004 Rehabilitate Taxiway (RE TW IM)
3-02-0013-011-2006 Construct Apron Phase 2 (06 EP + 05 Carryover) (ST AP CO)
Construct Apron Phase 2 (MY - Reimbursement) (ST AP CO)
3-02-0013-012-2010 Install Guidance Signs Install signage (SA OT SG)
3-02-0013-013-2010 Acquire Land for Development Land Acquisition Phase 1(C) (ST LA DV)
3-02-0013-014-2010 Improve Seaplane Base Bank stabilization, Phase 1 (ST SB CO)
3-02-0013-015-2011 Improve Seaplane Base Bank Stabilization, Phase 2 (ST SB CO)
3-02-0013-016-2011 Install Guidance Signs Install signage and lighting, Phase 2 (SA OT SG)
6/29/1989
1/25/1990
9/24/1995
9/24/1995
9/24/1995
9/24/1995
9/20/1996
9/6/2000
9/12/2001
8/26/2003
7/7/2003
6/2/2004
8/27/2004
7/14/2006
7/14/2006
9/23/2010
6/15/2010
9/16/2010
3/15/2011
9/15/2011
9/30/1997 $165,000
9/9/1997 $42,595
7/19/2000 $365,625
7/19/2000 $221,250
7/19/2000 $590,356
7/19/2000 $62,813
9/17/2001 $455,693
9/9/2003 $788,493
8/3/2004 $632,386
2/14/2007 $0
7/27/2007 $2,349,000
8/23/2007 $1,532,210
5/27/2008 $0
10/18/2011 $1,891,416
10/18/2011 $1,000,000
3/24/2015 $28,771
3/7/2013 $1,352,145
12/10/2015 $1,644,483
$1,000,000
3/10/2015 $0
$0
$0
$0
$0
$0
$0
$39,367
$511,562
$0
$729,786
$0
$0
$1,585,867
$0
$303,599
$626,037
$0
$0
$1,044,510
$690,140
$165,000
$42,595
$365,625
$221,250
$590,356
$62,813
$495,060
$1,300,055
$632,386
$729,786
$2,349,000
$1,532,210
$1,585,867
$1,891,416
$1,303,599
$654,809
$1,352,145
$1,644,483
$2,044,510
$690,140
Monday, January 11, 2016 Page 5 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0013-017-2011 9/15/2011 Acquire Land For Approaches Wendy's Way- RPZ phase 2 (ST LA SZ)
$0 $4,099,250 $4,099,250
3-02-0013-019-2012 6/25/2012 3/11/2013 Install Guidance Signs Phase 3 (SA OT SG) $143,299 $0 $143,299
3-02-0013-020-2014 8/15/2014 Update Airport Master Plan Study Update MP (PL PL MA)
$1,038,230 $0 $1,038,230
3-02-0013-021-2015 5/27/2015 Rehabilitate Apron LHD Rehabilitate General Aviation Aprons: Alpha Parking and Bravo Parking (RE AP IM)
$2,044,369 $4,709,645 $6,754,014
$17,348,134 $14,339,763 $31,687,896
Merrill Field (MRI)
3-02-0015-001-1982 9/29/1982 7/9/1986 Expand Apron (ST AP IM) $1,563,946 $0 $1,563,946
3-02-0015-002-1983 9/28/1983 4/28/1988 Install Runway Lighting (ST RW LI) $102,807 $0 $102,807
9/28/1983 4/28/1988 Acquire Snow Removal Equipment (ST EQ SN) $140,625 $0 $140,625
9/28/1983 4/28/1988 Acquire Land for Development (ST LA DV) $2,019,150 $3,408 $2,022,558
3-02-0015-003-1984 9/21/1984 5/5/1988 Expand Apron 15/33 (ST AP IM) $667,939 $54,587 $722,526
9/21/1984 5/5/1988 Install Apron Lighting (ST AP LI) $30,000 $0 $30,000
3-02-0015-004-1984 9/26/1984 5/10/1988 Improve Access Road (OT GT AC) $528,951 $38,738 $567,689
9/26/1984 5/10/1988 Improve Access Road (OT GT AC) $443,109 $30,000 $473,109
9/26/1984 5/10/1988 Improve Access Road (CA GT AC) $989,955 $0 $989,955
3-02-0015-005-1985 7/3/1985 5/16/1988 Rehabilitate Apron 6/24 (RE AP IM) $328,125 $0 $328,125
7/3/1985 5/16/1988 Acquire Snow Removal Equipment (ST EQ SN) $84,376 $0 $84,376
7/3/1985 5/16/1988 Rehabilitate Apron 6/24 (RE AP IM) $1,667,793 $48,941 $1,716,734
7/3/1985 5/16/1988 Acquire Security Equipment 6/24 (SA EQ SE) $140,625 $0 $140,625
3-02-0015-006-1986 6/9/1986 5/12/1988 Expand Apron (ST AP IM) $184,720 $4,746 $189,466
6/9/1986 5/12/1988 Expand Apron (ST AP IM) $2,731,977 $74,354 $2,806,331
6/9/1986 5/12/1988 Rehabilitate Taxiway Lighting (RE TW LI) $82,199 $0 $82,199
3-02-0015-007-1987 1/13/1987 2/19/1987 Acquire Land for Development 13/31 (ST LA DV) $2,130,133 $0 $2,130,133
3-02-0015-008-1987 9/23/1987 3/6/1990 Acquire Snow Removal Equipment (ST EQ SN) $338,572 $0 $338,572
9/23/1987 3/6/1990 Acquire Land for Development (ST LA DV) $973,573 $2,100,082 $3,073,655
3-02-0015-009-1988 7/20/1988 8/2/1991 Construct Taxiway (CA TW CO) $23,437 $0 $23,437
7/20/1988 8/2/1991 Expand Apron (CA AP EX) $35,437 $0 $35,437
7/20/1988 8/2/1991 Rehabilitate Runway 15/33 (RE RW IM) $946,047 $150,008 $1,096,055
7/20/1988 8/2/1991 Install Apron Lighting (ST AP LI) $23,000 $0 $23,000
7/20/1988 8/2/1991 Extend Taxiway (CA TW EX) $103,125 $0 $103,125
7/20/1988 8/2/1991 Improve Access Road (CA GT AC) $792,415 $0 $792,415
3-02-0015-010-1989 6/7/1989 10/13/1992 Conduct Noise Compatibility Plan Study (EN PL NO) $290,625 $0 $290,625
3-02-0015-011-1989 9/13/1989 12/16/1992 Acquire Land for Development (ST LA DV) $171,281 $0 $171,281
9/13/1989 12/16/1992 Acquire Miscellaneous Land (ST LA MS) $152,062 $0 $152,062
9/13/1989 12/16/1992 Noise Mitigation Measures for Public Buildings (EN PB 75)
$50,719 $17,619 $68,338
3-02-0015-012-1990 9/21/1990 12/17/1991 Acquire Land for Development (ST LA DV) $70,312 $0 $70,312
3-02-0015-013-1991 9/11/1991 9/28/1993 Rehabilitate Apron (RE AP IM) $455,963 $0 $455,963
9/11/1991 9/28/1993 Construct Apron (ST AP CO) $568,464 $204,808 $773,272
9/11/1991 9/28/1993 Acquire Security Equipment (SA EQ SE) $340,963 $0 $340,963
3-02-0015-014-1992 8/7/1992 8/13/1992 Acquire Land For Approaches (ST LA SZ) $863,273 $0 $863,273
3-02-0015-015-1993 2/17/1993 10/24/1998 Install Apron Lighting (ST AP LI) $27,163 $0 $27,163
2/17/1993 10/24/1998 Remove Obstructions (ST OT OB) $281,250 $0 $281,250
3-02-0015-016-1994 6/17/1994 12/28/1994 Acquire Land For Approaches (ST LA SZ) $1,840,808 $0 $1,840,808
3-02-0015-017-1995 8/1/1995 7/14/1999 Remove Obstructions (ST OT OB) $0 $500,625 $500,625
8/1/1995 7/14/1999 Acquire Snow Removal Equipment (ST EQ SN) $0 $187,500 $187,500
Monday, January 11, 2016 Page 6 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0015-017-1995 Acquire Security Equipment (SA EQ SE) 8/1/1995 7/14/1999 $0 $126,250 $126,250
Install Guidance Signs (SA OT SG) 8/1/1995 7/14/1999 $0 $171,065 $171,065
3-02-0015-018-1996 Rehabilitate Taxiway (RE TW IM) 9/19/1996 7/24/2000 $1,050,131 $0 $1,050,131
Improve Access Road (OT GT AC) 9/19/1996 7/24/2000 $125,000 $0 $125,000
Rehabilitate Apron (RE AP IM) 9/19/1996 7/24/2000 $1,325,000 $0 $1,325,000
3-02-0015-019-1996 Acquire Snow Removal Equipment (ST EQ SN) 9/19/1996 1/25/2000 $374,041 $0 $374,041
3-02-0015-020-1996 Conduct Airport Master Plan Study (PL PL MA) 9/19/1996 9/21/2000 $448,907 $0 $448,907
3-02-0015-021-1996 Acquire Land for Development (ST LA DV) 9/19/1996 6/8/2000 $166,712 $0 $166,712
3-02-0015-022-1997 Acquire Snow Removal Equipment (ST EQ SN) 6/6/1997 1/25/2000 $434,650 $0 $434,650
3-02-0015-023-1997 Improve Access Road (OT GT AC) 9/22/1997 9/21/2001 $57,079 $0 $57,079
Rehabilitate Taxiway (RE TW IM) 9/22/1997 9/21/2001 $50,729 $0 $50,729
Rehabilitate Runway Lighting 6-24 (RE RW LI) 9/22/1997 9/21/2001 $98,190 $0 $98,190
Install Runway Vertical/Visual Guidance System (ST 9/22/1997 9/21/2001 $13,125 $0 $13,125 RW VI)
Install Apron Lighting (ST AP LI) 9/22/1997 9/21/2001 $28,417 $0 $28,417
Construct Taxiway (ST TW CO) 9/22/1997 9/21/2001 $64,242 $0 $64,242
Improve Runway Safety Area 24 (ST RW SF) 9/22/1997 9/21/2001 $62,366 $0 $62,366
3-02-0015-024-1997 Acquire Land for Development (ST LA DV) 9/22/1997 9/21/2000 $204,870 $0 $204,870
3-02-0015-025-1998 Construct Taxiway (ST TW CO) 3/24/1998 9/27/2002 $78,125 $400,000 $478,125
Install Miscellaneous NAVAIDS (SP OT IN) 3/24/1998 9/27/2002 $150,000 $0 $150,000
Rehabilitate Runway Lighting 6-24 (RE RW LI) 3/24/1998 9/27/2002 $0 $600,000 $600,000
Improve Runway Safety Area 6-24 (SA RW SF) 3/24/1998 9/27/2002 $300,000 $53,364 $353,364
3-02-0015-026-1998 Acquire Snow Removal Equipment (ST EQ SN) 6/26/1998 9/5/2001 $234,375 $0 $234,375
Install Perimeter Fencing (ST EQ SE) 6/26/1998 9/5/2001 $299,306 $0 $299,306
3-02-0015-027-1999 Install Perimeter Fencing (ST EQ SE) 3/25/1999 9/8/2003 $0 $300,000 $300,000
Rehabilitate Taxiway (RE TW IM) 3/25/1999 9/8/2003 $300,000 $497,387 $797,387
3-02-0015-028-1999 Construct Runway (ST RW CO) 3/25/1999 9/27/2002 $293,646 $39,847 $333,493
3-02-0015-029-2000 Acquire Snow Removal Equipment (ST EQ SN) 6/20/2000 8/31/2001 $152,362 $0 $152,362
3-02-0015-030-2000 Construct Taxiway (ST TW CO) 7/31/2000 8/26/2004 $0 $847,500 $847,500
Install Perimeter Fencing (ST EQ SE) 7/31/2000 8/26/2004 $262,500 $420,589 $683,089
3-02-0015-031-2000 Install Perimeter Fencing (ST EQ SE) 9/8/2000 4/30/2004 $18,750 $437,816 $456,566
3-02-0015-032-2001 Improve Access Road (OT GT AC) 8/17/2001 5/3/2004 $1,517,199 $0 $1,517,199
3-02-0015-033-2001 Install Perimeter Fencing (ST EQ SE) 8/17/2001 5/3/2004 $0 $89,227 $89,227
3-02-0015-034-2001 Construct Runway (ST RW CO) 9/13/2001 2/24/2005 $1,424,640 $0 $1,424,640
3-02-0015-035-2002 Rehabilitate Taxiway C (RE TW IM) 8/13/2002 6/24/2005 $578,000 $0 $578,000
Security Enhancements (ST EQ SE) 8/13/2002 6/24/2005 $243,000 $550,000 $793,000
Rehabilitate Apron (RE AP IM) 8/13/2002 6/24/2005 $119,000 $40,514 $159,514
3-02-0015-037-2003 Install Guidance Signs (RSAT recommendations) (SP 8/21/2003 7/27/2007 $0 $563,358 $563,358 OT SG)
3-02-0015-038-2003 Rehabilitate Taxiway (RE TW IM) 8/7/2003 1/12/2007 $1,208,834 $0 $1,208,834
3-02-0015-039-2004 Security Enhancements (SA EQ SE) 7/23/2004 3/12/2007 $0 $1,042,500 $1,042,500
Expand Apron (ST AP IM) 7/23/2004 3/12/2007 $1,000,000 $179,029 $1,179,029
3-02-0015-036-2005 Extend Taxiway (RSAT Recommendation) (ST TW IM) 5/24/2005 7/1/2008 $0 $1,060,000 $1,060,000
Security Enhancements (RSAT Recommendations) (ST 5/24/2005 7/1/2008 $0 $1,155,163 $1,155,163 EQ SE)
Rehabilitate Runway 06/24 (RE RW IM) 5/24/2005 7/1/2008 $1,000,000 $1,092,500 $2,092,500
3-02-0015-040-2006 Acquire Snow Removal Equipment (ST EQ SN) 8/4/2006 5/6/2010 $525,464 $0 $525,464
3-02-0015-041-2006 Security Enhancements (RSAT Recommendations, 8/21/2006 6/16/2008 $500,000 $286,631 $786,631 Phase 2) (ST EQ SE)
Rehabilitate Apron Phase 1 (block 5) (RE AP IM) 8/21/2006 6/16/2008 $927,100 $0 $927,100
Monday, January 11, 2016 Page 7 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0015-042-2007 Rehabilitate Apron Phase 2 (block 5) (RE AP IM) 5/22/2007 6/13/2011 $1,000,000 $1,036,000 $2,036,000
Acquire Equipment (Public Address System) (ST EQ 5/22/2007 6/13/2011 $0 $264,696 $264,696 MS)
3-02-0015-043-2007 Construct Taxiway Phase 1 (Land Acquis.) (ST TW CO) 6/28/2007 6/3/2010 $1,528,788 $0 $1,528,788
3-02-0015-044-2008 Rehabilitate Apron Block 5 (phase 3), Charlie South 6/12/2008 6/4/2012 $2,546,000 $29,567 $2,575,567 (RE AP IM)
3-02-0015-045-2008 Install Runways Incursion Caution Bars Runway VPD 9/8/2008 3/7/2013 $244,129 $0 $244,129 barrier gate and warning light upgrades, phase 1 (SP OT SG)
3-02-0015-046-2009 Rehabilitate Apron Apron Rehabilitation - ARRA Funded 5/1/2009 1/18/2011 $0 $0 $0 (RE AP IM)
3-02-0015-047-2009 Rehabilitate Apron Block 5 (phase 4) (RE AP IM) 5/1/2009 3/26/2012 $1,794,066 $0 $1,794,066
Install Runways Incursion Caution Bars Runway VPD 5/1/2009 3/26/2012 $250,000 $0 $250,000 barrier gate and warning lights upgrades, phase 2 (SP OT SG)
3-02-0015-048-2009 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 8/18/2009 3/29/2011 $0 $0 $0 Phase 1 (ARRA funded) (RE TW IM)
3-02-0015-049-2010 Acquire Snow Removal Equipment Acquire SRE (part 6/7/2010 7/3/2013 $83,896 $569,704 $653,600 C) (ST EQ SN)
3-02-0015-050-2010 Install Runway Vertical/Visual Guidance System 16/34 3/15/2010 8/22/2013 $250,000 $0 $250,000 Replace Rwy 34 non-fed PLASI with non-fed PAPI (ST RW VI)
Rehabilitate Runway 16/34 Rehab. runway (RE RW IM) 3/15/2010 8/22/2013 $274,346 $2,861,218 $3,135,564
3-02-0015-051-2010 Acquire Land For Approaches Acquire Land (ST LA SZ) 7/16/2010 11/5/2014 $298,551 $0 $298,551
3-02-0015-052-2010 Remove Obstructions Remove structure and 8/31/2010 11/5/2014 $109,751 $0 $109,751 obstructions (ST OT OB)
3-02-0015-053-2011 Acquire Snow Removal Equipment Acquire SRE - 9/27/2011 $323,000 $0 $323,000 Replace Sweeper/Vacuum Truck (ST EQ SN)
3-02-0015-054-2011 Conduct Airport Master Plan Study Conduct Airport 8/26/2011 $608,000 $0 $608,000 Master Plan Phase I (PL PL MA)
3-02-0015-055-2011 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 6/8/2011 $2,253,400 $0 $2,253,400 Phase 2 (RE TW IM)
3-02-0015-056-2011 Acquire Safety Equipment and/or Fencing Fencing, 9/9/2011 $392,000 $157,100 $549,100 Signage, Lighting (VPD reduction) (SA EQ RF)
3-02-0015-057-2012 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 5/17/2012 $1,000,000 $1,437,500 $2,437,500 Phase 3 (RE TW IM)
3-02-0015-058-2012 Acquire Safety Equipment and/or Fencing Fencing, 8/27/2012 $0 $1,560,000 $1,560,000 Signage, Lighting (VPD reduction) Phase 2 (SA EQ RF)
3-02-0015-059-2013 Acquire Snow Removal Equipment (ST EQ SN) 8/8/2013 $937,500 $0 $937,500
3-02-0015-060-2013 Rehabilitate Runway Lighting 16/34 (RE RW LI) 8/27/2013 $1,012,500 $0 $1,012,500
3-02-0015-061-2014 Update Airport Master Plan Study Phase 2 (PL PL MA) 9/19/2014 $0 $600,000 $600,000
3-02-0015-062-2014 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 9/18/2014 $1,000,000 $0 $1,000,000 Phase 4 (RE TW IM)
3-02-0015-063-2015 Acquire Safety Equipment and/or Fencing Fencing, 8/5/2015 $1,000,000 $3,577,100 $4,577,100 Signage, Lighting (VPD reduction) Phase 3 (SA EQ RF)
3-02-0015-064-2015 Construct Taxiway Phase D (Land Acquis.-City Electr) 9/15/2015 $1,995,000 $0 $1,995,000 (ST TW CO)
$56,721,606 $25,461,041 $82,182,647
Ted Stevens Anchorage International (ANC)
3-02-0016-001-1984 Construct Apron (CA AP CO) 9/21/1984 11/10/1988 $2,673,731 $242,338 $2,916,069
3-02-0016-002-1985 Conduct Noise Compatibility Plan Study (EN PL NO) 9/6/1985 10/13/1992 $0 $315,274 $315,274
3-02-0016-003-1986 Rehabilitate Apron (RE AP IM) 7/30/1986 1/12/1988 $1,935,435 $0 $1,935,435
3-02-0016-004-1987 Improve Snow Removal Equipment Building (ST BD 9/16/1987 11/5/1991 $207,022 $0 $207,022 SN)
Monday, January 11, 2016 Page 8 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-004-1987 Install Runway Lighting 14/32 (SP RW LI) 9/16/1987 11/5/1991 $581,052 $0 $581,052
Install Apron Lighting 14/32 (ST AP LI) 9/16/1987 11/5/1991 $665,119 $0 $665,119
3-02-0016-005-1988 Rehabilitate Runway 6/24 (RE RW IM) 6/30/1988 1/30/1991 $1,465,371 $19,693 $1,485,064
Rehabilitate Taxiway (RE TW IM) 6/30/1988 1/30/1991 $159,317 $0 $159,317
3-02-0016-006-1989 Improve Aircraft Rescue & Fire Fighting Building (SA 8/21/1989 9/28/1995 $5,400,583 $343,111 $5,743,694 BD EX)
3-02-0016-007-1989 Rehabilitate Taxiway (RE TW IM) 9/20/1989 12/16/1992 $982,600 $0 $982,600
Construct Taxiway (CA TW CO) 9/20/1989 12/16/1992 $2,489,766 $98,705 $2,588,471
3-02-0016-008-1990 Rehabilitate Taxiway Lighting (RE TW LI) 9/5/1990 10/13/1992 $213,563 $0 $213,563
Rehabilitate Taxiway (RE TW IM) 9/5/1990 10/13/1992 $1,900,523 $0 $1,900,523
3-02-0016-009-1990 Construct Apron (CA AP CO) 7/3/1990 9/15/1994 $3,352,650 $250,056 $3,602,706
Install Apron Lighting (ST AP LI) 7/3/1990 9/15/1994 $133,557 $0 $133,557
3-02-0016-010-1990 Rehabilitate Runway 6/24 (RE RW IM) 8/31/1990 7/23/1992 $1,253,265 $0 $1,253,265
Rehabilitate Taxiway (RE TW IM) 8/31/1990 7/23/1992 $40,881 $0 $40,881
3-02-0016-011-1991 Rehabilitate Taxiway (RE TW IM) 7/15/1991 9/10/1993 $1,556,807 $86,445 $1,643,252
Rehabilitate Taxiway Lighting (RE TW LI) 7/15/1991 9/10/1993 $65,919 $0 $65,919
3-02-0016-012-1991 Install Apron Lighting (ST AP LI) 7/15/1991 2/10/1994 $36,204 $0 $36,204
Extend Taxiway (ST TW IM) 7/15/1991 2/10/1994 $1,318,313 $201,051 $1,519,364
3-02-0016-013-1991 Acquire Security Equipment (SA EQ SE) 9/5/1991 8/23/2000 $879,085 $0 $879,085
3-02-0016-014-1992 Extend Runway 06/24 (ST RW IM) 9/29/1992 12/20/1994 $218,747 $38,508 $257,255
Rehabilitate Taxiway (RE TW IM) 9/29/1992 12/20/1994 $2,312,974 $0 $2,312,974
3-02-0016-016-1992 Conduct Airport Master Plan Study (PL PL MA) 9/23/1992 1/25/2000 $449,827 $0 $449,827
3-02-0016-017-1992 Improve Access Road (OT GT AC) 9/29/1992 10/24/1998 $4,657,094 $523,567 $5,180,661
Improve Snow Removal Equipment Building (ST BD 9/29/1992 10/24/1998 $225,000 $0 $225,000 SN)
3-02-0016-018-1992 Improve Access Road (OT GT AC) 7/29/1992 5/12/2000 $796,406 $34,853 $831,259
3-02-0016-015-1993 Improve Airport Drainage (ST OT IM) 7/26/1993 6/12/2000 $256,365 $0 $256,365
3-02-0016-019-1993 Rehabilitate Taxiway (RE TW IM) 6/28/1993 9/26/1996 $1,991,114 $282,791 $2,273,905
3-02-0016-020-1993 Install Guidance Signs (SA OT SG) 9/16/1993 12/6/1994 $124,797 $0 $124,797
3-02-0016-021-1993 Extend Taxiway (ST TW IM) 9/10/1993 9/25/1997 $879,484 $0 $879,484
Rehabilitate Taxiway (RE TW IM) 9/10/1993 9/25/1997 $905,681 $201,406 $1,107,087
3-02-0016-022-1993 Expand Terminal Building (CA TE EX) 8/23/1993 6/3/1999 $300,629 $0 $300,629
3-02-0016-023-1993 Expand Terminal Building (CA TE EX) 9/23/1993 9/24/1998 $2,615,832 $0 $2,615,832
3-02-0016-024-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/29/1993 4/5/2000 $275,681 $0 $275,681
3-02-0016-025-1994 Improve Access Road (OT GT AC) 7/18/1994 9/12/2000 $1,274,820 $0 $1,274,820
3-02-0016-026-1994 Rehabilitate Apron (RE AP IM) 4/21/1994 9/9/1997 $1,015,647 $0 $1,015,647
3-02-0016-027-1994 Improve Terminal Building (ST TE IM) 8/26/1994 6/7/2000 $287,062 $0 $287,062
3-02-0016-028-1994 Improve Terminal Building (ST TE IM) 8/26/1994 6/12/2000 $858,008 $0 $858,008
3-02-0016-029-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/28/1994 1/25/2000 $506,319 $0 $506,319
3-02-0016-030-1994 Improve Access Road (OT GT AC) 9/28/1994 9/12/2000 $3,062,919 $0 $3,062,919
3-02-0016-031-1994 Conduct Noise Compatibility Plan Study (EN PL NO) 9/27/1994 4/17/2000 $387,332 $0 $387,332
3-02-0016-032-1995 Rehabilitate Apron (RE AP IM) 4/3/1995 10/24/1998 $1,669,750 $0 $1,669,750
3-02-0016-033-1995 Construct Taxiway (CA TW CO) 8/3/1995 7/19/2000 $103,150 $0 $103,150
Install Runway Lighting (SA RW LI) 8/3/1995 7/19/2000 $210,000 $0 $210,000
Extend Runway 14/32 (ST RW IM) 8/3/1995 7/19/2000 $1,658,345 $2,000,000 $3,658,345
Install Apron Lighting (ST AP LI) 8/3/1995 7/19/2000 $190,000 $0 $190,000
Extend Runway 14/32 (ST RW IM) 8/3/1995 7/19/2000 $787,689 $0 $787,689
3-02-0016-035-1996 Rehabilitate Apron (RE AP IM) 4/8/1996 7/15/1998 $1,876,169 $0 $1,876,169
3-02-0016-036-1996 Construct Taxiway (ST TW CO) 8/7/1996 4/18/2000 $0 $1,271,504 $1,271,504
Construct Taxiway (ST TW CO) 8/7/1996 4/18/2000 $1,156,000 $0 $1,156,000
Monday, January 11, 2016 Page 9 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-036-1996 Improve Runway Safety Area 6L (ST RW SF) 8/7/1996 4/18/2000 $1,104,500 $0 $1,104,500
Install Apron Lighting (ST AP LI) 8/7/1996 4/18/2000 $0 $675,000 $675,000
Install Apron Lighting (ST AP LI) 8/7/1996 4/18/2000 $0 $175,000 $175,000
3-02-0016-039-1996 Improve Terminal Building (ST TE IM) 9/20/1996 9/23/1998 $159,361 $0 $159,361
3-02-0016-040-1996 Extend Taxiway (ST TW IM) 7/9/1996 8/29/2000 $281,250 $1,491 $282,741
3-02-0016-037-1997 Expand Apron (ST AP IM) 4/2/1997 9/17/2001 $1,916,195 $0 $1,916,195
3-02-0016-038-1997 Extend Runway 6R/24 (ST RW IM) 12/17/1997 8/31/2001 $400,000 $0 $400,000
Extend Runway 6R/24 (ST RW IM) 12/17/1997 8/31/2001 $200,000 $2,034,988 $2,234,988
Groove Runway 6R/24L (SP RW FR) 12/17/1997 8/31/2001 $250,000 $0 $250,000
Install Apron Lighting (ST AP LI) 12/17/1997 8/31/2001 $60,000 $0 $60,000
Extend Runway 6R/24L (ST RW IM) 12/17/1997 8/31/2001 $2,055,000 $0 $2,055,000
Improve Runway Safety Area 6R/24 (ST RW SF) 12/17/1997 8/31/2001 $400,000 $0 $400,000
Rehabilitate Taxiway (RE TW IM) 12/17/1997 8/31/2001 $75,000 $0 $75,000
Install Runway Lighting (SA RW LI) 12/17/1997 8/31/2001 $500,000 $0 $500,000
Install Runway Lighting (SP RW LI) 12/17/1997 8/31/2001 $1,200,000 $0 $1,200,000
Install Runway Vertical/Visual Guidance System (ST 12/17/1997 8/31/2001 $80,000 $0 $80,000 RW VI)
3-02-0016-041-1997 Conduct Airport Master Plan Study (PL PL MA) 9/29/1997 9/26/2002 $400,000 $0 $400,000
3-02-0016-042-1998 Construct Taxiway (ST TW CO) 7/21/1998 9/26/2002 $680,000 $0 $680,000
Expand Apron (ST AP IM) 7/21/1998 9/26/2002 $143,212 $4,508,544 $4,651,756
3-02-0016-043-1998 Rehabilitate Runway 6L-24R (RE RW IM) 7/21/1998 9/26/2002 $0 $1,182,345 $1,182,345
Rehabilitate Runway 6L-24R (RE RW IM) 7/21/1998 9/26/2002 $4,038,027 $2,250,000 $6,288,027
3-02-0016-044-1998 Rehabilitate Apron (RE AP IM) 6/23/1998 9/18/2001 $924,087 $0 $924,087
3-02-0016-045-1999 Rehabilitate Runway 6L-24R (RE RW IM) 3/25/1999 9/5/2003 $1,950,000 $2,000,000 $3,950,000
3-02-0016-046-1999 Acquire Security Equipment (SA EQ SE) 3/25/1999 9/28/2001 $995,238 $0 $995,238
3-02-0016-047-1999 Improve Runway Safety Area 6L-24R (SA RW SF) 3/25/1999 9/8/2003 $534,520 $1,042,491 $1,577,011
3-02-0016-048-1999 Rehabilitate Apron (RE AP IM) 7/16/1999 9/5/2001 $405,756 $0 $405,756
3-02-0016-049-1999 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/19/1999 11/17/2006 $1,500 $902,128 $903,628 EQ RF)
3-02-0016-050-1999 Expand Apron (ST AP IM) 7/16/1999 9/26/2002 $436,222 $0 $436,222
3-02-0016-051-1999 Acquire Security Equipment (SA EQ SE) 7/26/1999 9/28/2001 $1,404,762 $0 $1,404,762
3-02-0016-052-1999 Conduct Airport Master Plan Study (PL PL MA) 8/3/1999 9/9/2003 $468,912 $0 $468,912
3-02-0016-053-1999 Rehabilitate Runway Lighting 14-32 (RE RW LI) 9/29/1999 9/8/2003 $568,615 $0 $568,615
3-02-0016-054-2000 Rehabilitate Apron (RE AP IM) 9/15/2000 8/3/2004 $1,285,239 $0 $1,285,239
3-02-0016-055-2000 Rehabilitate Runway (RE RW IM) 9/7/2000 9/9/2003 $1,950,000 $3,000,000 $4,950,000
3-02-0016-056-2000 Install Noise Monitoring System (EN OT NO) 9/14/2000 8/10/2005 $6,099 $1,235,901 $1,242,000
3-02-0016-057-2000 Rehabilitate Runway Lighting 14/32 (RE RW LI) 9/15/2000 8/27/2004 $1,837,737 $625,978 $2,463,715
3-02-0016-058-2000 Rehabilitate Taxiway (RE TW IM) 9/15/2000 8/30/2004 $3,064,000 $469,126 $3,533,126
Improve Runway Safety Area (SA RW SF) 9/15/2000 8/30/2004 $0 $550,000 $550,000
3-02-0016-059-2001 Rehabilitate Apron (RE AP IM) 4/26/2001 9/9/2005 $1,518,750 $3,500,000 $5,018,750
3-02-0016-060-2001 Rehabilitate Taxiway (RE TW IM) 9/12/2001 7/14/2005 $3,866,948 $18,384 $3,885,332
3-02-0016-061-2001 Noise Mitigation Measures (EN OT MS) 6/11/2001 8/25/2005 $0 $2,598,500 $2,598,500
3-02-0016-062-2001 Construct Taxiway (CA TW CO) 9/25/2001 8/26/2005 $7,807,106 $8,670,514 $16,477,620
3-02-0016-063-2002 Construct Apron (CA AP CO) 6/24/2002 9/6/2006 $1,518,750 $3,500,000 $5,018,750
3-02-0016-064-2002 Noise Mitigation Measures for Residences within 65 - 69 6/17/2002 8/11/2006 $0 $2,572,413 $2,572,413 DNL (EN HO 65)
3-02-0016-065-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $448,473 $448,473
3-02-0016-066-2002 Acquire Land for Noise Compatibility within 65 - 69 DNL (EN LA 65)
7/16/2002 2/21/2006 $0 $795,095 $795,095
3-02-0016-067-2002 Security Enhancements (SE SE SE) 9/19/2002 8/18/2006 $1,017,425 $6,178,704 $7,196,129
Monday, January 11, 2016 Page 10 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-068-2002 Construct Snow Removal Equipment Building Sand & 8/1/2002 8/11/2006 $2,600,000 $0 $2,600,000 Chemical Storage (ST BD SN)
3-02-0016-069-2002 Rehabilitate Runway Lighting (RE RW LI) 9/25/2002 8/18/2006 $2,800,000 $564,331 $3,364,331
3-02-0016-070-2002 Construct Taxiway (CA TW CO) 9/10/2002 1/24/2006 $5,075,000 $2,077,643 $7,152,643
3-02-0016-071-2002 Modify Terminal Building (ST TE IM) 9/17/2002 4/22/2005 $640,000 $95,655 $735,655
3-02-0016-072-2003 Rehabilitate Runway 14-32 (RE RW IM) 8/4/2003 7/27/2007 $11,042,852 $0 $11,042,852
Improve Runway Safety Area 14-32 (SA RW SF) 8/4/2003 7/27/2007 $0 $191,447 $191,447
3-02-0016-073-2003 Rehabilitate Apron (RE AP IM) 7/7/2003 9/17/2007 $0 $750,000 $750,000
Construct Apron (Concourse C) (CA AP CO) 7/7/2003 9/17/2007 $0 $2,000,000 $2,000,000
Rehabilitate Runway 6L-24R (RE RW IM) 7/7/2003 9/17/2007 $1,518,750 $0 $1,518,750
Expand Apron (CA AP EX) 7/7/2003 9/17/2007 $0 $750,000 $750,000
3-02-0016-074-2003 Construct Taxiway Y Phase 3 (LOI-2, Payment 1) (CA 7/10/2003 7/27/2007 $1,387,000 $0 $1,387,000 TW CO)
3-02-0016-075-2003 Noise Mitigation Measures for Residences within 65 - 69 8/4/2003 9/17/2007 $0 $2,350,000 $2,350,000 DNL (EN HO 65)
3-02-0016-076-2003 Security Enhancements (SA EQ SE) 8/22/2003 9/12/2007 $612,641 $5,687,438 $6,300,079
3-02-0016-077-2004 Rehabilitate Runway 6L-24R (RE RW IM) 4/6/2004 9/19/2008 $1,518,750 $0 $1,518,750
Rehabilitate Apron (RE AP IM) 4/6/2004 9/19/2008 $0 $750,000 $750,000
Construct Apron (CA AP CO) 4/6/2004 9/19/2008 $0 $2,000,000 $2,000,000
Expand Apron (CA AP EX) 4/6/2004 9/19/2008 $0 $750,000 $750,000
3-02-0016-078-2004 Construct Taxiway (CA TW CO) 4/7/2004 1/29/2008 $707,000 $2,500,000 $3,207,000
Widen Runway 6R / 24L (ST RW IM) 4/7/2004 1/29/2008 $707,000 $2,500,000 $3,207,000
3-02-0016-079-2004 Noise Mitigation Measures for Residences within 65 - 69 5/27/2004 8/18/2008 $0 $7,000,000 $7,000,000 DNL (EN HO 65)
3-02-0016-080-2004 Rehabilitate Taxiway (RE TW IM) 5/27/2004 9/23/2008 $10,526,560 $6,507,689 $17,034,249
3-02-0016-081-2004 Construct Snow Removal Equipment Building Wing (ST 7/1/2004 9/19/2008 $5,343,750 $0 $5,343,750 BD SN)
3-02-0016-082-2005 Rehabilitate Taxiway LOI #2-01 [grant 3]; DG6 Upgrade 4/27/2005 1/29/2008 $0 $4,487,875 $4,487,875 Twy K(J - Y) [pymt1] (RE TW IM)
Construct Taxiway LOI #2-01(grant 3): Construct twy Y 4/27/2005 1/29/2008 $1,443,000 $1,512,125 $2,955,125 (pymt 3) (CA TW CO)
3-02-0016-083-2005 Noise Mitigation Measures for Residences within 65 - 69 5/12/2005 4/12/2010 $0 $5,500,000 $5,500,000 DNL RSIP (phase 5), 150 homes (est.) (EN HO 65)
3-02-0016-084-2005 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/18/2005 7/20/2010 $0 $1,247,068 $1,247,068 ARFF vehicle 1 (SA EQ RF)
3-02-0016-085-2005 Construct Taxiway (ST TW CO) 6/13/2005 9/18/2009 $6,250,665 $847,147 $7,097,812
3-02-0016-086-2005 Construct Apron LOI #98-1 (grant 7): Postmark RRA 6/13/2005 4/12/2010 $1,518,750 $3,400,000 $4,918,750 (pymt 1) (CA AP CO)
3-02-0016-087-2005 Rehabilitate Taxiway Construct run-up pad (twy K) (RE 8/4/2005 3/10/2010 $1,419,648 $0 $1,419,648 TW IM)
3-02-0016-088-2005 Modify Terminal Building (Phase 1 [MYr 2]) (ST TE IM) 8/30/2005 4/15/2010 $2,989,372 $0 $2,989,372
Modify Terminal Building (Phase 1 [MYr 3]) (ST TE IM) 8/30/2005 4/15/2010 $3,403,336 $0 $3,403,336
Modify Terminal Building (Phase 1 [MYr 1]) (ST TE IM) 8/30/2005 4/15/2010 $3,358,619 $0 $3,358,619
3-02-0016-089-2005 Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 8/30/2005 4/12/2010 $3,425,476 $6,000,000 $9,425,476 phase 1 (RE TW IM)
Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 8/30/2005 4/12/2010 $2,809,524 $0 $2,809,524 phase 1; MY funds (RE TW IM)
3-02-0016-090-2006 Construct Apron LOI #98-1 (grant 8): Postmark RRA 5/17/2006 4/13/2010 $1,518,750 $3,200,000 $4,718,750 (pymt 2) (CA AP CO)
3-02-0016-091-2006 Rehabilitate Taxiway LOI #2-01 [grant 4]; DG 6 twy K(J- 5/17/2006 1/5/2012 $1,466,000 $6,000,000 $7,466,000 Y) [pymt 2] (RE TW IM)
Rehabilitate Runway 07R/25L LOI #2-01 [grant 4]; 5/17/2006 1/5/2012 $0 $2,000,000 $2,000,000 Reconst. rwy to DG6 [pymt 1] (RE RW IM)
Monday, January 11, 2016 Page 11 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-092-2006 Conduct Airport Master Plan Study phase 1 (PL PL MA) 8/3/2006 12/3/2010 $1,413,363 $0 $1,413,363
3-02-0016-093-2006 Rehabilitate Taxiway (DG6) (RE TW IM) 6/16/2006 7/12/2011 $2,870,863 $0 $2,870,863
Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 6/16/2006 7/12/2011 $1,807,115 $0 $1,807,115 phase 2 (RE TW IM)
3-02-0016-094-2006 Rehabilitate Apron Rehab gates N4 & N6 (MY phase 2) 7/14/2006 3/7/2012 $1,708,881 $0 $1,708,881 (RE AP IM)
Rehabilitate Apron Rehab gates N4 & N6 (RE AP IM) 7/14/2006 3/7/2012 $1,417,716 $0 $1,417,716
3-02-0016-095-2006 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/3/2006 7/20/2010 $661,806 $382,580 $1,044,386 ARFF vehicle 2 (SA EQ RF)
3-02-0016-096-2007 Rehabilitate Apron RON Parking 7-11 (RE AP IM) 4/26/2007 1/28/2013 $13,498,046 $3,687,743 $17,185,789
3-02-0016-097-2007 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 6/20/2007 3/10/2010 $0 $1,100,476 $1,100,476 ARFF vehicle 3 (SA EQ RF)
3-02-0016-098-2007 Noise Mitigation Measures for Residences within 65 - 69 4/26/2007 4/11/2012 $0 $4,474,230 $4,474,230 DNL RSIP (phase 6), 150 homes (est.) (EN HO 65)
3-02-0016-099-2007 Rehabilitate Apron LOI #98-1 [grant 9]; Concourse A 6/20/2007 12/20/2012 $460,000 $920,000 $1,380,000 apron (RE AP IM)
3-02-0016-100-2007 Acquire Snow Removal Equipment acquire sre (ST EQ 8/13/2007 3/10/2010 $220,941 $0 $220,941 SN)
3-02-0016-101-2008 Noise Mitigation Measures for Residences within 65 - 69 5/8/2008 4/11/2012 $0 $2,411,970 $2,411,970 DNL RSIP (phase 7), 75 homes (est.) (EN HO 65)
3-02-0016-102-2008 Rehabilitate Taxiway LOI no. 2-01 payment 5; 4/30/2008 7/22/2014 $1,000,000 $7,436,000 $8,436,000 Rehabilitate Taxiway Kilo (RE TW IM)
3-02-0016-103-2008 Modify Terminal Building Phase 2 (ST TE IM) 5/8/2008 4/15/2010 $2,494,098 $0 $2,494,098
3-02-0016-104-2008 Rehabilitate Taxiway Rehab. t/w G & E (RE TW IM) 5/8/2008 7/16/2014 $5,852,500 $0 $5,852,500
3-02-0016-105-2008 Security Enhancements replace access controls (SA 5/8/2008 2/26/2014 $2,258,224 $8,570,798 $10,829,022 EQ SE)
3-02-0016-106-2008 Update Airport Master Plan Study MP update phase 2 6/12/2008 6/29/2011 $1,204,991 $0 $1,204,991 (PL PL MA)
3-02-0016-107-2008 Acquire Snow Removal Equipment 3 runway snow 5/8/2008 7/1/2011 $1,000,000 $0 $1,000,000 plows (ST EQ SN)
3-02-0016-108-2008 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 5/8/2008 1/7/2013 $0 $1,358,899 $1,358,899 ARFF vehicle 4 (SA EQ RF)
3-02-0016-109-2008 Rehabilitate Taxiway Rehab. t/w G & E phase 2 (RE 6/17/2008 7/16/2014 $1,185,637 $0 $1,185,637 TW IM)
3-02-0016-111-2008 Rehabilitate Taxiway Rehab. t/w G & E phase 3 (RE TW IM)
8/25/2008 7/16/2014 $3,687,169 $0 $3,687,169
3-02-0016-112-2008 Modify Terminal Building Phase 3 (ST TE IM) 8/20/2008 4/15/2010 $869,008 $0 $869,008
3-02-0016-110-2009 Rehabilitate Taxiway LOI #2-01 [grant 6] (RE TW IM) 2/13/2009 7/29/2014 $1,347,279 $0 $1,347,279
3-02-0016-113-2009 Rehabilitate Apron RON 12-14 (RE AP IM) 5/28/2009 8/8/2014 $6,961,037 $3,064,461 $10,025,498
3-02-0016-114-2009 Rehabilitate Taxiway Rehab. t/w G & E phase 4 (RE 2/13/2009 7/18/2014 $2,301,238 $0 $2,301,238 TW IM)
3-02-0016-115-2009 Noise Mitigation Measures for Residences within 65 - 69 2/13/2009 4/4/2013 $0 $2,964,113 $2,964,113 DNL RSIP (phase 8), 55 homes (est.) (EN HO 65)
3-02-0016-116-2009 Modify Terminal Building Phase 4 (FY09 Phase A) (ST 2/13/2009 4/15/2010 $1,139,675 $0 $1,139,675 TE IM)
3-02-0016-117-2009 Conduct State System Plan Study (PL PL ST) 8/11/2009 7/22/2014 $937,453 $0 $937,453
3-02-0016-118-2009 Improve Aircraft Rescue & Fire Fighting Building ARFF 2/13/2009 $2,142,291 $0 $2,142,291 expansion, Phase 1 (FY09 Part A) (SA BD EX)
3-02-0016-119-2009 Acquire Snow Removal Equipment acquire SRE (ST 2/23/2009 7/12/2011 $0 $4,444,798 $4,444,798 EQ SN)
3-02-0016-120-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 2/13/2009 2/27/2012 $0 $1,143,910 $1,143,910 ARFF Truck (SA EQ RF)
3-02-0016-121-2009 Rehabilitate Apron Gate N8 Apron Rehabilitation 8/18/2009 4/11/2012 $0 $0 $0 (ARRA funded) (RE AP IM)
Monday, January 11, 2016 Page 12 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-122-2009 Improve Aircraft Rescue & Fire Fighting Building ARFF 7/2/2009 7/14/2014 $1,827,472 $1 $1,827,473 expansion, Phase 2 (FY09 Phase B) (SA BD EX)
3-02-0016-123-2009 Modify Terminal Building Phase 5 (FY09 Phase B) (ST 7/2/2009 4/15/2010 $2,371,112 $0 $2,371,112 TE IM)
3-02-0016-124-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle ARFF 8/6/2009 3/14/2012 $262,640 $0 $262,640 Rapid Intervention Vehicle (SA EQ RF)
3-02-0016-126-2009 Update Miscellaneous Study Kulis Planning Grant - Air 9/2/2009 3/7/2013 $453,067 $0 $453,067 Guard Base Closure/Airport Sponsor Takeover (PL PL MS)
3-02-0016-125-2010 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3/16/2010 1/28/2013 $0 $1,140,088 $1,140,088 ARFF Truck (SA EQ RF)
3-02-0016-127-2010 Noise Mitigation Measures for Residences within 65 - 69 3/30/2010 2/26/2013 $0 $1,312,500 $1,312,500 DNL RSIP (phase 9), 60 homes (act.) (EN HO 65)
3-02-0016-128-2010 Acquire Snow Removal Equipment Acquire Snow 3/30/2010 10/18/2011 $0 $992,867 $992,867 Removal Equipment (SRE) Phase 1 (ST EQ SN)
3-02-0016-129-2010 Widen Runway 07R/25L Design Group VI 3/17/2010 7/29/2014 $8,528,850 $4,000,000 $12,528,850 Improvements, Part A (ST RW IM)
3-02-0016-130-2010 Rehabilitate Runway 07R/25L Rehabilitate Runway 3/17/2010 7/9/2015 $0 $9,886,444 $9,886,444 7R/25L Embankment and Drainage System (RE RW IM)
3-02-0016-131-2010 Security Enhancements Provide and Install EOC/AOC 7/27/2010 3/24/2015 $0 $2,445,606 $2,445,606 Security Equipment (C) (SA EQ SE)
3-02-0016-132-2010 Acquire Snow Removal Equipment Acquire SRE Phase 6/22/2010 3/7/2013 $471,725 $2,693,212 $3,164,937 2 (part C) (ST EQ SN)
3-02-0016-133-2010 Modify Terminal Building Emergency Operations 7/27/2010 3/24/2015 $1,016,551 $94,391 $1,110,942 Command Center (EOC) (ST TE IM)
3-02-0016-134-2010 Modify Terminal Building Phase 6 (FY10 Phase A) (ST 3/10/2010 12/28/2015 $1,795,130 $0 $1,795,130 TE IM)
3-02-0016-136-2010 Extend Runway 07R/25L extend 7R, Phase 1 (CA RW 9/23/2010 11/10/2014 $471,583 $2,296,329 $2,767,912 EX)
3-02-0016-137-2010 Conduct Noise Compatibility Plan Study Part 150 Noise 9/16/2010 8/8/2014 $0 $667,808 $667,808 Study, Phase 1(part D/E) (EN PL NO)
3-02-0016-138-2010 Modify Terminal Building Phase 7 (FY10 Phase B) (ST 9/14/2010 12/28/2015 $778,580 $0 $778,580 TE IM)
3-02-0016-139-2010 Widen Runway 07R/25L Design Group VI 8/10/2010 7/22/2014 $5,444,004 $0 $5,444,004 Improvements, Part B (ST RW IM)
3-02-0016-140-2011 Extend Runway 07R/25L Extend 7R, Phase 2 (Part A) 3/15/2011 $3,334,024 $9,500,000 $12,834,024 (CA RW EX)
3-02-0016-141-2011 Construct Apron LOI #98-1 (grant 9): Conc A Apron 3/15/2011 $1,518,750 $3,200,000 $4,718,750 Recon (CA AP CO)
3-02-0016-142-2011 Widen Runway 07R/25L LOI #2-01 DG VI 3/15/2011 7/22/2014 $2,429,050 $5,000,000 $7,429,050 Improvements (ST RW IM)
3-02-0016-143-2011 Modify Terminal Building Phase 8 (including badging & 6/10/2011 12/30/2015 $320,848 $0 $320,848 communications center) (ST TE IM)
3-02-0016-144-2011 Security Enhancements Replace Gate Echo 21 (SA EQ 8/29/2011 7/22/2014 $495,102 $0 $495,102 SE)
3-02-0016-145-2011 Extend Runway 07R/25L Extend 7R, Phase 3 (Part B) 6/7/2011 $5,341,612 $0 $5,341,612 (CA RW EX)
3-02-0016-146-2011 Noise Mitigation Measures for Residences within 65 - 69 9/15/2011 12/19/2014 $0 $2,369,482 $2,369,482 DNL RSIP (phase 10), 50 homes (est.) (EN HO 65)
3-02-0016-147-2011 Acquire Snow Removal Equipment Acquire Snow 9/15/2011 3/25/2013 $1,421,016 $0 $1,421,016 Removal Equipment (SRE), Phase 1 (Part D) (ST EQ SN)
3-02-0016-148-2011 Extend Runway 07R/25L Extend 7R, Phase 4 (Part E) 9/15/2011 $2,415,456 $4,477,151 $6,892,607 (CA RW EX)
3-02-0016-149-2011 Acquire Snow Removal Equipment Acquire SRE, 9/28/2011 4/5/2013 $601,960 $0 $601,960 Phase 2 (Part F) (ST EQ SN)
Monday, January 11, 2016 Page 13 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0016-150-2012 Construct Apron LOI #98-1 (grant 10) (CA AP CO) 5/17/2012 $1,058,750 $2,280,000 $3,338,750
3-02-0016-152-2012 Environmental Mitigation East Airpark Storm Drain 8/15/2012 $5,228,308 $3,000,000 $8,228,308 Extension (EN OT MT)
3-02-0016-153-2012 Extend Runway 07R/25L Extend 7R, Phase 5 (CA RW 8/7/2012 $1,305,661 $0 $1,305,661 EX)
3-02-0016-154-2012 Acquire Snow Removal Equipment Acquire Snow 9/6/2012 11/5/2014 $1,861,273 $998,891 $2,860,164 Removal Equipment (SRE) (ST EQ SN)
3-02-0016-155-2012 Noise Mitigation Measures for Residences within 65 - 69 9/10/2012 6/2/2015 $0 $6,029,993 $6,029,993 DNL RSIP (phase 11), 77 homes (act.) (EN HO 65)
3-02-0016-156-2012 Rehabilitate Apron RON 2 (RE AP IM) 9/20/2012 $7,177,427 $0 $7,177,427
Rehabilitate Taxiway Taxiway E (RE TW IM) 9/20/2012 $4,430,531 $4,400,000 $8,830,531
3-02-0016-157-2012 Widen Runway 07R/25L Design Group VI Improvements 5/14/2012 $2,429,050 $5,000,000 $7,429,050 (ST RW IM)
3-02-0016-158-2012 Update Airport Master Plan Study Master Plan Update, 9/12/2012 $3,123,438 $500,000 $3,623,438 phase 1 (PL PL MA)
3-02-0016-159-2012 Conduct Noise Compatibility Plan Study Part 150 Noise 9/4/2012 $0 $843,750 $843,750 Compatibility Study Phase 2 (EN PL NO)
3-02-0016-160-2013 Widen Runway 07R/25L Design Group VI Improvements 7/23/2013 $4,250,837 $4,000,000 $8,250,837 (ST RW IM)
3-02-0016-161-2013 Construct Service Road ARFF access road (OT GT SV) 9/3/2013 $1,668,916 $0 $1,668,916
3-02-0016-162-2013 Rehabilitate Taxiway Taxiway Lima (RE TW IM) 9/13/2013 $6,311,950 $0 $6,311,950
3-02-0016-163-2013 Noise Mitigation Measures for Residences within 65 - 69 9/4/2013 $0 $7,028,849 $7,028,849 DNL RSIP (phase 12), 90 homes (est.) (EN HO 65)
3-02-0016-164-2013 Rehabilitate Terminal Building (ST TE IM) 8/22/2013 $1,640,625 $0 $1,640,625
3-02-0016-165-2013 Rehabilitate Taxiway Taxiway Mike, Echo2 (RE TW IM) 9/24/2013 $2,592,399 $4,780,975 $7,373,374
3-02-0016-166-2014 Widen Runway 07R/25L Design Group VI Improvements 7/8/2014 $1,911,930 $4,000,000 $5,911,930 (ST RW IM)
3-02-0016-167-2014 Acquire Snow Removal Equipment Acquire Snow 9/17/2014 $2,000,000 $1,505,937 $3,505,937 Removal Equipment (SRE) (ST EQ SN)
3-02-0016-169-2014 Rehabilitate Taxiway Rehabilitate Taxiway M and E2 6/18/2014 $948,366 $0 $948,366 (Phase2) (RE TW IM)
3-02-0016-170-2014 Update Airport Master Plan Study phase 2 (PL PL MA) 9/17/2014 $1,025,528 $0 $1,025,528
3-02-0016-171-2014 Rehabilitate Runway 07L/25R Runway 7L Rehab(need 9/22/2014 $8,592,655 $14,624,710 $23,217,365 to coordinate on funding levels each year) (RE RW IM)
3-02-0016-172-2015 Rehabilitate Runway 07L/25R Runway 7L Rehab, Phase 7/23/2015 $14,133,845 $12,214,564 $26,348,409 2 (RE RW IM)
3-02-0016-173-2015 Widen Runway 07R/25L Design Group VI Improvements 6/26/2015 $0 $2,595,840 $2,595,840 (ST RW IM)
Widen Taxiway Widen Taxiway K Safety Area (ST TW 6/26/2015 $0 $470,000 $470,000 IM)
Widen Taxiway Widen Taxiway Y Safety Area-LOI-2 6/26/2015 $0 $934,160 $934,160 (ST TW IM)
3-02-0016-174-2015 Acquire Safety Equipment and/or Fencing Security 8/31/2015 $476,643 $0 $476,643 Fencing Replacement (SA EQ RF)
3-02-0016-175-2015 Acquire Snow Removal Equipment Snow Remvoal 9/21/2015 $1,895,272 $1,455,741 $3,351,013 Equipment (ST EQ SN)
$351,751,525 $294,212,062 $645,963,587
Angoon Angoon (AGN)
3-02-0018-001-1987 Acquire Land for Development (ST LA DV) 7/13/1987 5/10/1991 $82,717 $0 $82,717
Improve Airport Drainage (ST OT IM) 7/13/1987 5/10/1991 $1,015,532 $0 $1,015,532
Improve Access Road (OT GT AC) 7/13/1987 5/10/1991 $35,500 $0 $35,500
Monday, January 11, 2016 Page 14 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0018-002-2000 Conduct Airport Master Plan Study (PL PL MA) 9/13/2000 8/27/2004 $330,902 $0 $330,902
3-02-0018-003-2004 Conduct Airport Master Plan Study (PL PL MA) 8/24/2004 6/16/2008 $352,477 $0 $352,477
$1,817,128 $0 $1,817,128
Angoon (Proposed GA) (+07E)
3-02-0476-001-2007 Construct New Airport (EIS, Phase 1) (ST NA CO) 8/8/2007 4/6/2012 $1,000,000 $147,523 $1,147,523
3-02-0476-002-2009 Construct New Airport (EIS, Phase 2) (ST NA CO) 1/22/2009 8/28/2014 $3,000,000 $0 $3,000,000
3-02-0476-003-2011 Construct New Airport Construct New Airport EIS 8/25/2011 8/18/2015 $1,000,000 $0 $1,000,000 Phase III (ST NA CO)
3-02-0476-004-2013 Construct New Airport Construct New Airport EIS 9/19/2013 $1,200,000 $0 $1,200,000 Phase IV (ST NA CO)
3-02-0476-005-2015 Construct New Airport Construct New Airport EIS 8/27/2015 $250,000 $0 $250,000 Phase V (ST NA CO)
$6,450,000 $147,523 $6,597,523
Aniak Aniak (ANI)
3-02-0019-001-1985 Improve Snow Removal Equipment Building (ST BD 9/9/1985 10/19/1987 $268,154 $0 $268,154 SN)
3-02-0019-002-1988 Install Apron Lighting (ST AP LI) 9/7/1988 11/8/1991 $10,200 $0 $10,200
Acquire Security Equipment (SA EQ SE) 9/7/1988 11/8/1991 $25,952 $0 $25,952
Install Miscellaneous NAVAIDS (SP OT IN) 9/7/1988 11/8/1991 $3,571 $0 $3,571
Expand Apron (ST AP IM) 9/7/1988 11/8/1991 $1,100,170 $0 $1,100,170
3-02-0019-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/1990 7/23/1992 $135,132 $0 $135,132 EQ RF)
3-02-0019-004-1995 Rehabilitate Apron (RE AP IM) 6/15/1995 7/19/2000 $200,000 $0 $200,000
Improve Airport Drainage (ST OT IM) 6/15/1995 7/19/2000 $125,000 $0 $125,000
Rehabilitate Runway 10/28 (RE RW IM) 6/15/1995 7/19/2000 $4,060,558 $0 $4,060,558
Improve Access Road (OT GT AC) 6/15/1995 7/19/2000 $93,750 $0 $93,750
Install Runway Lighting (SA RW LI) 6/15/1995 7/19/2000 $211,875 $0 $211,875
Rehabilitate Taxiway (RE TW IM) 6/15/1995 7/19/2000 $150,000 $0 $150,000
3-02-0019-005-1996 Improve Airport Drainage (ST OT IM) 6/28/1996 7/15/1998 $2,621,161 $0 $2,621,161
3-02-0019-006-2002 Conduct Airport Master Plan Study (PL PL MA) 9/20/2002 8/11/2006 $430,483 $0 $430,483
3-02-0019-007-2005 Construct Snow Removal Equipment Building (ST BD 8/8/2005 8/22/2011 $3,174,916 $0 $3,174,916 SN)
3-02-0019-008-2006 Conduct Airport Master Plan Study Erosion Study 7/14/2006 8/17/2007 $53,438 $0 $53,438 Phase II Aniak Master Plan (PL PL MA)
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $380,000 $0 $380,000 Acquire Various SRE: Aniak (Wheel Loader with attachments) (ST EQ SN)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 10/28 Various 9/16/2011 $53,200 $0 $53,200 Surface Preservation (RE RW IM)
$13,097,560 $0 $13,097,560
Anvik Anvik (ANV)
3-02-0021-001-1988 Improve Snow Removal Equipment Building (ST BD 7/11/1988 11/8/1991 $23,139 $0 $23,139 SN)
Rehabilitate Runway 17/35 (RE RW IM) 7/11/1988 11/8/1991 $812,109 $0 $812,109
Install Runway Lighting (ST RW LI) 7/11/1988 11/8/1991 $79,040 $0 $79,040
Construct Apron (ST AP CO) 7/11/1988 11/8/1991 $226,036 $0 $226,036
Monday, January 11, 2016 Page 15 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0021-001-1988 7/11/1988 11/8/1991 Acquire Snow Removal Equipment (ST EQ SN) $89,767 $0 $89,767
7/11/1988 11/8/1991 Improve Access Road (OT GT AC) $39,667 $0 $39,667
7/11/1988 11/8/1991 Construct Taxiway (ST TW CO) $11,733 $0 $11,733
3-02-0021-002-1993 8/10/1993 9/9/1997 Acquire Snow Removal Equipment (ST EQ SN) $104,855 $0 $104,855
3-02-0021-003-1997 9/26/1997 9/27/2001 Improve Snow Removal Equipment Building (ST BD SN)
$562,500 $24,064 $586,564
3-02-0021-004-2004 8/31/2004 6/9/2010 Construct Runway Safety Area 17/35 (ST RW SF) $1,000,000 $1,915,031 $2,915,031
8/31/2004 6/9/2010 Expand Apron (ST AP IM) $1,000,000 $0 $1,000,000
8/31/2004 6/9/2010 Rehabilitate Runway 17/35 (RE RW IM) $4,200,000 $0 $4,200,000
8/31/2004 6/9/2010 Extend Runway 17/35 (ST RW IM) $3,591,750 $0 $3,591,750
8/31/2004 6/9/2010 Improve Access Road (OT GT AC) $1,000,000 $0 $1,000,000
3-02-0000-012-2009 8/20/2009 11/5/2014 Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $226,230 $226,230
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Anvik Loader) (ST EQ SN)
$365,238 $0 $365,238
$13,105,834 $2,165,325 $15,271,159
Arctic Village Arctic Village (ARC)
3-02-0022-001-1998 7/31/1998 3/31/1999 Acquire Snow Removal Equipment (ST EQ SN) $198,795 $0 $198,795
3-02-0022-002-1999 7/6/1999 7/11/2001 Rehabilitate Runway 2-20 (RE RW IM) $421,872 $0 $421,872
7/6/1999 7/11/2001 Improve Snow Removal Equipment Building (ST BD SN)
$25,000 $0 $25,000
3-02-0022-003-2000 8/22/2000 8/30/2004 Rehabilitate Runway 03/21 (RE RW IM) $217,958 $0 $217,958
3-02-0022-004-2000 9/6/2000 8/30/2004 Rehabilitate Runway 2/20 (RE RW IM) $3,162,506 $0 $3,162,506
9/6/2000 8/30/2004 Improve Snow Removal Equipment Building (ST BD SN)
$300,000 $0 $300,000
3-02-0022-005-2001 4/26/2001 9/4/2001 Acquire Snow Removal Equipment (ST EQ SN) $215,764 $0 $215,764
3-02-0022-006-2002 5/28/2002 6/9/2005 Rehabilitate Runway (RE RW IM) $1,489,181 $41,299 $1,530,480
5/28/2002 6/9/2005 Construct Snow Removal Equipment Building (ST BD SN)
$850,000 $0 $850,000
$6,881,076 $41,299 $6,922,375
Atka Atka (AKA)
3-02-0394-001-1983 9/21/1983 1/23/1986 Install Runway Lighting 15/33 (ST RW LI) $205,488 $0 $205,488
9/21/1983 1/23/1986 Improve Airport Drainage (ST OT IM) $32,813 $0 $32,813
3-02-0394-002-1988 9/8/1988 11/15/1991 Improve Runway Safety Area 15/33 (ST RW SF) $72,626 $0 $72,626
9/8/1988 11/15/1991 Extend Runway 15/33 (ST RW IM) $7,048 $0 $7,048
9/8/1988 11/15/1991 Rehabilitate Runway 15/33 (RE RW IM) $470,266 $0 $470,266
9/8/1988 11/15/1991 Rehabilitate Apron (RE AP IM) $19,042 $0 $19,042
3-02-0394-003-2001 8/20/2001 8/25/2005 Conduct Airport Master Plan Study (PL PL MA) $0 $408,750 $408,750
3-02-0394-004-2002 9/12/2002 6/30/2006 Extend Runway (Phase 1- Environmental/Design) (ST RW IM)
$0 $610,431 $610,431
3-02-0394-005-2008 6/19/2008 Construct Snow Removal Equipment Building Construct Snow Removal Equipment Building (ST BD SN)
$2,500,000 $0 $2,500,000
6/19/2008 Construct Apron construct apron w/taxiway stub (ST AP CO)
$3,000,000 $0 $3,000,000
6/19/2008 Extend Runway 15/33 Extend/Rehab Runway (ST RW IM)
$6,647,363 $0 $6,647,363
Monday, January 11, 2016 Page 16 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0394-005-2008 Rehabilitate Runway 15/33 Reconstruct Runway from 6/19/2008 $9,500,000 $328,168 $9,828,168 15/33 to 16/34 (RE RW IM)
3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $251,454 $0 $251,454 Acquire SRE (Central Region): Loader with Attachments (ST EQ SN)
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $465,000 $0 $465,000 Acquire Various SRE: Atka (Grader with attachments, and Sand Truck with Plow) (ST EQ SN)
3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $400,000 $0 $400,000 approach (PL PL VI)
3-02-0200-096-2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) 9/18/2014 $54,137 $0 $54,137 Various EDA/EAS Locations: Atka - Accomplish Surface Preservation Maintenance _ Pavement Markings (RE RW IM)
3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 16/34 EAS/EDA 9/20/2015 $53,200 $0 $53,200 Various (Atka - Surface Preservation Maintenance: Pavements Markings on RWYs, TWYs and Aprons) (RE RW IM)
$23,678,437 $1,347,349 $25,025,786
Atmautluak Atmautluak (4A2)
3-02-0379-001-1998 Improve Snow Removal Equipment Building (ST BD 9/28/1998 9/24/2002 $200,000 $0 $200,000 SN)
Extend Runway 15-33 (ST RW IM) 9/28/1998 9/24/2002 $3,946,480 $0 $3,946,480
3-02-0379-002-2002 Rehabilitate Runway 15/33 (RE RW IM) 9/12/2002 7/7/2006 $0 $1,934,245 $1,934,245
Extend Runway (ST RW IM) 9/12/2002 7/7/2006 $900,000 $0 $900,000
Construct Snow Removal Equipment Building (ST BD 9/12/2002 7/7/2006 $400,000 $0 $400,000 SN)
$5,446,480 $1,934,245 $7,380,725
Atqasuk Atqasuk Edward Burnell Sr Memorial (ATK)
3-02-0023-001-1984 Improve Access Road (OT GT AC) 9/26/1984 4/19/1989 $459,773 $0 $459,773
3-02-0023-002-1986 Install Runway Lighting 6/24 (ST RW LI) 8/11/1986 9/9/1988 $689,586 $38,702 $728,288
3-02-0023-003-1999 Improve Snow Removal Equipment Building (ST BD 7/8/1999 9/9/2003 $641,783 $0 $641,783 SN)
3-02-0023-004-2000 Install Runway Vertical/Visual Guidance System 06-24 9/6/2000 8/27/2003 $166,308 $0 $166,308 (ST RW VI)
3-02-0023-005-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/29/2001 3/29/2005 $176,735 $0 $176,735
3-02-0200-070-2009 [Various Grnt] Conduct aeronautical survey for WAAS 8/24/2009 $0 $199,000 $199,000 approach (PL PL VI)
3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)
$2,184,185 $237,702 $2,421,887
Barrow Wiley Post-Will Rogers Memorial (BRW)
3-02-0026-001-1984 Rehabilitate Apron 6/24 (RE AP IM) 8/3/1984 11/20/1986 $521,185 $0 $521,185
3-02-0026-002-1986 Expand Apron (CA AP EX) 7/30/1986 8/8/1991 $0 $1,610,736 $1,610,736
Install Apron Lighting (ST AP LI) 7/30/1986 8/8/1991 $138,302 $0 $138,302
Monday, January 11, 2016 Page 17 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0026-002-1986 Rehabilitate Taxiway (RE TW IM) 7/30/1986 8/8/1991 $177,566 $1,207,947 $1,385,513
3-02-0026-003-1988 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/24/1988 4/13/1992 $295,783 $0 $295,783 EQ RF)
3-02-0026-004-1990 Install Runway Lighting (SA RW LI) 8/24/1990 11/10/1993 $886,319 $0 $886,319
Improve Runway Safety Area 6/24 (SA RW SF) 8/24/1990 11/10/1993 $952,801 $0 $952,801
Construct Apron (ST AP CO) 8/24/1990 11/10/1993 $123,094 $0 $123,094
Install Apron Lighting (ST AP LI) 8/24/1990 11/10/1993 $631,954 $0 $631,954
3-02-0026-005-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 9/10/1992 10/27/1998 $0 $2,200,515 $2,200,515 BD EX)
3-02-0026-006-1998 Conduct Airport Master Plan Study (PL PL MA) 8/19/1998 9/12/2002 $247,259 $0 $247,259
3-02-0026-007-1998 Improve Snow Removal Equipment Building (ST BD 7/13/1998 9/18/2001 $1,688,688 $0 $1,688,688 SN)
3-02-0026-008-2001 Expand Apron (ST AP IM) 9/12/2001 5/17/2005 $3,024,161 $0 $3,024,161
3-02-0026-009-2002 Extend Runway Safety Area (SA RW SF) 9/27/2002 9/3/2009 $5,099,354 $11,749,449 $16,848,803
Rehabilitate Runway (RE RW IM) 9/27/2002 9/3/2009 $5,650,861 $0 $5,650,861
Rehabilitate Apron (RE AP IM) 9/27/2002 9/3/2009 $1,500,000 $0 $1,500,000
3-02-0026-010-2003 Construct Runway Safety Area 6-24 (SA RW SF) 8/22/2003 3/1/2011 $0 $3,049,999 $3,049,999
Rehabilitate Runway 6-24 (RE RW IM) 8/22/2003 3/1/2011 $0 $2,750,000 $2,750,000
3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $100,000 $700,000 $800,000 Vehicle (SA EQ RF)
3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $107,350 $0 $107,350 EQ SN)
3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $262,064 $0 $262,064 (Acquire 8cy Dump Truck w/ Sander and Plow) (ST EQ SN)
3-02-0026-011-2008 Construct Runway Safety Area 06/24 Phase 3 5/12/2008 4/1/2013 $0 $2,889,973 $2,889,973 construction (SA RW SF)
Rehabilitate Runway 06/24 (RE RW IM) 5/12/2008 4/1/2013 $500,000 $0 $500,000
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0026-012-2010 Construct Runway Safety Area 06/24 RSA Phase 4 3/12/2010 $0 $7,200,000 $7,200,000 construction (SA RW SF)
3-02-0026-013-2012 Conduct Airport Master Plan Study Master Plan Update 9/10/2012 12/19/2014 $533,729 $0 $533,729 (PL PL MA)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $334,825 $0 $334,825 Acquire SRE (Alaska Region): Barrow (Grader with Attachments) (ST EQ SN)
3-02-0200-092-2013 [Various Grnt] Wildlife Hazard Assessments (PL PL 9/19/2013 $93,750 $0 $93,750 WH)
3-02-0026-014-2014 Install Runway Lighting Install outboard threshold lights 9/11/2014 $235,000 $0 $235,000 (ST RW LI)
Rehabilitate Runway 07/25 Runway rehab (fix bump) 9/11/2014 $4,264,866 $0 $4,264,866 (RE RW IM)
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $258,106 $0 $258,106 (+08J) Acquire SRE: Barrow - Broom (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 07/25 Accomplish 9/21/2015 $68,248 $0 $68,248 Various Airport Surface Preservation Maintenance (Barrow Pavement Markings) (RE RW IM)
$27,695,265 $33,454,119 $61,149,384
Monday, January 11, 2016 Page 18 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Beaver Beaver (WBQ)
3-02-0028-001-1988 Construct Runway 4/22 (ST RW CO) 6/3/1988 9/9/1992 $321,888 $744 $322,632
Install Runway Lighting (ST RW LI) 6/3/1988 9/9/1992 $273,021 $0 $273,021
Construct Apron (ST AP CO) 6/3/1988 9/9/1992 $184,455 $0 $184,455
3-02-0028-002-1991 Improve Snow Removal Equipment Building (ST BD 9/20/1991 12/2/1993 $178,922 $0 $178,922 SN)
Acquire Snow Removal Equipment (ST EQ SN) 9/20/1991 12/2/1993 $116,110 $0 $116,110
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $25,852 $0 $25,852 Obstructions (Various - Beaver) (SA OT OB)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Variuos 9/19/2012 $165,450 $0 $165,450 Surface Preservation Maintenance (Beaver) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $237,552 $0 $237,552 Acquire SRE (Loader) (ST EQ SN)
$1,503,250 $744 $1,503,994
Bethel Bethel (BET)
3-02-0029-001-1987 Expand Apron (ST AP IM) 7/15/1987 5/23/1990 $824,403 $11,205 $835,608
Improve Airport Drainage (ST OT IM) 7/15/1987 5/23/1990 $56,993 $0 $56,993
Extend Runway 18/36 (ST RW IM) 7/15/1987 5/23/1990 $49,459 $0 $49,459
Extend Taxiway (ST TW IM) 7/15/1987 5/23/1990 $31,187 $0 $31,187
Improve Snow Removal Equipment Building (ST BD 7/15/1987 5/23/1990 $215,003 $0 $215,003 SN)
Expand Apron (ST AP IM) 7/15/1987 5/23/1990 $5,625 $0 $5,625
3-02-0029-002-1988 Rehabilitate Runway 18/36 (RE RW IM) 6/20/1988 2/25/1991 $2,287,355 $0 $2,287,355
Rehabilitate Taxiway (RE TW IM) 6/20/1988 2/25/1991 $69,556 $0 $69,556
Groove Runway 18/36 (SP RW FR) 6/20/1988 2/25/1991 $164,374 $0 $164,374
Rehabilitate Apron (RE AP IM) 6/20/1988 2/25/1991 $197,875 $0 $197,875
3-02-0029-003-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 5/6/1992 7/19/2000 $756,987 $0 $756,987 BD EX)
Acquire Security Equipment (SA EQ SE) 5/6/1992 7/19/2000 $184,158 $0 $184,158
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 5/6/1992 7/19/2000 $304,688 $0 $304,688 EQ RF)
3-02-0029-004-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1994 1/18/2000 $241,800 $0 $241,800
Rehabilitate Taxiway Lighting (RE TW LI) 9/27/1994 1/18/2000 $203,740 $0 $203,740
Rehabilitate Apron (RE AP IM) 9/27/1994 1/18/2000 $332,511 $0 $332,511
Construct Taxiway (ST TW CO) 9/27/1994 1/18/2000 $1,163,986 $0 $1,163,986
Rehabilitate Runway 18/36 (RE RW IM) 9/27/1994 1/18/2000 $2,739,885 $0 $2,739,885
3-02-0029-005-1996 Install Runway Lighting (SA RW LI) 9/23/1996 7/13/2000 $285,863 $1,665 $287,528
Install Runway Lighting (ST RW LI) 9/23/1996 7/13/2000 $147,262 $0 $147,262
Expand Apron (ST AP IM) 9/23/1996 7/13/2000 $9,375 $0 $9,375
3-02-0029-006-1997 Conduct Airport Master Plan Study (PL PL MA) 8/7/1997 9/12/2002 $325,000 $0 $325,000
3-02-0029-007-1998 Construct Taxiway (ST TW CO) 5/15/1998 9/25/2002 $0 $3,711,220 $3,711,220
Acquire Land For Approaches (ST LA SZ) 5/15/1998 9/25/2002 $229,693 $0 $229,693
Expand Apron (ST AP IM) 5/15/1998 9/25/2002 $420,000 $700,000 $1,120,000
Rehabilitate Runway 36 (RE RW IM) 5/15/1998 9/25/2002 $0 $500,000 $500,000
Improve Access Road (OT GT AC) 5/15/1998 9/25/2002 $480,000 $0 $480,000
Monday, January 11, 2016 Page 19 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0029-008-1999 Construct Taxiway (ST TW CO) 7/6/1999 9/25/2002 $813,817 $0 $813,817
3-02-0029-009-2000 Construct Apron (ST AP CO) 8/4/2000 8/5/2003 $1,851,992 $1,375,817 $3,227,809
Acquire Security Equipment (SA EQ SE) 8/4/2000 8/5/2003 $370,000 $0 $370,000
3-02-0029-010-2003 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/7/2003 1/23/2006 $136,000 $566,812 $702,812 EQ RF)
3-02-0029-011-2003 Construct Runway Safety Area 18-36 (SA RW SF) 9/5/2003 9/17/2007 $0 $5,000,000 $5,000,000
3-02-0029-012-2004 Improve Runway Safety Area 18/36 (SA RW SF) 7/26/2004 5/27/2008 $400,000 $585,060 $985,060
Rehabilitate Runway 18/36 (RE RW IM) 7/26/2004 5/27/2008 $1,200,000 $0 $1,200,000
3-02-0029-013-2005 Construct Sand and Chemical Storage Building (ST BD 8/29/2005 7/20/2010 $1,686,972 $18,274 $1,705,246 SN)
3-02-0029-014-2005 Construct Runway Plan-1 (ST RW CO) 8/11/2005 3/7/2012 $10,100,000 $0 $10,100,000
Construct Runway Safety Area 18/36 (SA RW SF) 8/11/2005 3/7/2012 $0 $5,654,392 $5,654,392
3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $546,362 $0 $546,362 (Carrier w/broom) (ST EQ SN)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $65,000 $0 $65,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $70,000 $0 $70,000 (RE RW IM)
3-02-0029-015-2006 Construct Apron (ST AP CO) 7/27/2006 8/1/2012 $5,804,561 $532,661 $6,337,222
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $103,341 $0 $103,341 (RE RW IM)
3-02-0029-016-2007 Construct Runway Plan-1 Phase 2 (Paving Phase 1) (ST 8/31/2007 4/9/2012 $2,733,217 $0 $2,733,217 RW CO)
3-02-0029-017-2008 Construct Runway Plan-1 Phase 3 (Paving Phase 2) (ST 6/13/2008 4/9/2012 $1,377,983 $4,500,000 $5,877,983 RW CO)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: BET--Front-End Loader w/ Attachments (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 6/19/2008 6/10/2014 $0 $0 $0 (RE RW IM)
3-02-0029-018-2009 Construct Runway Plan-1 Phase 4 (Paving Runway 2/12/2009 1/20/2015 $1,277,634 $1,717,920 $2,995,554 1L/19R Phase 3--final phase) (ST RW CO)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 18/36 (Various 8/20/2009 12/19/2014 $63,840 $0 $63,840 Surface Maintenance) (RE RW IM)
3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $614,711 $0 $614,711 Acquire SRE (Central Region): Snow Blower w/Broom (ST EQ SN)
3-02-0029-019-2010 Conduct Airport Master Plan Study Airport Master Plan 8/23/2010 $650,000 $0 $650,000 (PL PL MA)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01R/19L Bethel 3/12/2010 12/9/2015 $80,243 $0 $80,243 Various Surface Maintenance (RE RW IM)
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $278,566 $0 $278,566 Acquire SRE (Central Region): Bethel (Sander with Attachments) (ST EQ SN)
3-02-0029-020-2011 Rehabilitate Runway 01L/19R Rehab Runway (RE RW 9/14/2011 $1,000,000 $6,535,827 $7,535,827 IM)
Rehabilitate Taxiway rehab taxiway (RE TW IM) 9/14/2011 $0 $1,600,000 $1,600,000
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various 9/16/2011 $462,838 $0 $462,838 Surface Preservation (RE RW IM)
3-02-0029-021-2012 Acquire Handicap Passenger Lift Device Acquire 8/17/2012 $0 $0 $0 Passenger Lift Device (Bethel) (ST TE MS)
3-02-0200-085-2012 [Various Grnt] Wildlife Hazard Assessments (PL PL 8/28/2012 $142,000 $0 $142,000 WH)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01L/19R Variuos 9/19/2012 $262,500 $0 $262,500 Surface Preservation Maintenance (Bethel) (RE RW IM)
Monday, January 11, 2016 Page 20 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01L/19R Surface Preservation Maintenance (Bethel) (RE RW IM)
$273,000 $0 $273,000
3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Bethel - Plow (ST EQ SN)
$705,835 $0 $705,835
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01L/19R (+08J) Various Surface Preservation Maintenance: Bethel - Crack Seal, Pavement Markings (RE RW IM)
$289,000 $0 $289,000
3-02-0029-022-2015 7/7/2015 Rehabilitate Apron rehab apron - commerical (RE AP IM)
$1,000,000 $4,587,042 $5,587,042
3-02-0029-023-2015 9/21/2015 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)
$3,000,000 $3,500,000 $6,500,000
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Bethel P-Series with Rollover Plow, and P-Series with Wing Plow) (ST EQ SN)
$1,019,776 $0 $1,019,776
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 01L/19R Accomplish Various Airport Surface Preservation Maintenance (Bethel RWYs and TWYs Marking and RSA Grading and Compaction) (RE RW IM)
$525,000 $0 $525,000
$50,830,966 $41,097,894 $91,928,860
Bettles Bettles (BTT)
3-02-0030-001-1988 6/15/1988 12/16/1992 Install Runway Lighting (ST RW LI) $453,500 $0 $453,500
6/15/1988 12/16/1992 Rehabilitate Runway 1/19 (RE RW IM) $426,290 $105,436 $531,726
6/15/1988 12/16/1992 Install Apron Lighting (ST AP LI) $18,140 $0 $18,140
6/15/1988 12/16/1992 Install Miscellaneous NAVAIDS (ST OT IN) $9,070 $0 $9,070
3-02-0030-002-1990 9/19/1990 7/19/1994 Acquire Snow Removal Equipment (ST EQ SN) $183,000 $0 $183,000
9/19/1990 7/19/1994 Improve Snow Removal Equipment Building (ST BD SN)
$232,791 $37,240 $270,031
3-02-0030-003-1992 9/2/1992 10/27/1998 Conduct Airport Master Plan Study (PL PL MA) $208,275 $0 $208,275
3-02-0030-004-2001 9/19/2001 2/24/2005 Improve Seaplane Base (ST SB CO) $3,044,857 $0 $3,044,857
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
$100,178 $0 $100,178
3-02-0200-084-2012 7/23/2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Bettles) (SA OT OB)
$41,363 $0 $41,363
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01/19 Surface Preservation Maintenance (Bettles) (RE RW IM)
$319,700 $0 $319,700
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)
$331,149 $0 $331,149
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Bettles - Surface Repair (RE RW IM)
$175,312 $0 $175,312
$5,543,625 $142,676 $5,686,301
Big Lake Big Lake (BGQ)
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 07/25 Big Lake Various Surface Maintenance (RE RW IM)
$56,392 $0 $56,392
3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Big Lake) (SA OT OB)
$42,000 $0 $42,000
3-02-0031-001-2014 9/12/2014 Conduct Airport Master Plan Study MP (PL PL MA) $400,000 $0 $400,000
Monday, January 11, 2016 Page 21 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $162,750 $0 $162,750 Various Surface Preservation Maintenance: Big Lake -Minor Gravel Resurfacing and Dust Control (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Remove Obstructions Various 9/21/2015 $63,000 $0 $63,000 Obstruction Removal (Big Lake, RPZ Rwy 7, 5 acres) (SA OT OB)
$724,142 $0 $724,142
Birch Creek Birch Creek (Z91)
3-02-0033-001-1984 Extend Runway 16/34 (ST RW IM) 5/18/1984 2/1/1991 $273,367 $0 $273,367
Construct Apron (ST AP CO) 5/18/1984 2/1/1991 $19,100 $0 $19,100
Acquire Snow Removal Equipment (ST EQ SN) 5/18/1984 2/1/1991 $103,643 $0 $103,643
Construct Taxiway (ST TW CO) 5/18/1984 2/1/1991 $47,976 $0 $47,976
Improve Access Road (OT GT AC) 5/18/1984 2/1/1991 $38,392 $0 $38,392
Acquire Land for Development (ST LA DV) 5/18/1984 2/1/1991 $11,500 $0 $11,500
Rehabilitate Runway 16/34 (RE RW IM) 5/18/1984 2/1/1991 $273,367 $0 $273,367
Install Runway Lighting (ST RW LI) 5/18/1984 2/1/1991 $273,367 $0 $273,367
3-02-0033-002-1994 Extend Runway 16/34 (ST RW IM) 6/28/1994 7/17/2000 $1,536,342 $274,438 $1,810,780
Acquire Land For Approaches (ST LA SZ) 6/28/1994 7/17/2000 $46,875 $0 $46,875
Install Runway Lighting (ST RW LI) 6/28/1994 7/17/2000 $154,500 $0 $154,500
Construct Apron (ST AP CO) 6/28/1994 7/17/2000 $150,938 $0 $150,938
Rehabilitate Taxiway (RE TW IM) 6/28/1994 7/17/2000 $8,626 $0 $8,626
Improve Access Road (OT GT AC) 6/28/1994 7/17/2000 $70,406 $0 $70,406
3-02-0033-003-2003 Rehabilitate Apron (RE AP IM) 8/21/2003 4/21/2006 $450,000 $0 $450,000
Rehabilitate Runway 16/34 (RE RW IM) 8/21/2003 4/21/2006 $541,056 $0 $541,056
Rehabilitate Taxiway (RE TW IM) 8/21/2003 4/21/2006 $450,000 $0 $450,000
3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $228,000 $0 $228,000 Acquire SRE (Northern Region): Birch Creek Loader (ST EQ SN)
$4,677,455 $274,438 $4,951,893
Birchwood Birchwood (BCV)
3-02-0034-001-1987 Construct Apron (CA AP CO) 8/10/1987 12/9/1992 $344,634 $0 $344,634
Rehabilitate Apron (RE AP IM) 8/10/1987 12/9/1992 $251,608 $0 $251,608
Improve Snow Removal Equipment Building (ST BD 8/10/1987 12/9/1992 $161,809 $0 $161,809 SN)
Acquire Land for Development (ST LA DV) 8/10/1987 12/9/1992 $163,791 $0 $163,791
Improve Access Road (OT GT AC) 8/10/1987 12/9/1992 $64,543 $0 $64,543
3-02-0034-002-2001 Conduct Airport Master Plan Study (PL PL MA) 6/11/2001 8/26/2004 $220,196 $0 $220,196
3-02-0034-003-2002 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/3/2002 8/28/2006 $185,718 $0 $185,718
3-02-0034-004-2004 Install Runway Lighting 1L/19R (ST RW LI) 8/27/2004 6/20/2008 $680,210 $86,883 $767,093
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $215,568 $0 $215,568 (Hydrostatic loader-mounted snow blower) (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 01L/19R 6/30/2006 2/27/2012 $6,327 $0 $6,327 (Maintenance) (RE RW IM)
3-02-0000-008-2007 Conduct Environmental Study Conduct Archaeological 9/4/2007 3/21/2012 $47,500 $0 $47,500 Survey for G2G and complete EA (EN PL MA)
Monday, January 11, 2016 Page 22 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 01L/19R 6/19/2008 6/10/2014 $134,700 $0 $134,700 (Maintenance) (RE RW IM)
3-02-0034-005-2009 Conduct Airport Master Plan Study (PL PL MA) 7/6/2009 8/8/2014 $151,080 $0 $151,080
3-02-0034-006-2012 Rehabilitate Runway 01L/19R (RE RW IM) 6/18/2012 $1,255,146 $0 $1,255,146
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $50,400 $0 $50,400 Obstructions (Various - Birchwood) (SA OT OB)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01L/19R Various 9/19/2012 $71,400 $0 $71,400 Surface Preservation Maintenance (Birchwood) (RE RW IM)
$4,004,630 $86,883 $4,091,513
Boundary Boundary (BYA)
3-02-0036-001-1989 Extend Runway 5/23 (ST RW IM) 9/15/1989 5/27/1992 $636,242 $0 $636,242
Acquire Land for Development (ST LA DV) 9/15/1989 5/27/1992 $104,166 $0 $104,166
Construct Taxiway (ST TW CO) 9/15/1989 5/27/1992 $203,853 $0 $203,853
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 6/30/2006 2/27/2012 $94,905 $0 $94,905 (RE RW IM)
$1,039,166 $0 $1,039,166
Brevig Mission Brevig Mission (KTS)
3-02-0294-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/20/1991 6/3/1999 $236,059 $0 $236,059
3-02-0294-002-1997 Improve Access Road (OT GT AC) 9/26/1997 9/11/2002 $60,000 $0 $60,000
Improve Snow Removal Equipment Building (ST BD 9/26/1997 9/11/2002 $250,000 $0 $250,000 SN)
Install Apron Lighting (ST AP LI) 9/26/1997 9/11/2002 $40,000 $0 $40,000
Install Runway Lighting 4-22 (ST RW LI) 9/26/1997 9/11/2002 $90,000 $0 $90,000
Construct Apron (ST AP CO) 9/26/1997 9/11/2002 $300,000 $0 $300,000
Acquire Land for Development (ST LA DV) 9/26/1997 9/11/2002 $281,250 $0 $281,250
Construct Taxiway (ST TW CO) 9/26/1997 9/11/2002 $300,000 $0 $300,000
Rehabilitate Runway 4-22 (RE RW IM) 9/26/1997 9/11/2002 $460,000 $0 $460,000
Construct Runway 11-29 (ST RW CO) 9/26/1997 9/11/2002 $1,537,883 $250,269 $1,788,152
Install Runway Lighting 11-29 (ST RW LI) 9/26/1997 9/11/2002 $100,000 $0 $100,000
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/30/2006 2/27/2012 $131,813 $0 $131,813 (RE RW IM)
$3,787,005 $250,269 $4,037,274
Buckland Buckland (BVK)
3-02-0399-001-1996 Install Runway Vertical/Visual Guidance System (ST 9/20/1996 9/12/2000 $0 $43,991 $43,991 RW VI)
Extend Runway 10/28 (ST RW IM) 9/20/1996 9/12/2000 $0 $3,176,456 $3,176,456
Rehabilitate Taxiway (RE TW IM) 9/20/1996 9/12/2000 $0 $220,327 $220,327
Expand Apron (ST AP IM) 9/20/1996 9/12/2000 $119,589 $0 $119,589
Install Apron Lighting (ST AP LI) 9/20/1996 9/12/2000 $75,519 $0 $75,519
Improve Snow Removal Equipment Building (ST BD 9/20/1996 9/12/2000 $219,958 $0 $219,958 SN)
Improve Access Road (OT GT AC) 9/20/1996 9/12/2000 $87,982 $0 $87,982
Monday, January 11, 2016 Page 23 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0399-001-1996 9/20/1996 9/12/2000 Install Runway Lighting (ST RW LI) $21,171 $78,829 $100,000
3-02-0399-002-1998 7/30/1998 8/4/1999 Acquire Land For Approaches (ST LA SZ) $183,943 $0 $183,943
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 11/29 Buckland Various Surface Maintenance (RE RW IM)
$212,800 $0 $212,800
3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Buckland (Dozer) (ST EQ SN)
$370,108 $0 $370,108
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Buckland Grader) (ST EQ SN)
$365,238 $0 $365,238
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish Various Airport Surface Preservation Maintenance (Buckland Compaction and Dust Pallative) (RE RW IM)
$155,109 $0 $155,109
$1,811,417 $3,519,603 $5,331,020
Central Central (CEM)
3-02-0045-001-1989 9/22/1989 8/9/1993 Install Runway Lighting (ST RW LI) $126,470 $0 $126,470
9/22/1989 8/9/1993 Acquire Land for Development (ST LA DV) $82,190 $0 $82,190
9/22/1989 8/9/1993 Improve Access Road (OT GT AC) $120,150 $0 $120,150
9/22/1989 8/9/1993 Construct Apron (ST AP CO) $416,590 $0 $416,590
9/22/1989 8/9/1993 Construct Runway 7/25 (ST RW CO) $390,680 $43,289 $433,969
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 07/25 (Various Surface Maintenance) (RE RW IM)
$164,920 $0 $164,920
$1,301,000 $43,289 $1,344,289
Chalkyitsik Chalkyitsik (CIK)
3-02-0046-001-1988 6/15/1988 1/7/1993 Install Miscellaneous NAVAIDS (ST OT IN) $10,190 $0 $10,190
6/15/1988 1/7/1993 Install Apron Lighting (ST AP LI) $10,150 $0 $10,150
6/15/1988 1/7/1993 Install Runway Lighting (ST RW LI) $77,190 $0 $77,190
6/15/1988 1/7/1993 Construct Apron (ST AP CO) $99,549 $0 $99,549
6/15/1988 1/7/1993 Construct Taxiway (ST TW CO) $17,871 $0 $17,871
6/15/1988 1/7/1993 Construct Runway 3/21 (ST RW CO) $671,237 $141,368 $812,605
6/15/1988 1/7/1993 Install Runway Lighting (ST RW LI) $85,235 $0 $85,235
3-02-0046-002-1991 9/24/1991 11/22/1993 Improve Building (ST BD MS) $70,000 $16,118 $86,118
9/24/1991 11/22/1993 Improve Building (ST BD MS) $0 $39,794 $39,794
9/24/1991 11/22/1993 Acquire Snow Removal Equipment (ST EQ SN) $130,000 $0 $130,000
3-02-0046-003-1993 9/29/1993 10/24/1998 Acquire Snow Removal Equipment (ST EQ SN) $187,500 $0 $187,500
9/29/1993 10/24/1998 Install Runway Lighting (ST RW LI) $83,660 $0 $83,660
9/29/1993 10/24/1998 Extend Runway 03/21 (ST RW IM) $1,016,182 $0 $1,016,182
3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $300,000 $300,000
$2,458,764 $497,280 $2,956,044
Chandalar Camp Chandalar Shelf (5CD)
3-02-0431-001-2004 8/24/2004 3/28/2008 Construct Snow Removal Equipment Building (ST BD SN)
$967,834 $0 $967,834
$967,834 $0 $967,834
Monday, January 11, 2016 Page 24 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Chandalar Lake Chandalar Lake (WCR)
3-02-0047-001-1994 6/24/1994 3/31/1999 Extend Runway 03/21 (ST RW IM) $820,478 $56,299 $876,777
6/24/1994 3/31/1999 Construct Taxiway (ST TW CO) $48,384 $0 $48,384
6/24/1994 3/31/1999 Construct Apron (ST AP CO) $380,006 $0 $380,006
6/24/1994 3/31/1999 Improve Access Road (OT GT AC) $83,451 $0 $83,451
6/24/1994 3/31/1999 Acquire Land For Approaches (ST LA SZ) $37,500 $0 $37,500
$1,369,819 $56,299 $1,426,118
Chefornak Chefornak (CFK)
3-02-0442-001-2002 9/12/2002 5/30/2006 Construct New Airport (ST NA CO) $7,022,719 $0 $7,022,719
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 16/34 (Various Surface Maintenance) (RE RW IM)
$319,200 $0 $319,200
3-02-0442-002-2010 9/15/2010 Construct New Airport Phase 2 (ST NA CO) $8,694,932 $12,997,368 $21,692,300
$16,036,851 $12,997,368 $29,034,219
Chenega Chenega Bay (C05)
3-02-0419-001-1990 9/7/1990 8/16/1993 Conduct Airport Master Plan Study (PL PL MA) $169,682 $0 $169,682
3-02-0419-002-1992 9/29/1992 6/17/1999 Acquire Snow Removal Equipment (ST EQ SN) $150,000 $0 $150,000
9/29/1992 6/17/1999 Construct Taxiway (ST TW CO) $107,479 $0 $107,479
9/29/1992 6/17/1999 Construct Runway 15/33 (ST RW CO) $2,005,924 $0 $2,005,924
9/29/1992 6/17/1999 Improve Snow Removal Equipment Building (ST BD SN)
$132,000 $0 $132,000
9/29/1992 6/17/1999 Improve Access Road (OT GT AC) $1,023,752 $0 $1,023,752
9/29/1992 6/17/1999 Acquire Land for Development (ST LA DV) $61,875 $0 $61,875
9/29/1992 6/17/1999 Construct Apron (ST AP CO) $452,286 $0 $452,286
3-02-0419-003-1997 6/13/1997 7/15/1998 Acquire Snow Removal Equipment (ST EQ SN) $71,709 $0 $71,709
3-02-0419-004-2004 9/1/2004 4/30/2008 Rehabilitate Access Road (OT GT AC) $452,000 $0 $452,000
9/1/2004 4/30/2008 Rehabilitate Apron (RE AP IM) $550,000 $0 $550,000
9/1/2004 4/30/2008 Construct Snow Removal Equipment Building (ST BD SN)
$570,000 $0 $570,000
9/1/2004 4/30/2008 Rehabilitate Runway 15/33 (RE RW IM) $2,460,000 $64,989 $2,524,989
3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader w/blower) (ST EQ SN)
$409,090 $0 $409,090
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) (RE RW IM)
$10,545 $0 $10,545
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Grader w/ Attachments (ST EQ SN)
$336,948 $0 $336,948
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 15/33 Chenega Bay Various Surface Maintenance (RE RW IM)
$106,400 $0 $106,400
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation Maintenance (Chenega Bay) (RE RW IM)
$262,500 $0 $262,500
$9,332,190 $64,989 $9,397,179
Monday, January 11, 2016 Page 25 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Chevak Chevak (VAK)
3-02-0052-001-1999 Construct New Airport (ST NA CO)
Improve Snow Removal Equipment Building (ST BD SN)
3-02-0052-002-2003 Construct Snow Removal Equipment Building (ST BD SN)
3-02-0468-001-2005 Construct Snow Removal Equipment Building (ST BD SN)
Construct New Airport Phase 2 (Surfacing) (ST NA CO)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Dozer--John Deere 550) (ST EQ SN)
3-02-0468-002-2007 Construct New Airport Phase III (ST NA CO)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various Surface Preservation (RE RW IM)
3/25/1999
3/25/1999
8/4/2003
8/24/2005
8/24/2005
8/17/2006
8/6/2007
9/16/2011
9/11/2003 $5,855,240
9/11/2003 $500,000
8/17/2007 $729,893
$500,000
$2,968,450
7/19/2013 $180,919
$193,800
$10,640
$10,938,942
$0
$0
$0
$0
$0
$0
$0
$0
$0
$5,855,240
$500,000
$729,893
$500,000
$2,968,450
$180,919
$193,800
$10,640
$10,938,942
Chicken Chicken (CKX)
3-02-0053-001-1987 Acquire Land for Development (ST LA DV)
Acquire Snow Removal Equipment (ST EQ SN)
Construct Apron (ST AP CO)
Construct Runway 13/31 (ST RW CO)
Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
3-02-0053-002-2008 Acquire Snow Removal Equipment Acquire Snow Removal Equipment (Motor Grader) (ST EQ SN)
Acquire Land for Development Acquire Land: Tract 1, Parcels B, C, D, D1, E, E1, and F (ST LA DV)
9/18/1987
9/18/1987
9/18/1987
9/18/1987
9/18/1987
5/1/2008
5/1/2008
10/24/1998 $143,438
10/24/1998 $108,750
10/24/1998 $323,506
10/24/1998 $524,524
10/24/1998 $77,072
3/21/2012 $269,024
3/21/2012 $111,240
$1,557,554
$0
$0
$0
$0
$0
$0
$0
$0
$143,438
$108,750
$323,506
$524,524
$77,072
$269,024
$111,240
$1,557,554
Chignik Chignik (AJC)
3-02-0330-001-1992 Rehabilitate Taxiway (RE TW IM)
Rehabilitate Apron (RE AP IM)
Extend Runway 02/20 (ST RW IM)
Improve Snow Removal Equipment Building (ST BD SN)
Improve Access Road (OT GT AC)
Acquire Land for Development (ST LA DV)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
Chignik Regional (Proposed GA) (+01H)
9/25/1992
9/25/1992
9/25/1992
9/25/1992
9/25/1992
9/25/1992
6/19/2008
9/25/1997
9/25/1997
9/25/1997
9/25/1997
9/25/1997
9/25/1997
6/10/2014
$14,000
$42,000
$538,225
$95,000
$4,000
$75,000
$0
$768,225
$0
$0
$26,979
$0
$0
$0
$0
$26,979
$14,000
$42,000
$565,204
$95,000
$4,000
$75,000
$0
$795,204
3-02-0443-001-2004 Conduct Airport Master Plan Study (PL PL MA)
3-02-0443-002-2005 Conduct Airport Master Plan Study Phase 2 (EA & ALP) (PL PL MA)
8/25/2004
8/19/2005
6/15/2007
6/9/2010
$124,493
$121,608
$246,101
$0
$0
$0
$124,493
$121,608
$246,101
Monday, January 11, 2016 Page 26 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Chignik Flats Chignik Lagoon (KCL)
3-02-0056-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/12/1990 10/13/1994 $138,768 $0 $138,768
$138,768 $0 $138,768
Chignik Lake Chignik Lake (A79)
3-02-0331-001-1985 Extend Runway 8/26 (ST RW IM) 8/26/1985 5/26/1992 $126,563 $0 $126,563
Rehabilitate Taxiway (RE TW IM) 8/26/1985 5/26/1992 $8,437 $0 $8,437
Rehabilitate Runway 8/26 (RE RW IM) 8/26/1985 5/26/1992 $694,035 $0 $694,035
Rehabilitate Apron (RE AP IM) 8/26/1985 5/26/1992 $14,063 $0 $14,063
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/19/2008 6/10/2014 $289,700 $0 $289,700 (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Chignik Lake 3/12/2010 12/9/2015 $42,560 $0 $42,560 Various Surface Maintenance (RE RW IM)
$1,185,358 $0 $1,185,358
Chisana Chisana (CZN)
3-02-0057-001-1993 Conduct Airport Master Plan Study (PL PL MA) 9/28/1993 9/11/1995 $10,305 $0 $10,305
3-02-0057-002-1996 Conduct Airport Master Plan Study (PL PL MA) 8/23/1996 11/17/2006 $234,423 $0 $234,423
$244,728 $0 $244,728
Chistochina Chistochina (Proposed GA) (+07D)
3-02-0475-001-2007 Conduct Airport Master Plan Study (Relocation Study, 8/8/2007 3/21/2012 $134,874 $0 $134,874 Phase 1) (PL PL MA)
3-02-0475-002-2009 Conduct Airport Master Plan Study (Relocation Study, 2/11/2009 11/5/2014 $170,767 $0 $170,767 Phase 2) (PL PL MA)
$305,641 $0 $305,641
Chitina Chitina (CXC)
3-02-0059-001-1991 Construct Apron (CA AP CO) 9/23/1991 10/24/1998 $219,474 $0 $219,474
Construct Taxiway (ST TW CO) 9/23/1991 10/24/1998 $55,143 $0 $55,143
Extend Runway 13/31 (ST RW IM) 9/23/1991 10/24/1998 $666,403 $0 $666,403
Acquire Land For Approaches (ST LA SZ) 9/23/1991 10/24/1998 $16,000 $0 $16,000
Improve Access Road (CA GT AC) 9/23/1991 10/24/1998 $55,205 $0 $55,205
3-02-0059-002-1999 Improve Snow Removal Equipment Building (ST BD 3/25/1999 8/31/2001 $530,786 $0 $530,786 SN)
3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $222,064 $0 $222,064 (Acquire Wheel Loader) (ST EQ SN)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) 5/31/2007 8/6/2013 $37,240 $0 $37,240 (RE RW IM)
Monday, January 11, 2016 Page 27 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $100,500 $0 $100,500 Obstruction Removal (Chitina) (SA OT OB)
$1,902,815 $0 $1,902,815
Chuathbaluk Chuathbaluk (9A3)
3-02-0460-001-2002 Construct Snow Removal Equipment Building (ST BD 9/17/2002 6/30/2006 $300,000 $0 $300,000 SN)
Construct New Airport (ST NA CO) 9/17/2002 6/30/2006 $5,723,410 $0 $5,723,410
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) 5/31/2007 8/6/2013 $53,200 $0 $53,200 (RE RW IM)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 09/27 (+08J) 9/19/2014 $144,900 $0 $144,900 Various Surface Preservation Maintenance: Chuathbaluk - Dust Control (RE RW IM)
$6,221,510 $0 $6,221,510
Circle Circle City (CRC)
3-02-0407-001-1985 Acquire Land for Development (ST LA DV) 9/3/1985 10/12/1990 $302,655 $0 $302,655
3-02-0407-002-1986 Install Runway Lighting (ST RW LI) 9/19/1986 9/20/1988 $79,106 $0 $79,106
Construct Apron (ST AP CO) 9/19/1986 9/20/1988 $780,025 $152,218 $932,243
Construct Runway 14/33 (CA RW CO) 9/19/1986 9/20/1988 $1,666,263 $0 $1,666,263
Improve Access Road (OT GT AC) 9/19/1986 9/20/1988 $78,142 $0 $78,142
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 15/33 (Various 8/20/2009 12/19/2014 $164,920 $0 $164,920 Surface Maintenance) (RE RW IM)
$3,071,111 $152,218 $3,223,329
Circle Hot Springs Circle Hot Springs (CHP)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/30/2006 2/27/2012 $168,720 $0 $168,720 (RE RW IM)
$168,720 $0 $168,720
Clarks Point Clarks Point (CLP)
3-02-0062-001-1995 Conduct Airport Master Plan Study (PL PL MA) 9/12/1995 8/1/2000 $271,900 $0 $271,900
3-02-0062-002-2000 Construct New Airport (ST NA CO) 9/14/2000 8/3/2004 $430,490 $2,609,506 $3,039,996
Improve Snow Removal Equipment Building (ST BD 9/14/2000 8/3/2004 $250,000 $0 $250,000 SN)
3-02-0062-003-2004 Construct New Airport (ST NA CO) 8/19/2004 9/2/2008 $2,924,837 $0 $2,924,837
Construct Snow Removal Equipment Building (ST BD 8/19/2004 9/2/2008 $1,000,000 $0 $1,000,000 SN)
3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $237,032 $0 $237,032 (Motor Grader) (ST EQ SN)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $226,393 $0 $226,393 (Loader w/Plow & Attachmnts) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Remove Obstructions Various 9/21/2015 $78,750 $0 $78,750 Obstruction Removal (Clarks Point, Rwy 18 Approach 20:1 penetrations, .6 acres) (SA OT OB)
$5,419,402 $2,609,506 $8,028,908
Monday, January 11, 2016 Page 28 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Clear Clear (Z84)
3-02-0420-001-1993 Construct Apron (ST AP CO) 8/19/1993 7/14/1999 $487,206 $0 $487,206
Construct Taxiway (ST TW CO) 8/19/1993 7/14/1999 $303,114 $0 $303,114
Extend Runway RW01/19 (ST RW IM) 8/19/1993 7/14/1999 $688,790 $0 $688,790
Install Runway Lighting (ST RW LI) 8/19/1993 7/14/1999 $166,969 $0 $166,969
Improve Access Road (OT GT AC) 8/19/1993 7/14/1999 $246,344 $0 $246,344
Acquire Land for Development (ST LA DV) 8/19/1993 7/14/1999 $53,693 $0 $53,693
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)
3-02-0000-007-2007 Conduct aeronautical survey for WAAS approach (PL 8/28/2007 1/28/2013 $0 $147,000 $147,000 PL VI)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
5/31/2007 8/6/2013 $63,840 $0 $63,840
$2,019,956 $147,000 $2,166,956
Coffman Cove Coffman Cove (KCC)
3-02-0064-001-1993 Construct Apron (ST AP CO) 9/17/1993 6/28/1995 $169,835 $635 $170,470
3-02-0064-002-2006 Construct Seaplane Base (ST SB CO) 5/19/2006 9/29/2011 $1,437,164 $31,334 $1,468,498
$1,606,999 $31,969 $1,638,968
Cold Bay Cold Bay (CDB)
3-02-0065-001-1987 Extend Taxiway (ST TW IM) 9/11/1987 4/9/1992 $17,328 $0 $17,328
Install Apron Lighting (ST AP LI) 9/11/1987 4/9/1992 $0 $40,000 $40,000
Rehabilitate Taxiway (RE TW IM) 9/11/1987 4/9/1992 $35,825 $0 $35,825
Rehabilitate Runway 14/32 (RE RW IM) 9/11/1987 4/9/1992 $1,829,408 $916,394 $2,745,802
Rehabilitate Runway 8/26 (RE RW IM) 9/11/1987 4/9/1992 $479,678 $0 $479,678
Rehabilitate Taxiway (RE TW IM) 9/11/1987 4/9/1992 $16,063 $0 $16,063
3-02-0065-002-1989 Improve Aircraft Rescue & Fire Fighting Building (SA 9/15/1989 4/13/1992 $315,870 $81,268 $397,138 BD EX)
3-02-0065-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
9/17/1990 3/24/1992 $280,029 $0 $280,029
3-02-0065-004-1993 Acquire Security Equipment (SA EQ SE) 7/27/1993 9/19/1995 $0 $454,010 $454,010
3-02-0065-005-1994 Acquire Security Equipment (SA EQ SE) 9/28/1994 8/16/2000 $52,811 $0 $52,811
Improve Access Road (OT GT AC) 9/28/1994 8/16/2000 $69,989 $0 $69,989
Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1994 8/16/2000 $991,286 $0 $991,286 BD EX)
3-02-0065-006-2002 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/9/2002 1/24/2006 $119,000 $567,205 $686,205 EQ RF)
3-02-0065-007-2004 Rehabilitate Taxiway (RE TW IM) 8/25/2004 7/20/2010 $420,000 $0 $420,000
Rehabilitate Runway 8/26 (RE RW IM) 8/25/2004 7/20/2010 $6,196,163 $0 $6,196,163
Improve Runway Safety Area 8/26 (SA RW SF) 8/25/2004 7/20/2010 $298,647 $3,738,196 $4,036,843
Rehabilitate Apron (RE AP IM) 8/25/2004 7/20/2010 $495,000 $0 $495,000
3-02-0065-008-2005 Conduct Airport Master Plan Study (Terminal Plan) (PL 8/8/2005 5/21/2010 $0 $167,789 $167,789 PL MA)
Monday, January 11, 2016 Page 29 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) 6/30/2006 2/27/2012 $168,720 $0 $168,720 (RE RW IM)
3-02-0065-009-2008 Conduct Airport Master Plan Study (PL PL MA) 9/4/2008 3/18/2013 $299,659 $0 $299,659
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Equipment (SA EQ RF)
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $930,850 $0 $930,850 Acquire SRE (Central Region): Cold Bay (Snow Blower with Attachments) (ST EQ SN)
3-02-0065-010-2011 Rehabilitate Apron Rehabilitate North Apron (RE AP IM) 9/14/2011 $1,500,000 $0 $1,500,000
Rehabilitate Taxiway Rehabilitate Taxiway C (RE TW 9/14/2011 $392,417 $0 $392,417 IM)
Rehabilitate Runway 14/32 Rehabilitate Rwy 14 Turn 9/14/2011 $500,000 $0 $500,000 Around (RE RW IM)
Construct Runway Safety Area 14/32 Extend Runway 9/14/2011 $686,142 $6,779,869 $7,466,011 Safety Area (ST RW SF)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 08/26 Various 9/16/2011 $276,640 $0 $276,640 Surface Preservation (RE RW IM)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 08/26 Variuos 9/19/2012 $31,500 $0 $31,500 Surface Preservation Maintenance (Cold Bay) (RE RW IM)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 15/33 (+08J) 9/19/2014 $241,500 $0 $241,500 Various Surface Preservation Maintenance: Cold Bay -Crack Seal, Erosion Control and Stabilization on Runway Edges (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 15/33 Accomplish 9/21/2015 $241,500 $0 $241,500 Various Airport Surface Preservation Maintenance (Cold Bay Crack Seal and Markings) (RE RW IM)
$16,886,025 $12,844,731 $29,730,756
Coldfoot Coldfoot (CXF)
3-02-0425-001-1993 Extend Runway 01/19 (ST RW IM) 9/17/1993 7/14/1999 $1,474,203 $22,365 $1,496,568
Rehabilitate Taxiway (RE TW IM) 9/17/1993 7/14/1999 $24,637 $0 $24,637
Construct Apron (ST AP CO) 9/17/1993 7/14/1999 $110,831 $0 $110,831
Install Runway Lighting (ST RW LI) 9/17/1993 7/14/1999 $281,532 $0 $281,532
Acquire Snow Removal Equipment (ST EQ SN) 9/17/1993 7/14/1999 $281,184 $0 $281,184
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 6/19/2008 6/10/2014 $158,000 $0 $158,000 (RE RW IM)
3-02-0000-015-2010 Conduct aeronautical survey for WAAS approach 9/22/2010 $0 $300,000 $300,000 Aeronauical Survey (PL PL VI)
3-02-0425-002-2015 Rehabilitate Taxiway (RE TW IM) 9/14/2015 $150,000 $0 $150,000
Rehabilitate Runway 01/19 (RE RW IM) 9/14/2015 $0 $5,721,903 $5,721,903
Rehabilitate Runway Lighting (RE RW LI) 9/14/2015 $248,527 $0 $248,527
Rehabilitate Apron (RE AP IM) 9/14/2015 $0 $1,500,000 $1,500,000
$2,728,914 $7,544,268 $10,273,182
Cordova Merle K (Mudhole) Smith (CDV)
3-02-0067-001-1985 Improve Snow Removal Equipment Building (ST BD 6/28/1985 3/24/1988 $95,049 $0 $95,049 SN)
Acquire Snow Removal Equipment (ST EQ SN) 6/28/1985 3/24/1988 $12,057 $0 $12,057
Install Apron Lighting (ST AP LI) 6/28/1985 3/24/1988 $77,875 $0 $77,875
Monday, January 11, 2016 Page 30 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0067-001-1985 Install Apron Lighting (ST AP LI) 6/28/1985 3/24/1988 $111,101 $0 $111,101
3-02-0067-002-1987 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/2/1987 2/25/1991 $270,490 $0 $270,490 EQ RF)
3-02-0067-003-1989 Groove Runway 9/27 (SP RW FR) 5/19/1989 1/31/1991 $211,599 $6,881 $218,480
Extend Runway 9/27 (ST RW IM) 5/19/1989 1/31/1991 $32,069 $0 $32,069
Extend Runway 9/27 (ST RW IM) 5/19/1989 1/31/1991 $56,279 $0 $56,279
3-02-0067-004-1993 Install Guidance Signs (SA OT SG) 9/20/1993 5/12/2000 $117,315 $0 $117,315
Extend Runway 09/27 (ST RW IM) 9/20/1993 5/12/2000 $0 $518,096 $518,096
Extend Runway 09/27 (ST RW IM) 9/20/1993 5/12/2000 $323,805 $556,133 $879,938
Install Runway Lighting (ST RW LI) 9/20/1993 5/12/2000 $451,212 $0 $451,212
Construct Apron (ST AP CO) 9/20/1993 5/12/2000 $700,883 $0 $700,883
Acquire Snow Removal Equipment (ST EQ SN) 9/20/1993 5/12/2000 $553,488 $0 $553,488
3-02-0067-006-1998 Conduct Airport Master Plan Study (PL PL MA) 7/20/1998 9/6/2002 $260,294 $0 $260,294
3-02-0067-007-1998 Improve Runway Safety Area 9-27 (SA RW SF) 5/20/1998 9/17/2001 $915,371 $0 $915,371
Rehabilitate Runway 9-27 (RE RW IM) 5/20/1998 9/17/2001 $75,000 $1,948,443 $2,023,443
3-02-0067-008-2000 Improve Snow Removal Equipment Building (ST BD 9/6/2000 7/13/2004 $609,141 $89,479 $698,621 SN)
3-02-0067-009-2005 Repair Utilities (Power) (OT OT FF) 8/25/2005 8/28/2009 $1,500,000 $0 $1,500,000
Construct Runway Safety Area 09/27 (Purchase EMAS, 8/25/2005 8/28/2009 $0 $5,264,226 $5,264,226 Phase 1) (SA RW SF)
3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $0 $700,000 $700,000 Vehicle (SA EQ RF)
3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $245,742 $0 $245,742 EQ SN)
3-02-0067-010-2006 Construct Runway Safety Area 09/27 (Install EMAS, 7/25/2006 1/21/2010 $103,673 $4,346,424 $4,450,097 Phase 2) (SA RW SF)
3-02-0067-012-2007 Construct Sand and Chemical Storage Building (ST BD 8/23/2007 5/4/2010 $2,624,783 $0 $2,624,783 SN)
3-02-0067-011-2008 Rehabilitate Runway Lighting 09/27 (RE RW LI) 6/5/2008 4/1/2013 $4,499,980 $626,530 $5,126,510
3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $655,109 $0 $655,109 Acquire Northern SRE - Cordova Towed Broom & Plow Truck with Appurtenances (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/19/2008 6/10/2014 $100,000 $0 $100,000 (RE RW IM)
3-02-0067-013-2009 Rehabilitate Runway Lighting 09/27 (RE RW LI) 9/1/2009 3/21/2012 $547,022 $0 $547,022
3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $728,000 $0 $728,000 Acquire SRE Northern Region (Cordova Snow Blower) (ST EQ SN)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various 9/16/2011 $260,915 $0 $260,915 Surface Preservation (RE RW IM)
3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $125,000 $0 $125,000 Obstruction Removal (Cordova) (ST OT OB)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $560,032 $0 $560,032 Acquire SRE (Alaska Region): Cordova (Plow Truck, Sander) (ST EQ SN)
3-02-0200-096-2014 [Various Grnt] Acquire Snow Removal Equipment 9/18/2014 $148,043 $0 $148,043 (+08J) Various EDA/EAS Locations: Cordova - Acquire SRE (Tow Plow) (ST EQ SN)
3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 16/34 EAS/EDA 9/20/2015 $33,320 $0 $33,320 Various (Cordova - Surface Preservation Maintenance: Re-Stripe RWYs and TWYs) (RE RW IM)
Monday, January 11, 2016 Page 31 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
$17,004,647 $14,151,712 $31,156,360
Council Council (K29)
3-02-0413-001-1987 Construct Apron (ST AP CO)
Construct Runway 3/21 (ST RW CO)
Improve Access Road (OT GT AC)
Acquire Land for Development (ST LA DV)
3-02-0413-002-1988 Improve Snow Removal Equipment Building (ST BD SN)
Acquire Snow Removal Equipment (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Council) (SA OT OB)
9/21/1987
9/21/1987
9/21/1987
9/21/1987
5/19/1988
5/19/1988
6/30/2006
8/20/2009
7/23/2012
3/15/2000 $166,621
3/15/2000 $1,036,795
3/15/2000 $99,147
3/15/2000 $176,188
9/9/1992 $35,407
9/9/1992 $67,633
2/27/2012 $21,090
12/19/2014 $37,240
$31,020
$1,671,141
$0
$0
$0
$133,031
$15,204
$0
$0
$0
$0
$148,235
$166,621
$1,036,795
$99,147
$309,219
$50,611
$67,633
$21,090
$37,240
$31,020
$1,819,376
Craig Craig (CGA)
3-02-0071-001-1994 Construct Apron (ST AP CO)
Acquire Land for Development (ST LA DV)
3-02-0071-002-1995 Construct Terminal Building (ST TE CO)
9/27/1994
9/27/1994
2/15/1995
7/14/1999 $1,423,433
7/14/1999 $101,906
9/28/1999 $743,850
$2,269,189
$6,057
$0
$48,433
$54,490
$1,429,490
$101,906
$792,283
$2,323,679
Crooked Creek Crooked Creek (CJX)
3-02-0073-001-1991 Improve Snow Removal Equipment Building (ST BD SN)
Construct Runway 13/31 (ST RW CO)
Construct Apron (ST AP CO)
3-02-0073-002-1991 Acquire Land for Development (ST LA DV)
3-02-0073-003-2001 Conduct Airport Master Plan Study (PL PL MA)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish Various Airport Surface Preservation Maintenance (Crooked Creek Minor Resurfacing and Compaction) (RE RW IM)
6/3/1991
6/3/1991
6/3/1991
8/30/1991
7/18/2001
5/31/2007
9/21/2015
8/9/1993 $98,727
8/9/1993 $1,111,110
8/9/1993 $353,236
5/9/2000 $136,218
8/17/2005 $350,000
8/6/2013 $53,200
$350,000
$2,452,491
$0
$89,077
$0
$0
$0
$0
$0
$89,077
$98,727
$1,200,187
$353,236
$136,218
$350,000
$53,200
$350,000
$2,541,568
Dahl Creek Dahl Creek (DCK)
3-02-0075-001-1985 Acquire Land for Development (ST LA DV)
3-02-0075-002-1986 Construct Apron (ST AP CO)
Remove Obstructions (ST OT OB)
Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
8/26/1985
9/10/1986
9/10/1986
9/10/1986
9/10/1996
3/16/1992
3/16/1992
3/16/1992
$168,458
$258,916
$61,800
$3,771
$0
$0
$0
$0
$168,458
$258,916
$61,800
$3,771
Monday, January 11, 2016 Page 32 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0075-002-1986 Extend Runway 8/26 (ST RW IM) 9/10/1986 3/16/1992 $976,426 $0 $976,426
Construct Taxiway (ST TW CO) 9/10/1986 3/16/1992 $79,242 $0 $79,242
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/30/2006 2/27/2012 $36,908 $0 $36,908 (RE RW IM)
$1,585,521 $0 $1,585,521
Deadhorse Deadhorse (SCC)
3-02-0339-001-1984 Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $297,888 $0 $297,888
Acquire Security Equipment (SA EQ SE) 8/24/1984 8/21/1989 $113,859 $0 $113,859
Construct Apron (CA AP CO) 8/24/1984 8/21/1989 $324,023 $0 $324,023
Rehabilitate Apron (RE AP IM) 8/24/1984 8/21/1989 $33,626 $0 $33,626
Construct Taxiway (CA TW CO) 8/24/1984 8/21/1989 $198,595 $0 $198,595
Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $1,893,184 $1,567,001 $3,460,185
Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $184,266 $0 $184,266
3-02-0339-002-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/22/1986 4/16/1992 $337,135 $0 $337,135 EQ RF)
3-02-0339-003-1989 Improve Snow Removal Equipment Building (ST BD 6/26/1989 10/9/1991 $301,966 $0 $301,966 SN)
3-02-0339-004-1995 Improve Access Road (OT GT AC) 9/27/1995 9/21/2000 $300,000 $0 $300,000
Rehabilitate Taxiway (RE TW IM) 9/27/1995 9/21/2000 $3,500,000 $0 $3,500,000
Rehabilitate Runway 04/22 (RE RW IM) 9/27/1995 9/21/2000 $1,026,664 $4,000,000 $5,026,664
Install Runway Lighting (SA RW LI) 9/27/1995 9/21/2000 $1,100,000 $0 $1,100,000
Acquire Snow Removal Equipment (ST EQ SN) 9/27/1995 9/21/2000 $300,000 $0 $300,000
Rehabilitate Runway 04/22 (RE RW IM) 9/27/1995 9/21/2000 $1,012,290 $3,323,336 $4,335,626
Install Runway Vertical/Visual Guidance System (ST 9/27/1995 9/21/2000 $750,000 $0 $750,000 RW VI)
3-02-0339-005-1998 Improve Aircraft Rescue & Fire Fighting Building (SA 9/10/1998 9/26/2002 $3,595,781 $97,513 $3,693,294 BD EX)
3-02-0339-006-2004 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/6/2004 9/18/2009 $249,160 $710,000 $959,160 EQ RF)
3-02-0339-007-2004 Expand Apron (ST AP IM) 9/1/2004 9/17/2008 $375,000 $0 $375,000
Construct Runway Safety Area 04/22 (SA RW SF) 9/1/2004 9/17/2008 $0 $8,988,312 $8,988,312
3-02-0339-008-2005 Expand Apron (ST AP IM) 8/25/2005 5/6/2010 $791,541 $0 $791,541
Extend Runway Safety Area 04/22 (Phase 2) (SA RW 8/25/2005 5/6/2010 $941,542 $6,856,090 $7,797,632 SF)
3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment 8/31/2007 12/7/2009 $715,000 $0 $715,000 (Carrier Unit and Broom) (ST EQ SN)
3-02-0339-009-2007 Update Airport Master Plan Study (PL PL MA) 8/28/2007 1/22/2013 $472,857 $0 $472,857
3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $75,000 $0 $75,000 Acquire Northern SRE - Deadhorse Sander (ST EQ SN)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0339-010-2010 Update Airport Master Plan Study MP update (PL PL 9/3/2010 3/7/2013 $132,519 $0 $132,519 MA)
3-02-0339-011-2011 Rehabilitate Runway 05/23 Rehab Runway phase 1 (RE 8/10/2011 2/5/2014 $3,831,982 $574,440 $4,406,422 RW IM)
3-02-0339-012-2011 Rehabilitate Runway 05/23 Rehab Runway phase 2 (RE 9/14/2011 $0 $10,683,822 $10,683,822 RW IM)
3-02-0339-013-2011 Rehabilitate Taxiway Phase 1 (RE TW IM) 9/28/2011 $437,837 $3,760,188 $4,198,025
Rehabilitate Apron Phase 1 (RE AP IM) 9/28/2011 $262,604 $4,191,990 $4,454,594
Monday, January 11, 2016 Page 33 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0339-014-2012 Rehabilitate Apron phase 2 (RE AP IM) 8/8/2012 $1,000,000 $1,250,000 $2,250,000
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (De-Icer) (ST EQ SN)
9/19/2013 $331,149 $0 $331,149
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Deadhorse - Blower and Grader (ST EQ SN)
9/19/2014 $998,317 $0 $998,317
3-02-0339-015-2014 Construct Sand and Chemical Storage Building Sand/Chemical Storage Bldg Addition, Phase 1 (ST BD SN)
9/19/2014 $1,500,000 $0 $1,500,000
Expand Snow Removal Equipment Building Expand SRE Bldg, Phase 1 (ST BD SN)
9/19/2014 $1,500,486 $0 $1,500,486
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 05/23 Accomplish Various Airport Surface Preservation Maintenance (Deadhorse RWY and TWY Markings) (RE RW IM)
9/21/2015 $61,010 $0 $61,010
3-02-0339-016-2015 Expand Snow Removal Equipment Building Expand SREB, Phase 2 (ST BD SN)
7/7/2015 $1,000,000 $179,826 $1,179,826
Expand Aircraft Rescue & Fire Fighting Building Expand ARFF Building (SA BD EX)
7/7/2015 $1,575,000 $3,125,750 $4,700,750
Construct Sand and Chemical Storage Building Sand/Chemical Storage Bldg Addition, Phase 2 (ST BD SN)
7/7/2015 $1,370,734 $0 $1,370,734
$32,891,015 $49,403,768 $82,294,783
Deering Deering (DEE)
3-02-0400-001-1989 Install Runway Lighting (ST RW LI) 6/26/1989 8/11/1993 $64,830 $0 $64,830
Construct Runway 11/29 (ST RW CO) 6/26/1989 8/11/1993 $2,439,613 $0 $2,439,613
3-02-0400-002-1991 Acquire Land for Development (ST LA DV) 8/21/1991 6/18/1992 $107,518 $0 $107,518
3-02-0400-003-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/24/1991 11/17/1995 $133,575 $0 $133,575
Improve Snow Removal Equipment Building (ST BD SN)
9/24/1991 11/17/1995 $362,451 $0 $362,451
3-02-0400-004-2001 Rehabilitate Runway (RE RW IM) 9/4/2001 9/2/2005 $2,713,972 $94,755 $2,808,727
Extend Runway (ST RW IM) 9/4/2001 9/2/2005 $1,900,000 $0 $1,900,000
3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment EQ SN)
(ST 9/2/2005 4/4/2008 $217,121 $0 $217,121
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Deering Various Surface Maintenance (RE RW IM)
3/12/2010 12/9/2015 $174,800 $0 $174,800
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)
9/19/2013 $311,670 $0 $311,670
$8,425,550 $94,755 $8,520,305
Delta Junction Ft Greely Allen AAF (BIG)
3-02-0077-001-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 6/3/2003 $228,285 $0 $228,285
$228,285 $0 $228,285
Dillingham Dillingham (DLG)
3-02-0078-001-1984 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
9/20/1984 2/4/1988 $182,142 $0 $182,142
3-02-0078-002-1986 Rehabilitate Taxiway (RE TW IM) 7/30/1986 11/23/1990 $0 $143,805 $143,805
Monday, January 11, 2016 Page 34 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0078-002-1986 Expand Apron (ST AP IM) 7/30/1986 11/23/1990 $0 $738,175 $738,175
Extend Runway 1/19 (ST RW IM) 7/30/1986 11/23/1990 $315,868 $1,765,199 $2,081,067
Expand Apron (CA AP EX) 7/30/1986 11/23/1990 $0 $440,380 $440,380
3-02-0078-003-1987 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/2/1987 2/25/1991 $195,130 $0 $195,130 EQ RF)
3-02-0078-004-1988 Improve Access Road (OT GT AC) 9/14/1988 11/5/1991 $648,576 $0 $648,576
3-02-0078-005-1990 Improve Airport Drainage (ST OT IM) 7/3/1990 6/17/1991 $455,884 $0 $455,884
3-02-0078-006-1991 Expand Apron (CA AP EX) 8/27/1991 12/20/1993 $2,099,420 $67,095 $2,166,515
Improve Access Road (CA GT AC) 8/27/1991 12/20/1993 $365,790 $0 $365,790
3-02-0078-007-1995 Improve Aircraft Rescue & Fire Fighting Building (SA 6/15/1995 9/20/2000 $0 $1,484,177 $1,484,177 BD EX)
Improve Aircraft Rescue & Fire Fighting Building (SA 6/15/1995 9/20/2000 $0 $86,000 $86,000 BD EX)
3-02-0078-008-1996 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 5/1/1996 10/24/1998 $0 $416,658 $416,658 EQ RF)
3-02-0078-009-2001 Conduct Airport Master Plan Study (PL PL MA) 8/15/2001 3/9/2007 $385,254 $0 $385,254
3-02-0078-010-2003 Construct Runway Safety Area 1-19 (ST RW SF) 7/7/2003 9/12/2007 $1,323,460 $146,151 $1,469,611
Rehabilitate Runway 1-19 (RE RW IM) 7/7/2003 9/12/2007 $3,522,364 $0 $3,522,364
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $80,000 $0 $80,000 (RE RW IM)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment De- 8/17/2006 7/19/2013 $173,661 $0 $173,661 icer truck (4,000-gal) (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 6/30/2006 2/27/2012 $89,633 $0 $89,633 (RE RW IM)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: DLG--Tractor Truck for pull broom w/ attachment (ST EQ SN)
3-02-0078-011-2009 Construct Sand and Chemical Storage Building 8/20/2009 $2,669,171 $78,190 $2,747,361 Construct 3-Bay Sand and Chemical Storage Building (ST BD SN)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 01/19 (Various 8/20/2009 12/19/2014 $85,120 $0 $85,120 Surface Maintenance) (RE RW IM)
3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $150,873 $0 $150,873 Acquire SRE (Central Region): Snow Blower w/ Attachments; Dozer w/ Attachments (ST EQ SN)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $67,145 $67,145 Fencing Acquire Water Rescue Equipment (SA EQ RF)
3-02-0078-012-2010 Rehabilitate Apron Rehabilitate Apron (LOC) (RE AP IM) 3/30/2010 3/10/2015 $5,586,886 $0 $5,586,886
Rehabilitate Taxiway Rehabilitate Taxiway (LOC) (RE 3/30/2010 3/10/2015 $2,107,386 $0 $2,107,386 TW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01/19 Dillingham 3/12/2010 12/9/2015 $96,840 $0 $96,840 Various Surface Maintenance (RE RW IM)
3-02-0078-013-2012 Construct Runway Safety Area 01/19 Construct RSA 8/29/2012 $3,193,668 $13,990,000 $17,183,668 (SA RW SF)
3-02-0200-085-2012 [Various Grnt] Wildlife Hazard Assessments (PL PL 8/28/2012 $143,000 $0 $143,000 WH)
3-02-0078-014-2013 Construct Runway Safety Area 01/19 Construct Runway 7/30/2013 $2,162,210 $0 $2,162,210 Safety Area (Rwy 01/19), Phase 2 (SA RW SF)
3-02-0078-015-2013 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/19/2013 $637,950 $0 $637,950 3000 Gallon ARFF Truck (SA EQ RF)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 01/19 Surface 9/18/2013 $180,600 $0 $180,600 Preservation Maintenance (Dillingham) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $448,026 $0 $448,026 Acquire SRE (Runway Broom) (ST EQ SN)
Monday, January 11, 2016 Page 35 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$278,437 $0 $278,437
3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Dillingham - Plow (ST EQ SN)
$667,168 $0 $667,168
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Dillingham - Pavement Markings (RE RW IM)
$312,350 $0 $312,350
$28,756,867 $19,422,975 $48,179,842
Diomede Diomede (DM2)
3-02-0381-001-1993 9/27/1993 7/14/1999 Acquire Land for Development (ST LA DV) $210,142 $0 $210,142
9/27/1993 7/14/1999 Construct Apron (ST AP CO) $3,211,343 $82,939 $3,294,282
3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Diomede Dozer (ST EQ SN)
$353,267 $0 $353,267
$3,774,752 $82,939 $3,857,691
Eagle Eagle (EAA)
3-02-0083-001-1984 9/13/1984 8/3/1992 Install Runway Lighting (ST RW LI) $197,184 $0 $197,184
9/13/1984 8/3/1992 Acquire Land For Approaches (ST LA SZ) $56,700 $0 $56,700
9/13/1984 8/3/1992 Improve Access Road (OT GT AC) $221,358 $0 $221,358
9/13/1984 8/3/1992 Extend Runway 6/24 (ST RW IM) $435,668 $34,621 $470,289
9/13/1984 8/3/1992 Construct Apron (ST AP CO) $346,148 $0 $346,148
9/13/1984 8/3/1992 Construct Taxiway (ST TW CO) $17,972 $0 $17,972
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)
$18,981 $0 $18,981
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 06/24 (Various Surface Maintenance) (RE RW IM)
$26,600 $0 $26,600
3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $236,000 $236,000
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$79,406 $0 $79,406
$1,400,017 $270,621 $1,670,638
Eek Eek (EEK)
3-02-0085-001-1993 8/5/1993 5/9/2000 Conduct Airport Master Plan Study (PL PL MA) $233,933 $0 $233,933
3-02-0085-002-1998 8/27/1998 9/24/2002 Construct New Airport 17-35 (ST NA CO) $2,832,014 $0 $2,832,014
3-02-0085-003-2002 9/17/2002 9/1/2006 Construct New Airport Phase 2 - Construction (ST NA CO)
$2,194,100 $4,169,120 $6,363,220
9/17/2002 9/1/2006 Construct Snow Removal Equipment Building (ST BD SN)
$352,100 $0 $352,100
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 17/35 (Maintenance) (RE RW IM)
$58,208 $0 $58,208
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 17/35 Various Surface Preservation Maintenance (Eek) (RE RW IM)
$10,500 $0 $10,500
$5,680,855 $4,169,120 $9,849,975
Monday, January 11, 2016 Page 36 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Egegik Egegik (EII)
3-02-0422-001-1993 Construct Runway RW11/29 (ST RW CO)
Acquire Land for Development (ST LA DV)
Install Runway Lighting (ST RW LI)
Acquire Snow Removal Equipment (ST EQ SN)
Construct Taxiway (ST TW CO)
Improve Access Road (OT GT AC)
Construct Apron (ST AP CO)
Improve Snow Removal Equipment Building (ST BD SN)
3-02-0422-002-1999 Construct Runway 02-20 (ST RW CO)
Extend Runway 11-29 (ST RW IM)
3-02-0422-003-2001 Construct Runway (ST RW CO)
Extend Runway (ST RW IM)
Egegik (New) (Z03)
9/14/1993
9/14/1993
9/14/1993
9/14/1993
9/14/1993
9/14/1993
9/14/1993
9/14/1993
7/30/1999
7/30/1999
4/13/2001
4/13/2001
7/14/1999 $1,291,523
7/14/1999 $225,000
7/14/1999 $305,000
7/14/1999 $125,000
7/14/1999 $306,000
7/14/1999 $150,000
7/14/1999 $662,000
7/14/1999 $135,000
5/29/2001 $75,000
5/29/2001 $253,125
7/30/2003 $1,345,313
7/30/2003 $235,000
$5,107,961
$434,178
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$4,000,000
$4,434,178
$1,725,701
$225,000
$305,000
$125,000
$306,000
$150,000
$662,000
$135,000
$75,000
$253,125
$1,345,313
$4,235,000
$9,542,139
3-02-0086-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/14/1990 9/14/1990 $157,150
$157,150
$0
$0
$157,150
$157,150
Ekwok Ekwok (KEK)
3-02-0088-001-1983 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
Acquire Land for Development (ST LA DV)
Expand Apron (ST AP IM)
Extend Runway 02/20 (ST RW IM)
Extend Runway 02/20 (ST RW IM)
3-02-0088-002-2004 Construct Runway New (ST RW CO)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Loader w/Plow & Attachmnts) (ST EQ SN)
3-02-0088-003-2008 Construct Snow Removal Equipment Building (ST BD SN)
7/27/1983
7/27/1983
7/27/1983
7/27/1983
7/27/1983
8/27/2004
8/17/2006
6/12/2008
1/16/1986 $66,037
1/16/1986 $3,166
1/16/1986 $30,847
1/16/1986 $215,730
1/16/1986 $565,924
8/8/2008 $4,121,544
7/19/2013 $142,580
6/10/2014 $1,548,823
$6,694,651
$0
$0
$0
$0
$0
$1,243,447
$0
$0
$1,243,447
$66,037
$3,166
$30,847
$215,730
$565,924
$5,364,991
$142,580
$1,548,823
$7,938,098
Elim Elim (ELI)
3-02-0090-001-1987 Construct Runway 19/1 (ST RW CO)
3-02-0090-002-1988 Install Runway Lighting (ST RW LI)
Construct Apron (ST AP CO)
Construct Taxiway /19 (ST TW CO)
Improve Access Road (OT GT AC)
3-02-0090-003-1994 Acquire Snow Removal Equipment (ST EQ SN)
Improve Snow Removal Equipment Building (ST BD SN)
3-02-0090-004-2004 Rehabilitate Runway 01/19 (RE RW IM)
Extend Runway Safety Area 01/19 (ST RW SF)
4/3/1987
4/28/1988
4/28/1988
4/28/1988
4/28/1988
6/29/1994
6/29/1994
5/27/2004
5/27/2004
8/3/1992 $1,764,075
10/14/1992 $211,199
10/14/1992 $219,075
10/14/1992 $185,663
10/14/1992 $206,028
8/23/2000 $75,000
8/23/2000 $447,261
9/15/2008 $2,015,112
9/15/2008 $430,561
$176,246
$0
$0
$0
$0
$0
$0
$0
$3,119,656
$1,940,321
$211,199
$219,075
$185,663
$206,028
$75,000
$447,261
$2,015,112
$3,550,217
Monday, January 11, 2016 Page 37 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0090-004-2004 Extend Runway 01/19 (ST RW IM)
3-02-0090-005-2008 Rehabilitate Runway 01/19 rehabilitate runway, phase 2 (RE RW IM)
5/27/2004
9/15/2008
9/15/2008 $1,560,441
3/21/2011 $1,426,624
$8,541,039
$0
$0
$3,295,902
$1,560,441
$1,426,624
$11,836,940
Emmonak Emmonak (ENM)
3-02-0397-001-1983 Improve Access Road (OT GT AC) 9/21/1983 9/25/1989 $357,208 $0 $357,208
Improve Snow Removal Equipment Building (ST BD SN)
Construct Apron (ST AP CO)
Construct Runway 16/34 (ST RW CO)
Acquire Land for Development (ST LA DV)
Construct Taxiway (ST TW CO)
3-02-0397-002-2001 Expand Apron (ST AP IM)
Extend Taxiway (ST TW IM)
Rehabilitate Runway (RE RW IM)
Improve Runway Safety Area (ST RW SF)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
3-02-0397-003-2008 Rehabilitate Apron rehabilitate apron (RE AP IM)
3-02-0397-004-2009 Rehabilitate Runway Lighting 16/34 (RE RW LI)
Rehabilitate Apron rehabilitate apron, phase 2 (RE AP IM)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)
3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Emmonak Segmented Circle (ST OT IN)
9/21/1983
9/21/1983
9/21/1983
9/21/1983
9/21/1983
9/12/2001
9/12/2001
9/12/2001
9/12/2001
5/31/2007
9/5/2008
2/11/2009
2/11/2009
9/16/2011
9/20/2015
9/25/1989 $198,131
9/25/1989 $994,467
9/25/1989 $3,806,409
9/25/1989 $9,526
9/25/1989 $724,259
1/24/2006 $709,772
1/24/2006 $772,956
1/24/2006 $1,400,000
1/24/2006 $0
8/6/2013 $255,360
3/7/2013 $7,235,095
3/7/2013 $602,939
3/7/2013 $2,302,665
$199,092
$127,962
$0
$0
$609,000
$0
$0
$0
$0
$2,459,469
$1,560,604
$0
$0
$0
$0
$0
$0
$198,131
$994,467
$4,415,409
$9,526
$724,259
$709,772
$772,956
$3,859,469
$1,560,604
$255,360
$7,235,095
$602,939
$2,302,665
$199,092
$127,962
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 16/34 Accomplish Various Airport Surface Preservation Maintenance (Emmonak) (RE RW IM)
9/21/2015 $736,359
$20,432,199
$0
$4,629,073
$736,359
$25,061,272
Eureka Gulkana (GKN)
3-02-0110-001-1984 Construct Runway 14/32 (ST RW CO)
Install Apron Lighting (ST AP LI)
8/7/1984
8/7/1984
11/13/1986
11/13/1986
$60,350
$13,716
$0
$0
$60,350
$13,716
Expand Apron (ST AP IM)
Expand Apron (ST AP IM)
Construct Taxiway (ST TW CO)
Extend Runway 14/32 (ST RW IM)
3-02-0110-002-1991 Install Apron Lighting (ST AP LI)
Extend Runway 14/32 (ST RW IM)
Acquire Snow Removal Equipment (ST EQ SN)
Improve Snow Removal Equipment Building (ST BD SN)
Rehabilitate Taxiway (RE TW IM)
Expand Apron (ST AP IM)
Rehabilitate Taxiway (RE TW IM)
3-02-0110-003-1992 Improve Access Road (OT GT AC)
8/7/1984
8/7/1984
8/7/1984
8/7/1984
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
4/14/1992
11/13/1986
11/13/1986
11/13/1986
11/13/1986
6/6/1995
6/6/1995
6/6/1995
6/6/1995
6/6/1995
6/6/1995
6/6/1995
6/16/1995
$226,133
$12,344
$242,957
$578,360
$168,463
$890,015
$116,854
$257,913
$236,000
$100,950
$103,470
$138,810
$0
$0
$0
$0
$0
$68,800
$0
$0
$0
$0
$0
$0
$226,133
$12,344
$242,957
$578,360
$168,463
$958,815
$116,854
$257,913
$236,000
$100,950
$103,470
$138,810
Monday, January 11, 2016 Page 38 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0110-003-1992 4/14/1992 6/16/1995 Acquire Snow Removal Equipment (ST EQ SN) $123,750 $0 $123,750
4/14/1992 6/16/1995 Construct Taxiway (ST TW CO) $197,110 $0 $197,110
4/14/1992 6/16/1995 Extend Runway 14/32 (ST RW IM) $240,330 $33,600 $273,930
3-02-0110-004-1994 9/27/1994 9/6/2000 Conduct Airport Master Plan Study (PL PL MA) $280,588 $0 $280,588
$3,988,113 $102,400 $4,090,513
Fairbanks Fairbanks International (FAI)
3-02-0096-001-1985 8/9/1985 9/20/1988 Groove Runway 1L/19R (SP RW FR) $430,262 $0 $430,262
8/9/1985 9/20/1988 Rehabilitate Runway 1L/19R (RE RW IM) $599,940 $1,792,747 $2,392,687
8/9/1985 9/20/1988 Rehabilitate Taxiway (RE TW IM) $1,691,131 $34,171 $1,725,302
8/9/1985 9/20/1988 Extend Taxiway (ST TW IM) $300,918 $0 $300,918
3-02-0096-002-1987 11/7/1986 3/2/1995 Conduct Noise Compatibility Plan Study (EN PL NO) $0 $236,859 $236,859
3-02-0096-003-1987 9/15/1987 6/11/1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
$469,890 $0 $469,890
3-02-0096-004-1989 9/13/1989 2/8/1993 Construct Taxiway (ST TW CO) $1,264,689 $40,550 $1,305,239
9/13/1989 2/8/1993 Construct Apron (ST AP CO) $47,311 $0 $47,311
3-02-0096-005-1991 9/12/1991 7/14/1999 Construct Apron (ST AP CO) $1,227,006 $205,141 $1,432,147
9/12/1991 7/14/1999 Rehabilitate Taxiway (RE TW IM) $472,994 $0 $472,994
3-02-0096-006-1991 9/10/1991 9/9/1997 Conduct Airport Master Plan Study (PL PL MA) $247,719 $0 $247,719
3-02-0096-007-1992 7/13/1992 4/17/2000 Acquire Security Equipment (SA EQ SE) $411,367 $0 $411,367
3-02-0096-008-1993 7/26/1993 3/15/2000 Install Guidance Signs (SA OT SG) $384,375 $54,410 $438,785
3-02-0096-009-1993 9/17/1993 1/26/2000 Acquire Security Equipment (SA EQ SE) $1,065,878 $0 $1,065,878
3-02-0096-010-1993 9/16/1993 12/1/1998 Improve Runway Safety Area RW01/19 (SA RW SF) $324,375 $22,214 $346,589
3-02-0096-011-1993 9/20/1993 7/19/2000 Rehabilitate Runway Lighting (RE RW LI) $80,713 $567,551 $648,264
9/20/1993 7/19/2000 Rehabilitate Taxiway Lighting (RE TW LI) $0 $51,112 $51,112
3-02-0096-012-1994 9/28/1994 9/9/1997 Acquire Land for Noise Compatibility within 75 DNL (EN LA 75)
$0 $3,159,015 $3,159,015
3-02-0096-015-1996 6/7/1996 9/27/2002 Improve Service Road (OT GT SV) $0 $126,094 $126,094
6/7/1996 9/27/2002 Install Miscellaneous NAVAIDS (ST OT IN) $0 $2,429,314 $2,429,314
6/7/1996 9/27/2002 Extend Taxiway (ST TW IM) $0 $744,592 $744,592
6/7/1996 9/27/2002 Extend Runway 1L/19R (CA RW EX) $2,350,432 $476,180 $2,826,612
3-02-0096-016-1997 4/22/1997 9/27/2002 Extend Runway 01-19 (CA RW EX) $804,244 $1,172,006 $1,976,250
4/22/1997 9/27/2002 Improve Runway Safety Area 1L-19 (ST RW SF) $0 $1,369,244 $1,369,244
4/22/1997 9/27/2002 Extend Taxiway (ST TW IM) $0 $658,750 $658,750
4/22/1997 9/27/2002 Install Runway Lighting 1L-19 (SA RW LI) $150,000 $352 $150,352
4/22/1997 9/27/2002 Install Apron Lighting (ST AP LI) $50,000 $0 $50,000
4/22/1997 9/27/2002 Install Miscellaneous NAVAIDS (ST OT IN) $575,000 $0 $575,000
3-02-0096-017-1998 7/15/1998 9/20/2001 Conduct Miscellaneous Study (PL PL MS) $134,578 $0 $134,578
7/15/1998 9/20/2001 Acquire Security Equipment (SA EQ SE) $85,000 $0 $85,000
7/15/1998 9/20/2001 Extend Taxiway (ST TW IM) $965,000 $0 $965,000
7/15/1998 9/20/2001 Environmental Mitigation (EN OT MT) $241,124 $750,000 $991,124
7/15/1998 9/20/2001 Acquire Snow Removal Equipment (ST EQ SN) $320,000 $0 $320,000
3-02-0096-018-1999 3/25/1999 9/26/2002 Environmental Mitigation (EN OT MT) $565,000 $0 $565,000
3/25/1999 9/26/2002 Acquire Security Equipment (SA EQ SE) $178,047 $164,007 $342,054
3/25/1999 9/26/2002 Improve Terminal Building (ST TE IM) $410,800 $0 $410,800
3-02-0096-019-1999 8/3/1999 9/10/2003 Improve Terminal Building (ST TE IM) $626,653 $0 $626,653
3-02-0096-020-1999 8/3/1999 8/29/2001 Acquire Land for Noise Compatibility within 65 - 69 DNL (EN LA 65)
$0 $349,846 $349,846
Monday, January 11, 2016 Page 39 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0096-021-2000 Conduct Airport Master Plan Study (PL PL MA) 9/8/2000 8/23/2004 $347,360 $0 $347,360
Conduct Miscellaneous Study (PL PL MS) 9/8/2000 8/23/2004 $170,000 $0 $170,000
Conduct Noise Compatibility Plan Study (EN PL NO) 9/8/2000 8/23/2004 $110,000 $0 $110,000
3-02-0096-022-2000 Improve Terminal Building (ST TE IM) 7/14/2000 9/10/2003 $1,320,705 $0 $1,320,705
3-02-0096-023-2001 Extend Runway (ST RW IM) 9/25/2001 7/29/2005 $3,212,446 $5,298,028 $8,510,474
Improve Seaplane Base (ST SB CO) 9/25/2001 7/29/2005 $2,120,400 $0 $2,120,400
3-02-0096-024-2001 Improve Airport Drainage (ST OT IM) 8/16/2001 9/10/2003 $457,370 $0 $457,370
3-02-0096-025-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $260,500 $260,500
3-02-0096-026-2002 Security Enhancements (SE SE SE) 7/18/2002 1/24/2006 $0 $311,400 $311,400
3-02-0096-027-2003 Improve Airport Drainage East Side (ST OT IM) 7/10/2003 5/17/2005 $493,901 $0 $493,901
3-02-0096-028-2003 Rehabilitate Terminal Building (ST TE IM) 8/19/2003 3/9/2007 $1,389,925 $0 $1,389,925
3-02-0096-029-2003 Construct Deicing Containment Facility (North) (EN OT 8/29/2003 9/6/2007 $1,500,000 $569,333 $2,069,333 DI)
Rehabilitate Taxiway A (RE TW IM) 8/29/2003 9/6/2007 $2,774,396 $9,671,669 $12,446,065
3-02-0096-030-2004 Expand Apron (ST AP IM) 8/12/2004 3/12/2007 $601,665 $0 $601,665
3-02-0096-031-2004 Rehabilitate Taxiway (RE TW IM) 8/24/2004 7/1/2008 $3,124,955 $7,956,173 $11,081,128
3-02-0096-032-2006 Install Taxiway Lighting (Centerline for Alpha & Bravo) 8/15/2006 5/4/2010 $250,000 $0 $250,000 (SA TW LI)
Rehabilitate Runway 01R/19L (RE RW IM) 8/15/2006 5/4/2010 $1,000,000 $0 $1,000,000
Construct Apron (Multi-yeared in 2006) (ST AP CO) 8/15/2006 5/4/2010 $3,509,407 $0 $3,509,407
Construct Apron (Construction) (ST AP CO) 8/15/2006 5/4/2010 $5,888,658 $10,888,343 $16,777,001
3-02-0096-033-2007 Rehabilitate Runway 01L/19R (Phase 1) (RE RW IM) 9/12/2007 12/28/2012 $0 $16,167,640 $16,167,640
3-02-0096-034-2008 Rehabilitate Runway 01L/19R (Phase 2) (RE RW IM) 6/20/2008 2/11/2013 $2,393,366 $14,898,241 $17,291,607
3-02-0096-035-2008 Rehabilitate Runway 01L/19R (Phase 3) (RE RW IM) 9/11/2008 3/11/2014 $823,156 $5,144,482 $5,967,638
3-02-0096-036-2009 Improve Aircraft Rescue & Fire Fighting Building (SA 9/3/2009 1/7/2013 $1,939,577 $0 $1,939,577 BD EX)
3-02-0096-037-2009 Acquire Safety Equipment and/or Fencing Access 9/10/2009 4/11/2012 $0 $0 $0 Control(ARRA funded) (SA EQ RF)
3-02-0096-038-2010 Collect airport data for Airports Geographic Information 7/19/2010 $0 $700,000 $700,000 System (PL PL GI)
3-02-0096-039-2010 Update Airport Master Plan Study Update MP (PL PL 8/6/2010 $950,000 $0 $950,000 MA)
3-02-0096-040-2011 Rehabilitate Apron Rehabilitate Apron (RE AP IM) 9/14/2011 7/8/2015 $5,597,621 $402,464 $6,000,085
Acquire Interactive Training System Interactive Training 9/14/2011 7/8/2015 $350,000 $0 $350,000 System (OT EQ MS)
3-02-0096-041-2012 Rehabilitate Apron Phase 2 (RE AP IM) 9/13/2012 $1,024,482 $0 $1,024,482
3-02-0096-042-2013 Improve Aircraft Rescue & Fire Fighting Building 9/12/2013 $0 $4,500,000 $4,500,000 Upgrade ARFF Bldg (SA BD EX)
Construct Sand and Chemical Storage Building 9/12/2013 $5,597,015 $0 $5,597,015 Construct Sand/Deicer Storage Bldg (ST BD SN)
3-02-0096-044-2014 Construct Sand and Chemical Storage Building Phase 8/27/2014 $2,342,943 $0 $2,342,943 2 (ST BD SN)
Improve Aircraft Rescue & Fire Fighting Building 8/27/2014 $837,570 $7,301,532 $8,139,102 Upgrade ARFF Bldg -ph2 (SA BD EX)
3-02-0096-045-2014 Acquire Snow Removal Equipment (ST EQ SN) 8/27/2014 $210,396 $0 $210,396
3-02-0096-046-2015 Acquire Snow Removal Equipment Snow Removal 7/1/2015 $1,447,564 $0 $1,447,564 Equipment (ST EQ SN)
$68,259,323 $98,473,959 $166,733,282
Monday, January 11, 2016 Page 40 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Fairbanks North Star (Borough) Northway (ORT)
3-02-0203-001-1982 Rehabilitate Apron (RE AP IM) 9/28/1982 1/29/1986 $336,017 $0 $336,017
Rehabilitate Runway 4/22 (RE RW IM)
Rehabilitate Runway Lighting (RE RW LI)
3-02-0203-002-1992 Install Apron Lighting (ST AP LI)
Rehabilitate Apron (RE AP IM)
Rehabilitate Runway 04/22 (RE RW IM)
3-02-0203-003-1993 Improve Snow Removal Equipment Building (ST BD SN)
9/28/1982
9/28/1982
8/6/1992
8/6/1992
8/6/1992
9/9/1993
1/29/1986 $1,359,154
1/29/1986 $283,646
9/26/1996 $99,792
9/26/1996 $321,420
9/26/1996 $752,273
7/14/1999 $376,875
$3,529,177
$0
$0
$0
$0
$112,376
$26,396
$138,772
$1,359,154
$283,646
$99,792
$321,420
$864,649
$403,271
$3,667,949
False Pass False Pass (KFP)
3-02-0097-001-1988 Rehabilitate Taxiway (RE TW IM)
Construct Apron (ST AP CO)
Acquire Snow Removal Equipment (ST EQ SN)
Improve Access Road (OT GT AC)
Rehabilitate Runway 13/31 (RE RW IM)
Acquire Land For Approaches (ST LA SZ)
Improve Snow Removal Equipment Building (ST BD SN)
3-02-0097-002-2003 Conduct Airport Master Plan Study Phase 1 (PL PL MA)
3-02-0097-003-2004 Update Airport Master Plan Study Phase 2 (PL PL MA)
3-02-0097-004-2005 Conduct Environmental Study Specialty marine studies (EN PL MA)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): False Pass (Grader with Attachments) (ST EQ SN)
7/29/1988
7/29/1988
7/29/1988
7/29/1988
7/29/1988
7/29/1988
7/29/1988
8/20/2003
8/19/2004
8/10/2005
8/30/2005
6/30/2006
9/3/2010
7/16/1991
7/16/1991
7/16/1991
7/16/1991
7/16/1991
7/16/1991
7/16/1991
5/17/2005
9/2/2008
5/21/2010
6/9/2010
2/27/2012
1/20/2015
$12,462
$104,378
$4,951
$404,935
$404,214
$16,143
$38,712
$84,906
$286,416
$297,084
$14,000
$152,903
$325,317
$0
$0
$0
$0
$83,873
$0
$0
$0
$0
$0
$0
$0
$0
$12,462
$104,378
$4,951
$404,935
$488,087
$16,143
$38,712
$84,906
$286,416
$297,084
$14,000
$152,903
$325,317
$2,146,421 $83,873 $2,230,294
Fort Yukon Fort Yukon (FYU)
3-02-0100-001-1985 Improve Access Road (OT GT AC)
Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
Acquire Land for Development (ST LA DV)
3-02-0100-002-1991 Install Apron Lighting (ST AP LI)
Rehabilitate Runway 3/21 (RE RW IM)
Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment Acquire Loader and Grader (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
9/23/1985
9/23/1985
9/23/1985
8/9/1991
8/9/1991
8/9/1991
8/31/2007
6/19/2008
7/22/1992
7/22/1992
7/22/1992
9/25/1997
9/25/1997
9/25/1997
12/7/2009
6/10/2014
$46,729
$240,649
$28,490
$92,483
$371,945
$9,376
$520,000
$132,700
$224,732
$0
$0
$0
$360,102
$0
$0
$0
$271,461
$240,649
$28,490
$92,483
$732,047
$9,376
$520,000
$132,700
Monday, January 11, 2016 Page 41 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0100-003-2009 Rehabilitate Runway 04/22 phase 1(ARRA funded) (RE 6/12/2009 7/15/2014 $0 $0 $0 RW IM)
3-02-0100-004-2009 Construct Snow Removal Equipment Building (ST BD 7/6/2009 9/2/2014 $1,089,667 $0 $1,089,667 SN)
Rehabilitate Apron Resurface apron (RE AP IM) 7/6/2009 9/2/2014 $390,542 $0 $390,542
Various Surface Preservation Maintenance: Fort Yukon -Surface Repair, Dust Control (RE RW IM)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 04/22 (+08J) 9/19/2014 $320,203 $0 $320,203
$3,242,784 $584,834 $3,827,618
Galena Edward G Pitka Sr (GAL)
3-02-0102-001-1982 Expand Apron (ST AP IM) 9/24/1982 7/21/1986 $1,075,750 $0 $1,075,750
Acquire Security Equipment (SA EQ SE) 9/24/1982 7/21/1986 $38,990 $0 $38,990
3-02-0102-002-1984 Improve Snow Removal Equipment Building (ST BD 9/26/1984 9/6/1989 $315,868 $118,088 $433,956 SN)
3-02-0102-003-1989 Conduct Airport Master Plan Study (PL PL MA) 7/26/1989 8/16/1993 $149,647 $0 $149,647
3-02-0102-004-2003 Construct Taxiway (Partial Parallel) (ST TW CO) 8/26/2003 2/14/2007 $3,319,087 $0 $3,319,087
Rehabilitate Apron (RE AP IM) 8/26/2003 2/14/2007 $1,850,000 $0 $1,850,000
Expand Apron (ST AP IM) 8/26/2003 2/14/2007 $1,850,000 $0 $1,850,000
3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment (Plow 8/31/2007 12/7/2009 $300,000 $0 $300,000 truck w/sander) (ST EQ SN)
3-02-0102-005-2009 Rehabilitate Snow Removal Equipment Building (ST 8/13/2009 4/1/2013 $1,775,493 $63,367 $1,838,860 BD SN)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Galena 3/12/2010 12/9/2015 $133,000 $0 $133,000 Various Surface Maintenance (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $167,523 $0 $167,523 Acquire SRE (Blower) (ST EQ SN)
$10,975,358 $181,455 $11,156,813
Gambell Gambell (GAM)
3-02-0103-001-1984 Rehabilitate Runway 16/34 (RE RW IM) 9/13/1984 1/4/1991 $1,471,028 $0 $1,471,028
Improve Airport Drainage (ST OT IM) 9/13/1984 1/4/1991 $31,875 $0 $31,875
Install Runway Lighting (ST RW LI) 9/13/1984 1/4/1991 $421,950 $0 $421,950
3-02-0103-002-1991 Conduct Airport Master Plan Study (PL PL MA) 8/9/1991 10/24/1998 $198,621 $0 $198,621
3-02-0103-003-1997 Improve Runway Safety Area 16-34 (ST RW SF) 8/7/1997 9/18/2001 $200,000 $0 $200,000
Install Apron Lighting (ST AP LI) 8/7/1997 9/18/2001 $100,000 $0 $100,000
Rehabilitate Runway 16-34 (RE RW IM) 8/7/1997 9/18/2001 $400,000 $0 $400,000
Install Apron Lighting (ST AP LI) 8/7/1997 9/18/2001 $22,000 $0 $22,000
Install Runway Vertical/Visual Guidance System (ST 8/7/1997 9/18/2001 $10,000 $0 $10,000 RW VI)
Construct Taxiway (ST TW CO) 8/7/1997 9/18/2001 $376,552 $0 $376,552
Construct Runway 16-34 (ST RW CO) 8/7/1997 9/18/2001 $3,130,530 $0 $3,130,530
Improve Snow Removal Equipment Building (ST BD 8/7/1997 9/18/2001 $350,000 $0 $350,000 SN)
Construct Apron (ST AP CO) 8/7/1997 9/18/2001 $370,000 $0 $370,000
Install Runway Lighting (ST RW LI) 8/7/1997 9/18/2001 $120,000 $0 $120,000
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 8/30/2005 6/9/2010 $105,000 $0 $105,000 (RE RW IM)
Monday, January 11, 2016 Page 42 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)
$251,484 $0 $251,484
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)
$340,889 $0 $340,889
$7,899,929 $0 $7,899,929
Girdwood Girdwood (AQY)
3-02-0104-001-2001 6/11/2001 8/26/2004 Conduct Airport Master Plan Study (PL PL MA) $189,218 $0 $189,218
3-02-0104-002-2002 9/26/2002 5/1/2006 Rehabilitate Runway 1/19 (RE RW IM) $250,000 $509,402 $759,402
9/26/2002 5/1/2006 Install Perimeter Fencing (ST EQ SE) $0 $400,000 $400,000
3-02-0104-003-2002 9/3/2002 3/27/2006 Conduct Airport Master Plan Study Phase 2 (PL PL MA) $204,491 $0 $204,491
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
$164,502 $0 $164,502
$808,211 $909,402 $1,717,614
Golovin Golovin (GLV)
3-02-0106-001-1986 9/24/1986 11/10/1993 Acquire Land for Development (ST LA DV) $307,016 $0 $307,016
3-02-0106-002-1987 9/22/1987 3/24/1992 Construct Taxiway (ST TW CO) $710,343 $0 $710,343
9/22/1987 3/24/1992 Improve Access Road (OT GT AC) $367,593 $0 $367,593
9/22/1987 3/24/1992 Install Runway Lighting (ST RW LI) $165,878 $0 $165,878
9/22/1987 3/24/1992 Construct Runway 2/20 (ST RW CO) $2,225,853 $0 $2,225,853
3-02-0106-003-1992 9/10/1992 1/14/1999 Improve Snow Removal Equipment Building (ST BD SN)
$373,394 $0 $373,394
9/10/1992 1/14/1999 Expand Apron (ST AP IM) $233,637 $0 $233,637
9/10/1992 1/14/1999 Extend Runway 02/20 (ST RW IM) $2,330,610 $366,915 $2,697,525
9/10/1992 1/14/1999 Rehabilitate Taxiway (RE TW IM) $76,984 $0 $76,984
3-02-0200-051-2005 9/2/2005 4/4/2008 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)
$175,000 $0 $175,000
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$128,300 $0 $128,300
3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $300,000 $300,000
$7,094,608 $666,915 $7,761,523
Goodnews Goodnews (GNU)
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)
$135,000 $0 $135,000
3-02-0107-001-2008 9/19/2008 12/9/2015 Construct Apron construct apron (w/taxiway stub) (ST AP CO)
$279,500 $1,925,585 $2,205,085
9/19/2008 12/9/2015 Extend Runway 05/23 extend runway (ST RW IM) $687,165 $8,161,134 $8,848,299
9/19/2008 12/9/2015 Construct Snow Removal Equipment Building SREB (ST BD SN)
$1,000,000 $0 $1,000,000
3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: GNU--Grader w/ Attachments (ST EQ SN)
$350,000 $0 $350,000
3-02-0107-002-2009 2/26/2009 Extend Runway 05/23 phase 2 extend & realign rwy 5/23 (ST RW IM)
$2,195,743 $2,259,317 $4,455,060
Monday, January 11, 2016 Page 43 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments (ST EQ SN)
$266,541 $0 $266,541
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 05/23 Various Surface Preservation Maintenance (Goodnews) (RE RW IM)
$10,500 $0 $10,500
$4,924,449 $12,346,036 $17,270,485
Goose Bay Goose Bay (Z40)
3-02-0409-001-1985 9/23/1985 2/10/1988 Improve Access Road (OT GT AC) $24,142 $0 $24,142
9/23/1985 2/10/1988 Construct Taxiway (ST TW CO) $10,217 $0 $10,217
9/23/1985 2/10/1988 Construct Apron (ST AP CO) $59,000 $0 $59,000
9/23/1985 2/10/1988 Rehabilitate Runway 7/25 (RE RW IM) $558,141 $0 $558,141
3-02-0409-002-1987 8/4/1987 4/9/1992 Acquire Snow Removal Equipment (ST EQ SN) $112,000 $0 $112,000
8/4/1987 4/9/1992 Install Runway Lighting (ST RW LI) $141,492 $49,242 $190,734
8/4/1987 4/9/1992 Improve Snow Removal Equipment Building (ST BD SN)
$137,320 $0 $137,320
8/4/1987 4/9/1992 Improve Access Road (OT GT AC) $101,606 $0 $101,606
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 08/26 Various Surface Preservation (RE RW IM)
$53,200 $0 $53,200
$1,197,118 $49,242 $1,246,360
Grayling Grayling (KGX)
3-02-0109-001-1987 7/29/1987 4/9/1992 Acquire Snow Removal Equipment (ST EQ SN) $123,300 $0 $123,300
7/29/1987 4/9/1992 Extend Runway 15/33 (ST RW IM) $150,080 $0 $150,080
7/29/1987 4/9/1992 Improve Access Road (OT GT AC) $151,805 $0 $151,805
7/29/1987 4/9/1992 Improve Snow Removal Equipment Building (ST BD SN)
$98,669 $0 $98,669
7/29/1987 4/9/1992 Install Runway Lighting (ST RW LI) $158,098 $0 $158,098
7/29/1987 4/9/1992 Expand Apron (CA AP EX) $196,423 $87,837 $284,260
3-02-0109-002-1993 9/14/1993 3/31/1999 Extend Runway RW15/33 (ST RW IM) $75,000 $0 $75,000
9/14/1993 3/31/1999 Improve Access Road (OT GT AC) $238,000 $0 $238,000
9/14/1993 3/31/1999 Construct Apron (ST AP CO) $223,000 $0 $223,000
9/14/1993 3/31/1999 Install Runway Lighting (ST RW LI) $285,000 $0 $285,000
9/14/1993 3/31/1999 Improve Runway Safety Area RW15/33 (ST RW SF) $1,337,320 $55,951 $1,393,271
9/14/1993 3/31/1999 Improve Snow Removal Equipment Building (ST BD SN)
$80,000 $0 $80,000
3-02-0109-003-1993 9/21/1993 9/9/1997 Acquire Snow Removal Equipment (ST EQ SN) $142,618 $0 $142,618
3-02-0109-004-2008 6/24/2008 3/15/2013 Construct Runway Plan-1 Phase 1 (ST RW CO) $6,195,436 $1,864,592 $8,060,028
6/24/2008 3/15/2013 Construct Apron construct apron, phase 1 (ST AP CO) $1,057,384 $0 $1,057,384
3-02-0109-005-2008 9/11/2008 1/28/2013 Construct Apron construct apron phase 2 (ST AP CO) $1,000,000 $0 $1,000,000
9/11/2008 1/28/2013 Construct Runway Plan-1 Phase 2 (ST RW CO) $6,601,059 $0 $6,601,059
3-02-0000-013-2010 3/30/2010 Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $200,000 $200,000
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Grayling Grader) (ST EQ SN)
$365,238 $0 $365,238
$18,478,430 $2,208,380 $20,686,810
Monday, January 11, 2016 Page 44 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Gulkana Gulkana (GKN)
3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $175,233 $0 $175,233 EQ SN)
3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $218,000 $0 $218,000 Acquire SRE Northern Region (Gulkana Snowblower) (ST EQ SN)
3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $370,500 $0 $370,500 Acquire Various SRE (Northern Region): Gu kana (Motor Grader with Plow and Wing) (ST EQ SN)
3-02-0110-005-2015 Rehabilitate Runway Remarking (RE RW IM) 8/10/2015 $150,000 $0 $150,000
Rehabilitate Taxiway (RE TW IM) 8/10/2015 $1,500,000 $0 $1,500,000
Rehabilitate Apron (RE AP IM) 8/10/2015 $668,248 $0 $668,248
$3,081,981 $0 $3,081,981
Gustavus Gustavus (GST)
3-02-0111-001-1987 Rehabilitate Apron (RE AP IM) 8/13/1987 5/3/1991 $47,692 $0 $47,692
Rehabilitate Taxiway (RE TW IM) 8/13/1987 5/3/1991 $5,660 $0 $5,660
Extend Runway 10/28 (ST RW IM) 8/13/1987 5/3/1991 $10,000 $0 $10,000
Rehabilitate Runway 1/19 (RE RW IM) 8/13/1987 5/3/1991 $252,516 $159,191 $411,707
3-02-0111-002-1993 Conduct Airport Master Plan Study (PL PL MA) 9/7/1993 4/18/2000 $142,351 $0 $142,351
3-02-0111-003-1997 Construct Taxiway (CA TW CO) 4/30/1997 9/27/2001 $699,998 $0 $699,998
Construct Apron (ST AP CO) 4/30/1997 9/27/2001 $2,699,985 $0 $2,699,985
Expand Apron (CA AP EX) 4/30/1997 9/27/2001 $299,999 $0 $299,999
Rehabilitate Runway 10,28 (RE RW IM) 4/30/1997 9/27/2001 $0 $3,422,678 $3,422,678
3-02-0111-004-1998 Acquire Security Equipment (SA EQ SE) 7/20/1998 9/20/2001 $106,588 $966,790 $1,073,378
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 8/30/2005 6/9/2010 $20,000 $0 $20,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $17,600 $0 $17,600 (RE RW IM)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $57,998 $0 $57,998 (RE RW IM)
3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $345,305 $0 $345,305 Acquire SRE: Loader (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $500,000 $0 $500,000 (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Gustavus (RE 3/12/2010 12/9/2015 $21,280 $0 $21,280 RW IM)
3-02-0111-005-2011 Improve Runway Safety Area 11/29 (SA RW SF) 6/27/2011 $3,210,274 $6,800,000 $10,010,274
3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $75,548 $0 $75,548 Acquire Various SRE: Gustavus (30ft Ramp Plow) (ST EQ SN)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various 9/16/2011 $105,514 $0 $105,514 Surface Preservation (RE RW IM)
3-02-0111-006-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $705,672 $0 $705,672 ARFF Vehicle (SA EQ RF)
Monday, January 11, 2016 Page 45 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-102-2015 [Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $51,722 $0 $51,722 (Gustavus - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)
$9,375,702 $11,452,084 $20,827,786
Haines Haines (HNS)
3-02-0112-001-1985 Rehabilitate Taxiway (RE TW IM) 6/18/1985 10/14/1987 $0 $59,954 $59,954
Rehabilitate Runway 18/36 (RE RW IM) 6/18/1985 10/14/1987 $0 $280,551 $280,551
Improve Airport Drainage (ST OT IM) 6/18/1985 10/14/1987 $0 $46,387 $46,387
3-02-0112-002-1987 Construct Apron (ST AP CO) 7/6/1987 7/3/1991 $0 $153,264 $153,264
Expand Apron (ST AP IM) 7/6/1987 7/3/1991 $0 $61,826 $61,826
Improve Airport Drainage (ST OT IM) 7/6/1987 7/3/1991 $0 $163,601 $163,601
3-02-0112-003-1990 Construct Taxiway (ST TW CO) 9/26/1990 9/25/2000 $351,562 $0 $351,562
Improve Heliport/Helipad 8/26 (ST HE CO) 9/26/1990 9/25/2000 $20,625 $0 $20,625
Construct Apron (ST AP CO) 9/26/1990 9/25/2000 $2,117,256 $0 $2,117,256
Construct Runway 8/26 (ST RW CO) 9/26/1990 9/25/2000 $619,728 $2,218,271 $2,837,999
Install Runway Lighting (ST RW LI) 9/26/1990 9/25/2000 $250,000 $0 $250,000
Improve Access Road (OT GT AC) 9/26/1990 9/25/2000 $139,687 $0 $139,687
Acquire Land for Development (ST LA DV) 9/26/1990 9/25/2000 $191,250 $0 $191,250
3-02-0112-004-2002 Update Airport Master Plan Study (PL PL MA) 9/3/2002 3/29/2005 $250,973 $0 $250,973
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 8/30/2005 6/9/2010 $17,500 $0 $17,500 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/19/2008 6/10/2014 $39,600 $0 $39,600 (RE RW IM)
3-02-0200-067-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 1/7/2013 $550,534 $0 $550,534 Acquire SRE (SE Region): Rotary Plow and Towed Runway Broom (ST EQ SN)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Haines 3/12/2010 12/9/2015 $37,240 $0 $37,240 Various Surface Maintenance (RE RW IM)
3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $34,196 $0 $34,196 Acquire Various SRE: Haines (V Plow) (ST EQ SN)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 08/26 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Haines - Crack Seal (RE RW IM)
$4,691,609 $2,983,854 $7,675,463
Healy Healy River (HRR)
3-02-0414-001-1987 Acquire Land for Development (ST LA DV) 9/21/1987 4/9/1992 $77,939 $0 $77,939
Construct Runway 18/32 (ST RW CO) 9/21/1987 4/9/1992 $357,332 $33,041 $390,373
Construct Apron (ST AP CO) 9/21/1987 4/9/1992 $135,910 $0 $135,910
Install Runway Lighting (ST RW LI) 9/21/1987 4/9/1992 $104,977 $0 $104,977
3-02-0414-002-1995 Expand Apron (ST AP IM) 6/2/1995 7/14/2000 $600,000 $137,990 $737,990
Extend Taxiway (ST TW IM) 6/2/1995 7/14/2000 $50,000 $0 $50,000
Extend Runway 15/33 (ST RW IM) 6/2/1995 7/14/2000 $325,703 $0 $325,703
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) 5/31/2007 8/6/2013 $63,840 $0 $63,840 (RE RW IM)
Monday, January 11, 2016 Page 46 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 15/33 Various Surface Preservation (RE RW IM)
$104,785 $0 $104,785
3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $236,000 $236,000
$1,820,486 $407,031 $2,227,517
Hollis Hollis Clark Bay (HYL)
3-02-0470-001-2006 9/1/2006 6/9/2010 Construct Seaplane Base (ST SB CO) $2,445,655 $0 $2,445,655
$2,445,655 $0 $2,445,655
Holy Cross Holy Cross (HCA)
3-02-0120-001-1983 7/28/1983 2/5/1986 Construct Apron (ST AP CO) $344,214 $0 $344,214
7/28/1983 2/5/1986 Acquire Land for Development 01/19 (ST LA DV) $7,982 $0 $7,982
7/28/1983 2/5/1986 Improve Access Road (OT GT AC) $86,919 $0 $86,919
7/28/1983 2/5/1986 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
$61,076 $0 $61,076
7/28/1983 2/5/1986 Install Apron Lighting (ST AP LI) $26,888 $0 $26,888
7/28/1983 2/5/1986 Extend Runway 01/19 (ST RW IM) $995,101 $42,905 $1,038,006
7/28/1983 2/5/1986 Improve Building (ST BD MS) $7,820 $0 $7,820
3-02-0120-002-1984 4/3/1984 1/22/1986 Install Runway Lighting 10/19 (ST RW LI) $137,865 $0 $137,865
3-02-0120-003-2001 8/13/2001 9/2/2004 Improve Snow Removal Equipment Building (ST BD SN)
$670,447 $42,270 $712,717
3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $300,000 $300,000
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01/19 Surface Preservation Maintenance (Holy Cross) (RE RW IM)
$199,813 $0 $199,813
3-02-0200-103-2015 9/20/2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Holy Cross Segmented Circle (ST OT IN)
$155,109 $0 $155,109
$2,693,234 $385,175 $3,078,409
Homer Homer (HOM)
3-02-0122-001-1983 9/12/1983 2/4/1988 Construct Taxiway 3/21 (ST TW CO) $4,390 $407,175 $411,565
9/12/1983 2/4/1988 Improve Access Road (OT GT AC) $260,815 $0 $260,815
9/12/1983 2/4/1988 Install Runway Lighting (ST RW LI) $50,663 $12,257 $62,920
9/12/1983 2/4/1988 Construct Apron 3/21 (ST AP CO) $22,107 $2,592,825 $2,614,932
3-02-0122-002-1986 9/9/1986 4/14/1989 Improve Airport Drainage (ST OT IM) $157,934 $224,583 $382,517
3-02-0122-003-1987 9/2/1987 2/25/1991 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
$195,321 $0 $195,321
3-02-0122-004-1992 9/11/1992 12/28/1994 Construct Terminal Building (CA TE CO) $650,000 $97,497 $747,497
3-02-0122-005-1996 9/20/1996 8/30/2000 Install Runway Lighting (SA RW LI) $262,120 $0 $262,120
9/20/1996 8/30/2000 Rehabilitate Runway 3/21 (RE RW IM) $31,326 $2,322,961 $2,354,287
9/20/1996 8/30/2000 Install Runway Vertical/Visual Guidance System (ST RW VI)
$330,938 $0 $330,938
9/20/1996 8/30/2000 Improve Runway Safety Area 3/21 (ST RW SF) $206,442 $306,426 $512,868
3-02-0122-006-1999 3/19/1999 9/26/2001 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
$300,958 $0 $300,958
Monday, January 11, 2016 Page 47 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0122-007-2000 Improve Snow Removal Equipment Building (ST BD 9/7/2000 8/23/2004 $681,125 $0 $681,125 SN)
3-02-0122-008-2000 Rehabilitate Taxiway (RE TW IM) 9/7/2000 9/9/2003 $300,000 $0 $300,000
Rehabilitate Apron (RE AP IM) 9/7/2000 9/9/2003 $1,529,468 $0 $1,529,468
3-02-0122-009-2001 Conduct Airport Master Plan Study (PL PL MA) 8/15/2001 4/27/2007 $430,586 $0 $430,586
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 8/30/2005 6/9/2010 $125,000 $0 $125,000 (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $250,000 $0 $250,000 Acquire SRE: HOM--De-icer Truck (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 6/19/2008 6/10/2014 $50,000 $0 $50,000 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 03/21 (Various 8/20/2009 12/19/2014 $223,440 $0 $223,440 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $44,205 $44,205 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 03/21 Homer 3/12/2010 12/9/2015 $77,688 $0 $77,688 Various Surface Maintenance (RE RW IM)
3-02-0122-010-2011 Improve Snow Removal Equipment Building Aquire and 3/16/2011 11/5/2014 $310,455 $0 $310,455 improve snow removal equipment building (ST BD SN)
3-02-0122-011-2011 Rehabilitate Taxiway Reconstruct Taxiway E & D (LOC) 9/14/2011 $1,400,000 $0 $1,400,000 (RE TW IM)
Rehabilitate Apron (RE AP IM) 9/14/2011 $616,924 $0 $616,924
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $1,047,481 $0 $1,047,481 Acquire Various SRE: Homer (Snow Blower with Broom, and Grader with attachments) (ST EQ SN)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 03/21 Various 9/16/2011 $218,120 $0 $218,120 Surface Preservation (RE RW IM)
3-02-0122-012-2012 Rehabilitate Taxiway Lighting (RE TW LI) 5/16/2012 $361,586 $0 $361,586
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $325,793 $0 $325,793 Acquire SRE (Alaska Region): Homer (Plow Truck) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 03/21 Variuos 9/19/2012 $173,250 $0 $173,250 Surface Preservation Maintenance (Homer) (RE RW IM)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 04/22 Surface 9/18/2013 $189,000 $0 $189,000 Preservation Maintenance (Homer) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $301,930 $0 $301,930 Acquire SRE (Plow Truck) (ST EQ SN)
3-02-0122-013-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $706,127 $0 $706,127 ARFF Vehicle (SA EQ RF)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $160,875 $0 $160,875 Obstruction Removal (+08J) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 04/22 (+08J) 9/19/2014 $126,000 $0 $126,000 Various Surface Preservation Maintenance: Homer -Pavement Markings (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 04/22 Accomplish 9/21/2015 $422,100 $0 $422,100 Various Airport Surface Preservation Maintenance (Homer RWY, TWY and Apron Markings and Seal Coat) (RE RW IM)
$12,521,242 $6,007,929 $18,529,171
Monday, January 11, 2016 Page 48 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Hoonah Hoonah (HNH)
3-02-0125-001-1991 Improve Access Road (OT GT AC) 9/20/1991 9/25/2000 $841,726 $53,321 $895,047
Construct Apron (ST AP CO) 9/20/1991 9/25/2000 $0 $1,256,965 $1,256,965
Construct Taxiway (ST TW CO) 9/20/1991 9/25/2000 $0 $1,079,739 $1,079,739
Extend Runway 5/23 (ST RW IM) 9/20/1991 9/25/2000 $0 $1,398,797 $1,398,797
Acquire Land for Development (ST LA DV) 9/20/1991 9/25/2000 $0 $157,080 $157,080
3-02-0125-002-2001 Conduct Airport Master Plan Study (PL PL MA) 9/5/2001 8/27/2004 $146,937 $0 $146,937
3-02-0125-003-2001 Install Runway Lighting (SP RW LI) 9/14/2001 2/25/2005 $63,067 $550,000 $613,067
Install Taxiway Lighting (SP TW LI) 9/14/2001 2/25/2005 $0 $200,000 $200,000
Install Miscellaneous NAVAIDS (ST OT IN) 9/14/2001 2/25/2005 $0 $31,287 $31,287
3-02-0125-004-2003 Construct Snow Removal Equipment Building (ST BD 9/2/2003 6/27/2007 $1,299,971 $0 $1,299,971 SN)
3-02-0453-001-2005 Construct Seaplane Base (ST SB CO) 8/30/2005 7/20/2010 $2,040,579 $0 $2,040,579
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 6/30/2006 2/27/2012 $15,818 $0 $15,818 (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 06/24 (Various 8/20/2009 12/19/2014 $40,432 $0 $40,432 Surface Maintenance) (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Hoonah 3/12/2010 12/9/2015 $40,432 $0 $40,432 Various Surface Maintenance (RE RW IM)
3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $329,650 $0 $329,650 Acquire Various SRE: Hoonah (Loader) (ST EQ SN)
3-02-0125-005-2012 Extend Runway 06/24 (ST RW IM) 9/11/2012 $4,544,063 $0 $4,544,063
Expand Apron (ST AP IM) 9/11/2012 $1,500,000 $0 $1,500,000
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 06/24 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Hoonah -Crack Seal (RE RW IM)
$10,955,413 $4,727,189 $15,682,602
Hooper Bay Hooper Bay (HPB)
3-02-0126-001-1990 Improve Access Road (OT GT AC) 8/15/1990 5/7/1992 $117,869 $0 $117,869
Improve Airport Drainage (ST OT IM) 8/15/1990 5/7/1992 $435,120 $0 $435,120
Rehabilitate Runway 13/31 (RE RW IM) 8/15/1990 5/7/1992 $825,602 $0 $825,602
Install Runway Lighting (ST RW LI) 8/15/1990 5/7/1992 $219,526 $0 $219,526
Construct Apron (ST AP CO) 8/15/1990 5/7/1992 $512,978 $0 $512,978
3-02-0126-002-1992 Acquire Snow Removal Equipment (ST EQ SN) 5/6/1992 9/16/1997 $132,026 $0 $132,026
3-02-0126-003-1996 Rehabilitate Runway 13/31 (RE RW IM) 7/23/1996 10/24/1998 $0 $454,279 $454,279
Rehabilitate Runway 13/31 (RE RW IM) 7/23/1996 10/24/1998 $0 $540,250 $540,250
3-02-0126-004-1999 Rehabilitate Runway 13-31 (RE RW IM) 3/25/1999 9/26/2002 $726,330 $33,660 $759,990
Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/26/2002 $374,100 $0 $374,100
3-02-0126-005-2005 Rehabilitate Access Road (OT GT AC) 6/30/2005 5/4/2010 $1,447,243 $0 $1,447,243
Rehabilitate Runway 13/31 (Maintenance) (RE RW IM) 6/30/2005 5/4/2010 $300,000 $0 $300,000
3-02-0200-061-2007 [Various Grnt] Acquire Snow Removal Equipment 7/25/2007 2/5/2014 $253,500 $0 $253,500 Acquire SRE: Grader with Attachments (ST EQ SN)
Monday, January 11, 2016 Page 49 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $214,273 $0 $214,273 Acquire SRE (Snow Blower) (ST EQ SN)
3-02-0126-006-2014 Rehabilitate Access Road Phase 1 (OT GT AC) 9/19/2014 $250,000 $0 $250,000
Construct Apron Relocate apron to meet setback 9/19/2014 $150,000 $0 $150,000 standards, Phase 1 (ST AP CO)
Construct Snow Removal Equipment Building Phase 1 9/19/2014 $100,000 $0 $100,000 (ST BD SN)
Rehabilitate Runway 13/31 Phase 1 (RE RW IM) 9/19/2014 $0 $3,500,000 $3,500,000
Rehabilitate Apron Phase 1 (RE AP IM) 9/19/2014 $0 $2,000,000 $2,000,000
3-02-0126-007-2015 Rehabilitate Runway 13/31 Phase 2 (RE RW IM) 9/22/2015 $2,978,816 $13,884,216 $16,863,032
Rehabilitate Taxiway (RE TW IM) 9/22/2015 $750,000 $0 $750,000
Rehabilitate Apron Phase 2 (RE AP IM) 9/22/2015 $0 $3,500,000 $3,500,000
Rehabilitate Runway Lighting 13/31 (RE RW LI) 9/22/2015 $750,000 $0 $750,000
$10,537,383 $23,912,405 $34,449,788
Hope Hope (5HO)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/30/2006 2/27/2012 $93,851 $0 $93,851 (RE RW IM)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various 9/16/2011 $21,280 $0 $21,280 Surface Preservation (RE RW IM)
$115,131 $0 $115,131
Hughes Hughes (HUS)
3-02-0127-001-1990 Expand Apron (ST AP IM) 9/19/1990 9/10/1996 $425,069 $0 $425,069
Acquire Land for Development (ST LA DV) 9/19/1990 9/10/1996 $157,969 $0 $157,969
Rehabilitate Runway RW17/35 (RE RW IM) 9/19/1990 9/10/1996 $1,099,594 $0 $1,099,594
Install Runway Lighting (ST RW LI) 9/19/1990 9/10/1996 $183,760 $0 $183,760
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 17/35 Hughes 3/12/2010 12/9/2015 $159,600 $0 $159,600 Various Surface Maintenance (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $31,022 $0 $31,022 Obstructions (Various - Hughes) (SA OT OB)
3-02-0200-088-2012 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2012 $0 $236,000 $236,000 approach (PL PL VI)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $257,812 $0 $257,812 Obstruction Removal (+08J) (SA OT OB)
$2,314,826 $236,000 $2,550,826
Huslia Huslia (HLA)
3-02-0128-001-1989 Improve Snow Removal Equipment Building (ST BD 9/13/1989 12/16/1993 $136,187 $0 $136,187 SN)
Rehabilitate Taxiway (RE TW IM) 9/13/1989 12/16/1993 $205,398 $0 $205,398
Acquire Snow Removal Equipment (ST EQ SN) 9/13/1989 12/16/1993 $89,364 $0 $89,364
Extend Runway 02/20 (ST RW IM) 9/13/1989 12/16/1993 $889,936 $2,856 $892,792
Install Runway Lighting (ST RW LI) 9/13/1989 12/16/1993 $150,132 $0 $150,132
3-02-0128-002-1994 Conduct Airport Master Plan Study (PL PL MA) 9/27/1994 1/25/2000 $299,457 $0 $299,457
3-02-0128-003-1999 Improve Snow Removal Equipment Building (ST BD 8/3/1999 9/9/2003 $450,000 $0 $450,000 SN)
Monday, January 11, 2016 Page 50 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0128-003-1999 Construct New Airport (ST NA CO)
3-02-0128-004-2002 Improve Access Road (OT GT AC)
3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)
3-02-0128-005-2009 Rehabilitate Runway 03/21 phase 1 (ARRA funded) (RE RW IM)
3-02-0128-006-2010 Rehabilitate Apron (RE AP IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Huslia) (SA OT OB)
8/3/1999
5/29/2002
9/2/2005
5/31/2007
8/27/2009
3/26/2010
7/23/2012
9/9/2003 $4,386,732
9/9/2003 $187,373
4/4/2008 $200,663
8/6/2013 $218,120
3/21/2012 $0
3/18/2013 $452,899
$41,363
$7,707,623
$0
$0
$0
$0
$0
$0
$0
$2,856
$4,386,732
$187,373
$200,663
$218,120
$0
$452,899
$41,363
$7,710,479
Hydaburg Hydaburg (HYG)
3-02-0129-001-1994 Construct Apron (ST AP CO)
Acquire Land for Development (ST LA DV)
6/27/1994
6/27/1994
9/16/1997
9/16/1997
$696,279
$10,313
$706,592
$0
$0
$0
$696,279
$10,313
$706,592
Hyder Hyder (4Z7)
3-02-0382-001-2002 Improve Seaplane Base (ST SB CO)
Rehabilitate Seaplane Base (RE SB IM)
9/23/2002
9/23/2002
2/21/2006
2/21/2006
$213,350
$291,597
$504,947
$0
$1,365
$1,365
$213,350
$292,962
$506,312
Igiugig Igiugig (IGG)
3-02-0131-001-1993 Improve Access Road (OT GT AC)
Acquire Snow Removal Equipment (ST EQ SN)
Construct Apron (ST AP CO)
Construct Taxiway (ST TW CO)
Acquire Land For Approaches (ST LA SZ)
Improve Snow Removal Equipment Building (ST BD SN)
Improve Runway Safety Area RW05/23 (ST RW SF)
Install Runway Lighting (ST RW LI)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)
9/15/1993
9/15/1993
9/15/1993
9/15/1993
9/15/1993
9/15/1993
9/15/1993
9/15/1993
6/19/2008
9/25/1997 $184,700
9/25/1997 $158,500
9/25/1997 $260,000
9/25/1997 $26,000
9/25/1997 $168,500
9/25/1997 $107,250
9/25/1997 $1,214,455
9/25/1997 $205,400
6/10/2014 $9,900
$2,334,705
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$184,700
$158,500
$260,000
$26,000
$168,500
$107,250
$1,214,455
$205,400
$9,900
$2,334,705
Iliamna Iliamna (ILI)
3-02-0132-001-1984 Construct Taxiway (CA TW CO)
Construct Apron (CA AP CO)
3-02-0132-002-1989 Rehabilitate Runway 17/35 (RE RW IM)
Rehabilitate Runway 17/35 (RE RW IM)
Extend Runway 7/25 (ST RW IM)
Rehabilitate Runway 17/35 (RE RW IM)
7/17/1984
7/17/1984
9/22/1989
9/22/1989
9/22/1989
9/22/1989
4/27/1988
4/27/1988
12/16/1992
12/16/1992
12/16/1992
12/16/1992
$151,973
$230,680
$0
$0
$0
$473,804
$0
$0
$181,004
$385,823
$238,062
$0
$151,973
$230,680
$181,004
$385,823
$238,062
$473,804
Monday, January 11, 2016 Page 51 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0132-002-1989 Install Runway Lighting (ST RW LI) 9/22/1989 12/16/1992 $0 $63,795 $63,795
Rehabilitate Runway 7/25 (RE RW IM) 9/22/1989 12/16/1992 $0 $412,531 $412,531
Remove Obstructions (SA OT OB) 9/22/1989 12/16/1992 $0 $28,275 $28,275
3-02-0132-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/1990 7/23/1992 $132,296 $0 $132,296 EQ RF)
3-02-0132-004-1997 Rehabilitate Runway 7-25 (RE RW IM) 7/16/1997 6/8/2000 $700,000 $0 $700,000
Install Runway Vertical/Visual Guidance System 7-25 7/16/1997 6/8/2000 $400,000 $0 $400,000 (ST RW VI)
Extend Runway 7-25 (ST RW IM) 7/16/1997 6/8/2000 $1,290,537 $0 $1,290,537
Improve Runway Safety Area 7-25 (ST RW SF) 7/16/1997 6/8/2000 $240,205 $0 $240,205
3-02-0132-005-1998 Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1998 9/25/2002 $878,677 $0 $878,677 BD EX)
3-02-0132-006-2002 Construct Service Road (OT GT SV) 9/26/2002 8/21/2006 $230,000 $0 $230,000
Strengthen Runway 7/25 (ST RW IM) 9/26/2002 8/21/2006 $3,108,318 $312,816 $3,421,134
Strengthen Runway 17/35 (ST RW IM) 9/26/2002 8/21/2006 $3,318,182 $312,816 $3,630,998
Acquire Security Equipment (SA EQ SE) 9/26/2002 8/21/2006 $670,000 $0 $670,000
Improve Access Road (OT GT AC) 9/26/2002 8/21/2006 $350,000 $0 $350,000
Construct Taxiway C (ST TW CO) 9/26/2002 8/21/2006 $250,000 $0 $250,000
Install Emergency Generator (ST EQ LI) 9/26/2002 8/21/2006 $85,000 $0 $85,000
3-02-0132-007-2003 Conduct Airport Master Plan Study (PL PL MA) 8/20/2003 3/9/2007 $83,008 $0 $83,008
3-02-0132-008-2004 Update Airport Master Plan Study (PL PL MA) 8/19/2004 8/8/2008 $310,379 $0 $310,379
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $7,500 $0 $7,500 (RE RW IM)
[Various Grnt] Rehabilitate Runway 17/35 (Maintenance) 8/30/2005 6/9/2010 $7,500 $0 $7,500 (RE RW IM)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (2CY 8/17/2006 7/19/2013 $53,550 $0 $53,550 Sander/Flatbed Truck) (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $42,180 $0 $42,180 (RE RW IM)
3-02-0132-009-2009 Construct Snow Removal Equipment Building Construct 2/24/2009 5/5/2015 $4,278,653 $0 $4,278,653 Combined Snow Removaland Sand Chemical Building (ST BD SN)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 07/25 (Various 8/20/2009 12/19/2014 $85,120 $0 $85,120 Surface Maintenance) (RE RW IM)
3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $603,883 $0 $603,883 Acquire SRE (Central Region): Snow Blower w/ Attachments (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 07/25 Various 9/19/2012 $735,000 $0 $735,000 Surface Preservation Maintenance (Iliamna) (RE RW IM)
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $52,500 $0 $52,500 Obstruction Removal (Iliamna) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $57,750 $0 $57,750 Various Surface Preservation Maintenance: Iliamna - Crack Seal (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 17/35 Accomplish 9/21/2015 $57,750 $0 $57,750 Various Airport Surface Preservation Maintenance (Iliamna Crack Seal) (RE RW IM)
$18,884,445 $1,935,122 $20,819,567
Ivanof Bay Ivanof Bay (KIB)
3-02-0378-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/4/2001 8/3/2004 $75,163 $0 $75,163
$75,163 $0 $75,163
Monday, January 11, 2016 Page 52 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Juneau Juneau Harbor (5Z1)
3-02-0403-001-1983 Rehabilitate Apron (RE AP IM) 8/23/1983 1/29/1986 $86,364 $0 $86,364
Expand Apron (ST AP IM) 8/23/1983 1/29/1986 $68,181 $0 $68,181
Construct Apron (ST AP CO) 8/23/1983 1/29/1986 $331,705 $0 $331,705
$486,250 $0 $486,250
Juneau International (JNU)
3-02-0133-001-1983 Construct Apron (ST AP CO) 9/20/1983 8/12/1987 $0 $226,218 $226,218
Construct Apron (ST AP CO) 9/20/1983 8/12/1987 $920,659 $104,990 $1,025,649
Expand Apron (ST AP IM) 9/20/1983 8/12/1987 $0 $192,094 $192,094
Rehabilitate Apron (RE AP IM) 9/20/1983 8/12/1987 $621,827 $0 $621,827
3-02-0133-003-1985 Acquire Land for Development (ST LA DV) 9/18/1985 11/13/1986 $781,310 $0 $781,310
3-02-0133-002-1986 Conduct Noise Compatibility Plan Study (EN PL NO) 5/22/1986 4/22/1993 $108,137 $0 $108,137
Conduct Airport Master Plan Study (PL PL MA) 5/22/1986 4/22/1993 $147,652 $0 $147,652
3-02-0133-004-1987 Acquire Aircraft Rescue & Fire Fighting Safety 7/28/1987 2/6/1991 $588,376 $16,163 $604,539 Equipment (ST EQ MS)
3-02-0133-005-1988 Acquire Security Equipment (SA EQ SE) 1/13/1988 2/6/1991 $314,115 $22,118 $336,233
Acquire Snow Removal Equipment (ST EQ SN) 1/13/1988 2/6/1991 $218,645 $0 $218,645
3-02-0133-006-1988 Acquire Aircraft Rescue & Fire Fighting Safety 6/8/1988 9/9/1992 $41,263 $6,189 $47,452 Equipment (ST EQ MS)
3-02-0133-007-1989 Improve Access Road (CA GT AC) 6/28/1989 1/6/1993 $202,719 $0 $202,719
Install Runway Lighting (ST RW LI) 6/28/1989 1/6/1993 $68,054 $0 $68,054
Construct Apron (CA AP CO) 6/28/1989 1/6/1993 $1,174,583 $0 $1,174,583
Construct Taxiway (CA TW CO) 6/28/1989 1/6/1993 $268,560 $0 $268,560
Construct Taxiway (CA TW CO) 6/28/1989 1/6/1993 $2,218,039 $2,225,470 $4,443,509
3-02-0133-008-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1991 2/6/1995 $696,588 $9,965 $706,553
Acquire Security Equipment (SA EQ SE) 9/27/1991 2/6/1995 $95,019 $0 $95,019
3-02-0133-009-1992 Acquire Snow Removal Equipment (ST EQ SN) 7/28/1992 1/3/1995 $468,117 $0 $468,117
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/28/1992 1/3/1995 $314,948 $0 $314,948 EQ RF)
Install Apron Lighting (ST AP LI) 7/28/1992 1/3/1995 $11,381 $0 $11,381
3-02-0133-010-1992 Acquire Security Equipment (SA EQ SE) 9/24/1992 9/25/1997 $52,476 $0 $52,476
Rehabilitate Taxiway (RE TW IM) 9/24/1992 9/25/1997 $111,398 $0 $111,398
Improve Terminal Building (CA TE IM) 9/24/1992 9/25/1997 $99,938 $0 $99,938
Improve Access Road (OT GT AC) 9/24/1992 9/25/1997 $70,747 $0 $70,747
Improve Access Road (OT GT AC) 9/24/1992 9/25/1997 $146,940 $0 $146,940
3-02-0133-011-1993 Rehabilitate Taxiway (RE TW IM) 4/16/1993 9/25/1997 $744,341 $588 $744,929
Rehabilitate Apron (RE AP IM) 4/16/1993 9/25/1997 $60,028 $0 $60,028
Improve Access Road (OT GT AC) 4/16/1993 9/25/1997 $143,108 $0 $143,108
3-02-0133-012-1994 Install Guidance Signs (SA OT SG) 6/22/1994 1/14/1999 $719,417 $22,441 $741,858
3-02-0133-013-1994 Conduct Miscellaneous Study (PL PL MS) 6/29/1994 7/11/2000 $150,000 $0 $150,000
Acquire Snow Removal Equipment (ST EQ SN) 6/29/1994 7/11/2000 $121,484 $0 $121,484
Acquire Security Equipment (SA EQ SE) 6/29/1994 7/11/2000 $23,438 $0 $23,438
3-02-0133-014-1994 Improve Terminal Building (CA TE IM) 9/28/1994 3/30/1999 $167,023 $0 $167,023
3-02-0133-015-1995 Install Runway Lighting (SA RW LI) 5/16/1995 1/14/1999 $816,644 $107,446 $924,090
3-02-0133-016-1995 Conduct Airport Master Plan Study (PL PL MA) 9/20/1995 9/6/2000 $328,125 $0 $328,125
3-02-0133-017-1995 Rehabilitate Taxiway (RE TW IM) 9/20/1995 9/25/2000 $0 $738,734 $738,734
Monday, January 11, 2016 Page 53 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0133-017-1995 Extend Runway 08/26 (ST RW IM) 9/20/1995 9/25/2000 $240,800 $0 $240,800
Expand Apron (ST AP IM) 9/20/1995 9/25/2000 $292,950 $0 $292,950
3-02-0133-018-1996 Construct Deicing Containment Facility (EN OT DI) 4/23/1996 1/28/2000 $20,000 $281,480 $301,480
3-02-0133-019-1996 Acquire Security Equipment (SA EQ SE) 7/17/1996 7/14/2000 $20,937 $126,563 $147,500
Acquire Snow Removal Equipment (ST EQ SN) 7/17/1996 7/14/2000 $340,000 $14,892 $354,892
3-02-0133-020-1996 Rehabilitate Runway 8/26 (RE RW IM) 8/12/1996 3/9/1999 $241,650 $0 $241,650
Improve Terminal Building (ST TE IM) 8/12/1996 3/9/1999 $130,964 $0 $130,964
3-02-0133-021-1997 Rehabilitate Taxiway Lighting (RE TW LI) 6/3/1997 9/5/2001 $332,735 $0 $332,735
Rehabilitate Runway 8/26 (RE RW IM) 6/3/1997 9/5/2001 $313,475 $3,900,000 $4,213,475
Install Runway Lighting (SP RW LI) 6/3/1997 9/5/2001 $0 $0 $0
Install Runway Lighting 8/26 (SP RW LI) 6/3/1997 9/5/2001 $795,207 $0 $795,207
3-02-0133-022-1997 Acquire Snow Removal Equipment (ST EQ SN) 5/12/1997 7/11/2000 $500,664 $0 $500,664
3-02-0133-023-1998 Acquire Snow Removal Equipment (ST EQ SN) 12/10/1997 7/11/2000 $280,626 $0 $280,626
3-02-0133-024-1998 Acquire Security Equipment (SA EQ SE) 5/1/1998 9/25/2002 $70,500 $10,575 $81,075
3-02-0133-025-1998 Improve Snow Removal Equipment Building (ST BD 6/22/1998 9/19/2008 $656,196 $0 $656,196 SN)
3-02-0133-026-1999 Rehabilitate Apron (RE AP IM) 3/31/1999 9/10/2001 $954,491 $0 $954,491
3-02-0133-027-1999 Acquire Snow Removal Equipment (ST EQ SN) 7/19/1999 9/6/2001 $164,013 $0 $164,013
3-02-0133-028-1999 Improve Terminal Building (ST TE IM) 7/19/1999 9/6/2001 $242,725 $0 $242,725
3-02-0133-029-2000 Improve Runway Safety Area 08-26 (SA RW SF) 6/23/2000 6/8/2004 $1,174,980 $2,621,748 $3,796,728
3-02-0133-030-2000 Improve Runway Safety Area (SA RW SF) 9/13/2000 8/26/2004 $0 $700,000 $700,000
3-02-0133-031-2001 Improve Runway Safety Area (SA RW SF) 9/4/2001 8/26/2004 $1,000,000 $0 $1,000,000
3-02-0133-032-2001 Improve Terminal Building (ST TE IM) 9/5/2001 5/5/2004 $478,097 $0 $478,097
3-02-0133-033-2001 Acquire Land for Noise Compatibility within 65 - 69 7/5/2001 8/26/2004 $0 $328,958 $328,958 DNL (EN LA 65)
3-02-0133-034-2002 Security Enhancements (SE SE SE) 4/18/2002 2/14/2005 $0 $89,554 $89,554
3-02-0133-035-2002 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/22/2002 5/17/2005 $4,451 $596,104 $600,555 EQ RF)
Acquire Snow Removal Equipment (ST EQ SN) 7/22/2002 5/17/2005 $1,097,972 $0 $1,097,972
3-02-0133-036-2002 Improve Terminal Building (ST TE IM) 8/19/2002 3/6/2006 $70,000 $11,442 $81,442
Security Enhancements (SE SE SE) 8/19/2002 3/6/2006 $0 $116,041 $116,041
3-02-0133-037-2003 Rehabilitate Taxiway A (RE TW IM) 8/13/2003 3/3/2006 $3,255,990 $36,857 $3,292,847
3-02-0133-038-2003 Security Enhancements (SA EQ SE) 8/26/2003 5/20/2005 $356,317 $16,113 $372,430
3-02-0133-039-2003 Improve Runway Safety Area 08/26 Phase 3 (SA RW 8/26/2003 5/22/2007 $0 $1,303,125 $1,303,125 SF)
3-02-0133-040-2004 Rehabilitate Access Road (OT GT AC) 7/16/2004 11/17/2006 $368,227 $0 $368,227
3-02-0133-041-2004 Acquire Friction Measuring Equipment (ST EQ SR) 5/20/2004 3/3/2006 $75,000 $4,090 $79,090
Acquire Snow Removal Equipment (ST EQ SN) 5/20/2004 3/3/2006 $482,480 $0 $482,480
3-02-0133-042-2004 Extend Taxiway (ST TW IM) 8/9/2004 4/27/2007 $1,244,168 $186,625 $1,430,793
3-02-0133-044-2004 Conduct Airport Master Plan Study (Terminal Study) 8/20/2004 3/12/2007 $760,000 $0 $760,000 (PL PL MA)
3-02-0133-043-2005 Construct Apron (ST AP CO) 6/13/2005 8/12/2009 $1,463,162 $0 $1,463,162
3-02-0133-045-2005 Security Enhancements (Security Vehicle) (SA EQ SE) 3/21/2005 11/17/2006 $24,460 $0 $24,460
3-02-0133-046-2005 Construct Runway Safety Area 08/26 (Environmental) 8/11/2005 5/4/2010 $0 $787,135 $787,135 (SA RW SF)
3-02-0133-047-2006 Expand Terminal Building (Planning & Design) (ST TE 9/1/2006 3/25/2011 $1,000,000 $0 $1,000,000 EX)
3-02-0133-048-2007 Construct Runway Safety Area 08/26 (Mitigation) (SA 8/21/2007 8/11/2015 $0 $2,500,000 $2,500,000 RW SF)
Construct Apron (Mitigation) (ST AP CO) 8/21/2007 8/11/2015 $1,000,000 $0 $1,000,000
Construct Apron (Place Fill) (ST AP CO) 8/21/2007 8/11/2015 $900,000 $0 $900,000
Monday, January 11, 2016 Page 54 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0133-048-2007 8/21/2007 8/11/2015 Construct Snow Removal Equipment Building (Place Fill) (ST BD SN)
$892,065 $0 $892,065
8/21/2007 8/11/2015 Construct Snow Removal Equipment Building (Mitigation) (ST BD SN)
$500,000 $500,000 $1,000,000
8/21/2007 8/11/2015 Environmental Mitigation (Mitigation) (EN OT MT) $700,000 $0 $700,000
8/21/2007 8/11/2015 Construct Taxiway (Mitigation) (ST TW CO) $100,000 $0 $100,000
8/21/2007 8/11/2015 Construct Runway Safety Area 08/26 (Place Fill) (SA RW SF)
$2,203,834 $7,500,000 $9,703,834
3-02-0133-049-2008 6/23/2008 Construct Apron (Construct) (ST AP CO) $3,000,000 $0 $3,000,000
6/23/2008 Construct Runway Safety Area 08/26 (Construction Phase 2) (SA RW SF)
$0 $7,506,094 $7,506,094
3-02-0133-050-2009 8/24/2009 Construct Snow Removal Equipment Building Construct SREF Embankment, phase 1 (ST BD SN)
$1,000,000 $1,000,000 $2,000,000
8/24/2009 Construct Apron construct NW Quad (and associated taxilane)embankment, phase 3 (ST AP CO)
$2,100,219 $0 $2,100,219
8/24/2009 Construct Runway Safety Area 08/26 construct runway safety area, phase 3 (SA RW SF)
$1,000,000 $9,456,137 $10,456,137
8/24/2009 Construct Apron construct NE Quad embankment, phase 3 (ST AP CO)
$2,000,000 $0 $2,000,000
3-02-0133-051-2011 3/15/2011 Construct Snow Removal Equipment Building phase 2 (utilities) - Part A (ST BD SN)
$1,441,744 $0 $1,441,744
3-02-0133-052-2011 6/20/2011 Construct Runway Safety Area 08/26 phase 4 (Design & construction) (SA RW SF)
$2,020,829 $2,489,131 $4,509,960
3-02-0133-053-2011 6/17/2011 10/27/2014 Construct Runway Safety Area 08/26 phase 5 (ATO RA) (SA RW SF)
$0 $2,000,000 $2,000,000
3-02-0133-054-2011 9/15/2011 Construct Runway Safety Area 08/26 Phase 6 (construction) (SA RW SF)
$615,644 $6,617,383 $7,233,027
3-02-0133-055-2012 7/18/2012 Construct Runway Safety Area 08/26 Phase 7 (SA RW SF)
$2,569,096 $14,715,447 $17,284,543
3-02-0133-056-2012 9/19/2012 12/23/2014 Construct Runway Safety Area 08/26 Phase 8 (ATO reimbursable agreement) (SA RW SF)
$0 $5,500,000 $5,500,000
3-02-0133-057-2013 6/17/2013 Construct Runway Safety Area 08/26 Final funding of ATO Reimbursible Agreement to complete NAVAIDS installation (SA RW SF)
$1,903,817 $0 $1,903,817
3-02-0133-058-2013 9/12/2013 Rehabilitate Runway 08/26 Phase 1, Design (RE RW IM) $1,171,875 $0 $1,171,875
3-02-0133-059-2013 9/19/2013 Sustainable Master Plan Sustainable Master Plan (EN PL ES)
$0 $250,000 $250,000
9/19/2013 Update Airport Master Plan Study Master Plan update. (PL PL MA)
$453,125 $0 $453,125
3-02-0133-060-2014 7/1/2014 Rehabilitate Runway 08/26 Phase 2 (RE RW IM) $2,615,850 $17,952,227 $20,568,077
3-02-0133-061-2015 7/15/2015 Acquire Handicap Passenger Lift Device (ST TE MS) $59,863 $0 $59,863
7/15/2015 Rehabilitate Terminal Building Replace passenger boarding bridge -- reimbursement for sponsor purchase. (ST TE IM)
$466,270 $0 $466,270
3-02-0133-062-2015 8/21/2015 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire ARFF vehicle. (SA EQ RF)
$647,473 $0 $647,473
3-02-0133-063-2015 8/21/2015 Conduct Environmental Study Preliminary Engineering/Design Analysis and Environmental Study of Proposed ARFF Building Expansion (EN PL MA)
$234,375 $0 $234,375
3-02-0133-064-2015 9/1/2015 Construct Apron Design NE Apron and South Fence -Phase 1 Design (ST AP CO)
$781,222 $0 $781,222
9/1/2015 Install Perimeter Fencing (ST EQ SE) $32,551 $0 $32,551
$61,878,188 $92,790,136 $154,668,324
Monday, January 11, 2016 Page 55 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kake Kake (AFE)
3-02-0398-001-1983 Construct Runway 10/28 (ST RW CO) 9/26/1983 6/22/1993 $3,582,052 $0 $3,582,052
Improve Airport Drainage (ST OT IM)
Improve Access Road (OT GT AC)
Improve Airport Drainage (ST OT IM)
Install Runway Lighting (ST RW LI)
Construct Taxiway (ST TW CO)
Acquire Land for Development (ST LA DV)
3-02-0398-002-1989 Rehabilitate Taxiway (RE TW IM)
Extend Runway 10/28 (ST RW IM)
Expand Apron (ST AP IM)
Improve Access Road (OT GT AC)
Remove Obstructions (SA OT OB)
3-02-0398-003-1991 Conduct Airport Master Plan Study (PL PL MA)
3-02-0398-004-1995 Improve Airport Drainage (ST OT IM)
Extend Runway 10/28 (ST RW IM)
3-02-0398-005-1997 Remove Obstructions (ST OT OB)
Install Runway Vertical/Visual Guidance System (ST RW VI)
3-02-0398-006-2002 Update Airport Master Plan Study Update Airport Layout Plan (ALP) (PL PL MA)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various Surface Maintenance) (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - ) (SA OT OB)
9/26/1983
9/26/1983
9/26/1983
9/26/1983
9/26/1983
9/26/1983
9/15/1989
9/15/1989
9/15/1989
9/15/1989
9/15/1989
9/13/1991
9/12/1995
9/12/1995
7/16/1997
7/16/1997
9/12/2002
8/30/2005
5/31/2007
8/20/2009
7/23/2012
6/22/1993
6/22/1993
6/22/1993
6/22/1993
6/22/1993
6/22/1993
10/14/1992
10/14/1992
10/14/1992
10/14/1992
10/14/1992
4/17/2000
9/25/1997
9/25/1997
9/13/2002
9/13/2002
5/30/2006
6/9/2010
8/6/2013
12/19/2014
$81,497
$840,019
$76,969
$267,759
$471,609
$590,625
$52,453
$619,172
$320,229
$140,895
$62,506
$120,129
$569,103
$50,063
$267,780
$60,659
$74,976
$10,000
$21,280
$77,672
$35,730
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,000
$0
$0
$0
$0
$0
$0
$0
$0
$81,497
$840,019
$76,969
$267,759
$471,609
$590,625
$52,453
$619,172
$320,229
$140,895
$62,506
$120,129
$585,103
$50,063
$267,780
$60,659
$74,976
$10,000
$21,280
$77,672
$35,730
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various Surface Preservation Maintenance (Kake) (RE RW IM)
3-02-0200-102-2015 [Various Grnt] Remove Obstructions EAS/EDA Various (Kake - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)
9/19/2012
9/20/2015
$45,938
$51,722
$8,490,837
$0
$0
$16,000
$45,938
$51,722
$8,506,837
Kaktovik Barter Island LRRS (BTI)
3-02-0027-001-1997 Conduct Airport Master Plan Study (PL PL MA)
3-02-0027-002-2002 Update Airport Master Plan Study (PL PL MA)
3-02-0027-003-2006 Update Airport Master Plan Study (Phase 2, Environmental) (PL PL MA)
3-02-0027-004-2006 Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)
9/26/1997
9/20/2002
6/23/2006
7/13/2006
9/24/2001 $92,766
8/11/2006 $278,283
4/9/2012 $927,771
7/24/2009 $1,741,271
$3,040,091
$0
$0
$0
$0
$0
$92,766
$278,283
$927,771
$1,741,271
$3,040,091
Kaktovik (Proposed CS) (+08O)
3-02-0482-001-2009 Construct New Airport Airport Design (ST NA CO)
3-02-0482-002-2011 Construct New Airport Construction Phase 1 (land acquis) (ST NA CO)
9/18/2009
9/14/2011
8/8/2014 $1,990,140
3/10/2015 $1,766,930
$0
$0
$1,990,140
$1,766,930
Monday, January 11, 2016 Page 56 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0482-003-2012 6/18/2012 Construct New Airport Construction Phase 2 (To include SREB) (ST NA CO)
$23,000,000 $0 $23,000,000
3-02-0482-004-2013 8/5/2013 Construct New Airport Construction Phase 3 (ST NA CO)
$13,000,000 $0 $13,000,000
3-02-0482-005-2014 9/18/2014 Acquire Snow Removal Equipment Acquire SRE (Motor Grader, Snow Blower) (ST EQ SN)
$855,223 $0 $855,223
$40,612,294 $0 $40,612,294
Kalskag Kalskag (KLG)
3-02-0136-001-1999 8/4/1999 9/8/2003 Rehabilitate Runway 6-24 (RE RW IM) $2,608,553 $0 $2,608,553
8/4/1999 9/8/2003 Improve Snow Removal Equipment Building (ST BD SN)
$267,700 $0 $267,700
8/4/1999 9/8/2003 Acquire Snow Removal Equipment (ST EQ SN) $250,000 $0 $250,000
8/4/1999 9/8/2003 Acquire Land For Approaches (ST LA SZ) $212,000 $0 $212,000
3-02-0136-002-2003 8/19/2003 7/28/2006 Install Perimeter Fencing (ST EQ SE) $339,834 $0 $339,834
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)
$12,654 $0 $12,654
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 06/24 Various Surface Preservation (RE RW IM)
$212,800 $0 $212,800
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$36,093 $0 $36,093
3-02-0200-100-2015 9/16/2015 [Various Grnt] Conduct Aeronautical Survey for RNAV Approach (PL PL VI)
$378,000 $0 $378,000
$4,317,634 $0 $4,317,634
Kaltag Kaltag (KAL)
3-02-0137-001-1984 9/4/1984 9/5/1989 Rehabilitate Runway 3/21 (RE RW IM) $311,505 $0 $311,505
9/4/1984 9/5/1989 Install Runway Lighting (ST RW LI) $130,278 $0 $130,278
9/4/1984 9/5/1989 Expand Apron (CA AP EX) $72,737 $0 $72,737
9/4/1984 9/5/1989 Extend Runway 3/21 (ST RW IM) $472,300 $0 $472,300
9/4/1984 9/5/1989 Remove Obstructions (SA OT OB) $3,010 $0 $3,010
9/4/1984 9/5/1989 Construct Taxiway (ST TW CO) $19,744 $0 $19,744
3-02-0137-002-1991 9/27/1991 9/26/1996 Install Runway Lighting (ST RW LI) $152,685 $0 $152,685
9/27/1991 9/26/1996 Construct Apron (ST AP CO) $69,713 $0 $69,713
9/27/1991 9/26/1996 Improve Access Road (OT GT AC) $127,006 $0 $127,006
9/27/1991 9/26/1996 Acquire Snow Removal Equipment (ST EQ SN) $74,078 $0 $74,078
9/27/1991 9/26/1996 Improve Snow Removal Equipment Building (ST BD SN)
$166,490 $0 $166,490
9/27/1991 9/26/1996 Improve Runway Safety Area 03/21 (SA RW SF) $1,190,228 $80,522 $1,270,750
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)
$143,086 $0 $143,086
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)
$178,000 $0 $178,000
3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Kaltag (Dozer) (ST EQ SN)
$370,108 $0 $370,108
3-02-0200-103-2015 9/20/2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Kaltag Segmented Circle (SP OT IN)
$155,109 $0 $155,109
$3,636,077 $80,522 $3,716,599
Monday, January 11, 2016 Page 57 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kantishna Kantishna (5Z5)
3-02-0426-001-1993 9/28/1993 9/11/1995 Conduct Airport Master Plan Study (PL PL MA) $12,563 $0 $12,563
3-02-0426-002-1998 8/19/1998 9/27/2002 Conduct Airport Master Plan Study (PL PL MA) $329,759 $0 $329,759
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Kantishna Various Surface Maintenance (RE RW IM)
$79,800 $0 $79,800
$422,122 $0 $422,122
Karluk Karluk (KYK)
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
$6,667 $0 $6,667
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
$25,308 $0 $25,308
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
$0 $0 $0
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)
$159,600 $0 $159,600
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Karluk (RE RW IM)
$159,600 $0 $159,600
3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Karluk) (SA OT OB)
$31,500 $0 $31,500
$382,675 $0 $382,675
Kasaan Kasaan (KXA)
3-02-0139-001-1989 9/22/1989 4/17/1992 Rehabilitate Apron (RE AP IM) $115,928 $0 $115,928
$115,928 $0 $115,928
Kasigluk Kasigluk (Z09)
3-02-0341-001-1997 6/13/1997 6/7/2000 Expand Apron (ST AP IM) $400,000 $0 $400,000
6/13/1997 6/7/2000 Acquire Land for Development (ST LA DV) $310,000 $0 $310,000
6/13/1997 6/7/2000 Acquire Snow Removal Equipment (ST EQ SN) $190,000 $0 $190,000
6/13/1997 6/7/2000 Improve Snow Removal Equipment Building (ST BD SN)
$240,000 $0 $240,000
6/13/1997 6/7/2000 Construct Taxiway (ST TW CO) $100,000 $0 $100,000
6/13/1997 6/7/2000 Install Runway Lighting (ST RW LI) $175,000 $0 $175,000
6/13/1997 6/7/2000 Install Apron Lighting (ST AP LI) $25,000 $0 $25,000
6/13/1997 6/7/2000 Install Runway Vertical/Visual Guidance System (ST RW VI)
$60,000 $0 $60,000
6/13/1997 6/7/2000 Improve Access Road (OT GT AC) $60,000 $0 $60,000
6/13/1997 6/7/2000 Extend Runway 17/35 (ST RW IM) $2,114,390 $0 $2,114,390
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 17/35 Various Surface Preservation Maintenance (Kasigluk) (RE RW IM)
$10,500 $0 $10,500
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$47,437 $0 $47,437
Monday, January 11, 2016 Page 58 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 17/35 Accomplish 9/21/2015 $4,620 $0 $4,620 Various Airport Surface Preservation Maintenance (Kasigluk Rehab Threshold Markings) (RE RW IM)
$3,736,947 $0 $3,736,947
Kenai Kenai Municipal (ENA)
3-02-0142-001-1983 Install Apron Lighting (ST AP LI) 9/28/1983 1/17/1986 $24,750 $0 $24,750
Construct Apron (CA AP CO) 9/28/1983 1/17/1986 $236,208 $0 $236,208
Rehabilitate Apron (RE AP IM) 9/28/1983 1/17/1986 $214,116 $0 $214,116
Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 1/17/1986 $12,375 $0 $12,375 Equipment (ST EQ MS)
3-02-0142-002-1985 Conduct Airport Master Plan Study (PL PL MA) 9/25/1985 4/19/1988 $67,060 $0 $67,060
3-02-0142-003-1986 Install Apron Lighting (ST AP LI) 9/9/1986 2/4/1988 $30,937 $0 $30,937
Rehabilitate Apron (RE AP IM) 9/9/1986 2/4/1988 $269,766 $0 $269,766
Construct Taxiway (CA TW CO) 9/9/1986 2/4/1988 $60,570 $0 $60,570
Rehabilitate Runway 1/19 (RE RW IM) 9/9/1986 2/4/1988 $336,562 $0 $336,562
3-02-0142-004-1987 Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $18,592 $0 $18,592
Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $63,234 $0 $63,234
Acquire Security Equipment (SA EQ SE) 8/27/1987 4/20/1990 $26,219 $0 $26,219
Construct Runway 01/19 (ST RW CO) 8/27/1987 4/20/1990 $576,367 $0 $576,367
Improve Access Road (OT GT AC) 8/27/1987 4/20/1990 $42,768 $0 $42,768
Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $7,433 $0 $7,433
3-02-0142-005-1988 Rehabilitate Taxiway (RE TW IM) 9/14/1988 4/11/1990 $247,384 $0 $247,384
3-02-0142-006-1989 Conduct Miscellaneous Study (PL PL MS) 4/21/1989 11/17/1992 $53,242 $0 $53,242
3-02-0142-007-1989 Rehabilitate Runway 1 (RE RW IM) 8/23/1989 12/4/1990 $687,838 $0 $687,838
Rehabilitate Taxiway (RE TW IM) 8/23/1989 12/4/1990 $193,523 $0 $193,523
Rehabilitate Runway Lighting (RE RW LI) 8/23/1989 12/4/1990 $146,980 $0 $146,980
3-02-0142-008-1990 Construct Taxiway (ST TW CO) 8/23/1990 2/28/1991 $230,368 $0 $230,368
3-02-0142-009-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/10/1991 11/17/1992 $96,383 $0 $96,383
3-02-0142-010-1991 Acquire Land for Development (ST LA DV) 8/7/1991 10/9/1991 $147,611 $0 $147,611
3-02-0142-011-1991 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/9/1991 10/13/1992 $270,832 $0 $270,832 EQ RF)
3-02-0142-012-1992 Improve Runway Safety Area 1/19 (ST RW SF) 5/28/1992 1/10/1996 $1,452,816 $0 $1,452,816
3-02-0142-013-1992 Acquire Security Equipment (SA EQ SE) 9/8/1992 12/22/1994 $129,122 $8,254 $137,376
3-02-0142-014-1993 Acquire Snow Removal Equipment (ST EQ SN) 12/2/1992 11/15/1993 $172,678 $0 $172,678
3-02-0142-015-1993 Acquire Snow Removal Equipment (ST EQ SN) 1/28/1993 11/22/1993 $242,944 $0 $242,944
3-02-0142-016-1993 Rehabilitate Taxiway (RE TW IM) 6/15/1993 12/20/1994 $172,926 $0 $172,926
3-02-0142-017-1993 Acquire Security Equipment (SA EQ SE) 7/13/1993 12/13/1994 $79,510 $0 $79,510
3-02-0142-018-1994 Install Guidance Signs (SA OT SG) 6/20/1994 1/12/1996 $34,888 $0 $34,888
3-02-0142-019-1994 Acquire Snow Removal Equipment (ST EQ SN) 6/22/1994 6/1/1995 $207,943 $0 $207,943
3-02-0142-020-1995 Conduct Airport Master Plan Study (PL PL MA) 6/5/1995 8/15/2000 $281,155 $0 $281,155
3-02-0142-021-1995 Acquire Snow Removal Equipment (ST EQ SN) 4/25/1995 10/24/1998 $197,847 $0 $197,847
3-02-0142-022-1997 Construct Runway 1R-19L (ST RW CO) 7/8/1997 12/6/2000 $303,482 $0 $303,482
Extend Taxiway (ST TW IM) 7/8/1997 12/6/2000 $788,749 $445,083 $1,233,832
3-02-0142-023-1997 Construct Aircraft Rescue & Fire Fighting Training Facility (ST OT RF)
12/17/1997 9/26/2000 $53,128 $6,017,761 $6,070,889
Construct Aircraft Rescue & Fire Fighting Training 12/17/1997 9/26/2000 $1,671,894 $1,682,200 $3,354,094 Facility (ST OT RF)
Monday, January 11, 2016 Page 59 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0142-024-1998 Construct Aircraft Rescue & Fire Fighting Training 4/29/1998 9/26/2000 $0 $2,200,000 $2,200,000 Facility (ST OT RF)
3-02-0142-025-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/24/1999 6/12/2000 $267,816 $0 $267,816
3-02-0142-026-2000 Improve Aircraft Rescue & Fire Fighting Building (SA 8/4/2000 8/27/2004 $671,853 $0 $671,853 BD EX)
3-02-0142-027-2001 Improve Aircraft Rescue & Fire Fighting Building (SA 4/16/2001 2/24/2005 $2,162,263 $1,900,000 $4,062,263 BD EX)
3-02-0142-028-2002 Acquire Snow Removal Equipment (loader, 9/19/2002 6/30/2004 $206,923 $0 $206,923 sander/truck unit) (ST EQ SN)
3-02-0142-029-2002 Security Enhancements (SE SE SE) 9/19/2002 4/21/2006 $78,125 $241,389 $319,514
3-02-0142-030-2002 Extend Runway (Environmental) Phase 1 (ST RW IM) 9/19/2002 8/1/2006 $188,359 $0 $188,359
Extend Runway Safety Area (Environmental) Phase 1 9/19/2002 8/1/2006 $163,204 $4,617 $167,821 (SA RW SF)
3-02-0142-031-2003 Acquire Handicap Passenger Lift Device (ST TE MS) 8/21/2003 5/22/2007 $30,937 $0 $30,937
Improve Access Road (ADA Access) (OT GT AC) 8/21/2003 5/22/2007 $955,086 $0 $955,086
3-02-0142-032-2004 Update Airport Master Plan Study (PL PL MA) 8/25/2004 4/14/2008 $350,489 $9 $350,498
3-02-0142-033-2004 Security Enhancements (ST EQ SE) 8/30/2004 2/14/2007 $506,666 $0 $506,666
3-02-0142-034-2005 Extend Taxiway (Multi-Year, Year 2) (ST TW IM) 5/24/2005 4/10/2007 $364,079 $0 $364,079
Extend Taxiway Extend Twy P (ST TW IM) 5/24/2005 4/10/2007 $1,677,996 $0 $1,677,996
3-02-0142-035-2006 Rehabilitate Runway 01L/19R (Phase 2) (RE RW IM) 7/24/2006 8/28/2009 $720,991 $4,540,286 $5,261,277
Rehabilitate Runway 01L/19R Rehabilitate runway 7/24/2006 8/28/2009 $348,566 $0 $348,566 lighting (RE RW IM)
Improve Seaplane Base extend & widen waterlane 7/24/2006 8/28/2009 $383,763 $0 $383,763 (phase 1) (ST SB CO)
Improve Seaplane Base extend & widen waterlane 7/24/2006 8/28/2009 $1,200,000 $0 $1,200,000 (phase 2a) (ST SB CO)
Rehabilitate Runway 01L/19R RSA, provide 7/24/2006 8/28/2009 $0 $2,500,000 $2,500,000 standard(Phase 2) (RE RW IM)
3-02-0142-037-2007 Rehabilitate Runway 01L/19R rehab. runway 1/19 & 4/20/2007 6/21/2010 $367,916 $2,515,429 $2,883,345 provide RSA (phase 3) (RE RW IM)
Improve Seaplane Base extend & widen waterlane 4/20/2007 6/21/2010 $27,567 $1,000,000 $1,027,567 (phase 2b) (ST SB CO)
3-02-0142-038-2008 Construct Sand and Chemical Storage Building 6/11/2008 8/12/2009 $432,436 $0 $432,436 Construct Sand/Urea Bldg (ST BD SN)
3-02-0142-039-2009 Acquire Snow Removal Equipment Acquire Plow Truck 2/2/2009 5/4/2010 $51,841 $0 $51,841 Attachment (ST EQ SN)
3-02-0142-040-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 2/12/2009 6/13/2011 $0 $843,698 $843,698 ARFF Truck (SA EQ RF)
3-02-0142-041-2009 Rehabilitate Apron Rehab Apron, Phase 1 (Design and 2/2/2009 3/13/2013 $721,837 $103,346 $825,183 Construction Block 1, FY09 Part A) (RE AP IM)
3-02-0142-042-2009 Rehabilitate Apron Rehab Apron, Phase 2 (Design and 6/22/2009 3/13/2013 $1,211,400 $3,484,418 $4,695,818 Construction Block 1, FY09 Phase B) (RE AP IM)
3-02-0142-043-2009 Rehabilitate Apron Apron Rehabilitation - 2009 ARRA 5/18/2009 12/10/2010 $0 $0 $0 Funded (RE AP IM)
3-02-0142-044-2010 Construct Apron Float Plane Basin Development, 8/13/2010 1/7/2015 $197,049 $0 $197,049 Phase 1 (ST AP CO)
3-02-0142-045-2010 Conduct Airport Master Plan Study Supplemental 7/23/2010 $531,608 $0 $531,608 Master Plan (PL PL MA)
3-02-0142-046-2011 Acquire Snow Removal Equipment Acquire SRE, FY11 3/14/2011 3/7/2013 $666,476 $159,625 $826,101 Phase 1: Grader/Loader (ST EQ SN)
3-02-0142-047-2011 Wildlife Hazard Assessments (PL PL WH) 3/14/2011 1/20/2015 $107,286 $0 $107,286
3-02-0142-048-2011 Acquire Snow Removal Equipment Acquire SRE, FY 11 8/25/2011 3/25/2013 $768,843 $0 $768,843 Phase 2: Tow Broom (ST EQ SN)
Monday, January 11, 2016 Page 60 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0142-049-2013 Rehabilitate Runway 01L/19R Airfield Remarking Project 9/19/2013 12/7/2015 $260,970 $9,293 $270,263 (RE RW IM)
3-02-0142-050-2013 Remove Obstructions Obstruction Clearing (SA OT OB) 7/11/2013 1/20/2015 $449,706 $0 $449,706
3-02-0142-052-2013 Update Airport Master Plan Study Conduct Airport 9/12/2013 $246,177 $0 $246,177 Master Plan, Phase 2 -- Conduct aeronautical survey (PL PL MA)
3-02-0142-051-2014 Acquire Snow Removal Equipment Replace OSHKOSH 7/18/2014 $509,724 $0 $509,724 Truck (ST EQ SN)
$26,678,152 $27,655,408 $54,333,560
Ketchikan Ketchikan International (KTN)
3-02-0144-001-1984 Rehabilitate Apron (RE AP IM) 9/20/1984 11/20/1986 $22,036 $0 $22,036
Rehabilitate Taxiway (RE TW IM) 9/20/1984 11/20/1986 $277,983 $0 $277,983
Rehabilitate Runway 29/120 (RE RW IM) 9/20/1984 11/20/1986 $1,658,942 $0 $1,658,942
3-02-0144-003-1985 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/18/1985 11/4/1988 $140,496 $138,504 $279,000 EQ RF)
3-02-0144-002-1986 Acquire Land for Development (ST LA DV) 5/13/1986 9/17/1992 $2,393,484 $280,247 $2,673,731
3-02-0144-004-1987 Conduct Airport Master Plan Study (PL PL MA) 9/21/1987 5/13/1993 $165,000 $0 $165,000
Conduct Noise Compatibility Plan Study (EN PL NO) 9/21/1987 5/13/1993 $69,375 $0 $69,375
3-02-0144-005-1987 Improve Access Road (OT GT AC) 9/21/1987 4/27/1992 $0 $113,562 $113,562
Improve Airport Drainage (ST OT IM) 9/21/1987 4/27/1992 $73,213 $249,305 $322,518
3-02-0144-006-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/24/1990 7/23/1992 $414,105 $0 $414,105 EQ RF)
3-02-0144-007-1990 Acquire Snow Removal Equipment (ST EQ SN) 8/29/1990 7/23/1992 $255,110 $0 $255,110
3-02-0144-008-1992 Improve Access Road (OT GT AC) 9/24/1992 9/9/1997 $7,127 $0 $7,127
Rehabilitate Taxiway (RE TW IM) 9/24/1992 9/9/1997 $919,329 $0 $919,329
Expand Apron (CA AP EX) 9/24/1992 9/9/1997 $862,317 $0 $862,317
Rehabilitate Apron (RE AP IM) 9/24/1992 9/9/1997 $151,219 $1,118,809 $1,270,028
Improve Airport Drainage (ST OT IM) 9/24/1992 9/9/1997 $409,779 $0 $409,779
3-02-0144-009-1996 Rehabilitate Apron (RE AP IM) 9/16/1996 7/20/2000 $0 $3,249,311 $3,249,311
Rehabilitate Apron (RE AP IM) 9/16/1996 7/20/2000 $0 $421,906 $421,906
3-02-0144-010-1997 Improve Access Road (OT GT AC) 9/4/1997 7/20/2000 $2,527,430 $90,165 $2,617,595
3-02-0144-011-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 9/10/2003 $392,470 $0 $392,470
3-02-0144-012-1999 Improve Access Road (OT GT AC) 3/25/1999 9/12/2003 $1,943,940 $80,538 $2,024,478
3-02-0144-013-2000 Rehabilitate Runway Lighting 11/29 (RE RW LI) 9/14/2000 9/10/2003 $1,151,991 $0 $1,151,991
Rehabilitate Taxiway Lighting (RE TW LI) 9/14/2000 9/10/2003 $646,875 $0 $646,875
3-02-0144-014-2002 Rehabilitate Seaplane Base (RE SB IM) 9/17/2002 8/2/2006 $150,000 $0 $150,000
Install Miscellaneous NAVAIDS Replace Segmented 9/17/2002 8/2/2006 $20,000 $0 $20,000 Circle (ST OT IN)
Construct Runway Safety Area Partial RSA 9/17/2002 8/2/2006 $150,000 $0 $150,000 development (SA RW SF)
Construct Taxiway (ST TW CO) 9/17/2002 8/2/2006 $9,019,375 $597,439 $9,616,814
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $140,100 $0 $140,100 (RE RW IM)
3-02-0144-015-2006 Install Emergency Generator (ST EQ LI) 8/30/2006 6/7/2007 $259,570 $0 $259,570
3-02-0144-016-2006 Rehabilitate Runway 11/29 (Extend RSA, Phase 1) (RE 9/12/2006 2/4/2014 $0 $24,201,396 $24,201,396 RW IM)
Rehabilitate Runway 11/29 (RE RW IM) 9/12/2006 2/4/2014 $3,500,216 $80,792 $3,581,008
3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $632,511 $39,907 $672,418 (Loader & Grader) (ST EQ SN)
Monday, January 11, 2016 Page 61 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $79,088 $0 $79,088 (RE RW IM)
3-02-0144-017-2007 Rehabilitate Runway 11/29 (Extend RSA, Phase 2) (RE 4/24/2007 2/4/2014 $0 $11,795,554 $11,795,554 RW IM)
3-02-0144-019-2007 Construct Snow Removal Equipment Building (ST BD 8/27/2007 2/4/2014 $4,000,000 $0 $4,000,000 SN)
Construct Sand and Chemical Storage Building (ST BD 8/27/2007 2/4/2014 $1,423,199 $150,000 $1,573,199 SN)
3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $349,330 $0 $349,330 Acquire SRE: Plow Truck w/ Sander, & Towed Broom (ST EQ SN)
3-02-0200-062-2008 [Various Grnt] Acquire Snow Removal Equipment (SRE 6/12/2008 10/18/2011 $245,100 $35,494 $280,594 Southeast Region) - Acquire Plow Truck with Sander (ST EQ SN)
[Various Grnt] Acquire Snow Removal Equipment (SRE 6/12/2008 10/18/2011 $571,079 $0 $571,079 Southeast Region) - Acquire SP Runway Broom (ST EQ SN)
3-02-0144-020-2010 Improve Runway Safety Area 11/29 Aeronautical Survey 8/12/2010 $152,126 $500,000 $652,126 and Environmental Mitigation (Part D) (SA RW SF)
3-02-0144-021-2011 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3/16/2011 3/27/2015 $0 $741,458 $741,458 3000 Gallon ARRF truck (Ketchikan) (SA EQ RF)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 11/29 Various 9/16/2011 $87,929 $0 $87,929 Surface Preservation (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $51,042 $0 $51,042 Obstructions (Various - Ketchikan) (SA OT OB)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $56,490 $0 $56,490 Acquire SRE (Alaska Region): Ketchikan (Flatbed with Plow and Spreader for De-Icer) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various 9/19/2012 $76,563 $0 $76,563 Surface Preservation Maintenance (Ketchikan) (RE RW IM)
3-02-0144-022-2013 Rehabilitate Apron (RE AP IM) 9/19/2013 $3,379,813 $0 $3,379,813
Rehabilitate Taxiway Rehab Taxiway (RE TW IM) 9/19/2013 $4,000,000 $0 $4,000,000
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $61,300 $0 $61,300 Obstruction Removal (Ketchikan) (SA OT OB)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface Preservation Maintenance (Ketch kan) (RE RW IM)
9/18/2013 $91,900 $0 $91,900
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $43,829 $0 $43,829 Acquire SRE (Plow Attachment for Loader) (ST EQ SN)
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $550,292 $0 $550,292 (+08J) Acquire SRE: Ketchikan - Broom (ST EQ SN)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/19/2014 $122,500 $0 $122,500 Various Surface Preservation Maintenance: Ketchikan -Pavement Markings, Crack Seal (RE RW IM)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $277,581 $0 $277,581 Acquire Various SRE (Ketchikan Deicer Truck) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish 9/21/2015 $112,292 $0 $112,292 Various Airport Surface Preservation Maintenance (Ketchikan Marking) (RE RW IM)
$44,085,445 $43,884,387 $87,969,832
Murphys Pullout (8K9)
3-02-0408-001-1985 Expand Apron (ST AP IM) 9/3/1985 5/3/1991 $365,038 $0 $365,038
Install Apron Lighting (ST AP LI) 9/3/1985 5/3/1991 $11,635 $0 $11,635
$376,673 $0 $376,673
Monday, January 11, 2016 Page 62 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kiana Bob Baker Memorial (IAN)
3-02-0146-001-1990 Expand Apron (ST AP IM) 9/19/1990 9/16/1997 $208,837 $0 $208,837
Rehabilitate Taxiway (RE TW IM) 9/19/1990 9/16/1997 $52,210 $0 $52,210
Acquire Snow Removal Equipment (ST EQ SN) 9/19/1990 9/16/1997 $95,742 $0 $95,742
Rehabilitate Taxiway Lighting (RE TW LI) 9/19/1990 9/16/1997 $64,051 $0 $64,051
Improve Snow Removal Equipment Building (ST BD 9/19/1990 9/16/1997 $156,538 $0 $156,538 SN)
Rehabilitate Runway Lighting (RE RW LI) 9/19/1990 9/16/1997 $164,704 $0 $164,704
Extend Runway 6/24 (ST RW IM) 9/19/1990 9/16/1997 $1,556,549 $0 $1,556,549
3-02-0146-002-1996 Improve Airport Drainage (ST OT IM) 7/19/1996 9/27/2002 $100,000 $0 $100,000
Rehabilitate Apron (RE AP IM) 7/19/1996 9/27/2002 $206,977 $0 $206,977
Rehabilitate Taxiway (RE TW IM) 7/19/1996 9/27/2002 $25,350 $0 $25,350
Rehabilitate Runway 6/24 (RE RW IM) 7/19/1996 9/27/2002 $823,800 $77,432 $901,232
Install Apron Lighting (ST AP LI) 7/19/1996 9/27/2002 $75,000 $0 $75,000
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 6/30/2006 2/27/2012 $131,813 $0 $131,813 (RE RW IM)
3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $342,000 $0 $342,000 Acquire SRE (Northern Region): Kiana Grader w/ Plow (ST EQ SN)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 06/24 Various 9/16/2011 $193,852 $0 $193,852 Surface Preservation (RE RW IM)
$4,197,423 $77,432 $4,274,855
King Cove King Cove (KVC)
3-02-0147-001-1983 Rehabilitate Taxiway (RE TW IM) 7/21/1983 4/10/1986 $18,383 $0 $18,383
Rehabilitate Apron (RE AP IM) 7/21/1983 4/10/1986 $25,965 $0 $25,965
Rehabilitate Runway 7/25 (RE RW IM) 7/21/1983 4/10/1986 $564,847 $0 $564,847
Improve Access Road (OT GT AC) 7/21/1983 4/10/1986 $132,660 $0 $132,660
3-02-0147-002-1986 Expand Apron (CA AP EX) 9/25/1986 4/14/1988 $384,045 $0 $384,045
3-02-0147-003-2005 Rehabilitate Runway 07/25 (RE RW IM) 8/30/2005 8/1/2012 $2,985,100 $650,003 $3,635,103
Rehabilitate Apron (RE AP IM) 8/30/2005 8/1/2012 $1,610,100 $0 $1,610,100
Rehabilitate Runway 07/25 (RSA) (RE RW IM) 8/30/2005 8/1/2012 $1,040,100 $0 $1,040,100
Construct Snow Removal Equipment Building (ST BD 8/30/2005 8/1/2012 $1,520,100 $0 $1,520,100 SN)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,580 $0 $242,580 (Loder w/Plow) (ST EQ SN)
[Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,426 $0 $242,426 (Grader w/Plow) (ST EQ SN)
3-02-0147-004-2010 Acquire Safety Equipment and/or Fencing Install 7/7/2010 $1,820,936 $0 $1,820,936 perimeter fencing (part C) (SA EQ RF)
$10,587,242 $650,003 $11,237,245
King Salmon King Salmon (AKN)
3-02-0148-001-1984 Rehabilitate Taxiway (RE TW IM) 9/13/1984 1/15/1988 $270,192 $0 $270,192
Construct Apron (CA AP CO) 9/13/1984 1/15/1988 $215,121 $0 $215,121
Monday, January 11, 2016 Page 63 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0148-001-1984 Construct Apron (CA AP CO) 9/13/1984 1/15/1988 $1,121,093 $0 $1,121,093
Improve Access Road (CA GT AC) 9/13/1984 1/15/1988 $6,255 $0 $6,255
Install Apron Lighting (ST AP LI) 9/13/1984 1/15/1988 $47,896 $0 $47,896
3-02-0148-002-1989 Install Runway Lighting (ST RW LI) 8/30/1989 5/13/1993 $76,875 $0 $76,875
Expand Apron (ST AP IM) 8/30/1989 5/13/1993 $35,718 $0 $35,718
Rehabilitate Taxiway (RE TW IM) 8/30/1989 5/13/1993 $307,716 $0 $307,716
Rehabilitate Apron (RE AP IM) 8/30/1989 5/13/1993 $1,369,492 $0 $1,369,492
Construct Taxiway (CA TW CO) 8/30/1989 5/13/1993 $186,484 $0 $186,484
Acquire Aircraft Rescue & Fire Fighting Safety 8/30/1989 5/13/1993 $111,750 $0 $111,750 Equipment (ST EQ MS)
Rehabilitate Runway 18/36 (RE RW IM) 8/30/1989 5/13/1993 $1,043,165 $160,507 $1,203,672
3-02-0148-003-1993 Install Runway Lighting (ST RW LI) 8/10/1993 9/26/1996 $0 $127,863 $127,863
Install Runway Lighting (SA RW LI) 8/10/1993 9/26/1996 $0 $369,605 $369,605
3-02-0148-004-1994 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/1/1994 1/10/1996 $355,925 $0 $355,925 EQ RF)
3-02-0148-005-1994 Acquire Security Equipment (SA EQ SE) 9/27/1994 10/24/1998 $760,199 $0 $760,199
3-02-0148-006-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/26/1995 7/13/2000 $0 $12,295 $12,295
Improve Aircraft Rescue & Fire Fighting Building (SA 7/26/1995 7/13/2000 $0 $1,634,910 $1,634,910 BD EX)
3-02-0148-007-1998 Conduct Airport Master Plan Study (PL PL MA) 8/19/1998 9/24/2002 $297,649 $0 $297,649
3-02-0148-008-1998 Install Runway Distance-To-Go Signs 11-29 (SP RW 8/19/1998 9/24/2002 $30,000 $0 $30,000 SG)
Groove Runway 18-36 (SP RW FR) 8/19/1998 9/24/2002 $135,000 $0 $135,000
Install Miscellaneous NAVAIDS (SP OT IN) 8/19/1998 9/24/2002 $75,000 $0 $75,000
Groove Runway 11-29 (SP RW FR) 8/19/1998 9/24/2002 $258,864 $0 $258,864
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $35,000 $0 $35,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $35,000 $0 $35,000 (RE RW IM)
3-02-0148-009-2006 Extend Runway Safety Area 11/29 Phase 1 (SA RW SF) 8/17/2006 $0 $7,489,430 $7,489,430
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $95,760 $0 $95,760 (RE RW IM)
3-02-0148-010-2008 Rehabilitate Runway 18/36 (RE RW IM) 6/13/2008 1/20/2015 $5,500,000 $0 $5,500,000
Construct Taxiway Construct GA Tawiway (ST TW CO) 6/13/2008 1/20/2015 $500,000 $0 $500,000
Extend Runway Safety Area 11/29 Phase 2 (SA RW SF) 6/13/2008 1/20/2015 $0 $1,031,187 $1,031,187
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $64,300 $0 $64,300 (RE RW IM)
3-02-0148-011-2009 Rehabilitate Apron Rehabiliate Apron (LOC) (ARRA 6/11/2009 3/21/2012 $0 $0 $0 funded) (RE AP IM)
3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $150,872 $0 $150,872 Acquire SRE (Central Region): Dozer w/ Attachments (ST EQ SN)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 12/30 King Salmon 3/12/2010 12/9/2015 $96,898 $0 $96,898 Various Surface Maintenance (RE RW IM)
3-02-0148-012-2011 Rehabilitate Taxiway Lighting (RE TW LI) 6/8/2011 $1,000,000 $0 $1,000,000
Rehabilitate Runway Lighting 18/36 (RE RW LI) 6/8/2011 $3,677,323 $3,000,000 $6,677,323
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various Surface Preservation (RE RW IM)
9/16/2011 $170,240 $0 $170,240
Monday, January 11, 2016 Page 64 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 12/30 Variuos Surface Preservation Maintenance (King Salmon) (RE RW IM)
$569,100 $0 $569,100
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 12/30 Surface Preservation Maintenance (King Salmon) (RE RW IM)
$98,700 $0 $98,700
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$92,812 $0 $92,812
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 12/30 (+08J) Various Surface Preservation Maintenance: King Salmon - Pavement Markings (RE RW IM)
$148,701 $0 $148,701
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (King Salmon Grader) (ST EQ SN)
$288,294 $0 $288,294
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 12/30 Accomplish Various Airport Surface Preservation Maintenance () (RE RW IM)
$108,150 $0 $108,150
$19,335,543 $13,925,797 $33,261,340
Kipnuk Kipnuk (IIK)
3-02-0150-001-1996 8/22/1996 8/1/2000 Conduct Airport Master Plan Study (PL PL MA) $295,305 $0 $295,305
3-02-0150-002-2000 9/12/2000 3/9/2007 Construct New Airport (ST NA CO) $4,226,445 $0 $4,226,445
3-02-0150-003-2010 3/26/2010 Construct Runway Plan-1 Construct runway ph.2 (A) (ST RW CO)
$9,186,403 $0 $9,186,403
3-02-0150-004-2010 7/15/2010 Construct Runway Plan-1 Construct runway ph.3 (C) (ST RW CO)
$523,030 $7,927,990 $8,451,020
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 15/33 Various Surface Preservation Maintenance (Kipnuk) (RE RW IM)
$10,500 $0 $10,500
$14,241,683 $7,927,990 $22,169,673
Kivalina Kivalina (KVL)
3-02-0152-001-1985 9/3/1985 3/11/1991 Construct Runway 11/29 (ST RW CO) $2,314,377 $0 $2,314,377
9/3/1985 3/11/1991 Install Runway Lighting (ST RW LI) $221,341 $0 $221,341
9/3/1985 3/11/1991 Acquire Land for Development (ST LA DV) $9,375 $0 $9,375
3-02-0152-002-1994 8/26/1994 9/11/2000 Acquire Snow Removal Equipment (ST EQ SN) $98,825 $0 $98,825
8/26/1994 9/11/2000 Improve Snow Removal Equipment Building (ST BD SN)
$456,168 $0 $456,168
3-02-0152-003-1998 8/19/1998 9/12/2002 Conduct Airport Master Plan Study (Wind Study Only) (PL PL MA)
$38,271 $0 $38,271
3-02-0152-004-2001 9/12/2001 8/23/2004 Rehabilitate Runway 12/30 (RE RW IM) $2,174,845 $0 $2,174,845
3-02-0000-015-2010 9/22/2010 Conduct aeronautical survey for WAAS approach Aeronautical Survey (PL PL VI)
$0 $300,000 $300,000
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 12/30 Various Surface Preservation (RE RW IM)
$199,092 $0 $199,092
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Loader) (ST EQ SN)
$394,457 $0 $394,457
$5,906,751 $300,000 $6,206,751
Klawock Klawock (AKW)
3-02-0154-001-1982 9/27/1982 1/16/1986 Expand Apron (CA AP EX) $59,518 $0 $59,518
Monday, January 11, 2016 Page 65 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0154-001-1982 Extend Runway 01/19 (ST RW IM) 9/27/1982 1/16/1986 $709,845 $0 $709,845
Extend Runway 01/19 (ST RW IM) 9/27/1982 1/16/1986 $15,198 $0 $15,198
3-02-0153-001-1985 Rehabilitate Apron (RE AP IM) 9/3/1985 1/25/1989 $67,492 $0 $67,492
3-02-0154-002-1986 Construct Runway 19 (ST RW CO) 7/28/1986 4/27/1992 $1,603,576 $32,430 $1,636,006
Construct Taxiway (ST TW CO) 7/28/1986 4/27/1992 $63,900 $0 $63,900
Improve Access Road (OT GT AC) 7/28/1986 4/27/1992 $210,406 $0 $210,406
Construct Apron (ST AP CO) 7/28/1986 4/27/1992 $567,534 $0 $567,534
3-02-0154-003-1988 Extend Runway 1/19 (ST RW IM) 6/8/1988 10/14/1992 $805,782 $0 $805,782
Expand Apron (ST AP IM) 6/8/1988 10/14/1992 $160,969 $0 $160,969
Rehabilitate Taxiway (RE TW IM) 6/8/1988 10/14/1992 $16,097 $0 $16,097
Improve Access Road (OT GT AC) 6/8/1988 10/14/1992 $32,194 $0 $32,194
Improve Airport Drainage (ST OT IM) 6/8/1988 10/14/1992 $32,193 $0 $32,193
Expand Apron (ST AP IM) 6/8/1988 10/14/1992 $515,100 $0 $515,100
3-02-0154-004-1991 Conduct Airport Master Plan Study (PL PL MA) 9/13/1991 4/17/2000 $93,750 $42,789 $136,539
3-02-0154-005-1992 Install Apron Lighting (ST AP LI) 9/23/1992 9/26/1996 $137,874 $87,230 $225,104
Rehabilitate Taxiway Lighting (RE TW LI) 9/23/1992 9/26/1996 $85,071 $0 $85,071
Install Runway Lighting (ST RW LI) 9/23/1992 9/26/1996 $363,751 $0 $363,751
3-02-0154-006-1994 Acquire Existing Airport (ST NA AQ) 9/27/1994 9/16/1997 $42,755 $0 $42,755
3-02-0154-007-1999 Install Perimeter Fencing (ST EQ SE) 8/3/1999 8/31/2001 $687,558 $0 $687,558
3-02-0154-008-2001 Improve Snow Removal Equipment Building (ST BD 8/31/2001 9/2/2005 $429,841 $10,430 $440,271 SN)
3-02-0154-009-2004 Update Airport Master Plan Study (PL PL MA) 8/24/2004 1/12/2007 $232,001 $0 $232,001
3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $425,724 $0 $425,724 (Towed Broom, & Plow Truck) (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $39,200 $0 $39,200 (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $20,417 $0 $20,417 Obstructions (Various - Klawock) (SA OT OB)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $701,258 $0 $701,258 Acquire SRE (Alaska Region): Klawock (Snow Blower) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 02/20 Various 9/19/2012 $45,938 $0 $45,938 Surface Preservation Maintenance (Klawock)) (RE RW IM)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 02/20 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Klawock -Crack Seal (RE RW IM)
$8,185,358 $172,879 $8,358,237
Kobuk Kobuk (OBU)
3-02-0427-001-1993 Conduct Airport Master Plan Study (PL PL MA) 9/9/1993 9/12/2000 $188,048 $0 $188,048
3-02-0427-002-1998 Improve Snow Removal Equipment Building (ST BD 7/21/1998 9/5/2001 $598,984 $0 $598,984 SN)
3-02-0427-003-2003 Extend Runway 09-27 (ST RW IM) 9/5/2003 1/12/2007 $4,600,000 $0 $4,600,000
Rehabilitate Apron (RE AP IM) 9/5/2003 1/12/2007 $1,000,000 $0 $1,000,000
Rehabilitate Runway 09-27 (RE RW IM) 9/5/2003 1/12/2007 $4,810,705 $0 $4,810,705
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 09/27 Kobuk 3/12/2010 12/9/2015 $196,840 $0 $196,840 Various Surface Maintenance (RE RW IM)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $79,406 $0 $79,406 Obstruction Removal (+08J) (SA OT OB)
$11,473,983 $0 $11,473,983
Monday, January 11, 2016 Page 66 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kodiak Kodiak (ADQ)
3-02-0158-001-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 6/11/1986 2/5/1991 $268,115 $0 $268,115 EQ RF)
3-02-0158-002-1987 Install Runway Lighting 10/28 (SA RW LI) 6/29/1987 9/27/1989 $168,207 $0 $168,207
Install Apron Lighting (ST AP LI) 6/29/1987 9/27/1989 $82,260 $0 $82,260
Install Runway Lighting (ST RW LI) 6/29/1987 9/27/1989 $0 $18,110 $18,110
Install Runway Lighting 7/25 (SA RW LI) 6/29/1987 9/27/1989 $65,500 $0 $65,500
Install Runway Lighting (SA RW LI) 6/29/1987 9/27/1989 $0 $7,043 $7,043
Extend Taxiway 0/28 (ST TW IM) 6/29/1987 9/27/1989 $90,049 $0 $90,049
Install Runway Lighting (ST RW LI) 6/29/1987 9/27/1989 $276,467 $0 $276,467
3-02-0158-003-1988 Rehabilitate Runway 7/25 (RE RW IM) 8/17/1988 4/2/1991 $1,498,669 $93,702 $1,592,371
3-02-0158-004-1989 Acquire Aircraft Rescue & Fire Fighting Safety 6/28/1989 2/25/1991 $127,831 $0 $127,831 Equipment (ST EQ MS)
Remove Obstructions (SA OT OB) 6/28/1989 2/25/1991 $14,392 $0 $14,392
3-02-0158-005-1993 Acquire Security Equipment (SA EQ SE) 9/14/1993 9/25/1997 $879,750 $2,542 $882,292
3-02-0158-006-1999 Improve Snow Removal Equipment Building (ST BD 3/19/1999 9/11/2002 $1,648,754 $0 $1,648,754 SN)
Remove Obstructions 18-38 (SA OT OB) 3/19/1999 9/11/2002 $500,000 $0 $500,000
3-02-0158-007-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 11/17/2006 $335,929 $0 $335,929
3-02-0158-008-2000 Rehabilitate Taxiway (RE TW IM) 9/7/2000 8/26/2004 $1,068,614 $117,042 $1,185,656
Rehabilitate Apron (RE AP IM) 9/7/2000 8/26/2004 $1,311,062 $0 $1,311,062
Rehabilitate Runway (RE RW IM) 9/7/2000 8/26/2004 $905,188 $1,200,000 $2,105,188
3-02-0158-009-2005 Extend Runway Safety Area 18/36 (EIS) (SA RW SF) 8/15/2005 4/13/2010 $0 $500,000 $500,000
Extend Runway Safety Area 07/25 (EIS) (SA RW SF) 8/15/2005 4/13/2010 $0 $500,000 $500,000
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $207,739 $0 $207,739 (RE RW IM)
3-02-0158-010-2007 Extend Runway Safety Area 18/36 (EIS Phase 2) (SA 8/9/2007 3/24/2015 $0 $1,743,000 $1,743,000 RW SF)
Extend Runway Safety Area 07/25 EIS Phase 2 (SA RW 8/9/2007 3/24/2015 $0 $1,743,000 $1,743,000 SF)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 5/31/2007 8/6/2013 $109,600 $0 $109,600 (RE RW IM)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $750,000 $0 $750,000 Acquire SRE: ADQ--D-6 Dozer w/ attachments, & Self-Propelled Blower (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/19/2008 6/10/2014 $100,000 $0 $100,000 (RE RW IM)
3-02-0158-011-2009 Extend Runway Safety Area 18/36 (EIS Phase 3) (SA 2/25/2009 3/24/2015 $0 $750,000 $750,000 RW SF)
Extend Runway Safety Area 07/25 EIS Phase 3 (SA RW 2/25/2009 3/24/2015 $0 $817,198 $817,198 SF)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 07/25 (Various 8/20/2009 12/19/2014 $1,439,439 $0 $1,439,439 Surface Maintenance) (RE RW IM)
Monday, January 11, 2016 Page 67 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0158-012-2010 Construct Sand and Chemical Storage Building 6/22/2010 $2,499,922 $0 $2,499,922 Construct Chemical Storage Building (part C) (ST BD SN)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 07/25 Kodiak 3/12/2010 12/9/2015 $100,000 $0 $100,000 Various Surface Maintenance (RE RW IM)
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $324,926 $0 $324,926 Acquire SRE (Central Region): Kodiak (Grader with Attachments) (ST EQ SN)
3-02-0158-013-2011 Rehabilitate Runway 18/36 Rehabilitate Runway (RE 6/13/2011 $7,083,780 $3,000,000 $10,083,780 RW IM)
Rehabilitate Runway Lighting 18/36 Edge lighting, 6/13/2011 $2,000,000 $0 $2,000,000 regulators, regulator bldg (RE RW LI)
3-02-0158-014-2011 Rehabilitate Runway 07/25 Reconstruct Runway, phase 9/16/2011 $0 $13,967,971 $13,967,971 1(LOC) (RE RW IM)
Rehabilitate Taxiway Rehab taxiway B (RE TW IM) 9/16/2011 $579,055 $0 $579,055
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 07/25 Various 9/16/2011 $313,880 $0 $313,880 Surface Preservation (RE RW IM)
3-02-0158-015-2012 Conduct Environmental Study EIS phase 4 (EN PL MA) 9/10/2012 3/24/2015 $1,025,558 $0 $1,025,558
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $726,581 $0 $726,581 Acquire SRE (Alaska Region): Kodiak (Towed Sweeper, Loader with Attachments) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Variuos 9/19/2012 $141,750 $0 $141,750 Surface Preservation Maintenance (Kodiak) (RE RW IM)
3-02-0158-016-2013 Extend Runway Safety Area 18/36 Construction, phase 9/24/2013 $2,000,000 $5,000,000 $7,000,000 1 (SA RW SF)
Extend Runway Safety Area 07/25 Construction Phase 1 9/24/2013 $1,000,000 $5,000,000 $6,000,000 (SA RW SF)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 07/25 Surface 9/18/2013 $404,300 $0 $404,300 Preservation Maintenance (Kodiak) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $102,267 $0 $102,267 Acquire SRE (Tow Plow) (ST EQ SN)
3-02-0158-017-2014 Extend Runway Safety Area 18/36 Construction, Phase 6/16/2014 $2,250,000 $22,000,000 $24,250,000 2 (SA RW SF)
Extend Runway Safety Area 07/25 Constuction Phase 2 6/16/2014 $2,250,000 $20,000,000 $22,250,000 (SA RW SF)
3-02-0158-018-2014 Extend Runway Safety Area 18/36 Phase 3 (SA RW SF) 9/23/2014 $789,000 $4,350,000 $5,139,000
Extend Runway Safety Area 07/25 Phase 3 (SA RW SF) 9/23/2014 $1,000,000 $3,850,000 $4,850,000
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $264,000 $0 $264,000 Obstruction Removal (+08J) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 18/36 (+08J) 9/19/2014 $341,500 $0 $341,500 Various Surface Preservation Maintenance: Kodiak - Crack Seal, Pavement Markings (RE RW IM)
3-02-0158-019-2015 Improve Airport Drainage (ST OT IM) 4/20/2015 $2,584,000 $0 $2,584,000
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $326,279 $0 $326,279 Acquire Various SRE (Kodiak Loader) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish 9/21/2015 $241,500 $0 $241,500 Various Airport Surface Preservation Maintenance (Kodiak Crack Sealing and Marking) (RE RW IM)
$40,315,863 $84,759,608 $125,075,471
Kodiak Municipal (KDK)
3-02-0465-001-2004 Conduct Metropolitan System Plan Study (PL PL ME) 4/12/2004 3/12/2007 $352,612 $0 $352,612
$352,612 $0 $352,612
Monday, January 11, 2016 Page 68 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Trident Basin (T44)
3-02-0450-001-2005 8/26/2005 3/12/2007 Improve Seaplane Base (Preliminary Design & Environmental) (ST SB CO)
$356,804 $0 $356,804
3-02-0450-002-2006 7/13/2006 6/3/2010 Improve Seaplane Base (ST SB CO) $4,200,702 $0 $4,200,702
$4,557,506 $0 $4,557,506
Kokhanok Kokhanok (9K2)
3-02-0406-001-1984 9/21/1984 2/4/1988 Construct Taxiway (ST TW CO) $15,244 $0 $15,244
9/21/1984 2/4/1988 Construct Apron (ST AP CO) $107,978 $0 $107,978
9/21/1984 2/4/1988 Construct Runway 13/31 (ST RW CO) $709,741 $0 $709,741
9/21/1984 2/4/1988 Improve Access Road (OT GT AC) $433,985 $0 $433,985
9/21/1984 2/4/1988 Improve Snow Removal Equipment Building (ST BD SN)
$57,336 $0 $57,336
3-02-0406-002-2005 8/18/2005 1/28/2013 Extend Runway 06/24 (ST RW IM) $1,995,000 $0 $1,995,000
8/18/2005 1/28/2013 Extend Runway 06/24 (RSA Development) (ST RW IM) $2,264,458 $0 $2,264,458
8/18/2005 1/28/2013 Construct Snow Removal Equipment Building (ST BD SN)
$713,000 $0 $713,000
8/18/2005 1/28/2013 Expand Apron (ST AP IM) $545,000 $0 $545,000
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 06/24 Various Surface Preservation Maintenance (Kokhanok) (RE RW IM)
$31,500 $0 $31,500
$6,873,242 $0 $6,873,242
Koliganek Koliganek (JZZ)
3-02-0192-001-1991 7/25/1991 4/18/2000 Conduct Airport Master Plan Study (PL PL MA) $167,168 $0 $167,168
3-02-0424-001-1994 9/27/1994 9/25/2000 Acquire Snow Removal Equipment (ST EQ SN) $150,000 $0 $150,000
9/27/1994 9/25/2000 Construct Runway 18/36 (ST RW CO) $2,159,770 $249,594 $2,409,364
9/27/1994 9/25/2000 Construct Taxiway (ST TW CO) $142,840 $0 $142,840
9/27/1994 9/25/2000 Install Runway Lighting (ST RW LI) $192,080 $0 $192,080
9/27/1994 9/25/2000 Improve Snow Removal Equipment Building (ST BD SN)
$98,437 $0 $98,437
9/27/1994 9/25/2000 Improve Access Road (OT GT AC) $398,447 $0 $398,447
9/27/1994 9/25/2000 Acquire Land for Development (ST LA DV) $164,062 $0 $164,062
9/27/1994 9/25/2000 Construct Apron (ST AP CO) $428,519 $0 $428,519
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)
$114,912 $0 $114,912
3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)
$360,368 $0 $360,368
3-02-0424-002-2013 9/18/2013 Rehabilitate Runway 09/27 (RE RW IM) $5,000,000 $0 $5,000,000
3-02-0424-003-2014 9/17/2014 Rehabilitate Runway 09/27 Phase 2 Rehab Runway (RE RW IM)
$4,388,988 $0 $4,388,988
9/17/2014 Construct Snow Removal Equipment Building (ST BD SN)
$1,000,000 $0 $1,000,000
9/17/2014 Extend Runway 09/27 (ST RW IM) $1,000,000 $0 $1,000,000
$15,765,591 $249,594 $16,015,185
Monday, January 11, 2016 Page 69 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kongiganak Kongiganak (DUY)
3-02-0380-001-2007 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)
Extend Runway 18/36 Extend/Widen RWY & RSA Phase 1 (ST RW IM)
Construct Apron (ST AP CO)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: DUY--Grader w/ attachments (ST EQ SN)
3-02-0380-002-2008 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)
Extend Runway 18/36 Extend/Widen RWY & RSA Phase 2 (ST RW IM)
3-02-0380-003-2010 Extend Runway 18/36 Extend/Widen RWY & RSA Phase 3 (ST RW IM)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01/19 Various Surface Preservation Maintenance (Kongiganak) (RE RW IM)
8/29/2007
8/29/2007
8/29/2007
6/16/2008
5/30/2008
5/30/2008
3/26/2010
9/19/2012
$961,723
$10,625,392
$3,000,000
2/5/2014 $350,000
$711,240
$3,898,010
$5,685,750
$10,500
$25,242,615
$0
$0
$0
$0
$0
$0
$0
$0
$0
$961,723
$10,625,392
$3,000,000
$350,000
$711,240
$3,898,010
$5,685,750
$10,500
$25,242,615
Kotlik Kotlik (2A9)
3-02-0159-001-1993 Conduct Airport Master Plan Study (PL PL MA)
3-02-0159-002-1995 Rehabilitate Runway 02/20 (RE RW IM)
Rehabilitate Taxiway (RE TW IM)
Rehabilitate Apron (RE AP IM)
Improve Snow Removal Equipment Building (ST BD SN)
Improve Access Road (OT GT AC)
3-02-0159-003-1997 Acquire Snow Removal Equipment (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
3-02-0000-012-2009 Conduct aeronautical survey for WAAS approach (PL PL VI)
9/13/1993
9/26/1995
9/26/1995
9/26/1995
9/26/1995
9/26/1995
6/13/1997
6/30/2006
6/19/2008
8/20/2009
10/24/1998 $253,633
9/20/2000 $6,804,062
9/20/2000 $187,500
9/20/2000 $187,500
9/20/2000 $218,750
9/20/2000 $20,000
7/20/2000 $178,125
2/27/2012 $226,718
6/10/2014 $110,400
11/5/2014 $0
$8,186,688
$0
$0
$0
$0
$0
$0
$13,745
$0
$0
$226,230
$239,975
$253,633
$6,804,062
$187,500
$187,500
$218,750
$20,000
$191,870
$226,718
$110,400
$226,230
$8,426,663
Kotzebue Ralph Wien Memorial (OTZ)
3-02-0160-001-1982 Acquire Land for Development (ST LA DV)
3-02-0160-002-1983 Rehabilitate Runway Lighting 8/26 (RE RW LI)
Rehabilitate Apron 8/26 (RE AP IM)
Rehabilitate Taxiway 8/26 (RE TW IM)
Groove Runway 8/26 (SP RW FR)
Rehabilitate Runway 8/26 (RE RW IM)
3-02-0160-003-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
3-02-0160-004-1987 Construct Taxiway (CA TW CO)
9/27/1982
9/28/1983
9/28/1983
9/28/1983
9/28/1983
9/28/1983
7/17/1986
9/21/1987
4/5/1990 $900,000
2/20/1991 $99,188
2/20/1991 $777,036
2/20/1991 $1,433,613
2/20/1991 $610,603
2/20/1991 $307,721
8/8/1991 $157,934
1/26/1993 $302,868
$966
$0
$0
$0
$0
$0
$82,554
$1,084,603
$900,966
$99,188
$777,036
$1,433,613
$610,603
$307,721
$240,488
$1,387,471
Monday, January 11, 2016 Page 70 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0160-004-1987 Extend Taxiway (ST TW IM) 9/21/1987 1/26/1993 $0 $10,746 $10,746
Install Runway Lighting (ST RW LI) 9/21/1987 1/26/1993 $0 $61,645 $61,645
Improve Access Road (OT GT AC) 9/21/1987 1/26/1993 $0 $227,252 $227,252
Improve Airport Drainage (ST OT IM) 9/21/1987 1/26/1993 $0 $261,831 $261,831
Extend Runway 8/26 (ST RW IM) 9/21/1987 1/26/1993 $0 $19,527 $19,527
Noise Mitigation Measures for Public Buildings (EN PB 9/21/1987 1/26/1993 $0 $280,202 $280,202 75)
Acquire Aircraft Rescue & Fire Fighting Safety 9/21/1987 1/26/1993 $0 $146,343 $146,343 Equipment (ST EQ MS)
3-02-0160-005-1993 Expand Apron (ST AP IM) 7/26/1993 7/14/1999 $0 $95,858 $95,858
Install Guidance Signs (SA OT SG) 7/26/1993 7/14/1999 $0 $73,313 $73,313
Acquire Snow Removal Equipment (ST EQ SN) 7/26/1993 7/14/1999 $0 $641,757 $641,757
Rehabilitate Apron (RE AP IM) 7/26/1993 7/14/1999 $0 $6,540 $6,540
Rehabilitate Taxiway (RE TW IM) 7/26/1993 7/14/1999 $0 $230,652 $230,652
Rehabilitate Runway 08/26 (RE RW IM) 7/26/1993 7/14/1999 $1,970,526 $1,176,173 $3,146,699
Acquire Security Equipment (SA EQ SE) 7/26/1993 7/14/1999 $0 $83,250 $83,250
3-02-0160-006-1996 Conduct Airport Master Plan Study (PL PL MA) 8/22/1996 8/15/2000 $281,250 $0 $281,250
3-02-0160-007-2001 Rehabilitate Apron (RE AP IM) 9/25/2001 3/29/2005 $3,242,407 $0 $3,242,407
3-02-0160-008-2003 Construct Aircraft Rescue & Fire Fighting Building (SA 9/5/2003 9/18/2008 $0 $5,068,109 $5,068,109 BD EX)
Construct Snow Removal Equipment Building (ST BD 9/5/2003 9/18/2008 $3,690,004 $0 $3,690,004 SN)
3-02-0160-009-2004 Remove Obstructions (ST OT OB) 9/1/2004 6/16/2008 $0 $2,000,000 $2,000,000
Construct Runway Safety Area 08/26 (SA RW SF) 9/1/2004 6/16/2008 $4,332,411 $741,263 $5,073,674
3-02-0160-010-2005 Update Airport Master Plan Study (Relocation Study) 8/11/2005 6/22/2010 $483,709 $0 $483,709 Stg 1 (PL PL MA)
3-02-0160-011-2005 Construct Runway Safety Area 09/27 (SA RW SF) 8/16/2005 8/28/2008 $0 $7,187,578 $7,187,578
3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $100,000 $649,414 $749,414 Vehicle (SA EQ RF)
3-02-0160-012-2006 Construct Sand and Chemical Storage Building (ST BD 7/25/2006 9/18/2009 $3,277,945 $0 $3,277,945 SN)
3-02-0160-013-2009 Update Airport Master Plan Study (Relocation Study) 2/23/2009 $400,000 $0 $400,000 Stg 2 (PL PL MA)
3-02-0160-014-2009 Install Runway Incursion Caution Bars (SA OT SG) 9/1/2009 11/29/2011 $763,796 $34,450 $798,246
Acquire Equipment install supplemental wind cone (ST 9/1/2009 11/29/2011 $100,000 $0 $100,000 EQ MS)
3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $29,000 $0 $29,000 Acquire SRE Northern Region (Kotzebue 12CY Bucket) (ST EQ SN)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 17/35 (Various 8/20/2009 12/19/2014 $558,600 $0 $558,600 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0160-015-2010 Acquire Safety Equipment and/or Fencing Install VPD 3/26/2010 11/5/2014 $0 $1,694,022 $1,694,022 Gates, Phase 2 (SA EQ RF)
3-02-0160-016-2010 Rehabilitate Runway 09/27 Phase 1 (RE RW IM) 9/23/2010 6/2/2015 $791,491 $16,473,196 $17,264,687
3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $798,000 $0 $798,000 Acquire SRE (Northern Region): Kotzebue Snow Blower & Broom (ST EQ SN)
3-02-0160-017-2011 Rehabilitate Taxiway (RE TW IM) 3/16/2011 $1,000,000 $1,958,362 $2,958,362
3-02-0160-018-2012 Construct Runway Safety Area 09/27 phase 1 (SA RW 9/14/2012 $2,635,314 $15,147,638 $17,782,952 SF)
Monday, January 11, 2016 Page 71 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0160-019-2012 9/24/2012 Construct Runway Safety Area 09/27 Phase 2 (SA RW SF)
$0 $11,911,843 $11,911,843
3-02-0160-020-2013 4/26/2013 Construct Runway Safety Area 09/27 phase 3 (SA RW SF)
$0 $10,705,816 $10,705,816
3-02-0200-092-2013 9/19/2013 [Various Grnt] Wildlife Hazard Assessments (PL PL WH)
$93,750 $0 $93,750
3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Kotzebue - Grader (ST EQ SN)
$365,238 $0 $365,238
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Kotzebue Tug with Cradeling Broom, and Loader) (ST EQ SN)
$784,044 $0 $784,044
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 09/27 Accomplish Various Airport Surface Preservation Maintenance (Kotzebue RWY & TWY Markings) (RE RW IM)
$68,248 $0 $68,248
$30,354,696 $78,158,327 $108,513,023
Koyuk Koyuk Alfred Adams (KKA)
3-02-0161-001-1989 9/22/1989 1/7/1993 Construct Taxiway (ST TW CO) $306,234 $0 $306,234
9/22/1989 1/7/1993 Acquire Land for Development (ST LA DV) $29,100 $0 $29,100
9/22/1989 1/7/1993 Install Runway Lighting (ST RW LI) $194,084 $0 $194,084
9/22/1989 1/7/1993 Construct Runway 2/20 (ST RW CO) $1,983,120 $215,498 $2,198,618
3-02-0161-002-1991 8/9/1991 2/6/1995 Acquire Land for Development (ST LA DV) $28,125 $0 $28,125
8/9/1991 2/6/1995 Improve Snow Removal Equipment Building (ST BD SN)
$299,297 $0 $299,297
8/9/1991 2/6/1995 Acquire Snow Removal Equipment (ST EQ SN) $145,313 $0 $145,313
8/9/1991 2/6/1995 Construct Apron (ST AP CO) $414,312 $0 $414,312
3-02-0200-068-2009 2/24/2009 5/16/2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE Northern Region (Koyuk Wheeled Loader) (ST EQ SN)
$223,000 $0 $223,000
3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $300,000 $300,000
$3,622,585 $515,498 $4,138,083
Koyukuk Koyukuk (KYU)
3-02-0162-001-1990 8/31/1990 10/26/1994 Rehabilitate Apron (RE AP IM) $255,000 $0 $255,000
8/31/1990 10/26/1994 Construct Runway 8/26 (ST RW CO) $1,030,586 $64,769 $1,095,355
8/31/1990 10/26/1994 Install Runway Lighting (ST RW LI) $148,125 $0 $148,125
8/31/1990 10/26/1994 Acquire Snow Removal Equipment (ST EQ SN) $153,125 $0 $153,125
8/31/1990 10/26/1994 Improve Snow Removal Equipment Building (ST BD SN)
$106,875 $0 $106,875
3-02-0162-002-2003 9/5/2003 8/23/2007 Extend Runway 06/24 (ST RW IM) $1,572,090 $0 $1,572,090
9/5/2003 8/23/2007 Construct Snow Removal Equipment Building (ST BD SN)
$500,000 $0 $500,000
9/5/2003 8/23/2007 Expand Apron (ST AP IM) $1,000,000 $0 $1,000,000
9/5/2003 8/23/2007 Extend Runway Safety Area 06/24 (ST RW SF) $2,000,000 $0 $2,000,000
9/5/2003 8/23/2007 Rehabilitate Runway 06/24 (RE RW IM) $5,196,416 $0 $5,196,416
3-02-0200-084-2012 7/23/2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Koyukuk) (SA OT OB)
$31,022 $0 $31,022
$11,993,239 $64,769 $12,058,008
Monday, January 11, 2016 Page 72 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Kwethluk Kwethluk (KWT)
3-02-0164-001-1996 Conduct Airport Master Plan Study (PL PL MA)
3-02-0435-001-2001 Construct New Airport (ST NA CO)
Improve Snow Removal Equipment Building (ST BD SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway Plan-1 (Maintenance) (RE RW IM)
3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various Obstruction Removal (Kwethluk) (ST OT OB)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (Kwethluk) (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish Various Airport Surface Preservation Maintenance (Kwethluk Resurface and Reshape RWY) (RE RW IM)
8/22/1996
9/25/2001
9/25/2001
6/30/2006
9/26/2011
9/19/2012
9/21/2015
9/6/2000 $275,191
9/2/2005 $5,256,000
9/2/2005 $280,000
2/27/2012 $58,208
$42,630
$10,500
$372,750
$6,295,279
$0
$203,135
$0
$0
$0
$0
$0
$203,135
$275,191
$5,459,135
$280,000
$58,208
$42,630
$10,500
$372,750
$6,498,414
Kwigillingok Kwigillingok (GGV)
3-02-0165-001-2000 Conduct Airport Master Plan Study (PL PL MA)
3-02-0165-002-2011 Rehabilitate Runway 15/33 (RE RW IM)
9/21/2000
9/1/2011
8/25/2004 $215,112
$1,488,031
$1,703,143
$0
$0
$0
$215,112
$1,488,031
$1,703,143
Lake Louise Lake Louise (Z55)
3-02-0430-001-2007 Construct Runway 12/30 (ST RW CO)
Construct Taxiway (ST TW CO)
Construct Apron (ST AP CO)
3-02-0430-002-2010 Rehabilitate Runway 12/30 Phase 2 (RE RW IM)
Rehabilitate Apron Phase 2 (RE AP IM)
Rehabilitate Access Road Phase 2 (OT GT AC)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 13/31 Variuos Surface Preservation Maintenance (Lake Louise) (RE RW IM)
8/15/2007
8/15/2007
8/15/2007
3/26/2010
3/26/2010
3/26/2010
9/19/2012
9/8/2010 $1,676,874
9/8/2010 $500,000
9/8/2010 $600,000
11/12/2014 $857,956
11/12/2014 $506,833
11/12/2014 $400,000
$144,769
$4,686,432
$223,585
$0
$0
$0
$0
$0
$0
$223,585
$1,900,459
$500,000
$600,000
$857,956
$506,833
$400,000
$144,769
$4,910,017
Lake Minchumina Minchumina (MHM)
3-02-0180-001-1988 Acquire Land for Development (ST LA DV)
Improve Access Road (OT GT AC)
Construct Apron (ST AP CO)
Construct Runway RW 2/20 (ST RW CO)
Install Runway Lighting (SA RW LI)
3-02-0180-002-1991 Improve Snow Removal Equipment Building (ST BD SN)
Acquire Snow Removal Equipment (ST EQ SN)
9/26/1988
9/26/1988
9/26/1988
9/26/1988
9/26/1988
9/24/1991
9/24/1991
9/26/1996 $58,163
9/26/1996 $278,409
9/26/1996 $111,099
9/26/1996 $1,846,075
9/26/1996 $213,069
10/24/1998 $219,733
10/24/1998 $130,000
$2,856,548
$0
$0
$0
$85,184
$0
$0
$0
$85,184
$58,163
$278,409
$111,099
$1,931,259
$213,069
$219,733
$130,000
$2,941,732
Monday, January 11, 2016 Page 73 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Larsen Bay Larsen Bay (2A3)
3-02-0166-001-1993 9/14/1993 5/12/2000 Improve Access Road (OT GT AC) $25,000 $0 $25,000
9/14/1993 5/12/2000 Extend Runway RW03/21 (ST RW IM) $1,229,911 $151,341 $1,381,252
9/14/1993 5/12/2000 Construct Apron (ST AP CO) $95,000 $0 $95,000
9/14/1993 5/12/2000 Acquire Land for Development (ST LA DV) $245,000 $0 $245,000
9/14/1993 5/12/2000 Acquire Snow Removal Equipment (ST EQ SN) $152,000 $0 $152,000
9/14/1993 5/12/2000 Improve Snow Removal Equipment Building (ST BD SN)
$122,000 $0 $122,000
9/14/1993 5/12/2000 Install Runway Lighting (ST RW LI) $205,500 $0 $205,500
9/14/1993 5/12/2000 Construct Taxiway (ST TW CO) $18,000 $0 $18,000
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
$23,333 $0 $23,333
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
$118,104 $0 $118,104
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)
$47,400 $0 $47,400
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 04/22 (Various Surface Maintenance) (RE RW IM)
$58,520 $0 $58,520
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 04/22 Surface Preservation Maintenance (Larsen Bay) (RE RW IM)
$78,800 $0 $78,800
$2,418,568 $151,341 $2,569,909
Levelock Levelock (9Z8)
3-02-0167-001-2000 9/12/2000 8/23/2004 Acquire Snow Removal Equipment (ST EQ SN) $210,000 $0 $210,000
9/12/2000 8/23/2004 Improve Snow Removal Equipment Building (ST BD SN)
$280,000 $0 $280,000
9/12/2000 8/23/2004 Construct New Airport (ST NA CO) $2,851,561 $0 $2,851,561
3-02-0167-002-2003 8/4/2003 8/17/2007 Construct Snow Removal Equipment Building (ST BD SN)
$558,033 $0 $558,033
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
$15,960 $0 $15,960
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Levelock - Minor Gravel Resurface and RSA/RWY Grading (RE RW IM)
$262,500 $0 $262,500
$4,178,054 $0 $4,178,054
Lime Village Lime Village (2AK)
3-02-0360-001-2000 9/8/2000 3/9/2007 Conduct Airport Master Plan Study (PL PL MA) $328,335 $0 $328,335
$328,335 $0 $328,335
Manley Hot Springs Manley Hot Springs (MLY)
3-02-0170-001-2011 3/16/2011 Construct Apron Construct apron phase 1 (ST AP CO) $356,380 $0 $356,380
Monday, January 11, 2016 Page 74 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0170-001-2011 Construct Runway Plan-1 Construct Runway Phase 1 3/16/2011 $6,960,606 $191,554 $7,152,160 (ST RW CO)
Construct Taxiway Phase 1 (ST TW CO) 3/16/2011 $1,500,000 $0 $1,500,000
3-02-0170-002-2012 Construct Runway Plan-1 Construct Runway-p2 (ST RW 7/3/2012 $9,160,586 $0 $9,160,586 CO)
3-02-0170-003-2015 Construct Snow Removal Equipment Building Construct 9/20/2015 $2,135,220 $0 $2,135,220 SREB (ST BD SN)
$20,112,792 $191,554 $20,304,346
Manokotak Manokotak (MBA)
3-02-0171-001-1986 Acquire Snow Removal Equipment (ST EQ SN) 6/12/1986 10/30/1990 $100,000 $0 $100,000
Rehabilitate Runway 1/19 (RE RW IM) 6/12/1986 10/30/1990 $953,795 $0 $953,795
Construct Taxiway (ST TW CO) 6/12/1986 10/30/1990 $60,358 $0 $60,358
Install Runway Lighting (ST RW LI) 6/12/1986 10/30/1990 $70,417 $0 $70,417
Improve Snow Removal Equipment Building (ST BD 6/12/1986 10/30/1990 $55,328 $0 $55,328 SN)
Improve Access Road (OT GT AC) 6/12/1986 10/30/1990 $204,546 $0 $204,546
Construct Apron (ST AP CO) 6/12/1986 10/30/1990 $301,789 $0 $301,789
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)
3-02-0473-001-2006 Construct New Airport Phase 1 (Construct 9/5/2006 1/24/2013 $311,638 $8,000,000 $8,311,638 Embankments) (ST NA CO)
3-02-0473-002-2007 Construct New Airport Phase 2 (Complete 5/14/2007 1/28/2013 $0 $4,689,335 $4,689,335 Construction) (ST NA CO)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: +07B--Loader w/ attachments (ST EQ SN)
$2,267,871 $12,689,335 $14,957,206
Marshall Marshall Don Hunter Sr (MDM)
3-02-0363-001-1995 Conduct Airport Master Plan Study (PL PL MA) 5/25/1995 4/17/2000 $298,798 $0 $298,798
3-02-0363-002-1998 Construct New Airport (ST NA CO) 9/28/1998 9/8/2003 $6,177,492 $0 $6,177,492
3-02-0363-003-1999 Improve Snow Removal Equipment Building (ST BD 1/19/1999 9/8/2003 $559,001 $0 $559,001 SN)
Construct New Airport (ST NA CO) 1/19/1999 9/8/2003 $1,930,672 $0 $1,930,672
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 07/25 Various 9/16/2011 $204,331 $0 $204,331 Surface Preservation (RE RW IM)
$9,170,294 $0 $9,170,294
McCarthy McCarthy (15Z)
3-02-0334-001-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/14/1993 10/24/1998 $310,845 $0 $310,845
3-02-0334-002-1994 Rehabilitate Runway 07/25 (RE RW IM) 6/28/1994 1/14/1999 $779,136 $287,486 $1,066,622
Rehabilitate Taxiway (RE TW IM) 6/28/1994 1/14/1999 $103,894 $0 $103,894
Construct Apron (ST AP CO) 6/28/1994 1/14/1999 $271,400 $0 $271,400
Improve Snow Removal Equipment Building (ST BD 6/28/1994 1/14/1999 $311,193 $0 $311,193 SN)
Improve Access Road (OT GT AC) 6/28/1994 1/14/1999 $101,877 $0 $101,877
Acquire Land for Development (ST LA DV) 6/28/1994 1/14/1999 $443,438 $0 $443,438
Monday, January 11, 2016 Page 75 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0334-003-1999 8/4/1999 7/16/2001 Construct Runway 1-19 (ST RW CO) $832,842 $0 $832,842
3-02-0200-058-2007 8/31/2007 12/7/2009 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader (ST EQ SN)
$238,054 $0 $238,054
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
$42,560 $0 $42,560
3-02-0200-082-2011 9/26/2011 [Various Grnt] Remove Obstructions Various Obstruction Removal (McCarthy) (ST OT OB)
$100,000 $0 $100,000
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 01/19 Variuos Surface Preservation Maintenance (McCarthy) (RE RW IM)
$155,109 $0 $155,109
3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $232,000 $232,000
$3,690,348 $519,486 $4,209,834
McGrath McGrath (MCG)
3-02-0176-001-1989 6/1/1989 3/6/1991 Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
$182,898 $6,911 $189,809
6/1/1989 3/6/1991 Extend Taxiway (ST TW IM) $31,707 $0 $31,707
3-02-0176-002-1997 7/16/1997 9/24/2001 Construct Apron (ST AP CO) $2,834,612 $0 $2,834,612
7/16/1997 9/24/2001 Improve Airport Drainage (ST OT IM) $54,000 $0 $54,000
7/16/1997 9/24/2001 Improve Access Road (OT GT AC) $143,000 $0 $143,000
7/16/1997 9/24/2001 Rehabilitate Apron (RE AP IM) $331,820 $0 $331,820
3-02-0176-003-2000 9/14/2000 8/27/2004 Rehabilitate Runway 16/34 (RE RW IM) $6,213,780 $3,751,403 $9,965,183
3-02-0176-004-2006 6/6/2006 2/27/2012 Construct Sand and Chemical Storage Building (ST BD SN)
$1,535,348 $0 $1,535,348
3-02-0176-005-2006 8/30/2006 12/28/2012 Construct Apron (ST AP CO) $1,674,950 $504,138 $2,179,088
8/30/2006 12/28/2012 Construct Runway Plan-1 (ST RW CO) $4,900,000 $0 $4,900,000
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
$82,992 $0 $82,992
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
$85,800 $0 $85,800
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Dump Truck & Sander w/ Attachments (ST EQ SN)
$271,570 $0 $271,570
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 16/34 McGrath Various Surface Maintenance (RE RW IM)
$101,080 $0 $101,080
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)
$90,440 $0 $90,440
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation Maintenance (McGrath) (RE RW IM)
$86,100 $0 $86,100
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) Various Surface Preservation Maintenance: McGrath - Crack Seal, Pavement Markings (RE RW IM)
$105,000 $0 $105,000
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 16/34 Accomplish Various Airport Surface Preservation Maintenance (McGrath Seal Coat Ramps, TWYs and Turnaround) (RE RW IM)
$531,300 $0 $531,300
$19,256,397 $4,262,452 $23,518,849
Monday, January 11, 2016 Page 76 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Mekoryuk Mekoryuk (MYU)
3-02-0178-001-1984 Install Runway Lighting (ST RW LI)
Acquire Snow Removal Equipment (ST EQ SN)
Rehabilitate Runway 5/23 (RE RW IM)
Rehabilitate Taxiway (RE TW IM)
Rehabilitate Apron (RE AP IM)
3-02-0178-002-1993 Acquire Snow Removal Equipment (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Various Surface Preservation Maintenance (Mekoryuk) (RE RW IM)
3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
8/21/1984
8/21/1984
8/21/1984
8/21/1984
8/21/1984
8/9/1993
9/19/2012
9/19/2013
2/5/1988 $129,021
2/5/1988 $103,401
2/5/1988 $951,084
2/5/1988 $22,458
2/5/1988 $83,123
9/25/1997 $104,669
$10,500
$400,000
$1,804,256
$0
$0
$0
$0
$0
$0
$0
$0
$0
$129,021
$103,401
$951,084
$22,458
$83,123
$104,669
$10,500
$400,000
$1,804,256
Metlakatla Metlakatla (MTM)
3-02-0369-001-1989 Rehabilitate Apron (RE AP IM)
3-02-0369-002-1995 Rehabilitate Runway 10 (RE RW IM)
3-02-0369-003-2004 Rehabilitate Seaplane Base (RE SB IM)
9/25/1989
4/17/1995
8/20/2004
4/13/1992
10/24/1998
7/5/2007
$399,877
$29,269
$252,867
$682,013
$0
$566,008
$0
$566,008
$399,877
$595,277
$252,867
$1,248,021
Minchumina Minchumina (MHM)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
3-02-0200-096-2014 [Various Grnt] Remove Obstructions (+08J) Various EDA/EAS Locations: Minchumina - Obstruction Removal _ Remove Brush/Trees along Runway and Apron and Approach Paths (SA OT OB)
8/30/2005
9/18/2014
6/9/2010 $145,000
$70,125
$215,125
$0
$0
$0
$145,000
$70,125
$215,125
Minto Minto Al Wright (51Z)
3-02-0336-001-1991 Conduct Airport Master Plan Study (PL PL MA)
3-02-0336-002-2007 Construct Snow Removal Equipment Building (ST BD SN)
Construct Apron (ST AP CO)
Construct Runway Plan-1 (ST RW CO)
3-02-0000-010-2008 Conduct aeronautical survey for WAAS approach LPV survey (PL PL VI)
3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment Acquire Northern SRE - Minto Grader (ST EQ SN)
9/5/1991
8/15/2007
8/15/2007
8/15/2007
6/13/2008
6/16/2008
9/15/2000 $118,126
1/28/2013 $600,000
1/28/2013 $1,200,000
1/28/2013 $0
5/20/2014 $50,000
5/21/2010 $375,000
$2,343,126
$0
$0
$0
$6,948,673
$130,000
$0
$7,078,673
$118,126
$600,000
$1,200,000
$6,948,673
$180,000
$375,000
$9,421,799
Monday, January 11, 2016 Page 77 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Mountain Village Mountain Village (MOU)
3-02-0184-001-1987 Acquire Snow Removal Equipment (ST EQ SN)
Install Apron Lighting (ST AP LI)
Improve Access Road (OT GT AC)
Improve Access Road (OT GT AC)
Construct Apron (ST AP CO)
Construct Taxiway (ST TW CO)
Install Runway Lighting (ST RW LI)
Improve Snow Removal Equipment Building (ST BD SN)
Construct Runway 15/33 (ST RW CO)
3-02-0184-002-2004 Construct Runway Safety Area 02/20 (ST RW SF)
Extend Runway 02/20 (ST RW IM)
3-02-0000-007-2007 Conduct aeronautical survey for WAAS approach (PL PL VI)
3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Mountain Village Segmented Circle (ST OT IN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 02/20 Accomplish Various Airport Surface Preservation Maintenance (Mountain Village Compaction and Dust Control) (RE RW IM)
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/3/1987
9/1/2004
9/1/2004
8/28/2007
9/20/2015
9/21/2015
10/9/1991 $122,125
10/9/1991 $6,378
10/9/1991 $56,395
10/9/1991 $207,480
10/9/1991 $424,610
10/9/1991 $108,400
10/9/1991 $399,297
10/9/1991 $81,168
10/9/1991 $1,292,333
5/27/2008 $0
5/27/2008 $5,169,142
1/28/2013 $0
$129,257
$178,893
$8,175,478
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,398,292
$0
$147,000
$0
$0
$2,545,292
$122,125
$6,378
$56,395
$207,480
$424,610
$108,400
$399,297
$81,168
$1,292,333
$2,398,292
$5,169,142
$147,000
$129,257
$178,893
$10,720,770
Naknek Naknek (5NK)
3-02-0185-001-1993 Conduct Airport Master Plan Study (PL PL MA)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 08/26 (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Naknek Various Surface Maintenance (RE RW IM)
9/14/1993
5/31/2007
6/19/2008
8/20/2009
3/12/2010
9/12/2002
8/6/2013
6/10/2014
12/19/2014
12/9/2015
$280,687
$42,560
$73,000
$6,384
$15,960
$418,591
$0
$0
$0
$0
$0
$0
$280,687
$42,560
$73,000
$6,384
$15,960
$418,591
Nanwalek Nanwalek (KEB)
3-02-0094-001-2005 Update Airport Master Plan Study (PL PL MA) 8/24/2005 8/17/2007 $94,970
$94,970
$0
$0
$94,970
$94,970
Napakiak Napakiak (WNA)
3-02-0188-001-1998 Rehabilitate Runway 16-34 (RE RW IM)
Install Perimeter Fencing (ST EQ SE)
Improve Snow Removal Equipment Building (ST BD SN)
5/28/1998
5/28/1998
5/28/1998
9/27/2002
9/27/2002
9/27/2002
$317,575
$75,000
$250,000
$1,700,000
$0
$0
$2,017,575
$75,000
$250,000
Monday, January 11, 2016 Page 78 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0188-001-1998 5/28/1998 9/27/2002 Extend Runway 16-34 (ST RW IM) $454,975 $300,000 $754,975
3-02-0188-002-2003 8/5/2003 8/17/2007 Construct Snow Removal Equipment Building (ST BD SN)
$668,486 $0 $668,486
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
$166,726 $0 $166,726
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
$10,640 $0 $10,640
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$20,625 $0 $20,625
$1,964,027 $2,000,000 $3,964,027
Napaskiak Napaskiak (PKA)
3-02-0189-001-1991 9/5/1991 10/13/1994 Acquire Land for Development (ST LA DV) $109,709 $0 $109,709
3-02-0189-002-1991 8/27/1991 9/19/1995 Construct Apron (ST AP CO) $217,845 $0 $217,845
8/27/1991 9/19/1995 Improve Access Road (OT GT AC) $53,566 $0 $53,566
8/27/1991 9/19/1995 Improve Snow Removal Equipment Building (ST BD SN)
$128,390 $0 $128,390
8/27/1991 9/19/1995 Rehabilitate Runway 1/19 (RE RW IM) $1,186,606 $0 $1,186,606
8/27/1991 9/19/1995 Install Runway Lighting (ST RW LI) $229,176 $0 $229,176
8/27/1991 9/19/1995 Construct Taxiway (ST TW CO) $26,156 $0 $26,156
8/27/1991 9/19/1995 Acquire Snow Removal Equipment (ST EQ SN) $125,104 $0 $125,104
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$90,000 $0 $90,000
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$168,720 $0 $168,720
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$10,640 $0 $10,640
3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Napaskiak) (SA OT OB)
$10,500 $0 $10,500
$2,356,412 $0 $2,356,412
Nelson Lagoon Nelson Lagoon (OUL)
3-02-0190-001-1996 9/20/1996 9/21/2000 Rehabilitate Runway 08/26 (RE RW IM) $1,875,000 $0 $1,875,000
9/20/1996 9/21/2000 Expand Apron (CA AP EX) $236,763 $0 $236,763
9/20/1996 9/21/2000 Rehabilitate Runway Lighting (RE RW LI) $131,250 $0 $131,250
9/20/1996 9/21/2000 Improve Snow Removal Equipment Building (ST BD SN)
$187,500 $0 $187,500
9/20/1996 9/21/2000 Improve Access Road (OT GT AC) $103,125 $0 $103,125
9/20/1996 9/21/2000 Acquire Land for Development (ST LA DV) $137,691 $0 $137,691
9/20/1996 9/21/2000 Rehabilitate Taxiway (RE TW IM) $64,059 $0 $64,059
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) (RE RW IM)
$6,000 $0 $6,000
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 08/26 (+08J) Various Surface Preservation Maintenance: Nelson Lagoon - RWY/RSA Grading (RE RW IM)
$42,000 $0 $42,000
$2,783,388 $0 $2,783,388
Monday, January 11, 2016 Page 79 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Nenana Nenana Municipal (ENN)
3-02-0191-001-1982 Construct Runway 03/21 (ST RW CO) 9/28/1982 5/19/1986 $136,129 $31,464 $167,593
Improve Airport Drainage (ST OT IM) 9/28/1982 5/19/1986 $190,762 $0 $190,762
Construct Taxiway (ST TW CO) 9/28/1982 5/19/1986 $45,938 $0 $45,938
Expand Apron (CA AP EX) 9/28/1982 5/19/1986 $207,281 $0 $207,281
3-02-0191-002-1983 Extend Runway 3/21 (ST RW IM) 9/28/1983 7/21/1986 $44,623 $0 $44,623
Construct Runway 3/21 (ST RW CO) 9/28/1983 7/21/1986 $915,237 $0 $915,237
Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 7/21/1986 $27,889 $0 $27,889 Equipment (ST EQ MS)
Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 7/21/1986 $5,578 $0 $5,578 Equipment (ST EQ MS)
Acquire Land for Development 3/21 (ST LA DV) 9/28/1983 7/21/1986 $69,722 $0 $69,722
Improve Service Road (OT GT SV) 9/28/1983 7/21/1986 $146,693 $0 $146,693
3-02-0191-003-1985 Acquire Aircraft Rescue & Fire Fighting Safety 9/23/1985 12/10/1990 $118,026 $0 $118,026 Equipment (ST EQ MS)
Improve Airport Drainage (ST OT IM) 9/23/1985 12/10/1990 $97,393 $0 $97,393
Install Apron Lighting (ST AP LI) 9/23/1985 12/10/1990 $56,053 $0 $56,053
3-02-0191-004-1986 Extend Runway 3/21 (ST RW IM) 9/24/1986 5/23/1990 $1,970,602 $10,353 $1,980,955
Acquire Snow Removal Equipment (ST EQ SN) 9/24/1986 5/23/1990 $22,523 $0 $22,523
3-02-0191-005-1987 Install Runway Lighting (ST RW LI) 9/22/1987 12/17/1990 $36,254 $0 $36,254
Acquire Snow Removal Equipment (ST EQ SN) 9/22/1987 12/17/1990 $180,258 $0 $180,258
Expand Apron (ST AP IM) 9/22/1987 12/17/1990 $137,370 $0 $137,370
Rehabilitate Apron (RE AP IM) 9/22/1987 12/17/1990 $129,326 $0 $129,326
Rehabilitate Runway 3L/21R (RE RW IM) 9/22/1987 12/17/1990 $352,802 $0 $352,802
Rehabilitate Taxiway (RE TW IM) 9/22/1987 12/17/1990 $37,872 $0 $37,872
Rehabilitate Taxiway (RE TW IM) 9/22/1987 12/17/1990 $64,825 $0 $64,825
Improve Airport Drainage (ST OT IM) 9/22/1987 12/17/1990 $4,546 $0 $4,546
3-02-0191-006-1992 Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 10/16/1996 $126,562 $0 $126,562
Install Runway Lighting (ST RW LI) 9/24/1992 10/16/1996 $66,408 $0 $66,408
Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $164,658 $0 $164,658
Rehabilitate Runway 03/21 (RE RW IM) 9/24/1992 10/16/1996 $69,502 $0 $69,502
Install Runway Lighting (ST RW LI) 9/24/1992 10/16/1996 $112,768 $0 $112,768
Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $127,067 $0 $127,067
Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $0 $0 $0
3-02-0191-007-2000 Rehabilitate Runway 4L/22R (RE RW IM) 9/6/2000 8/23/2004 $336,603 $0 $336,603
3-02-0191-008-2003 Acquire Snow Removal Equipment (ST EQ SN) 6/27/2003 5/17/2005 $386,368 $0 $386,368
3-02-0191-009-2003 Improve Runway Safety Area 3L-21R (ST RW SF) 7/9/2003 5/30/2006 $750,000 $0 $750,000
Rehabilitate Runway 3L-21R (RE RW IM) 7/9/2003 5/30/2006 $2,831,993 $537,298 $3,369,291
3-02-0191-010-2004 Construct Snow Removal Equipment Building (ST BD 8/28/2004 5/10/2006 $839,629 $78,120 $917,749 SN)
3-02-0191-011-2005 Acquire Snow Removal Equipment (ST EQ SN) 6/14/2005 3/12/2007 $191,546 $0 $191,546
3-02-0191-012-2007 Acquire Snow Removal Equipment (ST EQ SN) 6/13/2007 6/17/2008 $245,500 $8,205 $253,705
3-02-0191-013-2007 Install Perimeter Fencing (Design) (ST EQ SE) 8/28/2007 12/20/2012 $25,000 $0 $25,000
Rehabilitate Runway 04L/22R (Design) (RE RW IM) 8/28/2007 12/20/2012 $33,074 $0 $33,074
3-02-0191-014-2010 Rehabilitate Runway 04L/22R (Construction) (RE RW IM) 7/1/2010 6/21/2011 $634,702 $0 $634,702
Acquire Safety Equipment and/or Fencing Perimeter 7/1/2010 6/21/2011 $736,900 $0 $736,900 Fencing (SA EQ RF)
Monday, January 11, 2016 Page 80 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0191-015-2012 9/19/2012 6/25/2013 Construct Fuel Farm Replace Fuel Tank with Fuel Depot (OT OT FF)
$153,558 $0 $153,558
$12,829,539 $665,440 $13,494,979
New Stuyahok New Stuyahok (KNW)
3-02-0436-001-2002 9/27/2002 5/1/2006 Construct New Airport (ST NA CO) $1,725,053 $0 $1,725,053
3-02-0436-002-2004 5/24/2004 9/23/2008 Construct New Airport (ST NA CO) $6,878,950 $336,129 $7,215,079
3-02-0436-003-2006 4/5/2006 2/4/2014 Construct New Airport Phase 3 (ST NA CO) $4,487,450 $146,738 $4,634,188
4/5/2006 2/4/2014 Construct Snow Removal Equipment Building (ST BD SN)
$908,848 $0 $908,848
3-02-0200-061-2007 7/25/2007 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Loader/Boss with Attachments (ST EQ SN)
$314,025 $0 $314,025
3-02-0200-100-2015 9/16/2015 [Various Grnt] Conduct Aeronautical Survey for RNAV Approach (PL PL VI)
$378,000 $0 $378,000
$14,692,326 $482,867 $15,175,193
Newtok Newtok (EWU)
3-02-0194-001-1994 9/27/1994 8/3/2000 Acquire Land for Development (ST LA DV) $140,625 $0 $140,625
9/27/1994 8/3/2000 Improve Access Road (OT GT AC) $62,813 $0 $62,813
9/27/1994 8/3/2000 Improve Snow Removal Equipment Building (ST BD SN)
$249,957 $0 $249,957
9/27/1994 8/3/2000 Acquire Snow Removal Equipment (ST EQ SN) $149,250 $0 $149,250
9/27/1994 8/3/2000 Extend Runway 15/33 (ST RW IM) $579,844 $0 $579,844
9/27/1994 8/3/2000 Rehabilitate Runway 15/33 (RE RW IM) $1,388,079 $0 $1,388,079
9/27/1994 8/3/2000 Construct Apron (ST AP CO) $108,703 $0 $108,703
3-02-0194-002-2004 8/27/2004 9/19/2008 Conduct Airport Master Plan Study (PL PL MA) $90,001 $0 $90,001
3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Motor Grader & Dozer) (ST EQ SN)
$213,539 $0 $213,539
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) (RE RW IM)
$10,000 $0 $10,000
3-02-0194-003-2006 9/5/2006 2/27/2012 Conduct Airport Master Plan Study (Collection of Wind Data) (PL PL MA)
$97,792 $0 $97,792
3-02-0000-008-2007 9/4/2007 3/21/2012 Conduct Miscellaneous Study Conduct Geotechnical Investigation (PL PL MS)
$306,716 $0 $306,716
3-02-0194-004-2009 8/10/2009 2/24/2015 Conduct Airport Master Plan Study Conduct phase 4 of AMP for additional geotechnical, environmental data gathering, scoping and ALP. (PL PL MA)
$356,195 $0 $356,195
$3,753,514 $0 $3,753,514
Nightmute Nightmute (IGT)
3-02-0195-001-2007 9/5/2007 2/5/2014 Extend Runway 02/20 (ST RW IM) $11,809,074 $403,015 $12,212,089
9/5/2007 2/5/2014 Construct Snow Removal Equipment Building (ST BD SN)
$1,469,103 $0 $1,469,103
9/5/2007 2/5/2014 Expand Apron (ST AP IM) $1,835,126 $0 $1,835,126
3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: IGT--Grader w/ attachments (ST EQ SN)
$328,917 $0 $328,917
Monday, January 11, 2016 Page 81 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 03/21 Various Surface Preservation Maintenance (Nightmute) (RE RW IM)
9/19/2012 $10,500
$15,452,720
$0
$403,015
$10,500
$15,855,735
Nikolai Nikolai (FSP)
3-02-0357-001-2001 Improve Snow Removal Equipment Building (ST BD SN)
Extend Runway (ST RW IM)
Rehabilitate Runway (RE RW IM)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 04/22 Various Surface Preservation (RE RW IM)
6/28/2001
6/28/2001
6/28/2001
9/16/2011
8/26/2005 $250,000
8/26/2005 $2,000,000
8/26/2005 $0
$26,600
$2,276,600
$0
$0
$1,893,737
$0
$1,893,737
$250,000
$2,000,000
$1,893,737
$26,600
$4,170,337
Noatak Noatak (WTK)
3-02-0198-001-1986 Rehabilitate Runway 18/36 (RE RW IM)
Construct Taxiway (ST TW CO)
Construct Apron (ST AP CO)
Install Runway Lighting (ST RW LI)
Improve Access Road (OT GT AC)
3-02-0198-002-1992 Improve Snow Removal Equipment Building (ST BD SN)
Extend Runway 18/36 (ST RW IM)
Expand Apron (ST AP IM)
Install Runway Lighting (ST RW LI)
Acquire Snow Removal Equipment (ST EQ SN)
3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE Northern Region (Noatak Loader Bucket) (ST EQ SN)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01/19 Noatak Various Surface Maintenance (RE RW IM)
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Noatak) (SA OT OB)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 01/19 Accomplish Various Airport Surface Preservation Maintenance (Noatak Compaction and Dust Control) (RE RW IM)
8/25/1986
8/25/1986
8/25/1986
8/25/1986
8/25/1986
9/24/1992
9/24/1992
9/24/1992
9/24/1992
9/24/1992
2/24/2009
3/12/2010
9/18/2013
9/21/2015
1/25/1991 $1,326,603
1/25/1991 $47,655
1/25/1991 $343,974
1/25/1991 $230,084
1/25/1991 $22,000
1/14/2000 $342,689
1/14/2000 $1,877,006
1/14/2000 $96,295
1/14/2000 $101,935
1/14/2000 $53,077
5/16/2010 $23,431
12/9/2015 $186,200
$20,600
$235,766
$4,907,315
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,326,603
$47,655
$343,974
$230,084
$22,000
$342,689
$1,877,006
$96,295
$101,935
$53,077
$23,431
$186,200
$20,600
$235,766
$4,907,315
Nome Nome (OME)
3-02-0199-001-1984 Rehabilitate Runway 927-220 (RE RW IM)
Extend Runway 927-220 (ST RW IM)
Groove Runway 927-220 (SP RW FR)
3-02-0199-002-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
3-02-0199-003-1986 Acquire Land for Development (ST LA DV)
3-02-0199-004-1988 Install Runway Lighting (ST RW LI)
Construct Apron (CA AP CO)
8/13/1984
8/13/1984
8/13/1984
7/17/1986
9/9/1986
9/26/1988
9/26/1988
4/19/1991 $1,348,294
4/19/1991 $335,135
4/19/1991 $350,102
11/20/1991 $157,934
4/23/1991 $132,999
9/29/1994 $109,000
9/29/1994 $153,000
$0
$0
$0
$82,274
$157,462
$0
$0
$1,348,294
$335,135
$350,102
$240,208
$290,461
$109,000
$153,000
Monday, January 11, 2016 Page 82 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0199-004-1988 Improve Airport Drainage (ST OT IM) 9/26/1988 9/29/1994 $2,287,196 $0 $2,287,196
Improve Access Road (CA GT AC) 9/26/1988 9/29/1994 $139,000 $0 $139,000
Install Apron Lighting (ST AP LI) 9/26/1988 9/29/1994 $28,000 $0 $28,000
Rehabilitate Taxiway Lighting (RE TW LI) 9/26/1988 9/29/1994 $53,000 $0 $53,000
Rehabilitate Runway 2/20 (RE RW IM) 9/26/1988 9/29/1994 $3,119,000 $949,829 $4,068,829
Improve Runway Safety Area 2/20 (ST RW SF) 9/26/1988 9/29/1994 $17,000 $0 $17,000
Groove Runway 2/20 (SP RW FR) 9/26/1988 9/29/1994 $137,000 $0 $137,000
Rehabilitate Taxiway (RE TW IM) 9/26/1988 9/29/1994 $290,000 $0 $290,000
3-02-0199-005-1991 Install Apron Lighting (ST AP LI) 8/23/1991 9/30/2002 $29,970 $0 $29,970
Install Miscellaneous NAVAIDS (SP OT IN) 8/23/1991 9/30/2002 $0 $202,500 $202,500
Install Runway Lighting (SA RW LI) 8/23/1991 9/30/2002 $223,272 $17,500 $240,772
Rehabilitate Runway 9/27 (RE RW IM) 8/23/1991 9/30/2002 $7,804,350 $304,835 $8,109,185
Construct Taxiway (ST TW CO) 8/23/1991 9/30/2002 $24,908 $0 $24,908
3-02-0199-006-1992 Conduct Airport Master Plan Study (PL PL MA) 9/10/1992 9/9/1997 $279,968 $0 $279,968
3-02-0199-007-1993 Acquire Land for Development (ST LA DV) 9/9/1993 8/22/2000 $0 $337,500 $337,500
Install Runway Lighting (SA RW LI) 9/9/1993 8/22/2000 $0 $63,558 $63,558
Extend Runway RW 9/27 (ST RW IM) 9/9/1993 8/22/2000 $42,841 $1,654,424 $1,697,265
Extend Runway RW 9/27 (ST RW IM) 9/9/1993 8/22/2000 $0 $526,996 $526,996
3-02-0199-008-1994 Extend Runway 09/27 (ST RW IM) 6/21/1994 9/27/1999 $2,880,101 $0 $2,880,101
Install Runway Lighting (SA RW LI) 6/21/1994 9/27/1999 $89,580 $0 $89,580
3-02-0199-009-1997 Rehabilitate Taxiway (RE TW IM) 12/17/1997 9/17/2001 $234,934 $118,834 $353,768
Rehabilitate Apron (RE AP IM) 12/17/1997 9/17/2001 $1,392,968 $0 $1,392,968
3-02-0199-010-1999 Improve Runway Safety Area 9-27 (SA RW SF) 8/4/1999 9/12/2002 $712,960 $0 $712,960
Remove Obstructions 9-27 (SA OT OB) 8/4/1999 9/12/2002 $50,000 $0 $50,000
Rehabilitate Runway 9-27 (RE RW IM) 8/4/1999 9/12/2002 $199,345 $1,043,906 $1,243,251
3-02-0199-011-1999 Rehabilitate Runway 09-27 (RE RW IM) 9/29/1999 9/12/2002 $0 $1,150,164 $1,150,164
3-02-0199-012-2001 Rehabilitate Runway (RE RW IM) 9/24/2001 3/9/2007 $6,138,502 $0 $6,138,502
Improve Runway Safety Area (SA RW SF) 9/24/2001 3/9/2007 $740,000 $1,945,269 $2,685,269
Update Miscellaneous Study (PL PL MS) 9/24/2001 3/9/2007 $829,478 $0 $829,478
3-02-0199-013-2005 Construct Aircraft Rescue & Fire Fighting Building 8/29/2005 3/23/2010 $0 $4,571,409 $4,571,409 (Phase 1) (SA BD EX)
Construct Snow Removal Equipment Building (Phase 1) 8/29/2005 3/23/2010 $5,350,000 $0 $5,350,000 (ST BD SN)
3-02-0199-014-2006 Construct Aircraft Rescue & Fire Fighting Building 7/25/2006 9/15/2011 $87,396 $741,850 $829,246 (Phase 2) (SA BD EX)
Construct Snow Removal Equipment Building (Phase 2) 7/25/2006 9/15/2011 $740,594 $0 $740,594 (ST BD SN)
3-02-0199-015-2006 Remove Obstructions (Utility Pole Removal) (SA OT 9/1/2006 2/27/2012 $1,000,000 $0 $1,000,000 OB)
Rehabilitate Runway 03/21 (Phase 1) (RE RW IM) 9/1/2006 2/27/2012 $499,784 $0 $499,784
Rehabilitate Runway 10/28 (RE RW IM) 9/1/2006 2/27/2012 $4,586,613 $0 $4,586,613
3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $32,064 $0 $32,064 (Acquire Sander Attachment) (ST EQ SN)
3-02-0199-016-2007 Rehabilitate Runway 10/28 (Phase 2) (RE RW IM) 8/23/2007 6/3/2011 $1,200,000 $89,097 $1,289,097
Rehabilitate Runway 03/21 (Phase 2) (RE RW IM) 8/23/2007 6/3/2011 $6,364,064 $0 $6,364,064
3-02-0199-017-2007 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/22/2007 5/4/2010 $0 $927,524 $927,524 3000-Gallon ARFF Vehicle (SA EQ RF)
3-02-0199-018-2007 Update Airport Master Plan Study (PL PL MA) 8/28/2007 4/11/2012 $491,889 $0 $491,889
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway (Maintenance) (RE 5/31/2007 8/6/2013 $120,240 $0 $120,240 RW IM)
Monday, January 11, 2016 Page 83 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0199-019-2010 Update Airport Master Plan Study Update MP-Ph2 (PL 8/17/2010 9/2/2014 $85,067 $0 $85,067 PL MA)
3-02-0199-020-2010 Collect airport data for Airports Geographic Information 7/19/2010 5/14/2015 $0 $334,927 $334,927 System (PL PL GI)
3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $770,415 $0 $770,415 Acquire SRE (Northern Region): Nome Blower & Broom (ST EQ SN)
3-02-0199-021-2012 Rehabilitate Runway 10/28 (RE RW IM) 6/15/2012 $2,070,351 $0 $2,070,351
3-02-0199-022-2013 Construct Runway Safety Area 10/28 Construct Runway 9/19/2013 $2,781,395 $13,000,000 $15,781,395 Safety Area (includes ROW) (SA RW SF)
Construct Runway Safety Area 03/21 Construct Runway 9/19/2013 $1,000,000 $24,000,000 $25,000,000 Safety Area (EMAS SRE and grip tester equip.) (SA RW SF)
3-02-0199-023-2013 Rehabilitate Apron (RE AP IM) 9/24/2013 $3,237,337 $0 $3,237,337
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $28,662 $0 $28,662 Obstruction Removal (Nome) (SA OT OB)
3-02-0200-092-2013 [Various Grnt] Wildlife Hazard Assessments (PL PL 9/19/2013 $93,750 $0 $93,750 WH)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $178,236 $0 $178,236 Acquire SRE (Blower) (ST EQ SN)
3-02-0199-024-2014 Rehabilitate Taxiway Taxiway E&F (RE TW IM) 6/23/2014 $2,795,636 $0 $2,795,636
Rehabilitate Apron Rehabilitatet N and S apron (RE AP 6/23/2014 $2,000,000 $0 $2,000,000 IM)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $1,061,632 $0 $1,061,632 Acquire Various SRE (Nome Tug with Gradeling Broom, and Grader) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 03/21 Accomplish 9/21/2015 $68,248 $0 $68,248 Various Airport Surface Preservation Maintenance (Nome RWYs and TWYs Marking) (RE RW IM)
Nondalton Nondalton (5NN)
3-02-0432-001-1992 Construct Taxiway (ST TW CO)
Acquire Land for Development (ST LA DV)
Improve Access Road (OT GT AC)
Improve Snow Removal Equipment Building (ST BD SN)
Construct Apron (ST AP CO)
Rehabilitate Runway 02/20 (RE RW IM)
Acquire Snow Removal Equipment (ST EQ SN)
3-02-0432-002-2003 Construct Snow Removal Equipment Building (ST BD SN)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 02/20 (Various Surface Maintenance) (RE RW IM)
Monday, January 11, 2016
9/29/1992
9/29/1992
9/29/1992
9/29/1992
9/29/1992
9/29/1992
9/29/1992
8/4/2003
8/30/2005
6/19/2008
8/20/2009
6/17/1999
6/17/1999
6/17/1999
6/17/1999
6/17/1999
6/17/1999
6/17/1999
8/17/2007
6/9/2010
6/10/2014
12/19/2014
$66,973,209
$584,273
$219,283
$549,568
$147,188
$573,697
$1,821,369
$131,250
$664,589
$10,000
$0
$159,600
$52,323,282 $119,296,491
$0 $584,273
$0 $219,283
$0 $549,568
$0 $147,188
$0 $573,697
$0 $1,821,369
$0 $131,250
$0 $664,589
$0 $10,000
$0 $0
$0 $159,600
Page 84 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $360,365 $0 $360,365 Acquire Various SRE: Nondalton (Grader with attachments) (ST EQ SN)
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $26,300 $0 $26,300 Obstruction Removal (Nondalton) (SA OT OB)
$5,247,482 $0 $5,247,482
Noorvik Robert /Bob/ Curtis Memorial (D76)
3-02-0201-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/22/1991 10/24/1998 $241,371 $0 $241,371
3-02-0201-002-1997 Improve Access Road (OT GT AC) 9/29/1997 9/10/2003 $225,000 $0 $225,000
Acquire Land for Development (ST LA DV) 9/29/1997 9/10/2003 $220,000 $0 $220,000
Construct Apron (ST AP CO) 9/29/1997 9/10/2003 $341,952 $0 $341,952
Acquire Land For Approaches (ST LA SZ) 9/29/1997 9/10/2003 $80,000 $0 $80,000
Construct Runway 6-24 (ST RW CO) 9/29/1997 9/10/2003 $1,000,000 $1,051,638 $2,051,638
Construct Taxiway (ST TW CO) 9/29/1997 9/10/2003 $150,000 $0 $150,000
3-02-0201-003-1998 Construct Runway 02-20 (ST RW CO) 3/24/1998 9/10/2003 $151,000 $1,957,952 $2,108,952
Install Runway Lighting (ST RW LI) 3/24/1998 9/10/2003 $250,000 $0 $250,000
Improve Snow Removal Equipment Building (ST BD 3/24/1998 9/10/2003 $125,000 $0 $125,000 SN)
3-02-0201-004-2001 Construct New Airport (ST NA CO) 3/16/2001 9/12/2003 $1,180,885 $40,034 $1,220,919
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Noorvik 3/12/2010 12/9/2015 $218,120 $0 $218,120 Various Surface Maintenance (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 06/24 Accomplish 9/21/2015 $215,085 $0 $215,085 Various Airport Surface Preservation Maintenance (Noorvik Compaction and Dust Control) (RE RW IM)
$4,398,413 $3,049,623 $7,448,036
North Pole Bradley Sky-Ranch (95Z)
3-02-0803-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/18/2001 8/3/2004 $445,312 $0 $445,312
$445,312 $0 $445,312
North Whale Pass North Whale (96Z)
3-02-0415-001-1991 Improve Airport Drainage (ST OT IM) 9/20/1991 9/25/1997 $527,700 $9,942 $537,642
$527,700 $9,942 $537,642
Northway Northway (ORT)
3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $212,069 $0 $212,069 Acquire SRE Northern Region (Northway Front End Loader) (ST EQ SN)
PL VI) 3-02-0000-013-2010 Conduct aeronautical survey for WAAS approach (PL 3/30/2010 $0 $250,000 $250,000
$212,069 $250,000 $462,069
Monday, January 11, 2016 Page 85 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Nuiqsut Nuiqsut (AQT)
3-02-0366-001-2000 9/26/2000 9/10/2003 Improve Runway Safety Area ? (ST RW SF) $0 $1,086,242 $1,086,242
3-02-0200-064-2008 6/18/2008 10/27/2014 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$89,000 $110,000 $199,000
3-02-0200-076-2010 9/13/2010 [Various Grnt] Conduct aeronautical survey for WAAS approach Conduct Aeronautical Survey, Phase II (PL PL VI)
$50,000 $0 $50,000
$139,000 $1,196,242 $1,335,242
Nulato Nulato (NUL)
3-02-0204-001-1990 9/26/1990 9/25/1997 Install Runway Lighting (ST RW LI) $116,250 $0 $116,250
9/26/1990 9/25/1997 Construct Runway 2/20 (ST RW CO) $1,893,061 $134,353 $2,027,414
9/26/1990 9/25/1997 Construct Apron (ST AP CO) $184,747 $0 $184,747
9/26/1990 9/25/1997 Acquire Snow Removal Equipment (ST EQ SN) $84,475 $0 $84,475
9/26/1990 9/25/1997 Acquire Land for Development (ST LA DV) $168,750 $0 $168,750
9/26/1990 9/25/1997 Improve Access Road (OT GT AC) $196,151 $0 $196,151
3-02-0204-002-1996 9/27/1996 8/14/2000 Improve Snow Removal Equipment Building (ST BD SN)
$148,850 $0 $148,850
9/27/1996 8/14/2000 Rehabilitate Apron (RE AP IM) $100,221 $0 $100,221
9/27/1996 8/14/2000 Rehabilitate Runway 2/20 (RE RW IM) $871,893 $2,106 $873,999
9/27/1996 8/14/2000 Rehabilitate Taxiway (RE TW IM) $31,566 $0 $31,566
3-02-0204-003-1997 1/29/1997 8/23/2000 Improve Access Road (OT GT AC) $68,430 $0 $68,430
1/29/1997 8/23/2000 Rehabilitate Taxiway Lighting (RE TW LI) $71,655 $0 $71,655
1/29/1997 8/23/2000 Install Runway Lighting (ST RW LI) $44,784 $0 $44,784
1/29/1997 8/23/2000 Rehabilitate Runway Lighting 2/20 (RE RW LI) $100,179 $0 $100,179
1/29/1997 8/23/2000 Extend Runway 2/20 (ST RW IM) $422,302 $0 $422,302
1/29/1997 8/23/2000 Expand Apron (CA AP EX) $64,475 $0 $64,475
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$160,000 $0 $160,000
3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Nulato Grader w/ Plow (ST EQ SN)
$342,000 $0 $342,000
3-02-0204-004-2010 3/15/2010 Construct Snow Removal Equipment Building (ST BD SN)
$1,230,000 $0 $1,230,000
3/15/2010 Rehabilitate Runway 02/20 Phase 1 (RE RW IM) $4,100,000 $39,553 $4,139,553
3/15/2010 Rehabilitate Access Road (OT GT AC) $1,230,000 $0 $1,230,000
3/15/2010 Rehabilitate Apron (RE AP IM) $1,640,000 $0 $1,640,000
$13,269,789 $176,012 $13,445,801
Nunapitchuk Nunapitchuk (16A)
3-02-0446-001-2007 8/28/2007 5/28/2014 Extend Runway 18/36 (ST RW IM) $13,072,630 $0 $13,072,630
8/28/2007 5/28/2014 Construct Snow Removal Equipment Building (ST BD SN)
$1,250,000 $0 $1,250,000
3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: 16A--Loader w/ attachments (ST EQ SN)
$379,833 $0 $379,833
Monday, January 11, 2016 Page 86 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (Nunapitchuk) (RE RW IM)
$10,500 $0 $10,500
$14,712,963 $0 $14,712,963
Old Harbor Old Harbor (6R7)
3-02-0421-001-1992 9/21/1992 11/28/1994 Improve Snow Removal Equipment Building (ST BD SN)
$75,839 $0 $75,839
9/21/1992 11/28/1994 Improve Access Road (OT GT AC) $91,790 $0 $91,790
9/21/1992 11/28/1994 Acquire Snow Removal Equipment (ST EQ SN) $215,383 $0 $215,383
9/21/1992 11/28/1994 Construct Taxiway (ST TW CO) $16,214 $0 $16,214
9/21/1992 11/28/1994 Construct Apron (ST AP CO) $524,282 $0 $524,282
9/21/1992 11/28/1994 Construct Runway RW02/20 (ST RW CO) $3,063,633 $0 $3,063,633
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)
$16,872 $0 $16,872
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 03/21 (Various Surface Maintenance) (RE RW IM)
$159,600 $0 $159,600
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 03/21 Old Harbor Various Surface Maintenance (RE RW IM)
$159,600 $0 $159,600
3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Old Harbor) (SA OT OB)
$31,500 $0 $31,500
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 03/21 Surface Preservation Maintenance (Old Harbor) (RE RW IM)
$134,000 $0 $134,000
$4,488,713 $0 $4,488,713
Ouzinkie Ouzinkie (4K5)
3-02-0210-001-1999 5/20/1999 9/13/2002 Conduct Airport Master Plan Study (PL PL MA) $71,456 $0 $71,456
3-02-0210-002-2000 8/4/2000 8/25/2004 Conduct Airport Master Plan Study (PL PL MA) $204,385 $0 $204,385
3-02-0210-003-2001 8/30/2001 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $217,168 $0 $217,168
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)
$18,981 $0 $18,981
3-02-0200-061-2007 7/25/2007 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader w/ Attachments (ST EQ SN)
$230,000 $0 $230,000
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)
$27,700 $0 $27,700
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 11/29 (Various Surface Maintenance) (RE RW IM)
$31,920 $0 $31,920
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader w/ Attachments (ST EQ SN)
$352,036 $0 $352,036
3-02-0480-001-2009 6/11/2009 8/22/2013 Construct New Airport Phase 1 (To include SREB) (ARRA funded) (ST NA CO)
$0 $0 $0
3-02-0480-002-2011 6/8/2011 Construct New Airport Construct new airport-ph2 Utilities, SREB, MIRL (ST NA CO)
$2,433,682 $0 $2,433,682
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 08/26 Surface Preservation Maintenance (Ouzinkie) (RE RW IM)
$78,800 $0 $78,800
$3,666,128 $0 $3,666,128
Monday, January 11, 2016 Page 87 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Palmer Matanuska-Susitna Borough Planning (@01O)
3-02-0469-001-2006 Conduct Metropolitan System Plan Study (PL PL ME) 2/24/2006 6/6/2011 $625,796 $0 $625,796
3-02-0469-003-2014 Conduct Metropolitan System Plan Study Conduct 9/17/2014 $437,000 $0 $437,000 Regional Aviation System Plan (Phase 2) (PL PL ME)
$1,062,796 $0 $1,062,796
Palmer Municipal (PAQ)
3-02-0211-001-1986 Acquire Land for Development (ST LA DV) 9/25/1986 9/21/2000 $746,049 $0 $746,049
3-02-0211-002-1990 Acquire Snow Removal Equipment (ST EQ SN) 9/25/1990 2/28/1991 $114,998 $0 $114,998
3-02-0211-003-1992 Improve Snow Removal Equipment Building (ST BD 9/24/1992 5/4/1995 $258,750 $0 $258,750 SN)
3-02-0211-004-1994 Rehabilitate Apron (RE AP IM) 6/22/1994 1/10/1996 $315,000 $0 $315,000
Rehabilitate Taxiway (RE TW IM) 6/22/1994 1/10/1996 $396,419 $0 $396,419
3-02-0211-005-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/27/1995 7/26/1996 $244,265 $0 $244,265
3-02-0211-006-1996 Conduct Airport Master Plan Study (PL PL MA) 9/20/1996 9/24/2001 $265,216 $0 $265,216
3-02-0211-007-2001 Construct Runway (ST RW CO) 9/27/2001 8/25/2005 $0 $43,000 $43,000
Improve Runway Safety Area (ST RW SF) 9/27/2001 8/25/2005 $0 $40,000 $40,000
Acquire Snow Removal Equipment (ST EQ SN) 9/27/2001 8/25/2005 $0 $10,000 $10,000
Extend Runway (ST RW IM) 9/27/2001 8/25/2005 $150,000 $138,964 $288,964
Construct Taxiway (ST TW CO) 9/27/2001 8/25/2005 $0 $137,000 $137,000
3-02-0211-008-2002 Construct Taxiway Phase 2 (ST TW CO) 5/15/2002 4/22/2005 $1,788,382 $0 $1,788,382
Improve Runway Safety Area 16 Phase 2 (SA RW SF) 5/15/2002 4/22/2005 $70,000 $0 $70,000
Construct Runway Phase 2 (ST RW CO) 5/15/2002 4/22/2005 $175,000 $0 $175,000
3-02-0211-009-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/15/2003 8/28/2006 $147,172 $0 $147,172
3-02-0211-010-2004 Expand Apron (ST AP IM) 5/25/2004 9/5/2006 $850,000 $71,981 $921,981
Construct Taxiway (ST TW CO) 5/25/2004 9/5/2006 $127,029 $450,000 $577,029
Construct Access Road (OT GT AC) 5/25/2004 9/5/2006 $230,000 $0 $230,000
Install Perimeter Fencing (ST EQ SE) 5/25/2004 9/5/2006 $111,698 $98,302 $210,000
3-02-0211-011-2004 Acquire Land For Approaches Phase 1 (Lot 2 Willow 8/26/2004 8/29/2006 $259,002 $0 $259,002 Point Subdivision (2.45 AC), Lots 8, 9, 10, 11, Block 1 Rempel Subdivision) (ST LA SZ)
3-02-0211-012-2005 Acquire Land For Approaches (ST LA SZ) 8/30/2005 4/14/2008 $50,000 $0 $50,000
Acquire Snow Removal Equipment (Motor grader) (ST 8/30/2005 4/14/2008 $188,021 $0 $188,021 EQ SN)
Rehabilitate Runway 09/27 Phase 1 (Design) (RE RW 8/30/2005 4/14/2008 $164,969 $20,000 $184,969 IM)
Rehabilitate Runway Lighting 16/34 (Design) (RE RW LI) 8/30/2005 4/14/2008 $35,000 $28,123 $63,123
3-02-0211-013-2006 Rehabilitate Taxiway rehab. twy B, interlinks & lighting 5/11/2006 3/5/2012 $1,100,000 $0 $1,100,000 (RE TW IM)
Install Runway Vertical/Visual Guidance System 16/34 5/11/2006 3/5/2012 $45,446 $0 $45,446 PAPIs & REILs (ST RW VI)
Rehabilitate Runway Lighting 16/34 Install new runway 5/11/2006 3/5/2012 $704,845 $22,017 $726,862 lighting and lighted windcone (RE RW LI)
3-02-0211-015-2007 Update Airport Master Plan Study AMP Update (PL PL 8/29/2007 6/13/2011 $236,274 $0 $236,274 MA)
3-02-0211-016-2007 Rehabilitate Runway 16/34 pavement maintenance - 4/23/2007 3/7/2013 $150,000 $0 $150,000 crack seal (RE RW IM)
Rehabilitate Runway 09/27 Phase 2 (Construction) (RE 4/23/2007 3/7/2013 $2,099,352 $0 $2,099,352 RW IM)
Monday, January 11, 2016 Page 88 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0211-014-2009 2/17/2009 1/23/2012 Acquire Miscellaneous Land (RPZ land, Phase 2) (ST LA MS)
$330,738 $0 $330,738
3-02-0211-017-2012 9/13/2012 Conduct Airport Master Plan Study (PL PL MA) $375,000 $0 $375,000
3-02-0211-018-2014 5/22/2014 Rehabilitate Taxiway Pavement preservation (RE TW IM)
$50,000 $0 $50,000
5/22/2014 Rehabilitate Apron Pavement preservation (RE AP IM) $50,000 $0 $50,000
5/22/2014 Rehabilitate Runway 16/34 Pavement preservation (runways 16/34 and 9/27) (RE RW IM)
$116,074 $9 $116,083
3-02-0211-019-2015 9/22/2015 Conduct Airport Master Plan Study Phase 2 - conduct aeronautical survey (PL PL MA)
$235,312 $0 $235,312
$12,180,011 $1,059,396 $13,239,407
Pedro Bay Pedro Bay (4K0)
3-02-0215-001-1986 5/20/1986 2/5/1991 Improve Airport Drainage (ST OT IM) $6,446 $0 $6,446
5/20/1986 2/5/1991 Improve Access Road (OT GT AC) $214,083 $0 $214,083
5/20/1986 2/5/1991 Construct Apron (ST AP CO) $78,670 $0 $78,670
5/20/1986 2/5/1991 Improve Snow Removal Equipment Building (ST BD SN)
$48,465 $0 $48,465
5/20/1986 2/5/1991 Construct Runway 9/27 (ST RW CO) $859,025 $0 $859,025
5/20/1986 2/5/1991 Construct Taxiway (ST TW CO) $11,756 $0 $11,756
3-02-0215-002-1987 7/23/1987 6/17/1991 Acquire Snow Removal Equipment (ST EQ SN) $101,250 $0 $101,250
3-02-0215-003-1995 7/19/1995 7/14/1999 Install Runway Lighting (ST RW LI) $164,063 $0 $164,063
7/19/1995 7/14/1999 Extend Runway 09/27 (ST RW IM) $130,725 $0 $130,725
7/19/1995 7/14/1999 Acquire Land for Development (ST LA DV) $150,937 $0 $150,937
7/19/1995 7/14/1999 Rehabilitate Runway 09/27 (RE RW IM) $592,801 $0 $592,801
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)
$10,000 $0 $10,000
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$68,062 $0 $68,062
$2,436,283 $0 $2,436,283
Pelican Pelican (PEC)
3-02-0216-001-2004 8/24/2004 2/21/2006 Rehabilitate Seaplane Base (RE SB IM) $593,746 $0 $593,746
$593,746 $0 $593,746
Perryville Perryville (PEV)
3-02-0218-001-2005 8/29/2005 4/9/2012 Modify Access Road (OT GT AC) $729,000 $0 $729,000
8/29/2005 4/9/2012 Construct Apron (ST AP CO) $1,182,200 $0 $1,182,200
8/29/2005 4/9/2012 Construct Runway Plan-1 (Replacement RWY) (ST RW CO)
$4,361,679 $0 $4,361,679
8/29/2005 4/9/2012 Construct Snow Removal Equipment Building (ST BD SN)
$548,300 $0 $548,300
3-02-0200-055-2006 8/17/2006 7/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader w/ Plow and Attachments) (ST EQ SN)
$242,580 $0 $242,580
$7,063,759 $0 $7,063,759
Monday, January 11, 2016 Page 89 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Petersburg Lloyd R Roundtree Seaplane Facility (63A)
3-02-0340-001-1994 Construct Apron (ST AP CO) 9/27/1994 7/20/2000 $1,803,885 $175,737 $1,979,622
Acquire Land for Development (ST LA DV) 9/27/1994 7/20/2000 $18,750 $0 $18,750
$1,822,635 $175,737 $1,998,372
Petersburg James A Johnson (PSG)
3-02-0219-001-1985 Acquire Snow Removal Equipment (ST EQ SN) 8/26/1985 4/4/1988 $165,144 $0 $165,144
3-02-0219-002-1987 Improve Airport Drainage (ST OT IM) 7/1/1987 9/19/1988 $0 $9,375 $9,375
Rehabilitate Runway 4/22 (RE RW IM) 7/1/1987 9/19/1988 $285,191 $14,169 $299,360
Rehabilitate Taxiway (RE TW IM) 7/1/1987 9/19/1988 $0 $9,375 $9,375
Rehabilitate Apron (RE AP IM) 7/1/1987 9/19/1988 $30,677 $137,085 $167,762
3-02-0219-003-1988 Conduct Airport Master Plan Study (PL PL MA) 9/15/1988 5/12/1992 $68,476 $0 $68,476
3-02-0219-004-1990 Acquire Aircraft Rescue & Fire Fighting Safety 9/26/1990 9/9/1997 $564,122 $0 $564,122 Equipment (ST EQ MS)
3-02-0219-005-1994 Improve Aircraft Rescue & Fire Fighting Building (SA 6/27/1994 9/25/1997 $0 $1,523,018 $1,523,018 BD EX)
Improve Access Road (OT GT AC) 6/27/1994 9/25/1997 $256,781 $183,219 $440,000
3-02-0219-006-1995 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/3/1995 10/24/1998 $0 $369,544 $369,544 EQ RF)
3-02-0219-007-1995 Rehabilitate Taxiway (RE TW IM) 6/15/1995 9/25/1997 $544,621 $0 $544,621
Rehabilitate Apron (RE AP IM) 6/15/1995 9/25/1997 $804,745 $0 $804,745
Rehabilitate Runway 04/22 (RE RW IM) 6/15/1995 9/25/1997 $1,361,552 $196,127 $1,557,679
Install Runway Lighting (ST RW LI) 6/15/1995 9/25/1997 $375,946 $0 $375,946
3-02-0219-008-2002 Update Airport Master Plan Study (PL PL MA) 9/3/2002 2/21/2006 $266,800 $0 $266,800
3-02-0219-009-2003 Construct Sand and Chemical Storage Building (ST BD 8/26/2003 6/26/2007 $2,013,858 $0 $2,013,858 SN)
3-02-0219-010-2003 Expand Apron (ST AP IM) 8/22/2003 7/2/2007 $0 $2,289,550 $2,289,550
3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $235,000 $0 $235,000 (Loader) (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/30/2006 2/27/2012 $122,849 $0 $122,849 (RE RW IM)
3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $53,635 $0 $53,635 Acquire SRE: Trap Plow (ST EQ SN)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)
3-02-0219-011-2008 Rehabilitate Runway 04/22 mill and overlay (RE RW IM) 6/17/2008 12/21/2012 $1,400,000 $0 $1,400,000
Construct Runway Safety Area 04/22 (SA RW SF) 6/17/2008 12/21/2012 $0 $21,511,804 $21,511,804
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 04/22 (Various 8/20/2009 12/19/2014 $90,440 $0 $90,440 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0219-012-2009 Construct Runway Safety Area 04/22 Phase 2 (SA RW 7/31/2009 2/4/2013 $1,000,000 $5,149,471 $6,149,471 SF)
3-02-0219-013-2009 Construct Runway Safety Area 04/22 Phase 3 (SA RW 9/23/2009 $833,268 $15,195,320 $16,028,588 SF)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 04/22 Petersburg 3/12/2010 12/9/2015 $42,560 $0 $42,560 Various Surface Maintenance (RE RW IM)
Monday, January 11, 2016 Page 90 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $488,656 $0 $488,656 Acquire Various SRE: Petersburg (SP Runway Broom) (ST EQ SN)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $19,918 $0 $19,918 Acquire SRE (Alaska Region): Petersburg (Wing Plow Attachment) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Various 9/19/2012 $26,542 $0 $26,542 Surface Preservation Maintenance (Petersburg) (RE RW IM)
3-02-0200-091-2013 [Various Grnt] Rehabilitate Runway 05/23 Surface 9/19/2013 $67,286 $0 $67,286 Preservation Maintenance (Petersburg) - Pavement Markings (RE RW IM)
3-02-0200-096-2014 [Various Grnt] Remove Obstructions (+08J) Various 9/18/2014 $51,722 $0 $51,722 EDA/EAS Locations: Petersburg - Obstruction Removal _ Brush cutting in RSA and around ramp and taxiways. (SA OT OB)
[Various Grnt] Rehabilitate Runway 05/23 (+08J) 9/18/2014 $73,963 $0 $73,963 Various EDA/EAS Locations: Petersburg - Surface Preservations Maintenance _ Pavement Markings (RE RW IM)
3-02-0219-014-2014 Rehabilitate Taxiway Rehab taxiway (RE TW IM) 9/11/2014 $1,608,851 $0 $1,608,851
Rehabilitate Apron rehab apron (RE AP IM) 9/11/2014 $0 $2,000,000 $2,000,000
3-02-0219-015-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle ARFF 9/18/2014 $705,672 $0 $705,672 Truck (SA EQ RF)
3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 05/23 EAS/EDA 9/20/2015 $77,584 $0 $77,584 Various (Petersburg - Surface Preservation Maintenance - Markings on RWYs, TWYs and Aprons) (RE RW IM)
[Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $77,584 $0 $77,584 (Petersburg - Remove Obstructions - 109 Acres Brush Cutting around Ramp and TWYs) (SA OT OB)
$13,734,723 $48,691,482 $62,426,204
Pilot Point Pilot Point (PNP)
3-02-0222-001-1999 Improve Snow Removal Equipment Building (ST BD 3/24/1999 9/25/2002 $240,000 $0 $240,000 SN)
Construct New Airport 7-25 (ST NA CO) 3/24/1999 9/25/2002 $2,963,355 $0 $2,963,355
3-02-0222-002-2003 Construct Snow Removal Equipment Building (ST BD 8/4/2003 8/17/2007 $556,614 $0 $556,614 SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $58,208 $0 $58,208 (RE RW IM)
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $365,238 $0 $365,238 (+08J) Acquire SRE: Pilot Point - Grader (ST EQ SN)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE () (ST EQ SN)
$4,548,653 $0 $4,548,653
Pilot Station Pilot Station (0AK)
3-02-0223-001-1995 Conduct Airport Master Plan Study (PL PL MA) 6/6/1995 9/20/2000 $230,596 $0 $230,596
3-02-0223-002-1996 Install Runway Lighting (ST RW LI) 8/29/1996 9/25/2000 $288,134 $0 $288,134
3-02-0477-001-2015 Construct New Airport Construct Airport (ST NA CO) 9/14/2015 $8,216,631 $16,705,085 $24,921,716
$8,735,361 $16,705,085 $25,440,446
Monday, January 11, 2016 Page 91 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Platinum Platinum (PTU)
3-02-0224-001-1996 9/20/1996 11/17/2006 Conduct Airport Master Plan Study (PL PL MA) $300,000 $0 $300,000
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments and Grader with Attachments (ST EQ SN)
$628,635 $0 $628,635
3-02-0224-002-2009 2/24/2009 Construct Apron construct apron (ST AP CO) $1,104,235 $0 $1,104,235
2/24/2009 Construct Runway Plan-1 Consturct new runway 14/32 (75'X 3300') with RSA (ST RW CO)
$4,680,000 $0 $4,680,000
2/24/2009 Construct Access Road construct access road (OT GT AC)
$200,000 $0 $200,000
2/24/2009 Construct Snow Removal Equipment Building construct snow removal building (ST BD SN)
$1,000,000 $0 $1,000,000
2/24/2009 Construct Taxiway construct taxiway A & B (ST TW CO) $750,000 $0 $750,000
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 14/32 Various Surface Preservation Maintenance (Platinum) (RE RW IM)
$10,500 $0 $10,500
$8,673,370 $0 $8,673,370
Point Baker Point Baker (KPB)
3-02-0423-001-1994 6/27/1994 9/25/1997 Acquire Land for Development (ST LA DV) $18,750 $0 $18,750
6/27/1994 9/25/1997 Construct Apron (ST AP CO) $546,068 $13,614 $559,682
$564,818 $13,614 $578,432
Point Hope Point Hope (PHO)
3-02-0226-001-1991 9/24/1991 11/30/1993 Install Runway Lighting (ST RW LI) $370,000 $10,064 $380,064
3-02-0226-002-1992 9/24/1992 10/24/1998 Acquire Land for Development (ST LA DV) $105,007 $0 $105,007
9/24/1992 10/24/1998 Rehabilitate Taxiway (RE TW IM) $69,913 $0 $69,913
9/24/1992 10/24/1998 Extend Runway 01/19 (ST RW IM) $1,520,214 $0 $1,520,214
9/24/1992 10/24/1998 Expand Apron (ST AP IM) $530,052 $0 $530,052
3-02-0226-003-2000 9/6/2000 8/25/2004 Improve Snow Removal Equipment Building (ST BD SN)
$910,977 $0 $910,977
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)
$87,248 $0 $87,248
$3,593,411 $10,064 $3,603,475
Point Lay Point Lay LRRS (PIZ)
3-02-0387-001-1984 9/26/1984 5/19/1988 Construct Taxiway 05/23 (ST TW CO) $226,542 $0 $226,542
3-02-0387-002-1997 9/26/1997 9/25/2001 Conduct Airport Master Plan Study (PL PL MA) $108,029 $0 $108,029
3-02-0387-003-2006 9/1/2006 4/30/2010 Expand Apron (ST AP IM) $1,821,757 $0 $1,821,757
9/1/2006 4/30/2010 Extend Runway 05/23 (ST RW IM) $3,828,243 $689,350 $4,517,593
3-02-0387-004-2007 6/5/2007 10/12/2012 Extend Runway 05/23 (ST RW IM) $560,000 $4,889,213 $5,449,213
3-02-0200-070-2009 8/24/2009 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $200,000 $200,000
Monday, January 11, 2016 Page 92 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0387-005-2009 Construct Snow Removal Equipment Building Construct 9/17/2009 11/5/2014 $1,035,844 $0 $1,035,844 Snow Removal Equipment Building (1 Bay in joint facility) (ST BD SN)
3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)
3-02-0387-006-2014 Acquire Snow Removal Equipment Acquire SRE (Motor 9/18/2014 $855,223 $0 $855,223 Grader, Snow Blower) (ST EQ SN)
$8,485,638 $5,778,563 $14,264,201
Port Alsworth Port Alsworth Proposed (+074)
3-02-0418-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/26/1990 8/11/1993 $98,423 $0 $98,423
3-02-0418-002-2004 Update Airport Master Plan Study Phase 1 (PL PL MA) 8/19/2004 3/12/2007 $93,932 $0 $93,932
3-02-0418-003-2005 Conduct Airport Master Plan Study (PL PL MA) 8/11/2005 5/21/2010 $258,120 $0 $258,120
3-02-0418-004-2007 Conduct Airport Master Plan Study Phase 3 (PL PL MA) 8/17/2007 5/20/2013 $425,784 $0 $425,784
$876,259 $0 $876,259
Port Graham Nanwalek / Port Graham Regional (Proposed GA) (+08L)
3-02-0479-001-2006 Conduct Airport Master Plan Study (PL PL MA) 9/5/2006 3/7/2012 $490,798 $0 $490,798
3-02-0479-002-2009 Conduct Airport Master Plan Study (PL PL MA) 8/20/2009 $601,318 $0 $601,318
3-02-0479-003-2011 Conduct Miscellaneous Study (PL PL MS) 9/14/2011 $948,563 $0 $948,563
$2,040,679 $0 $2,040,679
Port Graham (PGM)
3-02-0233-001-1995 Conduct Airport Master Plan Study (PL PL MA) 9/12/1995 6/12/2000 $173,023 $0 $173,023
3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $239,967 $0 $239,967 (Motor Grader) (ST EQ SN)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 8/30/2005 6/9/2010 $22,500 $0 $22,500 (RE RW IM)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/30/2006 2/27/2012 $6,327 $0 $6,327 (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 5/31/2007 8/6/2013 $133,000 $0 $133,000 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/19/2008 6/10/2014 $7,200 $0 $7,200 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $159,600 $0 $159,600 Surface Maintenance) (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 12/30 Port Graham 3/12/2010 12/9/2015 $21,280 $0 $21,280 Various Surface Maintenance (RE RW IM)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 12/30 Various 9/19/2012 $89,250 $0 $89,250 Surface Preservation Maintenance (Port Graham) (RE RW IM)
$852,147 $0 $852,147
Port Heiden Port Heiden (PTH)
3-02-0234-001-1986 Install Runway Lighting (ST RW LI) 7/24/1986 5/23/1990 $315,581 $0 $315,581
Rehabilitate Taxiway (RE TW IM) 7/24/1986 5/23/1990 $84,975 $0 $84,975
Rehabilitate Apron (RE AP IM) 7/24/1986 5/23/1990 $41,691 $0 $41,691
Monday, January 11, 2016 Page 93 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0234-001-1986 Rehabilitate Runway 5/23 (RE RW IM) 7/24/1986 5/23/1990 $1,245,709 $23,343 $1,269,052
3-02-0234-002-1991 Improve Aircraft Rescue & Fire Fighting Building (SA 9/24/1991 7/14/2000 $690,923 $17,403 $708,326 BD EX)
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/24/1991 7/14/2000 $209,077 $161,258 $370,335 EQ RF)
3-02-0234-003-1992 Acquire Security Equipment (SA EQ SE) 9/23/1992 11/28/1994 $97,655 $0 $97,655
3-02-0234-004-2003 Construct Runway Safety Area 5/23 13/31 (ST RW SF) 6/4/2003 9/12/2007 $2,065,250 $0 $2,065,250
Rehabilitate Runway 5/23 13/31 (RE RW IM) 6/4/2003 9/12/2007 $2,199,087 $0 $2,199,087
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $163,358 $0 $163,358 (Snow Blower Attachment for Loader) (ST EQ SN)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) 6/30/2006 2/27/2012 $58,208 $0 $58,208 (RE RW IM)
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $360,000 $0 $360,000 Acquire Various SRE: Port Heiden (Grader with attachments) (ST EQ SN)
$7,531,514 $202,004 $7,733,518
Port Lions Port Lions (ORI)
3-02-0235-001-1983 Rehabilitate Taxiway (RE TW IM) 7/21/1983 10/14/1987 $9,673 $0 $9,673
Rehabilitate Apron (RE AP IM) 7/21/1983 10/14/1987 $71,602 $0 $71,602
Rehabilitate Runway 6/24 (RE RW IM) 7/21/1983 10/14/1987 $453,157 $0 $453,157
Install Runway Lighting (ST RW LI) 7/21/1983 10/14/1987 $406,895 $0 $406,895
Improve Airport Drainage (ST OT IM) 7/21/1983 10/14/1987 $109,058 $0 $109,058
3-02-0235-002-2002 Conduct Airport Master Plan Study Phase 1 (PL PL MA) 5/13/2002 5/17/2005 $84,573 $0 $84,573
3-02-0235-003-2003 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 8/22/2003 7/27/2007 $282,659 $0 $282,659
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 6/30/2006 2/27/2012 $73,810 $0 $73,810 (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 5/31/2007 8/6/2013 $63,840 $0 $63,840 (RE RW IM)
3-02-0235-004-2011 Rehabilitate Runway Lighting 07/25 Regulator Bldg (RE 3/17/2011 1/20/2015 $186,043 $0 $186,043 RW LI)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 07/25 Various 9/19/2012 $89,250 $0 $89,250 Surface Preservation Maintenance (Port Lions) (RE RW IM)
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $21,000 $0 $21,000 Obstruction Removal (Port Lions) (SA OT OB)
$1,891,559 $0 $1,891,559
Portage Creek Portage Creek (A14)
3-02-0348-001-1984 Rehabilitate Apron (RE AP IM) 9/24/1984 4/12/1988 $25,828 $0 $25,828
Remove Obstructions (SA OT OB) 9/24/1984 4/12/1988 $100,078 $0 $100,078
Rehabilitate Runway 1/19 (RE RW IM) 9/24/1984 4/12/1988 $243,781 $0 $243,781
Rehabilitate Taxiway (RE TW IM) 9/24/1984 4/12/1988 $10,969 $0 $10,969
Construct Runway 9/27 (ST RW CO) 9/24/1984 4/12/1988 $928,682 $0 $928,682
Acquire Snow Removal Equipment (ST EQ SN) 9/24/1984 4/12/1988 $88,078 $0 $88,078
Improve Snow Removal Equipment Building (ST BD 9/24/1984 4/12/1988 $27,141 $0 $27,141 SN)
Monday, January 11, 2016 Page 94 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
$1,424,557 $0 $1,424,557
Quinhagak Quinhagak (AQH)
3-02-0242-001-1994 Conduct Airport Master Plan Study (PL PL MA) 9/27/1994 8/1/2000 $277,017 $0 $277,017
3-02-0242-002-1999 Construct New Airport (ST NA CO) 3/24/1999 9/25/2002 $463,085 $0 $463,085
3-02-0242-003-1999 Construct New Airport (ST NA CO) 9/30/1999 9/12/2003 $4,319,268 $640,949 $4,960,217
3-02-0242-004-2002 Construct New Airport Phase 3 (ST NA CO) 6/20/2002 5/31/2006 $1,912,707 $6,821 $1,919,528
Construct Snow Removal Equipment Building (ST BD 6/20/2002 5/31/2006 $420,000 $0 $420,000 SN)
3-02-0242-005-2004 Construct New Airport (ST NA CO) 6/11/2004 9/19/2008 $2,319,896 $0 $2,319,896
Construct Terminal Building (ST TE CO) 6/11/2004 9/19/2008 $50,000 $0 $50,000
Acquire Snow Removal Equipment (Grader & Loader) 6/11/2004 9/19/2008 $525,000 $0 $525,000 (ST EQ SN)
$10,286,973 $647,770 $10,934,743
Rampart Rampart (RMP)
3-02-0244-001-1988 Install Miscellaneous NAVAIDS (ST OT IN) 7/11/1988 11/5/1991 $8,099 $0 $8,099
Install Apron Lighting (ST AP LI) 7/11/1988 11/5/1991 $5,940 $0 $5,940
Construct Apron (ST AP CO) 7/11/1988 11/5/1991 $118,653 $0 $118,653
Construct Taxiway (ST TW CO) 7/11/1988 11/5/1991 $40,334 $0 $40,334
Extend Runway 11/29 (ST RW IM) 7/11/1988 11/5/1991 $1,054,682 $0 $1,054,682
Acquire Land for Development (ST LA DV) 7/11/1988 11/5/1991 $52,500 $0 $52,500
Install Runway Lighting (ST RW LI) 7/11/1988 11/5/1991 $175,267 $0 $175,267
3-02-0244-002-1990 Conduct Airport Master Plan Study (PL PL MA) 1/25/1990 2/12/1992 $122,643 $0 $122,643
3-02-0244-003-2001 Improve Snow Removal Equipment Building (ST BD 2/15/2001 7/28/2005 $50,000 $0 $50,000 SN)
Rehabilitate Runway (RE RW IM) 2/15/2001 7/28/2005 $2,778,578 $0 $2,778,578
Expand Apron (ST AP IM) 2/15/2001 7/28/2005 $150,000 $0 $150,000
$4,556,696 $0 $4,556,696
Red Devil Red Devil (RDV)
3-02-0246-001-2005 Remove Obstructions (SA OT OB) 4/27/2005 5/4/2010 $473,000 $0 $473,000
Construct Snow Removal Equipment Building (ST BD 4/27/2005 5/4/2010 $1,903,687 $0 $1,903,687 SN)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,580 $0 $242,580 (Loader w/ Bucket) (ST EQ SN)
$2,619,267 $0 $2,619,267
Ruby Ruby (RBY)
3-02-0248-001-1992 Install Runway Lighting (ST RW LI) 9/24/1992 7/14/1999 $158,928 $0 $158,928
Expand Apron (ST AP IM) 9/24/1992 7/14/1999 $281,699 $0 $281,699
Rehabilitate Taxiway (RE TW IM) 9/24/1992 7/14/1999 $9,169 $0 $9,169
Extend Runway 03/31 (ST RW IM) 9/24/1992 7/14/1999 $1,371,637 $0 $1,371,637
Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 7/14/1999 $150,000 $0 $150,000
Monday, January 11, 2016 Page 95 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Northern Region): Ruby (Loader and Grader) (ST EQ SN)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 03/21 Surface Preservation Maintenance (Ruby)) (RE RW IM)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
6/8/2011
9/18/2013
9/22/2014
11/12/2014 $722,000
$208,933
$46,406
$2,948,772
$0
$0
$0
$0
$722,000
$208,933
$46,406
$2,948,772
Russian Mission Russian Mission (RSH)
3-02-0249-001-2000 Improve Snow Removal Equipment Building (ST BD SN)
Construct Runway 17/35 (ST RW CO)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 17/35 (Various Surface Maintenance) (RE RW IM)
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Russian Mission (Dozer) (ST EQ SN)
9/6/2000
9/6/2000
8/20/2009
9/11/2012
8/27/2004 $350,000
8/27/2004 $5,026,516
12/19/2014 $196,840
$370,108
$5,943,464
$0
$0
$0
$0
$0
$350,000
$5,026,516
$196,840
$370,108
$5,943,464
Saint Paul Island St Paul Island (SNP)
3-02-0277-001-1990 Acquire Land for Development (ST LA DV)
3-02-0277-002-1990 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
3-02-0277-003-1992 Acquire Security Equipment (SA EQ SE)
3-02-0277-004-1994 Rehabilitate Apron (RE AP IM)
Install Runway Lighting (SA RW LI)
Rehabilitate Taxiway (RE TW IM)
Install Instrument Approach Aid 18/36 (ST RW IN)
Construct Taxiway (ST TW CO)
Improve Access Road (OT GT AC)
Improve Runway Safety Area 18/36 (SA RW SF)
9/17/1990
9/24/1990
9/24/1990
9/23/1992
9/27/1994
9/27/1994
9/27/1994
9/27/1994
9/27/1994
9/27/1994
9/27/1994
7/11/2000
7/17/2000
7/17/2000
11/28/1994
6/8/2000
6/8/2000
6/8/2000
6/8/2000
6/8/2000
6/8/2000
6/8/2000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$937,379
$708,396
$314,063
$126,350
$700,000
$569,157
$59,335
$1,557,827
$104,325
$304,858
$5,184,485
$10,566,175
$937,379
$708,396
$314,063
$126,350
$700,000
$569,157
$59,335
$1,557,827
$104,325
$304,858
$5,184,485
$10,566,175
Sand Point Sand Point (SDP)
3-02-0253-001-1986 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
3-02-0253-002-1990 Remove Obstructions (ST OT OB)
3-02-0253-003-1991 Extend Runway 13/31 (ST RW IM)
3-02-0253-004-1992 Construct Taxiway (ST TW CO)
Install Runway Lighting (ST RW LI)
Construct Apron (ST AP CO)
Construct Runway 15/33 (ST RW CO)
4/22/1986
4/22/1986
9/24/1990
9/24/1991
9/22/1992
9/22/1992
9/22/1992
9/22/1992
1/15/1991
1/15/1991
1/6/1993
12/6/1994
9/25/1997
9/25/1997
9/25/1997
9/25/1997
$158,182
$238,655
$0
$473,804
$0
$0
$0
$157,934
$0
$0
$2,459,872
$2,807,887
$225,000
$300,000
$935,000
$3,439,123
$158,182
$238,655
$2,459,872
$3,281,691
$225,000
$300,000
$935,000
$3,597,057
Monday, January 11, 2016 Page 96 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0253-004-1992 Improve Access Road (OT GT AC) 9/22/1992 9/25/1997 $0 $81,800 $81,800
Acquire Snow Removal Equipment (ST EQ SN) 9/22/1992 9/25/1997 $0 $130,000 $130,000
3-02-0253-005-1994 Acquire Miscellaneous Land (ST LA MS) 9/27/1994 6/7/2000 $542,314 $0 $542,314
3-02-0253-006-2000 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/10/2000 6/30/2003 $321,862 $46,138 $368,000 EQ RF)
3-02-0253-007-2001 Improve Aircraft Rescue & Fire Fighting Building (SA 9/25/2001 8/25/2005 $2,445,564 $0 $2,445,564 BD EX)
3-02-0253-008-2002 Improve Runway Safety Area (Phase 1) (ST RW SF) 9/19/2002 9/1/2006 $1,900,000 $2,158,000 $4,058,000
Rehabilitate Apron (RE AP IM) 9/19/2002 9/1/2006 $50,000 $219,438 $269,438
Rehabilitate Access Road (OT GT AC) 9/19/2002 9/1/2006 $200,000 $0 $200,000
3-02-0253-009-2004 Extend Runway Safety Area 13 / 31 (SA RW SF) 7/19/2004 8/8/2014 $0 $8,690,158 $8,690,158
3-02-0253-010-2005 Extend Runway Safety Area 13/31 (Phase 3) (ST RW 8/25/2005 6/11/2010 $1,560,371 $5,000,000 $6,560,371 SF)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $237,738 $0 $237,738 (Broom Attachment for Loader) (ST EQ SN)
3-02-0253-011-2007 Conduct Airport Master Plan Study (Terminal Study) 6/18/2007 8/8/2008 $164,693 $0 $164,693 (Work is contingency for 2007) (PL PL MA)
3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $420,000 $0 $420,000 Acquire Various SRE: Sand Point (Grader with attachments, and U-Blade and Fork) (ST EQ SN)
3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $400,000 $0 $400,000 approach (PL PL VI)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 13/31 Surface 9/18/2013 $423,700 $0 $423,700 Preservation Maintenance (Sand Point) (RE RW IM)
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $199,663 $0 $199,663 (+08J) Acquire SRE: Sant Point - Blower (ST EQ SN)
$9,894,481 $26,492,416 $36,386,897
Savoonga Savoonga (SVA)
3-02-0254-001-1983 Acquire Snow Removal Equipment 5/23 (ST EQ SN) 8/23/1983 1/16/1986 $87,816 $0 $87,816
3-02-0254-002-1986 Improve Building (ST BD MS) 9/23/1986 2/25/1991 $92,630 $0 $92,630
Install Runway Lighting (SA RW LI) 9/23/1986 2/25/1991 $57,292 $0 $57,292
Construct Taxiway (ST TW CO) 9/23/1986 2/25/1991 $233,819 $0 $233,819
Install Apron Lighting (ST AP LI) 9/23/1986 2/25/1991 $12,739 $0 $12,739
Install Apron Lighting (ST AP LI) 9/23/1986 2/25/1991 $39,940 $0 $39,940
Construct Apron (ST AP CO) 9/23/1986 2/25/1991 $232,066 $0 $232,066
3-02-0254-003-1994 Construct Apron (ST AP CO) 6/28/1994 7/14/1999 $0 $1,371,300 $1,371,300
Improve Access Road (OT GT AC) 6/28/1994 7/14/1999 $0 $80,584 $80,584
Rehabilitate Taxiway (RE TW IM) 6/28/1994 7/14/1999 $0 $463,162 $463,162
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $223,440 $0 $223,440 (RE RW IM)
3-02-0254-004-2008 Rehabilitate Runway 05/23 (RE RW IM) 6/23/2008 3/7/2013 $0 $8,603,517 $8,603,517
Expand Apron (ST AP IM) 6/23/2008 3/7/2013 $600,648 $0 $600,648
Construct Taxiway (ST TW CO) 6/23/2008 3/7/2013 $1,500,000 $0 $1,500,000
Rehabilitate Access Road Rehabilitate primary access 6/23/2008 3/7/2013 $596,916 $0 $596,916 road (OT GT AC)
Rehabilitate Apron (RE AP IM) 6/23/2008 3/7/2013 $720,422 $0 $720,422
3-02-0254-005-2009 Rehabilitate Runway Lighting 05/23 (RE RW LI) 2/11/2009 9/2/2014 $500,000 $0 $500,000
Rehabilitate Runway 05/23 phase 2 (RE RW IM) 2/11/2009 9/2/2014 $331,941 $3,272,474 $3,604,415
Monday, January 11, 2016 Page 97 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0000-013-2010 Conduct aeronautical survey for WAAS approach (PL 3/30/2010 $0 $250,000 $250,000 PL VI)
3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $742,288 $0 $742,288 Acquire Various SRE (Northern Region): Savoonga (Dozer and Loader with Snow, bucket, forks and blade) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 05/23 Accomplish 9/21/2015 $230,596 $0 $230,596 Various Airport Surface Preservation Maintenance (Savoonga Compaction and Dust Control) (RE RW IM)
$6,202,553 $14,041,037 $20,243,590
Scammon Bay Scammon Bay (SCM)
3-02-0255-001-1991 Acquire Land for Development (ST LA DV) 8/20/1991 6/21/1993 $77,011 $0 $77,011
Improve Snow Removal Equipment Building (ST BD 8/20/1991 6/21/1993 $77,011 $0 $77,011 SN)
Construct Taxiway (ST TW CO) 8/20/1991 6/21/1993 $24,567 $0 $24,567
Install Runway Lighting (ST RW LI) 8/20/1991 6/21/1993 $100,077 $0 $100,077
Rehabilitate Runway 10/28 (RE RW IM) 8/20/1991 6/21/1993 $1,323,145 $0 $1,323,145
Acquire Snow Removal Equipment (ST EQ SN) 8/20/1991 6/21/1993 $104,421 $0 $104,421
Construct Apron (ST AP CO) 8/20/1991 6/21/1993 $122,136 $0 $122,136
3-02-0255-002-2003 Construct Snow Removal Equipment Building (ST BD 8/4/2003 8/17/2007 $753,265 $0 $753,265 SN)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) 5/31/2007 8/6/2013 $211,736 $0 $211,736 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 10/28 (Various 8/20/2009 12/19/2014 $532,000 $0 $532,000 Surface Maintenance) (RE RW IM)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 10/28 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Scammon Bay) (RE RW IM)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Scammon Bay Grader) (ST EQ SN)
$3,701,107 $0 $3,701,107
Selawik Selawik (WLK)
3-02-0256-001-1988 Acquire Land for Development (ST LA DV) 9/15/1988 12/1/1998 $469,688 $0 $469,688
Extend Runway 9/27 (ST RW IM) 9/15/1988 12/1/1998 $1,649,188 $86,239 $1,735,427
Construct Apron (ST AP CO) 9/15/1988 12/1/1998 $370,880 $0 $370,880
Extend Runway 9/27 (ST RW IM) 9/15/1988 12/1/1998 $159,432 $0 $159,432
3-02-0256-002-1990 Rehabilitate Taxiway (RE TW IM) 9/21/1990 12/1/1998 $20,419 $0 $20,419
Expand Apron (ST AP IM) 9/21/1990 12/1/1998 $392,288 $0 $392,288
Improve Aircraft Rescue & Fire Fighting Building (SA 9/21/1990 12/1/1998 $160,500 $0 $160,500 BD EX)
Acquire Aircraft Rescue & Fire Fighting Safety 9/21/1990 12/1/1998 $97,500 $0 $97,500 Equipment (ST EQ MS)
Construct Runway 3/21 (ST RW CO) 9/21/1990 12/1/1998 $3,989,283 $3,603 $3,992,886
3-02-0256-003-1998 Improve Runway Safety Area 03-21 (SA RW SF) 12/17/1997 9/25/2002 $1,062,202 $0 $1,062,202
Install Runway Vertical/Visual Guidance System (ST 12/17/1997 9/25/2002 $1,196 $127,443 $128,639 RW VI)
Install Runway Lighting 03-21 (ST RW LI) 12/17/1997 9/25/2002 $165,000 $0 $165,000
Monday, January 11, 2016 Page 98 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0256-003-1998 Rehabilitate Apron 9-27 (RE AP IM) 12/17/1997 9/25/2002 $46,875 $0 $46,875
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 09/27 Various Surface Preservation (RE RW IM)
9/16/2011 $246,245 $0 $246,245
$8,830,696 $217,285 $9,047,981
Seldovia Seldovia (SOV)
3-02-0258-001-1985 Construct Apron (CA AP CO) 9/9/1985 8/25/1989 $393,166 $0 $393,166
Rehabilitate Runway 16/34 (RE RW IM) 9/9/1985 8/25/1989 $165,042 $0 $165,042
Rehabilitate Apron (RE AP IM)
Improve Access Road (CA GT AC)
9/9/1985
9/9/1985
8/25/1989
8/25/1989
$27,000
$74,600
$0
$0
$27,000
$74,600
Rehabilitate Apron (RE AP IM) 9/9/1985 8/25/1989 $79,175 $0 $79,175
Construct Taxiway (CA TW CO) 9/9/1985 8/25/1989 $70,000 $0 $70,000
3-02-0258-002-2001 Conduct Airport Master Plan Study (PL PL MA) 3/21/2001 6/8/2005 $77,649 $0 $77,649
3-02-0258-003-2002 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/4/2002 8/16/2006 $286,376 $0 $286,376
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Snow Blower) (ST EQ SN)
8/30/2005
8/17/2006
6/9/2010
7/19/2013
$12,500
$136,153
$0
$0
$12,500
$136,153
[Various Grnt] Acquire Snow Removal Equipment (Loader w 4/CY Bucket & Plow) (ST EQ SN)
8/17/2006 7/19/2013 $183,074 $0 $183,074
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
6/30/2006 2/27/2012 $6,327 $0 $6,327
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)
5/31/2007 8/6/2013 $63,840 $0 $63,840
3-02-0258-004-2009 Construct Snow Removal Equipment Building (ST BD SN)
8/20/2009 5/12/2015 $3,375,817 $58,568 $3,434,385
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 16/34 Seldovia Various Surface Maintenance (RE RW IM)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)
3/12/2010
9/16/2011
12/9/2015 $69,160
$74,480
$0
$0
$69,160
$74,480
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) Various Surface Preservation Maintenance: Seldovia - Drainage, Maintain and Repair (RE RW IM)
9/19/2014 $31,500 $0 $31,500
3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Seldovia Segmented Circle (SP OT IN)
9/20/2015 $131,000 $0 $131,000
$5,256,859 $58,568 $5,315,427
Seward Seward (SWD)
3-02-0259-001-1983 Improve Snow Removal Equipment Building (ST BD SN)
7/27/1983 1/17/1986 $55,530 $0 $55,530
Rehabilitate Apron (RE AP IM) 7/27/1983 1/17/1986 $88,497 $0 $88,497
Rehabilitate Taxiway (RE TW IM) 7/27/1983 1/17/1986 $78,114 $0 $78,114
Rehabilitate Runway 15/33 (RE RW IM) 7/27/1983 1/17/1986 $121,938 $0 $121,938
Rehabilitate Runway 12/30 (RE RW IM) 7/27/1983 1/17/1986 $628,854 $0 $628,854
3-02-0259-002-1991 Improve Access Road (CA GT AC) 9/20/1991 12/20/1993 $354,000 $0 $354,000
Acquire Land for Development (ST LA DV) 9/20/1991 12/20/1993 $208,700 $0 $208,700
Construct Apron (CA AP CO) 9/20/1991 12/20/1993 $655,000 $125,122 $780,122
Construct Taxiway (CA TW CO)
3-02-0259-003-1995 Improve Airport Drainage (ST OT IM)
9/20/1991
9/18/1995
12/20/1993
10/24/1998
$37,596
$658,816
$0
$0
$37,596
$658,816
Monday, January 11, 2016 Page 99 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0259-004-2003 Conduct Airport Master Plan Study (PL PL MA) 8/21/2003 2/14/2007 $86,859 $0 $86,859
3-02-0259-005-2004 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 8/25/2004 9/2/2008 $362,539 $0 $362,539
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)
[Various Grnt] Rehabilitate Runway 15/33 (Maintenance) 8/30/2005 6/9/2010 $50,000 $0 $50,000 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/19/2008 6/10/2014 $275,600 $0 $275,600 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $53,058 $0 $53,058 Surface Maintenance) (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 13/31 Seward 3/12/2010 12/9/2015 $90,440 $0 $90,440 Various Surface Maintenance (RE RW IM)
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $327,039 $0 $327,039 Acquire SRE (Central Region): Seward (Grader with Attachments) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 13/31 Various 9/19/2012 $136,500 $0 $136,500 Surface Preservation Maintenance (Seward) (RE RW IM)
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $21,000 $0 $21,000 Obstruction Removal (Seward) (SA OT OB)
3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $392,750 $0 $392,750 approach (PL PL VI)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 13/31 Surface 9/18/2013 $388,500 $0 $388,500 Preservation Maintenance (Seward) (RE RW IM)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $47,250 $0 $47,250 Various Airport Surface Preservation Maintenance (Seward Crack Seal RWYs TWYs and Aprons) (RE RW IM)
[Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $4,620 $0 $4,620 Various Airport Surface Preservation Maintenance (Seward Rehab Threshold Marking) (RE RW IM)
$5,163,200 $125,122 $5,288,322
Shageluk Shageluk (SHX)
3-02-0370-001-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1994 9/9/1997 $138,376 $0 $138,376
3-02-0370-002-2000 Improve Snow Removal Equipment Building (ST BD 9/14/2000 8/23/2004 $500,000 $0 $500,000 SN)
Extend Runway 16-34 (ST RW IM) 9/14/2000 8/23/2004 $4,430,911 $251,449 $4,682,360
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/30/2006 2/27/2012 $21,090 $0 $21,090 (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $25,852 $0 $25,852 Obstructions (Various - Shageluk) (SA OT OB)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 16/34 Variuos 9/19/2012 $180,961 $0 $180,961 Surface Preservation Maintenance (Shageluk) (RE RW IM)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Shungnak Grader) (ST EQ SN)
$5,662,428 $251,449 $5,913,877
Shaktoolik Shaktoolik (2C7)
3-02-0401-001-1998 Construct New Airport (ST NA CO) 9/10/1998 9/10/2003 $3,213,704 $0 $3,213,704
Monday, January 11, 2016 Page 100 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0401-001-1998 Improve Snow Removal Equipment Building (ST BD 9/10/1998 9/10/2003 $350,000 $0 $350,000 SN)
$3,563,704 $0 $3,563,704
Sheldon Point Sheldon Point (SXP)
3-02-0262-001-1993 Rehabilitate Taxiway (RE TW IM) 9/9/1993 7/14/1999 $30,000 $0 $30,000
Construct Apron (ST AP CO) 9/9/1993 7/14/1999 $220,000 $0 $220,000
Acquire Snow Removal Equipment (ST EQ SN) 9/9/1993 7/14/1999 $130,000 $0 $130,000
Acquire Land for Development (ST LA DV) 9/9/1993 7/14/1999 $360,000 $0 $360,000
Extend Runway RW 2/20 (ST RW IM) 9/9/1993 7/14/1999 $80,000 $0 $80,000
Improve Snow Removal Equipment Building (ST BD 9/9/1993 7/14/1999 $115,000 $0 $115,000 SN)
Improve Runway Safety Area RW 2/20 (ST RW SF) 9/9/1993 7/14/1999 $1,350,573 $209,085 $1,559,658
Improve Access Road (OT GT AC) 9/9/1993 7/14/1999 $250,000 $0 $250,000
3-02-0262-002-1994 Improve Snow Removal Equipment Building (ST BD 6/29/1994 1/5/1999 $429,296 $15,830 $445,126 SN)
Acquire Snow Removal Equipment (ST EQ SN) 6/29/1994 1/5/1999 $75,000 $0 $75,000
3-02-0262-003-1999 Construct Taxiway (ST TW CO) 3/22/1999 9/26/2002 $250,000 $0 $250,000
Extend Runway 2-20 (ST RW IM) 3/22/1999 9/26/2002 $1,342,559 $247,105 $1,589,664
Construct Apron (ST AP CO) 3/22/1999 9/26/2002 $415,000 $0 $415,000
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $150,000 $0 $150,000 (RE RW IM)
$5,197,428 $472,020 $5,669,448
Shishmaref Shishmaref (SHH)
3-02-0404-001-1984 Construct Runway 15/33 (ST RW CO) 7/27/1984 7/20/1992 $2,855,796 $417,104 $3,272,900
Acquire Land for Development (ST LA DV) 7/27/1984 7/20/1992 $123,665 $0 $123,665
Construct Taxiway (ST TW CO) 7/27/1984 7/20/1992 $191,764 $0 $191,764
Improve Access Road (OT GT AC) 7/27/1984 7/20/1992 $187,764 $0 $187,764
Construct Apron (ST AP CO) 7/27/1984 7/20/1992 $899,897 $0 $899,897
3-02-0404-002-1991 Improve Snow Removal Equipment Building (ST BD 9/10/1991 2/26/1996 $249,915 $0 $249,915 SN)
Acquire Snow Removal Equipment (ST EQ SN) 9/10/1991 2/26/1996 $145,349 $0 $145,349
3-02-0404-003-1992 Improve Access Road (OT GT AC) 9/24/1992 1/25/2000 $69,223 $0 $69,223
Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 1/25/2000 $52,636 $0 $52,636
Extend Runway 5/23 (ST RW IM) 9/24/1992 1/25/2000 $835,501 $0 $835,501
Expand Apron (ST AP IM) 9/24/1992 1/25/2000 $401,155 $0 $401,155
Rehabilitate Taxiway (RE TW IM) 9/24/1992 1/25/2000 $13,037 $0 $13,037
3-02-0404-004-1998 Improve Snow Removal Equipment Building (ST BD 8/12/1998 7/20/2000 $335,000 $42,335 $377,335 SN)
3-02-0404-005-2006 Conduct Airport Master Plan Study Phase 1 (PL PL MA) 8/30/2006 2/27/2012 $121,634 $0 $121,634
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $74,480 $0 $74,480 (RE RW IM)
3-02-0404-006-2008 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/8/2008 3/7/2013 $201,992 $0 $201,992
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 05/23 Shishmaref 3/12/2010 12/9/2015 $133,000 $0 $133,000 Various Surface Maintenance (RE RW IM)
Monday, January 11, 2016 Page 101 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Northern Region): Shishmaref (Loader) (ST EQ SN)
6/8/2011 11/12/2014 $389,500 $0 $389,500
3-02-0404-007-2015 Rehabilitate Runway 05/23 (RE RW IM) 9/14/2015 $1,150,000 $4,200,000 $5,350,000
Rehabilitate Taxiway Rehabilitate Taxiway (RE TW IM) 9/14/2015 $150,000 $0 $150,000
Rehabilitate Apron Rehabilitate Apron (RE AP IM) 9/14/2015 $253,301 $1,000,000 $1,253,301
Rehabilitate Runway Lighting 05/23 (RE RW LI) 9/14/2015 $1,000,000
$9,834,609
$0
$5,659,439
$1,000,000
$15,494,048
Shungnak Shungnak (SHG)
3-02-0265-001-1996 Expand Apron (CA AP EX) 9/25/1996 9/21/2000 $174,957 $0 $174,957
Extend Taxiway (ST TW IM) 9/25/1996 9/21/2000 $145,798 $0 $145,798
Install Runway Lighting (ST RW LI) 9/25/1996 9/21/2000 $170,364 $0 $170,364
Extend Runway 9/27 (ST RW IM) 9/25/1996 9/21/2000 $1,632,935 $0 $1,632,935
Install Apron Lighting (ST AP LI) 9/25/1996 9/21/2000 $82,912 $0 $82,912
Improve Access Road (OT GT AC)
Improve Snow Removal Equipment Building (ST BD SN)
9/25/1996
9/25/1996
9/21/2000
9/21/2000
$87,479
$414,158
$0
$0
$87,479
$414,158
3-02-0265-002-1998 Acquire Land For Approaches (ST LA SZ) 7/20/1998 1/30/2001 $101,170 $0 $101,170
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)
8/30/2005 6/9/2010 $140,000 $0 $140,000
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)
5/31/2007 8/6/2013 $196,840 $0 $196,840
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 09/27 (Various Surface Maintenance) (RE RW IM)
8/20/2009 12/19/2014 $207,480 $0 $207,480
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Shungnak) (SA OT OB)
9/18/2013 $20,600 $0 $20,600
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
9/22/2014 $79,406
$3,454,099
$0
$0
$79,406
$3,454,099
Sitka Sitka (A29)
3-02-0267-001-2010 Update Miscellaneous Study Update Site study SPB (PL PL MS)
7/20/2010 $300,000
$300,000
$0
$0
$300,000
$300,000
Sitka Rocky Gutierrez (SIT)
3-02-0268-001-1983 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
9/21/1983 4/17/1986 $509,594 $0 $509,594
Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
9/21/1983 4/17/1986 $0 $504,228 $504,228
3-02-0268-002-1988 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
9/14/1988 3/24/1992 $0 $220,589 $220,589
Rehabilitate Runway 11/29 (RE RW IM) 9/14/1988 3/24/1992 $0 $1,363,329 $1,363,329
Extend Runway 11/29 (ST RW IM) 9/14/1988 3/24/1992 $0 $30,971 $30,971
3-02-0268-003-1993 Acquire Snow Removal Equipment (ST EQ SN) 7/29/1993 11/27/1995 $364,316 $0 $364,316
3-02-0268-004-1994 Rehabilitate Taxiway Lighting (RE TW LI) 6/27/1994 7/19/2000 $325,000 $0 $325,000
Rehabilitate Runway Lighting (RE RW LI) 6/27/1994 7/19/2000 $1,280,727 $0 $1,280,727
3-02-0268-005-1995 Acquire Snow Removal Equipment (ST EQ SN) 9/12/1995 8/15/2000 $500,000 $0 $500,000
Monday, January 11, 2016 Page 102 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0268-006-1998 Conduct Airport Master Plan Study (PL PL MA) 6/30/1998 9/12/2002 $217,975 $0 $217,975
3-02-0268-007-1999 Rehabilitate Apron (RE AP IM) 9/29/1999 8/26/2005 $0 $2,484,938 $2,484,938
3-02-0268-008-2000 Improve Runway Safety Area (SA RW SF) 9/7/2000 8/26/2005 $1,180,247 $0 $1,180,247
Rehabilitate Apron (RE AP IM) 9/7/2000 8/26/2005 $1,557,480 $0 $1,557,480
3-02-0268-009-2000 Construct Taxiway (ST TW CO) 9/7/2000 9/2/2005 $1,717,922 $257,688 $1,975,610
3-02-0268-010-2000 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/7/2000 9/26/2002 $0 $556,653 $556,653 EQ RF)
3-02-0268-011-2001 Construct Taxiway (ST TW CO) 8/30/2001 9/2/2005 $2,003,551 $300,532 $2,304,083
3-02-0268-012-2001 Remove Obstructions (SA OT OB) 7/20/2001 9/24/2002 $21,672 $0 $21,672
3-02-0268-013-2001 Conduct Environmental Study (EN PL MA) 9/25/2001 7/18/2005 $468,617 $731,383 $1,200,000
3-02-0268-014-2002 Construct Snow Removal Equipment Building Construct 6/12/2002 9/5/2006 $1,979,625 $215,394 $2,195,019 Sand & Chemical Building (ST BD SN)
3-02-0268-015-2002 Acquire Land for Development (ST LA DV) 7/23/2002 8/28/2006 $5,014,424 $0 $5,014,424
Remove Obstructions (ST OT OB) 7/23/2002 8/28/2006 $2,040,000 $0 $2,040,000
3-02-0268-016-2003 Security Enhancements (SA EQ SE) 9/3/2003 7/2/2007 $0 $535,036 $535,036
3-02-0268-017-2004 Modify Terminal Building (ST TE IM) 6/3/2004 6/15/2007 $590,978 $0 $590,978
3-02-0268-018-2004 Update Airport Master Plan Study (Terminal Area Plan) 8/24/2004 3/12/2007 $242,002 $0 $242,002 (PL PL MA)
3-02-0268-019-2004 Conduct Environmental Study (EN PL MA) 8/27/2004 3/28/2008 $0 $1,000,000 $1,000,000
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $358,800 $0 $358,800 (RE RW IM)
3-02-0268-020-2005 Conduct Environmental Study (EN PL MA) 7/25/2005 4/30/2010 $0 $1,500,000 $1,500,000
3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $254,010 $0 $254,010 Acquire SRE: Towed Broom (ST EQ SN)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $138,142 $0 $138,142 (RE RW IM)
3-02-0268-021-2007 Rehabilitate Terminal Building Emergency generator 9/4/2007 8/12/2009 $25,000 $0 $25,000 design (ST TE IM)
Rehabilitate Terminal Building HVAC control rehab (ST 9/4/2007 8/12/2009 $160,000 $0 $160,000 TE IM)
Rehabilitate Terminal Building Air handling design (ST 9/4/2007 8/12/2009 $11,605 $0 $11,605 TE IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $56,678 $0 $56,678 (RE RW IM)
3-02-0268-022-2008 Conduct Miscellaneous Study (PL PL MS) 6/12/2008 3/4/2013 $0 $200,000 $200,000
3-02-0268-023-2008 Conduct Environmental Study EIS (EN PL MA) 6/16/2008 12/10/2015 $0 $719,212 $719,212
3-02-0268-024-2008 Rehabilitate Terminal Building Install air handling units 6/23/2008 5/16/2010 $404,563 $0 $404,563 and emergency engine generator (ST TE IM)
3-02-0200-067-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 1/7/2013 $150,000 $0 $150,000 Acquire SRE (SE Region): Mid-sized truck (ST EQ SN)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various 8/20/2009 12/19/2014 $90,440 $0 $90,440 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0268-025-2009 Rehabilitate Apron Sitka Slotted Drains (RE AP IM) 2/13/2009 4/4/2013 $346,032 $0 $346,032
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Sitka Various 3/12/2010 12/9/2015 $90,440 $0 $90,440 Surface Maintenance (RE RW IM)
3-02-0268-026-2010 Acquire Snow Removal Equipment Acquire SRE: Sitka 6/22/2010 1/7/2015 $1,068,571 $0 $1,068,571 (Self Propelled Blower, Truck with Plow and Sander) (ST EQ SN)
3-02-0268-027-2010 Construct Runway Safety Area 11/29 Phase 1 (SA RW 9/13/2010 $1,000,000 $28,957,716 $29,957,716 SF)
Monday, January 11, 2016 Page 103 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 11/29 Various 9/16/2011 $20,689 $0 $20,689 Surface Preservation (RE RW IM)
3-02-0268-028-2011 Rehabilitate Runway 11/29 Rehab Runway (RE RW IM) 9/16/2011 $1,000,000 $7,583,504 $8,583,504
3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $259,076 $0 $259,076 Acquire SRE (Alaska Region): Sitka (Dump Truck with Plow Blade) (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various 9/19/2012 $86,772 $0 $86,772 Surface Preservation Maintenance (Sitka) (RE RW IM)
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface 9/18/2013 $86,800 $0 $86,800 Preservation Maintenance (Sitka) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $631,618 $0 $631,618 Acquire SRE (Plow Truck and Loader) (ST EQ SN)
3-02-0268-029-2013 Rehabilitate Runway 11/29 Rehabilitate Runway Ph2 5/1/2013 $0 $4,059,965 $4,059,965 (RE RW IM)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/19/2014 $115,864 $0 $115,864 Various Surface Preservation Maintenance: Sitka - Pavement Markings, Crack Seal (RE RW IM)
3-02-0268-030-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $696,387 $0 $696,387 ARFF Vehicle (SA EQ RF)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish 9/21/2015 $105,146 $0 $105,146 Various Airport Surface Preservation Maintenance (Sitka Markings) (RE RW IM)
$27,221,806 $51,324,562 $78,546,369
Skagway Skagway (SGY)
3-02-0270-001-1986 Conduct Airport Master Plan Study (PL PL MA) 8/29/1986 5/12/1992 $82,121 $0 $82,121
3-02-0270-002-1992 Conduct Airport Master Plan Study (PL PL MA) 9/14/1992 4/17/2000 $499,990 $0 $499,990
3-02-0270-003-1999 Construct Taxiway (ST TW CO) 3/25/1999 1/14/2013 $3,193,041 $2,607,509 $5,800,550
3-02-0270-004-1999 Construct Taxiway (ST TW CO) 7/26/1999 9/12/2003 $695,722 $1,502,099 $2,197,821
Install Perimeter Fencing (ST EQ SE) 7/26/1999 9/12/2003 $536,916 $0 $536,916
3-02-0270-005-1999 Construct Terminal Building (ST TE CO) 7/6/1999 9/12/2003 $454,589 $16,988 $471,577
3-02-0270-006-2003 Construct Taxiway (Environmental Mitigation) Phase 2 8/26/2003 7/9/2007 $28,145 $0 $28,145 (ST TW CO)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 8/30/2005 6/9/2010 $16,700 $0 $16,700 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $37,100 $0 $37,100 (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 02/20 Skagway 3/12/2010 12/9/2015 $38,304 $0 $38,304 Various Surface Maintenance (RE RW IM)
3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $38,005 $0 $38,005 Acquire Various SRE: Skagway (30ft Ramp Plow) (ST EQ SN)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 02/20 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Skagway - Crack Seal (RE RW IM)
$5,641,049 $4,126,596 $9,767,645
Skwentna Skwentna (SKW)
3-02-0411-001-1987 Install Runway Lighting (ST RW LI) 9/3/1987 7/20/1992 $166,022 $0 $166,022
Monday, January 11, 2016 Page 104 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0411-001-1987 Acquire Land for Development (ST LA DV) 9/3/1987 7/20/1992 $110,720 $0 $110,720
Acquire Snow Removal Equipment (ST EQ SN) 9/3/1987 7/20/1992 $70,312 $0 $70,312
Rehabilitate Runway 9/27 (RE RW IM) 9/3/1987 7/20/1992 $490,620 $134,296 $624,916
Extend Runway 9/27 (ST RW IM) 9/3/1987 7/20/1992 $110,000 $0 $110,000
Construct Taxiway (ST TW CO) 9/3/1987 7/20/1992 $19,700 $0 $19,700
Improve Access Road (OT GT AC) 9/3/1987 7/20/1992 $213,500 $0 $213,500
Construct Apron (ST AP CO)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 09/27 Skwentna Various Surface Maintenance (RE RW IM)
9/3/1987
3/12/2010
7/20/1992
12/9/2015
$162,125
$44,688
$0
$0
$162,125
$44,688
3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Skwentna) (SA OT OB)
9/18/2013 $63,000 $0 $63,000
3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Skwentna - Grader (ST EQ SN)
9/19/2014 $323,844 $0 $323,844
3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Skwentna Beacon and Wind Cone Poles (ST OT IN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 10/28 Accomplish Various Airport Surface Preservation Maintenance (Skwentna Rehab Threshold Markings) (RE RW IM)
9/20/2015
9/21/2015
$225,750
$4,620
$0
$0
$225,750
$4,620
$2,004,901 $134,296 $2,139,197
Sleetmute Sleetmute (SLQ)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) (RE RW IM)
8/30/2005 6/9/2010 $10,000 $0 $10,000
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
9/22/2014 $36,093 $0 $36,093
$46,093 $0 $46,093
Soldotna Soldotna (SXQ)
3-02-0274-001-1984 Improve Building (ST BD MS) 9/13/1984 1/26/1989 $0 $436,341 $436,341
Expand Apron (CA AP EX) 9/13/1984 1/26/1989 $0 $971,606 $971,606
Improve Access Road 7/25 (OT GT AC) 9/13/1984 1/26/1989 $0 $138,290 $138,290
Expand Apron (ST AP IM) 9/13/1984 1/26/1989 $0 $1,157,372 $1,157,372
Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
9/13/1984 1/26/1989 $0 $180,469 $180,469
3-02-0274-002-1988 Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)
9/7/1988 4/9/1990 $290,049 $0 $290,049
3-02-0274-003-1995 Rehabilitate Apron (RE AP IM)
Rehabilitate Taxiway (RE TW IM)
9/18/1995
9/18/1995
7/14/1999
7/14/1999
$0
$0
$404,489
$260,000
$404,489
$260,000
Extend Runway 07/25 (ST RW IM) 9/18/1995 7/14/1999 $0 $870,000 $870,000
3-02-0274-004-2001 Conduct Airport Master Plan Study (PL PL MA) 7/9/2001 7/28/2005 $313,845 $0 $313,845
3-02-0274-005-2005 Construct Runway Turf (Phae 1 design and EA) (ST RW CO)
8/1/2005 1/18/2011 $341,971 $0 $341,971
3-02-0274-006-2007 Acquire Miscellaneous Land (ST LA MS) 4/25/2007 7/1/2011 $1,122,990 $0 $1,122,990
3-02-0274-007-2007 Construct Runway Turf (construct ski strip & RSA and drainage improvements) (ST RW CO)
8/7/2007 1/20/2015 $1,822,354 $0 $1,822,354
Extend Runway Safety Area 07/25 (ST RW SF) 8/7/2007 1/20/2015 $1,448,513 $404,065 $1,852,578
3-02-0274-008-2008 Construct Apron Construct Apron Phase 1 (Design) (ST AP CO)
6/12/2008 $190,000 $0 $190,000
Monday, January 11, 2016 Page 105 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0274-009-2009 Acquire Snow Removal Equipment Acquire SRE 8/7/2009 9/22/2010 $436,865 $0 $436,865 equipment (ST EQ SN)
3-02-0274-010-2010 Construct Apron Relocate utilities and road (ST AP CO) 9/17/2010 $1,546,891 $0 $1,546,891
3-02-0274-011-2012 Rehabilitate Apron (RE AP IM) 9/17/2012 $1,000,000 $0 $1,000,000
Construct Apron Construct Apron Phase 2 (ST AP CO) 9/17/2012 $1,496,701 $0 $1,496,701
Rehabilitate Runway 07/25 Runway remarking (RE RW 9/17/2012 $242,664 $0 $242,664 IM)
3-02-0274-012-2014 Conduct Airport Master Plan Study Conduct Airport 9/4/2014 $468,750 $0 $468,750 Master Plan -- PH I (PL PL MA)
3-02-0274-013-2014 Construct Apron Construct Apron Phase 3 (ST AP CO) 9/16/2014 $1,250,000 $0 $1,250,000
Rehabilitate Taxiway Taxilane Asphalt Rehabilitation 9/16/2014 $2,000,000 $0 $2,000,000 (RE TW IM)
3-02-0274-014-2015 Conduct Airport Master Plan Study Conduct 6/25/2015 $250,000 $0 $250,000 aeronautical study -- PH II of Airport Master Plan (PL PL MA)
$14,221,593 $4,822,632 $19,044,225
South Naknek South Naknek Nr 2 (WSN)
3-02-0186-001-1996 Improve Snow Removal Equipment Building (ST BD 9/20/1996 9/20/2000 $168,750 $0 $168,750 SN)
Rehabilitate Runway 17/35 (RE RW IM) 9/20/1996 9/20/2000 $1,102,530 $0 $1,102,530
Construct Runway 12/30 (ST RW CO) 9/20/1996 9/20/2000 $843,750 $0 $843,750
Construct Taxiway (ST TW CO) 9/20/1996 9/20/2000 $140,625 $0 $140,625
Improve Access Road (OT GT AC) 9/20/1996 9/20/2000 $187,500 $0 $187,500
Expand Apron (CA AP EX) 9/20/1996 9/20/2000 $234,375 $0 $234,375
Acquire Snow Removal Equipment (ST EQ SN) 9/20/1996 9/20/2000 $178,125 $0 $178,125
Acquire Land for Development (ST LA DV) 9/20/1996 9/20/2000 $281,250 $0 $281,250
Install Runway Lighting (ST RW LI) 9/20/1996 9/20/2000 $215,625 $0 $215,625
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/19/2008 6/10/2014 $8,100 $0 $8,100 (RE RW IM)
$3,360,630 $0 $3,360,630
St Mary's St Mary's (KSM)
3-02-0017-001-1984 Improve Building (ST BD MS) 9/14/1984 4/13/1988 $278,544 $0 $278,544
Acquire Aircraft Rescue & Fire Fighting Safety 9/14/1984 4/13/1988 $49,249 $0 $49,249 Equipment (ST EQ MS)
3-02-0017-002-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1992 6/12/2000 $0 $486,913 $486,913 BD EX)
Improve Airport Drainage (ST OT IM) 9/28/1992 6/12/2000 $0 $705,243 $705,243
Acquire Aircraft Rescue & Fire Fighting Vehicle (ST EQ 9/28/1992 6/12/2000 $0 $330,000 $330,000 RF)
3-02-0017-003-1993 Improve Access Road (OT GT AC) 5/26/1993 9/26/1996 $196,711 $0 $196,711
Acquire Security Equipment (SA EQ SE) 5/26/1993 9/26/1996 $118,345 $0 $118,345
Rehabilitate Runway 16/34 (RE RW IM) 5/26/1993 9/26/1996 $1,120,889 $154,521 $1,275,410
Rehabilitate Runway 6/24 (RE RW IM) 5/26/1993 9/26/1996 $149,920 $0 $149,920
Rehabilitate Taxiway (RE TW IM) 5/26/1993 9/26/1996 $95,578 $0 $95,578
Construct Apron (ST AP CO) 5/26/1993 9/26/1996 $258,204 $0 $258,204
Remove Obstructions (ST OT OB) 5/26/1993 9/26/1996 $299,597 $0 $299,597
Monday, January 11, 2016 Page 106 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0017-003-1993 Expand Apron (ST AP IM) 5/26/1993 9/26/1996 $698,766 $0 $698,766
3-02-0017-004-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/14/1994 9/9/1997 $449,127 $0 $449,127
3-02-0017-005-1996 Extend Runway 16/34 (ST RW IM) 9/23/1996 1/24/2000 $350,408 $0 $350,408
Rehabilitate Runway Lighting (RE RW LI) 9/23/1996 1/24/2000 $291,491 $2,008 $293,499
Rehabilitate Runway Lighting (RE RW LI) 9/23/1996 1/24/2000 $0 $337,155 $337,155
3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader (ST EQ SN)
8/31/2007 12/7/2009 $310,000 $0 $310,000
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 17/35 (Maintenance) (RE RW IM)
5/31/2007 8/6/2013 $275,576 $0 $275,576
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 17/35 Surface Preservation Maintenance (St. Mary's) (RE RW IM)
9/18/2013 $375,600 $0 $375,600
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
9/22/2014 $46,406 $0 $46,406
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 17/35 (+08J) Various Surface Preservation Maintenance: St. Mary's -Surface Repair (RE RW IM)
9/19/2014 $360,937 $0 $360,937
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (St. Marys Loader and Blower) (ST EQ SN)
9/21/2015 $433,416 $0 $433,416
$6,158,764 $2,015,840 $8,174,604
St Michael St Michael (SMK)
3-02-0276-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/20/1991 9/9/1997 $218,046 $0 $218,046
3-02-0276-002-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/17/1993 3/15/2000 $319,570 $0 $319,570
Improve Access Road (OT GT AC) 9/17/1993 3/15/2000 $378,781 $0 $378,781
Install Runway Lighting (ST RW LI) 9/17/1993 3/15/2000 $159,438 $0 $159,438
Construct Apron (ST AP CO) 9/17/1993 3/15/2000 $379,065 $100,228 $479,293
Improve Snow Removal Equipment Building (ST BD SN)
9/17/1993 3/15/2000 $376,092 $0 $376,092
Construct Taxiway (ST TW CO) 9/17/1993 3/15/2000 $114,107 $0 $114,107
Construct Runway 02/20 (ST RW CO) 9/17/1993 3/15/2000 $2,523,105 $207,000 $2,730,105
Acquire Land for Development (ST LA DV) 9/17/1993 3/15/2000 $775,000 $0 $775,000
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 02/20 St. Michael Various Surface Maintenance (RE RW IM)
3/12/2010 12/9/2015 $170,240 $0 $170,240
$5,413,444 $307,228 $5,720,672
St Paul Island St Paul Island (SNP)
3-02-0277-005-2002 Strengthen Runway 18/36 (Design - Phase 1) (ST RW IM)
9/19/2002 1/23/2006 $149,375 $250,000 $399,375
Install Perimeter Fencing (ST EQ SE) 9/19/2002 1/23/2006 $0 $794,364 $794,364
3-02-0277-006-2004 Strengthen Runway 18/36 (ST RW IM) 7/1/2004 9/16/2008 $769,439 $10,592,598 $11,362,037
Construct Snow Removal Equipment Building (ST BD SN)
7/1/2004 9/16/2008 $1,282,806 $0 $1,282,806
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) (RE RW IM)
6/19/2008 6/10/2014 $126,900 $0 $126,900
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 18/36 St. Paul Various Surface Maintenance (RE RW IM)
3/12/2010 12/9/2015 $133,594 $0 $133,594
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (St Paul) (RE RW IM)
9/19/2012 $157,500 $0 $157,500
Monday, January 11, 2016 Page 107 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Saint Paul - Plow (ST EQ SN)
$667,168 $0 $667,168
$3,286,782 $11,636,962 $14,923,745
St. George St George (PBV)
3-02-0416-001-1991 6/27/1991 9/25/1997 Acquire Snow Removal Equipment (ST EQ SN) $76,323 $0 $76,323
6/27/1991 9/25/1997 Construct Taxiway (ST TW CO) $382,277 $0 $382,277
6/27/1991 9/25/1997 Construct Runway 11/29 (ST RW CO) $5,806,071 $0 $5,806,071
6/27/1991 9/25/1997 Improve Access Road (OT GT AC) $179,215 $0 $179,215
3-02-0416-002-1991 3/19/1991 7/14/2000 Acquire Land for Development (ST LA DV) $539,063 $18,083 $557,146
3-02-0416-003-1993 6/30/1993 9/15/2000 Conduct Airport Master Plan Study (PL PL MA) $259,764 $0 $259,764
3-02-0416-004-1996 8/29/1996 5/12/2000 Remove Obstructions (SA OT OB) $740,020 $7,893 $747,913
3-02-0416-005-2002 9/19/2002 4/21/2006 Strengthen Runway 11/29 (Design) (ST RW IM) $100,000 $456,178 $556,178
3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader / Motor Grader / Truck w/sander & Broom / Towed Broom) (ST EQ SN)
$774,965 $0 $774,965
3-02-0416-006-2005 8/15/2005 8/1/2012 Modify Access Road (OT GT AC) $519,205 $0 $519,205
8/15/2005 8/1/2012 Strengthen Runway 11/29 Phase 2 (Construction) (ST RW IM)
$2,000,000 $7,785,659 $9,785,659
8/15/2005 8/1/2012 Construct Snow Removal Equipment Building (ST BD SN)
$900,000 $0 $900,000
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 11/29 Various Surface Preservation Maintenance (St George) (RE RW IM)
$105,000 $0 $105,000
$12,381,903 $8,267,813 $20,649,716
State of Alaska State of Alaska (*AKS)
3-02-0000-0S1-1988 9/26/1988 9/25/1997 Conduct Vertiport Plan (PL PL VT) $0 $256,856 $256,856
3-02-0000-0S2-1991 9/10/1991 1/18/2000 Conduct State System Plan Study (PL PL ST) $0 $499,807 $499,807
3-02-0000-0S3-1992 9/3/1992 9/27/1999 Conduct State System Plan Study (PL PL ST) $0 $229,147 $229,147
3-02-0000-0S4-1994 6/28/1994 8/1/2000 Conduct State System Plan Study (PL PL ST) $0 $141,216 $141,216
3-02-0000-0S5-1994 9/27/1994 8/23/2000 Conduct State System Plan Study (PL PL ST) $0 $743,272 $743,272
3-02-0000-0S6-1995 6/2/1995 8/21/2000 Conduct State System Plan Study (PL PL ST) $0 $500,000 $500,000
3-02-0000-0S7-1995 8/9/1995 1/29/1999 Conduct State System Plan Study (PL PL ST) $200,000 $150,000 $350,000
3-02-0000-0S8-1995 9/19/1995 8/22/2000 Conduct State System Plan Study (PL PL ST) $421,875 $0 $421,875
3-02-0000-0S9-1996 8/22/1996 9/6/2000 Conduct State System Plan Study (PL PL ST) $0 $504,572 $504,572
3-02-0000-0SA-199 9/10/1997 9/24/2001 Conduct State System Plan Study (PL PL ST) $36,884 $0 $36,884
3-02-0000-0SB-199 9/10/1997 9/24/2001 Conduct State System Plan Study (PL PL ST) $252,494 $300,000 $552,494
3-02-0000-0SC-199 5/18/1998 9/12/2002 Conduct State System Plan Study (PL PL ST) $0 $79,687 $79,687
3-02-0000-0SD-199 9/10/1998 9/13/2002 Conduct State System Plan Study (PL PL ST) $175,000 $94,436 $269,436
3-02-0000-0SE-199 3/25/1999 9/9/2003 Conduct State System Plan Study (PL PL ST) $560,279 $0 $560,279
3-02-0000-0SF-2000 7/28/2000 8/26/2004 Conduct State System Plan Study (PL PL ST) $503,568 $0 $503,568
3-02-0000-0SG-200 9/15/2000 8/25/2004 Conduct State System Plan Study (PL PL ST) $564,531 $0 $564,531
3-02-0000-0SH-200 9/7/2001 8/10/2005 Conduct State System Plan Study (PL PL ST) $874,706 $0 $874,706
3-02-0000-0SI-2001 9/25/2001 8/25/2005 Conduct State System Plan Study (PL PL ST) $0 $273,033 $273,033
3-02-0000-001-2002 9/26/2002 2/21/2006 Update State System Plan Study (PL PL ST) $726,755 $0 $726,755
3-02-0000-002-2003 8/22/2003 8/21/2006 Update State System Plan Study (PL PL ST) $649,127 $0 $649,127
Monday, January 11, 2016 Page 108 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0000-003-2004 Update State System Plan Study (PL PL ST) 8/20/2004 3/28/2008 $754,972 $0 $754,972
3-02-0000-004-2005 Update State System Plan Study (PL PL ST) 8/25/2005 6/17/2010 $1,633,686 $0 $1,633,686
3-02-0000-005-2006 Update State System Plan Study (PL PL ST) 9/5/2006 7/12/2011 $2,410,925 $0 $2,410,925
Update State System Plan Study (Anchorage Seaplane 9/5/2006 7/12/2011 $100,000 $0 $100,000 Base Economic Study) (PL PL ST)
3-02-0000-006-2007 Update State System Plan Study (PL PL ST) 8/20/2007 7/26/2012 $2,419,011 $0 $2,419,011
3-02-0000-009-2008 Update State System Plan Study (PL PL ST) 6/12/2008 5/20/2014 $2,035,406 $0 $2,035,406
3-02-0000-011-2009 Update State System Plan Study (PL PL ST) 8/17/2009 12/23/2014 $2,653,371 $0 $2,653,371
3-02-0000-014-2010 Update State System Plan Study (PL PL ST) 9/23/2010 $2,500,000 $0 $2,500,000
3-02-0000-016-2011 Update State System Plan Study system planning (PL 9/16/2011 $2,000,000 $0 $2,000,000 PL ST)
3-02-0000-017-2012 Conduct State System Plan Study Int'l System Plan, 7/23/2012 6/2/2015 $379,999 $0 $379,999 Phase 2 (PL PL ST)
3-02-0000-018-2012 Update State System Plan Study ongoing statewide 9/19/2012 $1,174,098 $0 $1,174,098 system plan study (PL PL ST)
3-02-0000-019-2013 Update State System Plan Study (PL PL ST) 9/10/2013 $2,000,000 $0 $2,000,000
3-02-0000-020-2014 Update State System Plan Study (PL PL ST) 9/11/2014 $1,600,289 $0 $1,600,289
3-02-0000-021-2015 Update State System Plan Study (PL PL ST) 8/27/2015 $2,000,000 $0 $2,000,000
$28,626,976 $3,772,026 $32,399,002
Various Locations in Alaska (*AKV)
3-02-0200-001-1990 Acquire Aircraft Rescue & Fire Fighting Safety 7/6/1990 11/15/1991 $176,390 $0 $176,390 Equipment P (ST EQ MS)
3-02-0200-003-1992 Acquire Snow Removal Equipment P (ST EQ SN) 8/25/1992 12/6/1994 $647,904 $0 $647,904
3-02-0200-004-1993 Acquire Snow Removal Equipment GA (ST EQ SN) 12/8/1992 8/8/1995 $292,694 $0 $292,694
3-02-0200-005-1993 Install Guidance Signs (SA OT SG) 5/5/1993 11/2/1994 $321,708 $6,481 $328,189
3-02-0200-006-1993 Install Guidance Signs PN (SA OT SG) 9/1/1993 7/14/1999 $0 $386,500 $386,500
Install Guidance Signs GA (SA OT SG) 9/1/1993 7/14/1999 $75,022 $0 $75,022
3-02-0200-007-1993 Acquire Snow Removal Equipment PN (ST EQ SN) 8/10/1993 9/25/1997 $0 $1,063,137 $1,063,137
Acquire Snow Removal Equipment GA (ST EQ SN) 8/10/1993 9/25/1997 $363,493 $0 $363,493
3-02-0200-008-1993 Install Guidance Signs PN (SA OT SG) 9/10/1993 6/12/2000 $64,506 $0 $64,506
Install Guidance Signs CS (SA OT SG) 9/10/1993 6/12/2000 $42,812 $0 $42,812
3-02-0200-010-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/30/1994 4/18/2000 $0 $1,391,075 $1,391,075
3-02-0200-009-1995 Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $1,413,249 $3,550 $1,416,799
Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $360,083 $0 $360,083
Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $1,483,909 $0 $1,483,909
3-02-0200-011-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/19/1995 10/26/1998 $1,160,181 $0 $1,160,181
3-02-0200-012-1996 Acquire Snow Removal Equipment (ST EQ SN) 8/2/1996 10/26/1998 $472,145 $0 $472,145
Acquire Snow Removal Equipment (ST EQ SN) 8/2/1996 10/26/1998 $683,625 $0 $683,625
3-02-0200-013-1996 Non primary development projects in state block grant 9/16/1996 $0 $0 $0 program (SB GP PP)
3-02-0200-014-1996 Acquire Aircraft Rescue & Fire Fighting Safety 7/24/1996 9/23/1998 $46,993 $0 $46,993 Equipment (ST EQ MS)
3-02-0200-015-1996 Improve Snow Removal Equipment Building (ST BD 9/27/1996 5/12/2000 $770,588 $45,104 $815,692 SN)
3-02-0200-016-1996 Acquire Snow Removal Equipment (ST EQ SN) 8/23/1996 7/14/1999 $583,848 $1,455 $585,303
3-02-0200-017-1996 Acquire Land For Approaches (ST LA SZ) 9/20/1996 7/14/1999 $163,846 $0 $163,846
Acquire Land for Development (ST LA DV) 9/20/1996 7/14/1999 $263,268 $0 $263,268
3-02-0200-018-1996 Acquire Aircraft Rescue & Fire Fighting Safety 9/27/1996 8/30/2000 $488,126 $0 $488,126 Equipment GA (ST EQ MS)
3-02-0200-019-1997 Acquire Aircraft Rescue & Fire Fighting Safety 9/29/1997 9/24/2001 $413,667 $0 $413,667 Equipment (ST EQ MS)
Monday, January 11, 2016 Page 109 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-020-1998 Acquire Snow Removal Equipment (ST EQ SN) 9/10/1998 9/26/2001 $1,471,795 $0 $1,471,795
3-02-0200-021-1998 Acquire Snow Removal Equipment (ST EQ SN) 8/26/1998 4/17/2000 $424,269 $0 $424,269
3-02-0200-022-1998 Acquire Snow Removal Equipment (ST EQ SN) 9/28/1998 9/4/2001 $528,075 $0 $528,075
Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/28/1998 9/4/2001 $443,216 $0 $443,216 EQ RF)
3-02-0200-023-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/5/2001 $352,750 $0 $352,750
3-02-0200-024-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 1/26/2001 $402,393 $0 $402,393
3-02-0200-025-2000 Install Airfield Guidance Signs (ST OT SG) 9/6/2000 8/27/2003 $73,032 $0 $73,032
3-02-0200-026-2000 Rehabilitate Apron (RE AP IM) 8/30/2000 6/25/2003 $62,000 $0 $62,000
Rehabilitate Runway Various (RE RW IM) 8/30/2000 6/25/2003 $168,469 $0 $168,469
Rehabilitate Taxiway (RE TW IM) 8/30/2000 6/25/2003 $78,000 $0 $78,000
3-02-0200-027-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/13/2001 8/31/2004 $2,400,000 $107,599 $2,507,599
3-02-0200-028-2001 Acquire Snow Removal Equipment (ST EQ SN) 3/21/2001 8/3/2004 $975,546 $0 $975,546
3-02-0200-029-2001 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/30/2001 6/25/2003 $446,263 $0 $446,263 EQ RF)
3-02-0200-030-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/25/2001 9/9/2003 $500,716 $0 $500,716
3-02-0200-031-2001 Rehabilitate Runway (RE RW IM) 8/16/2001 2/24/2005 $1,105,317 $0 $1,105,317
3-02-0200-032-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $987,682 $987,682
3-02-0200-033-2002 Acquire Snow Removal Equipment Northern Region 9/12/2002 3/29/2005 $2,902,217 $0 $2,902,217 (ST EQ SN)
3-02-0200-034-2002 Acquire Handicap Passenger Lift Device (ST TE MS) 7/23/2002 3/30/2006 $1,577,513 $0 $1,577,513
3-02-0200-035-2002 Rehabilitate Runway Maintenance (RE RW IM) 8/27/2002 1/24/2006 $1,265,592 $0 $1,265,592
3-02-0200-036-2002 Security Enhancements (SE SE SE) 8/21/2002 8/1/2006 $0 $1,131,330 $1,131,330
3-02-0200-037-2002 Acquire Snow Removal Equipment Southeast Region 9/17/2002 2/23/2005 $2,094,659 $0 $2,094,659 (ST EQ SN)
3-02-0200-038-2002 Acquire Snow Removal Equipment Central Region (ST 9/12/2002 3/27/2006 $4,155,735 $0 $4,155,735 EQ SN)
3-02-0200-039-2003 Rehabilitate Runway Various (Maintenance) (RE RW IM) 7/7/2003 1/12/2007 $1,551,791 $0 $1,551,791
3-02-0200-040-2003 Modify Snow Removal Equipment Building (ST BD SN) 8/27/2003 1/12/2007 $1,475,073 $0 $1,475,073
3-02-0200-041-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/13/2003 3/13/2007 $3,149,527 $21,266 $3,170,792
3-02-0200-042-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/26/2003 1/12/2007 $1,180,345 $0 $1,180,345
3-02-0200-043-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/27/2003 1/12/2007 $4,694,035 $0 $4,694,035
3-02-0200-044-2003 Acquire Friction Measuring Equipment (ST EQ SR) 8/27/2003 7/9/2007 $1,459,093 $0 $1,459,093
3-02-0200-045-2004 Rehabilitate Runway Various (RE RW IM) 7/1/2004 3/28/2008 $3,515,614 $0 $3,515,614
3-02-0200-046-2004 Acquire Snow Removal Equipment -Central Region (ST 8/26/2004 4/30/2008 $3,513,623 $0 $3,513,623 EQ SN)
3-02-0200-047-2004 Acquire Snow Removal Equipment -Southeast Region 6/28/2004 1/12/2007 $1,526,401 $0 $1,526,401 (ST EQ SN)
3-02-0200-048-2004 Acquire Snow Removal Equipment -Northern Region 8/26/2004 8/23/2007 $2,213,734 $0 $2,213,734 (ST EQ SN)
$55,994,847 $5,145,179 $61,140,026
Stebbins Stebbins (WBB)
3-02-0279-001-1995 Improve Snow Removal Equipment Building (ST BD 8/3/1995 9/21/2000 $280,210 $0 $280,210 SN)
Acquire Snow Removal Equipment (ST EQ SN) 8/3/1995 9/21/2000 $153,750 $0 $153,750
Extend Runway 05/23 (ST RW IM) 8/3/1995 9/21/2000 $725,520 $0 $725,520
Construct Apron (ST AP CO) 8/3/1995 9/21/2000 $95,437 $0 $95,437
Acquire Land For Approaches (ST LA SZ) 8/3/1995 9/21/2000 $193,922 $0 $193,922
Install Runway Lighting (ST RW LI) 8/3/1995 9/21/2000 $263,156 $0 $263,156
Monday, January 11, 2016 Page 110 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)
$47,453 $0 $47,453
3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)
$116,222 $0 $116,222
3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Stebbins (Dozer) (ST EQ SN)
$343,057 $0 $343,057
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 05/23 (+08J) Various Surface Preservation Maintenance: Stebbins -Surface Repair, Dust Control (RE RW IM)
$376,837 $0 $376,837
$2,595,564 $0 $2,595,564
Stevens Village Stevens Village (SVS)
3-02-0444-001-2001 9/5/2001 5/17/2005 Improve Snow Removal Equipment Building (ST BD SN)
$270,446 $0 $270,446
9/5/2001 5/17/2005 Acquire Snow Removal Equipment (ST EQ SN) $205,894 $0 $205,894
9/5/2001 5/17/2005 Construct New Airport (ST NA CO) $5,056,196 $0 $5,056,196
3-02-0444-002-2005 8/8/2005 8/28/2009 Construct New Airport Phase 2 (Surfacing) (ST NA CO) $6,107,808 $0 $6,107,808
8/8/2005 8/28/2009 Construct Snow Removal Equipment Building (ST BD SN)
$600,000 $0 $600,000
3-02-0000-007-2007 8/28/2007 1/28/2013 Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $131,410 $131,410
3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Stevens Village Loader (ST EQ SN)
$218,500 $0 $218,500
$12,458,844 $131,410 $12,590,254
Stony River Stony River 2 (SRV)
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation (RE RW IM)
$212,800 $0 $212,800
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish Various Airport Surface Preservation Maintenance (Stony River Improve Runway Drainage) (RE RW IM)
$42,000 $0 $42,000
$254,800 $0 $254,800
Takotna Takotna (TCT)
3-02-0284-001-1999 5/20/1999 9/13/2002 Conduct Airport Master Plan Study (PL PL MA) $80,852 $0 $80,852
3-02-0284-002-2000 8/24/2000 7/3/2007 Conduct Airport Master Plan Study (PL PL MA) $205,467 $0 $205,467
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)
$23,408 $0 $23,408
3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments and Grader with Attachments (ST EQ SN)
$613,548 $0 $613,548
3-02-0472-001-2009 8/10/2009 Construct New Airport phase 1 (ST NA CO) $10,050,000 $7,733,074 $17,783,074
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 04/22 Surface Preservation Maintenance (Takotna) (RE RW IM)
$168,000 $0 $168,000
$11,141,275 $7,733,074 $18,874,349
Monday, January 11, 2016 Page 111 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Talkeetna Talkeetna (TKA)
3-02-0287-001-1986 Extend Runway 18/36 (ST RW IM) 9/11/1986 2/11/1991 $802,520 $0 $802,520
Rehabilitate Taxiway (RE TW IM) 9/11/1986 2/11/1991 $21,000 $0 $21,000
Expand Apron (ST AP IM) 9/11/1986 2/11/1991 $235,250 $0 $235,250
Install Apron Lighting (ST AP LI) 9/11/1986 2/11/1991 $80,000 $0 $80,000
3-02-0287-002-1995 Conduct Airport Master Plan Study (PL PL MA) 9/18/1995 9/24/2001 $281,250 $0 $281,250
3-02-0287-003-1996 Improve Snow Removal Equipment Building (ST BD 7/23/1996 8/23/2000 $620,279 $0 $620,279 SN)
Construct Taxiway (ST TW CO) 7/23/1996 8/23/2000 $1,866,312 $0 $1,866,312
Expand Apron (CA AP EX) 7/23/1996 8/23/2000 $100,000 $0 $100,000
Install Apron Lighting (ST AP LI) 7/23/1996 8/23/2000 $200,000 $0 $200,000
Improve Service Road (OT GT SV) 7/23/1996 8/23/2000 $50,000 $0 $50,000
Acquire Land for Development (ST LA DV) 7/23/1996 8/23/2000 $200,000 $0 $200,000
3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment (U- 8/19/2005 12/19/2013 $20,321 $0 $20,321 Blade) (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 6/19/2008 6/10/2014 $26,000 $0 $26,000 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 18/36 (Various 8/20/2009 12/19/2014 $16,031 $0 $16,031 Surface Maintenance) (RE RW IM)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 18/36 Talkeetna 3/12/2010 12/9/2015 $106,685 $0 $106,685 Various Surface Maintenance (RE RW IM)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $63,000 $0 $63,000 Obstructions (Various - Ta keetna) (SA OT OB)
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 18/36 (+08J) 9/19/2014 $63,000 $0 $63,000 Various Surface Preservation Maintenance: Talkeetna - Pavement Markings and Crack Seal (RE RW IM)
3-02-0287-004-2015 Construct Taxiway (ST TW CO) 9/16/2015 $700,000 $0 $700,000
Remove Obstructions Remove trees & brush (ST OT 9/16/2015 $344,541 $0 $344,541 OB)
Rehabilitate Taxiway Phase 1 (RE TW IM) 9/16/2015 $573,038 $0 $573,038
Rehabilitate Runway 18/36 Phase 1 (RE RW IM) 9/16/2015 $701,094 $0 $701,094
Rehabilitate Apron Phase 1 (RE AP IM) 9/16/2015 $500,000 $0 $500,000
Construct Apron Construct transient and GA apron, 9/16/2015 $1,181,327 $0 $1,181,327 phase 1 (ST AP CO)
Construct Access Road (OT GT AC) 9/16/2015 $2,500,000 $0 $2,500,000
$11,251,648 $0 $11,251,648
Tanana Ralph M Calhoun Memorial (TAL)
3-02-0290-001-1985 Install Runway Lighting 6/24 (ST RW LI) 8/27/1985 9/22/1988 $162,187 $0 $162,187
Rehabilitate Runway 6/24 (RE RW IM) 8/27/1985 9/22/1988 $153,681 $923,560 $1,077,241
3-02-0290-002-2004 Expand Apron (ST AP IM) 9/1/2004 7/20/2010 $1,500,000 $0 $1,500,000
Extend Runway Safety Area 07/25 (ST RW SF) 9/1/2004 7/20/2010 $750,000 $4,329,215 $5,079,215
Rehabilitate Runway 07/25 (RE RW IM) 9/1/2004 7/20/2010 $5,300,000 $0 $5,300,000
Construct Snow Removal Equipment Building (ST BD 9/1/2004 7/20/2010 $764,840 $0 $764,840 SN)
3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $370,500 $0 $370,500 Acquire Various SRE (Northern Region): Tanana (Grader with Plow and Wing) (ST EQ SN)
Monday, January 11, 2016 Page 112 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $245,953 $0 $245,953 Various Surface Preservation Maintenance: Tanana -Surface Repair, Dust Control (RE RW IM)
$9,247,161 $5,252,775 $14,499,936
Tatitlek Tatitlek (7KA)
3-02-0342-001-1991 Conduct Airport Master Plan Study (PL PL MA) 9/5/1991 9/27/1999 $232,790 $0 $232,790
3-02-0342-002-1995 Improve Access Road (OT GT AC) 9/14/1995 9/12/2000 $264,063 $0 $264,063
Extend Runway 12/30 (ST RW IM) 9/14/1995 9/12/2000 $3,608,381 $0 $3,608,381
Extend Taxiway (ST TW IM) 9/14/1995 9/12/2000 $117,187 $0 $117,187
Expand Apron (CA AP EX) 9/14/1995 9/12/2000 $234,375 $0 $234,375
Improve Building (ST BD MS) 9/14/1995 9/12/2000 $468,750 $0 $468,750
Install Runway Lighting (ST RW LI) 9/14/1995 9/12/2000 $206,250 $0 $206,250
3-02-0342-003-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 6/7/2000 $110,114 $0 $110,114
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/30/2006 2/27/2012 $121,268 $0 $121,268 (RE RW IM)
3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $75,000 $0 $75,000 Obstruction Removal (Tatitlek) (ST OT OB)
3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $20,681 $0 $20,681 Obstructions (Various - Tatitlek) (SA OT OB)
3-02-0200-088-2012 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2012 $0 $231,875 $231,875 approach (PL PL VI)
$5,458,859 $231,875 $5,690,734
Teller Teller (TER)
3-02-0333-001-1990 Improve Snow Removal Equipment Building (ST BD 2/28/1990 1/5/1994 $142,789 $0 $142,789 SN)
Acquire Snow Removal Equipment (ST EQ SN) 2/28/1990 1/5/1994 $142,167 $0 $142,167
Install Apron Lighting (ST AP LI) 2/28/1990 1/5/1994 $45,352 $0 $45,352
Install Runway Lighting (ST RW LI) 2/28/1990 1/5/1994 $233,251 $0 $233,251
Rehabilitate Taxiway (RE TW IM) 2/28/1990 1/5/1994 $260,767 $0 $260,767
Rehabilitate Runway 7/25 (RE RW IM) 2/28/1990 1/5/1994 $507,303 $67,051 $574,354
3-02-0333-002-1999 Extend Runway 7-25 (ST RW IM) 8/4/1999 6/4/2001 $759,973 $0 $759,973
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $190,000 $0 $190,000 (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $333,133 $0 $333,133 Acquire SRE (Dozer) (ST EQ SN)
$2,614,735 $67,051 $2,681,786
Tenakee Springs Tenakee (TKE)
3-02-0295-001-2005 Rehabilitate Seaplane Base (RE SB IM) 8/30/2005 1/26/2010 $1,209,759 $0 $1,209,759
$1,209,759 $0 $1,209,759
Tetlin Tetlin (4AK8)
3-02-0296-001-1992 Conduct Airport Master Plan Study (PL PL MA) 9/8/1992 8/30/2000 $277,513 $0 $277,513
Monday, January 11, 2016 Page 113 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0467-001-2003 8/26/2003 1/12/2007 Construct New Airport (ST NA CO) $8,435,269 $0 $8,435,269
3-02-0467-002-2004 8/24/2004 6/7/2007 Construct Snow Removal Equipment Building (ST BD SN)
$457,010 $0 $457,010
3-02-0200-051-2005 9/2/2005 4/4/2008 [Various Grnt] Acquire Snow Removal Equipment (Motor Grader) (ST EQ SN)
$209,663 $0 $209,663
3-02-0000-007-2007 8/28/2007 1/28/2013 Conduct aeronautical survey for WAAS approach (PL PL VI)
$0 $146,000 $146,000
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 08/26 (Various Surface Maintenance) (RE RW IM)
$154,280 $0 $154,280
$9,533,735 $146,000 $9,679,735
Thorne Bay Thorne Bay (KTB)
3-02-0297-001-1991 8/27/1991 6/2/1999 Improve Airport Drainage (ST OT IM) $437,349 $0 $437,349
$437,349 $0 $437,349
Togiak Village Togiak (TOG)
3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
$50,000 $0 $50,000
8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)
$50,000 $0 $50,000
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)
$58,208 $0 $58,208
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)
$214,928 $0 $214,928
3-02-0200-090-2013 9/19/2013 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)
$400,000 $0 $400,000
3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 03/21 Accomplish Various Airport Surface Preservation Maintenance (Togiak Rehab Threshold Markings) (RE RW IM)
$4,620 $0 $4,620
$777,756 $0 $777,756
Tok Tok Junction (6K8)
3-02-0412-001-1987 9/21/1987 1/14/2000 Install Apron Lighting (ST AP LI) $60,757 $0 $60,757
9/21/1987 1/14/2000 Expand Apron (ST AP IM) $184,636 $0 $184,636
9/21/1987 1/14/2000 Improve Access Road (CA GT AC) $248,220 $0 $248,220
9/21/1987 1/14/2000 Construct Apron (CA AP CO) $448,222 $0 $448,222
3-02-0412-002-1999 8/4/1999 9/13/2002 Construct Taxiway (ST TW CO) $315,967 $0 $315,967
8/4/1999 9/13/2002 Construct Apron (ST AP CO) $200,000 $0 $200,000
3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) (RE RW IM)
$384,893 $0 $384,893
3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
$70,125 $0 $70,125
3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) Various Surface Preservation Maintenance: Tok - Surface Repair (RE RW IM)
$515,625 $0 $515,625
$2,428,445 $0 $2,428,445
Monday, January 11, 2016 Page 114 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Toksook Bay Toksook Bay (OOK)
3-02-0301-001-1994 Conduct Airport Master Plan Study (PL PL MA) 9/26/1994 1/26/2000 $282,162 $0 $282,162
3-02-0441-001-2001 Improve Snow Removal Equipment Building (ST BD 8/30/2001 9/2/2005 $374,000 $0 $374,000 SN)
Construct New Airport (ST NA CO) 8/30/2001 9/2/2005 $5,114,245 $363,592 $5,477,837
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 5/31/2007 8/6/2013 $211,736 $0 $211,736 (RE RW IM)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 16/34 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Toksook Bay) (RE RW IM)
$5,992,643 $363,592 $6,356,235
Tuluksak Tuluksak (TLT)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 5/31/2007 8/6/2013 $10,640 $0 $10,640 (RE RW IM)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $113,500 $0 $113,500 (RE RW IM)
3-02-0484-001-2009 Construct New Airport Phase 1 (ST NA CO) 2/26/2009 $4,876,609 $0 $4,876,609
3-02-0484-002-2009 Construct New Airport Phase 2 (ST NA CO) 8/20/2009 $3,577,523 $13,925,000 $17,502,523
3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $240,741 $0 $240,741 Acquire SRE (Central Region): Tuluksak (Loader with Attachments) (ST EQ SN)
3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment 9/27/2011 3/10/2015 $174,000 $0 $174,000 Central Region Various SRE: Tuluksak - Grader with attachments (ST EQ SN)
$8,993,013 $13,925,000 $22,918,013
Tuntutuliak Tuntutuliak (A61)
3-02-0303-001-1998 Construct New Airport 05-23 (ST NA CO) 9/28/1998 9/27/2002 $4,206,000 $992 $4,206,992
3-02-0303-002-2006 Construct New Airport (Includes SREB) Phase 2 (ST 8/30/2006 7/9/2013 $18,571,444 $0 $18,571,444 NA CO)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $336,983 $0 $336,983 Acquire SRE: A61--Grader w/ attachments (ST EQ SN)
3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 02/20 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Tuntutuliak) (RE RW IM)
$23,124,927 $992 $23,125,919
Tununak Tununak (4KA)
3-02-0486-001-2012 Construct New Airport (ST NA CO) 9/17/2012 $12,010,000 $2,990,000 $15,000,000
3-02-0486-002-2013 Construct New Airport Phase 2 (ST NA CO) 7/5/2013 $13,622,475 $0 $13,622,475
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $667,168 $0 $667,168 Acquire Various SRE (Tununak Grader and Loader) (ST EQ SN)
$26,299,643 $2,990,000 $29,289,643
Monday, January 11, 2016 Page 115 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
Twin Hills Twin Hills (A63)
3-02-0356-001-1994 6/27/1994 7/14/1999 Improve Runway Safety Area 01/19 (SA RW SF) $1,125,858 $0 $1,125,858
6/27/1994 7/14/1999 Acquire Land For Approaches (ST LA SZ) $55,769 $0 $55,769
6/27/1994 7/14/1999 Acquire Land for Development (ST LA DV) $8,923 $0 $8,923
6/27/1994 7/14/1999 Improve Access Road (OT GT AC) $50,888 $0 $50,888
6/27/1994 7/14/1999 Improve Snow Removal Equipment Building (ST BD SN)
$220,450 $0 $220,450
6/27/1994 7/14/1999 Acquire Snow Removal Equipment (ST EQ SN) $139,875 $0 $139,875
6/27/1994 7/14/1999 Install Runway Lighting (ST RW LI) $134,480 $0 $134,480
6/27/1994 7/14/1999 Construct Taxiway (ST TW CO) $12,563 $0 $12,563
6/27/1994 7/14/1999 Construct Apron (ST AP CO) $218,050 $0 $218,050
3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (RE RW IM) $3,192 $0 $3,192
3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Twin Hills) (SA OT OB)
$21,000 $0 $21,000
3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Twin Hills Grader) (ST EQ SN)
$382,738 $0 $382,738
$2,373,786 $0 $2,373,786
Ugashik Ugashik (9A8)
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 06/24 Ugash k Various Surface Maintenance (RE RW IM)
$212,800 $0 $212,800
$212,800 $0 $212,800
Unalakleet Unalakleet (UNK)
3-02-0309-001-1995 9/12/1995 9/13/2000 Rehabilitate Runway 08/26 (RE RW IM) $0 $2,258,226 $2,258,226
9/12/1995 9/13/2000 Acquire Land For Approaches (ST LA SZ) $0 $112,500 $112,500
9/12/1995 9/13/2000 Improve Snow Removal Equipment Building (ST BD SN)
$0 $375,000 $375,000
9/12/1995 9/13/2000 Install Runway Lighting (ST RW LI) $0 $365,625 $365,625
9/12/1995 9/13/2000 Rehabilitate Apron (RE AP IM) $0 $328,125 $328,125
9/12/1995 9/13/2000 Rehabilitate Taxiway (RE TW IM) $0 $75,860 $75,860
3-02-0309-002-2005 9/2/2005 8/20/2010 Strengthen Runway 08/26 (Phase 1) (ST RW IM) $6,177,121 $194,142 $6,371,263
9/2/2005 8/20/2010 Strengthen Runway 14/32 (Phase 1) (ST RW IM) $6,177,126 $0 $6,177,126
3-02-0309-003-2006 7/25/2006 6/6/2012 Strengthen Runway 08/26 (phase 2) (ST RW IM) $4,313,625 $0 $4,313,625
7/25/2006 6/6/2012 Construct Apron (ST AP CO) $1,061,166 $0 $1,061,166
7/25/2006 6/6/2012 Strengthen Runway 14/32 (phase 2) (ST RW IM) $6,815,272 $0 $6,815,272
3-02-0200-058-2007 8/31/2007 12/7/2009 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)
$233,536 $0 $233,536
3-02-0200-063-2008 6/16/2008 5/21/2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE - Unalakleet Sander (ST EQ SN)
$75,000 $0 $75,000
3-02-0309-004-2008 9/9/2008 5/4/2010 Acquire Snow Removal Equipment Acquire SRE: Unalakleet Towed Broom (ST EQ SN)
$288,615 $0 $288,615
3-02-0309-005-2009 8/20/2009 11/25/2014 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)
$5,713,351 $0 $5,713,351
Monday, January 11, 2016 Page 116 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 08/26 Various 9/16/2011 $78,589 $0 $78,589 Surface Preservation (RE RW IM)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Unalakleet Grader) (ST EQ SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 15/33 Accomplish 9/21/2015 $51,703 $0 $51,703 Various Airport Surface Preservation Maintenance (Unalakleet RWYs and TWYs Marking) (RE RW IM)
$31,350,342 $3,709,478 $35,059,820
Unalaska Unalaska (DUT)
3-02-0082-001-1987 Extend Taxiway (ST TW IM) 9/10/1987 5/26/1992 $83,912 $108,304 $192,216
Improve Access Road (OT GT AC) 9/10/1987 5/26/1992 $0 $11,848 $11,848
Acquire Security Equipment (SA EQ SE) 9/10/1987 5/26/1992 $0 $5,385 $5,385
Extend Runway 12/30 (ST RW IM) 9/10/1987 5/26/1992 $69,286 $1,811,156 $1,880,442
Improve Access Road (OT GT AC) 9/10/1987 5/26/1992 $0 $75,396 $75,396
Install Runway Lighting (ST RW LI) 9/10/1987 5/26/1992 $157,934 $14,399 $172,333
Extend Runway 12/30 (ST RW IM) 9/10/1987 5/26/1992 $157,934 $219,045 $376,979
3-02-0082-002-1992 Extend Runway 12/30 (ST RW IM) 8/19/1992 12/8/1994 $2,869,254 $0 $2,869,254
Improve Airport Drainage (ST OT IM) 8/19/1992 12/8/1994 $80,406 $0 $80,406
3-02-0082-003-1992 Install Guidance Signs (SA OT SG) 9/28/1992 9/25/1997 $0 $55,000 $55,000
Acquire Security Equipment (SA EQ SE) 9/28/1992 9/25/1997 $0 $600,900 $600,900
3-02-0082-004-1995 Improve Runway Safety Area 12/30 (ST RW SF) 9/18/1995 9/15/2000 $0 $5,116,049 $5,116,049
Rehabilitate Runway 12/30 (RE RW IM) 9/18/1995 9/15/2000 $380,250 $219,750 $600,000
3-02-0082-005-1997 Rehabilitate Taxiway (RE TW IM) 7/16/1997 9/17/2001 $50,000 $0 $50,000
Expand Apron (ST AP IM) 7/16/1997 9/17/2001 $100,000 $0 $100,000
Rehabilitate Apron (RE AP IM) 7/16/1997 9/17/2001 $814,500 $136,965 $951,465
3-02-0082-006-1997 Improve Snow Removal Equipment Building (ST BD 6/18/1997 9/17/2001 $1,105,751 $0 $1,105,751 SN)
3-02-0082-007-2000 Conduct Airport Master Plan Study (PL PL MA) 8/24/2000 8/23/2004 $312,367 $0 $312,367
3-02-0082-008-2001 Expand Apron (ST AP IM) 9/18/2001 3/9/2007 $1,080,000 $0 $1,080,000
Improve Runway Safety Area (SA RW SF) 9/18/2001 3/9/2007 $847,178 $1,257,170 $2,104,348
3-02-0082-009-2003 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/7/2003 3/16/2007 $24,000 $615,671 $639,671 EQ RF)
3-02-0082-010-2003 Conduct Environmental Study Planning to Support EIS, 8/22/2003 5/22/2007 $0 $716,067 $716,067 Phase 1 (EN PL MA)
3-02-0082-012-2006 Conduct Environmental Study (Planning to Support 9/11/2006 7/19/2011 $439,950 $943,935 $1,383,885 EIS) (EN PL MA)
3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $278,538 $0 $278,538 (Grader w/Nose Plow and Wind Attachment) (ST EQ SN)
3-02-0082-013-2008 Conduct Environmental Study (Phase 2 EIS) (EN PL 6/19/2008 5/29/2015 $1,677,058 $822,942 $2,500,000 MA)
3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $645,167 $0 $645,167 Acquire SRE: Snow Blower w/ attachments (ST EQ SN)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $234,080 $0 $234,080 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $44,205 $44,205 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various 9/16/2011 $69,160 $0 $69,160 Surface Preservation (RE RW IM)
Monday, January 11, 2016 Page 117 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0082-014-2012 Extend Runway Safety Area 12/30 extend RSA (incl. 7/20/2012 $2,334,251 $7,650,000 $9,984,251 road relocate) (SA RW SF)
Extend Runway 12/30 (CA RW EX) 7/20/2012 $0 $4,300,000 $4,300,000
Rehabilitate Runway 12/30 (RE RW IM) 7/20/2012 $0 $12,000,000 $12,000,000
3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 12/30 Surface 9/18/2013 $52,500 $0 $52,500 Preservation Maintenance (Unalaska) (RE RW IM)
3-02-0082-015-2015 Construct Snow Removal Equipment Building (ST BD 8/31/2015 $4,466,356 $0 $4,466,356 SN)
Construct Sand and Chemical Storage Building (ST BD 8/31/2015 $4,082,000 $0 $4,082,000 SN)
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $56,895 $0 $56,895 Various Airport Surface Preservation Maintenance (Unalaska Pavement Markings) (RE RW IM)
$22,468,727 $36,724,186 $59,192,913
Valdez Valdez Pioneer Field (VDZ)
3-02-0311-001-1984 Improve Access Road (OT GT AC) 9/13/1984 2/4/1988 $208,980 $0 $208,980
Improve Airport Drainage (ST OT IM) 9/13/1984 2/4/1988 $276,197 $0 $276,197
3-02-0311-003-1994 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/7/1994 10/24/1998 $365,625 $0 $365,625 EQ RF)
Improve Snow Removal Equipment Building (ST BD 9/7/1994 10/24/1998 $675,556 $0 $675,556 SN)
3-02-0311-004-1999 Improve Aircraft Rescue & Fire Fighting Building (SA 3/25/1999 9/18/2001 $303,459 $800,000 $1,103,459 BD EX)
3-02-0311-005-2000 Conduct Airport Master Plan Study (PL PL MA) 5/30/2000 8/25/2004 $436,463 $0 $436,463
3-02-0311-006-2004 Extend Runway Safety Area 06/24 (SA RW SF) 8/6/2004 6/16/2008 $0 $6,121,492 $6,121,492
Rehabilitate Runway 06/24 (RE RW IM) 8/6/2004 6/16/2008 $8,250,000 $797,303 $9,047,303
3-02-0311-007-2004 Construct Sand and Chemical Storage Building (ST BD 8/26/2004 4/25/2008 $1,172,825 $0 $1,172,825 SN)
3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $577,064 $2,361 $579,425 (Acquire Rotary Snow Blower) (ST EQ SN)
3-02-0311-008-2007 Install Perimeter Fencing (ST EQ SE) 8/15/2007 3/7/2012 $33,000 $0 $33,000
Extend Runway Safety Area 06/24 (Phase 2) (SA RW 8/15/2007 3/7/2012 $0 $3,138,106 $3,138,106 SF)
3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $428,595 $0 $428,595 Acquire Northern SRE - Valdez Towed Broom (ST EQ SN)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,306 $95,306 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 06/24 Various 9/16/2011 $104,785 $0 $104,785 Surface Preservation (RE RW IM)
3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $35,000 $0 $35,000 Obstruction Removal (Valdez) (ST OT OB)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $311,670 $0 $311,670 Acquire SRE (Dump Truck) (ST EQ SN)
3-02-0311-009-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/2014 $696,387 $0 $696,387 EQ RF)
3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $438,285 $0 $438,285 Acquire Various SRE (Valdez Truck with Plow and Sander) (ST EQ SN)
Monday, January 11, 2016 Page 118 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 06/24 Accomplish 9/21/2015 $65,146 $0 $65,146 Various Airport Surface Preservation Maintenance (Valdez RWY and TWY Marking) (RE RW IM)
$14,379,037 $10,954,569 $25,333,605
Venetie Venetie (VEE)
3-02-0312-001-1999 Acquire Snow Removal Equipment (ST EQ SN) 6/26/1999 7/17/2000 $177,911 $18,249 $196,160
3-02-0312-002-2000 Construct Snow Removal Equipment Building (ST BD 9/5/2000 8/31/2004 $30,000 $0 $30,000 SN)
Construct New Airport (ST NA CO) 9/5/2000 8/31/2004 $412,177 $0 $412,177
3-02-0312-003-2001 Acquire Snow Removal Equipment (ST EQ SN) 4/5/2001 9/27/2002 $236,710 $0 $236,710
3-02-0312-004-2001 Rehabilitate Runway 03/21 (RE RW IM) 5/22/2001 8/27/2003 $108,562 $0 $108,562
3-02-0439-001-2001 Construct New Airport (ST NA CO) 5/22/2001 8/31/2004 $407,330 $32,924 $440,254
3-02-0439-002-2003 Construct Snow Removal Equipment Building (ST BD 6/27/2003 7/5/2007 $1,300,000 $0 $1,300,000 SN)
Construct New Airport (ST NA CO) 6/27/2003 7/5/2007 $4,581,816 $0 $4,581,816
$7,254,506 $51,173 $7,305,679
Wainwright Wainwright (AWI)
3-02-0313-001-1997 Rehabilitate Runway 04 (RE RW IM) 9/26/1997 9/26/2001 $1,104,995 $0 $1,104,995
3-02-0200-064-2008 [Various Grnt] Conduct aeronautical survey for WAAS 6/18/2008 10/27/2014 $90,000 $110,000 $200,000 approach (PL PL VI)
3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)
3-02-0313-002-2015 Rehabilitate Runway 05/23 Resurface Runway (RE RW 8/28/2015 $2,024,737 $934,745 $2,959,482 IM)
Rehabilitate Apron Resurface Apron (RE AP IM) 8/28/2015 $0 $203,350 $203,350
Rehabilitate Taxiway Resurface Taxiway (RE TW IM) 8/28/2015 $0 $92,280 $92,280
$3,269,732 $1,340,375 $4,610,107
Wales Wales (IWK)
3-02-0337-001-1985 Construct Taxiway (ST TW CO) 8/27/1985 6/11/1992 $293,400 $0 $293,400
Construct Apron (ST AP CO) 8/27/1985 6/11/1992 $301,843 $0 $301,843
Acquire Snow Removal Equipment (ST EQ SN) 8/27/1985 6/11/1992 $86,000 $0 $86,000
Improve Snow Removal Equipment Building (ST BD 8/27/1985 6/11/1992 $325,540 $0 $325,540 SN)
Acquire Land for Development (ST LA DV) 8/27/1985 6/11/1992 $11,250 $0 $11,250
Remove Obstructions (SA OT OB) 8/27/1985 6/11/1992 $204,638 $0 $204,638
Extend Runway 1/19 (ST RW IM) 8/27/1985 6/11/1992 $1,193,485 $0 $1,193,485
3-02-0337-002-1991 Rehabilitate Runway 17/35 (RE RW IM) 9/27/1991 10/24/1998 $431,050 $0 $431,050
Acquire Snow Removal Equipment (ST EQ SN) 9/27/1991 10/24/1998 $111,200 $0 $111,200
Improve Snow Removal Equipment Building (ST BD 9/27/1991 10/24/1998 $112,510 $0 $112,510 SN)
Improve Airport Drainage (ST OT IM) 9/27/1991 10/24/1998 $88,960 $0 $88,960
3-02-0337-003-2002 Acquire Snow Removal Equipment Construct Snow 9/25/2002 1/24/2006 $1,194,820 $0 $1,194,820 Fence (ST EQ SN)
Monday, January 11, 2016 Page 119 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0337-003-2002 9/25/2002 1/24/2006 Rehabilitate Snow Removal Equipment Building (ST BD SN)
$350,000 $109,841 $459,841
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 18/36 Wales Various Surface Maintenance (RE RW IM)
$175,560 $0 $175,560
3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Wales (Dozer) (ST EQ SN)
$370,108 $0 $370,108
$5,250,364 $109,841 $5,360,205
Wasilla Wasilla (IYS)
3-02-0417-001-1988 9/22/1988 1/26/2000 Acquire Land for Development (ST LA DV) $2,056,280 $0 $2,056,280
3-02-0417-002-1990 7/25/1990 11/10/1993 Improve Access Road (OT GT AC) $466,854 $0 $466,854
7/25/1990 11/10/1993 Install Runway Lighting (ST RW LI) $331,120 $0 $331,120
7/25/1990 11/10/1993 Construct Apron (ST AP CO) $1,486,603 $0 $1,486,603
7/25/1990 11/10/1993 Construct Runway 3/21 (ST RW CO) $1,436,456 $0 $1,436,456
7/25/1990 11/10/1993 Construct Taxiway (ST TW CO) $80,652 $0 $80,652
3-02-0417-003-1991 9/24/1991 7/14/1999 Noise Mitigation Measures for Public Buildings (EN PB 75)
$925,850 $0 $925,850
3-02-0417-004-1992 9/11/1992 9/13/2000 Acquire Snow Removal Equipment (ST EQ SN) $283,825 $0 $283,825
9/11/1992 9/13/2000 Improve Snow Removal Equipment Building (ST BD SN)
$215,625 $0 $215,625
3-02-0417-005-1998 8/28/1998 6/8/2000 Construct Runway 03-21 (ST RW CO) $102,772 $0 $102,772
3-02-0417-006-1999 3/24/1999 7/19/2000 Install Perimeter Fencing (ST EQ SE) $270,983 $0 $270,983
3/24/1999 7/19/2000 Construct Runway 3-21 (ST RW CO) $721,624 $44,716 $766,340
3-02-0417-007-2001 4/10/2001 7/14/2005 Conduct Airport Master Plan Study (PL PL MA) $407,072 $0 $407,072
3-02-0417-008-2002 9/11/2002 5/14/2004 Install Perimeter Fencing (ST EQ SE) $264,110 $154 $264,264
3-02-0417-009-2003 9/8/2003 7/28/2006 Construct Apron (Design) Phase 1 (ST AP CO) $199,999 $0 $199,999
3-02-0417-010-2004 7/9/2004 6/7/2007 Expand Apron (ST AP IM) $1,894,486 $102,393 $1,996,879
3-02-0417-011-2005 5/19/2005 6/16/2008 Construct Apron (Design) (ST AP CO) $250,000 $37,440 $287,440
3-02-0417-012-2006 5/9/2006 12/7/2009 Construct Runway 03/21 (ST RW CO) $350,000 $0 $350,000
5/9/2006 12/7/2009 Construct Apron Construction, ph. 1) (ST AP CO) $3,507,985 $191,005 $3,698,990
3-02-0417-013-2007 6/21/2007 7/20/2010 Construct Taxiway (ST TW CO) $1,052,877 $7,453 $1,060,330
3-02-0417-014-2008 6/11/2008 5/21/2010 Install Perimeter Fencing (ST EQ SE) $411,240 $0 $411,240
6/11/2008 5/21/2010 Expand Snow Removal Equipment Building expand SREB (ST BD SN)
$929,255 $0 $929,255
3-02-0417-015-2009 7/28/2009 Conduct aeronautical survey for WAAS approach Airport Survey (PL PL VI)
$0 $200,000 $200,000
7/28/2009 Update Airport Master Plan Study (PL PL MA) $275,000 $0 $275,000
3-02-0417-016-2010 3/17/2010 6/25/2013 Construct Apron Construction, Apron D (Phase 1) (ST AP CO)
$1,016,148 $0 $1,016,148
3-02-0417-017-2011 3/1/2011 4/1/2013 Acquire Snow Removal Equipment Acquire SRE (ST EQ SN)
$770,850 $8,982 $779,832
3-02-0417-018-2011 6/7/2011 7/7/2014 Construct Apron Construction, Apron D (Phase 2) (ST AP CO)
$1,057,217 $116,517 $1,173,734
3-02-0417-019-2011 9/14/2011 2/10/2015 Conduct Environmental Study Environmental phase 1 (EN PL MA)
$189,420 $0 $189,420
3-02-0417-020-2014 6/25/2014 Acquire Safety Equipment and/or Fencing (SA EQ RF) $598,432 $0 $598,432
$21,552,735 $708,660 $22,261,395
Monday, January 11, 2016 Page 120 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
White Mountain White Mountain (WMO)
3-02-0319-001-1991 Construct Apron (CA AP CO)
Construct Taxiway (CA TW CO)
Improve Access Road (CA GT AC)
Improve Snow Removal Equipment Building (ST BD SN)
Acquire Snow Removal Equipment (ST EQ SN)
Install Apron Lighting (ST AP LI)
Install Runway Lighting (ST RW LI)
Extend Runway 1/20 (ST RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 15/33 (Various Surface Maintenance) (RE RW IM)
3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader, Loader, and Blower) (ST EQ SN)
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
9/24/1991
8/20/2009
9/19/2013
9/26/1996 $137,527
9/26/1996 $164,158
9/26/1996 $119,415
9/26/1996 $166,008
9/26/1996 $130,000
9/26/1996 $42,349
9/26/1996 $158,802
9/26/1996 $1,945,534
12/19/2014 $198,968
$784,081
$3,846,842
$0
$0
$0
$0
$0
$0
$0
$208,856
$0
$0
$208,856
$137,527
$164,158
$119,415
$166,008
$130,000
$42,349
$158,802
$2,154,390
$198,968
$784,081
$4,055,698
Whittier Whittier (IEM)
3-02-0385-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/4/2001 8/3/2004 $72,631
$72,631
$0
$0
$72,631
$72,631
Willow Willow (UUO)
3-02-0320-001-1989 Acquire Land for Development (ST LA DV)
Improve Airport Drainage (ST OT IM)
Install Runway Lighting (ST RW LI)
3-02-0320-002-1999 Improve Snow Removal Equipment Building (ST BD SN)
3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)
3-02-0320-003-2009 Conduct Airport Master Plan Study (PL PL MA)
3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)
6/9/1989
6/9/1989
6/9/1989
3/25/1999
8/30/2005
5/31/2007
8/20/2009
9/22/2014
9/10/1992 $18,674
9/10/1992 $23,297
9/10/1992 $192,429
9/12/2003 $660,000
6/9/2010 $55,000
8/6/2013 $105,336
$167,340
$156,868
$1,378,944
$0
$0
$7,830
$4,418
$0
$0
$0
$0
$12,248
$18,674
$23,297
$200,259
$664,418
$55,000
$105,336
$167,340
$156,868
$1,391,192
Wrangell Wrangell (WRG)
3-02-0323-001-1982 Groove Runway 9/27 (SP RW FR)
Rehabilitate Apron (RE AP IM)
Rehabilitate Runway 9/27 (RE RW IM)
3-02-0323-002-1983 Improve Airport Drainage 9/27 (ST OT IM)
3-02-0323-003-1987 Groove Runway 9/27 (SP RW FR)
Extend Taxiway (ST TW IM)
3-02-0323-004-1988 Conduct Airport Master Plan Study (PL PL MA)
9/27/1982
9/27/1982
9/27/1982
9/26/1983
12/15/1986
12/15/1986
9/15/1988
1/17/1986 $137,760
1/17/1986 $6,455
1/17/1986 $1,028,492
1/29/1986 $389,857
11/8/1988 $222,975
11/8/1988 $4,688
5/7/1992 $67,628
$0
$0
$0
$0
$0
$0
$0
$137,760
$6,455
$1,028,492
$389,857
$222,975
$4,688
$67,628
Monday, January 11, 2016 Page 121 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0323-005-1996 5/22/1996 1/6/1999 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
$0 $366,899 $366,899
3-02-0323-006-1996 7/9/1996 8/22/2000 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)
$86,983 $1,325,578 $1,412,561
3-02-0323-007-1997 4/30/1997 9/27/2001 Install Guidance Signs (SA OT SG) $9,375 $0 $9,375
4/30/1997 9/27/2001 Construct Taxiway (ST TW CO) $615,442 $70,368 $685,810
4/30/1997 9/27/2001 Construct Apron (ST AP CO) $462,497 $0 $462,497
4/30/1997 9/27/2001 Improve Access Road (OT GT AC) $553,430 $0 $553,430
4/30/1997 9/27/2001 Rehabilitate Apron (RE AP IM) $457,809 $0 $457,809
3-02-0323-008-2000 9/7/2000 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $295,552 $0 $295,552
3-02-0323-009-2002 5/24/2002 1/24/2006 Construct Snow Removal Equipment Building Sand & Chemical Storage Building (ST BD SN)
$1,672,217 $171,961 $1,844,178
3-02-0323-010-2004 8/24/2004 9/15/2008 Construct Parking Lot (OT OT PA) $400,000 $0 $400,000
8/24/2004 9/15/2008 Modify Access Road (OT GT AC) $2,332,485 $349,488 $2,681,973
3-02-0323-011-2005 9/8/2005 7/18/2011 Rehabilitate Runway 10/28 (Runway Safety Area, Phase 1) (RE RW IM)
$0 $2,823,191 $2,823,191
9/8/2005 7/18/2011 Rehabilitate Runway 10/28 (RE RW IM) $2,908,793 $0 $2,908,793
3-02-0200-053-2006 4/10/2006 7/20/2010 [Various Grnt] Acquire Snow Removal Equipment (Self-Propelled Broom) (ST EQ SN)
$382,489 $0 $382,489
3-02-0323-012-2006 5/30/2006 4/11/2012 Rehabilitate Runway 10/28 (Runway Safety Area, Phase 2) (RE RW IM)
$0 $19,794,364 $19,794,364
3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)
$90,440 $0 $90,440
3-02-0200-072-2009 9/24/2009 11/12/2014 [Various Grnt] Acquire Safety Equipment and/or Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
$0 $103,425 $103,425
3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Wrangell Various Surface Maintenance (RE RW IM)
$42,560 $0 $42,560
3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 10/28 Various Surface Preservation (RE RW IM)
$20,689 $0 $20,689
3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 10/28 Various Surface Preservation Maintenance (Wrangell) (RE RW IM)
$81,668 $0 $81,668
3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 10/28 Surface Preservation Maintenance (Wrangell) (RE RW IM)
$76,600 $0 $76,600
3-02-0323-013-2013 9/18/2013 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3,000 Gallon ARFF Truck (Wrangell) (SA EQ RF)
$637,950 $0 $637,950
3-02-0200-096-2014 9/18/2014 [Various Grnt] Remove Obstructions (+08J) Various EDA/EAS Locations: Wrangell - Remove Obstructions (Cut brush in RSA and around ramp and taxiways (SA OT OB)
$62,067 $0 $62,067
9/18/2014 [Various Grnt] Rehabilitate Runway 10/28 (+08J) Various EDA/EAS Locations: Wrangell - Surface Preservations Maintenance_ Pavement Markings (RE RW IM)
$85,342 $0 $85,342
3-02-0200-102-2015 9/20/2015 [Various Grnt] Acquire Snow Removal Equipment EAS/EDA Various (Wrangell - Acquire SRE: Self-Propelled Broom) (ST EQ SN)
$614,822 $0 $614,822
9/20/2015 [Various Grnt] Rehabilitate Runway 10/28 EAS/EDA Various (Wrangell - Surface Preservation Maintenance -Markings on RWYs, TWYs, and Aprons) (RE RW IM)
$103,445 $0 $103,445
9/20/2015 [Various Grnt] Remove Obstructions EAS/EDA Various (Wrangell - Remove Obstructions - 86 Acres Brush Cutting around Ramp and TWYs) (SA OT OB)
$62,067 $0 $62,067
3-02-0323-014-2015 8/10/2015 Rehabilitate Taxiway (RE TW IM) $1,000,000 $1,000,000 $2,000,000
Monday, January 11, 2016 Page 122 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0323-014-2015 Rehabilitate Apron (RE AP IM) 8/10/2015 $0 $174,952 $174,952
$14,912,577 $26,180,226 $41,092,803
Yakutat Yakutat (YAK)
3-02-0327-001-1984 Groove Runway 11/29 (SP RW FR) 9/17/1984 11/13/1986 $387,045 $0 $387,045
3-02-0327-002-1985 Improve Airport Drainage (ST OT IM) 9/24/1985 2/6/1991 $214,414 $98,424 $312,838
3-02-0327-003-1987 Acquire Security Equipment (SA EQ SE) 7/7/1987 3/7/1990 $90,574 $0 $90,574
3-02-0327-004-1987 Conduct Airport Master Plan Study (PL PL MA) 6/29/1987 5/12/1992 $77,962 $0 $77,962
3-02-0327-005-1989 Install Apron Lighting (ST AP LI) 9/25/1989 11/17/1992 $130,310 $2,317 $132,627
3-02-0327-006-1991 Extend Runway 02/20 (ST RW IM) 9/24/1991 11/29/1993 $0 $94,871 $94,871
3-02-0327-007-1993 Acquire Aircraft Rescue & Fire Fighting Vehicle (ST EQ 9/9/1993 1/10/1996 $364,301 $0 $364,301 RF)
3-02-0327-008-1993 Acquire Snow Removal Equipment (ST EQ SN) 7/14/1993 2/6/1995 $499,708 $0 $499,708
3-02-0327-009-1994 Remove Obstructions (SA OT OB) 8/26/1994 9/17/1996 $681,059 $0 $681,059
3-02-0327-010-1996 Improve Aircraft Rescue & Fire Fighting Building (SA 9/16/1996 8/22/2000 $149,440 $1,045,530 $1,194,970 BD EX)
3-02-0327-011-1998 Acquire Snow Removal Equipment (ST EQ SN) 6/23/1998 9/20/2001 $148,127 $0 $148,127
3-02-0327-012-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/4/2001 $252,472 $0 $252,472
3-02-0327-013-1999 Rehabilitate Runway Lighting 11-29 (RE RW LI) 3/31/1999 9/27/2002 $77,433 $1,271,044 $1,348,476
3-02-0327-014-2001 Conduct Airport Master Plan Study (PL PL MA) 9/5/2001 4/27/2007 $181,243 $0 $181,243
3-02-0327-015-2001 Improve Snow Removal Equipment Building (ST BD 9/27/2001 9/2/2005 $5,211,501 $947,206 $6,158,707 SN)
3-02-0445-001-2001 Improve Seaplane Base (ST SB CO) 8/20/2001 7/13/2005 $529,005 $0 $529,005
3-02-0327-016-2003 Construct Runway Safety Area 11/29 (SA RW SF) 9/5/2003 9/12/2007 $0 $4,490,000 $4,490,000
Remove Obstructions (Transitional Surface) (SA OT 9/5/2003 9/12/2007 $500,000 $0 $500,000 OB)
Rehabilitate Runway 11/29 (RE RW IM) 9/5/2003 9/12/2007 $3,000,000 $1,469,514 $4,469,514
Rehabilitate Taxiway (RE TW IM) 9/5/2003 9/12/2007 $2,500,000 $543,195 $3,043,195
Rehabilitate Apron (RE AP IM) 9/5/2003 9/12/2007 $1,500,000 $0 $1,500,000
3-02-0327-017-2004 Construct Runway Safety Area 11/29 Phase 2 (SA RW 8/26/2004 4/2/2008 $1,520,000 $35,829 $1,555,829 SF)
3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $79,088 $0 $79,088 (RE RW IM)
3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $114,920 $0 $114,920 (RE RW IM)
3-02-0200-062-2008 [Various Grnt] Acquire Snow Removal Equipment 6/12/2008 10/18/2011 $542,094 $0 $542,094 Acquire SRE (ST EQ SN)
3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $66,200 $0 $66,200 (RE RW IM)
3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various 8/20/2009 12/19/2014 $106,400 $0 $106,400 Surface Maintenance) (RE RW IM)
3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)
3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Yakutat 3/12/2010 12/9/2015 $70,240 $0 $70,240 Various Surface Maintenance (RE RW IM)
3-02-0327-018-2010 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)
3/12/2010 1/7/2015 $702,707 $0 $702,707
3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various 9/16/2011 $201,719 $0 $201,719 Surface Preservation (RE RW IM)
Monday, January 11, 2016 Page 123 of 124
Obligated: Closed: Entitlement Discretionary TOTAL
3-02-0327-019-2012 Rehabilitate Runway 11/29 Accomplish Surface 8/8/2012 $455,160 $0 $455,160 Preservation Maintenance (Yakutat) (RE RW IM)
Remove Obstructions Remove Obstructions (Yakutat) 8/8/2012 $201,719 $0 $201,719 (SA OT OB)
3-02-0200-091-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface 9/19/2013 $103,400 $0 $103,400 Preservation Maintenance (Yakutat) - Pavement Markings (RE RW IM)
3-02-0200-096-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/18/2014 $113,790 $0 $113,790 Various EDA/EAS Locations: Yakutat - Surface Preservations Maintenance _ Pavement Markings (RE RW IM)
3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 11/29 EAS/EDA 9/20/2015 $124,134 $0 $124,134 Various (Yakutat - Surface Preservation Maintenance - Marking on RWYs, TWYs and Aprons) (RE RW IM)
[Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $51,722 $0 $51,722 (Yakutat - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)
3-02-0327-020-2015 Rehabilitate Runway 11/29 Rehabilitate 9/17/2015 $3,000,000 $11,604,319 $14,604,319 Runway/Improve Draining (RE RW IM)
$23,947,886 $21,705,673 $45,653,560