Alaskan Region Airport Improvement Program (AIP) FY 1982 - FY 2015

Obligated: Closed: Entitlement Discretionary TOTAL

Adak Island Adak (ADK)

3-02-0001-001-1999 3/24/1999 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $537,180 $0 $537,180

3-02-0001-002-2005 8/19/2005 5/4/2010 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

$0 $749,946 $749,946

3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Case 821 Loader & plow) (ST EQ SN)

$229,709 $0 $229,709

8/19/2005 12/19/2013 [Various Grnt] Acquire Friction Measuring Equipment (Grip Tester with tow vehicle) (ST EQ SR)

$82,080 $0 $82,080

3-02-0200-055-2006 8/17/2006 7/19/2013 [Various Grnt] Acquire Snow Removal Equipment (HS Tow Vehicle w/ Sweeper & Snow Plow) (ST EQ SN)

$641,827 $0 $641,827

3-02-0200-072-2009 9/24/2009 11/12/2014 [Various Grnt] Acquire Safety Equipment and/or Fencing Acquire Water Rescue Equipment (SA EQ RF)

$0 $100,000 $100,000

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Cupping Plow Attachment for Loader) (ST EQ SN)

$61,356 $0 $61,356

$1,552,152 $849,946 $2,402,098

Akhiok Akhiok (AKK)

3-02-0002-001-1985 9/10/1985 11/4/1988 Rehabilitate Runway 4/22 (RE RW IM) $745,899 $0 $745,899

3-02-0002-002-1994 5/27/1994 11/27/1995 Improve Snow Removal Equipment Building (ST BD SN)

$255,298 $0 $255,298

3-02-0002-003-1994 6/23/1994 9/23/1996 Acquire Snow Removal Equipment (ST EQ SN) $142,225 $0 $142,225

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

$40,000 $0 $40,000

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

$297,362 $0 $297,362

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 04/22 (Various Surface Maintenance) (RE RW IM)

$31,920 $0 $31,920

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 04/22 Akhiok Various Surface Maintenance (RE RW IM)

$85,120 $0 $85,120

$1,597,824 $0 $1,597,824

Akiachak Akiachak (Z13)

3-02-0345-001-1999 8/3/1999 8/27/2003 Conduct Airport Master Plan Study (PL PL MA) $382,101 $0 $382,101

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)

$8,512 $0 $8,512

3-02-0461-001-2009 6/12/2009 8/22/2013 Construct New Airport phase 1 (ARRA funded) (ST NA CO)

$0 $0 $0

3-02-0461-002-2010 3/25/2010 Construct New Airport Construct Airport Ph2 (ST NA CO)

$4,780,074 $7,000,000 $11,780,074

Monday, January 11, 2016 Page 1 of 124

Page 3: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment Central Region Various SRE: Akiachak - Loader and Grader with Attachments (ST EQ SN)

9/27/2011 3/10/2015 $300,529 $0 $300,529

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Akiachak (Loader with Attachments) (ST EQ SN)

9/11/2012 $336,286 $0 $336,286

$5,807,502 $7,000,000 $12,807,502

Akiak Akiak (AKI)

3-02-0004-001-1998 Acquire Land for Development (ST LA DV) 5/26/1998 9/25/2002 $100,000 $0 $100,000

Acquire Snow Removal Equipment (ST EQ SN) 5/26/1998 9/25/2002 $200,000 $0 $200,000

Improve Snow Removal Equipment Building (ST BD SN)

5/26/1998 9/25/2002 $250,000 $0 $250,000

Improve Access Road (OT GT AC) 5/26/1998 9/25/2002 $196,888 $0 $196,888

Construct Taxiway (ST TW CO) 5/26/1998 9/25/2002 $160,000 $0 $160,000

Improve Runway Safety Area 03-21 (SA RW SF) 5/26/1998 9/25/2002 $477,500 $0 $477,500

Extend Runway 03-21 (ST RW IM)

Construct Apron (ST AP CO)

5/26/1998

5/26/1998

9/25/2002 $1,456,231

9/25/2002 $400,000

$0

$0

$1,456,231

$400,000

3-02-0004-002-2003 Construct Snow Removal Equipment Building (ST BD SN)

8/4/2003 8/17/2007 $571,708 $0 $571,708

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 03/21 (Various Surface Maintenance) (RE RW IM)

8/20/2009 12/19/2014 $16,031 $0 $16,031

$3,828,358 $0 $3,828,358

Akutan Akutan (KQA)

3-02-0346-001-1995 Rehabilitate Runway E/W (RE RW IM) 9/8/1995 9/25/1997 $0 $418,615 $418,615

Expand Apron (ST AP IM) 9/8/1995 9/25/1997 $0 $700,000 $700,000

Rehabilitate Apron (RE AP IM) 9/8/1995 9/25/1997 $0 $400,000 $400,000

3-02-0346-002-1999 Conduct Airport Master Plan Study (PL PL MA) 8/3/1999 9/12/2002 $74,751 $0 $74,751

3-02-0346-003-2000 Conduct Airport Master Plan Study (PL PL MA)

3-02-0346-004-2002 Conduct Airport Master Plan Study (PL PL MA)

8/24/2000

9/20/2002

8/25/2004

5/31/2006

$218,015

$0

$0

$1,197,991

$218,015

$1,197,991

3-02-0346-005-2004 Conduct Airport Master Plan Study (PL PL MA) 5/21/2004 6/26/2007 $6,459 $411,826 $418,285

3-02-0346-006-2006 Conduct Airport Master Plan Study (Phase 5, Complete EA) (PL PL MA)

9/1/2006 3/1/2011 $104,651 $0 $104,651

3-02-0005-001-2007 Construct New Airport (Environmental Studies) Phase 1 (ST NA CO)

8/8/2007 1/28/2013 $0 $986,259 $986,259

3-02-0346-007-2007 Conduct Airport Master Plan Study (PL PL MA)

3-02-0005-002-2010 Construct New Airport Phase 2 (part C) (ST NA CO)

5/22/2007

8/6/2010

7/8/2011 $291,393

12/24/2014 $9,000,000

$0

$11,000,000

$291,393

$20,000,000

3-02-0005-003-2011 Construct New Airport Phase 3 (ST NA CO) 8/25/2011 12/23/2014 $11,000,000 $0 $11,000,000

3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment Various Central Region SRE: Akutan - Grader, Plow Truck, and Loadeer with Attachments (ST EQ SN)

9/27/2011 3/10/2015 $809,474 $0 $809,474

3-02-0005-004-2012 Construct New Airport Phase 4 (ST NA CO) 6/28/2012 12/24/2014 $5,250,000 $0 $5,250,000

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Akutan (Towed Broom, Slide-in Sander, Loader with Attachments, Loader Mounted Snow-Blower) (ST EQ SN)

9/11/2012 $1,000,000 $0 $1,000,000

3-02-0005-005-2013 Construct New Airport Phase 5 (ST NA CO) 8/29/2013 12/24/2014 $5,250,000 $0 $5,250,000

3-02-0005-006-2014 Construct New Airport Phase 6 (ST NA CO) 6/10/2014 $5,250,000 $0 $5,250,000

Monday, January 11, 2016 Page 2 of 124

Page 4: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0005-007-2015 Construct New Airport Phase 7 (ST NA CO) 8/5/2015 $5,000,000 $0 $5,000,000

$43,254,743 $15,114,691 $58,369,434

Alakanuk Alakanuk (AUK)

3-02-0332-001-1988 Improve Access Road (OT GT AC) 7/20/1988 8/9/1993 $100,000 $0 $100,000

Acquire Snow Removal Equipment (ST EQ SN) 7/20/1988 8/9/1993 $78,125 $0 $78,125

Construct Taxiway (ST TW CO) 7/20/1988 8/9/1993 $40,000 $0 $40,000

Construct Apron (ST AP CO) 7/20/1988 8/9/1993 $30,000 $0 $30,000

Improve Airport Drainage (ST OT IM) 7/20/1988 8/9/1993 $70,000 $0 $70,000

Improve Snow Removal Equipment Building (ST BD 7/20/1988 8/9/1993 $70,000 $0 $70,000 SN)

Install Runway Lighting (ST RW LI) 7/20/1988 8/9/1993 $111,000 $0 $111,000

Extend Runway 18/36 (ST RW IM) 7/20/1988 8/9/1993 $1,572,129 $307,543 $1,879,672

3-02-0332-002-1996 Conduct Airport Master Plan Study (PL PL MA) 9/12/1996 9/20/2000 $295,925 $0 $295,925

3-02-0440-001-2002 Construct New Airport (ST NA CO) 5/20/2002 1/24/2006 $5,596,264 $0 $5,596,264

3-02-0440-002-2007 Construct New Airport Phase 2 (Access Road & SREB) 9/6/2007 1/22/2013 $494,866 $5,885,922 $6,380,788 (ST NA CO)

3-02-0000-010-2008 Conduct aeronautical survey for WAAS approach (PL 6/13/2008 5/20/2014 $51,000 $119,870 $170,870 PL VI)

3-02-0440-003-2009 Construct New Airport Phase 3 (Subbase) (ST NA CO) 2/13/2009 1/28/2013 $2,214,959 $7,390,306 $9,605,265

3-02-0440-004-2011 Construct New Airport Phase 4 (Surfacing) (ST NA CO) 3/18/2011 12/19/2014 $4,511,963 $1,858,668 $6,370,631

$15,236,231 $15,562,310 $30,798,541

Aleknagik Aleknagik /New (5A8)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 15/33 Aleknagik 3/12/2010 12/9/2015 $38,304 $0 $38,304 Various Surface Maintenance (RE RW IM)

$38,304 $0 $38,304

Aleutians East Borough Aleutians East Borough Planning (@00H)

3-02-0804-001-2002 Conduct Metropolitan System Plan Study (PL PL ME) 8/27/2002 7/31/2006 $249,000 $0 $249,000

$249,000 $0 $249,000

Allakaket Allakaket (6A8)

3-02-0009-001-1987 Install Runway Lighting (ST RW LI) 7/28/1987 6/13/1991 $221,601 $0 $221,601

3-02-0009-002-1988 Acquire Land For Approaches (ST LA SZ) 6/30/1988 6/13/1991 $9,375 $0 $9,375

Extend Runway 17/35 (ST RW IM) 6/30/1988 6/13/1991 $116,364 $0 $116,364

Install Runway Lighting (ST RW LI) 6/30/1988 6/13/1991 $42,281 $0 $42,281

3-02-0009-003-1991 Conduct Airport Master Plan Study (PL PL MA) 9/5/1991 9/9/1997 $139,435 $0 $139,435

3-02-0009-004-1997 Construct Taxiway (ST TW CO) 6/12/1997 9/18/2001 $190,000 $0 $190,000

Install Runway Lighting (ST RW LI) 6/12/1997 9/18/2001 $256,300 $0 $256,300

Construct Runway 5/23 (ST RW CO) 6/12/1997 9/18/2001 $4,494,657 $0 $4,494,657

Improve Access Road (OT GT AC) 6/12/1997 9/18/2001 $511,080 $0 $511,080

Improve Snow Removal Equipment Building (ST BD 6/12/1997 9/18/2001 $540,000 $0 $540,000 SN)

Monday, January 11, 2016 Page 3 of 124

Page 5: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0009-004-1997 6/12/1997 9/18/2001 Construct Apron (ST AP CO) $520,000 $0 $520,000

6/12/1997 9/18/2001 Acquire Land for Development (ST LA DV) $229,440 $0 $229,440

6/12/1997 9/18/2001 Acquire Land For Approaches (ST LA SZ) $70,560 $0 $70,560

3-02-0009-005-2009 6/12/2009 1/9/2012 Rehabilitate Runway 05/23 ARRA funded (RE RW IM) $0 $0 $0

3-02-0009-006-2009 8/10/2009 1/28/2013 Expand Apron expand apron (ST AP IM) $560,114 $0 $560,114

3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Allakaket (Loader with Attachments, Grader with Attachments) (ST EQ SN)

$638,922 $0 $638,922

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$70,125 $0 $70,125

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 05/23 (+08J) Various Surface Preservation Maintenance: Allakaket - Surface Repair, Dust Control (RE RW IM)

$244,921 $0 $244,921

$8,855,175 $0 $8,855,175

Ambler Ambler (AFM)

3-02-0354-001-1986 9/19/1986 12/20/1993 Improve Airport Drainage (ST OT IM) $75,000 $0 $75,000

9/19/1986 12/20/1993 Acquire Snow Removal Equipment (ST EQ SN) $81,854 $0 $81,854

9/19/1986 12/20/1993 Improve Snow Removal Equipment Building (ST BD SN)

$216,670 $0 $216,670

9/19/1986 12/20/1993 Acquire Land for Development (ST LA DV) $312,412 $0 $312,412

9/19/1986 12/20/1993 Extend Runway 18/36 (ST RW IM) $938,793 $57,910 $996,703

9/19/1986 12/20/1993 Install Runway Lighting (ST RW LI) $93,933 $0 $93,933

3-02-0354-002-1989 6/26/1989 11/16/1993 Construct Runway 9/27 (ST RW CO) $924,742 $0 $924,742

6/26/1989 11/16/1993 Improve Airport Drainage (ST OT IM) $55,014 $0 $55,014

6/26/1989 11/16/1993 Install Runway Lighting (ST RW LI) $73,186 $0 $73,186

3-02-0354-003-1991 8/21/1991 3/17/1993 Acquire Land for Development (ST LA DV) $70,437 $0 $70,437

8/21/1991 3/17/1993 Acquire Land For Approaches (ST LA SZ) $14,457 $0 $14,457

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)

$143,800 $0 $143,800

3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $300,000 $300,000

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)

$315,084 $0 $315,084

3-02-0354-004-2013 9/23/2013 Extend Runway 18/36 Phase 1 (ST RW IM) $0 $1,000,000 $1,000,000

9/23/2013 Rehabilitate Runway 09/27 (RE RW IM) $0 $3,059,764 $3,059,764

9/23/2013 Rehabilitate Runway 18/36 Rehabilitate Runway 18/36 (RE RW IM)

$0 $3,000,000 $3,000,000

3-02-0354-005-2014 7/11/2014 Extend Runway 18/36 Phase 2 (ST RW IM) $412,500 $0 $412,500

7/11/2014 Rehabilitate Runway 18/36 Phase 2 (RE RW IM) $6,574,032 $0 $6,574,032

7/11/2014 Construct Snow Removal Equipment Building (ST BD SN)

$2,437,500 $0 $2,437,500

7/11/2014 Rehabilitate Runway 09/27 Phase 2 (RE RW IM) $4,804,688 $0 $4,804,688

7/11/2014 Install Airport Beacons (SA OT VI) $100,000 $0 $100,000

7/11/2014 Rehabilitate Access Road (OT GT AC) $937,500 $0 $937,500

7/11/2014 Rehabilitate Apron Rehabilitate Apron (RE AP IM) $1,696,875 $0 $1,696,875

3-02-0354-006-2015 7/7/2015 Rehabilitate Runway 18/36 Phase 3 (RE RW IM) $1,220,000 $0 $1,220,000

7/7/2015 Rehabilitate Runway 09/27 Rehab runway ph3 (RE RW IM)

$1,217,899 $0 $1,217,899

$22,716,376 $7,417,674 $30,134,050

Monday, January 11, 2016 Page 4 of 124

Page 6: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Anaktuvuk Pass Anaktuvuk Pass (AKP)

3-02-0012-001-1985 Acquire Land for Development 18/36 (ST LA DV)

3-02-0012-002-1986 Construct Apron (ST AP CO)

Acquire Land for Development (ST LA DV)

Construct Taxiway (ST TW CO)

3-02-0012-003-1998 Improve Snow Removal Equipment Building (ST BD SN)

Improve Access Road (OT GT AC)

Construct Apron (ST AP CO)

Construct Taxiway (ST TW CO)

Rehabilitate Runway 18-36 (RE RW IM)

3-02-0012-004-1999 Acquire Snow Removal Equipment (ST EQ SN)

3-02-0012-005-2003 Rehabilitate Runway 01-19 (Maintenance) (RE RW IM)

9/25/1985

9/10/1986

9/10/1986

9/10/1986

7/1/1998

7/1/1998

7/1/1998

7/1/1998

7/1/1998

8/6/1999

9/5/2003

4/17/1989 $143,577

4/9/1992 $31,826

4/9/1992 $0

4/9/1992 $16,033

9/27/2002 $561,000

9/27/2002 $325,000

9/27/2002 $602,278

9/27/2002 $50,000

9/27/2002 $2,786,000

9/5/2001 $361,932

9/17/2007 $100,000

$4,977,646

$6,455

$345,971

$194,063

$0

$0

$0

$0

$0

$0

$0

$0

$546,489

$150,032

$377,797

$194,063

$16,033

$561,000

$325,000

$602,278

$50,000

$2,786,000

$361,932

$100,000

$5,524,135

Anchorage Anchorage Float Plane Basin (+091)

3-02-0483-001-2007 Conduct Miscellaneous Study Airport Economic Options Study (PL PL MS)

7/25/2007 7/6/2011 $94,328

$94,328

$0

$0

$94,328

$94,328

Lake Hood (LHD)

3-02-0013-001-1989 Conduct Miscellaneous Study (PL PL MS)

3-02-0013-002-1990 Conduct Airport Master Plan Study (PL PL MA)

3-02-0013-003-1995 Construct Taxiway (ST TW CO)

Improve Access Road (OT GT AC)

Acquire Miscellaneous Land (ST LA MS)

Install Apron Lighting (ST AP LI)

3-02-0013-004-1996 Expand Apron (ST AP IM)

3-02-0013-005-2000 Rehabilitate Runway Lighting WE (RE RW LI)

3-02-0013-006-2001 Rehabilitate Taxiway (RE TW IM)

3-02-0013-007-2003 Improve Runway Safety Area 13/31 (SA RW SF)

3-02-0013-008-2003 Construct Apron E (Ph 1) (ST AP CO)

3-02-0013-009-2004 Construct Apron Reimbursement (ST AP CO)

3-02-0013-010-2004 Rehabilitate Taxiway (RE TW IM)

3-02-0013-011-2006 Construct Apron Phase 2 (06 EP + 05 Carryover) (ST AP CO)

Construct Apron Phase 2 (MY - Reimbursement) (ST AP CO)

3-02-0013-012-2010 Install Guidance Signs Install signage (SA OT SG)

3-02-0013-013-2010 Acquire Land for Development Land Acquisition Phase 1(C) (ST LA DV)

3-02-0013-014-2010 Improve Seaplane Base Bank stabilization, Phase 1 (ST SB CO)

3-02-0013-015-2011 Improve Seaplane Base Bank Stabilization, Phase 2 (ST SB CO)

3-02-0013-016-2011 Install Guidance Signs Install signage and lighting, Phase 2 (SA OT SG)

6/29/1989

1/25/1990

9/24/1995

9/24/1995

9/24/1995

9/24/1995

9/20/1996

9/6/2000

9/12/2001

8/26/2003

7/7/2003

6/2/2004

8/27/2004

7/14/2006

7/14/2006

9/23/2010

6/15/2010

9/16/2010

3/15/2011

9/15/2011

9/30/1997 $165,000

9/9/1997 $42,595

7/19/2000 $365,625

7/19/2000 $221,250

7/19/2000 $590,356

7/19/2000 $62,813

9/17/2001 $455,693

9/9/2003 $788,493

8/3/2004 $632,386

2/14/2007 $0

7/27/2007 $2,349,000

8/23/2007 $1,532,210

5/27/2008 $0

10/18/2011 $1,891,416

10/18/2011 $1,000,000

3/24/2015 $28,771

3/7/2013 $1,352,145

12/10/2015 $1,644,483

$1,000,000

3/10/2015 $0

$0

$0

$0

$0

$0

$0

$39,367

$511,562

$0

$729,786

$0

$0

$1,585,867

$0

$303,599

$626,037

$0

$0

$1,044,510

$690,140

$165,000

$42,595

$365,625

$221,250

$590,356

$62,813

$495,060

$1,300,055

$632,386

$729,786

$2,349,000

$1,532,210

$1,585,867

$1,891,416

$1,303,599

$654,809

$1,352,145

$1,644,483

$2,044,510

$690,140

Monday, January 11, 2016 Page 5 of 124

Page 7: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0013-017-2011 9/15/2011 Acquire Land For Approaches Wendy's Way- RPZ phase 2 (ST LA SZ)

$0 $4,099,250 $4,099,250

3-02-0013-019-2012 6/25/2012 3/11/2013 Install Guidance Signs Phase 3 (SA OT SG) $143,299 $0 $143,299

3-02-0013-020-2014 8/15/2014 Update Airport Master Plan Study Update MP (PL PL MA)

$1,038,230 $0 $1,038,230

3-02-0013-021-2015 5/27/2015 Rehabilitate Apron LHD Rehabilitate General Aviation Aprons: Alpha Parking and Bravo Parking (RE AP IM)

$2,044,369 $4,709,645 $6,754,014

$17,348,134 $14,339,763 $31,687,896

Merrill Field (MRI)

3-02-0015-001-1982 9/29/1982 7/9/1986 Expand Apron (ST AP IM) $1,563,946 $0 $1,563,946

3-02-0015-002-1983 9/28/1983 4/28/1988 Install Runway Lighting (ST RW LI) $102,807 $0 $102,807

9/28/1983 4/28/1988 Acquire Snow Removal Equipment (ST EQ SN) $140,625 $0 $140,625

9/28/1983 4/28/1988 Acquire Land for Development (ST LA DV) $2,019,150 $3,408 $2,022,558

3-02-0015-003-1984 9/21/1984 5/5/1988 Expand Apron 15/33 (ST AP IM) $667,939 $54,587 $722,526

9/21/1984 5/5/1988 Install Apron Lighting (ST AP LI) $30,000 $0 $30,000

3-02-0015-004-1984 9/26/1984 5/10/1988 Improve Access Road (OT GT AC) $528,951 $38,738 $567,689

9/26/1984 5/10/1988 Improve Access Road (OT GT AC) $443,109 $30,000 $473,109

9/26/1984 5/10/1988 Improve Access Road (CA GT AC) $989,955 $0 $989,955

3-02-0015-005-1985 7/3/1985 5/16/1988 Rehabilitate Apron 6/24 (RE AP IM) $328,125 $0 $328,125

7/3/1985 5/16/1988 Acquire Snow Removal Equipment (ST EQ SN) $84,376 $0 $84,376

7/3/1985 5/16/1988 Rehabilitate Apron 6/24 (RE AP IM) $1,667,793 $48,941 $1,716,734

7/3/1985 5/16/1988 Acquire Security Equipment 6/24 (SA EQ SE) $140,625 $0 $140,625

3-02-0015-006-1986 6/9/1986 5/12/1988 Expand Apron (ST AP IM) $184,720 $4,746 $189,466

6/9/1986 5/12/1988 Expand Apron (ST AP IM) $2,731,977 $74,354 $2,806,331

6/9/1986 5/12/1988 Rehabilitate Taxiway Lighting (RE TW LI) $82,199 $0 $82,199

3-02-0015-007-1987 1/13/1987 2/19/1987 Acquire Land for Development 13/31 (ST LA DV) $2,130,133 $0 $2,130,133

3-02-0015-008-1987 9/23/1987 3/6/1990 Acquire Snow Removal Equipment (ST EQ SN) $338,572 $0 $338,572

9/23/1987 3/6/1990 Acquire Land for Development (ST LA DV) $973,573 $2,100,082 $3,073,655

3-02-0015-009-1988 7/20/1988 8/2/1991 Construct Taxiway (CA TW CO) $23,437 $0 $23,437

7/20/1988 8/2/1991 Expand Apron (CA AP EX) $35,437 $0 $35,437

7/20/1988 8/2/1991 Rehabilitate Runway 15/33 (RE RW IM) $946,047 $150,008 $1,096,055

7/20/1988 8/2/1991 Install Apron Lighting (ST AP LI) $23,000 $0 $23,000

7/20/1988 8/2/1991 Extend Taxiway (CA TW EX) $103,125 $0 $103,125

7/20/1988 8/2/1991 Improve Access Road (CA GT AC) $792,415 $0 $792,415

3-02-0015-010-1989 6/7/1989 10/13/1992 Conduct Noise Compatibility Plan Study (EN PL NO) $290,625 $0 $290,625

3-02-0015-011-1989 9/13/1989 12/16/1992 Acquire Land for Development (ST LA DV) $171,281 $0 $171,281

9/13/1989 12/16/1992 Acquire Miscellaneous Land (ST LA MS) $152,062 $0 $152,062

9/13/1989 12/16/1992 Noise Mitigation Measures for Public Buildings (EN PB 75)

$50,719 $17,619 $68,338

3-02-0015-012-1990 9/21/1990 12/17/1991 Acquire Land for Development (ST LA DV) $70,312 $0 $70,312

3-02-0015-013-1991 9/11/1991 9/28/1993 Rehabilitate Apron (RE AP IM) $455,963 $0 $455,963

9/11/1991 9/28/1993 Construct Apron (ST AP CO) $568,464 $204,808 $773,272

9/11/1991 9/28/1993 Acquire Security Equipment (SA EQ SE) $340,963 $0 $340,963

3-02-0015-014-1992 8/7/1992 8/13/1992 Acquire Land For Approaches (ST LA SZ) $863,273 $0 $863,273

3-02-0015-015-1993 2/17/1993 10/24/1998 Install Apron Lighting (ST AP LI) $27,163 $0 $27,163

2/17/1993 10/24/1998 Remove Obstructions (ST OT OB) $281,250 $0 $281,250

3-02-0015-016-1994 6/17/1994 12/28/1994 Acquire Land For Approaches (ST LA SZ) $1,840,808 $0 $1,840,808

3-02-0015-017-1995 8/1/1995 7/14/1999 Remove Obstructions (ST OT OB) $0 $500,625 $500,625

8/1/1995 7/14/1999 Acquire Snow Removal Equipment (ST EQ SN) $0 $187,500 $187,500

Monday, January 11, 2016 Page 6 of 124

Page 8: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0015-017-1995 Acquire Security Equipment (SA EQ SE) 8/1/1995 7/14/1999 $0 $126,250 $126,250

Install Guidance Signs (SA OT SG) 8/1/1995 7/14/1999 $0 $171,065 $171,065

3-02-0015-018-1996 Rehabilitate Taxiway (RE TW IM) 9/19/1996 7/24/2000 $1,050,131 $0 $1,050,131

Improve Access Road (OT GT AC) 9/19/1996 7/24/2000 $125,000 $0 $125,000

Rehabilitate Apron (RE AP IM) 9/19/1996 7/24/2000 $1,325,000 $0 $1,325,000

3-02-0015-019-1996 Acquire Snow Removal Equipment (ST EQ SN) 9/19/1996 1/25/2000 $374,041 $0 $374,041

3-02-0015-020-1996 Conduct Airport Master Plan Study (PL PL MA) 9/19/1996 9/21/2000 $448,907 $0 $448,907

3-02-0015-021-1996 Acquire Land for Development (ST LA DV) 9/19/1996 6/8/2000 $166,712 $0 $166,712

3-02-0015-022-1997 Acquire Snow Removal Equipment (ST EQ SN) 6/6/1997 1/25/2000 $434,650 $0 $434,650

3-02-0015-023-1997 Improve Access Road (OT GT AC) 9/22/1997 9/21/2001 $57,079 $0 $57,079

Rehabilitate Taxiway (RE TW IM) 9/22/1997 9/21/2001 $50,729 $0 $50,729

Rehabilitate Runway Lighting 6-24 (RE RW LI) 9/22/1997 9/21/2001 $98,190 $0 $98,190

Install Runway Vertical/Visual Guidance System (ST 9/22/1997 9/21/2001 $13,125 $0 $13,125 RW VI)

Install Apron Lighting (ST AP LI) 9/22/1997 9/21/2001 $28,417 $0 $28,417

Construct Taxiway (ST TW CO) 9/22/1997 9/21/2001 $64,242 $0 $64,242

Improve Runway Safety Area 24 (ST RW SF) 9/22/1997 9/21/2001 $62,366 $0 $62,366

3-02-0015-024-1997 Acquire Land for Development (ST LA DV) 9/22/1997 9/21/2000 $204,870 $0 $204,870

3-02-0015-025-1998 Construct Taxiway (ST TW CO) 3/24/1998 9/27/2002 $78,125 $400,000 $478,125

Install Miscellaneous NAVAIDS (SP OT IN) 3/24/1998 9/27/2002 $150,000 $0 $150,000

Rehabilitate Runway Lighting 6-24 (RE RW LI) 3/24/1998 9/27/2002 $0 $600,000 $600,000

Improve Runway Safety Area 6-24 (SA RW SF) 3/24/1998 9/27/2002 $300,000 $53,364 $353,364

3-02-0015-026-1998 Acquire Snow Removal Equipment (ST EQ SN) 6/26/1998 9/5/2001 $234,375 $0 $234,375

Install Perimeter Fencing (ST EQ SE) 6/26/1998 9/5/2001 $299,306 $0 $299,306

3-02-0015-027-1999 Install Perimeter Fencing (ST EQ SE) 3/25/1999 9/8/2003 $0 $300,000 $300,000

Rehabilitate Taxiway (RE TW IM) 3/25/1999 9/8/2003 $300,000 $497,387 $797,387

3-02-0015-028-1999 Construct Runway (ST RW CO) 3/25/1999 9/27/2002 $293,646 $39,847 $333,493

3-02-0015-029-2000 Acquire Snow Removal Equipment (ST EQ SN) 6/20/2000 8/31/2001 $152,362 $0 $152,362

3-02-0015-030-2000 Construct Taxiway (ST TW CO) 7/31/2000 8/26/2004 $0 $847,500 $847,500

Install Perimeter Fencing (ST EQ SE) 7/31/2000 8/26/2004 $262,500 $420,589 $683,089

3-02-0015-031-2000 Install Perimeter Fencing (ST EQ SE) 9/8/2000 4/30/2004 $18,750 $437,816 $456,566

3-02-0015-032-2001 Improve Access Road (OT GT AC) 8/17/2001 5/3/2004 $1,517,199 $0 $1,517,199

3-02-0015-033-2001 Install Perimeter Fencing (ST EQ SE) 8/17/2001 5/3/2004 $0 $89,227 $89,227

3-02-0015-034-2001 Construct Runway (ST RW CO) 9/13/2001 2/24/2005 $1,424,640 $0 $1,424,640

3-02-0015-035-2002 Rehabilitate Taxiway C (RE TW IM) 8/13/2002 6/24/2005 $578,000 $0 $578,000

Security Enhancements (ST EQ SE) 8/13/2002 6/24/2005 $243,000 $550,000 $793,000

Rehabilitate Apron (RE AP IM) 8/13/2002 6/24/2005 $119,000 $40,514 $159,514

3-02-0015-037-2003 Install Guidance Signs (RSAT recommendations) (SP 8/21/2003 7/27/2007 $0 $563,358 $563,358 OT SG)

3-02-0015-038-2003 Rehabilitate Taxiway (RE TW IM) 8/7/2003 1/12/2007 $1,208,834 $0 $1,208,834

3-02-0015-039-2004 Security Enhancements (SA EQ SE) 7/23/2004 3/12/2007 $0 $1,042,500 $1,042,500

Expand Apron (ST AP IM) 7/23/2004 3/12/2007 $1,000,000 $179,029 $1,179,029

3-02-0015-036-2005 Extend Taxiway (RSAT Recommendation) (ST TW IM) 5/24/2005 7/1/2008 $0 $1,060,000 $1,060,000

Security Enhancements (RSAT Recommendations) (ST 5/24/2005 7/1/2008 $0 $1,155,163 $1,155,163 EQ SE)

Rehabilitate Runway 06/24 (RE RW IM) 5/24/2005 7/1/2008 $1,000,000 $1,092,500 $2,092,500

3-02-0015-040-2006 Acquire Snow Removal Equipment (ST EQ SN) 8/4/2006 5/6/2010 $525,464 $0 $525,464

3-02-0015-041-2006 Security Enhancements (RSAT Recommendations, 8/21/2006 6/16/2008 $500,000 $286,631 $786,631 Phase 2) (ST EQ SE)

Rehabilitate Apron Phase 1 (block 5) (RE AP IM) 8/21/2006 6/16/2008 $927,100 $0 $927,100

Monday, January 11, 2016 Page 7 of 124

Page 9: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0015-042-2007 Rehabilitate Apron Phase 2 (block 5) (RE AP IM) 5/22/2007 6/13/2011 $1,000,000 $1,036,000 $2,036,000

Acquire Equipment (Public Address System) (ST EQ 5/22/2007 6/13/2011 $0 $264,696 $264,696 MS)

3-02-0015-043-2007 Construct Taxiway Phase 1 (Land Acquis.) (ST TW CO) 6/28/2007 6/3/2010 $1,528,788 $0 $1,528,788

3-02-0015-044-2008 Rehabilitate Apron Block 5 (phase 3), Charlie South 6/12/2008 6/4/2012 $2,546,000 $29,567 $2,575,567 (RE AP IM)

3-02-0015-045-2008 Install Runways Incursion Caution Bars Runway VPD 9/8/2008 3/7/2013 $244,129 $0 $244,129 barrier gate and warning light upgrades, phase 1 (SP OT SG)

3-02-0015-046-2009 Rehabilitate Apron Apron Rehabilitation - ARRA Funded 5/1/2009 1/18/2011 $0 $0 $0 (RE AP IM)

3-02-0015-047-2009 Rehabilitate Apron Block 5 (phase 4) (RE AP IM) 5/1/2009 3/26/2012 $1,794,066 $0 $1,794,066

Install Runways Incursion Caution Bars Runway VPD 5/1/2009 3/26/2012 $250,000 $0 $250,000 barrier gate and warning lights upgrades, phase 2 (SP OT SG)

3-02-0015-048-2009 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 8/18/2009 3/29/2011 $0 $0 $0 Phase 1 (ARRA funded) (RE TW IM)

3-02-0015-049-2010 Acquire Snow Removal Equipment Acquire SRE (part 6/7/2010 7/3/2013 $83,896 $569,704 $653,600 C) (ST EQ SN)

3-02-0015-050-2010 Install Runway Vertical/Visual Guidance System 16/34 3/15/2010 8/22/2013 $250,000 $0 $250,000 Replace Rwy 34 non-fed PLASI with non-fed PAPI (ST RW VI)

Rehabilitate Runway 16/34 Rehab. runway (RE RW IM) 3/15/2010 8/22/2013 $274,346 $2,861,218 $3,135,564

3-02-0015-051-2010 Acquire Land For Approaches Acquire Land (ST LA SZ) 7/16/2010 11/5/2014 $298,551 $0 $298,551

3-02-0015-052-2010 Remove Obstructions Remove structure and 8/31/2010 11/5/2014 $109,751 $0 $109,751 obstructions (ST OT OB)

3-02-0015-053-2011 Acquire Snow Removal Equipment Acquire SRE - 9/27/2011 $323,000 $0 $323,000 Replace Sweeper/Vacuum Truck (ST EQ SN)

3-02-0015-054-2011 Conduct Airport Master Plan Study Conduct Airport 8/26/2011 $608,000 $0 $608,000 Master Plan Phase I (PL PL MA)

3-02-0015-055-2011 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 6/8/2011 $2,253,400 $0 $2,253,400 Phase 2 (RE TW IM)

3-02-0015-056-2011 Acquire Safety Equipment and/or Fencing Fencing, 9/9/2011 $392,000 $157,100 $549,100 Signage, Lighting (VPD reduction) (SA EQ RF)

3-02-0015-057-2012 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 5/17/2012 $1,000,000 $1,437,500 $2,437,500 Phase 3 (RE TW IM)

3-02-0015-058-2012 Acquire Safety Equipment and/or Fencing Fencing, 8/27/2012 $0 $1,560,000 $1,560,000 Signage, Lighting (VPD reduction) Phase 2 (SA EQ RF)

3-02-0015-059-2013 Acquire Snow Removal Equipment (ST EQ SN) 8/8/2013 $937,500 $0 $937,500

3-02-0015-060-2013 Rehabilitate Runway Lighting 16/34 (RE RW LI) 8/27/2013 $1,012,500 $0 $1,012,500

3-02-0015-061-2014 Update Airport Master Plan Study Phase 2 (PL PL MA) 9/19/2014 $0 $600,000 $600,000

3-02-0015-062-2014 Rehabilitate Taxiway Rehabilitate Taxiway Quebec - 9/18/2014 $1,000,000 $0 $1,000,000 Phase 4 (RE TW IM)

3-02-0015-063-2015 Acquire Safety Equipment and/or Fencing Fencing, 8/5/2015 $1,000,000 $3,577,100 $4,577,100 Signage, Lighting (VPD reduction) Phase 3 (SA EQ RF)

3-02-0015-064-2015 Construct Taxiway Phase D (Land Acquis.-City Electr) 9/15/2015 $1,995,000 $0 $1,995,000 (ST TW CO)

$56,721,606 $25,461,041 $82,182,647

Ted Stevens Anchorage International (ANC)

3-02-0016-001-1984 Construct Apron (CA AP CO) 9/21/1984 11/10/1988 $2,673,731 $242,338 $2,916,069

3-02-0016-002-1985 Conduct Noise Compatibility Plan Study (EN PL NO) 9/6/1985 10/13/1992 $0 $315,274 $315,274

3-02-0016-003-1986 Rehabilitate Apron (RE AP IM) 7/30/1986 1/12/1988 $1,935,435 $0 $1,935,435

3-02-0016-004-1987 Improve Snow Removal Equipment Building (ST BD 9/16/1987 11/5/1991 $207,022 $0 $207,022 SN)

Monday, January 11, 2016 Page 8 of 124

Page 10: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-004-1987 Install Runway Lighting 14/32 (SP RW LI) 9/16/1987 11/5/1991 $581,052 $0 $581,052

Install Apron Lighting 14/32 (ST AP LI) 9/16/1987 11/5/1991 $665,119 $0 $665,119

3-02-0016-005-1988 Rehabilitate Runway 6/24 (RE RW IM) 6/30/1988 1/30/1991 $1,465,371 $19,693 $1,485,064

Rehabilitate Taxiway (RE TW IM) 6/30/1988 1/30/1991 $159,317 $0 $159,317

3-02-0016-006-1989 Improve Aircraft Rescue & Fire Fighting Building (SA 8/21/1989 9/28/1995 $5,400,583 $343,111 $5,743,694 BD EX)

3-02-0016-007-1989 Rehabilitate Taxiway (RE TW IM) 9/20/1989 12/16/1992 $982,600 $0 $982,600

Construct Taxiway (CA TW CO) 9/20/1989 12/16/1992 $2,489,766 $98,705 $2,588,471

3-02-0016-008-1990 Rehabilitate Taxiway Lighting (RE TW LI) 9/5/1990 10/13/1992 $213,563 $0 $213,563

Rehabilitate Taxiway (RE TW IM) 9/5/1990 10/13/1992 $1,900,523 $0 $1,900,523

3-02-0016-009-1990 Construct Apron (CA AP CO) 7/3/1990 9/15/1994 $3,352,650 $250,056 $3,602,706

Install Apron Lighting (ST AP LI) 7/3/1990 9/15/1994 $133,557 $0 $133,557

3-02-0016-010-1990 Rehabilitate Runway 6/24 (RE RW IM) 8/31/1990 7/23/1992 $1,253,265 $0 $1,253,265

Rehabilitate Taxiway (RE TW IM) 8/31/1990 7/23/1992 $40,881 $0 $40,881

3-02-0016-011-1991 Rehabilitate Taxiway (RE TW IM) 7/15/1991 9/10/1993 $1,556,807 $86,445 $1,643,252

Rehabilitate Taxiway Lighting (RE TW LI) 7/15/1991 9/10/1993 $65,919 $0 $65,919

3-02-0016-012-1991 Install Apron Lighting (ST AP LI) 7/15/1991 2/10/1994 $36,204 $0 $36,204

Extend Taxiway (ST TW IM) 7/15/1991 2/10/1994 $1,318,313 $201,051 $1,519,364

3-02-0016-013-1991 Acquire Security Equipment (SA EQ SE) 9/5/1991 8/23/2000 $879,085 $0 $879,085

3-02-0016-014-1992 Extend Runway 06/24 (ST RW IM) 9/29/1992 12/20/1994 $218,747 $38,508 $257,255

Rehabilitate Taxiway (RE TW IM) 9/29/1992 12/20/1994 $2,312,974 $0 $2,312,974

3-02-0016-016-1992 Conduct Airport Master Plan Study (PL PL MA) 9/23/1992 1/25/2000 $449,827 $0 $449,827

3-02-0016-017-1992 Improve Access Road (OT GT AC) 9/29/1992 10/24/1998 $4,657,094 $523,567 $5,180,661

Improve Snow Removal Equipment Building (ST BD 9/29/1992 10/24/1998 $225,000 $0 $225,000 SN)

3-02-0016-018-1992 Improve Access Road (OT GT AC) 7/29/1992 5/12/2000 $796,406 $34,853 $831,259

3-02-0016-015-1993 Improve Airport Drainage (ST OT IM) 7/26/1993 6/12/2000 $256,365 $0 $256,365

3-02-0016-019-1993 Rehabilitate Taxiway (RE TW IM) 6/28/1993 9/26/1996 $1,991,114 $282,791 $2,273,905

3-02-0016-020-1993 Install Guidance Signs (SA OT SG) 9/16/1993 12/6/1994 $124,797 $0 $124,797

3-02-0016-021-1993 Extend Taxiway (ST TW IM) 9/10/1993 9/25/1997 $879,484 $0 $879,484

Rehabilitate Taxiway (RE TW IM) 9/10/1993 9/25/1997 $905,681 $201,406 $1,107,087

3-02-0016-022-1993 Expand Terminal Building (CA TE EX) 8/23/1993 6/3/1999 $300,629 $0 $300,629

3-02-0016-023-1993 Expand Terminal Building (CA TE EX) 9/23/1993 9/24/1998 $2,615,832 $0 $2,615,832

3-02-0016-024-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/29/1993 4/5/2000 $275,681 $0 $275,681

3-02-0016-025-1994 Improve Access Road (OT GT AC) 7/18/1994 9/12/2000 $1,274,820 $0 $1,274,820

3-02-0016-026-1994 Rehabilitate Apron (RE AP IM) 4/21/1994 9/9/1997 $1,015,647 $0 $1,015,647

3-02-0016-027-1994 Improve Terminal Building (ST TE IM) 8/26/1994 6/7/2000 $287,062 $0 $287,062

3-02-0016-028-1994 Improve Terminal Building (ST TE IM) 8/26/1994 6/12/2000 $858,008 $0 $858,008

3-02-0016-029-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/28/1994 1/25/2000 $506,319 $0 $506,319

3-02-0016-030-1994 Improve Access Road (OT GT AC) 9/28/1994 9/12/2000 $3,062,919 $0 $3,062,919

3-02-0016-031-1994 Conduct Noise Compatibility Plan Study (EN PL NO) 9/27/1994 4/17/2000 $387,332 $0 $387,332

3-02-0016-032-1995 Rehabilitate Apron (RE AP IM) 4/3/1995 10/24/1998 $1,669,750 $0 $1,669,750

3-02-0016-033-1995 Construct Taxiway (CA TW CO) 8/3/1995 7/19/2000 $103,150 $0 $103,150

Install Runway Lighting (SA RW LI) 8/3/1995 7/19/2000 $210,000 $0 $210,000

Extend Runway 14/32 (ST RW IM) 8/3/1995 7/19/2000 $1,658,345 $2,000,000 $3,658,345

Install Apron Lighting (ST AP LI) 8/3/1995 7/19/2000 $190,000 $0 $190,000

Extend Runway 14/32 (ST RW IM) 8/3/1995 7/19/2000 $787,689 $0 $787,689

3-02-0016-035-1996 Rehabilitate Apron (RE AP IM) 4/8/1996 7/15/1998 $1,876,169 $0 $1,876,169

3-02-0016-036-1996 Construct Taxiway (ST TW CO) 8/7/1996 4/18/2000 $0 $1,271,504 $1,271,504

Construct Taxiway (ST TW CO) 8/7/1996 4/18/2000 $1,156,000 $0 $1,156,000

Monday, January 11, 2016 Page 9 of 124

Page 11: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-036-1996 Improve Runway Safety Area 6L (ST RW SF) 8/7/1996 4/18/2000 $1,104,500 $0 $1,104,500

Install Apron Lighting (ST AP LI) 8/7/1996 4/18/2000 $0 $675,000 $675,000

Install Apron Lighting (ST AP LI) 8/7/1996 4/18/2000 $0 $175,000 $175,000

3-02-0016-039-1996 Improve Terminal Building (ST TE IM) 9/20/1996 9/23/1998 $159,361 $0 $159,361

3-02-0016-040-1996 Extend Taxiway (ST TW IM) 7/9/1996 8/29/2000 $281,250 $1,491 $282,741

3-02-0016-037-1997 Expand Apron (ST AP IM) 4/2/1997 9/17/2001 $1,916,195 $0 $1,916,195

3-02-0016-038-1997 Extend Runway 6R/24 (ST RW IM) 12/17/1997 8/31/2001 $400,000 $0 $400,000

Extend Runway 6R/24 (ST RW IM) 12/17/1997 8/31/2001 $200,000 $2,034,988 $2,234,988

Groove Runway 6R/24L (SP RW FR) 12/17/1997 8/31/2001 $250,000 $0 $250,000

Install Apron Lighting (ST AP LI) 12/17/1997 8/31/2001 $60,000 $0 $60,000

Extend Runway 6R/24L (ST RW IM) 12/17/1997 8/31/2001 $2,055,000 $0 $2,055,000

Improve Runway Safety Area 6R/24 (ST RW SF) 12/17/1997 8/31/2001 $400,000 $0 $400,000

Rehabilitate Taxiway (RE TW IM) 12/17/1997 8/31/2001 $75,000 $0 $75,000

Install Runway Lighting (SA RW LI) 12/17/1997 8/31/2001 $500,000 $0 $500,000

Install Runway Lighting (SP RW LI) 12/17/1997 8/31/2001 $1,200,000 $0 $1,200,000

Install Runway Vertical/Visual Guidance System (ST 12/17/1997 8/31/2001 $80,000 $0 $80,000 RW VI)

3-02-0016-041-1997 Conduct Airport Master Plan Study (PL PL MA) 9/29/1997 9/26/2002 $400,000 $0 $400,000

3-02-0016-042-1998 Construct Taxiway (ST TW CO) 7/21/1998 9/26/2002 $680,000 $0 $680,000

Expand Apron (ST AP IM) 7/21/1998 9/26/2002 $143,212 $4,508,544 $4,651,756

3-02-0016-043-1998 Rehabilitate Runway 6L-24R (RE RW IM) 7/21/1998 9/26/2002 $0 $1,182,345 $1,182,345

Rehabilitate Runway 6L-24R (RE RW IM) 7/21/1998 9/26/2002 $4,038,027 $2,250,000 $6,288,027

3-02-0016-044-1998 Rehabilitate Apron (RE AP IM) 6/23/1998 9/18/2001 $924,087 $0 $924,087

3-02-0016-045-1999 Rehabilitate Runway 6L-24R (RE RW IM) 3/25/1999 9/5/2003 $1,950,000 $2,000,000 $3,950,000

3-02-0016-046-1999 Acquire Security Equipment (SA EQ SE) 3/25/1999 9/28/2001 $995,238 $0 $995,238

3-02-0016-047-1999 Improve Runway Safety Area 6L-24R (SA RW SF) 3/25/1999 9/8/2003 $534,520 $1,042,491 $1,577,011

3-02-0016-048-1999 Rehabilitate Apron (RE AP IM) 7/16/1999 9/5/2001 $405,756 $0 $405,756

3-02-0016-049-1999 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/19/1999 11/17/2006 $1,500 $902,128 $903,628 EQ RF)

3-02-0016-050-1999 Expand Apron (ST AP IM) 7/16/1999 9/26/2002 $436,222 $0 $436,222

3-02-0016-051-1999 Acquire Security Equipment (SA EQ SE) 7/26/1999 9/28/2001 $1,404,762 $0 $1,404,762

3-02-0016-052-1999 Conduct Airport Master Plan Study (PL PL MA) 8/3/1999 9/9/2003 $468,912 $0 $468,912

3-02-0016-053-1999 Rehabilitate Runway Lighting 14-32 (RE RW LI) 9/29/1999 9/8/2003 $568,615 $0 $568,615

3-02-0016-054-2000 Rehabilitate Apron (RE AP IM) 9/15/2000 8/3/2004 $1,285,239 $0 $1,285,239

3-02-0016-055-2000 Rehabilitate Runway (RE RW IM) 9/7/2000 9/9/2003 $1,950,000 $3,000,000 $4,950,000

3-02-0016-056-2000 Install Noise Monitoring System (EN OT NO) 9/14/2000 8/10/2005 $6,099 $1,235,901 $1,242,000

3-02-0016-057-2000 Rehabilitate Runway Lighting 14/32 (RE RW LI) 9/15/2000 8/27/2004 $1,837,737 $625,978 $2,463,715

3-02-0016-058-2000 Rehabilitate Taxiway (RE TW IM) 9/15/2000 8/30/2004 $3,064,000 $469,126 $3,533,126

Improve Runway Safety Area (SA RW SF) 9/15/2000 8/30/2004 $0 $550,000 $550,000

3-02-0016-059-2001 Rehabilitate Apron (RE AP IM) 4/26/2001 9/9/2005 $1,518,750 $3,500,000 $5,018,750

3-02-0016-060-2001 Rehabilitate Taxiway (RE TW IM) 9/12/2001 7/14/2005 $3,866,948 $18,384 $3,885,332

3-02-0016-061-2001 Noise Mitigation Measures (EN OT MS) 6/11/2001 8/25/2005 $0 $2,598,500 $2,598,500

3-02-0016-062-2001 Construct Taxiway (CA TW CO) 9/25/2001 8/26/2005 $7,807,106 $8,670,514 $16,477,620

3-02-0016-063-2002 Construct Apron (CA AP CO) 6/24/2002 9/6/2006 $1,518,750 $3,500,000 $5,018,750

3-02-0016-064-2002 Noise Mitigation Measures for Residences within 65 - 69 6/17/2002 8/11/2006 $0 $2,572,413 $2,572,413 DNL (EN HO 65)

3-02-0016-065-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $448,473 $448,473

3-02-0016-066-2002 Acquire Land for Noise Compatibility within 65 - 69 DNL (EN LA 65)

7/16/2002 2/21/2006 $0 $795,095 $795,095

3-02-0016-067-2002 Security Enhancements (SE SE SE) 9/19/2002 8/18/2006 $1,017,425 $6,178,704 $7,196,129

Monday, January 11, 2016 Page 10 of 124

Page 12: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-068-2002 Construct Snow Removal Equipment Building Sand & 8/1/2002 8/11/2006 $2,600,000 $0 $2,600,000 Chemical Storage (ST BD SN)

3-02-0016-069-2002 Rehabilitate Runway Lighting (RE RW LI) 9/25/2002 8/18/2006 $2,800,000 $564,331 $3,364,331

3-02-0016-070-2002 Construct Taxiway (CA TW CO) 9/10/2002 1/24/2006 $5,075,000 $2,077,643 $7,152,643

3-02-0016-071-2002 Modify Terminal Building (ST TE IM) 9/17/2002 4/22/2005 $640,000 $95,655 $735,655

3-02-0016-072-2003 Rehabilitate Runway 14-32 (RE RW IM) 8/4/2003 7/27/2007 $11,042,852 $0 $11,042,852

Improve Runway Safety Area 14-32 (SA RW SF) 8/4/2003 7/27/2007 $0 $191,447 $191,447

3-02-0016-073-2003 Rehabilitate Apron (RE AP IM) 7/7/2003 9/17/2007 $0 $750,000 $750,000

Construct Apron (Concourse C) (CA AP CO) 7/7/2003 9/17/2007 $0 $2,000,000 $2,000,000

Rehabilitate Runway 6L-24R (RE RW IM) 7/7/2003 9/17/2007 $1,518,750 $0 $1,518,750

Expand Apron (CA AP EX) 7/7/2003 9/17/2007 $0 $750,000 $750,000

3-02-0016-074-2003 Construct Taxiway Y Phase 3 (LOI-2, Payment 1) (CA 7/10/2003 7/27/2007 $1,387,000 $0 $1,387,000 TW CO)

3-02-0016-075-2003 Noise Mitigation Measures for Residences within 65 - 69 8/4/2003 9/17/2007 $0 $2,350,000 $2,350,000 DNL (EN HO 65)

3-02-0016-076-2003 Security Enhancements (SA EQ SE) 8/22/2003 9/12/2007 $612,641 $5,687,438 $6,300,079

3-02-0016-077-2004 Rehabilitate Runway 6L-24R (RE RW IM) 4/6/2004 9/19/2008 $1,518,750 $0 $1,518,750

Rehabilitate Apron (RE AP IM) 4/6/2004 9/19/2008 $0 $750,000 $750,000

Construct Apron (CA AP CO) 4/6/2004 9/19/2008 $0 $2,000,000 $2,000,000

Expand Apron (CA AP EX) 4/6/2004 9/19/2008 $0 $750,000 $750,000

3-02-0016-078-2004 Construct Taxiway (CA TW CO) 4/7/2004 1/29/2008 $707,000 $2,500,000 $3,207,000

Widen Runway 6R / 24L (ST RW IM) 4/7/2004 1/29/2008 $707,000 $2,500,000 $3,207,000

3-02-0016-079-2004 Noise Mitigation Measures for Residences within 65 - 69 5/27/2004 8/18/2008 $0 $7,000,000 $7,000,000 DNL (EN HO 65)

3-02-0016-080-2004 Rehabilitate Taxiway (RE TW IM) 5/27/2004 9/23/2008 $10,526,560 $6,507,689 $17,034,249

3-02-0016-081-2004 Construct Snow Removal Equipment Building Wing (ST 7/1/2004 9/19/2008 $5,343,750 $0 $5,343,750 BD SN)

3-02-0016-082-2005 Rehabilitate Taxiway LOI #2-01 [grant 3]; DG6 Upgrade 4/27/2005 1/29/2008 $0 $4,487,875 $4,487,875 Twy K(J - Y) [pymt1] (RE TW IM)

Construct Taxiway LOI #2-01(grant 3): Construct twy Y 4/27/2005 1/29/2008 $1,443,000 $1,512,125 $2,955,125 (pymt 3) (CA TW CO)

3-02-0016-083-2005 Noise Mitigation Measures for Residences within 65 - 69 5/12/2005 4/12/2010 $0 $5,500,000 $5,500,000 DNL RSIP (phase 5), 150 homes (est.) (EN HO 65)

3-02-0016-084-2005 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/18/2005 7/20/2010 $0 $1,247,068 $1,247,068 ARFF vehicle 1 (SA EQ RF)

3-02-0016-085-2005 Construct Taxiway (ST TW CO) 6/13/2005 9/18/2009 $6,250,665 $847,147 $7,097,812

3-02-0016-086-2005 Construct Apron LOI #98-1 (grant 7): Postmark RRA 6/13/2005 4/12/2010 $1,518,750 $3,400,000 $4,918,750 (pymt 1) (CA AP CO)

3-02-0016-087-2005 Rehabilitate Taxiway Construct run-up pad (twy K) (RE 8/4/2005 3/10/2010 $1,419,648 $0 $1,419,648 TW IM)

3-02-0016-088-2005 Modify Terminal Building (Phase 1 [MYr 2]) (ST TE IM) 8/30/2005 4/15/2010 $2,989,372 $0 $2,989,372

Modify Terminal Building (Phase 1 [MYr 3]) (ST TE IM) 8/30/2005 4/15/2010 $3,403,336 $0 $3,403,336

Modify Terminal Building (Phase 1 [MYr 1]) (ST TE IM) 8/30/2005 4/15/2010 $3,358,619 $0 $3,358,619

3-02-0016-089-2005 Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 8/30/2005 4/12/2010 $3,425,476 $6,000,000 $9,425,476 phase 1 (RE TW IM)

Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 8/30/2005 4/12/2010 $2,809,524 $0 $2,809,524 phase 1; MY funds (RE TW IM)

3-02-0016-090-2006 Construct Apron LOI #98-1 (grant 8): Postmark RRA 5/17/2006 4/13/2010 $1,518,750 $3,200,000 $4,718,750 (pymt 2) (CA AP CO)

3-02-0016-091-2006 Rehabilitate Taxiway LOI #2-01 [grant 4]; DG 6 twy K(J- 5/17/2006 1/5/2012 $1,466,000 $6,000,000 $7,466,000 Y) [pymt 2] (RE TW IM)

Rehabilitate Runway 07R/25L LOI #2-01 [grant 4]; 5/17/2006 1/5/2012 $0 $2,000,000 $2,000,000 Reconst. rwy to DG6 [pymt 1] (RE RW IM)

Monday, January 11, 2016 Page 11 of 124

Page 13: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-092-2006 Conduct Airport Master Plan Study phase 1 (PL PL MA) 8/3/2006 12/3/2010 $1,413,363 $0 $1,413,363

3-02-0016-093-2006 Rehabilitate Taxiway (DG6) (RE TW IM) 6/16/2006 7/12/2011 $2,870,863 $0 $2,870,863

Rehabilitate Taxiway Reconstr K from C-A (non-LOI), 6/16/2006 7/12/2011 $1,807,115 $0 $1,807,115 phase 2 (RE TW IM)

3-02-0016-094-2006 Rehabilitate Apron Rehab gates N4 & N6 (MY phase 2) 7/14/2006 3/7/2012 $1,708,881 $0 $1,708,881 (RE AP IM)

Rehabilitate Apron Rehab gates N4 & N6 (RE AP IM) 7/14/2006 3/7/2012 $1,417,716 $0 $1,417,716

3-02-0016-095-2006 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/3/2006 7/20/2010 $661,806 $382,580 $1,044,386 ARFF vehicle 2 (SA EQ RF)

3-02-0016-096-2007 Rehabilitate Apron RON Parking 7-11 (RE AP IM) 4/26/2007 1/28/2013 $13,498,046 $3,687,743 $17,185,789

3-02-0016-097-2007 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 6/20/2007 3/10/2010 $0 $1,100,476 $1,100,476 ARFF vehicle 3 (SA EQ RF)

3-02-0016-098-2007 Noise Mitigation Measures for Residences within 65 - 69 4/26/2007 4/11/2012 $0 $4,474,230 $4,474,230 DNL RSIP (phase 6), 150 homes (est.) (EN HO 65)

3-02-0016-099-2007 Rehabilitate Apron LOI #98-1 [grant 9]; Concourse A 6/20/2007 12/20/2012 $460,000 $920,000 $1,380,000 apron (RE AP IM)

3-02-0016-100-2007 Acquire Snow Removal Equipment acquire sre (ST EQ 8/13/2007 3/10/2010 $220,941 $0 $220,941 SN)

3-02-0016-101-2008 Noise Mitigation Measures for Residences within 65 - 69 5/8/2008 4/11/2012 $0 $2,411,970 $2,411,970 DNL RSIP (phase 7), 75 homes (est.) (EN HO 65)

3-02-0016-102-2008 Rehabilitate Taxiway LOI no. 2-01 payment 5; 4/30/2008 7/22/2014 $1,000,000 $7,436,000 $8,436,000 Rehabilitate Taxiway Kilo (RE TW IM)

3-02-0016-103-2008 Modify Terminal Building Phase 2 (ST TE IM) 5/8/2008 4/15/2010 $2,494,098 $0 $2,494,098

3-02-0016-104-2008 Rehabilitate Taxiway Rehab. t/w G & E (RE TW IM) 5/8/2008 7/16/2014 $5,852,500 $0 $5,852,500

3-02-0016-105-2008 Security Enhancements replace access controls (SA 5/8/2008 2/26/2014 $2,258,224 $8,570,798 $10,829,022 EQ SE)

3-02-0016-106-2008 Update Airport Master Plan Study MP update phase 2 6/12/2008 6/29/2011 $1,204,991 $0 $1,204,991 (PL PL MA)

3-02-0016-107-2008 Acquire Snow Removal Equipment 3 runway snow 5/8/2008 7/1/2011 $1,000,000 $0 $1,000,000 plows (ST EQ SN)

3-02-0016-108-2008 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 5/8/2008 1/7/2013 $0 $1,358,899 $1,358,899 ARFF vehicle 4 (SA EQ RF)

3-02-0016-109-2008 Rehabilitate Taxiway Rehab. t/w G & E phase 2 (RE 6/17/2008 7/16/2014 $1,185,637 $0 $1,185,637 TW IM)

3-02-0016-111-2008 Rehabilitate Taxiway Rehab. t/w G & E phase 3 (RE TW IM)

8/25/2008 7/16/2014 $3,687,169 $0 $3,687,169

3-02-0016-112-2008 Modify Terminal Building Phase 3 (ST TE IM) 8/20/2008 4/15/2010 $869,008 $0 $869,008

3-02-0016-110-2009 Rehabilitate Taxiway LOI #2-01 [grant 6] (RE TW IM) 2/13/2009 7/29/2014 $1,347,279 $0 $1,347,279

3-02-0016-113-2009 Rehabilitate Apron RON 12-14 (RE AP IM) 5/28/2009 8/8/2014 $6,961,037 $3,064,461 $10,025,498

3-02-0016-114-2009 Rehabilitate Taxiway Rehab. t/w G & E phase 4 (RE 2/13/2009 7/18/2014 $2,301,238 $0 $2,301,238 TW IM)

3-02-0016-115-2009 Noise Mitigation Measures for Residences within 65 - 69 2/13/2009 4/4/2013 $0 $2,964,113 $2,964,113 DNL RSIP (phase 8), 55 homes (est.) (EN HO 65)

3-02-0016-116-2009 Modify Terminal Building Phase 4 (FY09 Phase A) (ST 2/13/2009 4/15/2010 $1,139,675 $0 $1,139,675 TE IM)

3-02-0016-117-2009 Conduct State System Plan Study (PL PL ST) 8/11/2009 7/22/2014 $937,453 $0 $937,453

3-02-0016-118-2009 Improve Aircraft Rescue & Fire Fighting Building ARFF 2/13/2009 $2,142,291 $0 $2,142,291 expansion, Phase 1 (FY09 Part A) (SA BD EX)

3-02-0016-119-2009 Acquire Snow Removal Equipment acquire SRE (ST 2/23/2009 7/12/2011 $0 $4,444,798 $4,444,798 EQ SN)

3-02-0016-120-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 2/13/2009 2/27/2012 $0 $1,143,910 $1,143,910 ARFF Truck (SA EQ RF)

3-02-0016-121-2009 Rehabilitate Apron Gate N8 Apron Rehabilitation 8/18/2009 4/11/2012 $0 $0 $0 (ARRA funded) (RE AP IM)

Monday, January 11, 2016 Page 12 of 124

Page 14: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-122-2009 Improve Aircraft Rescue & Fire Fighting Building ARFF 7/2/2009 7/14/2014 $1,827,472 $1 $1,827,473 expansion, Phase 2 (FY09 Phase B) (SA BD EX)

3-02-0016-123-2009 Modify Terminal Building Phase 5 (FY09 Phase B) (ST 7/2/2009 4/15/2010 $2,371,112 $0 $2,371,112 TE IM)

3-02-0016-124-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle ARFF 8/6/2009 3/14/2012 $262,640 $0 $262,640 Rapid Intervention Vehicle (SA EQ RF)

3-02-0016-126-2009 Update Miscellaneous Study Kulis Planning Grant - Air 9/2/2009 3/7/2013 $453,067 $0 $453,067 Guard Base Closure/Airport Sponsor Takeover (PL PL MS)

3-02-0016-125-2010 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3/16/2010 1/28/2013 $0 $1,140,088 $1,140,088 ARFF Truck (SA EQ RF)

3-02-0016-127-2010 Noise Mitigation Measures for Residences within 65 - 69 3/30/2010 2/26/2013 $0 $1,312,500 $1,312,500 DNL RSIP (phase 9), 60 homes (act.) (EN HO 65)

3-02-0016-128-2010 Acquire Snow Removal Equipment Acquire Snow 3/30/2010 10/18/2011 $0 $992,867 $992,867 Removal Equipment (SRE) Phase 1 (ST EQ SN)

3-02-0016-129-2010 Widen Runway 07R/25L Design Group VI 3/17/2010 7/29/2014 $8,528,850 $4,000,000 $12,528,850 Improvements, Part A (ST RW IM)

3-02-0016-130-2010 Rehabilitate Runway 07R/25L Rehabilitate Runway 3/17/2010 7/9/2015 $0 $9,886,444 $9,886,444 7R/25L Embankment and Drainage System (RE RW IM)

3-02-0016-131-2010 Security Enhancements Provide and Install EOC/AOC 7/27/2010 3/24/2015 $0 $2,445,606 $2,445,606 Security Equipment (C) (SA EQ SE)

3-02-0016-132-2010 Acquire Snow Removal Equipment Acquire SRE Phase 6/22/2010 3/7/2013 $471,725 $2,693,212 $3,164,937 2 (part C) (ST EQ SN)

3-02-0016-133-2010 Modify Terminal Building Emergency Operations 7/27/2010 3/24/2015 $1,016,551 $94,391 $1,110,942 Command Center (EOC) (ST TE IM)

3-02-0016-134-2010 Modify Terminal Building Phase 6 (FY10 Phase A) (ST 3/10/2010 12/28/2015 $1,795,130 $0 $1,795,130 TE IM)

3-02-0016-136-2010 Extend Runway 07R/25L extend 7R, Phase 1 (CA RW 9/23/2010 11/10/2014 $471,583 $2,296,329 $2,767,912 EX)

3-02-0016-137-2010 Conduct Noise Compatibility Plan Study Part 150 Noise 9/16/2010 8/8/2014 $0 $667,808 $667,808 Study, Phase 1(part D/E) (EN PL NO)

3-02-0016-138-2010 Modify Terminal Building Phase 7 (FY10 Phase B) (ST 9/14/2010 12/28/2015 $778,580 $0 $778,580 TE IM)

3-02-0016-139-2010 Widen Runway 07R/25L Design Group VI 8/10/2010 7/22/2014 $5,444,004 $0 $5,444,004 Improvements, Part B (ST RW IM)

3-02-0016-140-2011 Extend Runway 07R/25L Extend 7R, Phase 2 (Part A) 3/15/2011 $3,334,024 $9,500,000 $12,834,024 (CA RW EX)

3-02-0016-141-2011 Construct Apron LOI #98-1 (grant 9): Conc A Apron 3/15/2011 $1,518,750 $3,200,000 $4,718,750 Recon (CA AP CO)

3-02-0016-142-2011 Widen Runway 07R/25L LOI #2-01 DG VI 3/15/2011 7/22/2014 $2,429,050 $5,000,000 $7,429,050 Improvements (ST RW IM)

3-02-0016-143-2011 Modify Terminal Building Phase 8 (including badging & 6/10/2011 12/30/2015 $320,848 $0 $320,848 communications center) (ST TE IM)

3-02-0016-144-2011 Security Enhancements Replace Gate Echo 21 (SA EQ 8/29/2011 7/22/2014 $495,102 $0 $495,102 SE)

3-02-0016-145-2011 Extend Runway 07R/25L Extend 7R, Phase 3 (Part B) 6/7/2011 $5,341,612 $0 $5,341,612 (CA RW EX)

3-02-0016-146-2011 Noise Mitigation Measures for Residences within 65 - 69 9/15/2011 12/19/2014 $0 $2,369,482 $2,369,482 DNL RSIP (phase 10), 50 homes (est.) (EN HO 65)

3-02-0016-147-2011 Acquire Snow Removal Equipment Acquire Snow 9/15/2011 3/25/2013 $1,421,016 $0 $1,421,016 Removal Equipment (SRE), Phase 1 (Part D) (ST EQ SN)

3-02-0016-148-2011 Extend Runway 07R/25L Extend 7R, Phase 4 (Part E) 9/15/2011 $2,415,456 $4,477,151 $6,892,607 (CA RW EX)

3-02-0016-149-2011 Acquire Snow Removal Equipment Acquire SRE, 9/28/2011 4/5/2013 $601,960 $0 $601,960 Phase 2 (Part F) (ST EQ SN)

Monday, January 11, 2016 Page 13 of 124

Page 15: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0016-150-2012 Construct Apron LOI #98-1 (grant 10) (CA AP CO) 5/17/2012 $1,058,750 $2,280,000 $3,338,750

3-02-0016-152-2012 Environmental Mitigation East Airpark Storm Drain 8/15/2012 $5,228,308 $3,000,000 $8,228,308 Extension (EN OT MT)

3-02-0016-153-2012 Extend Runway 07R/25L Extend 7R, Phase 5 (CA RW 8/7/2012 $1,305,661 $0 $1,305,661 EX)

3-02-0016-154-2012 Acquire Snow Removal Equipment Acquire Snow 9/6/2012 11/5/2014 $1,861,273 $998,891 $2,860,164 Removal Equipment (SRE) (ST EQ SN)

3-02-0016-155-2012 Noise Mitigation Measures for Residences within 65 - 69 9/10/2012 6/2/2015 $0 $6,029,993 $6,029,993 DNL RSIP (phase 11), 77 homes (act.) (EN HO 65)

3-02-0016-156-2012 Rehabilitate Apron RON 2 (RE AP IM) 9/20/2012 $7,177,427 $0 $7,177,427

Rehabilitate Taxiway Taxiway E (RE TW IM) 9/20/2012 $4,430,531 $4,400,000 $8,830,531

3-02-0016-157-2012 Widen Runway 07R/25L Design Group VI Improvements 5/14/2012 $2,429,050 $5,000,000 $7,429,050 (ST RW IM)

3-02-0016-158-2012 Update Airport Master Plan Study Master Plan Update, 9/12/2012 $3,123,438 $500,000 $3,623,438 phase 1 (PL PL MA)

3-02-0016-159-2012 Conduct Noise Compatibility Plan Study Part 150 Noise 9/4/2012 $0 $843,750 $843,750 Compatibility Study Phase 2 (EN PL NO)

3-02-0016-160-2013 Widen Runway 07R/25L Design Group VI Improvements 7/23/2013 $4,250,837 $4,000,000 $8,250,837 (ST RW IM)

3-02-0016-161-2013 Construct Service Road ARFF access road (OT GT SV) 9/3/2013 $1,668,916 $0 $1,668,916

3-02-0016-162-2013 Rehabilitate Taxiway Taxiway Lima (RE TW IM) 9/13/2013 $6,311,950 $0 $6,311,950

3-02-0016-163-2013 Noise Mitigation Measures for Residences within 65 - 69 9/4/2013 $0 $7,028,849 $7,028,849 DNL RSIP (phase 12), 90 homes (est.) (EN HO 65)

3-02-0016-164-2013 Rehabilitate Terminal Building (ST TE IM) 8/22/2013 $1,640,625 $0 $1,640,625

3-02-0016-165-2013 Rehabilitate Taxiway Taxiway Mike, Echo2 (RE TW IM) 9/24/2013 $2,592,399 $4,780,975 $7,373,374

3-02-0016-166-2014 Widen Runway 07R/25L Design Group VI Improvements 7/8/2014 $1,911,930 $4,000,000 $5,911,930 (ST RW IM)

3-02-0016-167-2014 Acquire Snow Removal Equipment Acquire Snow 9/17/2014 $2,000,000 $1,505,937 $3,505,937 Removal Equipment (SRE) (ST EQ SN)

3-02-0016-169-2014 Rehabilitate Taxiway Rehabilitate Taxiway M and E2 6/18/2014 $948,366 $0 $948,366 (Phase2) (RE TW IM)

3-02-0016-170-2014 Update Airport Master Plan Study phase 2 (PL PL MA) 9/17/2014 $1,025,528 $0 $1,025,528

3-02-0016-171-2014 Rehabilitate Runway 07L/25R Runway 7L Rehab(need 9/22/2014 $8,592,655 $14,624,710 $23,217,365 to coordinate on funding levels each year) (RE RW IM)

3-02-0016-172-2015 Rehabilitate Runway 07L/25R Runway 7L Rehab, Phase 7/23/2015 $14,133,845 $12,214,564 $26,348,409 2 (RE RW IM)

3-02-0016-173-2015 Widen Runway 07R/25L Design Group VI Improvements 6/26/2015 $0 $2,595,840 $2,595,840 (ST RW IM)

Widen Taxiway Widen Taxiway K Safety Area (ST TW 6/26/2015 $0 $470,000 $470,000 IM)

Widen Taxiway Widen Taxiway Y Safety Area-LOI-2 6/26/2015 $0 $934,160 $934,160 (ST TW IM)

3-02-0016-174-2015 Acquire Safety Equipment and/or Fencing Security 8/31/2015 $476,643 $0 $476,643 Fencing Replacement (SA EQ RF)

3-02-0016-175-2015 Acquire Snow Removal Equipment Snow Remvoal 9/21/2015 $1,895,272 $1,455,741 $3,351,013 Equipment (ST EQ SN)

$351,751,525 $294,212,062 $645,963,587

Angoon Angoon (AGN)

3-02-0018-001-1987 Acquire Land for Development (ST LA DV) 7/13/1987 5/10/1991 $82,717 $0 $82,717

Improve Airport Drainage (ST OT IM) 7/13/1987 5/10/1991 $1,015,532 $0 $1,015,532

Improve Access Road (OT GT AC) 7/13/1987 5/10/1991 $35,500 $0 $35,500

Monday, January 11, 2016 Page 14 of 124

Page 16: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0018-002-2000 Conduct Airport Master Plan Study (PL PL MA) 9/13/2000 8/27/2004 $330,902 $0 $330,902

3-02-0018-003-2004 Conduct Airport Master Plan Study (PL PL MA) 8/24/2004 6/16/2008 $352,477 $0 $352,477

$1,817,128 $0 $1,817,128

Angoon (Proposed GA) (+07E)

3-02-0476-001-2007 Construct New Airport (EIS, Phase 1) (ST NA CO) 8/8/2007 4/6/2012 $1,000,000 $147,523 $1,147,523

3-02-0476-002-2009 Construct New Airport (EIS, Phase 2) (ST NA CO) 1/22/2009 8/28/2014 $3,000,000 $0 $3,000,000

3-02-0476-003-2011 Construct New Airport Construct New Airport EIS 8/25/2011 8/18/2015 $1,000,000 $0 $1,000,000 Phase III (ST NA CO)

3-02-0476-004-2013 Construct New Airport Construct New Airport EIS 9/19/2013 $1,200,000 $0 $1,200,000 Phase IV (ST NA CO)

3-02-0476-005-2015 Construct New Airport Construct New Airport EIS 8/27/2015 $250,000 $0 $250,000 Phase V (ST NA CO)

$6,450,000 $147,523 $6,597,523

Aniak Aniak (ANI)

3-02-0019-001-1985 Improve Snow Removal Equipment Building (ST BD 9/9/1985 10/19/1987 $268,154 $0 $268,154 SN)

3-02-0019-002-1988 Install Apron Lighting (ST AP LI) 9/7/1988 11/8/1991 $10,200 $0 $10,200

Acquire Security Equipment (SA EQ SE) 9/7/1988 11/8/1991 $25,952 $0 $25,952

Install Miscellaneous NAVAIDS (SP OT IN) 9/7/1988 11/8/1991 $3,571 $0 $3,571

Expand Apron (ST AP IM) 9/7/1988 11/8/1991 $1,100,170 $0 $1,100,170

3-02-0019-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/1990 7/23/1992 $135,132 $0 $135,132 EQ RF)

3-02-0019-004-1995 Rehabilitate Apron (RE AP IM) 6/15/1995 7/19/2000 $200,000 $0 $200,000

Improve Airport Drainage (ST OT IM) 6/15/1995 7/19/2000 $125,000 $0 $125,000

Rehabilitate Runway 10/28 (RE RW IM) 6/15/1995 7/19/2000 $4,060,558 $0 $4,060,558

Improve Access Road (OT GT AC) 6/15/1995 7/19/2000 $93,750 $0 $93,750

Install Runway Lighting (SA RW LI) 6/15/1995 7/19/2000 $211,875 $0 $211,875

Rehabilitate Taxiway (RE TW IM) 6/15/1995 7/19/2000 $150,000 $0 $150,000

3-02-0019-005-1996 Improve Airport Drainage (ST OT IM) 6/28/1996 7/15/1998 $2,621,161 $0 $2,621,161

3-02-0019-006-2002 Conduct Airport Master Plan Study (PL PL MA) 9/20/2002 8/11/2006 $430,483 $0 $430,483

3-02-0019-007-2005 Construct Snow Removal Equipment Building (ST BD 8/8/2005 8/22/2011 $3,174,916 $0 $3,174,916 SN)

3-02-0019-008-2006 Conduct Airport Master Plan Study Erosion Study 7/14/2006 8/17/2007 $53,438 $0 $53,438 Phase II Aniak Master Plan (PL PL MA)

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $380,000 $0 $380,000 Acquire Various SRE: Aniak (Wheel Loader with attachments) (ST EQ SN)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 10/28 Various 9/16/2011 $53,200 $0 $53,200 Surface Preservation (RE RW IM)

$13,097,560 $0 $13,097,560

Anvik Anvik (ANV)

3-02-0021-001-1988 Improve Snow Removal Equipment Building (ST BD 7/11/1988 11/8/1991 $23,139 $0 $23,139 SN)

Rehabilitate Runway 17/35 (RE RW IM) 7/11/1988 11/8/1991 $812,109 $0 $812,109

Install Runway Lighting (ST RW LI) 7/11/1988 11/8/1991 $79,040 $0 $79,040

Construct Apron (ST AP CO) 7/11/1988 11/8/1991 $226,036 $0 $226,036

Monday, January 11, 2016 Page 15 of 124

Page 17: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0021-001-1988 7/11/1988 11/8/1991 Acquire Snow Removal Equipment (ST EQ SN) $89,767 $0 $89,767

7/11/1988 11/8/1991 Improve Access Road (OT GT AC) $39,667 $0 $39,667

7/11/1988 11/8/1991 Construct Taxiway (ST TW CO) $11,733 $0 $11,733

3-02-0021-002-1993 8/10/1993 9/9/1997 Acquire Snow Removal Equipment (ST EQ SN) $104,855 $0 $104,855

3-02-0021-003-1997 9/26/1997 9/27/2001 Improve Snow Removal Equipment Building (ST BD SN)

$562,500 $24,064 $586,564

3-02-0021-004-2004 8/31/2004 6/9/2010 Construct Runway Safety Area 17/35 (ST RW SF) $1,000,000 $1,915,031 $2,915,031

8/31/2004 6/9/2010 Expand Apron (ST AP IM) $1,000,000 $0 $1,000,000

8/31/2004 6/9/2010 Rehabilitate Runway 17/35 (RE RW IM) $4,200,000 $0 $4,200,000

8/31/2004 6/9/2010 Extend Runway 17/35 (ST RW IM) $3,591,750 $0 $3,591,750

8/31/2004 6/9/2010 Improve Access Road (OT GT AC) $1,000,000 $0 $1,000,000

3-02-0000-012-2009 8/20/2009 11/5/2014 Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $226,230 $226,230

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Anvik Loader) (ST EQ SN)

$365,238 $0 $365,238

$13,105,834 $2,165,325 $15,271,159

Arctic Village Arctic Village (ARC)

3-02-0022-001-1998 7/31/1998 3/31/1999 Acquire Snow Removal Equipment (ST EQ SN) $198,795 $0 $198,795

3-02-0022-002-1999 7/6/1999 7/11/2001 Rehabilitate Runway 2-20 (RE RW IM) $421,872 $0 $421,872

7/6/1999 7/11/2001 Improve Snow Removal Equipment Building (ST BD SN)

$25,000 $0 $25,000

3-02-0022-003-2000 8/22/2000 8/30/2004 Rehabilitate Runway 03/21 (RE RW IM) $217,958 $0 $217,958

3-02-0022-004-2000 9/6/2000 8/30/2004 Rehabilitate Runway 2/20 (RE RW IM) $3,162,506 $0 $3,162,506

9/6/2000 8/30/2004 Improve Snow Removal Equipment Building (ST BD SN)

$300,000 $0 $300,000

3-02-0022-005-2001 4/26/2001 9/4/2001 Acquire Snow Removal Equipment (ST EQ SN) $215,764 $0 $215,764

3-02-0022-006-2002 5/28/2002 6/9/2005 Rehabilitate Runway (RE RW IM) $1,489,181 $41,299 $1,530,480

5/28/2002 6/9/2005 Construct Snow Removal Equipment Building (ST BD SN)

$850,000 $0 $850,000

$6,881,076 $41,299 $6,922,375

Atka Atka (AKA)

3-02-0394-001-1983 9/21/1983 1/23/1986 Install Runway Lighting 15/33 (ST RW LI) $205,488 $0 $205,488

9/21/1983 1/23/1986 Improve Airport Drainage (ST OT IM) $32,813 $0 $32,813

3-02-0394-002-1988 9/8/1988 11/15/1991 Improve Runway Safety Area 15/33 (ST RW SF) $72,626 $0 $72,626

9/8/1988 11/15/1991 Extend Runway 15/33 (ST RW IM) $7,048 $0 $7,048

9/8/1988 11/15/1991 Rehabilitate Runway 15/33 (RE RW IM) $470,266 $0 $470,266

9/8/1988 11/15/1991 Rehabilitate Apron (RE AP IM) $19,042 $0 $19,042

3-02-0394-003-2001 8/20/2001 8/25/2005 Conduct Airport Master Plan Study (PL PL MA) $0 $408,750 $408,750

3-02-0394-004-2002 9/12/2002 6/30/2006 Extend Runway (Phase 1- Environmental/Design) (ST RW IM)

$0 $610,431 $610,431

3-02-0394-005-2008 6/19/2008 Construct Snow Removal Equipment Building Construct Snow Removal Equipment Building (ST BD SN)

$2,500,000 $0 $2,500,000

6/19/2008 Construct Apron construct apron w/taxiway stub (ST AP CO)

$3,000,000 $0 $3,000,000

6/19/2008 Extend Runway 15/33 Extend/Rehab Runway (ST RW IM)

$6,647,363 $0 $6,647,363

Monday, January 11, 2016 Page 16 of 124

Page 18: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0394-005-2008 Rehabilitate Runway 15/33 Reconstruct Runway from 6/19/2008 $9,500,000 $328,168 $9,828,168 15/33 to 16/34 (RE RW IM)

3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $251,454 $0 $251,454 Acquire SRE (Central Region): Loader with Attachments (ST EQ SN)

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $465,000 $0 $465,000 Acquire Various SRE: Atka (Grader with attachments, and Sand Truck with Plow) (ST EQ SN)

3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $400,000 $0 $400,000 approach (PL PL VI)

3-02-0200-096-2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) 9/18/2014 $54,137 $0 $54,137 Various EDA/EAS Locations: Atka - Accomplish Surface Preservation Maintenance _ Pavement Markings (RE RW IM)

3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 16/34 EAS/EDA 9/20/2015 $53,200 $0 $53,200 Various (Atka - Surface Preservation Maintenance: Pavements Markings on RWYs, TWYs and Aprons) (RE RW IM)

$23,678,437 $1,347,349 $25,025,786

Atmautluak Atmautluak (4A2)

3-02-0379-001-1998 Improve Snow Removal Equipment Building (ST BD 9/28/1998 9/24/2002 $200,000 $0 $200,000 SN)

Extend Runway 15-33 (ST RW IM) 9/28/1998 9/24/2002 $3,946,480 $0 $3,946,480

3-02-0379-002-2002 Rehabilitate Runway 15/33 (RE RW IM) 9/12/2002 7/7/2006 $0 $1,934,245 $1,934,245

Extend Runway (ST RW IM) 9/12/2002 7/7/2006 $900,000 $0 $900,000

Construct Snow Removal Equipment Building (ST BD 9/12/2002 7/7/2006 $400,000 $0 $400,000 SN)

$5,446,480 $1,934,245 $7,380,725

Atqasuk Atqasuk Edward Burnell Sr Memorial (ATK)

3-02-0023-001-1984 Improve Access Road (OT GT AC) 9/26/1984 4/19/1989 $459,773 $0 $459,773

3-02-0023-002-1986 Install Runway Lighting 6/24 (ST RW LI) 8/11/1986 9/9/1988 $689,586 $38,702 $728,288

3-02-0023-003-1999 Improve Snow Removal Equipment Building (ST BD 7/8/1999 9/9/2003 $641,783 $0 $641,783 SN)

3-02-0023-004-2000 Install Runway Vertical/Visual Guidance System 06-24 9/6/2000 8/27/2003 $166,308 $0 $166,308 (ST RW VI)

3-02-0023-005-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/29/2001 3/29/2005 $176,735 $0 $176,735

3-02-0200-070-2009 [Various Grnt] Conduct aeronautical survey for WAAS 8/24/2009 $0 $199,000 $199,000 approach (PL PL VI)

3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)

$2,184,185 $237,702 $2,421,887

Barrow Wiley Post-Will Rogers Memorial (BRW)

3-02-0026-001-1984 Rehabilitate Apron 6/24 (RE AP IM) 8/3/1984 11/20/1986 $521,185 $0 $521,185

3-02-0026-002-1986 Expand Apron (CA AP EX) 7/30/1986 8/8/1991 $0 $1,610,736 $1,610,736

Install Apron Lighting (ST AP LI) 7/30/1986 8/8/1991 $138,302 $0 $138,302

Monday, January 11, 2016 Page 17 of 124

Page 19: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0026-002-1986 Rehabilitate Taxiway (RE TW IM) 7/30/1986 8/8/1991 $177,566 $1,207,947 $1,385,513

3-02-0026-003-1988 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/24/1988 4/13/1992 $295,783 $0 $295,783 EQ RF)

3-02-0026-004-1990 Install Runway Lighting (SA RW LI) 8/24/1990 11/10/1993 $886,319 $0 $886,319

Improve Runway Safety Area 6/24 (SA RW SF) 8/24/1990 11/10/1993 $952,801 $0 $952,801

Construct Apron (ST AP CO) 8/24/1990 11/10/1993 $123,094 $0 $123,094

Install Apron Lighting (ST AP LI) 8/24/1990 11/10/1993 $631,954 $0 $631,954

3-02-0026-005-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 9/10/1992 10/27/1998 $0 $2,200,515 $2,200,515 BD EX)

3-02-0026-006-1998 Conduct Airport Master Plan Study (PL PL MA) 8/19/1998 9/12/2002 $247,259 $0 $247,259

3-02-0026-007-1998 Improve Snow Removal Equipment Building (ST BD 7/13/1998 9/18/2001 $1,688,688 $0 $1,688,688 SN)

3-02-0026-008-2001 Expand Apron (ST AP IM) 9/12/2001 5/17/2005 $3,024,161 $0 $3,024,161

3-02-0026-009-2002 Extend Runway Safety Area (SA RW SF) 9/27/2002 9/3/2009 $5,099,354 $11,749,449 $16,848,803

Rehabilitate Runway (RE RW IM) 9/27/2002 9/3/2009 $5,650,861 $0 $5,650,861

Rehabilitate Apron (RE AP IM) 9/27/2002 9/3/2009 $1,500,000 $0 $1,500,000

3-02-0026-010-2003 Construct Runway Safety Area 6-24 (SA RW SF) 8/22/2003 3/1/2011 $0 $3,049,999 $3,049,999

Rehabilitate Runway 6-24 (RE RW IM) 8/22/2003 3/1/2011 $0 $2,750,000 $2,750,000

3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $100,000 $700,000 $800,000 Vehicle (SA EQ RF)

3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $107,350 $0 $107,350 EQ SN)

3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $262,064 $0 $262,064 (Acquire 8cy Dump Truck w/ Sander and Plow) (ST EQ SN)

3-02-0026-011-2008 Construct Runway Safety Area 06/24 Phase 3 5/12/2008 4/1/2013 $0 $2,889,973 $2,889,973 construction (SA RW SF)

Rehabilitate Runway 06/24 (RE RW IM) 5/12/2008 4/1/2013 $500,000 $0 $500,000

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0026-012-2010 Construct Runway Safety Area 06/24 RSA Phase 4 3/12/2010 $0 $7,200,000 $7,200,000 construction (SA RW SF)

3-02-0026-013-2012 Conduct Airport Master Plan Study Master Plan Update 9/10/2012 12/19/2014 $533,729 $0 $533,729 (PL PL MA)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $334,825 $0 $334,825 Acquire SRE (Alaska Region): Barrow (Grader with Attachments) (ST EQ SN)

3-02-0200-092-2013 [Various Grnt] Wildlife Hazard Assessments (PL PL 9/19/2013 $93,750 $0 $93,750 WH)

3-02-0026-014-2014 Install Runway Lighting Install outboard threshold lights 9/11/2014 $235,000 $0 $235,000 (ST RW LI)

Rehabilitate Runway 07/25 Runway rehab (fix bump) 9/11/2014 $4,264,866 $0 $4,264,866 (RE RW IM)

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $258,106 $0 $258,106 (+08J) Acquire SRE: Barrow - Broom (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 07/25 Accomplish 9/21/2015 $68,248 $0 $68,248 Various Airport Surface Preservation Maintenance (Barrow Pavement Markings) (RE RW IM)

$27,695,265 $33,454,119 $61,149,384

Monday, January 11, 2016 Page 18 of 124

Page 20: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Beaver Beaver (WBQ)

3-02-0028-001-1988 Construct Runway 4/22 (ST RW CO) 6/3/1988 9/9/1992 $321,888 $744 $322,632

Install Runway Lighting (ST RW LI) 6/3/1988 9/9/1992 $273,021 $0 $273,021

Construct Apron (ST AP CO) 6/3/1988 9/9/1992 $184,455 $0 $184,455

3-02-0028-002-1991 Improve Snow Removal Equipment Building (ST BD 9/20/1991 12/2/1993 $178,922 $0 $178,922 SN)

Acquire Snow Removal Equipment (ST EQ SN) 9/20/1991 12/2/1993 $116,110 $0 $116,110

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $25,852 $0 $25,852 Obstructions (Various - Beaver) (SA OT OB)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Variuos 9/19/2012 $165,450 $0 $165,450 Surface Preservation Maintenance (Beaver) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $237,552 $0 $237,552 Acquire SRE (Loader) (ST EQ SN)

$1,503,250 $744 $1,503,994

Bethel Bethel (BET)

3-02-0029-001-1987 Expand Apron (ST AP IM) 7/15/1987 5/23/1990 $824,403 $11,205 $835,608

Improve Airport Drainage (ST OT IM) 7/15/1987 5/23/1990 $56,993 $0 $56,993

Extend Runway 18/36 (ST RW IM) 7/15/1987 5/23/1990 $49,459 $0 $49,459

Extend Taxiway (ST TW IM) 7/15/1987 5/23/1990 $31,187 $0 $31,187

Improve Snow Removal Equipment Building (ST BD 7/15/1987 5/23/1990 $215,003 $0 $215,003 SN)

Expand Apron (ST AP IM) 7/15/1987 5/23/1990 $5,625 $0 $5,625

3-02-0029-002-1988 Rehabilitate Runway 18/36 (RE RW IM) 6/20/1988 2/25/1991 $2,287,355 $0 $2,287,355

Rehabilitate Taxiway (RE TW IM) 6/20/1988 2/25/1991 $69,556 $0 $69,556

Groove Runway 18/36 (SP RW FR) 6/20/1988 2/25/1991 $164,374 $0 $164,374

Rehabilitate Apron (RE AP IM) 6/20/1988 2/25/1991 $197,875 $0 $197,875

3-02-0029-003-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 5/6/1992 7/19/2000 $756,987 $0 $756,987 BD EX)

Acquire Security Equipment (SA EQ SE) 5/6/1992 7/19/2000 $184,158 $0 $184,158

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 5/6/1992 7/19/2000 $304,688 $0 $304,688 EQ RF)

3-02-0029-004-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1994 1/18/2000 $241,800 $0 $241,800

Rehabilitate Taxiway Lighting (RE TW LI) 9/27/1994 1/18/2000 $203,740 $0 $203,740

Rehabilitate Apron (RE AP IM) 9/27/1994 1/18/2000 $332,511 $0 $332,511

Construct Taxiway (ST TW CO) 9/27/1994 1/18/2000 $1,163,986 $0 $1,163,986

Rehabilitate Runway 18/36 (RE RW IM) 9/27/1994 1/18/2000 $2,739,885 $0 $2,739,885

3-02-0029-005-1996 Install Runway Lighting (SA RW LI) 9/23/1996 7/13/2000 $285,863 $1,665 $287,528

Install Runway Lighting (ST RW LI) 9/23/1996 7/13/2000 $147,262 $0 $147,262

Expand Apron (ST AP IM) 9/23/1996 7/13/2000 $9,375 $0 $9,375

3-02-0029-006-1997 Conduct Airport Master Plan Study (PL PL MA) 8/7/1997 9/12/2002 $325,000 $0 $325,000

3-02-0029-007-1998 Construct Taxiway (ST TW CO) 5/15/1998 9/25/2002 $0 $3,711,220 $3,711,220

Acquire Land For Approaches (ST LA SZ) 5/15/1998 9/25/2002 $229,693 $0 $229,693

Expand Apron (ST AP IM) 5/15/1998 9/25/2002 $420,000 $700,000 $1,120,000

Rehabilitate Runway 36 (RE RW IM) 5/15/1998 9/25/2002 $0 $500,000 $500,000

Improve Access Road (OT GT AC) 5/15/1998 9/25/2002 $480,000 $0 $480,000

Monday, January 11, 2016 Page 19 of 124

Page 21: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0029-008-1999 Construct Taxiway (ST TW CO) 7/6/1999 9/25/2002 $813,817 $0 $813,817

3-02-0029-009-2000 Construct Apron (ST AP CO) 8/4/2000 8/5/2003 $1,851,992 $1,375,817 $3,227,809

Acquire Security Equipment (SA EQ SE) 8/4/2000 8/5/2003 $370,000 $0 $370,000

3-02-0029-010-2003 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/7/2003 1/23/2006 $136,000 $566,812 $702,812 EQ RF)

3-02-0029-011-2003 Construct Runway Safety Area 18-36 (SA RW SF) 9/5/2003 9/17/2007 $0 $5,000,000 $5,000,000

3-02-0029-012-2004 Improve Runway Safety Area 18/36 (SA RW SF) 7/26/2004 5/27/2008 $400,000 $585,060 $985,060

Rehabilitate Runway 18/36 (RE RW IM) 7/26/2004 5/27/2008 $1,200,000 $0 $1,200,000

3-02-0029-013-2005 Construct Sand and Chemical Storage Building (ST BD 8/29/2005 7/20/2010 $1,686,972 $18,274 $1,705,246 SN)

3-02-0029-014-2005 Construct Runway Plan-1 (ST RW CO) 8/11/2005 3/7/2012 $10,100,000 $0 $10,100,000

Construct Runway Safety Area 18/36 (SA RW SF) 8/11/2005 3/7/2012 $0 $5,654,392 $5,654,392

3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $546,362 $0 $546,362 (Carrier w/broom) (ST EQ SN)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $65,000 $0 $65,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $70,000 $0 $70,000 (RE RW IM)

3-02-0029-015-2006 Construct Apron (ST AP CO) 7/27/2006 8/1/2012 $5,804,561 $532,661 $6,337,222

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $103,341 $0 $103,341 (RE RW IM)

3-02-0029-016-2007 Construct Runway Plan-1 Phase 2 (Paving Phase 1) (ST 8/31/2007 4/9/2012 $2,733,217 $0 $2,733,217 RW CO)

3-02-0029-017-2008 Construct Runway Plan-1 Phase 3 (Paving Phase 2) (ST 6/13/2008 4/9/2012 $1,377,983 $4,500,000 $5,877,983 RW CO)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: BET--Front-End Loader w/ Attachments (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 6/19/2008 6/10/2014 $0 $0 $0 (RE RW IM)

3-02-0029-018-2009 Construct Runway Plan-1 Phase 4 (Paving Runway 2/12/2009 1/20/2015 $1,277,634 $1,717,920 $2,995,554 1L/19R Phase 3--final phase) (ST RW CO)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 18/36 (Various 8/20/2009 12/19/2014 $63,840 $0 $63,840 Surface Maintenance) (RE RW IM)

3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $614,711 $0 $614,711 Acquire SRE (Central Region): Snow Blower w/Broom (ST EQ SN)

3-02-0029-019-2010 Conduct Airport Master Plan Study Airport Master Plan 8/23/2010 $650,000 $0 $650,000 (PL PL MA)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01R/19L Bethel 3/12/2010 12/9/2015 $80,243 $0 $80,243 Various Surface Maintenance (RE RW IM)

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $278,566 $0 $278,566 Acquire SRE (Central Region): Bethel (Sander with Attachments) (ST EQ SN)

3-02-0029-020-2011 Rehabilitate Runway 01L/19R Rehab Runway (RE RW 9/14/2011 $1,000,000 $6,535,827 $7,535,827 IM)

Rehabilitate Taxiway rehab taxiway (RE TW IM) 9/14/2011 $0 $1,600,000 $1,600,000

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various 9/16/2011 $462,838 $0 $462,838 Surface Preservation (RE RW IM)

3-02-0029-021-2012 Acquire Handicap Passenger Lift Device Acquire 8/17/2012 $0 $0 $0 Passenger Lift Device (Bethel) (ST TE MS)

3-02-0200-085-2012 [Various Grnt] Wildlife Hazard Assessments (PL PL 8/28/2012 $142,000 $0 $142,000 WH)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01L/19R Variuos 9/19/2012 $262,500 $0 $262,500 Surface Preservation Maintenance (Bethel) (RE RW IM)

Monday, January 11, 2016 Page 20 of 124

Page 22: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01L/19R Surface Preservation Maintenance (Bethel) (RE RW IM)

$273,000 $0 $273,000

3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Bethel - Plow (ST EQ SN)

$705,835 $0 $705,835

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01L/19R (+08J) Various Surface Preservation Maintenance: Bethel - Crack Seal, Pavement Markings (RE RW IM)

$289,000 $0 $289,000

3-02-0029-022-2015 7/7/2015 Rehabilitate Apron rehab apron - commerical (RE AP IM)

$1,000,000 $4,587,042 $5,587,042

3-02-0029-023-2015 9/21/2015 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)

$3,000,000 $3,500,000 $6,500,000

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Bethel P-Series with Rollover Plow, and P-Series with Wing Plow) (ST EQ SN)

$1,019,776 $0 $1,019,776

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 01L/19R Accomplish Various Airport Surface Preservation Maintenance (Bethel RWYs and TWYs Marking and RSA Grading and Compaction) (RE RW IM)

$525,000 $0 $525,000

$50,830,966 $41,097,894 $91,928,860

Bettles Bettles (BTT)

3-02-0030-001-1988 6/15/1988 12/16/1992 Install Runway Lighting (ST RW LI) $453,500 $0 $453,500

6/15/1988 12/16/1992 Rehabilitate Runway 1/19 (RE RW IM) $426,290 $105,436 $531,726

6/15/1988 12/16/1992 Install Apron Lighting (ST AP LI) $18,140 $0 $18,140

6/15/1988 12/16/1992 Install Miscellaneous NAVAIDS (ST OT IN) $9,070 $0 $9,070

3-02-0030-002-1990 9/19/1990 7/19/1994 Acquire Snow Removal Equipment (ST EQ SN) $183,000 $0 $183,000

9/19/1990 7/19/1994 Improve Snow Removal Equipment Building (ST BD SN)

$232,791 $37,240 $270,031

3-02-0030-003-1992 9/2/1992 10/27/1998 Conduct Airport Master Plan Study (PL PL MA) $208,275 $0 $208,275

3-02-0030-004-2001 9/19/2001 2/24/2005 Improve Seaplane Base (ST SB CO) $3,044,857 $0 $3,044,857

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

$100,178 $0 $100,178

3-02-0200-084-2012 7/23/2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Bettles) (SA OT OB)

$41,363 $0 $41,363

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01/19 Surface Preservation Maintenance (Bettles) (RE RW IM)

$319,700 $0 $319,700

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)

$331,149 $0 $331,149

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Bettles - Surface Repair (RE RW IM)

$175,312 $0 $175,312

$5,543,625 $142,676 $5,686,301

Big Lake Big Lake (BGQ)

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 07/25 Big Lake Various Surface Maintenance (RE RW IM)

$56,392 $0 $56,392

3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Big Lake) (SA OT OB)

$42,000 $0 $42,000

3-02-0031-001-2014 9/12/2014 Conduct Airport Master Plan Study MP (PL PL MA) $400,000 $0 $400,000

Monday, January 11, 2016 Page 21 of 124

Page 23: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $162,750 $0 $162,750 Various Surface Preservation Maintenance: Big Lake -Minor Gravel Resurfacing and Dust Control (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Remove Obstructions Various 9/21/2015 $63,000 $0 $63,000 Obstruction Removal (Big Lake, RPZ Rwy 7, 5 acres) (SA OT OB)

$724,142 $0 $724,142

Birch Creek Birch Creek (Z91)

3-02-0033-001-1984 Extend Runway 16/34 (ST RW IM) 5/18/1984 2/1/1991 $273,367 $0 $273,367

Construct Apron (ST AP CO) 5/18/1984 2/1/1991 $19,100 $0 $19,100

Acquire Snow Removal Equipment (ST EQ SN) 5/18/1984 2/1/1991 $103,643 $0 $103,643

Construct Taxiway (ST TW CO) 5/18/1984 2/1/1991 $47,976 $0 $47,976

Improve Access Road (OT GT AC) 5/18/1984 2/1/1991 $38,392 $0 $38,392

Acquire Land for Development (ST LA DV) 5/18/1984 2/1/1991 $11,500 $0 $11,500

Rehabilitate Runway 16/34 (RE RW IM) 5/18/1984 2/1/1991 $273,367 $0 $273,367

Install Runway Lighting (ST RW LI) 5/18/1984 2/1/1991 $273,367 $0 $273,367

3-02-0033-002-1994 Extend Runway 16/34 (ST RW IM) 6/28/1994 7/17/2000 $1,536,342 $274,438 $1,810,780

Acquire Land For Approaches (ST LA SZ) 6/28/1994 7/17/2000 $46,875 $0 $46,875

Install Runway Lighting (ST RW LI) 6/28/1994 7/17/2000 $154,500 $0 $154,500

Construct Apron (ST AP CO) 6/28/1994 7/17/2000 $150,938 $0 $150,938

Rehabilitate Taxiway (RE TW IM) 6/28/1994 7/17/2000 $8,626 $0 $8,626

Improve Access Road (OT GT AC) 6/28/1994 7/17/2000 $70,406 $0 $70,406

3-02-0033-003-2003 Rehabilitate Apron (RE AP IM) 8/21/2003 4/21/2006 $450,000 $0 $450,000

Rehabilitate Runway 16/34 (RE RW IM) 8/21/2003 4/21/2006 $541,056 $0 $541,056

Rehabilitate Taxiway (RE TW IM) 8/21/2003 4/21/2006 $450,000 $0 $450,000

3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $228,000 $0 $228,000 Acquire SRE (Northern Region): Birch Creek Loader (ST EQ SN)

$4,677,455 $274,438 $4,951,893

Birchwood Birchwood (BCV)

3-02-0034-001-1987 Construct Apron (CA AP CO) 8/10/1987 12/9/1992 $344,634 $0 $344,634

Rehabilitate Apron (RE AP IM) 8/10/1987 12/9/1992 $251,608 $0 $251,608

Improve Snow Removal Equipment Building (ST BD 8/10/1987 12/9/1992 $161,809 $0 $161,809 SN)

Acquire Land for Development (ST LA DV) 8/10/1987 12/9/1992 $163,791 $0 $163,791

Improve Access Road (OT GT AC) 8/10/1987 12/9/1992 $64,543 $0 $64,543

3-02-0034-002-2001 Conduct Airport Master Plan Study (PL PL MA) 6/11/2001 8/26/2004 $220,196 $0 $220,196

3-02-0034-003-2002 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/3/2002 8/28/2006 $185,718 $0 $185,718

3-02-0034-004-2004 Install Runway Lighting 1L/19R (ST RW LI) 8/27/2004 6/20/2008 $680,210 $86,883 $767,093

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $215,568 $0 $215,568 (Hydrostatic loader-mounted snow blower) (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 01L/19R 6/30/2006 2/27/2012 $6,327 $0 $6,327 (Maintenance) (RE RW IM)

3-02-0000-008-2007 Conduct Environmental Study Conduct Archaeological 9/4/2007 3/21/2012 $47,500 $0 $47,500 Survey for G2G and complete EA (EN PL MA)

Monday, January 11, 2016 Page 22 of 124

Page 24: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 01L/19R 6/19/2008 6/10/2014 $134,700 $0 $134,700 (Maintenance) (RE RW IM)

3-02-0034-005-2009 Conduct Airport Master Plan Study (PL PL MA) 7/6/2009 8/8/2014 $151,080 $0 $151,080

3-02-0034-006-2012 Rehabilitate Runway 01L/19R (RE RW IM) 6/18/2012 $1,255,146 $0 $1,255,146

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $50,400 $0 $50,400 Obstructions (Various - Birchwood) (SA OT OB)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01L/19R Various 9/19/2012 $71,400 $0 $71,400 Surface Preservation Maintenance (Birchwood) (RE RW IM)

$4,004,630 $86,883 $4,091,513

Boundary Boundary (BYA)

3-02-0036-001-1989 Extend Runway 5/23 (ST RW IM) 9/15/1989 5/27/1992 $636,242 $0 $636,242

Acquire Land for Development (ST LA DV) 9/15/1989 5/27/1992 $104,166 $0 $104,166

Construct Taxiway (ST TW CO) 9/15/1989 5/27/1992 $203,853 $0 $203,853

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 6/30/2006 2/27/2012 $94,905 $0 $94,905 (RE RW IM)

$1,039,166 $0 $1,039,166

Brevig Mission Brevig Mission (KTS)

3-02-0294-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/20/1991 6/3/1999 $236,059 $0 $236,059

3-02-0294-002-1997 Improve Access Road (OT GT AC) 9/26/1997 9/11/2002 $60,000 $0 $60,000

Improve Snow Removal Equipment Building (ST BD 9/26/1997 9/11/2002 $250,000 $0 $250,000 SN)

Install Apron Lighting (ST AP LI) 9/26/1997 9/11/2002 $40,000 $0 $40,000

Install Runway Lighting 4-22 (ST RW LI) 9/26/1997 9/11/2002 $90,000 $0 $90,000

Construct Apron (ST AP CO) 9/26/1997 9/11/2002 $300,000 $0 $300,000

Acquire Land for Development (ST LA DV) 9/26/1997 9/11/2002 $281,250 $0 $281,250

Construct Taxiway (ST TW CO) 9/26/1997 9/11/2002 $300,000 $0 $300,000

Rehabilitate Runway 4-22 (RE RW IM) 9/26/1997 9/11/2002 $460,000 $0 $460,000

Construct Runway 11-29 (ST RW CO) 9/26/1997 9/11/2002 $1,537,883 $250,269 $1,788,152

Install Runway Lighting 11-29 (ST RW LI) 9/26/1997 9/11/2002 $100,000 $0 $100,000

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/30/2006 2/27/2012 $131,813 $0 $131,813 (RE RW IM)

$3,787,005 $250,269 $4,037,274

Buckland Buckland (BVK)

3-02-0399-001-1996 Install Runway Vertical/Visual Guidance System (ST 9/20/1996 9/12/2000 $0 $43,991 $43,991 RW VI)

Extend Runway 10/28 (ST RW IM) 9/20/1996 9/12/2000 $0 $3,176,456 $3,176,456

Rehabilitate Taxiway (RE TW IM) 9/20/1996 9/12/2000 $0 $220,327 $220,327

Expand Apron (ST AP IM) 9/20/1996 9/12/2000 $119,589 $0 $119,589

Install Apron Lighting (ST AP LI) 9/20/1996 9/12/2000 $75,519 $0 $75,519

Improve Snow Removal Equipment Building (ST BD 9/20/1996 9/12/2000 $219,958 $0 $219,958 SN)

Improve Access Road (OT GT AC) 9/20/1996 9/12/2000 $87,982 $0 $87,982

Monday, January 11, 2016 Page 23 of 124

Page 25: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0399-001-1996 9/20/1996 9/12/2000 Install Runway Lighting (ST RW LI) $21,171 $78,829 $100,000

3-02-0399-002-1998 7/30/1998 8/4/1999 Acquire Land For Approaches (ST LA SZ) $183,943 $0 $183,943

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 11/29 Buckland Various Surface Maintenance (RE RW IM)

$212,800 $0 $212,800

3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Buckland (Dozer) (ST EQ SN)

$370,108 $0 $370,108

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Buckland Grader) (ST EQ SN)

$365,238 $0 $365,238

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish Various Airport Surface Preservation Maintenance (Buckland Compaction and Dust Pallative) (RE RW IM)

$155,109 $0 $155,109

$1,811,417 $3,519,603 $5,331,020

Central Central (CEM)

3-02-0045-001-1989 9/22/1989 8/9/1993 Install Runway Lighting (ST RW LI) $126,470 $0 $126,470

9/22/1989 8/9/1993 Acquire Land for Development (ST LA DV) $82,190 $0 $82,190

9/22/1989 8/9/1993 Improve Access Road (OT GT AC) $120,150 $0 $120,150

9/22/1989 8/9/1993 Construct Apron (ST AP CO) $416,590 $0 $416,590

9/22/1989 8/9/1993 Construct Runway 7/25 (ST RW CO) $390,680 $43,289 $433,969

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 07/25 (Various Surface Maintenance) (RE RW IM)

$164,920 $0 $164,920

$1,301,000 $43,289 $1,344,289

Chalkyitsik Chalkyitsik (CIK)

3-02-0046-001-1988 6/15/1988 1/7/1993 Install Miscellaneous NAVAIDS (ST OT IN) $10,190 $0 $10,190

6/15/1988 1/7/1993 Install Apron Lighting (ST AP LI) $10,150 $0 $10,150

6/15/1988 1/7/1993 Install Runway Lighting (ST RW LI) $77,190 $0 $77,190

6/15/1988 1/7/1993 Construct Apron (ST AP CO) $99,549 $0 $99,549

6/15/1988 1/7/1993 Construct Taxiway (ST TW CO) $17,871 $0 $17,871

6/15/1988 1/7/1993 Construct Runway 3/21 (ST RW CO) $671,237 $141,368 $812,605

6/15/1988 1/7/1993 Install Runway Lighting (ST RW LI) $85,235 $0 $85,235

3-02-0046-002-1991 9/24/1991 11/22/1993 Improve Building (ST BD MS) $70,000 $16,118 $86,118

9/24/1991 11/22/1993 Improve Building (ST BD MS) $0 $39,794 $39,794

9/24/1991 11/22/1993 Acquire Snow Removal Equipment (ST EQ SN) $130,000 $0 $130,000

3-02-0046-003-1993 9/29/1993 10/24/1998 Acquire Snow Removal Equipment (ST EQ SN) $187,500 $0 $187,500

9/29/1993 10/24/1998 Install Runway Lighting (ST RW LI) $83,660 $0 $83,660

9/29/1993 10/24/1998 Extend Runway 03/21 (ST RW IM) $1,016,182 $0 $1,016,182

3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $300,000 $300,000

$2,458,764 $497,280 $2,956,044

Chandalar Camp Chandalar Shelf (5CD)

3-02-0431-001-2004 8/24/2004 3/28/2008 Construct Snow Removal Equipment Building (ST BD SN)

$967,834 $0 $967,834

$967,834 $0 $967,834

Monday, January 11, 2016 Page 24 of 124

Page 26: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Chandalar Lake Chandalar Lake (WCR)

3-02-0047-001-1994 6/24/1994 3/31/1999 Extend Runway 03/21 (ST RW IM) $820,478 $56,299 $876,777

6/24/1994 3/31/1999 Construct Taxiway (ST TW CO) $48,384 $0 $48,384

6/24/1994 3/31/1999 Construct Apron (ST AP CO) $380,006 $0 $380,006

6/24/1994 3/31/1999 Improve Access Road (OT GT AC) $83,451 $0 $83,451

6/24/1994 3/31/1999 Acquire Land For Approaches (ST LA SZ) $37,500 $0 $37,500

$1,369,819 $56,299 $1,426,118

Chefornak Chefornak (CFK)

3-02-0442-001-2002 9/12/2002 5/30/2006 Construct New Airport (ST NA CO) $7,022,719 $0 $7,022,719

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 16/34 (Various Surface Maintenance) (RE RW IM)

$319,200 $0 $319,200

3-02-0442-002-2010 9/15/2010 Construct New Airport Phase 2 (ST NA CO) $8,694,932 $12,997,368 $21,692,300

$16,036,851 $12,997,368 $29,034,219

Chenega Chenega Bay (C05)

3-02-0419-001-1990 9/7/1990 8/16/1993 Conduct Airport Master Plan Study (PL PL MA) $169,682 $0 $169,682

3-02-0419-002-1992 9/29/1992 6/17/1999 Acquire Snow Removal Equipment (ST EQ SN) $150,000 $0 $150,000

9/29/1992 6/17/1999 Construct Taxiway (ST TW CO) $107,479 $0 $107,479

9/29/1992 6/17/1999 Construct Runway 15/33 (ST RW CO) $2,005,924 $0 $2,005,924

9/29/1992 6/17/1999 Improve Snow Removal Equipment Building (ST BD SN)

$132,000 $0 $132,000

9/29/1992 6/17/1999 Improve Access Road (OT GT AC) $1,023,752 $0 $1,023,752

9/29/1992 6/17/1999 Acquire Land for Development (ST LA DV) $61,875 $0 $61,875

9/29/1992 6/17/1999 Construct Apron (ST AP CO) $452,286 $0 $452,286

3-02-0419-003-1997 6/13/1997 7/15/1998 Acquire Snow Removal Equipment (ST EQ SN) $71,709 $0 $71,709

3-02-0419-004-2004 9/1/2004 4/30/2008 Rehabilitate Access Road (OT GT AC) $452,000 $0 $452,000

9/1/2004 4/30/2008 Rehabilitate Apron (RE AP IM) $550,000 $0 $550,000

9/1/2004 4/30/2008 Construct Snow Removal Equipment Building (ST BD SN)

$570,000 $0 $570,000

9/1/2004 4/30/2008 Rehabilitate Runway 15/33 (RE RW IM) $2,460,000 $64,989 $2,524,989

3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader w/blower) (ST EQ SN)

$409,090 $0 $409,090

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) (RE RW IM)

$10,545 $0 $10,545

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Grader w/ Attachments (ST EQ SN)

$336,948 $0 $336,948

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 15/33 Chenega Bay Various Surface Maintenance (RE RW IM)

$106,400 $0 $106,400

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation Maintenance (Chenega Bay) (RE RW IM)

$262,500 $0 $262,500

$9,332,190 $64,989 $9,397,179

Monday, January 11, 2016 Page 25 of 124

Page 27: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Chevak Chevak (VAK)

3-02-0052-001-1999 Construct New Airport (ST NA CO)

Improve Snow Removal Equipment Building (ST BD SN)

3-02-0052-002-2003 Construct Snow Removal Equipment Building (ST BD SN)

3-02-0468-001-2005 Construct Snow Removal Equipment Building (ST BD SN)

Construct New Airport Phase 2 (Surfacing) (ST NA CO)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Dozer--John Deere 550) (ST EQ SN)

3-02-0468-002-2007 Construct New Airport Phase III (ST NA CO)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various Surface Preservation (RE RW IM)

3/25/1999

3/25/1999

8/4/2003

8/24/2005

8/24/2005

8/17/2006

8/6/2007

9/16/2011

9/11/2003 $5,855,240

9/11/2003 $500,000

8/17/2007 $729,893

$500,000

$2,968,450

7/19/2013 $180,919

$193,800

$10,640

$10,938,942

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,855,240

$500,000

$729,893

$500,000

$2,968,450

$180,919

$193,800

$10,640

$10,938,942

Chicken Chicken (CKX)

3-02-0053-001-1987 Acquire Land for Development (ST LA DV)

Acquire Snow Removal Equipment (ST EQ SN)

Construct Apron (ST AP CO)

Construct Runway 13/31 (ST RW CO)

Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

3-02-0053-002-2008 Acquire Snow Removal Equipment Acquire Snow Removal Equipment (Motor Grader) (ST EQ SN)

Acquire Land for Development Acquire Land: Tract 1, Parcels B, C, D, D1, E, E1, and F (ST LA DV)

9/18/1987

9/18/1987

9/18/1987

9/18/1987

9/18/1987

5/1/2008

5/1/2008

10/24/1998 $143,438

10/24/1998 $108,750

10/24/1998 $323,506

10/24/1998 $524,524

10/24/1998 $77,072

3/21/2012 $269,024

3/21/2012 $111,240

$1,557,554

$0

$0

$0

$0

$0

$0

$0

$0

$143,438

$108,750

$323,506

$524,524

$77,072

$269,024

$111,240

$1,557,554

Chignik Chignik (AJC)

3-02-0330-001-1992 Rehabilitate Taxiway (RE TW IM)

Rehabilitate Apron (RE AP IM)

Extend Runway 02/20 (ST RW IM)

Improve Snow Removal Equipment Building (ST BD SN)

Improve Access Road (OT GT AC)

Acquire Land for Development (ST LA DV)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

Chignik Regional (Proposed GA) (+01H)

9/25/1992

9/25/1992

9/25/1992

9/25/1992

9/25/1992

9/25/1992

6/19/2008

9/25/1997

9/25/1997

9/25/1997

9/25/1997

9/25/1997

9/25/1997

6/10/2014

$14,000

$42,000

$538,225

$95,000

$4,000

$75,000

$0

$768,225

$0

$0

$26,979

$0

$0

$0

$0

$26,979

$14,000

$42,000

$565,204

$95,000

$4,000

$75,000

$0

$795,204

3-02-0443-001-2004 Conduct Airport Master Plan Study (PL PL MA)

3-02-0443-002-2005 Conduct Airport Master Plan Study Phase 2 (EA & ALP) (PL PL MA)

8/25/2004

8/19/2005

6/15/2007

6/9/2010

$124,493

$121,608

$246,101

$0

$0

$0

$124,493

$121,608

$246,101

Monday, January 11, 2016 Page 26 of 124

Page 28: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Chignik Flats Chignik Lagoon (KCL)

3-02-0056-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/12/1990 10/13/1994 $138,768 $0 $138,768

$138,768 $0 $138,768

Chignik Lake Chignik Lake (A79)

3-02-0331-001-1985 Extend Runway 8/26 (ST RW IM) 8/26/1985 5/26/1992 $126,563 $0 $126,563

Rehabilitate Taxiway (RE TW IM) 8/26/1985 5/26/1992 $8,437 $0 $8,437

Rehabilitate Runway 8/26 (RE RW IM) 8/26/1985 5/26/1992 $694,035 $0 $694,035

Rehabilitate Apron (RE AP IM) 8/26/1985 5/26/1992 $14,063 $0 $14,063

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/19/2008 6/10/2014 $289,700 $0 $289,700 (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Chignik Lake 3/12/2010 12/9/2015 $42,560 $0 $42,560 Various Surface Maintenance (RE RW IM)

$1,185,358 $0 $1,185,358

Chisana Chisana (CZN)

3-02-0057-001-1993 Conduct Airport Master Plan Study (PL PL MA) 9/28/1993 9/11/1995 $10,305 $0 $10,305

3-02-0057-002-1996 Conduct Airport Master Plan Study (PL PL MA) 8/23/1996 11/17/2006 $234,423 $0 $234,423

$244,728 $0 $244,728

Chistochina Chistochina (Proposed GA) (+07D)

3-02-0475-001-2007 Conduct Airport Master Plan Study (Relocation Study, 8/8/2007 3/21/2012 $134,874 $0 $134,874 Phase 1) (PL PL MA)

3-02-0475-002-2009 Conduct Airport Master Plan Study (Relocation Study, 2/11/2009 11/5/2014 $170,767 $0 $170,767 Phase 2) (PL PL MA)

$305,641 $0 $305,641

Chitina Chitina (CXC)

3-02-0059-001-1991 Construct Apron (CA AP CO) 9/23/1991 10/24/1998 $219,474 $0 $219,474

Construct Taxiway (ST TW CO) 9/23/1991 10/24/1998 $55,143 $0 $55,143

Extend Runway 13/31 (ST RW IM) 9/23/1991 10/24/1998 $666,403 $0 $666,403

Acquire Land For Approaches (ST LA SZ) 9/23/1991 10/24/1998 $16,000 $0 $16,000

Improve Access Road (CA GT AC) 9/23/1991 10/24/1998 $55,205 $0 $55,205

3-02-0059-002-1999 Improve Snow Removal Equipment Building (ST BD 3/25/1999 8/31/2001 $530,786 $0 $530,786 SN)

3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $222,064 $0 $222,064 (Acquire Wheel Loader) (ST EQ SN)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) 5/31/2007 8/6/2013 $37,240 $0 $37,240 (RE RW IM)

Monday, January 11, 2016 Page 27 of 124

Page 29: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $100,500 $0 $100,500 Obstruction Removal (Chitina) (SA OT OB)

$1,902,815 $0 $1,902,815

Chuathbaluk Chuathbaluk (9A3)

3-02-0460-001-2002 Construct Snow Removal Equipment Building (ST BD 9/17/2002 6/30/2006 $300,000 $0 $300,000 SN)

Construct New Airport (ST NA CO) 9/17/2002 6/30/2006 $5,723,410 $0 $5,723,410

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) 5/31/2007 8/6/2013 $53,200 $0 $53,200 (RE RW IM)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 09/27 (+08J) 9/19/2014 $144,900 $0 $144,900 Various Surface Preservation Maintenance: Chuathbaluk - Dust Control (RE RW IM)

$6,221,510 $0 $6,221,510

Circle Circle City (CRC)

3-02-0407-001-1985 Acquire Land for Development (ST LA DV) 9/3/1985 10/12/1990 $302,655 $0 $302,655

3-02-0407-002-1986 Install Runway Lighting (ST RW LI) 9/19/1986 9/20/1988 $79,106 $0 $79,106

Construct Apron (ST AP CO) 9/19/1986 9/20/1988 $780,025 $152,218 $932,243

Construct Runway 14/33 (CA RW CO) 9/19/1986 9/20/1988 $1,666,263 $0 $1,666,263

Improve Access Road (OT GT AC) 9/19/1986 9/20/1988 $78,142 $0 $78,142

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 15/33 (Various 8/20/2009 12/19/2014 $164,920 $0 $164,920 Surface Maintenance) (RE RW IM)

$3,071,111 $152,218 $3,223,329

Circle Hot Springs Circle Hot Springs (CHP)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/30/2006 2/27/2012 $168,720 $0 $168,720 (RE RW IM)

$168,720 $0 $168,720

Clarks Point Clarks Point (CLP)

3-02-0062-001-1995 Conduct Airport Master Plan Study (PL PL MA) 9/12/1995 8/1/2000 $271,900 $0 $271,900

3-02-0062-002-2000 Construct New Airport (ST NA CO) 9/14/2000 8/3/2004 $430,490 $2,609,506 $3,039,996

Improve Snow Removal Equipment Building (ST BD 9/14/2000 8/3/2004 $250,000 $0 $250,000 SN)

3-02-0062-003-2004 Construct New Airport (ST NA CO) 8/19/2004 9/2/2008 $2,924,837 $0 $2,924,837

Construct Snow Removal Equipment Building (ST BD 8/19/2004 9/2/2008 $1,000,000 $0 $1,000,000 SN)

3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $237,032 $0 $237,032 (Motor Grader) (ST EQ SN)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $226,393 $0 $226,393 (Loader w/Plow & Attachmnts) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Remove Obstructions Various 9/21/2015 $78,750 $0 $78,750 Obstruction Removal (Clarks Point, Rwy 18 Approach 20:1 penetrations, .6 acres) (SA OT OB)

$5,419,402 $2,609,506 $8,028,908

Monday, January 11, 2016 Page 28 of 124

Page 30: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Clear Clear (Z84)

3-02-0420-001-1993 Construct Apron (ST AP CO) 8/19/1993 7/14/1999 $487,206 $0 $487,206

Construct Taxiway (ST TW CO) 8/19/1993 7/14/1999 $303,114 $0 $303,114

Extend Runway RW01/19 (ST RW IM) 8/19/1993 7/14/1999 $688,790 $0 $688,790

Install Runway Lighting (ST RW LI) 8/19/1993 7/14/1999 $166,969 $0 $166,969

Improve Access Road (OT GT AC) 8/19/1993 7/14/1999 $246,344 $0 $246,344

Acquire Land for Development (ST LA DV) 8/19/1993 7/14/1999 $53,693 $0 $53,693

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)

3-02-0000-007-2007 Conduct aeronautical survey for WAAS approach (PL 8/28/2007 1/28/2013 $0 $147,000 $147,000 PL VI)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

5/31/2007 8/6/2013 $63,840 $0 $63,840

$2,019,956 $147,000 $2,166,956

Coffman Cove Coffman Cove (KCC)

3-02-0064-001-1993 Construct Apron (ST AP CO) 9/17/1993 6/28/1995 $169,835 $635 $170,470

3-02-0064-002-2006 Construct Seaplane Base (ST SB CO) 5/19/2006 9/29/2011 $1,437,164 $31,334 $1,468,498

$1,606,999 $31,969 $1,638,968

Cold Bay Cold Bay (CDB)

3-02-0065-001-1987 Extend Taxiway (ST TW IM) 9/11/1987 4/9/1992 $17,328 $0 $17,328

Install Apron Lighting (ST AP LI) 9/11/1987 4/9/1992 $0 $40,000 $40,000

Rehabilitate Taxiway (RE TW IM) 9/11/1987 4/9/1992 $35,825 $0 $35,825

Rehabilitate Runway 14/32 (RE RW IM) 9/11/1987 4/9/1992 $1,829,408 $916,394 $2,745,802

Rehabilitate Runway 8/26 (RE RW IM) 9/11/1987 4/9/1992 $479,678 $0 $479,678

Rehabilitate Taxiway (RE TW IM) 9/11/1987 4/9/1992 $16,063 $0 $16,063

3-02-0065-002-1989 Improve Aircraft Rescue & Fire Fighting Building (SA 9/15/1989 4/13/1992 $315,870 $81,268 $397,138 BD EX)

3-02-0065-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

9/17/1990 3/24/1992 $280,029 $0 $280,029

3-02-0065-004-1993 Acquire Security Equipment (SA EQ SE) 7/27/1993 9/19/1995 $0 $454,010 $454,010

3-02-0065-005-1994 Acquire Security Equipment (SA EQ SE) 9/28/1994 8/16/2000 $52,811 $0 $52,811

Improve Access Road (OT GT AC) 9/28/1994 8/16/2000 $69,989 $0 $69,989

Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1994 8/16/2000 $991,286 $0 $991,286 BD EX)

3-02-0065-006-2002 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/9/2002 1/24/2006 $119,000 $567,205 $686,205 EQ RF)

3-02-0065-007-2004 Rehabilitate Taxiway (RE TW IM) 8/25/2004 7/20/2010 $420,000 $0 $420,000

Rehabilitate Runway 8/26 (RE RW IM) 8/25/2004 7/20/2010 $6,196,163 $0 $6,196,163

Improve Runway Safety Area 8/26 (SA RW SF) 8/25/2004 7/20/2010 $298,647 $3,738,196 $4,036,843

Rehabilitate Apron (RE AP IM) 8/25/2004 7/20/2010 $495,000 $0 $495,000

3-02-0065-008-2005 Conduct Airport Master Plan Study (Terminal Plan) (PL 8/8/2005 5/21/2010 $0 $167,789 $167,789 PL MA)

Monday, January 11, 2016 Page 29 of 124

Page 31: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) 6/30/2006 2/27/2012 $168,720 $0 $168,720 (RE RW IM)

3-02-0065-009-2008 Conduct Airport Master Plan Study (PL PL MA) 9/4/2008 3/18/2013 $299,659 $0 $299,659

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Equipment (SA EQ RF)

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $930,850 $0 $930,850 Acquire SRE (Central Region): Cold Bay (Snow Blower with Attachments) (ST EQ SN)

3-02-0065-010-2011 Rehabilitate Apron Rehabilitate North Apron (RE AP IM) 9/14/2011 $1,500,000 $0 $1,500,000

Rehabilitate Taxiway Rehabilitate Taxiway C (RE TW 9/14/2011 $392,417 $0 $392,417 IM)

Rehabilitate Runway 14/32 Rehabilitate Rwy 14 Turn 9/14/2011 $500,000 $0 $500,000 Around (RE RW IM)

Construct Runway Safety Area 14/32 Extend Runway 9/14/2011 $686,142 $6,779,869 $7,466,011 Safety Area (ST RW SF)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 08/26 Various 9/16/2011 $276,640 $0 $276,640 Surface Preservation (RE RW IM)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 08/26 Variuos 9/19/2012 $31,500 $0 $31,500 Surface Preservation Maintenance (Cold Bay) (RE RW IM)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 15/33 (+08J) 9/19/2014 $241,500 $0 $241,500 Various Surface Preservation Maintenance: Cold Bay -Crack Seal, Erosion Control and Stabilization on Runway Edges (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 15/33 Accomplish 9/21/2015 $241,500 $0 $241,500 Various Airport Surface Preservation Maintenance (Cold Bay Crack Seal and Markings) (RE RW IM)

$16,886,025 $12,844,731 $29,730,756

Coldfoot Coldfoot (CXF)

3-02-0425-001-1993 Extend Runway 01/19 (ST RW IM) 9/17/1993 7/14/1999 $1,474,203 $22,365 $1,496,568

Rehabilitate Taxiway (RE TW IM) 9/17/1993 7/14/1999 $24,637 $0 $24,637

Construct Apron (ST AP CO) 9/17/1993 7/14/1999 $110,831 $0 $110,831

Install Runway Lighting (ST RW LI) 9/17/1993 7/14/1999 $281,532 $0 $281,532

Acquire Snow Removal Equipment (ST EQ SN) 9/17/1993 7/14/1999 $281,184 $0 $281,184

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 6/19/2008 6/10/2014 $158,000 $0 $158,000 (RE RW IM)

3-02-0000-015-2010 Conduct aeronautical survey for WAAS approach 9/22/2010 $0 $300,000 $300,000 Aeronauical Survey (PL PL VI)

3-02-0425-002-2015 Rehabilitate Taxiway (RE TW IM) 9/14/2015 $150,000 $0 $150,000

Rehabilitate Runway 01/19 (RE RW IM) 9/14/2015 $0 $5,721,903 $5,721,903

Rehabilitate Runway Lighting (RE RW LI) 9/14/2015 $248,527 $0 $248,527

Rehabilitate Apron (RE AP IM) 9/14/2015 $0 $1,500,000 $1,500,000

$2,728,914 $7,544,268 $10,273,182

Cordova Merle K (Mudhole) Smith (CDV)

3-02-0067-001-1985 Improve Snow Removal Equipment Building (ST BD 6/28/1985 3/24/1988 $95,049 $0 $95,049 SN)

Acquire Snow Removal Equipment (ST EQ SN) 6/28/1985 3/24/1988 $12,057 $0 $12,057

Install Apron Lighting (ST AP LI) 6/28/1985 3/24/1988 $77,875 $0 $77,875

Monday, January 11, 2016 Page 30 of 124

Page 32: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0067-001-1985 Install Apron Lighting (ST AP LI) 6/28/1985 3/24/1988 $111,101 $0 $111,101

3-02-0067-002-1987 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/2/1987 2/25/1991 $270,490 $0 $270,490 EQ RF)

3-02-0067-003-1989 Groove Runway 9/27 (SP RW FR) 5/19/1989 1/31/1991 $211,599 $6,881 $218,480

Extend Runway 9/27 (ST RW IM) 5/19/1989 1/31/1991 $32,069 $0 $32,069

Extend Runway 9/27 (ST RW IM) 5/19/1989 1/31/1991 $56,279 $0 $56,279

3-02-0067-004-1993 Install Guidance Signs (SA OT SG) 9/20/1993 5/12/2000 $117,315 $0 $117,315

Extend Runway 09/27 (ST RW IM) 9/20/1993 5/12/2000 $0 $518,096 $518,096

Extend Runway 09/27 (ST RW IM) 9/20/1993 5/12/2000 $323,805 $556,133 $879,938

Install Runway Lighting (ST RW LI) 9/20/1993 5/12/2000 $451,212 $0 $451,212

Construct Apron (ST AP CO) 9/20/1993 5/12/2000 $700,883 $0 $700,883

Acquire Snow Removal Equipment (ST EQ SN) 9/20/1993 5/12/2000 $553,488 $0 $553,488

3-02-0067-006-1998 Conduct Airport Master Plan Study (PL PL MA) 7/20/1998 9/6/2002 $260,294 $0 $260,294

3-02-0067-007-1998 Improve Runway Safety Area 9-27 (SA RW SF) 5/20/1998 9/17/2001 $915,371 $0 $915,371

Rehabilitate Runway 9-27 (RE RW IM) 5/20/1998 9/17/2001 $75,000 $1,948,443 $2,023,443

3-02-0067-008-2000 Improve Snow Removal Equipment Building (ST BD 9/6/2000 7/13/2004 $609,141 $89,479 $698,621 SN)

3-02-0067-009-2005 Repair Utilities (Power) (OT OT FF) 8/25/2005 8/28/2009 $1,500,000 $0 $1,500,000

Construct Runway Safety Area 09/27 (Purchase EMAS, 8/25/2005 8/28/2009 $0 $5,264,226 $5,264,226 Phase 1) (SA RW SF)

3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $0 $700,000 $700,000 Vehicle (SA EQ RF)

3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $245,742 $0 $245,742 EQ SN)

3-02-0067-010-2006 Construct Runway Safety Area 09/27 (Install EMAS, 7/25/2006 1/21/2010 $103,673 $4,346,424 $4,450,097 Phase 2) (SA RW SF)

3-02-0067-012-2007 Construct Sand and Chemical Storage Building (ST BD 8/23/2007 5/4/2010 $2,624,783 $0 $2,624,783 SN)

3-02-0067-011-2008 Rehabilitate Runway Lighting 09/27 (RE RW LI) 6/5/2008 4/1/2013 $4,499,980 $626,530 $5,126,510

3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $655,109 $0 $655,109 Acquire Northern SRE - Cordova Towed Broom & Plow Truck with Appurtenances (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/19/2008 6/10/2014 $100,000 $0 $100,000 (RE RW IM)

3-02-0067-013-2009 Rehabilitate Runway Lighting 09/27 (RE RW LI) 9/1/2009 3/21/2012 $547,022 $0 $547,022

3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $728,000 $0 $728,000 Acquire SRE Northern Region (Cordova Snow Blower) (ST EQ SN)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various 9/16/2011 $260,915 $0 $260,915 Surface Preservation (RE RW IM)

3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $125,000 $0 $125,000 Obstruction Removal (Cordova) (ST OT OB)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $560,032 $0 $560,032 Acquire SRE (Alaska Region): Cordova (Plow Truck, Sander) (ST EQ SN)

3-02-0200-096-2014 [Various Grnt] Acquire Snow Removal Equipment 9/18/2014 $148,043 $0 $148,043 (+08J) Various EDA/EAS Locations: Cordova - Acquire SRE (Tow Plow) (ST EQ SN)

3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 16/34 EAS/EDA 9/20/2015 $33,320 $0 $33,320 Various (Cordova - Surface Preservation Maintenance: Re-Stripe RWYs and TWYs) (RE RW IM)

Monday, January 11, 2016 Page 31 of 124

Page 33: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

$17,004,647 $14,151,712 $31,156,360

Council Council (K29)

3-02-0413-001-1987 Construct Apron (ST AP CO)

Construct Runway 3/21 (ST RW CO)

Improve Access Road (OT GT AC)

Acquire Land for Development (ST LA DV)

3-02-0413-002-1988 Improve Snow Removal Equipment Building (ST BD SN)

Acquire Snow Removal Equipment (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Council) (SA OT OB)

9/21/1987

9/21/1987

9/21/1987

9/21/1987

5/19/1988

5/19/1988

6/30/2006

8/20/2009

7/23/2012

3/15/2000 $166,621

3/15/2000 $1,036,795

3/15/2000 $99,147

3/15/2000 $176,188

9/9/1992 $35,407

9/9/1992 $67,633

2/27/2012 $21,090

12/19/2014 $37,240

$31,020

$1,671,141

$0

$0

$0

$133,031

$15,204

$0

$0

$0

$0

$148,235

$166,621

$1,036,795

$99,147

$309,219

$50,611

$67,633

$21,090

$37,240

$31,020

$1,819,376

Craig Craig (CGA)

3-02-0071-001-1994 Construct Apron (ST AP CO)

Acquire Land for Development (ST LA DV)

3-02-0071-002-1995 Construct Terminal Building (ST TE CO)

9/27/1994

9/27/1994

2/15/1995

7/14/1999 $1,423,433

7/14/1999 $101,906

9/28/1999 $743,850

$2,269,189

$6,057

$0

$48,433

$54,490

$1,429,490

$101,906

$792,283

$2,323,679

Crooked Creek Crooked Creek (CJX)

3-02-0073-001-1991 Improve Snow Removal Equipment Building (ST BD SN)

Construct Runway 13/31 (ST RW CO)

Construct Apron (ST AP CO)

3-02-0073-002-1991 Acquire Land for Development (ST LA DV)

3-02-0073-003-2001 Conduct Airport Master Plan Study (PL PL MA)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish Various Airport Surface Preservation Maintenance (Crooked Creek Minor Resurfacing and Compaction) (RE RW IM)

6/3/1991

6/3/1991

6/3/1991

8/30/1991

7/18/2001

5/31/2007

9/21/2015

8/9/1993 $98,727

8/9/1993 $1,111,110

8/9/1993 $353,236

5/9/2000 $136,218

8/17/2005 $350,000

8/6/2013 $53,200

$350,000

$2,452,491

$0

$89,077

$0

$0

$0

$0

$0

$89,077

$98,727

$1,200,187

$353,236

$136,218

$350,000

$53,200

$350,000

$2,541,568

Dahl Creek Dahl Creek (DCK)

3-02-0075-001-1985 Acquire Land for Development (ST LA DV)

3-02-0075-002-1986 Construct Apron (ST AP CO)

Remove Obstructions (ST OT OB)

Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

8/26/1985

9/10/1986

9/10/1986

9/10/1986

9/10/1996

3/16/1992

3/16/1992

3/16/1992

$168,458

$258,916

$61,800

$3,771

$0

$0

$0

$0

$168,458

$258,916

$61,800

$3,771

Monday, January 11, 2016 Page 32 of 124

Page 34: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0075-002-1986 Extend Runway 8/26 (ST RW IM) 9/10/1986 3/16/1992 $976,426 $0 $976,426

Construct Taxiway (ST TW CO) 9/10/1986 3/16/1992 $79,242 $0 $79,242

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/30/2006 2/27/2012 $36,908 $0 $36,908 (RE RW IM)

$1,585,521 $0 $1,585,521

Deadhorse Deadhorse (SCC)

3-02-0339-001-1984 Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $297,888 $0 $297,888

Acquire Security Equipment (SA EQ SE) 8/24/1984 8/21/1989 $113,859 $0 $113,859

Construct Apron (CA AP CO) 8/24/1984 8/21/1989 $324,023 $0 $324,023

Rehabilitate Apron (RE AP IM) 8/24/1984 8/21/1989 $33,626 $0 $33,626

Construct Taxiway (CA TW CO) 8/24/1984 8/21/1989 $198,595 $0 $198,595

Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $1,893,184 $1,567,001 $3,460,185

Construct Taxiway (ST TW CO) 8/24/1984 8/21/1989 $184,266 $0 $184,266

3-02-0339-002-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/22/1986 4/16/1992 $337,135 $0 $337,135 EQ RF)

3-02-0339-003-1989 Improve Snow Removal Equipment Building (ST BD 6/26/1989 10/9/1991 $301,966 $0 $301,966 SN)

3-02-0339-004-1995 Improve Access Road (OT GT AC) 9/27/1995 9/21/2000 $300,000 $0 $300,000

Rehabilitate Taxiway (RE TW IM) 9/27/1995 9/21/2000 $3,500,000 $0 $3,500,000

Rehabilitate Runway 04/22 (RE RW IM) 9/27/1995 9/21/2000 $1,026,664 $4,000,000 $5,026,664

Install Runway Lighting (SA RW LI) 9/27/1995 9/21/2000 $1,100,000 $0 $1,100,000

Acquire Snow Removal Equipment (ST EQ SN) 9/27/1995 9/21/2000 $300,000 $0 $300,000

Rehabilitate Runway 04/22 (RE RW IM) 9/27/1995 9/21/2000 $1,012,290 $3,323,336 $4,335,626

Install Runway Vertical/Visual Guidance System (ST 9/27/1995 9/21/2000 $750,000 $0 $750,000 RW VI)

3-02-0339-005-1998 Improve Aircraft Rescue & Fire Fighting Building (SA 9/10/1998 9/26/2002 $3,595,781 $97,513 $3,693,294 BD EX)

3-02-0339-006-2004 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/6/2004 9/18/2009 $249,160 $710,000 $959,160 EQ RF)

3-02-0339-007-2004 Expand Apron (ST AP IM) 9/1/2004 9/17/2008 $375,000 $0 $375,000

Construct Runway Safety Area 04/22 (SA RW SF) 9/1/2004 9/17/2008 $0 $8,988,312 $8,988,312

3-02-0339-008-2005 Expand Apron (ST AP IM) 8/25/2005 5/6/2010 $791,541 $0 $791,541

Extend Runway Safety Area 04/22 (Phase 2) (SA RW 8/25/2005 5/6/2010 $941,542 $6,856,090 $7,797,632 SF)

3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment 8/31/2007 12/7/2009 $715,000 $0 $715,000 (Carrier Unit and Broom) (ST EQ SN)

3-02-0339-009-2007 Update Airport Master Plan Study (PL PL MA) 8/28/2007 1/22/2013 $472,857 $0 $472,857

3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $75,000 $0 $75,000 Acquire Northern SRE - Deadhorse Sander (ST EQ SN)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,500 $95,500 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0339-010-2010 Update Airport Master Plan Study MP update (PL PL 9/3/2010 3/7/2013 $132,519 $0 $132,519 MA)

3-02-0339-011-2011 Rehabilitate Runway 05/23 Rehab Runway phase 1 (RE 8/10/2011 2/5/2014 $3,831,982 $574,440 $4,406,422 RW IM)

3-02-0339-012-2011 Rehabilitate Runway 05/23 Rehab Runway phase 2 (RE 9/14/2011 $0 $10,683,822 $10,683,822 RW IM)

3-02-0339-013-2011 Rehabilitate Taxiway Phase 1 (RE TW IM) 9/28/2011 $437,837 $3,760,188 $4,198,025

Rehabilitate Apron Phase 1 (RE AP IM) 9/28/2011 $262,604 $4,191,990 $4,454,594

Monday, January 11, 2016 Page 33 of 124

Page 35: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0339-014-2012 Rehabilitate Apron phase 2 (RE AP IM) 8/8/2012 $1,000,000 $1,250,000 $2,250,000

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (De-Icer) (ST EQ SN)

9/19/2013 $331,149 $0 $331,149

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Deadhorse - Blower and Grader (ST EQ SN)

9/19/2014 $998,317 $0 $998,317

3-02-0339-015-2014 Construct Sand and Chemical Storage Building Sand/Chemical Storage Bldg Addition, Phase 1 (ST BD SN)

9/19/2014 $1,500,000 $0 $1,500,000

Expand Snow Removal Equipment Building Expand SRE Bldg, Phase 1 (ST BD SN)

9/19/2014 $1,500,486 $0 $1,500,486

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 05/23 Accomplish Various Airport Surface Preservation Maintenance (Deadhorse RWY and TWY Markings) (RE RW IM)

9/21/2015 $61,010 $0 $61,010

3-02-0339-016-2015 Expand Snow Removal Equipment Building Expand SREB, Phase 2 (ST BD SN)

7/7/2015 $1,000,000 $179,826 $1,179,826

Expand Aircraft Rescue & Fire Fighting Building Expand ARFF Building (SA BD EX)

7/7/2015 $1,575,000 $3,125,750 $4,700,750

Construct Sand and Chemical Storage Building Sand/Chemical Storage Bldg Addition, Phase 2 (ST BD SN)

7/7/2015 $1,370,734 $0 $1,370,734

$32,891,015 $49,403,768 $82,294,783

Deering Deering (DEE)

3-02-0400-001-1989 Install Runway Lighting (ST RW LI) 6/26/1989 8/11/1993 $64,830 $0 $64,830

Construct Runway 11/29 (ST RW CO) 6/26/1989 8/11/1993 $2,439,613 $0 $2,439,613

3-02-0400-002-1991 Acquire Land for Development (ST LA DV) 8/21/1991 6/18/1992 $107,518 $0 $107,518

3-02-0400-003-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/24/1991 11/17/1995 $133,575 $0 $133,575

Improve Snow Removal Equipment Building (ST BD SN)

9/24/1991 11/17/1995 $362,451 $0 $362,451

3-02-0400-004-2001 Rehabilitate Runway (RE RW IM) 9/4/2001 9/2/2005 $2,713,972 $94,755 $2,808,727

Extend Runway (ST RW IM) 9/4/2001 9/2/2005 $1,900,000 $0 $1,900,000

3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment EQ SN)

(ST 9/2/2005 4/4/2008 $217,121 $0 $217,121

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Deering Various Surface Maintenance (RE RW IM)

3/12/2010 12/9/2015 $174,800 $0 $174,800

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)

9/19/2013 $311,670 $0 $311,670

$8,425,550 $94,755 $8,520,305

Delta Junction Ft Greely Allen AAF (BIG)

3-02-0077-001-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 6/3/2003 $228,285 $0 $228,285

$228,285 $0 $228,285

Dillingham Dillingham (DLG)

3-02-0078-001-1984 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

9/20/1984 2/4/1988 $182,142 $0 $182,142

3-02-0078-002-1986 Rehabilitate Taxiway (RE TW IM) 7/30/1986 11/23/1990 $0 $143,805 $143,805

Monday, January 11, 2016 Page 34 of 124

Page 36: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0078-002-1986 Expand Apron (ST AP IM) 7/30/1986 11/23/1990 $0 $738,175 $738,175

Extend Runway 1/19 (ST RW IM) 7/30/1986 11/23/1990 $315,868 $1,765,199 $2,081,067

Expand Apron (CA AP EX) 7/30/1986 11/23/1990 $0 $440,380 $440,380

3-02-0078-003-1987 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/2/1987 2/25/1991 $195,130 $0 $195,130 EQ RF)

3-02-0078-004-1988 Improve Access Road (OT GT AC) 9/14/1988 11/5/1991 $648,576 $0 $648,576

3-02-0078-005-1990 Improve Airport Drainage (ST OT IM) 7/3/1990 6/17/1991 $455,884 $0 $455,884

3-02-0078-006-1991 Expand Apron (CA AP EX) 8/27/1991 12/20/1993 $2,099,420 $67,095 $2,166,515

Improve Access Road (CA GT AC) 8/27/1991 12/20/1993 $365,790 $0 $365,790

3-02-0078-007-1995 Improve Aircraft Rescue & Fire Fighting Building (SA 6/15/1995 9/20/2000 $0 $1,484,177 $1,484,177 BD EX)

Improve Aircraft Rescue & Fire Fighting Building (SA 6/15/1995 9/20/2000 $0 $86,000 $86,000 BD EX)

3-02-0078-008-1996 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 5/1/1996 10/24/1998 $0 $416,658 $416,658 EQ RF)

3-02-0078-009-2001 Conduct Airport Master Plan Study (PL PL MA) 8/15/2001 3/9/2007 $385,254 $0 $385,254

3-02-0078-010-2003 Construct Runway Safety Area 1-19 (ST RW SF) 7/7/2003 9/12/2007 $1,323,460 $146,151 $1,469,611

Rehabilitate Runway 1-19 (RE RW IM) 7/7/2003 9/12/2007 $3,522,364 $0 $3,522,364

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $80,000 $0 $80,000 (RE RW IM)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment De- 8/17/2006 7/19/2013 $173,661 $0 $173,661 icer truck (4,000-gal) (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 6/30/2006 2/27/2012 $89,633 $0 $89,633 (RE RW IM)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: DLG--Tractor Truck for pull broom w/ attachment (ST EQ SN)

3-02-0078-011-2009 Construct Sand and Chemical Storage Building 8/20/2009 $2,669,171 $78,190 $2,747,361 Construct 3-Bay Sand and Chemical Storage Building (ST BD SN)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 01/19 (Various 8/20/2009 12/19/2014 $85,120 $0 $85,120 Surface Maintenance) (RE RW IM)

3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $150,873 $0 $150,873 Acquire SRE (Central Region): Snow Blower w/ Attachments; Dozer w/ Attachments (ST EQ SN)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $67,145 $67,145 Fencing Acquire Water Rescue Equipment (SA EQ RF)

3-02-0078-012-2010 Rehabilitate Apron Rehabilitate Apron (LOC) (RE AP IM) 3/30/2010 3/10/2015 $5,586,886 $0 $5,586,886

Rehabilitate Taxiway Rehabilitate Taxiway (LOC) (RE 3/30/2010 3/10/2015 $2,107,386 $0 $2,107,386 TW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01/19 Dillingham 3/12/2010 12/9/2015 $96,840 $0 $96,840 Various Surface Maintenance (RE RW IM)

3-02-0078-013-2012 Construct Runway Safety Area 01/19 Construct RSA 8/29/2012 $3,193,668 $13,990,000 $17,183,668 (SA RW SF)

3-02-0200-085-2012 [Various Grnt] Wildlife Hazard Assessments (PL PL 8/28/2012 $143,000 $0 $143,000 WH)

3-02-0078-014-2013 Construct Runway Safety Area 01/19 Construct Runway 7/30/2013 $2,162,210 $0 $2,162,210 Safety Area (Rwy 01/19), Phase 2 (SA RW SF)

3-02-0078-015-2013 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/19/2013 $637,950 $0 $637,950 3000 Gallon ARFF Truck (SA EQ RF)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 01/19 Surface 9/18/2013 $180,600 $0 $180,600 Preservation Maintenance (Dillingham) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $448,026 $0 $448,026 Acquire SRE (Runway Broom) (ST EQ SN)

Monday, January 11, 2016 Page 35 of 124

Page 37: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$278,437 $0 $278,437

3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Dillingham - Plow (ST EQ SN)

$667,168 $0 $667,168

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Dillingham - Pavement Markings (RE RW IM)

$312,350 $0 $312,350

$28,756,867 $19,422,975 $48,179,842

Diomede Diomede (DM2)

3-02-0381-001-1993 9/27/1993 7/14/1999 Acquire Land for Development (ST LA DV) $210,142 $0 $210,142

9/27/1993 7/14/1999 Construct Apron (ST AP CO) $3,211,343 $82,939 $3,294,282

3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Diomede Dozer (ST EQ SN)

$353,267 $0 $353,267

$3,774,752 $82,939 $3,857,691

Eagle Eagle (EAA)

3-02-0083-001-1984 9/13/1984 8/3/1992 Install Runway Lighting (ST RW LI) $197,184 $0 $197,184

9/13/1984 8/3/1992 Acquire Land For Approaches (ST LA SZ) $56,700 $0 $56,700

9/13/1984 8/3/1992 Improve Access Road (OT GT AC) $221,358 $0 $221,358

9/13/1984 8/3/1992 Extend Runway 6/24 (ST RW IM) $435,668 $34,621 $470,289

9/13/1984 8/3/1992 Construct Apron (ST AP CO) $346,148 $0 $346,148

9/13/1984 8/3/1992 Construct Taxiway (ST TW CO) $17,972 $0 $17,972

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)

$18,981 $0 $18,981

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 06/24 (Various Surface Maintenance) (RE RW IM)

$26,600 $0 $26,600

3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $236,000 $236,000

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$79,406 $0 $79,406

$1,400,017 $270,621 $1,670,638

Eek Eek (EEK)

3-02-0085-001-1993 8/5/1993 5/9/2000 Conduct Airport Master Plan Study (PL PL MA) $233,933 $0 $233,933

3-02-0085-002-1998 8/27/1998 9/24/2002 Construct New Airport 17-35 (ST NA CO) $2,832,014 $0 $2,832,014

3-02-0085-003-2002 9/17/2002 9/1/2006 Construct New Airport Phase 2 - Construction (ST NA CO)

$2,194,100 $4,169,120 $6,363,220

9/17/2002 9/1/2006 Construct Snow Removal Equipment Building (ST BD SN)

$352,100 $0 $352,100

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 17/35 (Maintenance) (RE RW IM)

$58,208 $0 $58,208

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 17/35 Various Surface Preservation Maintenance (Eek) (RE RW IM)

$10,500 $0 $10,500

$5,680,855 $4,169,120 $9,849,975

Monday, January 11, 2016 Page 36 of 124

Page 38: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Egegik Egegik (EII)

3-02-0422-001-1993 Construct Runway RW11/29 (ST RW CO)

Acquire Land for Development (ST LA DV)

Install Runway Lighting (ST RW LI)

Acquire Snow Removal Equipment (ST EQ SN)

Construct Taxiway (ST TW CO)

Improve Access Road (OT GT AC)

Construct Apron (ST AP CO)

Improve Snow Removal Equipment Building (ST BD SN)

3-02-0422-002-1999 Construct Runway 02-20 (ST RW CO)

Extend Runway 11-29 (ST RW IM)

3-02-0422-003-2001 Construct Runway (ST RW CO)

Extend Runway (ST RW IM)

Egegik (New) (Z03)

9/14/1993

9/14/1993

9/14/1993

9/14/1993

9/14/1993

9/14/1993

9/14/1993

9/14/1993

7/30/1999

7/30/1999

4/13/2001

4/13/2001

7/14/1999 $1,291,523

7/14/1999 $225,000

7/14/1999 $305,000

7/14/1999 $125,000

7/14/1999 $306,000

7/14/1999 $150,000

7/14/1999 $662,000

7/14/1999 $135,000

5/29/2001 $75,000

5/29/2001 $253,125

7/30/2003 $1,345,313

7/30/2003 $235,000

$5,107,961

$434,178

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$4,000,000

$4,434,178

$1,725,701

$225,000

$305,000

$125,000

$306,000

$150,000

$662,000

$135,000

$75,000

$253,125

$1,345,313

$4,235,000

$9,542,139

3-02-0086-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/14/1990 9/14/1990 $157,150

$157,150

$0

$0

$157,150

$157,150

Ekwok Ekwok (KEK)

3-02-0088-001-1983 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

Acquire Land for Development (ST LA DV)

Expand Apron (ST AP IM)

Extend Runway 02/20 (ST RW IM)

Extend Runway 02/20 (ST RW IM)

3-02-0088-002-2004 Construct Runway New (ST RW CO)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Loader w/Plow & Attachmnts) (ST EQ SN)

3-02-0088-003-2008 Construct Snow Removal Equipment Building (ST BD SN)

7/27/1983

7/27/1983

7/27/1983

7/27/1983

7/27/1983

8/27/2004

8/17/2006

6/12/2008

1/16/1986 $66,037

1/16/1986 $3,166

1/16/1986 $30,847

1/16/1986 $215,730

1/16/1986 $565,924

8/8/2008 $4,121,544

7/19/2013 $142,580

6/10/2014 $1,548,823

$6,694,651

$0

$0

$0

$0

$0

$1,243,447

$0

$0

$1,243,447

$66,037

$3,166

$30,847

$215,730

$565,924

$5,364,991

$142,580

$1,548,823

$7,938,098

Elim Elim (ELI)

3-02-0090-001-1987 Construct Runway 19/1 (ST RW CO)

3-02-0090-002-1988 Install Runway Lighting (ST RW LI)

Construct Apron (ST AP CO)

Construct Taxiway /19 (ST TW CO)

Improve Access Road (OT GT AC)

3-02-0090-003-1994 Acquire Snow Removal Equipment (ST EQ SN)

Improve Snow Removal Equipment Building (ST BD SN)

3-02-0090-004-2004 Rehabilitate Runway 01/19 (RE RW IM)

Extend Runway Safety Area 01/19 (ST RW SF)

4/3/1987

4/28/1988

4/28/1988

4/28/1988

4/28/1988

6/29/1994

6/29/1994

5/27/2004

5/27/2004

8/3/1992 $1,764,075

10/14/1992 $211,199

10/14/1992 $219,075

10/14/1992 $185,663

10/14/1992 $206,028

8/23/2000 $75,000

8/23/2000 $447,261

9/15/2008 $2,015,112

9/15/2008 $430,561

$176,246

$0

$0

$0

$0

$0

$0

$0

$3,119,656

$1,940,321

$211,199

$219,075

$185,663

$206,028

$75,000

$447,261

$2,015,112

$3,550,217

Monday, January 11, 2016 Page 37 of 124

Page 39: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0090-004-2004 Extend Runway 01/19 (ST RW IM)

3-02-0090-005-2008 Rehabilitate Runway 01/19 rehabilitate runway, phase 2 (RE RW IM)

5/27/2004

9/15/2008

9/15/2008 $1,560,441

3/21/2011 $1,426,624

$8,541,039

$0

$0

$3,295,902

$1,560,441

$1,426,624

$11,836,940

Emmonak Emmonak (ENM)

3-02-0397-001-1983 Improve Access Road (OT GT AC) 9/21/1983 9/25/1989 $357,208 $0 $357,208

Improve Snow Removal Equipment Building (ST BD SN)

Construct Apron (ST AP CO)

Construct Runway 16/34 (ST RW CO)

Acquire Land for Development (ST LA DV)

Construct Taxiway (ST TW CO)

3-02-0397-002-2001 Expand Apron (ST AP IM)

Extend Taxiway (ST TW IM)

Rehabilitate Runway (RE RW IM)

Improve Runway Safety Area (ST RW SF)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

3-02-0397-003-2008 Rehabilitate Apron rehabilitate apron (RE AP IM)

3-02-0397-004-2009 Rehabilitate Runway Lighting 16/34 (RE RW LI)

Rehabilitate Apron rehabilitate apron, phase 2 (RE AP IM)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)

3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Emmonak Segmented Circle (ST OT IN)

9/21/1983

9/21/1983

9/21/1983

9/21/1983

9/21/1983

9/12/2001

9/12/2001

9/12/2001

9/12/2001

5/31/2007

9/5/2008

2/11/2009

2/11/2009

9/16/2011

9/20/2015

9/25/1989 $198,131

9/25/1989 $994,467

9/25/1989 $3,806,409

9/25/1989 $9,526

9/25/1989 $724,259

1/24/2006 $709,772

1/24/2006 $772,956

1/24/2006 $1,400,000

1/24/2006 $0

8/6/2013 $255,360

3/7/2013 $7,235,095

3/7/2013 $602,939

3/7/2013 $2,302,665

$199,092

$127,962

$0

$0

$609,000

$0

$0

$0

$0

$2,459,469

$1,560,604

$0

$0

$0

$0

$0

$0

$198,131

$994,467

$4,415,409

$9,526

$724,259

$709,772

$772,956

$3,859,469

$1,560,604

$255,360

$7,235,095

$602,939

$2,302,665

$199,092

$127,962

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 16/34 Accomplish Various Airport Surface Preservation Maintenance (Emmonak) (RE RW IM)

9/21/2015 $736,359

$20,432,199

$0

$4,629,073

$736,359

$25,061,272

Eureka Gulkana (GKN)

3-02-0110-001-1984 Construct Runway 14/32 (ST RW CO)

Install Apron Lighting (ST AP LI)

8/7/1984

8/7/1984

11/13/1986

11/13/1986

$60,350

$13,716

$0

$0

$60,350

$13,716

Expand Apron (ST AP IM)

Expand Apron (ST AP IM)

Construct Taxiway (ST TW CO)

Extend Runway 14/32 (ST RW IM)

3-02-0110-002-1991 Install Apron Lighting (ST AP LI)

Extend Runway 14/32 (ST RW IM)

Acquire Snow Removal Equipment (ST EQ SN)

Improve Snow Removal Equipment Building (ST BD SN)

Rehabilitate Taxiway (RE TW IM)

Expand Apron (ST AP IM)

Rehabilitate Taxiway (RE TW IM)

3-02-0110-003-1992 Improve Access Road (OT GT AC)

8/7/1984

8/7/1984

8/7/1984

8/7/1984

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

4/14/1992

11/13/1986

11/13/1986

11/13/1986

11/13/1986

6/6/1995

6/6/1995

6/6/1995

6/6/1995

6/6/1995

6/6/1995

6/6/1995

6/16/1995

$226,133

$12,344

$242,957

$578,360

$168,463

$890,015

$116,854

$257,913

$236,000

$100,950

$103,470

$138,810

$0

$0

$0

$0

$0

$68,800

$0

$0

$0

$0

$0

$0

$226,133

$12,344

$242,957

$578,360

$168,463

$958,815

$116,854

$257,913

$236,000

$100,950

$103,470

$138,810

Monday, January 11, 2016 Page 38 of 124

Page 40: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0110-003-1992 4/14/1992 6/16/1995 Acquire Snow Removal Equipment (ST EQ SN) $123,750 $0 $123,750

4/14/1992 6/16/1995 Construct Taxiway (ST TW CO) $197,110 $0 $197,110

4/14/1992 6/16/1995 Extend Runway 14/32 (ST RW IM) $240,330 $33,600 $273,930

3-02-0110-004-1994 9/27/1994 9/6/2000 Conduct Airport Master Plan Study (PL PL MA) $280,588 $0 $280,588

$3,988,113 $102,400 $4,090,513

Fairbanks Fairbanks International (FAI)

3-02-0096-001-1985 8/9/1985 9/20/1988 Groove Runway 1L/19R (SP RW FR) $430,262 $0 $430,262

8/9/1985 9/20/1988 Rehabilitate Runway 1L/19R (RE RW IM) $599,940 $1,792,747 $2,392,687

8/9/1985 9/20/1988 Rehabilitate Taxiway (RE TW IM) $1,691,131 $34,171 $1,725,302

8/9/1985 9/20/1988 Extend Taxiway (ST TW IM) $300,918 $0 $300,918

3-02-0096-002-1987 11/7/1986 3/2/1995 Conduct Noise Compatibility Plan Study (EN PL NO) $0 $236,859 $236,859

3-02-0096-003-1987 9/15/1987 6/11/1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

$469,890 $0 $469,890

3-02-0096-004-1989 9/13/1989 2/8/1993 Construct Taxiway (ST TW CO) $1,264,689 $40,550 $1,305,239

9/13/1989 2/8/1993 Construct Apron (ST AP CO) $47,311 $0 $47,311

3-02-0096-005-1991 9/12/1991 7/14/1999 Construct Apron (ST AP CO) $1,227,006 $205,141 $1,432,147

9/12/1991 7/14/1999 Rehabilitate Taxiway (RE TW IM) $472,994 $0 $472,994

3-02-0096-006-1991 9/10/1991 9/9/1997 Conduct Airport Master Plan Study (PL PL MA) $247,719 $0 $247,719

3-02-0096-007-1992 7/13/1992 4/17/2000 Acquire Security Equipment (SA EQ SE) $411,367 $0 $411,367

3-02-0096-008-1993 7/26/1993 3/15/2000 Install Guidance Signs (SA OT SG) $384,375 $54,410 $438,785

3-02-0096-009-1993 9/17/1993 1/26/2000 Acquire Security Equipment (SA EQ SE) $1,065,878 $0 $1,065,878

3-02-0096-010-1993 9/16/1993 12/1/1998 Improve Runway Safety Area RW01/19 (SA RW SF) $324,375 $22,214 $346,589

3-02-0096-011-1993 9/20/1993 7/19/2000 Rehabilitate Runway Lighting (RE RW LI) $80,713 $567,551 $648,264

9/20/1993 7/19/2000 Rehabilitate Taxiway Lighting (RE TW LI) $0 $51,112 $51,112

3-02-0096-012-1994 9/28/1994 9/9/1997 Acquire Land for Noise Compatibility within 75 DNL (EN LA 75)

$0 $3,159,015 $3,159,015

3-02-0096-015-1996 6/7/1996 9/27/2002 Improve Service Road (OT GT SV) $0 $126,094 $126,094

6/7/1996 9/27/2002 Install Miscellaneous NAVAIDS (ST OT IN) $0 $2,429,314 $2,429,314

6/7/1996 9/27/2002 Extend Taxiway (ST TW IM) $0 $744,592 $744,592

6/7/1996 9/27/2002 Extend Runway 1L/19R (CA RW EX) $2,350,432 $476,180 $2,826,612

3-02-0096-016-1997 4/22/1997 9/27/2002 Extend Runway 01-19 (CA RW EX) $804,244 $1,172,006 $1,976,250

4/22/1997 9/27/2002 Improve Runway Safety Area 1L-19 (ST RW SF) $0 $1,369,244 $1,369,244

4/22/1997 9/27/2002 Extend Taxiway (ST TW IM) $0 $658,750 $658,750

4/22/1997 9/27/2002 Install Runway Lighting 1L-19 (SA RW LI) $150,000 $352 $150,352

4/22/1997 9/27/2002 Install Apron Lighting (ST AP LI) $50,000 $0 $50,000

4/22/1997 9/27/2002 Install Miscellaneous NAVAIDS (ST OT IN) $575,000 $0 $575,000

3-02-0096-017-1998 7/15/1998 9/20/2001 Conduct Miscellaneous Study (PL PL MS) $134,578 $0 $134,578

7/15/1998 9/20/2001 Acquire Security Equipment (SA EQ SE) $85,000 $0 $85,000

7/15/1998 9/20/2001 Extend Taxiway (ST TW IM) $965,000 $0 $965,000

7/15/1998 9/20/2001 Environmental Mitigation (EN OT MT) $241,124 $750,000 $991,124

7/15/1998 9/20/2001 Acquire Snow Removal Equipment (ST EQ SN) $320,000 $0 $320,000

3-02-0096-018-1999 3/25/1999 9/26/2002 Environmental Mitigation (EN OT MT) $565,000 $0 $565,000

3/25/1999 9/26/2002 Acquire Security Equipment (SA EQ SE) $178,047 $164,007 $342,054

3/25/1999 9/26/2002 Improve Terminal Building (ST TE IM) $410,800 $0 $410,800

3-02-0096-019-1999 8/3/1999 9/10/2003 Improve Terminal Building (ST TE IM) $626,653 $0 $626,653

3-02-0096-020-1999 8/3/1999 8/29/2001 Acquire Land for Noise Compatibility within 65 - 69 DNL (EN LA 65)

$0 $349,846 $349,846

Monday, January 11, 2016 Page 39 of 124

Page 41: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0096-021-2000 Conduct Airport Master Plan Study (PL PL MA) 9/8/2000 8/23/2004 $347,360 $0 $347,360

Conduct Miscellaneous Study (PL PL MS) 9/8/2000 8/23/2004 $170,000 $0 $170,000

Conduct Noise Compatibility Plan Study (EN PL NO) 9/8/2000 8/23/2004 $110,000 $0 $110,000

3-02-0096-022-2000 Improve Terminal Building (ST TE IM) 7/14/2000 9/10/2003 $1,320,705 $0 $1,320,705

3-02-0096-023-2001 Extend Runway (ST RW IM) 9/25/2001 7/29/2005 $3,212,446 $5,298,028 $8,510,474

Improve Seaplane Base (ST SB CO) 9/25/2001 7/29/2005 $2,120,400 $0 $2,120,400

3-02-0096-024-2001 Improve Airport Drainage (ST OT IM) 8/16/2001 9/10/2003 $457,370 $0 $457,370

3-02-0096-025-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $260,500 $260,500

3-02-0096-026-2002 Security Enhancements (SE SE SE) 7/18/2002 1/24/2006 $0 $311,400 $311,400

3-02-0096-027-2003 Improve Airport Drainage East Side (ST OT IM) 7/10/2003 5/17/2005 $493,901 $0 $493,901

3-02-0096-028-2003 Rehabilitate Terminal Building (ST TE IM) 8/19/2003 3/9/2007 $1,389,925 $0 $1,389,925

3-02-0096-029-2003 Construct Deicing Containment Facility (North) (EN OT 8/29/2003 9/6/2007 $1,500,000 $569,333 $2,069,333 DI)

Rehabilitate Taxiway A (RE TW IM) 8/29/2003 9/6/2007 $2,774,396 $9,671,669 $12,446,065

3-02-0096-030-2004 Expand Apron (ST AP IM) 8/12/2004 3/12/2007 $601,665 $0 $601,665

3-02-0096-031-2004 Rehabilitate Taxiway (RE TW IM) 8/24/2004 7/1/2008 $3,124,955 $7,956,173 $11,081,128

3-02-0096-032-2006 Install Taxiway Lighting (Centerline for Alpha & Bravo) 8/15/2006 5/4/2010 $250,000 $0 $250,000 (SA TW LI)

Rehabilitate Runway 01R/19L (RE RW IM) 8/15/2006 5/4/2010 $1,000,000 $0 $1,000,000

Construct Apron (Multi-yeared in 2006) (ST AP CO) 8/15/2006 5/4/2010 $3,509,407 $0 $3,509,407

Construct Apron (Construction) (ST AP CO) 8/15/2006 5/4/2010 $5,888,658 $10,888,343 $16,777,001

3-02-0096-033-2007 Rehabilitate Runway 01L/19R (Phase 1) (RE RW IM) 9/12/2007 12/28/2012 $0 $16,167,640 $16,167,640

3-02-0096-034-2008 Rehabilitate Runway 01L/19R (Phase 2) (RE RW IM) 6/20/2008 2/11/2013 $2,393,366 $14,898,241 $17,291,607

3-02-0096-035-2008 Rehabilitate Runway 01L/19R (Phase 3) (RE RW IM) 9/11/2008 3/11/2014 $823,156 $5,144,482 $5,967,638

3-02-0096-036-2009 Improve Aircraft Rescue & Fire Fighting Building (SA 9/3/2009 1/7/2013 $1,939,577 $0 $1,939,577 BD EX)

3-02-0096-037-2009 Acquire Safety Equipment and/or Fencing Access 9/10/2009 4/11/2012 $0 $0 $0 Control(ARRA funded) (SA EQ RF)

3-02-0096-038-2010 Collect airport data for Airports Geographic Information 7/19/2010 $0 $700,000 $700,000 System (PL PL GI)

3-02-0096-039-2010 Update Airport Master Plan Study Update MP (PL PL 8/6/2010 $950,000 $0 $950,000 MA)

3-02-0096-040-2011 Rehabilitate Apron Rehabilitate Apron (RE AP IM) 9/14/2011 7/8/2015 $5,597,621 $402,464 $6,000,085

Acquire Interactive Training System Interactive Training 9/14/2011 7/8/2015 $350,000 $0 $350,000 System (OT EQ MS)

3-02-0096-041-2012 Rehabilitate Apron Phase 2 (RE AP IM) 9/13/2012 $1,024,482 $0 $1,024,482

3-02-0096-042-2013 Improve Aircraft Rescue & Fire Fighting Building 9/12/2013 $0 $4,500,000 $4,500,000 Upgrade ARFF Bldg (SA BD EX)

Construct Sand and Chemical Storage Building 9/12/2013 $5,597,015 $0 $5,597,015 Construct Sand/Deicer Storage Bldg (ST BD SN)

3-02-0096-044-2014 Construct Sand and Chemical Storage Building Phase 8/27/2014 $2,342,943 $0 $2,342,943 2 (ST BD SN)

Improve Aircraft Rescue & Fire Fighting Building 8/27/2014 $837,570 $7,301,532 $8,139,102 Upgrade ARFF Bldg -ph2 (SA BD EX)

3-02-0096-045-2014 Acquire Snow Removal Equipment (ST EQ SN) 8/27/2014 $210,396 $0 $210,396

3-02-0096-046-2015 Acquire Snow Removal Equipment Snow Removal 7/1/2015 $1,447,564 $0 $1,447,564 Equipment (ST EQ SN)

$68,259,323 $98,473,959 $166,733,282

Monday, January 11, 2016 Page 40 of 124

Page 42: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Fairbanks North Star (Borough) Northway (ORT)

3-02-0203-001-1982 Rehabilitate Apron (RE AP IM) 9/28/1982 1/29/1986 $336,017 $0 $336,017

Rehabilitate Runway 4/22 (RE RW IM)

Rehabilitate Runway Lighting (RE RW LI)

3-02-0203-002-1992 Install Apron Lighting (ST AP LI)

Rehabilitate Apron (RE AP IM)

Rehabilitate Runway 04/22 (RE RW IM)

3-02-0203-003-1993 Improve Snow Removal Equipment Building (ST BD SN)

9/28/1982

9/28/1982

8/6/1992

8/6/1992

8/6/1992

9/9/1993

1/29/1986 $1,359,154

1/29/1986 $283,646

9/26/1996 $99,792

9/26/1996 $321,420

9/26/1996 $752,273

7/14/1999 $376,875

$3,529,177

$0

$0

$0

$0

$112,376

$26,396

$138,772

$1,359,154

$283,646

$99,792

$321,420

$864,649

$403,271

$3,667,949

False Pass False Pass (KFP)

3-02-0097-001-1988 Rehabilitate Taxiway (RE TW IM)

Construct Apron (ST AP CO)

Acquire Snow Removal Equipment (ST EQ SN)

Improve Access Road (OT GT AC)

Rehabilitate Runway 13/31 (RE RW IM)

Acquire Land For Approaches (ST LA SZ)

Improve Snow Removal Equipment Building (ST BD SN)

3-02-0097-002-2003 Conduct Airport Master Plan Study Phase 1 (PL PL MA)

3-02-0097-003-2004 Update Airport Master Plan Study Phase 2 (PL PL MA)

3-02-0097-004-2005 Conduct Environmental Study Specialty marine studies (EN PL MA)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): False Pass (Grader with Attachments) (ST EQ SN)

7/29/1988

7/29/1988

7/29/1988

7/29/1988

7/29/1988

7/29/1988

7/29/1988

8/20/2003

8/19/2004

8/10/2005

8/30/2005

6/30/2006

9/3/2010

7/16/1991

7/16/1991

7/16/1991

7/16/1991

7/16/1991

7/16/1991

7/16/1991

5/17/2005

9/2/2008

5/21/2010

6/9/2010

2/27/2012

1/20/2015

$12,462

$104,378

$4,951

$404,935

$404,214

$16,143

$38,712

$84,906

$286,416

$297,084

$14,000

$152,903

$325,317

$0

$0

$0

$0

$83,873

$0

$0

$0

$0

$0

$0

$0

$0

$12,462

$104,378

$4,951

$404,935

$488,087

$16,143

$38,712

$84,906

$286,416

$297,084

$14,000

$152,903

$325,317

$2,146,421 $83,873 $2,230,294

Fort Yukon Fort Yukon (FYU)

3-02-0100-001-1985 Improve Access Road (OT GT AC)

Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

Acquire Land for Development (ST LA DV)

3-02-0100-002-1991 Install Apron Lighting (ST AP LI)

Rehabilitate Runway 3/21 (RE RW IM)

Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment Acquire Loader and Grader (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

9/23/1985

9/23/1985

9/23/1985

8/9/1991

8/9/1991

8/9/1991

8/31/2007

6/19/2008

7/22/1992

7/22/1992

7/22/1992

9/25/1997

9/25/1997

9/25/1997

12/7/2009

6/10/2014

$46,729

$240,649

$28,490

$92,483

$371,945

$9,376

$520,000

$132,700

$224,732

$0

$0

$0

$360,102

$0

$0

$0

$271,461

$240,649

$28,490

$92,483

$732,047

$9,376

$520,000

$132,700

Monday, January 11, 2016 Page 41 of 124

Page 43: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0100-003-2009 Rehabilitate Runway 04/22 phase 1(ARRA funded) (RE 6/12/2009 7/15/2014 $0 $0 $0 RW IM)

3-02-0100-004-2009 Construct Snow Removal Equipment Building (ST BD 7/6/2009 9/2/2014 $1,089,667 $0 $1,089,667 SN)

Rehabilitate Apron Resurface apron (RE AP IM) 7/6/2009 9/2/2014 $390,542 $0 $390,542

Various Surface Preservation Maintenance: Fort Yukon -Surface Repair, Dust Control (RE RW IM)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 04/22 (+08J) 9/19/2014 $320,203 $0 $320,203

$3,242,784 $584,834 $3,827,618

Galena Edward G Pitka Sr (GAL)

3-02-0102-001-1982 Expand Apron (ST AP IM) 9/24/1982 7/21/1986 $1,075,750 $0 $1,075,750

Acquire Security Equipment (SA EQ SE) 9/24/1982 7/21/1986 $38,990 $0 $38,990

3-02-0102-002-1984 Improve Snow Removal Equipment Building (ST BD 9/26/1984 9/6/1989 $315,868 $118,088 $433,956 SN)

3-02-0102-003-1989 Conduct Airport Master Plan Study (PL PL MA) 7/26/1989 8/16/1993 $149,647 $0 $149,647

3-02-0102-004-2003 Construct Taxiway (Partial Parallel) (ST TW CO) 8/26/2003 2/14/2007 $3,319,087 $0 $3,319,087

Rehabilitate Apron (RE AP IM) 8/26/2003 2/14/2007 $1,850,000 $0 $1,850,000

Expand Apron (ST AP IM) 8/26/2003 2/14/2007 $1,850,000 $0 $1,850,000

3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment (Plow 8/31/2007 12/7/2009 $300,000 $0 $300,000 truck w/sander) (ST EQ SN)

3-02-0102-005-2009 Rehabilitate Snow Removal Equipment Building (ST 8/13/2009 4/1/2013 $1,775,493 $63,367 $1,838,860 BD SN)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Galena 3/12/2010 12/9/2015 $133,000 $0 $133,000 Various Surface Maintenance (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $167,523 $0 $167,523 Acquire SRE (Blower) (ST EQ SN)

$10,975,358 $181,455 $11,156,813

Gambell Gambell (GAM)

3-02-0103-001-1984 Rehabilitate Runway 16/34 (RE RW IM) 9/13/1984 1/4/1991 $1,471,028 $0 $1,471,028

Improve Airport Drainage (ST OT IM) 9/13/1984 1/4/1991 $31,875 $0 $31,875

Install Runway Lighting (ST RW LI) 9/13/1984 1/4/1991 $421,950 $0 $421,950

3-02-0103-002-1991 Conduct Airport Master Plan Study (PL PL MA) 8/9/1991 10/24/1998 $198,621 $0 $198,621

3-02-0103-003-1997 Improve Runway Safety Area 16-34 (ST RW SF) 8/7/1997 9/18/2001 $200,000 $0 $200,000

Install Apron Lighting (ST AP LI) 8/7/1997 9/18/2001 $100,000 $0 $100,000

Rehabilitate Runway 16-34 (RE RW IM) 8/7/1997 9/18/2001 $400,000 $0 $400,000

Install Apron Lighting (ST AP LI) 8/7/1997 9/18/2001 $22,000 $0 $22,000

Install Runway Vertical/Visual Guidance System (ST 8/7/1997 9/18/2001 $10,000 $0 $10,000 RW VI)

Construct Taxiway (ST TW CO) 8/7/1997 9/18/2001 $376,552 $0 $376,552

Construct Runway 16-34 (ST RW CO) 8/7/1997 9/18/2001 $3,130,530 $0 $3,130,530

Improve Snow Removal Equipment Building (ST BD 8/7/1997 9/18/2001 $350,000 $0 $350,000 SN)

Construct Apron (ST AP CO) 8/7/1997 9/18/2001 $370,000 $0 $370,000

Install Runway Lighting (ST RW LI) 8/7/1997 9/18/2001 $120,000 $0 $120,000

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 8/30/2005 6/9/2010 $105,000 $0 $105,000 (RE RW IM)

Monday, January 11, 2016 Page 42 of 124

Page 44: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)

$251,484 $0 $251,484

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)

$340,889 $0 $340,889

$7,899,929 $0 $7,899,929

Girdwood Girdwood (AQY)

3-02-0104-001-2001 6/11/2001 8/26/2004 Conduct Airport Master Plan Study (PL PL MA) $189,218 $0 $189,218

3-02-0104-002-2002 9/26/2002 5/1/2006 Rehabilitate Runway 1/19 (RE RW IM) $250,000 $509,402 $759,402

9/26/2002 5/1/2006 Install Perimeter Fencing (ST EQ SE) $0 $400,000 $400,000

3-02-0104-003-2002 9/3/2002 3/27/2006 Conduct Airport Master Plan Study Phase 2 (PL PL MA) $204,491 $0 $204,491

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

$164,502 $0 $164,502

$808,211 $909,402 $1,717,614

Golovin Golovin (GLV)

3-02-0106-001-1986 9/24/1986 11/10/1993 Acquire Land for Development (ST LA DV) $307,016 $0 $307,016

3-02-0106-002-1987 9/22/1987 3/24/1992 Construct Taxiway (ST TW CO) $710,343 $0 $710,343

9/22/1987 3/24/1992 Improve Access Road (OT GT AC) $367,593 $0 $367,593

9/22/1987 3/24/1992 Install Runway Lighting (ST RW LI) $165,878 $0 $165,878

9/22/1987 3/24/1992 Construct Runway 2/20 (ST RW CO) $2,225,853 $0 $2,225,853

3-02-0106-003-1992 9/10/1992 1/14/1999 Improve Snow Removal Equipment Building (ST BD SN)

$373,394 $0 $373,394

9/10/1992 1/14/1999 Expand Apron (ST AP IM) $233,637 $0 $233,637

9/10/1992 1/14/1999 Extend Runway 02/20 (ST RW IM) $2,330,610 $366,915 $2,697,525

9/10/1992 1/14/1999 Rehabilitate Taxiway (RE TW IM) $76,984 $0 $76,984

3-02-0200-051-2005 9/2/2005 4/4/2008 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)

$175,000 $0 $175,000

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$128,300 $0 $128,300

3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $300,000 $300,000

$7,094,608 $666,915 $7,761,523

Goodnews Goodnews (GNU)

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)

$135,000 $0 $135,000

3-02-0107-001-2008 9/19/2008 12/9/2015 Construct Apron construct apron (w/taxiway stub) (ST AP CO)

$279,500 $1,925,585 $2,205,085

9/19/2008 12/9/2015 Extend Runway 05/23 extend runway (ST RW IM) $687,165 $8,161,134 $8,848,299

9/19/2008 12/9/2015 Construct Snow Removal Equipment Building SREB (ST BD SN)

$1,000,000 $0 $1,000,000

3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: GNU--Grader w/ Attachments (ST EQ SN)

$350,000 $0 $350,000

3-02-0107-002-2009 2/26/2009 Extend Runway 05/23 phase 2 extend & realign rwy 5/23 (ST RW IM)

$2,195,743 $2,259,317 $4,455,060

Monday, January 11, 2016 Page 43 of 124

Page 45: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments (ST EQ SN)

$266,541 $0 $266,541

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 05/23 Various Surface Preservation Maintenance (Goodnews) (RE RW IM)

$10,500 $0 $10,500

$4,924,449 $12,346,036 $17,270,485

Goose Bay Goose Bay (Z40)

3-02-0409-001-1985 9/23/1985 2/10/1988 Improve Access Road (OT GT AC) $24,142 $0 $24,142

9/23/1985 2/10/1988 Construct Taxiway (ST TW CO) $10,217 $0 $10,217

9/23/1985 2/10/1988 Construct Apron (ST AP CO) $59,000 $0 $59,000

9/23/1985 2/10/1988 Rehabilitate Runway 7/25 (RE RW IM) $558,141 $0 $558,141

3-02-0409-002-1987 8/4/1987 4/9/1992 Acquire Snow Removal Equipment (ST EQ SN) $112,000 $0 $112,000

8/4/1987 4/9/1992 Install Runway Lighting (ST RW LI) $141,492 $49,242 $190,734

8/4/1987 4/9/1992 Improve Snow Removal Equipment Building (ST BD SN)

$137,320 $0 $137,320

8/4/1987 4/9/1992 Improve Access Road (OT GT AC) $101,606 $0 $101,606

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 08/26 Various Surface Preservation (RE RW IM)

$53,200 $0 $53,200

$1,197,118 $49,242 $1,246,360

Grayling Grayling (KGX)

3-02-0109-001-1987 7/29/1987 4/9/1992 Acquire Snow Removal Equipment (ST EQ SN) $123,300 $0 $123,300

7/29/1987 4/9/1992 Extend Runway 15/33 (ST RW IM) $150,080 $0 $150,080

7/29/1987 4/9/1992 Improve Access Road (OT GT AC) $151,805 $0 $151,805

7/29/1987 4/9/1992 Improve Snow Removal Equipment Building (ST BD SN)

$98,669 $0 $98,669

7/29/1987 4/9/1992 Install Runway Lighting (ST RW LI) $158,098 $0 $158,098

7/29/1987 4/9/1992 Expand Apron (CA AP EX) $196,423 $87,837 $284,260

3-02-0109-002-1993 9/14/1993 3/31/1999 Extend Runway RW15/33 (ST RW IM) $75,000 $0 $75,000

9/14/1993 3/31/1999 Improve Access Road (OT GT AC) $238,000 $0 $238,000

9/14/1993 3/31/1999 Construct Apron (ST AP CO) $223,000 $0 $223,000

9/14/1993 3/31/1999 Install Runway Lighting (ST RW LI) $285,000 $0 $285,000

9/14/1993 3/31/1999 Improve Runway Safety Area RW15/33 (ST RW SF) $1,337,320 $55,951 $1,393,271

9/14/1993 3/31/1999 Improve Snow Removal Equipment Building (ST BD SN)

$80,000 $0 $80,000

3-02-0109-003-1993 9/21/1993 9/9/1997 Acquire Snow Removal Equipment (ST EQ SN) $142,618 $0 $142,618

3-02-0109-004-2008 6/24/2008 3/15/2013 Construct Runway Plan-1 Phase 1 (ST RW CO) $6,195,436 $1,864,592 $8,060,028

6/24/2008 3/15/2013 Construct Apron construct apron, phase 1 (ST AP CO) $1,057,384 $0 $1,057,384

3-02-0109-005-2008 9/11/2008 1/28/2013 Construct Apron construct apron phase 2 (ST AP CO) $1,000,000 $0 $1,000,000

9/11/2008 1/28/2013 Construct Runway Plan-1 Phase 2 (ST RW CO) $6,601,059 $0 $6,601,059

3-02-0000-013-2010 3/30/2010 Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $200,000 $200,000

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Grayling Grader) (ST EQ SN)

$365,238 $0 $365,238

$18,478,430 $2,208,380 $20,686,810

Monday, January 11, 2016 Page 44 of 124

Page 46: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Gulkana Gulkana (GKN)

3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST 9/2/2005 4/4/2008 $175,233 $0 $175,233 EQ SN)

3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $218,000 $0 $218,000 Acquire SRE Northern Region (Gulkana Snowblower) (ST EQ SN)

3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $370,500 $0 $370,500 Acquire Various SRE (Northern Region): Gu kana (Motor Grader with Plow and Wing) (ST EQ SN)

3-02-0110-005-2015 Rehabilitate Runway Remarking (RE RW IM) 8/10/2015 $150,000 $0 $150,000

Rehabilitate Taxiway (RE TW IM) 8/10/2015 $1,500,000 $0 $1,500,000

Rehabilitate Apron (RE AP IM) 8/10/2015 $668,248 $0 $668,248

$3,081,981 $0 $3,081,981

Gustavus Gustavus (GST)

3-02-0111-001-1987 Rehabilitate Apron (RE AP IM) 8/13/1987 5/3/1991 $47,692 $0 $47,692

Rehabilitate Taxiway (RE TW IM) 8/13/1987 5/3/1991 $5,660 $0 $5,660

Extend Runway 10/28 (ST RW IM) 8/13/1987 5/3/1991 $10,000 $0 $10,000

Rehabilitate Runway 1/19 (RE RW IM) 8/13/1987 5/3/1991 $252,516 $159,191 $411,707

3-02-0111-002-1993 Conduct Airport Master Plan Study (PL PL MA) 9/7/1993 4/18/2000 $142,351 $0 $142,351

3-02-0111-003-1997 Construct Taxiway (CA TW CO) 4/30/1997 9/27/2001 $699,998 $0 $699,998

Construct Apron (ST AP CO) 4/30/1997 9/27/2001 $2,699,985 $0 $2,699,985

Expand Apron (CA AP EX) 4/30/1997 9/27/2001 $299,999 $0 $299,999

Rehabilitate Runway 10,28 (RE RW IM) 4/30/1997 9/27/2001 $0 $3,422,678 $3,422,678

3-02-0111-004-1998 Acquire Security Equipment (SA EQ SE) 7/20/1998 9/20/2001 $106,588 $966,790 $1,073,378

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 8/30/2005 6/9/2010 $20,000 $0 $20,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $17,600 $0 $17,600 (RE RW IM)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $57,998 $0 $57,998 (RE RW IM)

3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $345,305 $0 $345,305 Acquire SRE: Loader (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $500,000 $0 $500,000 (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Gustavus (RE 3/12/2010 12/9/2015 $21,280 $0 $21,280 RW IM)

3-02-0111-005-2011 Improve Runway Safety Area 11/29 (SA RW SF) 6/27/2011 $3,210,274 $6,800,000 $10,010,274

3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $75,548 $0 $75,548 Acquire Various SRE: Gustavus (30ft Ramp Plow) (ST EQ SN)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various 9/16/2011 $105,514 $0 $105,514 Surface Preservation (RE RW IM)

3-02-0111-006-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $705,672 $0 $705,672 ARFF Vehicle (SA EQ RF)

Monday, January 11, 2016 Page 45 of 124

Page 47: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-102-2015 [Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $51,722 $0 $51,722 (Gustavus - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)

$9,375,702 $11,452,084 $20,827,786

Haines Haines (HNS)

3-02-0112-001-1985 Rehabilitate Taxiway (RE TW IM) 6/18/1985 10/14/1987 $0 $59,954 $59,954

Rehabilitate Runway 18/36 (RE RW IM) 6/18/1985 10/14/1987 $0 $280,551 $280,551

Improve Airport Drainage (ST OT IM) 6/18/1985 10/14/1987 $0 $46,387 $46,387

3-02-0112-002-1987 Construct Apron (ST AP CO) 7/6/1987 7/3/1991 $0 $153,264 $153,264

Expand Apron (ST AP IM) 7/6/1987 7/3/1991 $0 $61,826 $61,826

Improve Airport Drainage (ST OT IM) 7/6/1987 7/3/1991 $0 $163,601 $163,601

3-02-0112-003-1990 Construct Taxiway (ST TW CO) 9/26/1990 9/25/2000 $351,562 $0 $351,562

Improve Heliport/Helipad 8/26 (ST HE CO) 9/26/1990 9/25/2000 $20,625 $0 $20,625

Construct Apron (ST AP CO) 9/26/1990 9/25/2000 $2,117,256 $0 $2,117,256

Construct Runway 8/26 (ST RW CO) 9/26/1990 9/25/2000 $619,728 $2,218,271 $2,837,999

Install Runway Lighting (ST RW LI) 9/26/1990 9/25/2000 $250,000 $0 $250,000

Improve Access Road (OT GT AC) 9/26/1990 9/25/2000 $139,687 $0 $139,687

Acquire Land for Development (ST LA DV) 9/26/1990 9/25/2000 $191,250 $0 $191,250

3-02-0112-004-2002 Update Airport Master Plan Study (PL PL MA) 9/3/2002 3/29/2005 $250,973 $0 $250,973

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 8/30/2005 6/9/2010 $17,500 $0 $17,500 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) 6/19/2008 6/10/2014 $39,600 $0 $39,600 (RE RW IM)

3-02-0200-067-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 1/7/2013 $550,534 $0 $550,534 Acquire SRE (SE Region): Rotary Plow and Towed Runway Broom (ST EQ SN)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Haines 3/12/2010 12/9/2015 $37,240 $0 $37,240 Various Surface Maintenance (RE RW IM)

3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $34,196 $0 $34,196 Acquire Various SRE: Haines (V Plow) (ST EQ SN)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 08/26 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Haines - Crack Seal (RE RW IM)

$4,691,609 $2,983,854 $7,675,463

Healy Healy River (HRR)

3-02-0414-001-1987 Acquire Land for Development (ST LA DV) 9/21/1987 4/9/1992 $77,939 $0 $77,939

Construct Runway 18/32 (ST RW CO) 9/21/1987 4/9/1992 $357,332 $33,041 $390,373

Construct Apron (ST AP CO) 9/21/1987 4/9/1992 $135,910 $0 $135,910

Install Runway Lighting (ST RW LI) 9/21/1987 4/9/1992 $104,977 $0 $104,977

3-02-0414-002-1995 Expand Apron (ST AP IM) 6/2/1995 7/14/2000 $600,000 $137,990 $737,990

Extend Taxiway (ST TW IM) 6/2/1995 7/14/2000 $50,000 $0 $50,000

Extend Runway 15/33 (ST RW IM) 6/2/1995 7/14/2000 $325,703 $0 $325,703

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) 5/31/2007 8/6/2013 $63,840 $0 $63,840 (RE RW IM)

Monday, January 11, 2016 Page 46 of 124

Page 48: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 15/33 Various Surface Preservation (RE RW IM)

$104,785 $0 $104,785

3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $236,000 $236,000

$1,820,486 $407,031 $2,227,517

Hollis Hollis Clark Bay (HYL)

3-02-0470-001-2006 9/1/2006 6/9/2010 Construct Seaplane Base (ST SB CO) $2,445,655 $0 $2,445,655

$2,445,655 $0 $2,445,655

Holy Cross Holy Cross (HCA)

3-02-0120-001-1983 7/28/1983 2/5/1986 Construct Apron (ST AP CO) $344,214 $0 $344,214

7/28/1983 2/5/1986 Acquire Land for Development 01/19 (ST LA DV) $7,982 $0 $7,982

7/28/1983 2/5/1986 Improve Access Road (OT GT AC) $86,919 $0 $86,919

7/28/1983 2/5/1986 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

$61,076 $0 $61,076

7/28/1983 2/5/1986 Install Apron Lighting (ST AP LI) $26,888 $0 $26,888

7/28/1983 2/5/1986 Extend Runway 01/19 (ST RW IM) $995,101 $42,905 $1,038,006

7/28/1983 2/5/1986 Improve Building (ST BD MS) $7,820 $0 $7,820

3-02-0120-002-1984 4/3/1984 1/22/1986 Install Runway Lighting 10/19 (ST RW LI) $137,865 $0 $137,865

3-02-0120-003-2001 8/13/2001 9/2/2004 Improve Snow Removal Equipment Building (ST BD SN)

$670,447 $42,270 $712,717

3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $300,000 $300,000

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 01/19 Surface Preservation Maintenance (Holy Cross) (RE RW IM)

$199,813 $0 $199,813

3-02-0200-103-2015 9/20/2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Holy Cross Segmented Circle (ST OT IN)

$155,109 $0 $155,109

$2,693,234 $385,175 $3,078,409

Homer Homer (HOM)

3-02-0122-001-1983 9/12/1983 2/4/1988 Construct Taxiway 3/21 (ST TW CO) $4,390 $407,175 $411,565

9/12/1983 2/4/1988 Improve Access Road (OT GT AC) $260,815 $0 $260,815

9/12/1983 2/4/1988 Install Runway Lighting (ST RW LI) $50,663 $12,257 $62,920

9/12/1983 2/4/1988 Construct Apron 3/21 (ST AP CO) $22,107 $2,592,825 $2,614,932

3-02-0122-002-1986 9/9/1986 4/14/1989 Improve Airport Drainage (ST OT IM) $157,934 $224,583 $382,517

3-02-0122-003-1987 9/2/1987 2/25/1991 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

$195,321 $0 $195,321

3-02-0122-004-1992 9/11/1992 12/28/1994 Construct Terminal Building (CA TE CO) $650,000 $97,497 $747,497

3-02-0122-005-1996 9/20/1996 8/30/2000 Install Runway Lighting (SA RW LI) $262,120 $0 $262,120

9/20/1996 8/30/2000 Rehabilitate Runway 3/21 (RE RW IM) $31,326 $2,322,961 $2,354,287

9/20/1996 8/30/2000 Install Runway Vertical/Visual Guidance System (ST RW VI)

$330,938 $0 $330,938

9/20/1996 8/30/2000 Improve Runway Safety Area 3/21 (ST RW SF) $206,442 $306,426 $512,868

3-02-0122-006-1999 3/19/1999 9/26/2001 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

$300,958 $0 $300,958

Monday, January 11, 2016 Page 47 of 124

Page 49: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0122-007-2000 Improve Snow Removal Equipment Building (ST BD 9/7/2000 8/23/2004 $681,125 $0 $681,125 SN)

3-02-0122-008-2000 Rehabilitate Taxiway (RE TW IM) 9/7/2000 9/9/2003 $300,000 $0 $300,000

Rehabilitate Apron (RE AP IM) 9/7/2000 9/9/2003 $1,529,468 $0 $1,529,468

3-02-0122-009-2001 Conduct Airport Master Plan Study (PL PL MA) 8/15/2001 4/27/2007 $430,586 $0 $430,586

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 8/30/2005 6/9/2010 $125,000 $0 $125,000 (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $250,000 $0 $250,000 Acquire SRE: HOM--De-icer Truck (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) 6/19/2008 6/10/2014 $50,000 $0 $50,000 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 03/21 (Various 8/20/2009 12/19/2014 $223,440 $0 $223,440 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $44,205 $44,205 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 03/21 Homer 3/12/2010 12/9/2015 $77,688 $0 $77,688 Various Surface Maintenance (RE RW IM)

3-02-0122-010-2011 Improve Snow Removal Equipment Building Aquire and 3/16/2011 11/5/2014 $310,455 $0 $310,455 improve snow removal equipment building (ST BD SN)

3-02-0122-011-2011 Rehabilitate Taxiway Reconstruct Taxiway E & D (LOC) 9/14/2011 $1,400,000 $0 $1,400,000 (RE TW IM)

Rehabilitate Apron (RE AP IM) 9/14/2011 $616,924 $0 $616,924

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $1,047,481 $0 $1,047,481 Acquire Various SRE: Homer (Snow Blower with Broom, and Grader with attachments) (ST EQ SN)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 03/21 Various 9/16/2011 $218,120 $0 $218,120 Surface Preservation (RE RW IM)

3-02-0122-012-2012 Rehabilitate Taxiway Lighting (RE TW LI) 5/16/2012 $361,586 $0 $361,586

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $325,793 $0 $325,793 Acquire SRE (Alaska Region): Homer (Plow Truck) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 03/21 Variuos 9/19/2012 $173,250 $0 $173,250 Surface Preservation Maintenance (Homer) (RE RW IM)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 04/22 Surface 9/18/2013 $189,000 $0 $189,000 Preservation Maintenance (Homer) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $301,930 $0 $301,930 Acquire SRE (Plow Truck) (ST EQ SN)

3-02-0122-013-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $706,127 $0 $706,127 ARFF Vehicle (SA EQ RF)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $160,875 $0 $160,875 Obstruction Removal (+08J) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 04/22 (+08J) 9/19/2014 $126,000 $0 $126,000 Various Surface Preservation Maintenance: Homer -Pavement Markings (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 04/22 Accomplish 9/21/2015 $422,100 $0 $422,100 Various Airport Surface Preservation Maintenance (Homer RWY, TWY and Apron Markings and Seal Coat) (RE RW IM)

$12,521,242 $6,007,929 $18,529,171

Monday, January 11, 2016 Page 48 of 124

Page 50: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Hoonah Hoonah (HNH)

3-02-0125-001-1991 Improve Access Road (OT GT AC) 9/20/1991 9/25/2000 $841,726 $53,321 $895,047

Construct Apron (ST AP CO) 9/20/1991 9/25/2000 $0 $1,256,965 $1,256,965

Construct Taxiway (ST TW CO) 9/20/1991 9/25/2000 $0 $1,079,739 $1,079,739

Extend Runway 5/23 (ST RW IM) 9/20/1991 9/25/2000 $0 $1,398,797 $1,398,797

Acquire Land for Development (ST LA DV) 9/20/1991 9/25/2000 $0 $157,080 $157,080

3-02-0125-002-2001 Conduct Airport Master Plan Study (PL PL MA) 9/5/2001 8/27/2004 $146,937 $0 $146,937

3-02-0125-003-2001 Install Runway Lighting (SP RW LI) 9/14/2001 2/25/2005 $63,067 $550,000 $613,067

Install Taxiway Lighting (SP TW LI) 9/14/2001 2/25/2005 $0 $200,000 $200,000

Install Miscellaneous NAVAIDS (ST OT IN) 9/14/2001 2/25/2005 $0 $31,287 $31,287

3-02-0125-004-2003 Construct Snow Removal Equipment Building (ST BD 9/2/2003 6/27/2007 $1,299,971 $0 $1,299,971 SN)

3-02-0453-001-2005 Construct Seaplane Base (ST SB CO) 8/30/2005 7/20/2010 $2,040,579 $0 $2,040,579

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 6/30/2006 2/27/2012 $15,818 $0 $15,818 (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 06/24 (Various 8/20/2009 12/19/2014 $40,432 $0 $40,432 Surface Maintenance) (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Hoonah 3/12/2010 12/9/2015 $40,432 $0 $40,432 Various Surface Maintenance (RE RW IM)

3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $329,650 $0 $329,650 Acquire Various SRE: Hoonah (Loader) (ST EQ SN)

3-02-0125-005-2012 Extend Runway 06/24 (ST RW IM) 9/11/2012 $4,544,063 $0 $4,544,063

Expand Apron (ST AP IM) 9/11/2012 $1,500,000 $0 $1,500,000

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 06/24 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Hoonah -Crack Seal (RE RW IM)

$10,955,413 $4,727,189 $15,682,602

Hooper Bay Hooper Bay (HPB)

3-02-0126-001-1990 Improve Access Road (OT GT AC) 8/15/1990 5/7/1992 $117,869 $0 $117,869

Improve Airport Drainage (ST OT IM) 8/15/1990 5/7/1992 $435,120 $0 $435,120

Rehabilitate Runway 13/31 (RE RW IM) 8/15/1990 5/7/1992 $825,602 $0 $825,602

Install Runway Lighting (ST RW LI) 8/15/1990 5/7/1992 $219,526 $0 $219,526

Construct Apron (ST AP CO) 8/15/1990 5/7/1992 $512,978 $0 $512,978

3-02-0126-002-1992 Acquire Snow Removal Equipment (ST EQ SN) 5/6/1992 9/16/1997 $132,026 $0 $132,026

3-02-0126-003-1996 Rehabilitate Runway 13/31 (RE RW IM) 7/23/1996 10/24/1998 $0 $454,279 $454,279

Rehabilitate Runway 13/31 (RE RW IM) 7/23/1996 10/24/1998 $0 $540,250 $540,250

3-02-0126-004-1999 Rehabilitate Runway 13-31 (RE RW IM) 3/25/1999 9/26/2002 $726,330 $33,660 $759,990

Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/26/2002 $374,100 $0 $374,100

3-02-0126-005-2005 Rehabilitate Access Road (OT GT AC) 6/30/2005 5/4/2010 $1,447,243 $0 $1,447,243

Rehabilitate Runway 13/31 (Maintenance) (RE RW IM) 6/30/2005 5/4/2010 $300,000 $0 $300,000

3-02-0200-061-2007 [Various Grnt] Acquire Snow Removal Equipment 7/25/2007 2/5/2014 $253,500 $0 $253,500 Acquire SRE: Grader with Attachments (ST EQ SN)

Monday, January 11, 2016 Page 49 of 124

Page 51: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $214,273 $0 $214,273 Acquire SRE (Snow Blower) (ST EQ SN)

3-02-0126-006-2014 Rehabilitate Access Road Phase 1 (OT GT AC) 9/19/2014 $250,000 $0 $250,000

Construct Apron Relocate apron to meet setback 9/19/2014 $150,000 $0 $150,000 standards, Phase 1 (ST AP CO)

Construct Snow Removal Equipment Building Phase 1 9/19/2014 $100,000 $0 $100,000 (ST BD SN)

Rehabilitate Runway 13/31 Phase 1 (RE RW IM) 9/19/2014 $0 $3,500,000 $3,500,000

Rehabilitate Apron Phase 1 (RE AP IM) 9/19/2014 $0 $2,000,000 $2,000,000

3-02-0126-007-2015 Rehabilitate Runway 13/31 Phase 2 (RE RW IM) 9/22/2015 $2,978,816 $13,884,216 $16,863,032

Rehabilitate Taxiway (RE TW IM) 9/22/2015 $750,000 $0 $750,000

Rehabilitate Apron Phase 2 (RE AP IM) 9/22/2015 $0 $3,500,000 $3,500,000

Rehabilitate Runway Lighting 13/31 (RE RW LI) 9/22/2015 $750,000 $0 $750,000

$10,537,383 $23,912,405 $34,449,788

Hope Hope (5HO)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/30/2006 2/27/2012 $93,851 $0 $93,851 (RE RW IM)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various 9/16/2011 $21,280 $0 $21,280 Surface Preservation (RE RW IM)

$115,131 $0 $115,131

Hughes Hughes (HUS)

3-02-0127-001-1990 Expand Apron (ST AP IM) 9/19/1990 9/10/1996 $425,069 $0 $425,069

Acquire Land for Development (ST LA DV) 9/19/1990 9/10/1996 $157,969 $0 $157,969

Rehabilitate Runway RW17/35 (RE RW IM) 9/19/1990 9/10/1996 $1,099,594 $0 $1,099,594

Install Runway Lighting (ST RW LI) 9/19/1990 9/10/1996 $183,760 $0 $183,760

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 17/35 Hughes 3/12/2010 12/9/2015 $159,600 $0 $159,600 Various Surface Maintenance (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $31,022 $0 $31,022 Obstructions (Various - Hughes) (SA OT OB)

3-02-0200-088-2012 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2012 $0 $236,000 $236,000 approach (PL PL VI)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $257,812 $0 $257,812 Obstruction Removal (+08J) (SA OT OB)

$2,314,826 $236,000 $2,550,826

Huslia Huslia (HLA)

3-02-0128-001-1989 Improve Snow Removal Equipment Building (ST BD 9/13/1989 12/16/1993 $136,187 $0 $136,187 SN)

Rehabilitate Taxiway (RE TW IM) 9/13/1989 12/16/1993 $205,398 $0 $205,398

Acquire Snow Removal Equipment (ST EQ SN) 9/13/1989 12/16/1993 $89,364 $0 $89,364

Extend Runway 02/20 (ST RW IM) 9/13/1989 12/16/1993 $889,936 $2,856 $892,792

Install Runway Lighting (ST RW LI) 9/13/1989 12/16/1993 $150,132 $0 $150,132

3-02-0128-002-1994 Conduct Airport Master Plan Study (PL PL MA) 9/27/1994 1/25/2000 $299,457 $0 $299,457

3-02-0128-003-1999 Improve Snow Removal Equipment Building (ST BD 8/3/1999 9/9/2003 $450,000 $0 $450,000 SN)

Monday, January 11, 2016 Page 50 of 124

Page 52: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0128-003-1999 Construct New Airport (ST NA CO)

3-02-0128-004-2002 Improve Access Road (OT GT AC)

3-02-0200-051-2005 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)

3-02-0128-005-2009 Rehabilitate Runway 03/21 phase 1 (ARRA funded) (RE RW IM)

3-02-0128-006-2010 Rehabilitate Apron (RE AP IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Huslia) (SA OT OB)

8/3/1999

5/29/2002

9/2/2005

5/31/2007

8/27/2009

3/26/2010

7/23/2012

9/9/2003 $4,386,732

9/9/2003 $187,373

4/4/2008 $200,663

8/6/2013 $218,120

3/21/2012 $0

3/18/2013 $452,899

$41,363

$7,707,623

$0

$0

$0

$0

$0

$0

$0

$2,856

$4,386,732

$187,373

$200,663

$218,120

$0

$452,899

$41,363

$7,710,479

Hydaburg Hydaburg (HYG)

3-02-0129-001-1994 Construct Apron (ST AP CO)

Acquire Land for Development (ST LA DV)

6/27/1994

6/27/1994

9/16/1997

9/16/1997

$696,279

$10,313

$706,592

$0

$0

$0

$696,279

$10,313

$706,592

Hyder Hyder (4Z7)

3-02-0382-001-2002 Improve Seaplane Base (ST SB CO)

Rehabilitate Seaplane Base (RE SB IM)

9/23/2002

9/23/2002

2/21/2006

2/21/2006

$213,350

$291,597

$504,947

$0

$1,365

$1,365

$213,350

$292,962

$506,312

Igiugig Igiugig (IGG)

3-02-0131-001-1993 Improve Access Road (OT GT AC)

Acquire Snow Removal Equipment (ST EQ SN)

Construct Apron (ST AP CO)

Construct Taxiway (ST TW CO)

Acquire Land For Approaches (ST LA SZ)

Improve Snow Removal Equipment Building (ST BD SN)

Improve Runway Safety Area RW05/23 (ST RW SF)

Install Runway Lighting (ST RW LI)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)

9/15/1993

9/15/1993

9/15/1993

9/15/1993

9/15/1993

9/15/1993

9/15/1993

9/15/1993

6/19/2008

9/25/1997 $184,700

9/25/1997 $158,500

9/25/1997 $260,000

9/25/1997 $26,000

9/25/1997 $168,500

9/25/1997 $107,250

9/25/1997 $1,214,455

9/25/1997 $205,400

6/10/2014 $9,900

$2,334,705

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$184,700

$158,500

$260,000

$26,000

$168,500

$107,250

$1,214,455

$205,400

$9,900

$2,334,705

Iliamna Iliamna (ILI)

3-02-0132-001-1984 Construct Taxiway (CA TW CO)

Construct Apron (CA AP CO)

3-02-0132-002-1989 Rehabilitate Runway 17/35 (RE RW IM)

Rehabilitate Runway 17/35 (RE RW IM)

Extend Runway 7/25 (ST RW IM)

Rehabilitate Runway 17/35 (RE RW IM)

7/17/1984

7/17/1984

9/22/1989

9/22/1989

9/22/1989

9/22/1989

4/27/1988

4/27/1988

12/16/1992

12/16/1992

12/16/1992

12/16/1992

$151,973

$230,680

$0

$0

$0

$473,804

$0

$0

$181,004

$385,823

$238,062

$0

$151,973

$230,680

$181,004

$385,823

$238,062

$473,804

Monday, January 11, 2016 Page 51 of 124

Page 53: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0132-002-1989 Install Runway Lighting (ST RW LI) 9/22/1989 12/16/1992 $0 $63,795 $63,795

Rehabilitate Runway 7/25 (RE RW IM) 9/22/1989 12/16/1992 $0 $412,531 $412,531

Remove Obstructions (SA OT OB) 9/22/1989 12/16/1992 $0 $28,275 $28,275

3-02-0132-003-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/1990 7/23/1992 $132,296 $0 $132,296 EQ RF)

3-02-0132-004-1997 Rehabilitate Runway 7-25 (RE RW IM) 7/16/1997 6/8/2000 $700,000 $0 $700,000

Install Runway Vertical/Visual Guidance System 7-25 7/16/1997 6/8/2000 $400,000 $0 $400,000 (ST RW VI)

Extend Runway 7-25 (ST RW IM) 7/16/1997 6/8/2000 $1,290,537 $0 $1,290,537

Improve Runway Safety Area 7-25 (ST RW SF) 7/16/1997 6/8/2000 $240,205 $0 $240,205

3-02-0132-005-1998 Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1998 9/25/2002 $878,677 $0 $878,677 BD EX)

3-02-0132-006-2002 Construct Service Road (OT GT SV) 9/26/2002 8/21/2006 $230,000 $0 $230,000

Strengthen Runway 7/25 (ST RW IM) 9/26/2002 8/21/2006 $3,108,318 $312,816 $3,421,134

Strengthen Runway 17/35 (ST RW IM) 9/26/2002 8/21/2006 $3,318,182 $312,816 $3,630,998

Acquire Security Equipment (SA EQ SE) 9/26/2002 8/21/2006 $670,000 $0 $670,000

Improve Access Road (OT GT AC) 9/26/2002 8/21/2006 $350,000 $0 $350,000

Construct Taxiway C (ST TW CO) 9/26/2002 8/21/2006 $250,000 $0 $250,000

Install Emergency Generator (ST EQ LI) 9/26/2002 8/21/2006 $85,000 $0 $85,000

3-02-0132-007-2003 Conduct Airport Master Plan Study (PL PL MA) 8/20/2003 3/9/2007 $83,008 $0 $83,008

3-02-0132-008-2004 Update Airport Master Plan Study (PL PL MA) 8/19/2004 8/8/2008 $310,379 $0 $310,379

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $7,500 $0 $7,500 (RE RW IM)

[Various Grnt] Rehabilitate Runway 17/35 (Maintenance) 8/30/2005 6/9/2010 $7,500 $0 $7,500 (RE RW IM)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (2CY 8/17/2006 7/19/2013 $53,550 $0 $53,550 Sander/Flatbed Truck) (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $42,180 $0 $42,180 (RE RW IM)

3-02-0132-009-2009 Construct Snow Removal Equipment Building Construct 2/24/2009 5/5/2015 $4,278,653 $0 $4,278,653 Combined Snow Removaland Sand Chemical Building (ST BD SN)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 07/25 (Various 8/20/2009 12/19/2014 $85,120 $0 $85,120 Surface Maintenance) (RE RW IM)

3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $603,883 $0 $603,883 Acquire SRE (Central Region): Snow Blower w/ Attachments (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 07/25 Various 9/19/2012 $735,000 $0 $735,000 Surface Preservation Maintenance (Iliamna) (RE RW IM)

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $52,500 $0 $52,500 Obstruction Removal (Iliamna) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $57,750 $0 $57,750 Various Surface Preservation Maintenance: Iliamna - Crack Seal (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 17/35 Accomplish 9/21/2015 $57,750 $0 $57,750 Various Airport Surface Preservation Maintenance (Iliamna Crack Seal) (RE RW IM)

$18,884,445 $1,935,122 $20,819,567

Ivanof Bay Ivanof Bay (KIB)

3-02-0378-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/4/2001 8/3/2004 $75,163 $0 $75,163

$75,163 $0 $75,163

Monday, January 11, 2016 Page 52 of 124

Page 54: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Juneau Juneau Harbor (5Z1)

3-02-0403-001-1983 Rehabilitate Apron (RE AP IM) 8/23/1983 1/29/1986 $86,364 $0 $86,364

Expand Apron (ST AP IM) 8/23/1983 1/29/1986 $68,181 $0 $68,181

Construct Apron (ST AP CO) 8/23/1983 1/29/1986 $331,705 $0 $331,705

$486,250 $0 $486,250

Juneau International (JNU)

3-02-0133-001-1983 Construct Apron (ST AP CO) 9/20/1983 8/12/1987 $0 $226,218 $226,218

Construct Apron (ST AP CO) 9/20/1983 8/12/1987 $920,659 $104,990 $1,025,649

Expand Apron (ST AP IM) 9/20/1983 8/12/1987 $0 $192,094 $192,094

Rehabilitate Apron (RE AP IM) 9/20/1983 8/12/1987 $621,827 $0 $621,827

3-02-0133-003-1985 Acquire Land for Development (ST LA DV) 9/18/1985 11/13/1986 $781,310 $0 $781,310

3-02-0133-002-1986 Conduct Noise Compatibility Plan Study (EN PL NO) 5/22/1986 4/22/1993 $108,137 $0 $108,137

Conduct Airport Master Plan Study (PL PL MA) 5/22/1986 4/22/1993 $147,652 $0 $147,652

3-02-0133-004-1987 Acquire Aircraft Rescue & Fire Fighting Safety 7/28/1987 2/6/1991 $588,376 $16,163 $604,539 Equipment (ST EQ MS)

3-02-0133-005-1988 Acquire Security Equipment (SA EQ SE) 1/13/1988 2/6/1991 $314,115 $22,118 $336,233

Acquire Snow Removal Equipment (ST EQ SN) 1/13/1988 2/6/1991 $218,645 $0 $218,645

3-02-0133-006-1988 Acquire Aircraft Rescue & Fire Fighting Safety 6/8/1988 9/9/1992 $41,263 $6,189 $47,452 Equipment (ST EQ MS)

3-02-0133-007-1989 Improve Access Road (CA GT AC) 6/28/1989 1/6/1993 $202,719 $0 $202,719

Install Runway Lighting (ST RW LI) 6/28/1989 1/6/1993 $68,054 $0 $68,054

Construct Apron (CA AP CO) 6/28/1989 1/6/1993 $1,174,583 $0 $1,174,583

Construct Taxiway (CA TW CO) 6/28/1989 1/6/1993 $268,560 $0 $268,560

Construct Taxiway (CA TW CO) 6/28/1989 1/6/1993 $2,218,039 $2,225,470 $4,443,509

3-02-0133-008-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1991 2/6/1995 $696,588 $9,965 $706,553

Acquire Security Equipment (SA EQ SE) 9/27/1991 2/6/1995 $95,019 $0 $95,019

3-02-0133-009-1992 Acquire Snow Removal Equipment (ST EQ SN) 7/28/1992 1/3/1995 $468,117 $0 $468,117

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/28/1992 1/3/1995 $314,948 $0 $314,948 EQ RF)

Install Apron Lighting (ST AP LI) 7/28/1992 1/3/1995 $11,381 $0 $11,381

3-02-0133-010-1992 Acquire Security Equipment (SA EQ SE) 9/24/1992 9/25/1997 $52,476 $0 $52,476

Rehabilitate Taxiway (RE TW IM) 9/24/1992 9/25/1997 $111,398 $0 $111,398

Improve Terminal Building (CA TE IM) 9/24/1992 9/25/1997 $99,938 $0 $99,938

Improve Access Road (OT GT AC) 9/24/1992 9/25/1997 $70,747 $0 $70,747

Improve Access Road (OT GT AC) 9/24/1992 9/25/1997 $146,940 $0 $146,940

3-02-0133-011-1993 Rehabilitate Taxiway (RE TW IM) 4/16/1993 9/25/1997 $744,341 $588 $744,929

Rehabilitate Apron (RE AP IM) 4/16/1993 9/25/1997 $60,028 $0 $60,028

Improve Access Road (OT GT AC) 4/16/1993 9/25/1997 $143,108 $0 $143,108

3-02-0133-012-1994 Install Guidance Signs (SA OT SG) 6/22/1994 1/14/1999 $719,417 $22,441 $741,858

3-02-0133-013-1994 Conduct Miscellaneous Study (PL PL MS) 6/29/1994 7/11/2000 $150,000 $0 $150,000

Acquire Snow Removal Equipment (ST EQ SN) 6/29/1994 7/11/2000 $121,484 $0 $121,484

Acquire Security Equipment (SA EQ SE) 6/29/1994 7/11/2000 $23,438 $0 $23,438

3-02-0133-014-1994 Improve Terminal Building (CA TE IM) 9/28/1994 3/30/1999 $167,023 $0 $167,023

3-02-0133-015-1995 Install Runway Lighting (SA RW LI) 5/16/1995 1/14/1999 $816,644 $107,446 $924,090

3-02-0133-016-1995 Conduct Airport Master Plan Study (PL PL MA) 9/20/1995 9/6/2000 $328,125 $0 $328,125

3-02-0133-017-1995 Rehabilitate Taxiway (RE TW IM) 9/20/1995 9/25/2000 $0 $738,734 $738,734

Monday, January 11, 2016 Page 53 of 124

Page 55: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0133-017-1995 Extend Runway 08/26 (ST RW IM) 9/20/1995 9/25/2000 $240,800 $0 $240,800

Expand Apron (ST AP IM) 9/20/1995 9/25/2000 $292,950 $0 $292,950

3-02-0133-018-1996 Construct Deicing Containment Facility (EN OT DI) 4/23/1996 1/28/2000 $20,000 $281,480 $301,480

3-02-0133-019-1996 Acquire Security Equipment (SA EQ SE) 7/17/1996 7/14/2000 $20,937 $126,563 $147,500

Acquire Snow Removal Equipment (ST EQ SN) 7/17/1996 7/14/2000 $340,000 $14,892 $354,892

3-02-0133-020-1996 Rehabilitate Runway 8/26 (RE RW IM) 8/12/1996 3/9/1999 $241,650 $0 $241,650

Improve Terminal Building (ST TE IM) 8/12/1996 3/9/1999 $130,964 $0 $130,964

3-02-0133-021-1997 Rehabilitate Taxiway Lighting (RE TW LI) 6/3/1997 9/5/2001 $332,735 $0 $332,735

Rehabilitate Runway 8/26 (RE RW IM) 6/3/1997 9/5/2001 $313,475 $3,900,000 $4,213,475

Install Runway Lighting (SP RW LI) 6/3/1997 9/5/2001 $0 $0 $0

Install Runway Lighting 8/26 (SP RW LI) 6/3/1997 9/5/2001 $795,207 $0 $795,207

3-02-0133-022-1997 Acquire Snow Removal Equipment (ST EQ SN) 5/12/1997 7/11/2000 $500,664 $0 $500,664

3-02-0133-023-1998 Acquire Snow Removal Equipment (ST EQ SN) 12/10/1997 7/11/2000 $280,626 $0 $280,626

3-02-0133-024-1998 Acquire Security Equipment (SA EQ SE) 5/1/1998 9/25/2002 $70,500 $10,575 $81,075

3-02-0133-025-1998 Improve Snow Removal Equipment Building (ST BD 6/22/1998 9/19/2008 $656,196 $0 $656,196 SN)

3-02-0133-026-1999 Rehabilitate Apron (RE AP IM) 3/31/1999 9/10/2001 $954,491 $0 $954,491

3-02-0133-027-1999 Acquire Snow Removal Equipment (ST EQ SN) 7/19/1999 9/6/2001 $164,013 $0 $164,013

3-02-0133-028-1999 Improve Terminal Building (ST TE IM) 7/19/1999 9/6/2001 $242,725 $0 $242,725

3-02-0133-029-2000 Improve Runway Safety Area 08-26 (SA RW SF) 6/23/2000 6/8/2004 $1,174,980 $2,621,748 $3,796,728

3-02-0133-030-2000 Improve Runway Safety Area (SA RW SF) 9/13/2000 8/26/2004 $0 $700,000 $700,000

3-02-0133-031-2001 Improve Runway Safety Area (SA RW SF) 9/4/2001 8/26/2004 $1,000,000 $0 $1,000,000

3-02-0133-032-2001 Improve Terminal Building (ST TE IM) 9/5/2001 5/5/2004 $478,097 $0 $478,097

3-02-0133-033-2001 Acquire Land for Noise Compatibility within 65 - 69 7/5/2001 8/26/2004 $0 $328,958 $328,958 DNL (EN LA 65)

3-02-0133-034-2002 Security Enhancements (SE SE SE) 4/18/2002 2/14/2005 $0 $89,554 $89,554

3-02-0133-035-2002 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/22/2002 5/17/2005 $4,451 $596,104 $600,555 EQ RF)

Acquire Snow Removal Equipment (ST EQ SN) 7/22/2002 5/17/2005 $1,097,972 $0 $1,097,972

3-02-0133-036-2002 Improve Terminal Building (ST TE IM) 8/19/2002 3/6/2006 $70,000 $11,442 $81,442

Security Enhancements (SE SE SE) 8/19/2002 3/6/2006 $0 $116,041 $116,041

3-02-0133-037-2003 Rehabilitate Taxiway A (RE TW IM) 8/13/2003 3/3/2006 $3,255,990 $36,857 $3,292,847

3-02-0133-038-2003 Security Enhancements (SA EQ SE) 8/26/2003 5/20/2005 $356,317 $16,113 $372,430

3-02-0133-039-2003 Improve Runway Safety Area 08/26 Phase 3 (SA RW 8/26/2003 5/22/2007 $0 $1,303,125 $1,303,125 SF)

3-02-0133-040-2004 Rehabilitate Access Road (OT GT AC) 7/16/2004 11/17/2006 $368,227 $0 $368,227

3-02-0133-041-2004 Acquire Friction Measuring Equipment (ST EQ SR) 5/20/2004 3/3/2006 $75,000 $4,090 $79,090

Acquire Snow Removal Equipment (ST EQ SN) 5/20/2004 3/3/2006 $482,480 $0 $482,480

3-02-0133-042-2004 Extend Taxiway (ST TW IM) 8/9/2004 4/27/2007 $1,244,168 $186,625 $1,430,793

3-02-0133-044-2004 Conduct Airport Master Plan Study (Terminal Study) 8/20/2004 3/12/2007 $760,000 $0 $760,000 (PL PL MA)

3-02-0133-043-2005 Construct Apron (ST AP CO) 6/13/2005 8/12/2009 $1,463,162 $0 $1,463,162

3-02-0133-045-2005 Security Enhancements (Security Vehicle) (SA EQ SE) 3/21/2005 11/17/2006 $24,460 $0 $24,460

3-02-0133-046-2005 Construct Runway Safety Area 08/26 (Environmental) 8/11/2005 5/4/2010 $0 $787,135 $787,135 (SA RW SF)

3-02-0133-047-2006 Expand Terminal Building (Planning & Design) (ST TE 9/1/2006 3/25/2011 $1,000,000 $0 $1,000,000 EX)

3-02-0133-048-2007 Construct Runway Safety Area 08/26 (Mitigation) (SA 8/21/2007 8/11/2015 $0 $2,500,000 $2,500,000 RW SF)

Construct Apron (Mitigation) (ST AP CO) 8/21/2007 8/11/2015 $1,000,000 $0 $1,000,000

Construct Apron (Place Fill) (ST AP CO) 8/21/2007 8/11/2015 $900,000 $0 $900,000

Monday, January 11, 2016 Page 54 of 124

Page 56: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0133-048-2007 8/21/2007 8/11/2015 Construct Snow Removal Equipment Building (Place Fill) (ST BD SN)

$892,065 $0 $892,065

8/21/2007 8/11/2015 Construct Snow Removal Equipment Building (Mitigation) (ST BD SN)

$500,000 $500,000 $1,000,000

8/21/2007 8/11/2015 Environmental Mitigation (Mitigation) (EN OT MT) $700,000 $0 $700,000

8/21/2007 8/11/2015 Construct Taxiway (Mitigation) (ST TW CO) $100,000 $0 $100,000

8/21/2007 8/11/2015 Construct Runway Safety Area 08/26 (Place Fill) (SA RW SF)

$2,203,834 $7,500,000 $9,703,834

3-02-0133-049-2008 6/23/2008 Construct Apron (Construct) (ST AP CO) $3,000,000 $0 $3,000,000

6/23/2008 Construct Runway Safety Area 08/26 (Construction Phase 2) (SA RW SF)

$0 $7,506,094 $7,506,094

3-02-0133-050-2009 8/24/2009 Construct Snow Removal Equipment Building Construct SREF Embankment, phase 1 (ST BD SN)

$1,000,000 $1,000,000 $2,000,000

8/24/2009 Construct Apron construct NW Quad (and associated taxilane)embankment, phase 3 (ST AP CO)

$2,100,219 $0 $2,100,219

8/24/2009 Construct Runway Safety Area 08/26 construct runway safety area, phase 3 (SA RW SF)

$1,000,000 $9,456,137 $10,456,137

8/24/2009 Construct Apron construct NE Quad embankment, phase 3 (ST AP CO)

$2,000,000 $0 $2,000,000

3-02-0133-051-2011 3/15/2011 Construct Snow Removal Equipment Building phase 2 (utilities) - Part A (ST BD SN)

$1,441,744 $0 $1,441,744

3-02-0133-052-2011 6/20/2011 Construct Runway Safety Area 08/26 phase 4 (Design & construction) (SA RW SF)

$2,020,829 $2,489,131 $4,509,960

3-02-0133-053-2011 6/17/2011 10/27/2014 Construct Runway Safety Area 08/26 phase 5 (ATO RA) (SA RW SF)

$0 $2,000,000 $2,000,000

3-02-0133-054-2011 9/15/2011 Construct Runway Safety Area 08/26 Phase 6 (construction) (SA RW SF)

$615,644 $6,617,383 $7,233,027

3-02-0133-055-2012 7/18/2012 Construct Runway Safety Area 08/26 Phase 7 (SA RW SF)

$2,569,096 $14,715,447 $17,284,543

3-02-0133-056-2012 9/19/2012 12/23/2014 Construct Runway Safety Area 08/26 Phase 8 (ATO reimbursable agreement) (SA RW SF)

$0 $5,500,000 $5,500,000

3-02-0133-057-2013 6/17/2013 Construct Runway Safety Area 08/26 Final funding of ATO Reimbursible Agreement to complete NAVAIDS installation (SA RW SF)

$1,903,817 $0 $1,903,817

3-02-0133-058-2013 9/12/2013 Rehabilitate Runway 08/26 Phase 1, Design (RE RW IM) $1,171,875 $0 $1,171,875

3-02-0133-059-2013 9/19/2013 Sustainable Master Plan Sustainable Master Plan (EN PL ES)

$0 $250,000 $250,000

9/19/2013 Update Airport Master Plan Study Master Plan update. (PL PL MA)

$453,125 $0 $453,125

3-02-0133-060-2014 7/1/2014 Rehabilitate Runway 08/26 Phase 2 (RE RW IM) $2,615,850 $17,952,227 $20,568,077

3-02-0133-061-2015 7/15/2015 Acquire Handicap Passenger Lift Device (ST TE MS) $59,863 $0 $59,863

7/15/2015 Rehabilitate Terminal Building Replace passenger boarding bridge -- reimbursement for sponsor purchase. (ST TE IM)

$466,270 $0 $466,270

3-02-0133-062-2015 8/21/2015 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire ARFF vehicle. (SA EQ RF)

$647,473 $0 $647,473

3-02-0133-063-2015 8/21/2015 Conduct Environmental Study Preliminary Engineering/Design Analysis and Environmental Study of Proposed ARFF Building Expansion (EN PL MA)

$234,375 $0 $234,375

3-02-0133-064-2015 9/1/2015 Construct Apron Design NE Apron and South Fence -Phase 1 Design (ST AP CO)

$781,222 $0 $781,222

9/1/2015 Install Perimeter Fencing (ST EQ SE) $32,551 $0 $32,551

$61,878,188 $92,790,136 $154,668,324

Monday, January 11, 2016 Page 55 of 124

Page 57: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kake Kake (AFE)

3-02-0398-001-1983 Construct Runway 10/28 (ST RW CO) 9/26/1983 6/22/1993 $3,582,052 $0 $3,582,052

Improve Airport Drainage (ST OT IM)

Improve Access Road (OT GT AC)

Improve Airport Drainage (ST OT IM)

Install Runway Lighting (ST RW LI)

Construct Taxiway (ST TW CO)

Acquire Land for Development (ST LA DV)

3-02-0398-002-1989 Rehabilitate Taxiway (RE TW IM)

Extend Runway 10/28 (ST RW IM)

Expand Apron (ST AP IM)

Improve Access Road (OT GT AC)

Remove Obstructions (SA OT OB)

3-02-0398-003-1991 Conduct Airport Master Plan Study (PL PL MA)

3-02-0398-004-1995 Improve Airport Drainage (ST OT IM)

Extend Runway 10/28 (ST RW IM)

3-02-0398-005-1997 Remove Obstructions (ST OT OB)

Install Runway Vertical/Visual Guidance System (ST RW VI)

3-02-0398-006-2002 Update Airport Master Plan Study Update Airport Layout Plan (ALP) (PL PL MA)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various Surface Maintenance) (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - ) (SA OT OB)

9/26/1983

9/26/1983

9/26/1983

9/26/1983

9/26/1983

9/26/1983

9/15/1989

9/15/1989

9/15/1989

9/15/1989

9/15/1989

9/13/1991

9/12/1995

9/12/1995

7/16/1997

7/16/1997

9/12/2002

8/30/2005

5/31/2007

8/20/2009

7/23/2012

6/22/1993

6/22/1993

6/22/1993

6/22/1993

6/22/1993

6/22/1993

10/14/1992

10/14/1992

10/14/1992

10/14/1992

10/14/1992

4/17/2000

9/25/1997

9/25/1997

9/13/2002

9/13/2002

5/30/2006

6/9/2010

8/6/2013

12/19/2014

$81,497

$840,019

$76,969

$267,759

$471,609

$590,625

$52,453

$619,172

$320,229

$140,895

$62,506

$120,129

$569,103

$50,063

$267,780

$60,659

$74,976

$10,000

$21,280

$77,672

$35,730

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$16,000

$0

$0

$0

$0

$0

$0

$0

$0

$81,497

$840,019

$76,969

$267,759

$471,609

$590,625

$52,453

$619,172

$320,229

$140,895

$62,506

$120,129

$585,103

$50,063

$267,780

$60,659

$74,976

$10,000

$21,280

$77,672

$35,730

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various Surface Preservation Maintenance (Kake) (RE RW IM)

3-02-0200-102-2015 [Various Grnt] Remove Obstructions EAS/EDA Various (Kake - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)

9/19/2012

9/20/2015

$45,938

$51,722

$8,490,837

$0

$0

$16,000

$45,938

$51,722

$8,506,837

Kaktovik Barter Island LRRS (BTI)

3-02-0027-001-1997 Conduct Airport Master Plan Study (PL PL MA)

3-02-0027-002-2002 Update Airport Master Plan Study (PL PL MA)

3-02-0027-003-2006 Update Airport Master Plan Study (Phase 2, Environmental) (PL PL MA)

3-02-0027-004-2006 Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)

9/26/1997

9/20/2002

6/23/2006

7/13/2006

9/24/2001 $92,766

8/11/2006 $278,283

4/9/2012 $927,771

7/24/2009 $1,741,271

$3,040,091

$0

$0

$0

$0

$0

$92,766

$278,283

$927,771

$1,741,271

$3,040,091

Kaktovik (Proposed CS) (+08O)

3-02-0482-001-2009 Construct New Airport Airport Design (ST NA CO)

3-02-0482-002-2011 Construct New Airport Construction Phase 1 (land acquis) (ST NA CO)

9/18/2009

9/14/2011

8/8/2014 $1,990,140

3/10/2015 $1,766,930

$0

$0

$1,990,140

$1,766,930

Monday, January 11, 2016 Page 56 of 124

Page 58: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0482-003-2012 6/18/2012 Construct New Airport Construction Phase 2 (To include SREB) (ST NA CO)

$23,000,000 $0 $23,000,000

3-02-0482-004-2013 8/5/2013 Construct New Airport Construction Phase 3 (ST NA CO)

$13,000,000 $0 $13,000,000

3-02-0482-005-2014 9/18/2014 Acquire Snow Removal Equipment Acquire SRE (Motor Grader, Snow Blower) (ST EQ SN)

$855,223 $0 $855,223

$40,612,294 $0 $40,612,294

Kalskag Kalskag (KLG)

3-02-0136-001-1999 8/4/1999 9/8/2003 Rehabilitate Runway 6-24 (RE RW IM) $2,608,553 $0 $2,608,553

8/4/1999 9/8/2003 Improve Snow Removal Equipment Building (ST BD SN)

$267,700 $0 $267,700

8/4/1999 9/8/2003 Acquire Snow Removal Equipment (ST EQ SN) $250,000 $0 $250,000

8/4/1999 9/8/2003 Acquire Land For Approaches (ST LA SZ) $212,000 $0 $212,000

3-02-0136-002-2003 8/19/2003 7/28/2006 Install Perimeter Fencing (ST EQ SE) $339,834 $0 $339,834

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)

$12,654 $0 $12,654

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 06/24 Various Surface Preservation (RE RW IM)

$212,800 $0 $212,800

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$36,093 $0 $36,093

3-02-0200-100-2015 9/16/2015 [Various Grnt] Conduct Aeronautical Survey for RNAV Approach (PL PL VI)

$378,000 $0 $378,000

$4,317,634 $0 $4,317,634

Kaltag Kaltag (KAL)

3-02-0137-001-1984 9/4/1984 9/5/1989 Rehabilitate Runway 3/21 (RE RW IM) $311,505 $0 $311,505

9/4/1984 9/5/1989 Install Runway Lighting (ST RW LI) $130,278 $0 $130,278

9/4/1984 9/5/1989 Expand Apron (CA AP EX) $72,737 $0 $72,737

9/4/1984 9/5/1989 Extend Runway 3/21 (ST RW IM) $472,300 $0 $472,300

9/4/1984 9/5/1989 Remove Obstructions (SA OT OB) $3,010 $0 $3,010

9/4/1984 9/5/1989 Construct Taxiway (ST TW CO) $19,744 $0 $19,744

3-02-0137-002-1991 9/27/1991 9/26/1996 Install Runway Lighting (ST RW LI) $152,685 $0 $152,685

9/27/1991 9/26/1996 Construct Apron (ST AP CO) $69,713 $0 $69,713

9/27/1991 9/26/1996 Improve Access Road (OT GT AC) $127,006 $0 $127,006

9/27/1991 9/26/1996 Acquire Snow Removal Equipment (ST EQ SN) $74,078 $0 $74,078

9/27/1991 9/26/1996 Improve Snow Removal Equipment Building (ST BD SN)

$166,490 $0 $166,490

9/27/1991 9/26/1996 Improve Runway Safety Area 03/21 (SA RW SF) $1,190,228 $80,522 $1,270,750

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)

$143,086 $0 $143,086

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)

$178,000 $0 $178,000

3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Kaltag (Dozer) (ST EQ SN)

$370,108 $0 $370,108

3-02-0200-103-2015 9/20/2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Kaltag Segmented Circle (SP OT IN)

$155,109 $0 $155,109

$3,636,077 $80,522 $3,716,599

Monday, January 11, 2016 Page 57 of 124

Page 59: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kantishna Kantishna (5Z5)

3-02-0426-001-1993 9/28/1993 9/11/1995 Conduct Airport Master Plan Study (PL PL MA) $12,563 $0 $12,563

3-02-0426-002-1998 8/19/1998 9/27/2002 Conduct Airport Master Plan Study (PL PL MA) $329,759 $0 $329,759

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Kantishna Various Surface Maintenance (RE RW IM)

$79,800 $0 $79,800

$422,122 $0 $422,122

Karluk Karluk (KYK)

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

$6,667 $0 $6,667

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

$25,308 $0 $25,308

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

$0 $0 $0

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)

$159,600 $0 $159,600

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Karluk (RE RW IM)

$159,600 $0 $159,600

3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Karluk) (SA OT OB)

$31,500 $0 $31,500

$382,675 $0 $382,675

Kasaan Kasaan (KXA)

3-02-0139-001-1989 9/22/1989 4/17/1992 Rehabilitate Apron (RE AP IM) $115,928 $0 $115,928

$115,928 $0 $115,928

Kasigluk Kasigluk (Z09)

3-02-0341-001-1997 6/13/1997 6/7/2000 Expand Apron (ST AP IM) $400,000 $0 $400,000

6/13/1997 6/7/2000 Acquire Land for Development (ST LA DV) $310,000 $0 $310,000

6/13/1997 6/7/2000 Acquire Snow Removal Equipment (ST EQ SN) $190,000 $0 $190,000

6/13/1997 6/7/2000 Improve Snow Removal Equipment Building (ST BD SN)

$240,000 $0 $240,000

6/13/1997 6/7/2000 Construct Taxiway (ST TW CO) $100,000 $0 $100,000

6/13/1997 6/7/2000 Install Runway Lighting (ST RW LI) $175,000 $0 $175,000

6/13/1997 6/7/2000 Install Apron Lighting (ST AP LI) $25,000 $0 $25,000

6/13/1997 6/7/2000 Install Runway Vertical/Visual Guidance System (ST RW VI)

$60,000 $0 $60,000

6/13/1997 6/7/2000 Improve Access Road (OT GT AC) $60,000 $0 $60,000

6/13/1997 6/7/2000 Extend Runway 17/35 (ST RW IM) $2,114,390 $0 $2,114,390

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 17/35 Various Surface Preservation Maintenance (Kasigluk) (RE RW IM)

$10,500 $0 $10,500

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$47,437 $0 $47,437

Monday, January 11, 2016 Page 58 of 124

Page 60: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 17/35 Accomplish 9/21/2015 $4,620 $0 $4,620 Various Airport Surface Preservation Maintenance (Kasigluk Rehab Threshold Markings) (RE RW IM)

$3,736,947 $0 $3,736,947

Kenai Kenai Municipal (ENA)

3-02-0142-001-1983 Install Apron Lighting (ST AP LI) 9/28/1983 1/17/1986 $24,750 $0 $24,750

Construct Apron (CA AP CO) 9/28/1983 1/17/1986 $236,208 $0 $236,208

Rehabilitate Apron (RE AP IM) 9/28/1983 1/17/1986 $214,116 $0 $214,116

Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 1/17/1986 $12,375 $0 $12,375 Equipment (ST EQ MS)

3-02-0142-002-1985 Conduct Airport Master Plan Study (PL PL MA) 9/25/1985 4/19/1988 $67,060 $0 $67,060

3-02-0142-003-1986 Install Apron Lighting (ST AP LI) 9/9/1986 2/4/1988 $30,937 $0 $30,937

Rehabilitate Apron (RE AP IM) 9/9/1986 2/4/1988 $269,766 $0 $269,766

Construct Taxiway (CA TW CO) 9/9/1986 2/4/1988 $60,570 $0 $60,570

Rehabilitate Runway 1/19 (RE RW IM) 9/9/1986 2/4/1988 $336,562 $0 $336,562

3-02-0142-004-1987 Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $18,592 $0 $18,592

Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $63,234 $0 $63,234

Acquire Security Equipment (SA EQ SE) 8/27/1987 4/20/1990 $26,219 $0 $26,219

Construct Runway 01/19 (ST RW CO) 8/27/1987 4/20/1990 $576,367 $0 $576,367

Improve Access Road (OT GT AC) 8/27/1987 4/20/1990 $42,768 $0 $42,768

Construct Taxiway (ST TW CO) 8/27/1987 4/20/1990 $7,433 $0 $7,433

3-02-0142-005-1988 Rehabilitate Taxiway (RE TW IM) 9/14/1988 4/11/1990 $247,384 $0 $247,384

3-02-0142-006-1989 Conduct Miscellaneous Study (PL PL MS) 4/21/1989 11/17/1992 $53,242 $0 $53,242

3-02-0142-007-1989 Rehabilitate Runway 1 (RE RW IM) 8/23/1989 12/4/1990 $687,838 $0 $687,838

Rehabilitate Taxiway (RE TW IM) 8/23/1989 12/4/1990 $193,523 $0 $193,523

Rehabilitate Runway Lighting (RE RW LI) 8/23/1989 12/4/1990 $146,980 $0 $146,980

3-02-0142-008-1990 Construct Taxiway (ST TW CO) 8/23/1990 2/28/1991 $230,368 $0 $230,368

3-02-0142-009-1991 Acquire Snow Removal Equipment (ST EQ SN) 9/10/1991 11/17/1992 $96,383 $0 $96,383

3-02-0142-010-1991 Acquire Land for Development (ST LA DV) 8/7/1991 10/9/1991 $147,611 $0 $147,611

3-02-0142-011-1991 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/9/1991 10/13/1992 $270,832 $0 $270,832 EQ RF)

3-02-0142-012-1992 Improve Runway Safety Area 1/19 (ST RW SF) 5/28/1992 1/10/1996 $1,452,816 $0 $1,452,816

3-02-0142-013-1992 Acquire Security Equipment (SA EQ SE) 9/8/1992 12/22/1994 $129,122 $8,254 $137,376

3-02-0142-014-1993 Acquire Snow Removal Equipment (ST EQ SN) 12/2/1992 11/15/1993 $172,678 $0 $172,678

3-02-0142-015-1993 Acquire Snow Removal Equipment (ST EQ SN) 1/28/1993 11/22/1993 $242,944 $0 $242,944

3-02-0142-016-1993 Rehabilitate Taxiway (RE TW IM) 6/15/1993 12/20/1994 $172,926 $0 $172,926

3-02-0142-017-1993 Acquire Security Equipment (SA EQ SE) 7/13/1993 12/13/1994 $79,510 $0 $79,510

3-02-0142-018-1994 Install Guidance Signs (SA OT SG) 6/20/1994 1/12/1996 $34,888 $0 $34,888

3-02-0142-019-1994 Acquire Snow Removal Equipment (ST EQ SN) 6/22/1994 6/1/1995 $207,943 $0 $207,943

3-02-0142-020-1995 Conduct Airport Master Plan Study (PL PL MA) 6/5/1995 8/15/2000 $281,155 $0 $281,155

3-02-0142-021-1995 Acquire Snow Removal Equipment (ST EQ SN) 4/25/1995 10/24/1998 $197,847 $0 $197,847

3-02-0142-022-1997 Construct Runway 1R-19L (ST RW CO) 7/8/1997 12/6/2000 $303,482 $0 $303,482

Extend Taxiway (ST TW IM) 7/8/1997 12/6/2000 $788,749 $445,083 $1,233,832

3-02-0142-023-1997 Construct Aircraft Rescue & Fire Fighting Training Facility (ST OT RF)

12/17/1997 9/26/2000 $53,128 $6,017,761 $6,070,889

Construct Aircraft Rescue & Fire Fighting Training 12/17/1997 9/26/2000 $1,671,894 $1,682,200 $3,354,094 Facility (ST OT RF)

Monday, January 11, 2016 Page 59 of 124

Page 61: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0142-024-1998 Construct Aircraft Rescue & Fire Fighting Training 4/29/1998 9/26/2000 $0 $2,200,000 $2,200,000 Facility (ST OT RF)

3-02-0142-025-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/24/1999 6/12/2000 $267,816 $0 $267,816

3-02-0142-026-2000 Improve Aircraft Rescue & Fire Fighting Building (SA 8/4/2000 8/27/2004 $671,853 $0 $671,853 BD EX)

3-02-0142-027-2001 Improve Aircraft Rescue & Fire Fighting Building (SA 4/16/2001 2/24/2005 $2,162,263 $1,900,000 $4,062,263 BD EX)

3-02-0142-028-2002 Acquire Snow Removal Equipment (loader, 9/19/2002 6/30/2004 $206,923 $0 $206,923 sander/truck unit) (ST EQ SN)

3-02-0142-029-2002 Security Enhancements (SE SE SE) 9/19/2002 4/21/2006 $78,125 $241,389 $319,514

3-02-0142-030-2002 Extend Runway (Environmental) Phase 1 (ST RW IM) 9/19/2002 8/1/2006 $188,359 $0 $188,359

Extend Runway Safety Area (Environmental) Phase 1 9/19/2002 8/1/2006 $163,204 $4,617 $167,821 (SA RW SF)

3-02-0142-031-2003 Acquire Handicap Passenger Lift Device (ST TE MS) 8/21/2003 5/22/2007 $30,937 $0 $30,937

Improve Access Road (ADA Access) (OT GT AC) 8/21/2003 5/22/2007 $955,086 $0 $955,086

3-02-0142-032-2004 Update Airport Master Plan Study (PL PL MA) 8/25/2004 4/14/2008 $350,489 $9 $350,498

3-02-0142-033-2004 Security Enhancements (ST EQ SE) 8/30/2004 2/14/2007 $506,666 $0 $506,666

3-02-0142-034-2005 Extend Taxiway (Multi-Year, Year 2) (ST TW IM) 5/24/2005 4/10/2007 $364,079 $0 $364,079

Extend Taxiway Extend Twy P (ST TW IM) 5/24/2005 4/10/2007 $1,677,996 $0 $1,677,996

3-02-0142-035-2006 Rehabilitate Runway 01L/19R (Phase 2) (RE RW IM) 7/24/2006 8/28/2009 $720,991 $4,540,286 $5,261,277

Rehabilitate Runway 01L/19R Rehabilitate runway 7/24/2006 8/28/2009 $348,566 $0 $348,566 lighting (RE RW IM)

Improve Seaplane Base extend & widen waterlane 7/24/2006 8/28/2009 $383,763 $0 $383,763 (phase 1) (ST SB CO)

Improve Seaplane Base extend & widen waterlane 7/24/2006 8/28/2009 $1,200,000 $0 $1,200,000 (phase 2a) (ST SB CO)

Rehabilitate Runway 01L/19R RSA, provide 7/24/2006 8/28/2009 $0 $2,500,000 $2,500,000 standard(Phase 2) (RE RW IM)

3-02-0142-037-2007 Rehabilitate Runway 01L/19R rehab. runway 1/19 & 4/20/2007 6/21/2010 $367,916 $2,515,429 $2,883,345 provide RSA (phase 3) (RE RW IM)

Improve Seaplane Base extend & widen waterlane 4/20/2007 6/21/2010 $27,567 $1,000,000 $1,027,567 (phase 2b) (ST SB CO)

3-02-0142-038-2008 Construct Sand and Chemical Storage Building 6/11/2008 8/12/2009 $432,436 $0 $432,436 Construct Sand/Urea Bldg (ST BD SN)

3-02-0142-039-2009 Acquire Snow Removal Equipment Acquire Plow Truck 2/2/2009 5/4/2010 $51,841 $0 $51,841 Attachment (ST EQ SN)

3-02-0142-040-2009 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 2/12/2009 6/13/2011 $0 $843,698 $843,698 ARFF Truck (SA EQ RF)

3-02-0142-041-2009 Rehabilitate Apron Rehab Apron, Phase 1 (Design and 2/2/2009 3/13/2013 $721,837 $103,346 $825,183 Construction Block 1, FY09 Part A) (RE AP IM)

3-02-0142-042-2009 Rehabilitate Apron Rehab Apron, Phase 2 (Design and 6/22/2009 3/13/2013 $1,211,400 $3,484,418 $4,695,818 Construction Block 1, FY09 Phase B) (RE AP IM)

3-02-0142-043-2009 Rehabilitate Apron Apron Rehabilitation - 2009 ARRA 5/18/2009 12/10/2010 $0 $0 $0 Funded (RE AP IM)

3-02-0142-044-2010 Construct Apron Float Plane Basin Development, 8/13/2010 1/7/2015 $197,049 $0 $197,049 Phase 1 (ST AP CO)

3-02-0142-045-2010 Conduct Airport Master Plan Study Supplemental 7/23/2010 $531,608 $0 $531,608 Master Plan (PL PL MA)

3-02-0142-046-2011 Acquire Snow Removal Equipment Acquire SRE, FY11 3/14/2011 3/7/2013 $666,476 $159,625 $826,101 Phase 1: Grader/Loader (ST EQ SN)

3-02-0142-047-2011 Wildlife Hazard Assessments (PL PL WH) 3/14/2011 1/20/2015 $107,286 $0 $107,286

3-02-0142-048-2011 Acquire Snow Removal Equipment Acquire SRE, FY 11 8/25/2011 3/25/2013 $768,843 $0 $768,843 Phase 2: Tow Broom (ST EQ SN)

Monday, January 11, 2016 Page 60 of 124

Page 62: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0142-049-2013 Rehabilitate Runway 01L/19R Airfield Remarking Project 9/19/2013 12/7/2015 $260,970 $9,293 $270,263 (RE RW IM)

3-02-0142-050-2013 Remove Obstructions Obstruction Clearing (SA OT OB) 7/11/2013 1/20/2015 $449,706 $0 $449,706

3-02-0142-052-2013 Update Airport Master Plan Study Conduct Airport 9/12/2013 $246,177 $0 $246,177 Master Plan, Phase 2 -- Conduct aeronautical survey (PL PL MA)

3-02-0142-051-2014 Acquire Snow Removal Equipment Replace OSHKOSH 7/18/2014 $509,724 $0 $509,724 Truck (ST EQ SN)

$26,678,152 $27,655,408 $54,333,560

Ketchikan Ketchikan International (KTN)

3-02-0144-001-1984 Rehabilitate Apron (RE AP IM) 9/20/1984 11/20/1986 $22,036 $0 $22,036

Rehabilitate Taxiway (RE TW IM) 9/20/1984 11/20/1986 $277,983 $0 $277,983

Rehabilitate Runway 29/120 (RE RW IM) 9/20/1984 11/20/1986 $1,658,942 $0 $1,658,942

3-02-0144-003-1985 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/18/1985 11/4/1988 $140,496 $138,504 $279,000 EQ RF)

3-02-0144-002-1986 Acquire Land for Development (ST LA DV) 5/13/1986 9/17/1992 $2,393,484 $280,247 $2,673,731

3-02-0144-004-1987 Conduct Airport Master Plan Study (PL PL MA) 9/21/1987 5/13/1993 $165,000 $0 $165,000

Conduct Noise Compatibility Plan Study (EN PL NO) 9/21/1987 5/13/1993 $69,375 $0 $69,375

3-02-0144-005-1987 Improve Access Road (OT GT AC) 9/21/1987 4/27/1992 $0 $113,562 $113,562

Improve Airport Drainage (ST OT IM) 9/21/1987 4/27/1992 $73,213 $249,305 $322,518

3-02-0144-006-1990 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/24/1990 7/23/1992 $414,105 $0 $414,105 EQ RF)

3-02-0144-007-1990 Acquire Snow Removal Equipment (ST EQ SN) 8/29/1990 7/23/1992 $255,110 $0 $255,110

3-02-0144-008-1992 Improve Access Road (OT GT AC) 9/24/1992 9/9/1997 $7,127 $0 $7,127

Rehabilitate Taxiway (RE TW IM) 9/24/1992 9/9/1997 $919,329 $0 $919,329

Expand Apron (CA AP EX) 9/24/1992 9/9/1997 $862,317 $0 $862,317

Rehabilitate Apron (RE AP IM) 9/24/1992 9/9/1997 $151,219 $1,118,809 $1,270,028

Improve Airport Drainage (ST OT IM) 9/24/1992 9/9/1997 $409,779 $0 $409,779

3-02-0144-009-1996 Rehabilitate Apron (RE AP IM) 9/16/1996 7/20/2000 $0 $3,249,311 $3,249,311

Rehabilitate Apron (RE AP IM) 9/16/1996 7/20/2000 $0 $421,906 $421,906

3-02-0144-010-1997 Improve Access Road (OT GT AC) 9/4/1997 7/20/2000 $2,527,430 $90,165 $2,617,595

3-02-0144-011-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 9/10/2003 $392,470 $0 $392,470

3-02-0144-012-1999 Improve Access Road (OT GT AC) 3/25/1999 9/12/2003 $1,943,940 $80,538 $2,024,478

3-02-0144-013-2000 Rehabilitate Runway Lighting 11/29 (RE RW LI) 9/14/2000 9/10/2003 $1,151,991 $0 $1,151,991

Rehabilitate Taxiway Lighting (RE TW LI) 9/14/2000 9/10/2003 $646,875 $0 $646,875

3-02-0144-014-2002 Rehabilitate Seaplane Base (RE SB IM) 9/17/2002 8/2/2006 $150,000 $0 $150,000

Install Miscellaneous NAVAIDS Replace Segmented 9/17/2002 8/2/2006 $20,000 $0 $20,000 Circle (ST OT IN)

Construct Runway Safety Area Partial RSA 9/17/2002 8/2/2006 $150,000 $0 $150,000 development (SA RW SF)

Construct Taxiway (ST TW CO) 9/17/2002 8/2/2006 $9,019,375 $597,439 $9,616,814

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $140,100 $0 $140,100 (RE RW IM)

3-02-0144-015-2006 Install Emergency Generator (ST EQ LI) 8/30/2006 6/7/2007 $259,570 $0 $259,570

3-02-0144-016-2006 Rehabilitate Runway 11/29 (Extend RSA, Phase 1) (RE 9/12/2006 2/4/2014 $0 $24,201,396 $24,201,396 RW IM)

Rehabilitate Runway 11/29 (RE RW IM) 9/12/2006 2/4/2014 $3,500,216 $80,792 $3,581,008

3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $632,511 $39,907 $672,418 (Loader & Grader) (ST EQ SN)

Monday, January 11, 2016 Page 61 of 124

Page 63: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $79,088 $0 $79,088 (RE RW IM)

3-02-0144-017-2007 Rehabilitate Runway 11/29 (Extend RSA, Phase 2) (RE 4/24/2007 2/4/2014 $0 $11,795,554 $11,795,554 RW IM)

3-02-0144-019-2007 Construct Snow Removal Equipment Building (ST BD 8/27/2007 2/4/2014 $4,000,000 $0 $4,000,000 SN)

Construct Sand and Chemical Storage Building (ST BD 8/27/2007 2/4/2014 $1,423,199 $150,000 $1,573,199 SN)

3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $349,330 $0 $349,330 Acquire SRE: Plow Truck w/ Sander, & Towed Broom (ST EQ SN)

3-02-0200-062-2008 [Various Grnt] Acquire Snow Removal Equipment (SRE 6/12/2008 10/18/2011 $245,100 $35,494 $280,594 Southeast Region) - Acquire Plow Truck with Sander (ST EQ SN)

[Various Grnt] Acquire Snow Removal Equipment (SRE 6/12/2008 10/18/2011 $571,079 $0 $571,079 Southeast Region) - Acquire SP Runway Broom (ST EQ SN)

3-02-0144-020-2010 Improve Runway Safety Area 11/29 Aeronautical Survey 8/12/2010 $152,126 $500,000 $652,126 and Environmental Mitigation (Part D) (SA RW SF)

3-02-0144-021-2011 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3/16/2011 3/27/2015 $0 $741,458 $741,458 3000 Gallon ARRF truck (Ketchikan) (SA EQ RF)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 11/29 Various 9/16/2011 $87,929 $0 $87,929 Surface Preservation (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $51,042 $0 $51,042 Obstructions (Various - Ketchikan) (SA OT OB)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $56,490 $0 $56,490 Acquire SRE (Alaska Region): Ketchikan (Flatbed with Plow and Spreader for De-Icer) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various 9/19/2012 $76,563 $0 $76,563 Surface Preservation Maintenance (Ketchikan) (RE RW IM)

3-02-0144-022-2013 Rehabilitate Apron (RE AP IM) 9/19/2013 $3,379,813 $0 $3,379,813

Rehabilitate Taxiway Rehab Taxiway (RE TW IM) 9/19/2013 $4,000,000 $0 $4,000,000

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $61,300 $0 $61,300 Obstruction Removal (Ketchikan) (SA OT OB)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface Preservation Maintenance (Ketch kan) (RE RW IM)

9/18/2013 $91,900 $0 $91,900

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $43,829 $0 $43,829 Acquire SRE (Plow Attachment for Loader) (ST EQ SN)

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $550,292 $0 $550,292 (+08J) Acquire SRE: Ketchikan - Broom (ST EQ SN)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/19/2014 $122,500 $0 $122,500 Various Surface Preservation Maintenance: Ketchikan -Pavement Markings, Crack Seal (RE RW IM)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $277,581 $0 $277,581 Acquire Various SRE (Ketchikan Deicer Truck) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish 9/21/2015 $112,292 $0 $112,292 Various Airport Surface Preservation Maintenance (Ketchikan Marking) (RE RW IM)

$44,085,445 $43,884,387 $87,969,832

Murphys Pullout (8K9)

3-02-0408-001-1985 Expand Apron (ST AP IM) 9/3/1985 5/3/1991 $365,038 $0 $365,038

Install Apron Lighting (ST AP LI) 9/3/1985 5/3/1991 $11,635 $0 $11,635

$376,673 $0 $376,673

Monday, January 11, 2016 Page 62 of 124

Page 64: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kiana Bob Baker Memorial (IAN)

3-02-0146-001-1990 Expand Apron (ST AP IM) 9/19/1990 9/16/1997 $208,837 $0 $208,837

Rehabilitate Taxiway (RE TW IM) 9/19/1990 9/16/1997 $52,210 $0 $52,210

Acquire Snow Removal Equipment (ST EQ SN) 9/19/1990 9/16/1997 $95,742 $0 $95,742

Rehabilitate Taxiway Lighting (RE TW LI) 9/19/1990 9/16/1997 $64,051 $0 $64,051

Improve Snow Removal Equipment Building (ST BD 9/19/1990 9/16/1997 $156,538 $0 $156,538 SN)

Rehabilitate Runway Lighting (RE RW LI) 9/19/1990 9/16/1997 $164,704 $0 $164,704

Extend Runway 6/24 (ST RW IM) 9/19/1990 9/16/1997 $1,556,549 $0 $1,556,549

3-02-0146-002-1996 Improve Airport Drainage (ST OT IM) 7/19/1996 9/27/2002 $100,000 $0 $100,000

Rehabilitate Apron (RE AP IM) 7/19/1996 9/27/2002 $206,977 $0 $206,977

Rehabilitate Taxiway (RE TW IM) 7/19/1996 9/27/2002 $25,350 $0 $25,350

Rehabilitate Runway 6/24 (RE RW IM) 7/19/1996 9/27/2002 $823,800 $77,432 $901,232

Install Apron Lighting (ST AP LI) 7/19/1996 9/27/2002 $75,000 $0 $75,000

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 6/30/2006 2/27/2012 $131,813 $0 $131,813 (RE RW IM)

3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $342,000 $0 $342,000 Acquire SRE (Northern Region): Kiana Grader w/ Plow (ST EQ SN)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 06/24 Various 9/16/2011 $193,852 $0 $193,852 Surface Preservation (RE RW IM)

$4,197,423 $77,432 $4,274,855

King Cove King Cove (KVC)

3-02-0147-001-1983 Rehabilitate Taxiway (RE TW IM) 7/21/1983 4/10/1986 $18,383 $0 $18,383

Rehabilitate Apron (RE AP IM) 7/21/1983 4/10/1986 $25,965 $0 $25,965

Rehabilitate Runway 7/25 (RE RW IM) 7/21/1983 4/10/1986 $564,847 $0 $564,847

Improve Access Road (OT GT AC) 7/21/1983 4/10/1986 $132,660 $0 $132,660

3-02-0147-002-1986 Expand Apron (CA AP EX) 9/25/1986 4/14/1988 $384,045 $0 $384,045

3-02-0147-003-2005 Rehabilitate Runway 07/25 (RE RW IM) 8/30/2005 8/1/2012 $2,985,100 $650,003 $3,635,103

Rehabilitate Apron (RE AP IM) 8/30/2005 8/1/2012 $1,610,100 $0 $1,610,100

Rehabilitate Runway 07/25 (RSA) (RE RW IM) 8/30/2005 8/1/2012 $1,040,100 $0 $1,040,100

Construct Snow Removal Equipment Building (ST BD 8/30/2005 8/1/2012 $1,520,100 $0 $1,520,100 SN)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,580 $0 $242,580 (Loder w/Plow) (ST EQ SN)

[Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,426 $0 $242,426 (Grader w/Plow) (ST EQ SN)

3-02-0147-004-2010 Acquire Safety Equipment and/or Fencing Install 7/7/2010 $1,820,936 $0 $1,820,936 perimeter fencing (part C) (SA EQ RF)

$10,587,242 $650,003 $11,237,245

King Salmon King Salmon (AKN)

3-02-0148-001-1984 Rehabilitate Taxiway (RE TW IM) 9/13/1984 1/15/1988 $270,192 $0 $270,192

Construct Apron (CA AP CO) 9/13/1984 1/15/1988 $215,121 $0 $215,121

Monday, January 11, 2016 Page 63 of 124

Page 65: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0148-001-1984 Construct Apron (CA AP CO) 9/13/1984 1/15/1988 $1,121,093 $0 $1,121,093

Improve Access Road (CA GT AC) 9/13/1984 1/15/1988 $6,255 $0 $6,255

Install Apron Lighting (ST AP LI) 9/13/1984 1/15/1988 $47,896 $0 $47,896

3-02-0148-002-1989 Install Runway Lighting (ST RW LI) 8/30/1989 5/13/1993 $76,875 $0 $76,875

Expand Apron (ST AP IM) 8/30/1989 5/13/1993 $35,718 $0 $35,718

Rehabilitate Taxiway (RE TW IM) 8/30/1989 5/13/1993 $307,716 $0 $307,716

Rehabilitate Apron (RE AP IM) 8/30/1989 5/13/1993 $1,369,492 $0 $1,369,492

Construct Taxiway (CA TW CO) 8/30/1989 5/13/1993 $186,484 $0 $186,484

Acquire Aircraft Rescue & Fire Fighting Safety 8/30/1989 5/13/1993 $111,750 $0 $111,750 Equipment (ST EQ MS)

Rehabilitate Runway 18/36 (RE RW IM) 8/30/1989 5/13/1993 $1,043,165 $160,507 $1,203,672

3-02-0148-003-1993 Install Runway Lighting (ST RW LI) 8/10/1993 9/26/1996 $0 $127,863 $127,863

Install Runway Lighting (SA RW LI) 8/10/1993 9/26/1996 $0 $369,605 $369,605

3-02-0148-004-1994 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/1/1994 1/10/1996 $355,925 $0 $355,925 EQ RF)

3-02-0148-005-1994 Acquire Security Equipment (SA EQ SE) 9/27/1994 10/24/1998 $760,199 $0 $760,199

3-02-0148-006-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/26/1995 7/13/2000 $0 $12,295 $12,295

Improve Aircraft Rescue & Fire Fighting Building (SA 7/26/1995 7/13/2000 $0 $1,634,910 $1,634,910 BD EX)

3-02-0148-007-1998 Conduct Airport Master Plan Study (PL PL MA) 8/19/1998 9/24/2002 $297,649 $0 $297,649

3-02-0148-008-1998 Install Runway Distance-To-Go Signs 11-29 (SP RW 8/19/1998 9/24/2002 $30,000 $0 $30,000 SG)

Groove Runway 18-36 (SP RW FR) 8/19/1998 9/24/2002 $135,000 $0 $135,000

Install Miscellaneous NAVAIDS (SP OT IN) 8/19/1998 9/24/2002 $75,000 $0 $75,000

Groove Runway 11-29 (SP RW FR) 8/19/1998 9/24/2002 $258,864 $0 $258,864

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $35,000 $0 $35,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $35,000 $0 $35,000 (RE RW IM)

3-02-0148-009-2006 Extend Runway Safety Area 11/29 Phase 1 (SA RW SF) 8/17/2006 $0 $7,489,430 $7,489,430

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $95,760 $0 $95,760 (RE RW IM)

3-02-0148-010-2008 Rehabilitate Runway 18/36 (RE RW IM) 6/13/2008 1/20/2015 $5,500,000 $0 $5,500,000

Construct Taxiway Construct GA Tawiway (ST TW CO) 6/13/2008 1/20/2015 $500,000 $0 $500,000

Extend Runway Safety Area 11/29 Phase 2 (SA RW SF) 6/13/2008 1/20/2015 $0 $1,031,187 $1,031,187

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $64,300 $0 $64,300 (RE RW IM)

3-02-0148-011-2009 Rehabilitate Apron Rehabiliate Apron (LOC) (ARRA 6/11/2009 3/21/2012 $0 $0 $0 funded) (RE AP IM)

3-02-0200-071-2009 [Various Grnt] Acquire Snow Removal Equipment 9/17/2009 10/28/2013 $150,872 $0 $150,872 Acquire SRE (Central Region): Dozer w/ Attachments (ST EQ SN)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 12/30 King Salmon 3/12/2010 12/9/2015 $96,898 $0 $96,898 Various Surface Maintenance (RE RW IM)

3-02-0148-012-2011 Rehabilitate Taxiway Lighting (RE TW LI) 6/8/2011 $1,000,000 $0 $1,000,000

Rehabilitate Runway Lighting 18/36 (RE RW LI) 6/8/2011 $3,677,323 $3,000,000 $6,677,323

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various Surface Preservation (RE RW IM)

9/16/2011 $170,240 $0 $170,240

Monday, January 11, 2016 Page 64 of 124

Page 66: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 12/30 Variuos Surface Preservation Maintenance (King Salmon) (RE RW IM)

$569,100 $0 $569,100

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 12/30 Surface Preservation Maintenance (King Salmon) (RE RW IM)

$98,700 $0 $98,700

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$92,812 $0 $92,812

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 12/30 (+08J) Various Surface Preservation Maintenance: King Salmon - Pavement Markings (RE RW IM)

$148,701 $0 $148,701

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (King Salmon Grader) (ST EQ SN)

$288,294 $0 $288,294

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 12/30 Accomplish Various Airport Surface Preservation Maintenance () (RE RW IM)

$108,150 $0 $108,150

$19,335,543 $13,925,797 $33,261,340

Kipnuk Kipnuk (IIK)

3-02-0150-001-1996 8/22/1996 8/1/2000 Conduct Airport Master Plan Study (PL PL MA) $295,305 $0 $295,305

3-02-0150-002-2000 9/12/2000 3/9/2007 Construct New Airport (ST NA CO) $4,226,445 $0 $4,226,445

3-02-0150-003-2010 3/26/2010 Construct Runway Plan-1 Construct runway ph.2 (A) (ST RW CO)

$9,186,403 $0 $9,186,403

3-02-0150-004-2010 7/15/2010 Construct Runway Plan-1 Construct runway ph.3 (C) (ST RW CO)

$523,030 $7,927,990 $8,451,020

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 15/33 Various Surface Preservation Maintenance (Kipnuk) (RE RW IM)

$10,500 $0 $10,500

$14,241,683 $7,927,990 $22,169,673

Kivalina Kivalina (KVL)

3-02-0152-001-1985 9/3/1985 3/11/1991 Construct Runway 11/29 (ST RW CO) $2,314,377 $0 $2,314,377

9/3/1985 3/11/1991 Install Runway Lighting (ST RW LI) $221,341 $0 $221,341

9/3/1985 3/11/1991 Acquire Land for Development (ST LA DV) $9,375 $0 $9,375

3-02-0152-002-1994 8/26/1994 9/11/2000 Acquire Snow Removal Equipment (ST EQ SN) $98,825 $0 $98,825

8/26/1994 9/11/2000 Improve Snow Removal Equipment Building (ST BD SN)

$456,168 $0 $456,168

3-02-0152-003-1998 8/19/1998 9/12/2002 Conduct Airport Master Plan Study (Wind Study Only) (PL PL MA)

$38,271 $0 $38,271

3-02-0152-004-2001 9/12/2001 8/23/2004 Rehabilitate Runway 12/30 (RE RW IM) $2,174,845 $0 $2,174,845

3-02-0000-015-2010 9/22/2010 Conduct aeronautical survey for WAAS approach Aeronautical Survey (PL PL VI)

$0 $300,000 $300,000

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 12/30 Various Surface Preservation (RE RW IM)

$199,092 $0 $199,092

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Loader) (ST EQ SN)

$394,457 $0 $394,457

$5,906,751 $300,000 $6,206,751

Klawock Klawock (AKW)

3-02-0154-001-1982 9/27/1982 1/16/1986 Expand Apron (CA AP EX) $59,518 $0 $59,518

Monday, January 11, 2016 Page 65 of 124

Page 67: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0154-001-1982 Extend Runway 01/19 (ST RW IM) 9/27/1982 1/16/1986 $709,845 $0 $709,845

Extend Runway 01/19 (ST RW IM) 9/27/1982 1/16/1986 $15,198 $0 $15,198

3-02-0153-001-1985 Rehabilitate Apron (RE AP IM) 9/3/1985 1/25/1989 $67,492 $0 $67,492

3-02-0154-002-1986 Construct Runway 19 (ST RW CO) 7/28/1986 4/27/1992 $1,603,576 $32,430 $1,636,006

Construct Taxiway (ST TW CO) 7/28/1986 4/27/1992 $63,900 $0 $63,900

Improve Access Road (OT GT AC) 7/28/1986 4/27/1992 $210,406 $0 $210,406

Construct Apron (ST AP CO) 7/28/1986 4/27/1992 $567,534 $0 $567,534

3-02-0154-003-1988 Extend Runway 1/19 (ST RW IM) 6/8/1988 10/14/1992 $805,782 $0 $805,782

Expand Apron (ST AP IM) 6/8/1988 10/14/1992 $160,969 $0 $160,969

Rehabilitate Taxiway (RE TW IM) 6/8/1988 10/14/1992 $16,097 $0 $16,097

Improve Access Road (OT GT AC) 6/8/1988 10/14/1992 $32,194 $0 $32,194

Improve Airport Drainage (ST OT IM) 6/8/1988 10/14/1992 $32,193 $0 $32,193

Expand Apron (ST AP IM) 6/8/1988 10/14/1992 $515,100 $0 $515,100

3-02-0154-004-1991 Conduct Airport Master Plan Study (PL PL MA) 9/13/1991 4/17/2000 $93,750 $42,789 $136,539

3-02-0154-005-1992 Install Apron Lighting (ST AP LI) 9/23/1992 9/26/1996 $137,874 $87,230 $225,104

Rehabilitate Taxiway Lighting (RE TW LI) 9/23/1992 9/26/1996 $85,071 $0 $85,071

Install Runway Lighting (ST RW LI) 9/23/1992 9/26/1996 $363,751 $0 $363,751

3-02-0154-006-1994 Acquire Existing Airport (ST NA AQ) 9/27/1994 9/16/1997 $42,755 $0 $42,755

3-02-0154-007-1999 Install Perimeter Fencing (ST EQ SE) 8/3/1999 8/31/2001 $687,558 $0 $687,558

3-02-0154-008-2001 Improve Snow Removal Equipment Building (ST BD 8/31/2001 9/2/2005 $429,841 $10,430 $440,271 SN)

3-02-0154-009-2004 Update Airport Master Plan Study (PL PL MA) 8/24/2004 1/12/2007 $232,001 $0 $232,001

3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $425,724 $0 $425,724 (Towed Broom, & Plow Truck) (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $39,200 $0 $39,200 (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $20,417 $0 $20,417 Obstructions (Various - Klawock) (SA OT OB)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $701,258 $0 $701,258 Acquire SRE (Alaska Region): Klawock (Snow Blower) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 02/20 Various 9/19/2012 $45,938 $0 $45,938 Surface Preservation Maintenance (Klawock)) (RE RW IM)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 02/20 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Klawock -Crack Seal (RE RW IM)

$8,185,358 $172,879 $8,358,237

Kobuk Kobuk (OBU)

3-02-0427-001-1993 Conduct Airport Master Plan Study (PL PL MA) 9/9/1993 9/12/2000 $188,048 $0 $188,048

3-02-0427-002-1998 Improve Snow Removal Equipment Building (ST BD 7/21/1998 9/5/2001 $598,984 $0 $598,984 SN)

3-02-0427-003-2003 Extend Runway 09-27 (ST RW IM) 9/5/2003 1/12/2007 $4,600,000 $0 $4,600,000

Rehabilitate Apron (RE AP IM) 9/5/2003 1/12/2007 $1,000,000 $0 $1,000,000

Rehabilitate Runway 09-27 (RE RW IM) 9/5/2003 1/12/2007 $4,810,705 $0 $4,810,705

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 09/27 Kobuk 3/12/2010 12/9/2015 $196,840 $0 $196,840 Various Surface Maintenance (RE RW IM)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $79,406 $0 $79,406 Obstruction Removal (+08J) (SA OT OB)

$11,473,983 $0 $11,473,983

Monday, January 11, 2016 Page 66 of 124

Page 68: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kodiak Kodiak (ADQ)

3-02-0158-001-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 6/11/1986 2/5/1991 $268,115 $0 $268,115 EQ RF)

3-02-0158-002-1987 Install Runway Lighting 10/28 (SA RW LI) 6/29/1987 9/27/1989 $168,207 $0 $168,207

Install Apron Lighting (ST AP LI) 6/29/1987 9/27/1989 $82,260 $0 $82,260

Install Runway Lighting (ST RW LI) 6/29/1987 9/27/1989 $0 $18,110 $18,110

Install Runway Lighting 7/25 (SA RW LI) 6/29/1987 9/27/1989 $65,500 $0 $65,500

Install Runway Lighting (SA RW LI) 6/29/1987 9/27/1989 $0 $7,043 $7,043

Extend Taxiway 0/28 (ST TW IM) 6/29/1987 9/27/1989 $90,049 $0 $90,049

Install Runway Lighting (ST RW LI) 6/29/1987 9/27/1989 $276,467 $0 $276,467

3-02-0158-003-1988 Rehabilitate Runway 7/25 (RE RW IM) 8/17/1988 4/2/1991 $1,498,669 $93,702 $1,592,371

3-02-0158-004-1989 Acquire Aircraft Rescue & Fire Fighting Safety 6/28/1989 2/25/1991 $127,831 $0 $127,831 Equipment (ST EQ MS)

Remove Obstructions (SA OT OB) 6/28/1989 2/25/1991 $14,392 $0 $14,392

3-02-0158-005-1993 Acquire Security Equipment (SA EQ SE) 9/14/1993 9/25/1997 $879,750 $2,542 $882,292

3-02-0158-006-1999 Improve Snow Removal Equipment Building (ST BD 3/19/1999 9/11/2002 $1,648,754 $0 $1,648,754 SN)

Remove Obstructions 18-38 (SA OT OB) 3/19/1999 9/11/2002 $500,000 $0 $500,000

3-02-0158-007-1999 Conduct Airport Master Plan Study (PL PL MA) 3/19/1999 11/17/2006 $335,929 $0 $335,929

3-02-0158-008-2000 Rehabilitate Taxiway (RE TW IM) 9/7/2000 8/26/2004 $1,068,614 $117,042 $1,185,656

Rehabilitate Apron (RE AP IM) 9/7/2000 8/26/2004 $1,311,062 $0 $1,311,062

Rehabilitate Runway (RE RW IM) 9/7/2000 8/26/2004 $905,188 $1,200,000 $2,105,188

3-02-0158-009-2005 Extend Runway Safety Area 18/36 (EIS) (SA RW SF) 8/15/2005 4/13/2010 $0 $500,000 $500,000

Extend Runway Safety Area 07/25 (EIS) (SA RW SF) 8/15/2005 4/13/2010 $0 $500,000 $500,000

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $207,739 $0 $207,739 (RE RW IM)

3-02-0158-010-2007 Extend Runway Safety Area 18/36 (EIS Phase 2) (SA 8/9/2007 3/24/2015 $0 $1,743,000 $1,743,000 RW SF)

Extend Runway Safety Area 07/25 EIS Phase 2 (SA RW 8/9/2007 3/24/2015 $0 $1,743,000 $1,743,000 SF)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 5/31/2007 8/6/2013 $109,600 $0 $109,600 (RE RW IM)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $750,000 $0 $750,000 Acquire SRE: ADQ--D-6 Dozer w/ attachments, & Self-Propelled Blower (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/19/2008 6/10/2014 $100,000 $0 $100,000 (RE RW IM)

3-02-0158-011-2009 Extend Runway Safety Area 18/36 (EIS Phase 3) (SA 2/25/2009 3/24/2015 $0 $750,000 $750,000 RW SF)

Extend Runway Safety Area 07/25 EIS Phase 3 (SA RW 2/25/2009 3/24/2015 $0 $817,198 $817,198 SF)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 07/25 (Various 8/20/2009 12/19/2014 $1,439,439 $0 $1,439,439 Surface Maintenance) (RE RW IM)

Monday, January 11, 2016 Page 67 of 124

Page 69: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $100,000 $100,000 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0158-012-2010 Construct Sand and Chemical Storage Building 6/22/2010 $2,499,922 $0 $2,499,922 Construct Chemical Storage Building (part C) (ST BD SN)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 07/25 Kodiak 3/12/2010 12/9/2015 $100,000 $0 $100,000 Various Surface Maintenance (RE RW IM)

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $324,926 $0 $324,926 Acquire SRE (Central Region): Kodiak (Grader with Attachments) (ST EQ SN)

3-02-0158-013-2011 Rehabilitate Runway 18/36 Rehabilitate Runway (RE 6/13/2011 $7,083,780 $3,000,000 $10,083,780 RW IM)

Rehabilitate Runway Lighting 18/36 Edge lighting, 6/13/2011 $2,000,000 $0 $2,000,000 regulators, regulator bldg (RE RW LI)

3-02-0158-014-2011 Rehabilitate Runway 07/25 Reconstruct Runway, phase 9/16/2011 $0 $13,967,971 $13,967,971 1(LOC) (RE RW IM)

Rehabilitate Taxiway Rehab taxiway B (RE TW IM) 9/16/2011 $579,055 $0 $579,055

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 07/25 Various 9/16/2011 $313,880 $0 $313,880 Surface Preservation (RE RW IM)

3-02-0158-015-2012 Conduct Environmental Study EIS phase 4 (EN PL MA) 9/10/2012 3/24/2015 $1,025,558 $0 $1,025,558

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $726,581 $0 $726,581 Acquire SRE (Alaska Region): Kodiak (Towed Sweeper, Loader with Attachments) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Variuos 9/19/2012 $141,750 $0 $141,750 Surface Preservation Maintenance (Kodiak) (RE RW IM)

3-02-0158-016-2013 Extend Runway Safety Area 18/36 Construction, phase 9/24/2013 $2,000,000 $5,000,000 $7,000,000 1 (SA RW SF)

Extend Runway Safety Area 07/25 Construction Phase 1 9/24/2013 $1,000,000 $5,000,000 $6,000,000 (SA RW SF)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 07/25 Surface 9/18/2013 $404,300 $0 $404,300 Preservation Maintenance (Kodiak) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $102,267 $0 $102,267 Acquire SRE (Tow Plow) (ST EQ SN)

3-02-0158-017-2014 Extend Runway Safety Area 18/36 Construction, Phase 6/16/2014 $2,250,000 $22,000,000 $24,250,000 2 (SA RW SF)

Extend Runway Safety Area 07/25 Constuction Phase 2 6/16/2014 $2,250,000 $20,000,000 $22,250,000 (SA RW SF)

3-02-0158-018-2014 Extend Runway Safety Area 18/36 Phase 3 (SA RW SF) 9/23/2014 $789,000 $4,350,000 $5,139,000

Extend Runway Safety Area 07/25 Phase 3 (SA RW SF) 9/23/2014 $1,000,000 $3,850,000 $4,850,000

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $264,000 $0 $264,000 Obstruction Removal (+08J) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 18/36 (+08J) 9/19/2014 $341,500 $0 $341,500 Various Surface Preservation Maintenance: Kodiak - Crack Seal, Pavement Markings (RE RW IM)

3-02-0158-019-2015 Improve Airport Drainage (ST OT IM) 4/20/2015 $2,584,000 $0 $2,584,000

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $326,279 $0 $326,279 Acquire Various SRE (Kodiak Loader) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish 9/21/2015 $241,500 $0 $241,500 Various Airport Surface Preservation Maintenance (Kodiak Crack Sealing and Marking) (RE RW IM)

$40,315,863 $84,759,608 $125,075,471

Kodiak Municipal (KDK)

3-02-0465-001-2004 Conduct Metropolitan System Plan Study (PL PL ME) 4/12/2004 3/12/2007 $352,612 $0 $352,612

$352,612 $0 $352,612

Monday, January 11, 2016 Page 68 of 124

Page 70: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Trident Basin (T44)

3-02-0450-001-2005 8/26/2005 3/12/2007 Improve Seaplane Base (Preliminary Design & Environmental) (ST SB CO)

$356,804 $0 $356,804

3-02-0450-002-2006 7/13/2006 6/3/2010 Improve Seaplane Base (ST SB CO) $4,200,702 $0 $4,200,702

$4,557,506 $0 $4,557,506

Kokhanok Kokhanok (9K2)

3-02-0406-001-1984 9/21/1984 2/4/1988 Construct Taxiway (ST TW CO) $15,244 $0 $15,244

9/21/1984 2/4/1988 Construct Apron (ST AP CO) $107,978 $0 $107,978

9/21/1984 2/4/1988 Construct Runway 13/31 (ST RW CO) $709,741 $0 $709,741

9/21/1984 2/4/1988 Improve Access Road (OT GT AC) $433,985 $0 $433,985

9/21/1984 2/4/1988 Improve Snow Removal Equipment Building (ST BD SN)

$57,336 $0 $57,336

3-02-0406-002-2005 8/18/2005 1/28/2013 Extend Runway 06/24 (ST RW IM) $1,995,000 $0 $1,995,000

8/18/2005 1/28/2013 Extend Runway 06/24 (RSA Development) (ST RW IM) $2,264,458 $0 $2,264,458

8/18/2005 1/28/2013 Construct Snow Removal Equipment Building (ST BD SN)

$713,000 $0 $713,000

8/18/2005 1/28/2013 Expand Apron (ST AP IM) $545,000 $0 $545,000

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 06/24 Various Surface Preservation Maintenance (Kokhanok) (RE RW IM)

$31,500 $0 $31,500

$6,873,242 $0 $6,873,242

Koliganek Koliganek (JZZ)

3-02-0192-001-1991 7/25/1991 4/18/2000 Conduct Airport Master Plan Study (PL PL MA) $167,168 $0 $167,168

3-02-0424-001-1994 9/27/1994 9/25/2000 Acquire Snow Removal Equipment (ST EQ SN) $150,000 $0 $150,000

9/27/1994 9/25/2000 Construct Runway 18/36 (ST RW CO) $2,159,770 $249,594 $2,409,364

9/27/1994 9/25/2000 Construct Taxiway (ST TW CO) $142,840 $0 $142,840

9/27/1994 9/25/2000 Install Runway Lighting (ST RW LI) $192,080 $0 $192,080

9/27/1994 9/25/2000 Improve Snow Removal Equipment Building (ST BD SN)

$98,437 $0 $98,437

9/27/1994 9/25/2000 Improve Access Road (OT GT AC) $398,447 $0 $398,447

9/27/1994 9/25/2000 Acquire Land for Development (ST LA DV) $164,062 $0 $164,062

9/27/1994 9/25/2000 Construct Apron (ST AP CO) $428,519 $0 $428,519

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)

$114,912 $0 $114,912

3-02-0200-094-2013 9/19/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader) (ST EQ SN)

$360,368 $0 $360,368

3-02-0424-002-2013 9/18/2013 Rehabilitate Runway 09/27 (RE RW IM) $5,000,000 $0 $5,000,000

3-02-0424-003-2014 9/17/2014 Rehabilitate Runway 09/27 Phase 2 Rehab Runway (RE RW IM)

$4,388,988 $0 $4,388,988

9/17/2014 Construct Snow Removal Equipment Building (ST BD SN)

$1,000,000 $0 $1,000,000

9/17/2014 Extend Runway 09/27 (ST RW IM) $1,000,000 $0 $1,000,000

$15,765,591 $249,594 $16,015,185

Monday, January 11, 2016 Page 69 of 124

Page 71: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kongiganak Kongiganak (DUY)

3-02-0380-001-2007 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)

Extend Runway 18/36 Extend/Widen RWY & RSA Phase 1 (ST RW IM)

Construct Apron (ST AP CO)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: DUY--Grader w/ attachments (ST EQ SN)

3-02-0380-002-2008 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)

Extend Runway 18/36 Extend/Widen RWY & RSA Phase 2 (ST RW IM)

3-02-0380-003-2010 Extend Runway 18/36 Extend/Widen RWY & RSA Phase 3 (ST RW IM)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 01/19 Various Surface Preservation Maintenance (Kongiganak) (RE RW IM)

8/29/2007

8/29/2007

8/29/2007

6/16/2008

5/30/2008

5/30/2008

3/26/2010

9/19/2012

$961,723

$10,625,392

$3,000,000

2/5/2014 $350,000

$711,240

$3,898,010

$5,685,750

$10,500

$25,242,615

$0

$0

$0

$0

$0

$0

$0

$0

$0

$961,723

$10,625,392

$3,000,000

$350,000

$711,240

$3,898,010

$5,685,750

$10,500

$25,242,615

Kotlik Kotlik (2A9)

3-02-0159-001-1993 Conduct Airport Master Plan Study (PL PL MA)

3-02-0159-002-1995 Rehabilitate Runway 02/20 (RE RW IM)

Rehabilitate Taxiway (RE TW IM)

Rehabilitate Apron (RE AP IM)

Improve Snow Removal Equipment Building (ST BD SN)

Improve Access Road (OT GT AC)

3-02-0159-003-1997 Acquire Snow Removal Equipment (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

3-02-0000-012-2009 Conduct aeronautical survey for WAAS approach (PL PL VI)

9/13/1993

9/26/1995

9/26/1995

9/26/1995

9/26/1995

9/26/1995

6/13/1997

6/30/2006

6/19/2008

8/20/2009

10/24/1998 $253,633

9/20/2000 $6,804,062

9/20/2000 $187,500

9/20/2000 $187,500

9/20/2000 $218,750

9/20/2000 $20,000

7/20/2000 $178,125

2/27/2012 $226,718

6/10/2014 $110,400

11/5/2014 $0

$8,186,688

$0

$0

$0

$0

$0

$0

$13,745

$0

$0

$226,230

$239,975

$253,633

$6,804,062

$187,500

$187,500

$218,750

$20,000

$191,870

$226,718

$110,400

$226,230

$8,426,663

Kotzebue Ralph Wien Memorial (OTZ)

3-02-0160-001-1982 Acquire Land for Development (ST LA DV)

3-02-0160-002-1983 Rehabilitate Runway Lighting 8/26 (RE RW LI)

Rehabilitate Apron 8/26 (RE AP IM)

Rehabilitate Taxiway 8/26 (RE TW IM)

Groove Runway 8/26 (SP RW FR)

Rehabilitate Runway 8/26 (RE RW IM)

3-02-0160-003-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

3-02-0160-004-1987 Construct Taxiway (CA TW CO)

9/27/1982

9/28/1983

9/28/1983

9/28/1983

9/28/1983

9/28/1983

7/17/1986

9/21/1987

4/5/1990 $900,000

2/20/1991 $99,188

2/20/1991 $777,036

2/20/1991 $1,433,613

2/20/1991 $610,603

2/20/1991 $307,721

8/8/1991 $157,934

1/26/1993 $302,868

$966

$0

$0

$0

$0

$0

$82,554

$1,084,603

$900,966

$99,188

$777,036

$1,433,613

$610,603

$307,721

$240,488

$1,387,471

Monday, January 11, 2016 Page 70 of 124

Page 72: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0160-004-1987 Extend Taxiway (ST TW IM) 9/21/1987 1/26/1993 $0 $10,746 $10,746

Install Runway Lighting (ST RW LI) 9/21/1987 1/26/1993 $0 $61,645 $61,645

Improve Access Road (OT GT AC) 9/21/1987 1/26/1993 $0 $227,252 $227,252

Improve Airport Drainage (ST OT IM) 9/21/1987 1/26/1993 $0 $261,831 $261,831

Extend Runway 8/26 (ST RW IM) 9/21/1987 1/26/1993 $0 $19,527 $19,527

Noise Mitigation Measures for Public Buildings (EN PB 9/21/1987 1/26/1993 $0 $280,202 $280,202 75)

Acquire Aircraft Rescue & Fire Fighting Safety 9/21/1987 1/26/1993 $0 $146,343 $146,343 Equipment (ST EQ MS)

3-02-0160-005-1993 Expand Apron (ST AP IM) 7/26/1993 7/14/1999 $0 $95,858 $95,858

Install Guidance Signs (SA OT SG) 7/26/1993 7/14/1999 $0 $73,313 $73,313

Acquire Snow Removal Equipment (ST EQ SN) 7/26/1993 7/14/1999 $0 $641,757 $641,757

Rehabilitate Apron (RE AP IM) 7/26/1993 7/14/1999 $0 $6,540 $6,540

Rehabilitate Taxiway (RE TW IM) 7/26/1993 7/14/1999 $0 $230,652 $230,652

Rehabilitate Runway 08/26 (RE RW IM) 7/26/1993 7/14/1999 $1,970,526 $1,176,173 $3,146,699

Acquire Security Equipment (SA EQ SE) 7/26/1993 7/14/1999 $0 $83,250 $83,250

3-02-0160-006-1996 Conduct Airport Master Plan Study (PL PL MA) 8/22/1996 8/15/2000 $281,250 $0 $281,250

3-02-0160-007-2001 Rehabilitate Apron (RE AP IM) 9/25/2001 3/29/2005 $3,242,407 $0 $3,242,407

3-02-0160-008-2003 Construct Aircraft Rescue & Fire Fighting Building (SA 9/5/2003 9/18/2008 $0 $5,068,109 $5,068,109 BD EX)

Construct Snow Removal Equipment Building (ST BD 9/5/2003 9/18/2008 $3,690,004 $0 $3,690,004 SN)

3-02-0160-009-2004 Remove Obstructions (ST OT OB) 9/1/2004 6/16/2008 $0 $2,000,000 $2,000,000

Construct Runway Safety Area 08/26 (SA RW SF) 9/1/2004 6/16/2008 $4,332,411 $741,263 $5,073,674

3-02-0160-010-2005 Update Airport Master Plan Study (Relocation Study) 8/11/2005 6/22/2010 $483,709 $0 $483,709 Stg 1 (PL PL MA)

3-02-0160-011-2005 Construct Runway Safety Area 09/27 (SA RW SF) 8/16/2005 8/28/2008 $0 $7,187,578 $7,187,578

3-02-0200-049-2005 [Various Grnt] Acquire Aircraft Rescue & Fire Fighting 6/14/2005 7/28/2009 $100,000 $649,414 $749,414 Vehicle (SA EQ RF)

3-02-0160-012-2006 Construct Sand and Chemical Storage Building (ST BD 7/25/2006 9/18/2009 $3,277,945 $0 $3,277,945 SN)

3-02-0160-013-2009 Update Airport Master Plan Study (Relocation Study) 2/23/2009 $400,000 $0 $400,000 Stg 2 (PL PL MA)

3-02-0160-014-2009 Install Runway Incursion Caution Bars (SA OT SG) 9/1/2009 11/29/2011 $763,796 $34,450 $798,246

Acquire Equipment install supplemental wind cone (ST 9/1/2009 11/29/2011 $100,000 $0 $100,000 EQ MS)

3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $29,000 $0 $29,000 Acquire SRE Northern Region (Kotzebue 12CY Bucket) (ST EQ SN)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 17/35 (Various 8/20/2009 12/19/2014 $558,600 $0 $558,600 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0160-015-2010 Acquire Safety Equipment and/or Fencing Install VPD 3/26/2010 11/5/2014 $0 $1,694,022 $1,694,022 Gates, Phase 2 (SA EQ RF)

3-02-0160-016-2010 Rehabilitate Runway 09/27 Phase 1 (RE RW IM) 9/23/2010 6/2/2015 $791,491 $16,473,196 $17,264,687

3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $798,000 $0 $798,000 Acquire SRE (Northern Region): Kotzebue Snow Blower & Broom (ST EQ SN)

3-02-0160-017-2011 Rehabilitate Taxiway (RE TW IM) 3/16/2011 $1,000,000 $1,958,362 $2,958,362

3-02-0160-018-2012 Construct Runway Safety Area 09/27 phase 1 (SA RW 9/14/2012 $2,635,314 $15,147,638 $17,782,952 SF)

Monday, January 11, 2016 Page 71 of 124

Page 73: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0160-019-2012 9/24/2012 Construct Runway Safety Area 09/27 Phase 2 (SA RW SF)

$0 $11,911,843 $11,911,843

3-02-0160-020-2013 4/26/2013 Construct Runway Safety Area 09/27 phase 3 (SA RW SF)

$0 $10,705,816 $10,705,816

3-02-0200-092-2013 9/19/2013 [Various Grnt] Wildlife Hazard Assessments (PL PL WH)

$93,750 $0 $93,750

3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Kotzebue - Grader (ST EQ SN)

$365,238 $0 $365,238

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Kotzebue Tug with Cradeling Broom, and Loader) (ST EQ SN)

$784,044 $0 $784,044

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 09/27 Accomplish Various Airport Surface Preservation Maintenance (Kotzebue RWY & TWY Markings) (RE RW IM)

$68,248 $0 $68,248

$30,354,696 $78,158,327 $108,513,023

Koyuk Koyuk Alfred Adams (KKA)

3-02-0161-001-1989 9/22/1989 1/7/1993 Construct Taxiway (ST TW CO) $306,234 $0 $306,234

9/22/1989 1/7/1993 Acquire Land for Development (ST LA DV) $29,100 $0 $29,100

9/22/1989 1/7/1993 Install Runway Lighting (ST RW LI) $194,084 $0 $194,084

9/22/1989 1/7/1993 Construct Runway 2/20 (ST RW CO) $1,983,120 $215,498 $2,198,618

3-02-0161-002-1991 8/9/1991 2/6/1995 Acquire Land for Development (ST LA DV) $28,125 $0 $28,125

8/9/1991 2/6/1995 Improve Snow Removal Equipment Building (ST BD SN)

$299,297 $0 $299,297

8/9/1991 2/6/1995 Acquire Snow Removal Equipment (ST EQ SN) $145,313 $0 $145,313

8/9/1991 2/6/1995 Construct Apron (ST AP CO) $414,312 $0 $414,312

3-02-0200-068-2009 2/24/2009 5/16/2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE Northern Region (Koyuk Wheeled Loader) (ST EQ SN)

$223,000 $0 $223,000

3-02-0200-081-2011 9/1/2011 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $300,000 $300,000

$3,622,585 $515,498 $4,138,083

Koyukuk Koyukuk (KYU)

3-02-0162-001-1990 8/31/1990 10/26/1994 Rehabilitate Apron (RE AP IM) $255,000 $0 $255,000

8/31/1990 10/26/1994 Construct Runway 8/26 (ST RW CO) $1,030,586 $64,769 $1,095,355

8/31/1990 10/26/1994 Install Runway Lighting (ST RW LI) $148,125 $0 $148,125

8/31/1990 10/26/1994 Acquire Snow Removal Equipment (ST EQ SN) $153,125 $0 $153,125

8/31/1990 10/26/1994 Improve Snow Removal Equipment Building (ST BD SN)

$106,875 $0 $106,875

3-02-0162-002-2003 9/5/2003 8/23/2007 Extend Runway 06/24 (ST RW IM) $1,572,090 $0 $1,572,090

9/5/2003 8/23/2007 Construct Snow Removal Equipment Building (ST BD SN)

$500,000 $0 $500,000

9/5/2003 8/23/2007 Expand Apron (ST AP IM) $1,000,000 $0 $1,000,000

9/5/2003 8/23/2007 Extend Runway Safety Area 06/24 (ST RW SF) $2,000,000 $0 $2,000,000

9/5/2003 8/23/2007 Rehabilitate Runway 06/24 (RE RW IM) $5,196,416 $0 $5,196,416

3-02-0200-084-2012 7/23/2012 [Various Grnt] Remove Obstructions Remove Obstructions (Various - Koyukuk) (SA OT OB)

$31,022 $0 $31,022

$11,993,239 $64,769 $12,058,008

Monday, January 11, 2016 Page 72 of 124

Page 74: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Kwethluk Kwethluk (KWT)

3-02-0164-001-1996 Conduct Airport Master Plan Study (PL PL MA)

3-02-0435-001-2001 Construct New Airport (ST NA CO)

Improve Snow Removal Equipment Building (ST BD SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway Plan-1 (Maintenance) (RE RW IM)

3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various Obstruction Removal (Kwethluk) (ST OT OB)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (Kwethluk) (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish Various Airport Surface Preservation Maintenance (Kwethluk Resurface and Reshape RWY) (RE RW IM)

8/22/1996

9/25/2001

9/25/2001

6/30/2006

9/26/2011

9/19/2012

9/21/2015

9/6/2000 $275,191

9/2/2005 $5,256,000

9/2/2005 $280,000

2/27/2012 $58,208

$42,630

$10,500

$372,750

$6,295,279

$0

$203,135

$0

$0

$0

$0

$0

$203,135

$275,191

$5,459,135

$280,000

$58,208

$42,630

$10,500

$372,750

$6,498,414

Kwigillingok Kwigillingok (GGV)

3-02-0165-001-2000 Conduct Airport Master Plan Study (PL PL MA)

3-02-0165-002-2011 Rehabilitate Runway 15/33 (RE RW IM)

9/21/2000

9/1/2011

8/25/2004 $215,112

$1,488,031

$1,703,143

$0

$0

$0

$215,112

$1,488,031

$1,703,143

Lake Louise Lake Louise (Z55)

3-02-0430-001-2007 Construct Runway 12/30 (ST RW CO)

Construct Taxiway (ST TW CO)

Construct Apron (ST AP CO)

3-02-0430-002-2010 Rehabilitate Runway 12/30 Phase 2 (RE RW IM)

Rehabilitate Apron Phase 2 (RE AP IM)

Rehabilitate Access Road Phase 2 (OT GT AC)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 13/31 Variuos Surface Preservation Maintenance (Lake Louise) (RE RW IM)

8/15/2007

8/15/2007

8/15/2007

3/26/2010

3/26/2010

3/26/2010

9/19/2012

9/8/2010 $1,676,874

9/8/2010 $500,000

9/8/2010 $600,000

11/12/2014 $857,956

11/12/2014 $506,833

11/12/2014 $400,000

$144,769

$4,686,432

$223,585

$0

$0

$0

$0

$0

$0

$223,585

$1,900,459

$500,000

$600,000

$857,956

$506,833

$400,000

$144,769

$4,910,017

Lake Minchumina Minchumina (MHM)

3-02-0180-001-1988 Acquire Land for Development (ST LA DV)

Improve Access Road (OT GT AC)

Construct Apron (ST AP CO)

Construct Runway RW 2/20 (ST RW CO)

Install Runway Lighting (SA RW LI)

3-02-0180-002-1991 Improve Snow Removal Equipment Building (ST BD SN)

Acquire Snow Removal Equipment (ST EQ SN)

9/26/1988

9/26/1988

9/26/1988

9/26/1988

9/26/1988

9/24/1991

9/24/1991

9/26/1996 $58,163

9/26/1996 $278,409

9/26/1996 $111,099

9/26/1996 $1,846,075

9/26/1996 $213,069

10/24/1998 $219,733

10/24/1998 $130,000

$2,856,548

$0

$0

$0

$85,184

$0

$0

$0

$85,184

$58,163

$278,409

$111,099

$1,931,259

$213,069

$219,733

$130,000

$2,941,732

Monday, January 11, 2016 Page 73 of 124

Page 75: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Larsen Bay Larsen Bay (2A3)

3-02-0166-001-1993 9/14/1993 5/12/2000 Improve Access Road (OT GT AC) $25,000 $0 $25,000

9/14/1993 5/12/2000 Extend Runway RW03/21 (ST RW IM) $1,229,911 $151,341 $1,381,252

9/14/1993 5/12/2000 Construct Apron (ST AP CO) $95,000 $0 $95,000

9/14/1993 5/12/2000 Acquire Land for Development (ST LA DV) $245,000 $0 $245,000

9/14/1993 5/12/2000 Acquire Snow Removal Equipment (ST EQ SN) $152,000 $0 $152,000

9/14/1993 5/12/2000 Improve Snow Removal Equipment Building (ST BD SN)

$122,000 $0 $122,000

9/14/1993 5/12/2000 Install Runway Lighting (ST RW LI) $205,500 $0 $205,500

9/14/1993 5/12/2000 Construct Taxiway (ST TW CO) $18,000 $0 $18,000

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

$23,333 $0 $23,333

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

$118,104 $0 $118,104

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) (RE RW IM)

$47,400 $0 $47,400

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 04/22 (Various Surface Maintenance) (RE RW IM)

$58,520 $0 $58,520

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 04/22 Surface Preservation Maintenance (Larsen Bay) (RE RW IM)

$78,800 $0 $78,800

$2,418,568 $151,341 $2,569,909

Levelock Levelock (9Z8)

3-02-0167-001-2000 9/12/2000 8/23/2004 Acquire Snow Removal Equipment (ST EQ SN) $210,000 $0 $210,000

9/12/2000 8/23/2004 Improve Snow Removal Equipment Building (ST BD SN)

$280,000 $0 $280,000

9/12/2000 8/23/2004 Construct New Airport (ST NA CO) $2,851,561 $0 $2,851,561

3-02-0167-002-2003 8/4/2003 8/17/2007 Construct Snow Removal Equipment Building (ST BD SN)

$558,033 $0 $558,033

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

$15,960 $0 $15,960

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 01/19 (+08J) Various Surface Preservation Maintenance: Levelock - Minor Gravel Resurface and RSA/RWY Grading (RE RW IM)

$262,500 $0 $262,500

$4,178,054 $0 $4,178,054

Lime Village Lime Village (2AK)

3-02-0360-001-2000 9/8/2000 3/9/2007 Conduct Airport Master Plan Study (PL PL MA) $328,335 $0 $328,335

$328,335 $0 $328,335

Manley Hot Springs Manley Hot Springs (MLY)

3-02-0170-001-2011 3/16/2011 Construct Apron Construct apron phase 1 (ST AP CO) $356,380 $0 $356,380

Monday, January 11, 2016 Page 74 of 124

Page 76: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0170-001-2011 Construct Runway Plan-1 Construct Runway Phase 1 3/16/2011 $6,960,606 $191,554 $7,152,160 (ST RW CO)

Construct Taxiway Phase 1 (ST TW CO) 3/16/2011 $1,500,000 $0 $1,500,000

3-02-0170-002-2012 Construct Runway Plan-1 Construct Runway-p2 (ST RW 7/3/2012 $9,160,586 $0 $9,160,586 CO)

3-02-0170-003-2015 Construct Snow Removal Equipment Building Construct 9/20/2015 $2,135,220 $0 $2,135,220 SREB (ST BD SN)

$20,112,792 $191,554 $20,304,346

Manokotak Manokotak (MBA)

3-02-0171-001-1986 Acquire Snow Removal Equipment (ST EQ SN) 6/12/1986 10/30/1990 $100,000 $0 $100,000

Rehabilitate Runway 1/19 (RE RW IM) 6/12/1986 10/30/1990 $953,795 $0 $953,795

Construct Taxiway (ST TW CO) 6/12/1986 10/30/1990 $60,358 $0 $60,358

Install Runway Lighting (ST RW LI) 6/12/1986 10/30/1990 $70,417 $0 $70,417

Improve Snow Removal Equipment Building (ST BD 6/12/1986 10/30/1990 $55,328 $0 $55,328 SN)

Improve Access Road (OT GT AC) 6/12/1986 10/30/1990 $204,546 $0 $204,546

Construct Apron (ST AP CO) 6/12/1986 10/30/1990 $301,789 $0 $301,789

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $10,000 $0 $10,000 (RE RW IM)

3-02-0473-001-2006 Construct New Airport Phase 1 (Construct 9/5/2006 1/24/2013 $311,638 $8,000,000 $8,311,638 Embankments) (ST NA CO)

3-02-0473-002-2007 Construct New Airport Phase 2 (Complete 5/14/2007 1/28/2013 $0 $4,689,335 $4,689,335 Construction) (ST NA CO)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $200,000 $0 $200,000 Acquire SRE: +07B--Loader w/ attachments (ST EQ SN)

$2,267,871 $12,689,335 $14,957,206

Marshall Marshall Don Hunter Sr (MDM)

3-02-0363-001-1995 Conduct Airport Master Plan Study (PL PL MA) 5/25/1995 4/17/2000 $298,798 $0 $298,798

3-02-0363-002-1998 Construct New Airport (ST NA CO) 9/28/1998 9/8/2003 $6,177,492 $0 $6,177,492

3-02-0363-003-1999 Improve Snow Removal Equipment Building (ST BD 1/19/1999 9/8/2003 $559,001 $0 $559,001 SN)

Construct New Airport (ST NA CO) 1/19/1999 9/8/2003 $1,930,672 $0 $1,930,672

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 07/25 Various 9/16/2011 $204,331 $0 $204,331 Surface Preservation (RE RW IM)

$9,170,294 $0 $9,170,294

McCarthy McCarthy (15Z)

3-02-0334-001-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/14/1993 10/24/1998 $310,845 $0 $310,845

3-02-0334-002-1994 Rehabilitate Runway 07/25 (RE RW IM) 6/28/1994 1/14/1999 $779,136 $287,486 $1,066,622

Rehabilitate Taxiway (RE TW IM) 6/28/1994 1/14/1999 $103,894 $0 $103,894

Construct Apron (ST AP CO) 6/28/1994 1/14/1999 $271,400 $0 $271,400

Improve Snow Removal Equipment Building (ST BD 6/28/1994 1/14/1999 $311,193 $0 $311,193 SN)

Improve Access Road (OT GT AC) 6/28/1994 1/14/1999 $101,877 $0 $101,877

Acquire Land for Development (ST LA DV) 6/28/1994 1/14/1999 $443,438 $0 $443,438

Monday, January 11, 2016 Page 75 of 124

Page 77: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0334-003-1999 8/4/1999 7/16/2001 Construct Runway 1-19 (ST RW CO) $832,842 $0 $832,842

3-02-0200-058-2007 8/31/2007 12/7/2009 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader (ST EQ SN)

$238,054 $0 $238,054

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

$42,560 $0 $42,560

3-02-0200-082-2011 9/26/2011 [Various Grnt] Remove Obstructions Various Obstruction Removal (McCarthy) (ST OT OB)

$100,000 $0 $100,000

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 01/19 Variuos Surface Preservation Maintenance (McCarthy) (RE RW IM)

$155,109 $0 $155,109

3-02-0200-088-2012 9/19/2012 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $232,000 $232,000

$3,690,348 $519,486 $4,209,834

McGrath McGrath (MCG)

3-02-0176-001-1989 6/1/1989 3/6/1991 Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

$182,898 $6,911 $189,809

6/1/1989 3/6/1991 Extend Taxiway (ST TW IM) $31,707 $0 $31,707

3-02-0176-002-1997 7/16/1997 9/24/2001 Construct Apron (ST AP CO) $2,834,612 $0 $2,834,612

7/16/1997 9/24/2001 Improve Airport Drainage (ST OT IM) $54,000 $0 $54,000

7/16/1997 9/24/2001 Improve Access Road (OT GT AC) $143,000 $0 $143,000

7/16/1997 9/24/2001 Rehabilitate Apron (RE AP IM) $331,820 $0 $331,820

3-02-0176-003-2000 9/14/2000 8/27/2004 Rehabilitate Runway 16/34 (RE RW IM) $6,213,780 $3,751,403 $9,965,183

3-02-0176-004-2006 6/6/2006 2/27/2012 Construct Sand and Chemical Storage Building (ST BD SN)

$1,535,348 $0 $1,535,348

3-02-0176-005-2006 8/30/2006 12/28/2012 Construct Apron (ST AP CO) $1,674,950 $504,138 $2,179,088

8/30/2006 12/28/2012 Construct Runway Plan-1 (ST RW CO) $4,900,000 $0 $4,900,000

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

$82,992 $0 $82,992

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

$85,800 $0 $85,800

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Dump Truck & Sander w/ Attachments (ST EQ SN)

$271,570 $0 $271,570

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 16/34 McGrath Various Surface Maintenance (RE RW IM)

$101,080 $0 $101,080

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)

$90,440 $0 $90,440

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation Maintenance (McGrath) (RE RW IM)

$86,100 $0 $86,100

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) Various Surface Preservation Maintenance: McGrath - Crack Seal, Pavement Markings (RE RW IM)

$105,000 $0 $105,000

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 16/34 Accomplish Various Airport Surface Preservation Maintenance (McGrath Seal Coat Ramps, TWYs and Turnaround) (RE RW IM)

$531,300 $0 $531,300

$19,256,397 $4,262,452 $23,518,849

Monday, January 11, 2016 Page 76 of 124

Page 78: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Mekoryuk Mekoryuk (MYU)

3-02-0178-001-1984 Install Runway Lighting (ST RW LI)

Acquire Snow Removal Equipment (ST EQ SN)

Rehabilitate Runway 5/23 (RE RW IM)

Rehabilitate Taxiway (RE TW IM)

Rehabilitate Apron (RE AP IM)

3-02-0178-002-1993 Acquire Snow Removal Equipment (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Various Surface Preservation Maintenance (Mekoryuk) (RE RW IM)

3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

8/21/1984

8/21/1984

8/21/1984

8/21/1984

8/21/1984

8/9/1993

9/19/2012

9/19/2013

2/5/1988 $129,021

2/5/1988 $103,401

2/5/1988 $951,084

2/5/1988 $22,458

2/5/1988 $83,123

9/25/1997 $104,669

$10,500

$400,000

$1,804,256

$0

$0

$0

$0

$0

$0

$0

$0

$0

$129,021

$103,401

$951,084

$22,458

$83,123

$104,669

$10,500

$400,000

$1,804,256

Metlakatla Metlakatla (MTM)

3-02-0369-001-1989 Rehabilitate Apron (RE AP IM)

3-02-0369-002-1995 Rehabilitate Runway 10 (RE RW IM)

3-02-0369-003-2004 Rehabilitate Seaplane Base (RE SB IM)

9/25/1989

4/17/1995

8/20/2004

4/13/1992

10/24/1998

7/5/2007

$399,877

$29,269

$252,867

$682,013

$0

$566,008

$0

$566,008

$399,877

$595,277

$252,867

$1,248,021

Minchumina Minchumina (MHM)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

3-02-0200-096-2014 [Various Grnt] Remove Obstructions (+08J) Various EDA/EAS Locations: Minchumina - Obstruction Removal _ Remove Brush/Trees along Runway and Apron and Approach Paths (SA OT OB)

8/30/2005

9/18/2014

6/9/2010 $145,000

$70,125

$215,125

$0

$0

$0

$145,000

$70,125

$215,125

Minto Minto Al Wright (51Z)

3-02-0336-001-1991 Conduct Airport Master Plan Study (PL PL MA)

3-02-0336-002-2007 Construct Snow Removal Equipment Building (ST BD SN)

Construct Apron (ST AP CO)

Construct Runway Plan-1 (ST RW CO)

3-02-0000-010-2008 Conduct aeronautical survey for WAAS approach LPV survey (PL PL VI)

3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment Acquire Northern SRE - Minto Grader (ST EQ SN)

9/5/1991

8/15/2007

8/15/2007

8/15/2007

6/13/2008

6/16/2008

9/15/2000 $118,126

1/28/2013 $600,000

1/28/2013 $1,200,000

1/28/2013 $0

5/20/2014 $50,000

5/21/2010 $375,000

$2,343,126

$0

$0

$0

$6,948,673

$130,000

$0

$7,078,673

$118,126

$600,000

$1,200,000

$6,948,673

$180,000

$375,000

$9,421,799

Monday, January 11, 2016 Page 77 of 124

Page 79: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Mountain Village Mountain Village (MOU)

3-02-0184-001-1987 Acquire Snow Removal Equipment (ST EQ SN)

Install Apron Lighting (ST AP LI)

Improve Access Road (OT GT AC)

Improve Access Road (OT GT AC)

Construct Apron (ST AP CO)

Construct Taxiway (ST TW CO)

Install Runway Lighting (ST RW LI)

Improve Snow Removal Equipment Building (ST BD SN)

Construct Runway 15/33 (ST RW CO)

3-02-0184-002-2004 Construct Runway Safety Area 02/20 (ST RW SF)

Extend Runway 02/20 (ST RW IM)

3-02-0000-007-2007 Conduct aeronautical survey for WAAS approach (PL PL VI)

3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Mountain Village Segmented Circle (ST OT IN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 02/20 Accomplish Various Airport Surface Preservation Maintenance (Mountain Village Compaction and Dust Control) (RE RW IM)

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/3/1987

9/1/2004

9/1/2004

8/28/2007

9/20/2015

9/21/2015

10/9/1991 $122,125

10/9/1991 $6,378

10/9/1991 $56,395

10/9/1991 $207,480

10/9/1991 $424,610

10/9/1991 $108,400

10/9/1991 $399,297

10/9/1991 $81,168

10/9/1991 $1,292,333

5/27/2008 $0

5/27/2008 $5,169,142

1/28/2013 $0

$129,257

$178,893

$8,175,478

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,398,292

$0

$147,000

$0

$0

$2,545,292

$122,125

$6,378

$56,395

$207,480

$424,610

$108,400

$399,297

$81,168

$1,292,333

$2,398,292

$5,169,142

$147,000

$129,257

$178,893

$10,720,770

Naknek Naknek (5NK)

3-02-0185-001-1993 Conduct Airport Master Plan Study (PL PL MA)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 08/26 (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 08/26 Naknek Various Surface Maintenance (RE RW IM)

9/14/1993

5/31/2007

6/19/2008

8/20/2009

3/12/2010

9/12/2002

8/6/2013

6/10/2014

12/19/2014

12/9/2015

$280,687

$42,560

$73,000

$6,384

$15,960

$418,591

$0

$0

$0

$0

$0

$0

$280,687

$42,560

$73,000

$6,384

$15,960

$418,591

Nanwalek Nanwalek (KEB)

3-02-0094-001-2005 Update Airport Master Plan Study (PL PL MA) 8/24/2005 8/17/2007 $94,970

$94,970

$0

$0

$94,970

$94,970

Napakiak Napakiak (WNA)

3-02-0188-001-1998 Rehabilitate Runway 16-34 (RE RW IM)

Install Perimeter Fencing (ST EQ SE)

Improve Snow Removal Equipment Building (ST BD SN)

5/28/1998

5/28/1998

5/28/1998

9/27/2002

9/27/2002

9/27/2002

$317,575

$75,000

$250,000

$1,700,000

$0

$0

$2,017,575

$75,000

$250,000

Monday, January 11, 2016 Page 78 of 124

Page 80: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0188-001-1998 5/28/1998 9/27/2002 Extend Runway 16-34 (ST RW IM) $454,975 $300,000 $754,975

3-02-0188-002-2003 8/5/2003 8/17/2007 Construct Snow Removal Equipment Building (ST BD SN)

$668,486 $0 $668,486

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

$166,726 $0 $166,726

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

$10,640 $0 $10,640

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$20,625 $0 $20,625

$1,964,027 $2,000,000 $3,964,027

Napaskiak Napaskiak (PKA)

3-02-0189-001-1991 9/5/1991 10/13/1994 Acquire Land for Development (ST LA DV) $109,709 $0 $109,709

3-02-0189-002-1991 8/27/1991 9/19/1995 Construct Apron (ST AP CO) $217,845 $0 $217,845

8/27/1991 9/19/1995 Improve Access Road (OT GT AC) $53,566 $0 $53,566

8/27/1991 9/19/1995 Improve Snow Removal Equipment Building (ST BD SN)

$128,390 $0 $128,390

8/27/1991 9/19/1995 Rehabilitate Runway 1/19 (RE RW IM) $1,186,606 $0 $1,186,606

8/27/1991 9/19/1995 Install Runway Lighting (ST RW LI) $229,176 $0 $229,176

8/27/1991 9/19/1995 Construct Taxiway (ST TW CO) $26,156 $0 $26,156

8/27/1991 9/19/1995 Acquire Snow Removal Equipment (ST EQ SN) $125,104 $0 $125,104

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$90,000 $0 $90,000

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$168,720 $0 $168,720

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$10,640 $0 $10,640

3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Napaskiak) (SA OT OB)

$10,500 $0 $10,500

$2,356,412 $0 $2,356,412

Nelson Lagoon Nelson Lagoon (OUL)

3-02-0190-001-1996 9/20/1996 9/21/2000 Rehabilitate Runway 08/26 (RE RW IM) $1,875,000 $0 $1,875,000

9/20/1996 9/21/2000 Expand Apron (CA AP EX) $236,763 $0 $236,763

9/20/1996 9/21/2000 Rehabilitate Runway Lighting (RE RW LI) $131,250 $0 $131,250

9/20/1996 9/21/2000 Improve Snow Removal Equipment Building (ST BD SN)

$187,500 $0 $187,500

9/20/1996 9/21/2000 Improve Access Road (OT GT AC) $103,125 $0 $103,125

9/20/1996 9/21/2000 Acquire Land for Development (ST LA DV) $137,691 $0 $137,691

9/20/1996 9/21/2000 Rehabilitate Taxiway (RE TW IM) $64,059 $0 $64,059

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 08/26 (Maintenance) (RE RW IM)

$6,000 $0 $6,000

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 08/26 (+08J) Various Surface Preservation Maintenance: Nelson Lagoon - RWY/RSA Grading (RE RW IM)

$42,000 $0 $42,000

$2,783,388 $0 $2,783,388

Monday, January 11, 2016 Page 79 of 124

Page 81: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Nenana Nenana Municipal (ENN)

3-02-0191-001-1982 Construct Runway 03/21 (ST RW CO) 9/28/1982 5/19/1986 $136,129 $31,464 $167,593

Improve Airport Drainage (ST OT IM) 9/28/1982 5/19/1986 $190,762 $0 $190,762

Construct Taxiway (ST TW CO) 9/28/1982 5/19/1986 $45,938 $0 $45,938

Expand Apron (CA AP EX) 9/28/1982 5/19/1986 $207,281 $0 $207,281

3-02-0191-002-1983 Extend Runway 3/21 (ST RW IM) 9/28/1983 7/21/1986 $44,623 $0 $44,623

Construct Runway 3/21 (ST RW CO) 9/28/1983 7/21/1986 $915,237 $0 $915,237

Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 7/21/1986 $27,889 $0 $27,889 Equipment (ST EQ MS)

Acquire Aircraft Rescue & Fire Fighting Safety 9/28/1983 7/21/1986 $5,578 $0 $5,578 Equipment (ST EQ MS)

Acquire Land for Development 3/21 (ST LA DV) 9/28/1983 7/21/1986 $69,722 $0 $69,722

Improve Service Road (OT GT SV) 9/28/1983 7/21/1986 $146,693 $0 $146,693

3-02-0191-003-1985 Acquire Aircraft Rescue & Fire Fighting Safety 9/23/1985 12/10/1990 $118,026 $0 $118,026 Equipment (ST EQ MS)

Improve Airport Drainage (ST OT IM) 9/23/1985 12/10/1990 $97,393 $0 $97,393

Install Apron Lighting (ST AP LI) 9/23/1985 12/10/1990 $56,053 $0 $56,053

3-02-0191-004-1986 Extend Runway 3/21 (ST RW IM) 9/24/1986 5/23/1990 $1,970,602 $10,353 $1,980,955

Acquire Snow Removal Equipment (ST EQ SN) 9/24/1986 5/23/1990 $22,523 $0 $22,523

3-02-0191-005-1987 Install Runway Lighting (ST RW LI) 9/22/1987 12/17/1990 $36,254 $0 $36,254

Acquire Snow Removal Equipment (ST EQ SN) 9/22/1987 12/17/1990 $180,258 $0 $180,258

Expand Apron (ST AP IM) 9/22/1987 12/17/1990 $137,370 $0 $137,370

Rehabilitate Apron (RE AP IM) 9/22/1987 12/17/1990 $129,326 $0 $129,326

Rehabilitate Runway 3L/21R (RE RW IM) 9/22/1987 12/17/1990 $352,802 $0 $352,802

Rehabilitate Taxiway (RE TW IM) 9/22/1987 12/17/1990 $37,872 $0 $37,872

Rehabilitate Taxiway (RE TW IM) 9/22/1987 12/17/1990 $64,825 $0 $64,825

Improve Airport Drainage (ST OT IM) 9/22/1987 12/17/1990 $4,546 $0 $4,546

3-02-0191-006-1992 Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 10/16/1996 $126,562 $0 $126,562

Install Runway Lighting (ST RW LI) 9/24/1992 10/16/1996 $66,408 $0 $66,408

Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $164,658 $0 $164,658

Rehabilitate Runway 03/21 (RE RW IM) 9/24/1992 10/16/1996 $69,502 $0 $69,502

Install Runway Lighting (ST RW LI) 9/24/1992 10/16/1996 $112,768 $0 $112,768

Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $127,067 $0 $127,067

Acquire Security Equipment (SA EQ SE) 9/24/1992 10/16/1996 $0 $0 $0

3-02-0191-007-2000 Rehabilitate Runway 4L/22R (RE RW IM) 9/6/2000 8/23/2004 $336,603 $0 $336,603

3-02-0191-008-2003 Acquire Snow Removal Equipment (ST EQ SN) 6/27/2003 5/17/2005 $386,368 $0 $386,368

3-02-0191-009-2003 Improve Runway Safety Area 3L-21R (ST RW SF) 7/9/2003 5/30/2006 $750,000 $0 $750,000

Rehabilitate Runway 3L-21R (RE RW IM) 7/9/2003 5/30/2006 $2,831,993 $537,298 $3,369,291

3-02-0191-010-2004 Construct Snow Removal Equipment Building (ST BD 8/28/2004 5/10/2006 $839,629 $78,120 $917,749 SN)

3-02-0191-011-2005 Acquire Snow Removal Equipment (ST EQ SN) 6/14/2005 3/12/2007 $191,546 $0 $191,546

3-02-0191-012-2007 Acquire Snow Removal Equipment (ST EQ SN) 6/13/2007 6/17/2008 $245,500 $8,205 $253,705

3-02-0191-013-2007 Install Perimeter Fencing (Design) (ST EQ SE) 8/28/2007 12/20/2012 $25,000 $0 $25,000

Rehabilitate Runway 04L/22R (Design) (RE RW IM) 8/28/2007 12/20/2012 $33,074 $0 $33,074

3-02-0191-014-2010 Rehabilitate Runway 04L/22R (Construction) (RE RW IM) 7/1/2010 6/21/2011 $634,702 $0 $634,702

Acquire Safety Equipment and/or Fencing Perimeter 7/1/2010 6/21/2011 $736,900 $0 $736,900 Fencing (SA EQ RF)

Monday, January 11, 2016 Page 80 of 124

Page 82: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0191-015-2012 9/19/2012 6/25/2013 Construct Fuel Farm Replace Fuel Tank with Fuel Depot (OT OT FF)

$153,558 $0 $153,558

$12,829,539 $665,440 $13,494,979

New Stuyahok New Stuyahok (KNW)

3-02-0436-001-2002 9/27/2002 5/1/2006 Construct New Airport (ST NA CO) $1,725,053 $0 $1,725,053

3-02-0436-002-2004 5/24/2004 9/23/2008 Construct New Airport (ST NA CO) $6,878,950 $336,129 $7,215,079

3-02-0436-003-2006 4/5/2006 2/4/2014 Construct New Airport Phase 3 (ST NA CO) $4,487,450 $146,738 $4,634,188

4/5/2006 2/4/2014 Construct Snow Removal Equipment Building (ST BD SN)

$908,848 $0 $908,848

3-02-0200-061-2007 7/25/2007 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Loader/Boss with Attachments (ST EQ SN)

$314,025 $0 $314,025

3-02-0200-100-2015 9/16/2015 [Various Grnt] Conduct Aeronautical Survey for RNAV Approach (PL PL VI)

$378,000 $0 $378,000

$14,692,326 $482,867 $15,175,193

Newtok Newtok (EWU)

3-02-0194-001-1994 9/27/1994 8/3/2000 Acquire Land for Development (ST LA DV) $140,625 $0 $140,625

9/27/1994 8/3/2000 Improve Access Road (OT GT AC) $62,813 $0 $62,813

9/27/1994 8/3/2000 Improve Snow Removal Equipment Building (ST BD SN)

$249,957 $0 $249,957

9/27/1994 8/3/2000 Acquire Snow Removal Equipment (ST EQ SN) $149,250 $0 $149,250

9/27/1994 8/3/2000 Extend Runway 15/33 (ST RW IM) $579,844 $0 $579,844

9/27/1994 8/3/2000 Rehabilitate Runway 15/33 (RE RW IM) $1,388,079 $0 $1,388,079

9/27/1994 8/3/2000 Construct Apron (ST AP CO) $108,703 $0 $108,703

3-02-0194-002-2004 8/27/2004 9/19/2008 Conduct Airport Master Plan Study (PL PL MA) $90,001 $0 $90,001

3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Motor Grader & Dozer) (ST EQ SN)

$213,539 $0 $213,539

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 15/33 (Maintenance) (RE RW IM)

$10,000 $0 $10,000

3-02-0194-003-2006 9/5/2006 2/27/2012 Conduct Airport Master Plan Study (Collection of Wind Data) (PL PL MA)

$97,792 $0 $97,792

3-02-0000-008-2007 9/4/2007 3/21/2012 Conduct Miscellaneous Study Conduct Geotechnical Investigation (PL PL MS)

$306,716 $0 $306,716

3-02-0194-004-2009 8/10/2009 2/24/2015 Conduct Airport Master Plan Study Conduct phase 4 of AMP for additional geotechnical, environmental data gathering, scoping and ALP. (PL PL MA)

$356,195 $0 $356,195

$3,753,514 $0 $3,753,514

Nightmute Nightmute (IGT)

3-02-0195-001-2007 9/5/2007 2/5/2014 Extend Runway 02/20 (ST RW IM) $11,809,074 $403,015 $12,212,089

9/5/2007 2/5/2014 Construct Snow Removal Equipment Building (ST BD SN)

$1,469,103 $0 $1,469,103

9/5/2007 2/5/2014 Expand Apron (ST AP IM) $1,835,126 $0 $1,835,126

3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: IGT--Grader w/ attachments (ST EQ SN)

$328,917 $0 $328,917

Monday, January 11, 2016 Page 81 of 124

Page 83: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 03/21 Various Surface Preservation Maintenance (Nightmute) (RE RW IM)

9/19/2012 $10,500

$15,452,720

$0

$403,015

$10,500

$15,855,735

Nikolai Nikolai (FSP)

3-02-0357-001-2001 Improve Snow Removal Equipment Building (ST BD SN)

Extend Runway (ST RW IM)

Rehabilitate Runway (RE RW IM)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 04/22 Various Surface Preservation (RE RW IM)

6/28/2001

6/28/2001

6/28/2001

9/16/2011

8/26/2005 $250,000

8/26/2005 $2,000,000

8/26/2005 $0

$26,600

$2,276,600

$0

$0

$1,893,737

$0

$1,893,737

$250,000

$2,000,000

$1,893,737

$26,600

$4,170,337

Noatak Noatak (WTK)

3-02-0198-001-1986 Rehabilitate Runway 18/36 (RE RW IM)

Construct Taxiway (ST TW CO)

Construct Apron (ST AP CO)

Install Runway Lighting (ST RW LI)

Improve Access Road (OT GT AC)

3-02-0198-002-1992 Improve Snow Removal Equipment Building (ST BD SN)

Extend Runway 18/36 (ST RW IM)

Expand Apron (ST AP IM)

Install Runway Lighting (ST RW LI)

Acquire Snow Removal Equipment (ST EQ SN)

3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE Northern Region (Noatak Loader Bucket) (ST EQ SN)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 01/19 Noatak Various Surface Maintenance (RE RW IM)

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Noatak) (SA OT OB)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 01/19 Accomplish Various Airport Surface Preservation Maintenance (Noatak Compaction and Dust Control) (RE RW IM)

8/25/1986

8/25/1986

8/25/1986

8/25/1986

8/25/1986

9/24/1992

9/24/1992

9/24/1992

9/24/1992

9/24/1992

2/24/2009

3/12/2010

9/18/2013

9/21/2015

1/25/1991 $1,326,603

1/25/1991 $47,655

1/25/1991 $343,974

1/25/1991 $230,084

1/25/1991 $22,000

1/14/2000 $342,689

1/14/2000 $1,877,006

1/14/2000 $96,295

1/14/2000 $101,935

1/14/2000 $53,077

5/16/2010 $23,431

12/9/2015 $186,200

$20,600

$235,766

$4,907,315

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,326,603

$47,655

$343,974

$230,084

$22,000

$342,689

$1,877,006

$96,295

$101,935

$53,077

$23,431

$186,200

$20,600

$235,766

$4,907,315

Nome Nome (OME)

3-02-0199-001-1984 Rehabilitate Runway 927-220 (RE RW IM)

Extend Runway 927-220 (ST RW IM)

Groove Runway 927-220 (SP RW FR)

3-02-0199-002-1986 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

3-02-0199-003-1986 Acquire Land for Development (ST LA DV)

3-02-0199-004-1988 Install Runway Lighting (ST RW LI)

Construct Apron (CA AP CO)

8/13/1984

8/13/1984

8/13/1984

7/17/1986

9/9/1986

9/26/1988

9/26/1988

4/19/1991 $1,348,294

4/19/1991 $335,135

4/19/1991 $350,102

11/20/1991 $157,934

4/23/1991 $132,999

9/29/1994 $109,000

9/29/1994 $153,000

$0

$0

$0

$82,274

$157,462

$0

$0

$1,348,294

$335,135

$350,102

$240,208

$290,461

$109,000

$153,000

Monday, January 11, 2016 Page 82 of 124

Page 84: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0199-004-1988 Improve Airport Drainage (ST OT IM) 9/26/1988 9/29/1994 $2,287,196 $0 $2,287,196

Improve Access Road (CA GT AC) 9/26/1988 9/29/1994 $139,000 $0 $139,000

Install Apron Lighting (ST AP LI) 9/26/1988 9/29/1994 $28,000 $0 $28,000

Rehabilitate Taxiway Lighting (RE TW LI) 9/26/1988 9/29/1994 $53,000 $0 $53,000

Rehabilitate Runway 2/20 (RE RW IM) 9/26/1988 9/29/1994 $3,119,000 $949,829 $4,068,829

Improve Runway Safety Area 2/20 (ST RW SF) 9/26/1988 9/29/1994 $17,000 $0 $17,000

Groove Runway 2/20 (SP RW FR) 9/26/1988 9/29/1994 $137,000 $0 $137,000

Rehabilitate Taxiway (RE TW IM) 9/26/1988 9/29/1994 $290,000 $0 $290,000

3-02-0199-005-1991 Install Apron Lighting (ST AP LI) 8/23/1991 9/30/2002 $29,970 $0 $29,970

Install Miscellaneous NAVAIDS (SP OT IN) 8/23/1991 9/30/2002 $0 $202,500 $202,500

Install Runway Lighting (SA RW LI) 8/23/1991 9/30/2002 $223,272 $17,500 $240,772

Rehabilitate Runway 9/27 (RE RW IM) 8/23/1991 9/30/2002 $7,804,350 $304,835 $8,109,185

Construct Taxiway (ST TW CO) 8/23/1991 9/30/2002 $24,908 $0 $24,908

3-02-0199-006-1992 Conduct Airport Master Plan Study (PL PL MA) 9/10/1992 9/9/1997 $279,968 $0 $279,968

3-02-0199-007-1993 Acquire Land for Development (ST LA DV) 9/9/1993 8/22/2000 $0 $337,500 $337,500

Install Runway Lighting (SA RW LI) 9/9/1993 8/22/2000 $0 $63,558 $63,558

Extend Runway RW 9/27 (ST RW IM) 9/9/1993 8/22/2000 $42,841 $1,654,424 $1,697,265

Extend Runway RW 9/27 (ST RW IM) 9/9/1993 8/22/2000 $0 $526,996 $526,996

3-02-0199-008-1994 Extend Runway 09/27 (ST RW IM) 6/21/1994 9/27/1999 $2,880,101 $0 $2,880,101

Install Runway Lighting (SA RW LI) 6/21/1994 9/27/1999 $89,580 $0 $89,580

3-02-0199-009-1997 Rehabilitate Taxiway (RE TW IM) 12/17/1997 9/17/2001 $234,934 $118,834 $353,768

Rehabilitate Apron (RE AP IM) 12/17/1997 9/17/2001 $1,392,968 $0 $1,392,968

3-02-0199-010-1999 Improve Runway Safety Area 9-27 (SA RW SF) 8/4/1999 9/12/2002 $712,960 $0 $712,960

Remove Obstructions 9-27 (SA OT OB) 8/4/1999 9/12/2002 $50,000 $0 $50,000

Rehabilitate Runway 9-27 (RE RW IM) 8/4/1999 9/12/2002 $199,345 $1,043,906 $1,243,251

3-02-0199-011-1999 Rehabilitate Runway 09-27 (RE RW IM) 9/29/1999 9/12/2002 $0 $1,150,164 $1,150,164

3-02-0199-012-2001 Rehabilitate Runway (RE RW IM) 9/24/2001 3/9/2007 $6,138,502 $0 $6,138,502

Improve Runway Safety Area (SA RW SF) 9/24/2001 3/9/2007 $740,000 $1,945,269 $2,685,269

Update Miscellaneous Study (PL PL MS) 9/24/2001 3/9/2007 $829,478 $0 $829,478

3-02-0199-013-2005 Construct Aircraft Rescue & Fire Fighting Building 8/29/2005 3/23/2010 $0 $4,571,409 $4,571,409 (Phase 1) (SA BD EX)

Construct Snow Removal Equipment Building (Phase 1) 8/29/2005 3/23/2010 $5,350,000 $0 $5,350,000 (ST BD SN)

3-02-0199-014-2006 Construct Aircraft Rescue & Fire Fighting Building 7/25/2006 9/15/2011 $87,396 $741,850 $829,246 (Phase 2) (SA BD EX)

Construct Snow Removal Equipment Building (Phase 2) 7/25/2006 9/15/2011 $740,594 $0 $740,594 (ST BD SN)

3-02-0199-015-2006 Remove Obstructions (Utility Pole Removal) (SA OT 9/1/2006 2/27/2012 $1,000,000 $0 $1,000,000 OB)

Rehabilitate Runway 03/21 (Phase 1) (RE RW IM) 9/1/2006 2/27/2012 $499,784 $0 $499,784

Rehabilitate Runway 10/28 (RE RW IM) 9/1/2006 2/27/2012 $4,586,613 $0 $4,586,613

3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $32,064 $0 $32,064 (Acquire Sander Attachment) (ST EQ SN)

3-02-0199-016-2007 Rehabilitate Runway 10/28 (Phase 2) (RE RW IM) 8/23/2007 6/3/2011 $1,200,000 $89,097 $1,289,097

Rehabilitate Runway 03/21 (Phase 2) (RE RW IM) 8/23/2007 6/3/2011 $6,364,064 $0 $6,364,064

3-02-0199-017-2007 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 8/22/2007 5/4/2010 $0 $927,524 $927,524 3000-Gallon ARFF Vehicle (SA EQ RF)

3-02-0199-018-2007 Update Airport Master Plan Study (PL PL MA) 8/28/2007 4/11/2012 $491,889 $0 $491,889

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway (Maintenance) (RE 5/31/2007 8/6/2013 $120,240 $0 $120,240 RW IM)

Monday, January 11, 2016 Page 83 of 124

Page 85: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0199-019-2010 Update Airport Master Plan Study Update MP-Ph2 (PL 8/17/2010 9/2/2014 $85,067 $0 $85,067 PL MA)

3-02-0199-020-2010 Collect airport data for Airports Geographic Information 7/19/2010 5/14/2015 $0 $334,927 $334,927 System (PL PL GI)

3-02-0200-074-2010 [Various Grnt] Acquire Snow Removal Equipment 7/7/2010 2/25/2013 $770,415 $0 $770,415 Acquire SRE (Northern Region): Nome Blower & Broom (ST EQ SN)

3-02-0199-021-2012 Rehabilitate Runway 10/28 (RE RW IM) 6/15/2012 $2,070,351 $0 $2,070,351

3-02-0199-022-2013 Construct Runway Safety Area 10/28 Construct Runway 9/19/2013 $2,781,395 $13,000,000 $15,781,395 Safety Area (includes ROW) (SA RW SF)

Construct Runway Safety Area 03/21 Construct Runway 9/19/2013 $1,000,000 $24,000,000 $25,000,000 Safety Area (EMAS SRE and grip tester equip.) (SA RW SF)

3-02-0199-023-2013 Rehabilitate Apron (RE AP IM) 9/24/2013 $3,237,337 $0 $3,237,337

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $28,662 $0 $28,662 Obstruction Removal (Nome) (SA OT OB)

3-02-0200-092-2013 [Various Grnt] Wildlife Hazard Assessments (PL PL 9/19/2013 $93,750 $0 $93,750 WH)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $178,236 $0 $178,236 Acquire SRE (Blower) (ST EQ SN)

3-02-0199-024-2014 Rehabilitate Taxiway Taxiway E&F (RE TW IM) 6/23/2014 $2,795,636 $0 $2,795,636

Rehabilitate Apron Rehabilitatet N and S apron (RE AP 6/23/2014 $2,000,000 $0 $2,000,000 IM)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $1,061,632 $0 $1,061,632 Acquire Various SRE (Nome Tug with Gradeling Broom, and Grader) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 03/21 Accomplish 9/21/2015 $68,248 $0 $68,248 Various Airport Surface Preservation Maintenance (Nome RWYs and TWYs Marking) (RE RW IM)

Nondalton Nondalton (5NN)

3-02-0432-001-1992 Construct Taxiway (ST TW CO)

Acquire Land for Development (ST LA DV)

Improve Access Road (OT GT AC)

Improve Snow Removal Equipment Building (ST BD SN)

Construct Apron (ST AP CO)

Rehabilitate Runway 02/20 (RE RW IM)

Acquire Snow Removal Equipment (ST EQ SN)

3-02-0432-002-2003 Construct Snow Removal Equipment Building (ST BD SN)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 02/20 (Various Surface Maintenance) (RE RW IM)

Monday, January 11, 2016

9/29/1992

9/29/1992

9/29/1992

9/29/1992

9/29/1992

9/29/1992

9/29/1992

8/4/2003

8/30/2005

6/19/2008

8/20/2009

6/17/1999

6/17/1999

6/17/1999

6/17/1999

6/17/1999

6/17/1999

6/17/1999

8/17/2007

6/9/2010

6/10/2014

12/19/2014

$66,973,209

$584,273

$219,283

$549,568

$147,188

$573,697

$1,821,369

$131,250

$664,589

$10,000

$0

$159,600

$52,323,282 $119,296,491

$0 $584,273

$0 $219,283

$0 $549,568

$0 $147,188

$0 $573,697

$0 $1,821,369

$0 $131,250

$0 $664,589

$0 $10,000

$0 $0

$0 $159,600

Page 84 of 124

Page 86: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $360,365 $0 $360,365 Acquire Various SRE: Nondalton (Grader with attachments) (ST EQ SN)

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $26,300 $0 $26,300 Obstruction Removal (Nondalton) (SA OT OB)

$5,247,482 $0 $5,247,482

Noorvik Robert /Bob/ Curtis Memorial (D76)

3-02-0201-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/22/1991 10/24/1998 $241,371 $0 $241,371

3-02-0201-002-1997 Improve Access Road (OT GT AC) 9/29/1997 9/10/2003 $225,000 $0 $225,000

Acquire Land for Development (ST LA DV) 9/29/1997 9/10/2003 $220,000 $0 $220,000

Construct Apron (ST AP CO) 9/29/1997 9/10/2003 $341,952 $0 $341,952

Acquire Land For Approaches (ST LA SZ) 9/29/1997 9/10/2003 $80,000 $0 $80,000

Construct Runway 6-24 (ST RW CO) 9/29/1997 9/10/2003 $1,000,000 $1,051,638 $2,051,638

Construct Taxiway (ST TW CO) 9/29/1997 9/10/2003 $150,000 $0 $150,000

3-02-0201-003-1998 Construct Runway 02-20 (ST RW CO) 3/24/1998 9/10/2003 $151,000 $1,957,952 $2,108,952

Install Runway Lighting (ST RW LI) 3/24/1998 9/10/2003 $250,000 $0 $250,000

Improve Snow Removal Equipment Building (ST BD 3/24/1998 9/10/2003 $125,000 $0 $125,000 SN)

3-02-0201-004-2001 Construct New Airport (ST NA CO) 3/16/2001 9/12/2003 $1,180,885 $40,034 $1,220,919

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 06/24 Noorvik 3/12/2010 12/9/2015 $218,120 $0 $218,120 Various Surface Maintenance (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 06/24 Accomplish 9/21/2015 $215,085 $0 $215,085 Various Airport Surface Preservation Maintenance (Noorvik Compaction and Dust Control) (RE RW IM)

$4,398,413 $3,049,623 $7,448,036

North Pole Bradley Sky-Ranch (95Z)

3-02-0803-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/18/2001 8/3/2004 $445,312 $0 $445,312

$445,312 $0 $445,312

North Whale Pass North Whale (96Z)

3-02-0415-001-1991 Improve Airport Drainage (ST OT IM) 9/20/1991 9/25/1997 $527,700 $9,942 $537,642

$527,700 $9,942 $537,642

Northway Northway (ORT)

3-02-0200-068-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 5/16/2010 $212,069 $0 $212,069 Acquire SRE Northern Region (Northway Front End Loader) (ST EQ SN)

PL VI) 3-02-0000-013-2010 Conduct aeronautical survey for WAAS approach (PL 3/30/2010 $0 $250,000 $250,000

$212,069 $250,000 $462,069

Monday, January 11, 2016 Page 85 of 124

Page 87: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Nuiqsut Nuiqsut (AQT)

3-02-0366-001-2000 9/26/2000 9/10/2003 Improve Runway Safety Area ? (ST RW SF) $0 $1,086,242 $1,086,242

3-02-0200-064-2008 6/18/2008 10/27/2014 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$89,000 $110,000 $199,000

3-02-0200-076-2010 9/13/2010 [Various Grnt] Conduct aeronautical survey for WAAS approach Conduct Aeronautical Survey, Phase II (PL PL VI)

$50,000 $0 $50,000

$139,000 $1,196,242 $1,335,242

Nulato Nulato (NUL)

3-02-0204-001-1990 9/26/1990 9/25/1997 Install Runway Lighting (ST RW LI) $116,250 $0 $116,250

9/26/1990 9/25/1997 Construct Runway 2/20 (ST RW CO) $1,893,061 $134,353 $2,027,414

9/26/1990 9/25/1997 Construct Apron (ST AP CO) $184,747 $0 $184,747

9/26/1990 9/25/1997 Acquire Snow Removal Equipment (ST EQ SN) $84,475 $0 $84,475

9/26/1990 9/25/1997 Acquire Land for Development (ST LA DV) $168,750 $0 $168,750

9/26/1990 9/25/1997 Improve Access Road (OT GT AC) $196,151 $0 $196,151

3-02-0204-002-1996 9/27/1996 8/14/2000 Improve Snow Removal Equipment Building (ST BD SN)

$148,850 $0 $148,850

9/27/1996 8/14/2000 Rehabilitate Apron (RE AP IM) $100,221 $0 $100,221

9/27/1996 8/14/2000 Rehabilitate Runway 2/20 (RE RW IM) $871,893 $2,106 $873,999

9/27/1996 8/14/2000 Rehabilitate Taxiway (RE TW IM) $31,566 $0 $31,566

3-02-0204-003-1997 1/29/1997 8/23/2000 Improve Access Road (OT GT AC) $68,430 $0 $68,430

1/29/1997 8/23/2000 Rehabilitate Taxiway Lighting (RE TW LI) $71,655 $0 $71,655

1/29/1997 8/23/2000 Install Runway Lighting (ST RW LI) $44,784 $0 $44,784

1/29/1997 8/23/2000 Rehabilitate Runway Lighting 2/20 (RE RW LI) $100,179 $0 $100,179

1/29/1997 8/23/2000 Extend Runway 2/20 (ST RW IM) $422,302 $0 $422,302

1/29/1997 8/23/2000 Expand Apron (CA AP EX) $64,475 $0 $64,475

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$160,000 $0 $160,000

3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Nulato Grader w/ Plow (ST EQ SN)

$342,000 $0 $342,000

3-02-0204-004-2010 3/15/2010 Construct Snow Removal Equipment Building (ST BD SN)

$1,230,000 $0 $1,230,000

3/15/2010 Rehabilitate Runway 02/20 Phase 1 (RE RW IM) $4,100,000 $39,553 $4,139,553

3/15/2010 Rehabilitate Access Road (OT GT AC) $1,230,000 $0 $1,230,000

3/15/2010 Rehabilitate Apron (RE AP IM) $1,640,000 $0 $1,640,000

$13,269,789 $176,012 $13,445,801

Nunapitchuk Nunapitchuk (16A)

3-02-0446-001-2007 8/28/2007 5/28/2014 Extend Runway 18/36 (ST RW IM) $13,072,630 $0 $13,072,630

8/28/2007 5/28/2014 Construct Snow Removal Equipment Building (ST BD SN)

$1,250,000 $0 $1,250,000

3-02-0200-065-2008 6/16/2008 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: 16A--Loader w/ attachments (ST EQ SN)

$379,833 $0 $379,833

Monday, January 11, 2016 Page 86 of 124

Page 88: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (Nunapitchuk) (RE RW IM)

$10,500 $0 $10,500

$14,712,963 $0 $14,712,963

Old Harbor Old Harbor (6R7)

3-02-0421-001-1992 9/21/1992 11/28/1994 Improve Snow Removal Equipment Building (ST BD SN)

$75,839 $0 $75,839

9/21/1992 11/28/1994 Improve Access Road (OT GT AC) $91,790 $0 $91,790

9/21/1992 11/28/1994 Acquire Snow Removal Equipment (ST EQ SN) $215,383 $0 $215,383

9/21/1992 11/28/1994 Construct Taxiway (ST TW CO) $16,214 $0 $16,214

9/21/1992 11/28/1994 Construct Apron (ST AP CO) $524,282 $0 $524,282

9/21/1992 11/28/1994 Construct Runway RW02/20 (ST RW CO) $3,063,633 $0 $3,063,633

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) (RE RW IM)

$16,872 $0 $16,872

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 03/21 (Various Surface Maintenance) (RE RW IM)

$159,600 $0 $159,600

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 03/21 Old Harbor Various Surface Maintenance (RE RW IM)

$159,600 $0 $159,600

3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Old Harbor) (SA OT OB)

$31,500 $0 $31,500

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 03/21 Surface Preservation Maintenance (Old Harbor) (RE RW IM)

$134,000 $0 $134,000

$4,488,713 $0 $4,488,713

Ouzinkie Ouzinkie (4K5)

3-02-0210-001-1999 5/20/1999 9/13/2002 Conduct Airport Master Plan Study (PL PL MA) $71,456 $0 $71,456

3-02-0210-002-2000 8/4/2000 8/25/2004 Conduct Airport Master Plan Study (PL PL MA) $204,385 $0 $204,385

3-02-0210-003-2001 8/30/2001 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $217,168 $0 $217,168

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)

$18,981 $0 $18,981

3-02-0200-061-2007 7/25/2007 2/5/2014 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader w/ Attachments (ST EQ SN)

$230,000 $0 $230,000

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) (RE RW IM)

$27,700 $0 $27,700

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 11/29 (Various Surface Maintenance) (RE RW IM)

$31,920 $0 $31,920

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader w/ Attachments (ST EQ SN)

$352,036 $0 $352,036

3-02-0480-001-2009 6/11/2009 8/22/2013 Construct New Airport Phase 1 (To include SREB) (ARRA funded) (ST NA CO)

$0 $0 $0

3-02-0480-002-2011 6/8/2011 Construct New Airport Construct new airport-ph2 Utilities, SREB, MIRL (ST NA CO)

$2,433,682 $0 $2,433,682

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 08/26 Surface Preservation Maintenance (Ouzinkie) (RE RW IM)

$78,800 $0 $78,800

$3,666,128 $0 $3,666,128

Monday, January 11, 2016 Page 87 of 124

Page 89: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Palmer Matanuska-Susitna Borough Planning (@01O)

3-02-0469-001-2006 Conduct Metropolitan System Plan Study (PL PL ME) 2/24/2006 6/6/2011 $625,796 $0 $625,796

3-02-0469-003-2014 Conduct Metropolitan System Plan Study Conduct 9/17/2014 $437,000 $0 $437,000 Regional Aviation System Plan (Phase 2) (PL PL ME)

$1,062,796 $0 $1,062,796

Palmer Municipal (PAQ)

3-02-0211-001-1986 Acquire Land for Development (ST LA DV) 9/25/1986 9/21/2000 $746,049 $0 $746,049

3-02-0211-002-1990 Acquire Snow Removal Equipment (ST EQ SN) 9/25/1990 2/28/1991 $114,998 $0 $114,998

3-02-0211-003-1992 Improve Snow Removal Equipment Building (ST BD 9/24/1992 5/4/1995 $258,750 $0 $258,750 SN)

3-02-0211-004-1994 Rehabilitate Apron (RE AP IM) 6/22/1994 1/10/1996 $315,000 $0 $315,000

Rehabilitate Taxiway (RE TW IM) 6/22/1994 1/10/1996 $396,419 $0 $396,419

3-02-0211-005-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/27/1995 7/26/1996 $244,265 $0 $244,265

3-02-0211-006-1996 Conduct Airport Master Plan Study (PL PL MA) 9/20/1996 9/24/2001 $265,216 $0 $265,216

3-02-0211-007-2001 Construct Runway (ST RW CO) 9/27/2001 8/25/2005 $0 $43,000 $43,000

Improve Runway Safety Area (ST RW SF) 9/27/2001 8/25/2005 $0 $40,000 $40,000

Acquire Snow Removal Equipment (ST EQ SN) 9/27/2001 8/25/2005 $0 $10,000 $10,000

Extend Runway (ST RW IM) 9/27/2001 8/25/2005 $150,000 $138,964 $288,964

Construct Taxiway (ST TW CO) 9/27/2001 8/25/2005 $0 $137,000 $137,000

3-02-0211-008-2002 Construct Taxiway Phase 2 (ST TW CO) 5/15/2002 4/22/2005 $1,788,382 $0 $1,788,382

Improve Runway Safety Area 16 Phase 2 (SA RW SF) 5/15/2002 4/22/2005 $70,000 $0 $70,000

Construct Runway Phase 2 (ST RW CO) 5/15/2002 4/22/2005 $175,000 $0 $175,000

3-02-0211-009-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/15/2003 8/28/2006 $147,172 $0 $147,172

3-02-0211-010-2004 Expand Apron (ST AP IM) 5/25/2004 9/5/2006 $850,000 $71,981 $921,981

Construct Taxiway (ST TW CO) 5/25/2004 9/5/2006 $127,029 $450,000 $577,029

Construct Access Road (OT GT AC) 5/25/2004 9/5/2006 $230,000 $0 $230,000

Install Perimeter Fencing (ST EQ SE) 5/25/2004 9/5/2006 $111,698 $98,302 $210,000

3-02-0211-011-2004 Acquire Land For Approaches Phase 1 (Lot 2 Willow 8/26/2004 8/29/2006 $259,002 $0 $259,002 Point Subdivision (2.45 AC), Lots 8, 9, 10, 11, Block 1 Rempel Subdivision) (ST LA SZ)

3-02-0211-012-2005 Acquire Land For Approaches (ST LA SZ) 8/30/2005 4/14/2008 $50,000 $0 $50,000

Acquire Snow Removal Equipment (Motor grader) (ST 8/30/2005 4/14/2008 $188,021 $0 $188,021 EQ SN)

Rehabilitate Runway 09/27 Phase 1 (Design) (RE RW 8/30/2005 4/14/2008 $164,969 $20,000 $184,969 IM)

Rehabilitate Runway Lighting 16/34 (Design) (RE RW LI) 8/30/2005 4/14/2008 $35,000 $28,123 $63,123

3-02-0211-013-2006 Rehabilitate Taxiway rehab. twy B, interlinks & lighting 5/11/2006 3/5/2012 $1,100,000 $0 $1,100,000 (RE TW IM)

Install Runway Vertical/Visual Guidance System 16/34 5/11/2006 3/5/2012 $45,446 $0 $45,446 PAPIs & REILs (ST RW VI)

Rehabilitate Runway Lighting 16/34 Install new runway 5/11/2006 3/5/2012 $704,845 $22,017 $726,862 lighting and lighted windcone (RE RW LI)

3-02-0211-015-2007 Update Airport Master Plan Study AMP Update (PL PL 8/29/2007 6/13/2011 $236,274 $0 $236,274 MA)

3-02-0211-016-2007 Rehabilitate Runway 16/34 pavement maintenance - 4/23/2007 3/7/2013 $150,000 $0 $150,000 crack seal (RE RW IM)

Rehabilitate Runway 09/27 Phase 2 (Construction) (RE 4/23/2007 3/7/2013 $2,099,352 $0 $2,099,352 RW IM)

Monday, January 11, 2016 Page 88 of 124

Page 90: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0211-014-2009 2/17/2009 1/23/2012 Acquire Miscellaneous Land (RPZ land, Phase 2) (ST LA MS)

$330,738 $0 $330,738

3-02-0211-017-2012 9/13/2012 Conduct Airport Master Plan Study (PL PL MA) $375,000 $0 $375,000

3-02-0211-018-2014 5/22/2014 Rehabilitate Taxiway Pavement preservation (RE TW IM)

$50,000 $0 $50,000

5/22/2014 Rehabilitate Apron Pavement preservation (RE AP IM) $50,000 $0 $50,000

5/22/2014 Rehabilitate Runway 16/34 Pavement preservation (runways 16/34 and 9/27) (RE RW IM)

$116,074 $9 $116,083

3-02-0211-019-2015 9/22/2015 Conduct Airport Master Plan Study Phase 2 - conduct aeronautical survey (PL PL MA)

$235,312 $0 $235,312

$12,180,011 $1,059,396 $13,239,407

Pedro Bay Pedro Bay (4K0)

3-02-0215-001-1986 5/20/1986 2/5/1991 Improve Airport Drainage (ST OT IM) $6,446 $0 $6,446

5/20/1986 2/5/1991 Improve Access Road (OT GT AC) $214,083 $0 $214,083

5/20/1986 2/5/1991 Construct Apron (ST AP CO) $78,670 $0 $78,670

5/20/1986 2/5/1991 Improve Snow Removal Equipment Building (ST BD SN)

$48,465 $0 $48,465

5/20/1986 2/5/1991 Construct Runway 9/27 (ST RW CO) $859,025 $0 $859,025

5/20/1986 2/5/1991 Construct Taxiway (ST TW CO) $11,756 $0 $11,756

3-02-0215-002-1987 7/23/1987 6/17/1991 Acquire Snow Removal Equipment (ST EQ SN) $101,250 $0 $101,250

3-02-0215-003-1995 7/19/1995 7/14/1999 Install Runway Lighting (ST RW LI) $164,063 $0 $164,063

7/19/1995 7/14/1999 Extend Runway 09/27 (ST RW IM) $130,725 $0 $130,725

7/19/1995 7/14/1999 Acquire Land for Development (ST LA DV) $150,937 $0 $150,937

7/19/1995 7/14/1999 Rehabilitate Runway 09/27 (RE RW IM) $592,801 $0 $592,801

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)

$10,000 $0 $10,000

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$68,062 $0 $68,062

$2,436,283 $0 $2,436,283

Pelican Pelican (PEC)

3-02-0216-001-2004 8/24/2004 2/21/2006 Rehabilitate Seaplane Base (RE SB IM) $593,746 $0 $593,746

$593,746 $0 $593,746

Perryville Perryville (PEV)

3-02-0218-001-2005 8/29/2005 4/9/2012 Modify Access Road (OT GT AC) $729,000 $0 $729,000

8/29/2005 4/9/2012 Construct Apron (ST AP CO) $1,182,200 $0 $1,182,200

8/29/2005 4/9/2012 Construct Runway Plan-1 (Replacement RWY) (ST RW CO)

$4,361,679 $0 $4,361,679

8/29/2005 4/9/2012 Construct Snow Removal Equipment Building (ST BD SN)

$548,300 $0 $548,300

3-02-0200-055-2006 8/17/2006 7/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader w/ Plow and Attachments) (ST EQ SN)

$242,580 $0 $242,580

$7,063,759 $0 $7,063,759

Monday, January 11, 2016 Page 89 of 124

Page 91: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Petersburg Lloyd R Roundtree Seaplane Facility (63A)

3-02-0340-001-1994 Construct Apron (ST AP CO) 9/27/1994 7/20/2000 $1,803,885 $175,737 $1,979,622

Acquire Land for Development (ST LA DV) 9/27/1994 7/20/2000 $18,750 $0 $18,750

$1,822,635 $175,737 $1,998,372

Petersburg James A Johnson (PSG)

3-02-0219-001-1985 Acquire Snow Removal Equipment (ST EQ SN) 8/26/1985 4/4/1988 $165,144 $0 $165,144

3-02-0219-002-1987 Improve Airport Drainage (ST OT IM) 7/1/1987 9/19/1988 $0 $9,375 $9,375

Rehabilitate Runway 4/22 (RE RW IM) 7/1/1987 9/19/1988 $285,191 $14,169 $299,360

Rehabilitate Taxiway (RE TW IM) 7/1/1987 9/19/1988 $0 $9,375 $9,375

Rehabilitate Apron (RE AP IM) 7/1/1987 9/19/1988 $30,677 $137,085 $167,762

3-02-0219-003-1988 Conduct Airport Master Plan Study (PL PL MA) 9/15/1988 5/12/1992 $68,476 $0 $68,476

3-02-0219-004-1990 Acquire Aircraft Rescue & Fire Fighting Safety 9/26/1990 9/9/1997 $564,122 $0 $564,122 Equipment (ST EQ MS)

3-02-0219-005-1994 Improve Aircraft Rescue & Fire Fighting Building (SA 6/27/1994 9/25/1997 $0 $1,523,018 $1,523,018 BD EX)

Improve Access Road (OT GT AC) 6/27/1994 9/25/1997 $256,781 $183,219 $440,000

3-02-0219-006-1995 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/3/1995 10/24/1998 $0 $369,544 $369,544 EQ RF)

3-02-0219-007-1995 Rehabilitate Taxiway (RE TW IM) 6/15/1995 9/25/1997 $544,621 $0 $544,621

Rehabilitate Apron (RE AP IM) 6/15/1995 9/25/1997 $804,745 $0 $804,745

Rehabilitate Runway 04/22 (RE RW IM) 6/15/1995 9/25/1997 $1,361,552 $196,127 $1,557,679

Install Runway Lighting (ST RW LI) 6/15/1995 9/25/1997 $375,946 $0 $375,946

3-02-0219-008-2002 Update Airport Master Plan Study (PL PL MA) 9/3/2002 2/21/2006 $266,800 $0 $266,800

3-02-0219-009-2003 Construct Sand and Chemical Storage Building (ST BD 8/26/2003 6/26/2007 $2,013,858 $0 $2,013,858 SN)

3-02-0219-010-2003 Expand Apron (ST AP IM) 8/22/2003 7/2/2007 $0 $2,289,550 $2,289,550

3-02-0200-053-2006 [Various Grnt] Acquire Snow Removal Equipment 4/10/2006 7/20/2010 $235,000 $0 $235,000 (Loader) (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/30/2006 2/27/2012 $122,849 $0 $122,849 (RE RW IM)

3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $53,635 $0 $53,635 Acquire SRE: Trap Plow (ST EQ SN)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 5/31/2007 8/6/2013 $21,280 $0 $21,280 (RE RW IM)

3-02-0219-011-2008 Rehabilitate Runway 04/22 mill and overlay (RE RW IM) 6/17/2008 12/21/2012 $1,400,000 $0 $1,400,000

Construct Runway Safety Area 04/22 (SA RW SF) 6/17/2008 12/21/2012 $0 $21,511,804 $21,511,804

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 04/22 (Various 8/20/2009 12/19/2014 $90,440 $0 $90,440 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0219-012-2009 Construct Runway Safety Area 04/22 Phase 2 (SA RW 7/31/2009 2/4/2013 $1,000,000 $5,149,471 $6,149,471 SF)

3-02-0219-013-2009 Construct Runway Safety Area 04/22 Phase 3 (SA RW 9/23/2009 $833,268 $15,195,320 $16,028,588 SF)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 04/22 Petersburg 3/12/2010 12/9/2015 $42,560 $0 $42,560 Various Surface Maintenance (RE RW IM)

Monday, January 11, 2016 Page 90 of 124

Page 92: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $488,656 $0 $488,656 Acquire Various SRE: Petersburg (SP Runway Broom) (ST EQ SN)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $19,918 $0 $19,918 Acquire SRE (Alaska Region): Petersburg (Wing Plow Attachment) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 05/23 Various 9/19/2012 $26,542 $0 $26,542 Surface Preservation Maintenance (Petersburg) (RE RW IM)

3-02-0200-091-2013 [Various Grnt] Rehabilitate Runway 05/23 Surface 9/19/2013 $67,286 $0 $67,286 Preservation Maintenance (Petersburg) - Pavement Markings (RE RW IM)

3-02-0200-096-2014 [Various Grnt] Remove Obstructions (+08J) Various 9/18/2014 $51,722 $0 $51,722 EDA/EAS Locations: Petersburg - Obstruction Removal _ Brush cutting in RSA and around ramp and taxiways. (SA OT OB)

[Various Grnt] Rehabilitate Runway 05/23 (+08J) 9/18/2014 $73,963 $0 $73,963 Various EDA/EAS Locations: Petersburg - Surface Preservations Maintenance _ Pavement Markings (RE RW IM)

3-02-0219-014-2014 Rehabilitate Taxiway Rehab taxiway (RE TW IM) 9/11/2014 $1,608,851 $0 $1,608,851

Rehabilitate Apron rehab apron (RE AP IM) 9/11/2014 $0 $2,000,000 $2,000,000

3-02-0219-015-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle ARFF 9/18/2014 $705,672 $0 $705,672 Truck (SA EQ RF)

3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 05/23 EAS/EDA 9/20/2015 $77,584 $0 $77,584 Various (Petersburg - Surface Preservation Maintenance - Markings on RWYs, TWYs and Aprons) (RE RW IM)

[Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $77,584 $0 $77,584 (Petersburg - Remove Obstructions - 109 Acres Brush Cutting around Ramp and TWYs) (SA OT OB)

$13,734,723 $48,691,482 $62,426,204

Pilot Point Pilot Point (PNP)

3-02-0222-001-1999 Improve Snow Removal Equipment Building (ST BD 3/24/1999 9/25/2002 $240,000 $0 $240,000 SN)

Construct New Airport 7-25 (ST NA CO) 3/24/1999 9/25/2002 $2,963,355 $0 $2,963,355

3-02-0222-002-2003 Construct Snow Removal Equipment Building (ST BD 8/4/2003 8/17/2007 $556,614 $0 $556,614 SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 6/30/2006 2/27/2012 $58,208 $0 $58,208 (RE RW IM)

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $365,238 $0 $365,238 (+08J) Acquire SRE: Pilot Point - Grader (ST EQ SN)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE () (ST EQ SN)

$4,548,653 $0 $4,548,653

Pilot Station Pilot Station (0AK)

3-02-0223-001-1995 Conduct Airport Master Plan Study (PL PL MA) 6/6/1995 9/20/2000 $230,596 $0 $230,596

3-02-0223-002-1996 Install Runway Lighting (ST RW LI) 8/29/1996 9/25/2000 $288,134 $0 $288,134

3-02-0477-001-2015 Construct New Airport Construct Airport (ST NA CO) 9/14/2015 $8,216,631 $16,705,085 $24,921,716

$8,735,361 $16,705,085 $25,440,446

Monday, January 11, 2016 Page 91 of 124

Page 93: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Platinum Platinum (PTU)

3-02-0224-001-1996 9/20/1996 11/17/2006 Conduct Airport Master Plan Study (PL PL MA) $300,000 $0 $300,000

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments and Grader with Attachments (ST EQ SN)

$628,635 $0 $628,635

3-02-0224-002-2009 2/24/2009 Construct Apron construct apron (ST AP CO) $1,104,235 $0 $1,104,235

2/24/2009 Construct Runway Plan-1 Consturct new runway 14/32 (75'X 3300') with RSA (ST RW CO)

$4,680,000 $0 $4,680,000

2/24/2009 Construct Access Road construct access road (OT GT AC)

$200,000 $0 $200,000

2/24/2009 Construct Snow Removal Equipment Building construct snow removal building (ST BD SN)

$1,000,000 $0 $1,000,000

2/24/2009 Construct Taxiway construct taxiway A & B (ST TW CO) $750,000 $0 $750,000

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 14/32 Various Surface Preservation Maintenance (Platinum) (RE RW IM)

$10,500 $0 $10,500

$8,673,370 $0 $8,673,370

Point Baker Point Baker (KPB)

3-02-0423-001-1994 6/27/1994 9/25/1997 Acquire Land for Development (ST LA DV) $18,750 $0 $18,750

6/27/1994 9/25/1997 Construct Apron (ST AP CO) $546,068 $13,614 $559,682

$564,818 $13,614 $578,432

Point Hope Point Hope (PHO)

3-02-0226-001-1991 9/24/1991 11/30/1993 Install Runway Lighting (ST RW LI) $370,000 $10,064 $380,064

3-02-0226-002-1992 9/24/1992 10/24/1998 Acquire Land for Development (ST LA DV) $105,007 $0 $105,007

9/24/1992 10/24/1998 Rehabilitate Taxiway (RE TW IM) $69,913 $0 $69,913

9/24/1992 10/24/1998 Extend Runway 01/19 (ST RW IM) $1,520,214 $0 $1,520,214

9/24/1992 10/24/1998 Expand Apron (ST AP IM) $530,052 $0 $530,052

3-02-0226-003-2000 9/6/2000 8/25/2004 Improve Snow Removal Equipment Building (ST BD SN)

$910,977 $0 $910,977

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) (RE RW IM)

$87,248 $0 $87,248

$3,593,411 $10,064 $3,603,475

Point Lay Point Lay LRRS (PIZ)

3-02-0387-001-1984 9/26/1984 5/19/1988 Construct Taxiway 05/23 (ST TW CO) $226,542 $0 $226,542

3-02-0387-002-1997 9/26/1997 9/25/2001 Conduct Airport Master Plan Study (PL PL MA) $108,029 $0 $108,029

3-02-0387-003-2006 9/1/2006 4/30/2010 Expand Apron (ST AP IM) $1,821,757 $0 $1,821,757

9/1/2006 4/30/2010 Extend Runway 05/23 (ST RW IM) $3,828,243 $689,350 $4,517,593

3-02-0387-004-2007 6/5/2007 10/12/2012 Extend Runway 05/23 (ST RW IM) $560,000 $4,889,213 $5,449,213

3-02-0200-070-2009 8/24/2009 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $200,000 $200,000

Monday, January 11, 2016 Page 92 of 124

Page 94: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0387-005-2009 Construct Snow Removal Equipment Building Construct 9/17/2009 11/5/2014 $1,035,844 $0 $1,035,844 Snow Removal Equipment Building (1 Bay in joint facility) (ST BD SN)

3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)

3-02-0387-006-2014 Acquire Snow Removal Equipment Acquire SRE (Motor 9/18/2014 $855,223 $0 $855,223 Grader, Snow Blower) (ST EQ SN)

$8,485,638 $5,778,563 $14,264,201

Port Alsworth Port Alsworth Proposed (+074)

3-02-0418-001-1990 Conduct Airport Master Plan Study (PL PL MA) 9/26/1990 8/11/1993 $98,423 $0 $98,423

3-02-0418-002-2004 Update Airport Master Plan Study Phase 1 (PL PL MA) 8/19/2004 3/12/2007 $93,932 $0 $93,932

3-02-0418-003-2005 Conduct Airport Master Plan Study (PL PL MA) 8/11/2005 5/21/2010 $258,120 $0 $258,120

3-02-0418-004-2007 Conduct Airport Master Plan Study Phase 3 (PL PL MA) 8/17/2007 5/20/2013 $425,784 $0 $425,784

$876,259 $0 $876,259

Port Graham Nanwalek / Port Graham Regional (Proposed GA) (+08L)

3-02-0479-001-2006 Conduct Airport Master Plan Study (PL PL MA) 9/5/2006 3/7/2012 $490,798 $0 $490,798

3-02-0479-002-2009 Conduct Airport Master Plan Study (PL PL MA) 8/20/2009 $601,318 $0 $601,318

3-02-0479-003-2011 Conduct Miscellaneous Study (PL PL MS) 9/14/2011 $948,563 $0 $948,563

$2,040,679 $0 $2,040,679

Port Graham (PGM)

3-02-0233-001-1995 Conduct Airport Master Plan Study (PL PL MA) 9/12/1995 6/12/2000 $173,023 $0 $173,023

3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment 8/19/2005 12/19/2013 $239,967 $0 $239,967 (Motor Grader) (ST EQ SN)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 8/30/2005 6/9/2010 $22,500 $0 $22,500 (RE RW IM)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/30/2006 2/27/2012 $6,327 $0 $6,327 (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 5/31/2007 8/6/2013 $133,000 $0 $133,000 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/19/2008 6/10/2014 $7,200 $0 $7,200 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $159,600 $0 $159,600 Surface Maintenance) (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 12/30 Port Graham 3/12/2010 12/9/2015 $21,280 $0 $21,280 Various Surface Maintenance (RE RW IM)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 12/30 Various 9/19/2012 $89,250 $0 $89,250 Surface Preservation Maintenance (Port Graham) (RE RW IM)

$852,147 $0 $852,147

Port Heiden Port Heiden (PTH)

3-02-0234-001-1986 Install Runway Lighting (ST RW LI) 7/24/1986 5/23/1990 $315,581 $0 $315,581

Rehabilitate Taxiway (RE TW IM) 7/24/1986 5/23/1990 $84,975 $0 $84,975

Rehabilitate Apron (RE AP IM) 7/24/1986 5/23/1990 $41,691 $0 $41,691

Monday, January 11, 2016 Page 93 of 124

Page 95: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0234-001-1986 Rehabilitate Runway 5/23 (RE RW IM) 7/24/1986 5/23/1990 $1,245,709 $23,343 $1,269,052

3-02-0234-002-1991 Improve Aircraft Rescue & Fire Fighting Building (SA 9/24/1991 7/14/2000 $690,923 $17,403 $708,326 BD EX)

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/24/1991 7/14/2000 $209,077 $161,258 $370,335 EQ RF)

3-02-0234-003-1992 Acquire Security Equipment (SA EQ SE) 9/23/1992 11/28/1994 $97,655 $0 $97,655

3-02-0234-004-2003 Construct Runway Safety Area 5/23 13/31 (ST RW SF) 6/4/2003 9/12/2007 $2,065,250 $0 $2,065,250

Rehabilitate Runway 5/23 13/31 (RE RW IM) 6/4/2003 9/12/2007 $2,199,087 $0 $2,199,087

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $163,358 $0 $163,358 (Snow Blower Attachment for Loader) (ST EQ SN)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) 6/30/2006 2/27/2012 $58,208 $0 $58,208 (RE RW IM)

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $360,000 $0 $360,000 Acquire Various SRE: Port Heiden (Grader with attachments) (ST EQ SN)

$7,531,514 $202,004 $7,733,518

Port Lions Port Lions (ORI)

3-02-0235-001-1983 Rehabilitate Taxiway (RE TW IM) 7/21/1983 10/14/1987 $9,673 $0 $9,673

Rehabilitate Apron (RE AP IM) 7/21/1983 10/14/1987 $71,602 $0 $71,602

Rehabilitate Runway 6/24 (RE RW IM) 7/21/1983 10/14/1987 $453,157 $0 $453,157

Install Runway Lighting (ST RW LI) 7/21/1983 10/14/1987 $406,895 $0 $406,895

Improve Airport Drainage (ST OT IM) 7/21/1983 10/14/1987 $109,058 $0 $109,058

3-02-0235-002-2002 Conduct Airport Master Plan Study Phase 1 (PL PL MA) 5/13/2002 5/17/2005 $84,573 $0 $84,573

3-02-0235-003-2003 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 8/22/2003 7/27/2007 $282,659 $0 $282,659

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 6/30/2006 2/27/2012 $73,810 $0 $73,810 (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) 5/31/2007 8/6/2013 $63,840 $0 $63,840 (RE RW IM)

3-02-0235-004-2011 Rehabilitate Runway Lighting 07/25 Regulator Bldg (RE 3/17/2011 1/20/2015 $186,043 $0 $186,043 RW LI)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 07/25 Various 9/19/2012 $89,250 $0 $89,250 Surface Preservation Maintenance (Port Lions) (RE RW IM)

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $21,000 $0 $21,000 Obstruction Removal (Port Lions) (SA OT OB)

$1,891,559 $0 $1,891,559

Portage Creek Portage Creek (A14)

3-02-0348-001-1984 Rehabilitate Apron (RE AP IM) 9/24/1984 4/12/1988 $25,828 $0 $25,828

Remove Obstructions (SA OT OB) 9/24/1984 4/12/1988 $100,078 $0 $100,078

Rehabilitate Runway 1/19 (RE RW IM) 9/24/1984 4/12/1988 $243,781 $0 $243,781

Rehabilitate Taxiway (RE TW IM) 9/24/1984 4/12/1988 $10,969 $0 $10,969

Construct Runway 9/27 (ST RW CO) 9/24/1984 4/12/1988 $928,682 $0 $928,682

Acquire Snow Removal Equipment (ST EQ SN) 9/24/1984 4/12/1988 $88,078 $0 $88,078

Improve Snow Removal Equipment Building (ST BD 9/24/1984 4/12/1988 $27,141 $0 $27,141 SN)

Monday, January 11, 2016 Page 94 of 124

Page 96: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

$1,424,557 $0 $1,424,557

Quinhagak Quinhagak (AQH)

3-02-0242-001-1994 Conduct Airport Master Plan Study (PL PL MA) 9/27/1994 8/1/2000 $277,017 $0 $277,017

3-02-0242-002-1999 Construct New Airport (ST NA CO) 3/24/1999 9/25/2002 $463,085 $0 $463,085

3-02-0242-003-1999 Construct New Airport (ST NA CO) 9/30/1999 9/12/2003 $4,319,268 $640,949 $4,960,217

3-02-0242-004-2002 Construct New Airport Phase 3 (ST NA CO) 6/20/2002 5/31/2006 $1,912,707 $6,821 $1,919,528

Construct Snow Removal Equipment Building (ST BD 6/20/2002 5/31/2006 $420,000 $0 $420,000 SN)

3-02-0242-005-2004 Construct New Airport (ST NA CO) 6/11/2004 9/19/2008 $2,319,896 $0 $2,319,896

Construct Terminal Building (ST TE CO) 6/11/2004 9/19/2008 $50,000 $0 $50,000

Acquire Snow Removal Equipment (Grader & Loader) 6/11/2004 9/19/2008 $525,000 $0 $525,000 (ST EQ SN)

$10,286,973 $647,770 $10,934,743

Rampart Rampart (RMP)

3-02-0244-001-1988 Install Miscellaneous NAVAIDS (ST OT IN) 7/11/1988 11/5/1991 $8,099 $0 $8,099

Install Apron Lighting (ST AP LI) 7/11/1988 11/5/1991 $5,940 $0 $5,940

Construct Apron (ST AP CO) 7/11/1988 11/5/1991 $118,653 $0 $118,653

Construct Taxiway (ST TW CO) 7/11/1988 11/5/1991 $40,334 $0 $40,334

Extend Runway 11/29 (ST RW IM) 7/11/1988 11/5/1991 $1,054,682 $0 $1,054,682

Acquire Land for Development (ST LA DV) 7/11/1988 11/5/1991 $52,500 $0 $52,500

Install Runway Lighting (ST RW LI) 7/11/1988 11/5/1991 $175,267 $0 $175,267

3-02-0244-002-1990 Conduct Airport Master Plan Study (PL PL MA) 1/25/1990 2/12/1992 $122,643 $0 $122,643

3-02-0244-003-2001 Improve Snow Removal Equipment Building (ST BD 2/15/2001 7/28/2005 $50,000 $0 $50,000 SN)

Rehabilitate Runway (RE RW IM) 2/15/2001 7/28/2005 $2,778,578 $0 $2,778,578

Expand Apron (ST AP IM) 2/15/2001 7/28/2005 $150,000 $0 $150,000

$4,556,696 $0 $4,556,696

Red Devil Red Devil (RDV)

3-02-0246-001-2005 Remove Obstructions (SA OT OB) 4/27/2005 5/4/2010 $473,000 $0 $473,000

Construct Snow Removal Equipment Building (ST BD 4/27/2005 5/4/2010 $1,903,687 $0 $1,903,687 SN)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $242,580 $0 $242,580 (Loader w/ Bucket) (ST EQ SN)

$2,619,267 $0 $2,619,267

Ruby Ruby (RBY)

3-02-0248-001-1992 Install Runway Lighting (ST RW LI) 9/24/1992 7/14/1999 $158,928 $0 $158,928

Expand Apron (ST AP IM) 9/24/1992 7/14/1999 $281,699 $0 $281,699

Rehabilitate Taxiway (RE TW IM) 9/24/1992 7/14/1999 $9,169 $0 $9,169

Extend Runway 03/31 (ST RW IM) 9/24/1992 7/14/1999 $1,371,637 $0 $1,371,637

Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 7/14/1999 $150,000 $0 $150,000

Monday, January 11, 2016 Page 95 of 124

Page 97: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Northern Region): Ruby (Loader and Grader) (ST EQ SN)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 03/21 Surface Preservation Maintenance (Ruby)) (RE RW IM)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

6/8/2011

9/18/2013

9/22/2014

11/12/2014 $722,000

$208,933

$46,406

$2,948,772

$0

$0

$0

$0

$722,000

$208,933

$46,406

$2,948,772

Russian Mission Russian Mission (RSH)

3-02-0249-001-2000 Improve Snow Removal Equipment Building (ST BD SN)

Construct Runway 17/35 (ST RW CO)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 17/35 (Various Surface Maintenance) (RE RW IM)

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Russian Mission (Dozer) (ST EQ SN)

9/6/2000

9/6/2000

8/20/2009

9/11/2012

8/27/2004 $350,000

8/27/2004 $5,026,516

12/19/2014 $196,840

$370,108

$5,943,464

$0

$0

$0

$0

$0

$350,000

$5,026,516

$196,840

$370,108

$5,943,464

Saint Paul Island St Paul Island (SNP)

3-02-0277-001-1990 Acquire Land for Development (ST LA DV)

3-02-0277-002-1990 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

3-02-0277-003-1992 Acquire Security Equipment (SA EQ SE)

3-02-0277-004-1994 Rehabilitate Apron (RE AP IM)

Install Runway Lighting (SA RW LI)

Rehabilitate Taxiway (RE TW IM)

Install Instrument Approach Aid 18/36 (ST RW IN)

Construct Taxiway (ST TW CO)

Improve Access Road (OT GT AC)

Improve Runway Safety Area 18/36 (SA RW SF)

9/17/1990

9/24/1990

9/24/1990

9/23/1992

9/27/1994

9/27/1994

9/27/1994

9/27/1994

9/27/1994

9/27/1994

9/27/1994

7/11/2000

7/17/2000

7/17/2000

11/28/1994

6/8/2000

6/8/2000

6/8/2000

6/8/2000

6/8/2000

6/8/2000

6/8/2000

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$937,379

$708,396

$314,063

$126,350

$700,000

$569,157

$59,335

$1,557,827

$104,325

$304,858

$5,184,485

$10,566,175

$937,379

$708,396

$314,063

$126,350

$700,000

$569,157

$59,335

$1,557,827

$104,325

$304,858

$5,184,485

$10,566,175

Sand Point Sand Point (SDP)

3-02-0253-001-1986 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

3-02-0253-002-1990 Remove Obstructions (ST OT OB)

3-02-0253-003-1991 Extend Runway 13/31 (ST RW IM)

3-02-0253-004-1992 Construct Taxiway (ST TW CO)

Install Runway Lighting (ST RW LI)

Construct Apron (ST AP CO)

Construct Runway 15/33 (ST RW CO)

4/22/1986

4/22/1986

9/24/1990

9/24/1991

9/22/1992

9/22/1992

9/22/1992

9/22/1992

1/15/1991

1/15/1991

1/6/1993

12/6/1994

9/25/1997

9/25/1997

9/25/1997

9/25/1997

$158,182

$238,655

$0

$473,804

$0

$0

$0

$157,934

$0

$0

$2,459,872

$2,807,887

$225,000

$300,000

$935,000

$3,439,123

$158,182

$238,655

$2,459,872

$3,281,691

$225,000

$300,000

$935,000

$3,597,057

Monday, January 11, 2016 Page 96 of 124

Page 98: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0253-004-1992 Improve Access Road (OT GT AC) 9/22/1992 9/25/1997 $0 $81,800 $81,800

Acquire Snow Removal Equipment (ST EQ SN) 9/22/1992 9/25/1997 $0 $130,000 $130,000

3-02-0253-005-1994 Acquire Miscellaneous Land (ST LA MS) 9/27/1994 6/7/2000 $542,314 $0 $542,314

3-02-0253-006-2000 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/10/2000 6/30/2003 $321,862 $46,138 $368,000 EQ RF)

3-02-0253-007-2001 Improve Aircraft Rescue & Fire Fighting Building (SA 9/25/2001 8/25/2005 $2,445,564 $0 $2,445,564 BD EX)

3-02-0253-008-2002 Improve Runway Safety Area (Phase 1) (ST RW SF) 9/19/2002 9/1/2006 $1,900,000 $2,158,000 $4,058,000

Rehabilitate Apron (RE AP IM) 9/19/2002 9/1/2006 $50,000 $219,438 $269,438

Rehabilitate Access Road (OT GT AC) 9/19/2002 9/1/2006 $200,000 $0 $200,000

3-02-0253-009-2004 Extend Runway Safety Area 13 / 31 (SA RW SF) 7/19/2004 8/8/2014 $0 $8,690,158 $8,690,158

3-02-0253-010-2005 Extend Runway Safety Area 13/31 (Phase 3) (ST RW 8/25/2005 6/11/2010 $1,560,371 $5,000,000 $6,560,371 SF)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $237,738 $0 $237,738 (Broom Attachment for Loader) (ST EQ SN)

3-02-0253-011-2007 Conduct Airport Master Plan Study (Terminal Study) 6/18/2007 8/8/2008 $164,693 $0 $164,693 (Work is contingency for 2007) (PL PL MA)

3-02-0200-077-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 3/10/2015 $420,000 $0 $420,000 Acquire Various SRE: Sand Point (Grader with attachments, and U-Blade and Fork) (ST EQ SN)

3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $400,000 $0 $400,000 approach (PL PL VI)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 13/31 Surface 9/18/2013 $423,700 $0 $423,700 Preservation Maintenance (Sand Point) (RE RW IM)

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment 9/19/2014 $199,663 $0 $199,663 (+08J) Acquire SRE: Sant Point - Blower (ST EQ SN)

$9,894,481 $26,492,416 $36,386,897

Savoonga Savoonga (SVA)

3-02-0254-001-1983 Acquire Snow Removal Equipment 5/23 (ST EQ SN) 8/23/1983 1/16/1986 $87,816 $0 $87,816

3-02-0254-002-1986 Improve Building (ST BD MS) 9/23/1986 2/25/1991 $92,630 $0 $92,630

Install Runway Lighting (SA RW LI) 9/23/1986 2/25/1991 $57,292 $0 $57,292

Construct Taxiway (ST TW CO) 9/23/1986 2/25/1991 $233,819 $0 $233,819

Install Apron Lighting (ST AP LI) 9/23/1986 2/25/1991 $12,739 $0 $12,739

Install Apron Lighting (ST AP LI) 9/23/1986 2/25/1991 $39,940 $0 $39,940

Construct Apron (ST AP CO) 9/23/1986 2/25/1991 $232,066 $0 $232,066

3-02-0254-003-1994 Construct Apron (ST AP CO) 6/28/1994 7/14/1999 $0 $1,371,300 $1,371,300

Improve Access Road (OT GT AC) 6/28/1994 7/14/1999 $0 $80,584 $80,584

Rehabilitate Taxiway (RE TW IM) 6/28/1994 7/14/1999 $0 $463,162 $463,162

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $223,440 $0 $223,440 (RE RW IM)

3-02-0254-004-2008 Rehabilitate Runway 05/23 (RE RW IM) 6/23/2008 3/7/2013 $0 $8,603,517 $8,603,517

Expand Apron (ST AP IM) 6/23/2008 3/7/2013 $600,648 $0 $600,648

Construct Taxiway (ST TW CO) 6/23/2008 3/7/2013 $1,500,000 $0 $1,500,000

Rehabilitate Access Road Rehabilitate primary access 6/23/2008 3/7/2013 $596,916 $0 $596,916 road (OT GT AC)

Rehabilitate Apron (RE AP IM) 6/23/2008 3/7/2013 $720,422 $0 $720,422

3-02-0254-005-2009 Rehabilitate Runway Lighting 05/23 (RE RW LI) 2/11/2009 9/2/2014 $500,000 $0 $500,000

Rehabilitate Runway 05/23 phase 2 (RE RW IM) 2/11/2009 9/2/2014 $331,941 $3,272,474 $3,604,415

Monday, January 11, 2016 Page 97 of 124

Page 99: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0000-013-2010 Conduct aeronautical survey for WAAS approach (PL 3/30/2010 $0 $250,000 $250,000 PL VI)

3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $742,288 $0 $742,288 Acquire Various SRE (Northern Region): Savoonga (Dozer and Loader with Snow, bucket, forks and blade) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 05/23 Accomplish 9/21/2015 $230,596 $0 $230,596 Various Airport Surface Preservation Maintenance (Savoonga Compaction and Dust Control) (RE RW IM)

$6,202,553 $14,041,037 $20,243,590

Scammon Bay Scammon Bay (SCM)

3-02-0255-001-1991 Acquire Land for Development (ST LA DV) 8/20/1991 6/21/1993 $77,011 $0 $77,011

Improve Snow Removal Equipment Building (ST BD 8/20/1991 6/21/1993 $77,011 $0 $77,011 SN)

Construct Taxiway (ST TW CO) 8/20/1991 6/21/1993 $24,567 $0 $24,567

Install Runway Lighting (ST RW LI) 8/20/1991 6/21/1993 $100,077 $0 $100,077

Rehabilitate Runway 10/28 (RE RW IM) 8/20/1991 6/21/1993 $1,323,145 $0 $1,323,145

Acquire Snow Removal Equipment (ST EQ SN) 8/20/1991 6/21/1993 $104,421 $0 $104,421

Construct Apron (ST AP CO) 8/20/1991 6/21/1993 $122,136 $0 $122,136

3-02-0255-002-2003 Construct Snow Removal Equipment Building (ST BD 8/4/2003 8/17/2007 $753,265 $0 $753,265 SN)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) 5/31/2007 8/6/2013 $211,736 $0 $211,736 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 10/28 (Various 8/20/2009 12/19/2014 $532,000 $0 $532,000 Surface Maintenance) (RE RW IM)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 10/28 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Scammon Bay) (RE RW IM)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Scammon Bay Grader) (ST EQ SN)

$3,701,107 $0 $3,701,107

Selawik Selawik (WLK)

3-02-0256-001-1988 Acquire Land for Development (ST LA DV) 9/15/1988 12/1/1998 $469,688 $0 $469,688

Extend Runway 9/27 (ST RW IM) 9/15/1988 12/1/1998 $1,649,188 $86,239 $1,735,427

Construct Apron (ST AP CO) 9/15/1988 12/1/1998 $370,880 $0 $370,880

Extend Runway 9/27 (ST RW IM) 9/15/1988 12/1/1998 $159,432 $0 $159,432

3-02-0256-002-1990 Rehabilitate Taxiway (RE TW IM) 9/21/1990 12/1/1998 $20,419 $0 $20,419

Expand Apron (ST AP IM) 9/21/1990 12/1/1998 $392,288 $0 $392,288

Improve Aircraft Rescue & Fire Fighting Building (SA 9/21/1990 12/1/1998 $160,500 $0 $160,500 BD EX)

Acquire Aircraft Rescue & Fire Fighting Safety 9/21/1990 12/1/1998 $97,500 $0 $97,500 Equipment (ST EQ MS)

Construct Runway 3/21 (ST RW CO) 9/21/1990 12/1/1998 $3,989,283 $3,603 $3,992,886

3-02-0256-003-1998 Improve Runway Safety Area 03-21 (SA RW SF) 12/17/1997 9/25/2002 $1,062,202 $0 $1,062,202

Install Runway Vertical/Visual Guidance System (ST 12/17/1997 9/25/2002 $1,196 $127,443 $128,639 RW VI)

Install Runway Lighting 03-21 (ST RW LI) 12/17/1997 9/25/2002 $165,000 $0 $165,000

Monday, January 11, 2016 Page 98 of 124

Page 100: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0256-003-1998 Rehabilitate Apron 9-27 (RE AP IM) 12/17/1997 9/25/2002 $46,875 $0 $46,875

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 09/27 Various Surface Preservation (RE RW IM)

9/16/2011 $246,245 $0 $246,245

$8,830,696 $217,285 $9,047,981

Seldovia Seldovia (SOV)

3-02-0258-001-1985 Construct Apron (CA AP CO) 9/9/1985 8/25/1989 $393,166 $0 $393,166

Rehabilitate Runway 16/34 (RE RW IM) 9/9/1985 8/25/1989 $165,042 $0 $165,042

Rehabilitate Apron (RE AP IM)

Improve Access Road (CA GT AC)

9/9/1985

9/9/1985

8/25/1989

8/25/1989

$27,000

$74,600

$0

$0

$27,000

$74,600

Rehabilitate Apron (RE AP IM) 9/9/1985 8/25/1989 $79,175 $0 $79,175

Construct Taxiway (CA TW CO) 9/9/1985 8/25/1989 $70,000 $0 $70,000

3-02-0258-002-2001 Conduct Airport Master Plan Study (PL PL MA) 3/21/2001 6/8/2005 $77,649 $0 $77,649

3-02-0258-003-2002 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/4/2002 8/16/2006 $286,376 $0 $286,376

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment (Snow Blower) (ST EQ SN)

8/30/2005

8/17/2006

6/9/2010

7/19/2013

$12,500

$136,153

$0

$0

$12,500

$136,153

[Various Grnt] Acquire Snow Removal Equipment (Loader w 4/CY Bucket & Plow) (ST EQ SN)

8/17/2006 7/19/2013 $183,074 $0 $183,074

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

6/30/2006 2/27/2012 $6,327 $0 $6,327

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) (RE RW IM)

5/31/2007 8/6/2013 $63,840 $0 $63,840

3-02-0258-004-2009 Construct Snow Removal Equipment Building (ST BD SN)

8/20/2009 5/12/2015 $3,375,817 $58,568 $3,434,385

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 16/34 Seldovia Various Surface Maintenance (RE RW IM)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 16/34 Various Surface Preservation (RE RW IM)

3/12/2010

9/16/2011

12/9/2015 $69,160

$74,480

$0

$0

$69,160

$74,480

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 16/34 (+08J) Various Surface Preservation Maintenance: Seldovia - Drainage, Maintain and Repair (RE RW IM)

9/19/2014 $31,500 $0 $31,500

3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Seldovia Segmented Circle (SP OT IN)

9/20/2015 $131,000 $0 $131,000

$5,256,859 $58,568 $5,315,427

Seward Seward (SWD)

3-02-0259-001-1983 Improve Snow Removal Equipment Building (ST BD SN)

7/27/1983 1/17/1986 $55,530 $0 $55,530

Rehabilitate Apron (RE AP IM) 7/27/1983 1/17/1986 $88,497 $0 $88,497

Rehabilitate Taxiway (RE TW IM) 7/27/1983 1/17/1986 $78,114 $0 $78,114

Rehabilitate Runway 15/33 (RE RW IM) 7/27/1983 1/17/1986 $121,938 $0 $121,938

Rehabilitate Runway 12/30 (RE RW IM) 7/27/1983 1/17/1986 $628,854 $0 $628,854

3-02-0259-002-1991 Improve Access Road (CA GT AC) 9/20/1991 12/20/1993 $354,000 $0 $354,000

Acquire Land for Development (ST LA DV) 9/20/1991 12/20/1993 $208,700 $0 $208,700

Construct Apron (CA AP CO) 9/20/1991 12/20/1993 $655,000 $125,122 $780,122

Construct Taxiway (CA TW CO)

3-02-0259-003-1995 Improve Airport Drainage (ST OT IM)

9/20/1991

9/18/1995

12/20/1993

10/24/1998

$37,596

$658,816

$0

$0

$37,596

$658,816

Monday, January 11, 2016 Page 99 of 124

Page 101: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0259-004-2003 Conduct Airport Master Plan Study (PL PL MA) 8/21/2003 2/14/2007 $86,859 $0 $86,859

3-02-0259-005-2004 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 8/25/2004 9/2/2008 $362,539 $0 $362,539

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 8/30/2005 6/9/2010 $40,000 $0 $40,000 (RE RW IM)

[Various Grnt] Rehabilitate Runway 15/33 (Maintenance) 8/30/2005 6/9/2010 $50,000 $0 $50,000 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/19/2008 6/10/2014 $275,600 $0 $275,600 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $53,058 $0 $53,058 Surface Maintenance) (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 13/31 Seward 3/12/2010 12/9/2015 $90,440 $0 $90,440 Various Surface Maintenance (RE RW IM)

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $327,039 $0 $327,039 Acquire SRE (Central Region): Seward (Grader with Attachments) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 13/31 Various 9/19/2012 $136,500 $0 $136,500 Surface Preservation Maintenance (Seward) (RE RW IM)

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various 9/18/2013 $21,000 $0 $21,000 Obstruction Removal (Seward) (SA OT OB)

3-02-0200-090-2013 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2013 $392,750 $0 $392,750 approach (PL PL VI)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 13/31 Surface 9/18/2013 $388,500 $0 $388,500 Preservation Maintenance (Seward) (RE RW IM)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $47,250 $0 $47,250 Various Airport Surface Preservation Maintenance (Seward Crack Seal RWYs TWYs and Aprons) (RE RW IM)

[Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $4,620 $0 $4,620 Various Airport Surface Preservation Maintenance (Seward Rehab Threshold Marking) (RE RW IM)

$5,163,200 $125,122 $5,288,322

Shageluk Shageluk (SHX)

3-02-0370-001-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/27/1994 9/9/1997 $138,376 $0 $138,376

3-02-0370-002-2000 Improve Snow Removal Equipment Building (ST BD 9/14/2000 8/23/2004 $500,000 $0 $500,000 SN)

Extend Runway 16-34 (ST RW IM) 9/14/2000 8/23/2004 $4,430,911 $251,449 $4,682,360

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 6/30/2006 2/27/2012 $21,090 $0 $21,090 (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $25,852 $0 $25,852 Obstructions (Various - Shageluk) (SA OT OB)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 16/34 Variuos 9/19/2012 $180,961 $0 $180,961 Surface Preservation Maintenance (Shageluk) (RE RW IM)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Shungnak Grader) (ST EQ SN)

$5,662,428 $251,449 $5,913,877

Shaktoolik Shaktoolik (2C7)

3-02-0401-001-1998 Construct New Airport (ST NA CO) 9/10/1998 9/10/2003 $3,213,704 $0 $3,213,704

Monday, January 11, 2016 Page 100 of 124

Page 102: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0401-001-1998 Improve Snow Removal Equipment Building (ST BD 9/10/1998 9/10/2003 $350,000 $0 $350,000 SN)

$3,563,704 $0 $3,563,704

Sheldon Point Sheldon Point (SXP)

3-02-0262-001-1993 Rehabilitate Taxiway (RE TW IM) 9/9/1993 7/14/1999 $30,000 $0 $30,000

Construct Apron (ST AP CO) 9/9/1993 7/14/1999 $220,000 $0 $220,000

Acquire Snow Removal Equipment (ST EQ SN) 9/9/1993 7/14/1999 $130,000 $0 $130,000

Acquire Land for Development (ST LA DV) 9/9/1993 7/14/1999 $360,000 $0 $360,000

Extend Runway RW 2/20 (ST RW IM) 9/9/1993 7/14/1999 $80,000 $0 $80,000

Improve Snow Removal Equipment Building (ST BD 9/9/1993 7/14/1999 $115,000 $0 $115,000 SN)

Improve Runway Safety Area RW 2/20 (ST RW SF) 9/9/1993 7/14/1999 $1,350,573 $209,085 $1,559,658

Improve Access Road (OT GT AC) 9/9/1993 7/14/1999 $250,000 $0 $250,000

3-02-0262-002-1994 Improve Snow Removal Equipment Building (ST BD 6/29/1994 1/5/1999 $429,296 $15,830 $445,126 SN)

Acquire Snow Removal Equipment (ST EQ SN) 6/29/1994 1/5/1999 $75,000 $0 $75,000

3-02-0262-003-1999 Construct Taxiway (ST TW CO) 3/22/1999 9/26/2002 $250,000 $0 $250,000

Extend Runway 2-20 (ST RW IM) 3/22/1999 9/26/2002 $1,342,559 $247,105 $1,589,664

Construct Apron (ST AP CO) 3/22/1999 9/26/2002 $415,000 $0 $415,000

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 01/19 (Maintenance) 8/30/2005 6/9/2010 $150,000 $0 $150,000 (RE RW IM)

$5,197,428 $472,020 $5,669,448

Shishmaref Shishmaref (SHH)

3-02-0404-001-1984 Construct Runway 15/33 (ST RW CO) 7/27/1984 7/20/1992 $2,855,796 $417,104 $3,272,900

Acquire Land for Development (ST LA DV) 7/27/1984 7/20/1992 $123,665 $0 $123,665

Construct Taxiway (ST TW CO) 7/27/1984 7/20/1992 $191,764 $0 $191,764

Improve Access Road (OT GT AC) 7/27/1984 7/20/1992 $187,764 $0 $187,764

Construct Apron (ST AP CO) 7/27/1984 7/20/1992 $899,897 $0 $899,897

3-02-0404-002-1991 Improve Snow Removal Equipment Building (ST BD 9/10/1991 2/26/1996 $249,915 $0 $249,915 SN)

Acquire Snow Removal Equipment (ST EQ SN) 9/10/1991 2/26/1996 $145,349 $0 $145,349

3-02-0404-003-1992 Improve Access Road (OT GT AC) 9/24/1992 1/25/2000 $69,223 $0 $69,223

Acquire Snow Removal Equipment (ST EQ SN) 9/24/1992 1/25/2000 $52,636 $0 $52,636

Extend Runway 5/23 (ST RW IM) 9/24/1992 1/25/2000 $835,501 $0 $835,501

Expand Apron (ST AP IM) 9/24/1992 1/25/2000 $401,155 $0 $401,155

Rehabilitate Taxiway (RE TW IM) 9/24/1992 1/25/2000 $13,037 $0 $13,037

3-02-0404-004-1998 Improve Snow Removal Equipment Building (ST BD 8/12/1998 7/20/2000 $335,000 $42,335 $377,335 SN)

3-02-0404-005-2006 Conduct Airport Master Plan Study Phase 1 (PL PL MA) 8/30/2006 2/27/2012 $121,634 $0 $121,634

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) 5/31/2007 8/6/2013 $74,480 $0 $74,480 (RE RW IM)

3-02-0404-006-2008 Conduct Airport Master Plan Study Phase 2 (PL PL MA) 9/8/2008 3/7/2013 $201,992 $0 $201,992

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 05/23 Shishmaref 3/12/2010 12/9/2015 $133,000 $0 $133,000 Various Surface Maintenance (RE RW IM)

Monday, January 11, 2016 Page 101 of 124

Page 103: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Northern Region): Shishmaref (Loader) (ST EQ SN)

6/8/2011 11/12/2014 $389,500 $0 $389,500

3-02-0404-007-2015 Rehabilitate Runway 05/23 (RE RW IM) 9/14/2015 $1,150,000 $4,200,000 $5,350,000

Rehabilitate Taxiway Rehabilitate Taxiway (RE TW IM) 9/14/2015 $150,000 $0 $150,000

Rehabilitate Apron Rehabilitate Apron (RE AP IM) 9/14/2015 $253,301 $1,000,000 $1,253,301

Rehabilitate Runway Lighting 05/23 (RE RW LI) 9/14/2015 $1,000,000

$9,834,609

$0

$5,659,439

$1,000,000

$15,494,048

Shungnak Shungnak (SHG)

3-02-0265-001-1996 Expand Apron (CA AP EX) 9/25/1996 9/21/2000 $174,957 $0 $174,957

Extend Taxiway (ST TW IM) 9/25/1996 9/21/2000 $145,798 $0 $145,798

Install Runway Lighting (ST RW LI) 9/25/1996 9/21/2000 $170,364 $0 $170,364

Extend Runway 9/27 (ST RW IM) 9/25/1996 9/21/2000 $1,632,935 $0 $1,632,935

Install Apron Lighting (ST AP LI) 9/25/1996 9/21/2000 $82,912 $0 $82,912

Improve Access Road (OT GT AC)

Improve Snow Removal Equipment Building (ST BD SN)

9/25/1996

9/25/1996

9/21/2000

9/21/2000

$87,479

$414,158

$0

$0

$87,479

$414,158

3-02-0265-002-1998 Acquire Land For Approaches (ST LA SZ) 7/20/1998 1/30/2001 $101,170 $0 $101,170

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)

8/30/2005 6/9/2010 $140,000 $0 $140,000

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 09/27 (Maintenance) (RE RW IM)

5/31/2007 8/6/2013 $196,840 $0 $196,840

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 09/27 (Various Surface Maintenance) (RE RW IM)

8/20/2009 12/19/2014 $207,480 $0 $207,480

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Shungnak) (SA OT OB)

9/18/2013 $20,600 $0 $20,600

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

9/22/2014 $79,406

$3,454,099

$0

$0

$79,406

$3,454,099

Sitka Sitka (A29)

3-02-0267-001-2010 Update Miscellaneous Study Update Site study SPB (PL PL MS)

7/20/2010 $300,000

$300,000

$0

$0

$300,000

$300,000

Sitka Rocky Gutierrez (SIT)

3-02-0268-001-1983 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

9/21/1983 4/17/1986 $509,594 $0 $509,594

Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

9/21/1983 4/17/1986 $0 $504,228 $504,228

3-02-0268-002-1988 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

9/14/1988 3/24/1992 $0 $220,589 $220,589

Rehabilitate Runway 11/29 (RE RW IM) 9/14/1988 3/24/1992 $0 $1,363,329 $1,363,329

Extend Runway 11/29 (ST RW IM) 9/14/1988 3/24/1992 $0 $30,971 $30,971

3-02-0268-003-1993 Acquire Snow Removal Equipment (ST EQ SN) 7/29/1993 11/27/1995 $364,316 $0 $364,316

3-02-0268-004-1994 Rehabilitate Taxiway Lighting (RE TW LI) 6/27/1994 7/19/2000 $325,000 $0 $325,000

Rehabilitate Runway Lighting (RE RW LI) 6/27/1994 7/19/2000 $1,280,727 $0 $1,280,727

3-02-0268-005-1995 Acquire Snow Removal Equipment (ST EQ SN) 9/12/1995 8/15/2000 $500,000 $0 $500,000

Monday, January 11, 2016 Page 102 of 124

Page 104: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0268-006-1998 Conduct Airport Master Plan Study (PL PL MA) 6/30/1998 9/12/2002 $217,975 $0 $217,975

3-02-0268-007-1999 Rehabilitate Apron (RE AP IM) 9/29/1999 8/26/2005 $0 $2,484,938 $2,484,938

3-02-0268-008-2000 Improve Runway Safety Area (SA RW SF) 9/7/2000 8/26/2005 $1,180,247 $0 $1,180,247

Rehabilitate Apron (RE AP IM) 9/7/2000 8/26/2005 $1,557,480 $0 $1,557,480

3-02-0268-009-2000 Construct Taxiway (ST TW CO) 9/7/2000 9/2/2005 $1,717,922 $257,688 $1,975,610

3-02-0268-010-2000 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/7/2000 9/26/2002 $0 $556,653 $556,653 EQ RF)

3-02-0268-011-2001 Construct Taxiway (ST TW CO) 8/30/2001 9/2/2005 $2,003,551 $300,532 $2,304,083

3-02-0268-012-2001 Remove Obstructions (SA OT OB) 7/20/2001 9/24/2002 $21,672 $0 $21,672

3-02-0268-013-2001 Conduct Environmental Study (EN PL MA) 9/25/2001 7/18/2005 $468,617 $731,383 $1,200,000

3-02-0268-014-2002 Construct Snow Removal Equipment Building Construct 6/12/2002 9/5/2006 $1,979,625 $215,394 $2,195,019 Sand & Chemical Building (ST BD SN)

3-02-0268-015-2002 Acquire Land for Development (ST LA DV) 7/23/2002 8/28/2006 $5,014,424 $0 $5,014,424

Remove Obstructions (ST OT OB) 7/23/2002 8/28/2006 $2,040,000 $0 $2,040,000

3-02-0268-016-2003 Security Enhancements (SA EQ SE) 9/3/2003 7/2/2007 $0 $535,036 $535,036

3-02-0268-017-2004 Modify Terminal Building (ST TE IM) 6/3/2004 6/15/2007 $590,978 $0 $590,978

3-02-0268-018-2004 Update Airport Master Plan Study (Terminal Area Plan) 8/24/2004 3/12/2007 $242,002 $0 $242,002 (PL PL MA)

3-02-0268-019-2004 Conduct Environmental Study (EN PL MA) 8/27/2004 3/28/2008 $0 $1,000,000 $1,000,000

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 8/30/2005 6/9/2010 $358,800 $0 $358,800 (RE RW IM)

3-02-0268-020-2005 Conduct Environmental Study (EN PL MA) 7/25/2005 4/30/2010 $0 $1,500,000 $1,500,000

3-02-0200-059-2007 [Various Grnt] Acquire Snow Removal Equipment 6/21/2007 7/20/2010 $254,010 $0 $254,010 Acquire SRE: Towed Broom (ST EQ SN)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $138,142 $0 $138,142 (RE RW IM)

3-02-0268-021-2007 Rehabilitate Terminal Building Emergency generator 9/4/2007 8/12/2009 $25,000 $0 $25,000 design (ST TE IM)

Rehabilitate Terminal Building HVAC control rehab (ST 9/4/2007 8/12/2009 $160,000 $0 $160,000 TE IM)

Rehabilitate Terminal Building Air handling design (ST 9/4/2007 8/12/2009 $11,605 $0 $11,605 TE IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $56,678 $0 $56,678 (RE RW IM)

3-02-0268-022-2008 Conduct Miscellaneous Study (PL PL MS) 6/12/2008 3/4/2013 $0 $200,000 $200,000

3-02-0268-023-2008 Conduct Environmental Study EIS (EN PL MA) 6/16/2008 12/10/2015 $0 $719,212 $719,212

3-02-0268-024-2008 Rehabilitate Terminal Building Install air handling units 6/23/2008 5/16/2010 $404,563 $0 $404,563 and emergency engine generator (ST TE IM)

3-02-0200-067-2009 [Various Grnt] Acquire Snow Removal Equipment 2/24/2009 1/7/2013 $150,000 $0 $150,000 Acquire SRE (SE Region): Mid-sized truck (ST EQ SN)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various 8/20/2009 12/19/2014 $90,440 $0 $90,440 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0268-025-2009 Rehabilitate Apron Sitka Slotted Drains (RE AP IM) 2/13/2009 4/4/2013 $346,032 $0 $346,032

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Sitka Various 3/12/2010 12/9/2015 $90,440 $0 $90,440 Surface Maintenance (RE RW IM)

3-02-0268-026-2010 Acquire Snow Removal Equipment Acquire SRE: Sitka 6/22/2010 1/7/2015 $1,068,571 $0 $1,068,571 (Self Propelled Blower, Truck with Plow and Sander) (ST EQ SN)

3-02-0268-027-2010 Construct Runway Safety Area 11/29 Phase 1 (SA RW 9/13/2010 $1,000,000 $28,957,716 $29,957,716 SF)

Monday, January 11, 2016 Page 103 of 124

Page 105: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 11/29 Various 9/16/2011 $20,689 $0 $20,689 Surface Preservation (RE RW IM)

3-02-0268-028-2011 Rehabilitate Runway 11/29 Rehab Runway (RE RW IM) 9/16/2011 $1,000,000 $7,583,504 $8,583,504

3-02-0200-086-2012 [Various Grnt] Acquire Snow Removal Equipment 9/11/2012 $259,076 $0 $259,076 Acquire SRE (Alaska Region): Sitka (Dump Truck with Plow Blade) (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 11/29 Various 9/19/2012 $86,772 $0 $86,772 Surface Preservation Maintenance (Sitka) (RE RW IM)

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface 9/18/2013 $86,800 $0 $86,800 Preservation Maintenance (Sitka) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $631,618 $0 $631,618 Acquire SRE (Plow Truck and Loader) (ST EQ SN)

3-02-0268-029-2013 Rehabilitate Runway 11/29 Rehabilitate Runway Ph2 5/1/2013 $0 $4,059,965 $4,059,965 (RE RW IM)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various 9/22/2014 $51,042 $0 $51,042 Obstruction Removal (+08J) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/19/2014 $115,864 $0 $115,864 Various Surface Preservation Maintenance: Sitka - Pavement Markings, Crack Seal (RE RW IM)

3-02-0268-030-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 9/18/2014 $696,387 $0 $696,387 ARFF Vehicle (SA EQ RF)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 11/29 Accomplish 9/21/2015 $105,146 $0 $105,146 Various Airport Surface Preservation Maintenance (Sitka Markings) (RE RW IM)

$27,221,806 $51,324,562 $78,546,369

Skagway Skagway (SGY)

3-02-0270-001-1986 Conduct Airport Master Plan Study (PL PL MA) 8/29/1986 5/12/1992 $82,121 $0 $82,121

3-02-0270-002-1992 Conduct Airport Master Plan Study (PL PL MA) 9/14/1992 4/17/2000 $499,990 $0 $499,990

3-02-0270-003-1999 Construct Taxiway (ST TW CO) 3/25/1999 1/14/2013 $3,193,041 $2,607,509 $5,800,550

3-02-0270-004-1999 Construct Taxiway (ST TW CO) 7/26/1999 9/12/2003 $695,722 $1,502,099 $2,197,821

Install Perimeter Fencing (ST EQ SE) 7/26/1999 9/12/2003 $536,916 $0 $536,916

3-02-0270-005-1999 Construct Terminal Building (ST TE CO) 7/6/1999 9/12/2003 $454,589 $16,988 $471,577

3-02-0270-006-2003 Construct Taxiway (Environmental Mitigation) Phase 2 8/26/2003 7/9/2007 $28,145 $0 $28,145 (ST TW CO)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 8/30/2005 6/9/2010 $16,700 $0 $16,700 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $37,100 $0 $37,100 (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 02/20 Skagway 3/12/2010 12/9/2015 $38,304 $0 $38,304 Various Surface Maintenance (RE RW IM)

3-02-0200-078-2011 [Various Grnt] Acquire Snow Removal Equipment 3/3/2011 11/25/2014 $38,005 $0 $38,005 Acquire Various SRE: Skagway (30ft Ramp Plow) (ST EQ SN)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 02/20 (+08J) 9/19/2014 $20,416 $0 $20,416 Various Surface Preservation Maintenance: Skagway - Crack Seal (RE RW IM)

$5,641,049 $4,126,596 $9,767,645

Skwentna Skwentna (SKW)

3-02-0411-001-1987 Install Runway Lighting (ST RW LI) 9/3/1987 7/20/1992 $166,022 $0 $166,022

Monday, January 11, 2016 Page 104 of 124

Page 106: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0411-001-1987 Acquire Land for Development (ST LA DV) 9/3/1987 7/20/1992 $110,720 $0 $110,720

Acquire Snow Removal Equipment (ST EQ SN) 9/3/1987 7/20/1992 $70,312 $0 $70,312

Rehabilitate Runway 9/27 (RE RW IM) 9/3/1987 7/20/1992 $490,620 $134,296 $624,916

Extend Runway 9/27 (ST RW IM) 9/3/1987 7/20/1992 $110,000 $0 $110,000

Construct Taxiway (ST TW CO) 9/3/1987 7/20/1992 $19,700 $0 $19,700

Improve Access Road (OT GT AC) 9/3/1987 7/20/1992 $213,500 $0 $213,500

Construct Apron (ST AP CO)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 09/27 Skwentna Various Surface Maintenance (RE RW IM)

9/3/1987

3/12/2010

7/20/1992

12/9/2015

$162,125

$44,688

$0

$0

$162,125

$44,688

3-02-0200-089-2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Skwentna) (SA OT OB)

9/18/2013 $63,000 $0 $63,000

3-02-0200-097-2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Skwentna - Grader (ST EQ SN)

9/19/2014 $323,844 $0 $323,844

3-02-0200-103-2015 [Various Grnt] Install Miscellaneous NAVAIDS Various Visual AIDS: Skwentna Beacon and Wind Cone Poles (ST OT IN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 10/28 Accomplish Various Airport Surface Preservation Maintenance (Skwentna Rehab Threshold Markings) (RE RW IM)

9/20/2015

9/21/2015

$225,750

$4,620

$0

$0

$225,750

$4,620

$2,004,901 $134,296 $2,139,197

Sleetmute Sleetmute (SLQ)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 14/32 (Maintenance) (RE RW IM)

8/30/2005 6/9/2010 $10,000 $0 $10,000

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

9/22/2014 $36,093 $0 $36,093

$46,093 $0 $46,093

Soldotna Soldotna (SXQ)

3-02-0274-001-1984 Improve Building (ST BD MS) 9/13/1984 1/26/1989 $0 $436,341 $436,341

Expand Apron (CA AP EX) 9/13/1984 1/26/1989 $0 $971,606 $971,606

Improve Access Road 7/25 (OT GT AC) 9/13/1984 1/26/1989 $0 $138,290 $138,290

Expand Apron (ST AP IM) 9/13/1984 1/26/1989 $0 $1,157,372 $1,157,372

Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

9/13/1984 1/26/1989 $0 $180,469 $180,469

3-02-0274-002-1988 Acquire Aircraft Rescue & Fire Fighting Safety Equipment (ST EQ MS)

9/7/1988 4/9/1990 $290,049 $0 $290,049

3-02-0274-003-1995 Rehabilitate Apron (RE AP IM)

Rehabilitate Taxiway (RE TW IM)

9/18/1995

9/18/1995

7/14/1999

7/14/1999

$0

$0

$404,489

$260,000

$404,489

$260,000

Extend Runway 07/25 (ST RW IM) 9/18/1995 7/14/1999 $0 $870,000 $870,000

3-02-0274-004-2001 Conduct Airport Master Plan Study (PL PL MA) 7/9/2001 7/28/2005 $313,845 $0 $313,845

3-02-0274-005-2005 Construct Runway Turf (Phae 1 design and EA) (ST RW CO)

8/1/2005 1/18/2011 $341,971 $0 $341,971

3-02-0274-006-2007 Acquire Miscellaneous Land (ST LA MS) 4/25/2007 7/1/2011 $1,122,990 $0 $1,122,990

3-02-0274-007-2007 Construct Runway Turf (construct ski strip & RSA and drainage improvements) (ST RW CO)

8/7/2007 1/20/2015 $1,822,354 $0 $1,822,354

Extend Runway Safety Area 07/25 (ST RW SF) 8/7/2007 1/20/2015 $1,448,513 $404,065 $1,852,578

3-02-0274-008-2008 Construct Apron Construct Apron Phase 1 (Design) (ST AP CO)

6/12/2008 $190,000 $0 $190,000

Monday, January 11, 2016 Page 105 of 124

Page 107: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0274-009-2009 Acquire Snow Removal Equipment Acquire SRE 8/7/2009 9/22/2010 $436,865 $0 $436,865 equipment (ST EQ SN)

3-02-0274-010-2010 Construct Apron Relocate utilities and road (ST AP CO) 9/17/2010 $1,546,891 $0 $1,546,891

3-02-0274-011-2012 Rehabilitate Apron (RE AP IM) 9/17/2012 $1,000,000 $0 $1,000,000

Construct Apron Construct Apron Phase 2 (ST AP CO) 9/17/2012 $1,496,701 $0 $1,496,701

Rehabilitate Runway 07/25 Runway remarking (RE RW 9/17/2012 $242,664 $0 $242,664 IM)

3-02-0274-012-2014 Conduct Airport Master Plan Study Conduct Airport 9/4/2014 $468,750 $0 $468,750 Master Plan -- PH I (PL PL MA)

3-02-0274-013-2014 Construct Apron Construct Apron Phase 3 (ST AP CO) 9/16/2014 $1,250,000 $0 $1,250,000

Rehabilitate Taxiway Taxilane Asphalt Rehabilitation 9/16/2014 $2,000,000 $0 $2,000,000 (RE TW IM)

3-02-0274-014-2015 Conduct Airport Master Plan Study Conduct 6/25/2015 $250,000 $0 $250,000 aeronautical study -- PH II of Airport Master Plan (PL PL MA)

$14,221,593 $4,822,632 $19,044,225

South Naknek South Naknek Nr 2 (WSN)

3-02-0186-001-1996 Improve Snow Removal Equipment Building (ST BD 9/20/1996 9/20/2000 $168,750 $0 $168,750 SN)

Rehabilitate Runway 17/35 (RE RW IM) 9/20/1996 9/20/2000 $1,102,530 $0 $1,102,530

Construct Runway 12/30 (ST RW CO) 9/20/1996 9/20/2000 $843,750 $0 $843,750

Construct Taxiway (ST TW CO) 9/20/1996 9/20/2000 $140,625 $0 $140,625

Improve Access Road (OT GT AC) 9/20/1996 9/20/2000 $187,500 $0 $187,500

Expand Apron (CA AP EX) 9/20/1996 9/20/2000 $234,375 $0 $234,375

Acquire Snow Removal Equipment (ST EQ SN) 9/20/1996 9/20/2000 $178,125 $0 $178,125

Acquire Land for Development (ST LA DV) 9/20/1996 9/20/2000 $281,250 $0 $281,250

Install Runway Lighting (ST RW LI) 9/20/1996 9/20/2000 $215,625 $0 $215,625

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 04/22 (Maintenance) 6/19/2008 6/10/2014 $8,100 $0 $8,100 (RE RW IM)

$3,360,630 $0 $3,360,630

St Mary's St Mary's (KSM)

3-02-0017-001-1984 Improve Building (ST BD MS) 9/14/1984 4/13/1988 $278,544 $0 $278,544

Acquire Aircraft Rescue & Fire Fighting Safety 9/14/1984 4/13/1988 $49,249 $0 $49,249 Equipment (ST EQ MS)

3-02-0017-002-1992 Improve Aircraft Rescue & Fire Fighting Building (SA 9/28/1992 6/12/2000 $0 $486,913 $486,913 BD EX)

Improve Airport Drainage (ST OT IM) 9/28/1992 6/12/2000 $0 $705,243 $705,243

Acquire Aircraft Rescue & Fire Fighting Vehicle (ST EQ 9/28/1992 6/12/2000 $0 $330,000 $330,000 RF)

3-02-0017-003-1993 Improve Access Road (OT GT AC) 5/26/1993 9/26/1996 $196,711 $0 $196,711

Acquire Security Equipment (SA EQ SE) 5/26/1993 9/26/1996 $118,345 $0 $118,345

Rehabilitate Runway 16/34 (RE RW IM) 5/26/1993 9/26/1996 $1,120,889 $154,521 $1,275,410

Rehabilitate Runway 6/24 (RE RW IM) 5/26/1993 9/26/1996 $149,920 $0 $149,920

Rehabilitate Taxiway (RE TW IM) 5/26/1993 9/26/1996 $95,578 $0 $95,578

Construct Apron (ST AP CO) 5/26/1993 9/26/1996 $258,204 $0 $258,204

Remove Obstructions (ST OT OB) 5/26/1993 9/26/1996 $299,597 $0 $299,597

Monday, January 11, 2016 Page 106 of 124

Page 108: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0017-003-1993 Expand Apron (ST AP IM) 5/26/1993 9/26/1996 $698,766 $0 $698,766

3-02-0017-004-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/14/1994 9/9/1997 $449,127 $0 $449,127

3-02-0017-005-1996 Extend Runway 16/34 (ST RW IM) 9/23/1996 1/24/2000 $350,408 $0 $350,408

Rehabilitate Runway Lighting (RE RW LI) 9/23/1996 1/24/2000 $291,491 $2,008 $293,499

Rehabilitate Runway Lighting (RE RW LI) 9/23/1996 1/24/2000 $0 $337,155 $337,155

3-02-0200-058-2007 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE: Grader (ST EQ SN)

8/31/2007 12/7/2009 $310,000 $0 $310,000

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 17/35 (Maintenance) (RE RW IM)

5/31/2007 8/6/2013 $275,576 $0 $275,576

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 17/35 Surface Preservation Maintenance (St. Mary's) (RE RW IM)

9/18/2013 $375,600 $0 $375,600

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

9/22/2014 $46,406 $0 $46,406

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 17/35 (+08J) Various Surface Preservation Maintenance: St. Mary's -Surface Repair (RE RW IM)

9/19/2014 $360,937 $0 $360,937

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (St. Marys Loader and Blower) (ST EQ SN)

9/21/2015 $433,416 $0 $433,416

$6,158,764 $2,015,840 $8,174,604

St Michael St Michael (SMK)

3-02-0276-001-1991 Conduct Airport Master Plan Study (PL PL MA) 8/20/1991 9/9/1997 $218,046 $0 $218,046

3-02-0276-002-1993 Acquire Snow Removal Equipment (ST EQ SN) 9/17/1993 3/15/2000 $319,570 $0 $319,570

Improve Access Road (OT GT AC) 9/17/1993 3/15/2000 $378,781 $0 $378,781

Install Runway Lighting (ST RW LI) 9/17/1993 3/15/2000 $159,438 $0 $159,438

Construct Apron (ST AP CO) 9/17/1993 3/15/2000 $379,065 $100,228 $479,293

Improve Snow Removal Equipment Building (ST BD SN)

9/17/1993 3/15/2000 $376,092 $0 $376,092

Construct Taxiway (ST TW CO) 9/17/1993 3/15/2000 $114,107 $0 $114,107

Construct Runway 02/20 (ST RW CO) 9/17/1993 3/15/2000 $2,523,105 $207,000 $2,730,105

Acquire Land for Development (ST LA DV) 9/17/1993 3/15/2000 $775,000 $0 $775,000

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 02/20 St. Michael Various Surface Maintenance (RE RW IM)

3/12/2010 12/9/2015 $170,240 $0 $170,240

$5,413,444 $307,228 $5,720,672

St Paul Island St Paul Island (SNP)

3-02-0277-005-2002 Strengthen Runway 18/36 (Design - Phase 1) (ST RW IM)

9/19/2002 1/23/2006 $149,375 $250,000 $399,375

Install Perimeter Fencing (ST EQ SE) 9/19/2002 1/23/2006 $0 $794,364 $794,364

3-02-0277-006-2004 Strengthen Runway 18/36 (ST RW IM) 7/1/2004 9/16/2008 $769,439 $10,592,598 $11,362,037

Construct Snow Removal Equipment Building (ST BD SN)

7/1/2004 9/16/2008 $1,282,806 $0 $1,282,806

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) (RE RW IM)

6/19/2008 6/10/2014 $126,900 $0 $126,900

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 18/36 St. Paul Various Surface Maintenance (RE RW IM)

3/12/2010 12/9/2015 $133,594 $0 $133,594

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation Maintenance (St Paul) (RE RW IM)

9/19/2012 $157,500 $0 $157,500

Monday, January 11, 2016 Page 107 of 124

Page 109: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-097-2014 9/19/2014 [Various Grnt] Acquire Snow Removal Equipment (+08J) Acquire SRE: Saint Paul - Plow (ST EQ SN)

$667,168 $0 $667,168

$3,286,782 $11,636,962 $14,923,745

St. George St George (PBV)

3-02-0416-001-1991 6/27/1991 9/25/1997 Acquire Snow Removal Equipment (ST EQ SN) $76,323 $0 $76,323

6/27/1991 9/25/1997 Construct Taxiway (ST TW CO) $382,277 $0 $382,277

6/27/1991 9/25/1997 Construct Runway 11/29 (ST RW CO) $5,806,071 $0 $5,806,071

6/27/1991 9/25/1997 Improve Access Road (OT GT AC) $179,215 $0 $179,215

3-02-0416-002-1991 3/19/1991 7/14/2000 Acquire Land for Development (ST LA DV) $539,063 $18,083 $557,146

3-02-0416-003-1993 6/30/1993 9/15/2000 Conduct Airport Master Plan Study (PL PL MA) $259,764 $0 $259,764

3-02-0416-004-1996 8/29/1996 5/12/2000 Remove Obstructions (SA OT OB) $740,020 $7,893 $747,913

3-02-0416-005-2002 9/19/2002 4/21/2006 Strengthen Runway 11/29 (Design) (ST RW IM) $100,000 $456,178 $556,178

3-02-0200-050-2005 8/19/2005 12/19/2013 [Various Grnt] Acquire Snow Removal Equipment (Loader / Motor Grader / Truck w/sander & Broom / Towed Broom) (ST EQ SN)

$774,965 $0 $774,965

3-02-0416-006-2005 8/15/2005 8/1/2012 Modify Access Road (OT GT AC) $519,205 $0 $519,205

8/15/2005 8/1/2012 Strengthen Runway 11/29 Phase 2 (Construction) (ST RW IM)

$2,000,000 $7,785,659 $9,785,659

8/15/2005 8/1/2012 Construct Snow Removal Equipment Building (ST BD SN)

$900,000 $0 $900,000

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 11/29 Various Surface Preservation Maintenance (St George) (RE RW IM)

$105,000 $0 $105,000

$12,381,903 $8,267,813 $20,649,716

State of Alaska State of Alaska (*AKS)

3-02-0000-0S1-1988 9/26/1988 9/25/1997 Conduct Vertiport Plan (PL PL VT) $0 $256,856 $256,856

3-02-0000-0S2-1991 9/10/1991 1/18/2000 Conduct State System Plan Study (PL PL ST) $0 $499,807 $499,807

3-02-0000-0S3-1992 9/3/1992 9/27/1999 Conduct State System Plan Study (PL PL ST) $0 $229,147 $229,147

3-02-0000-0S4-1994 6/28/1994 8/1/2000 Conduct State System Plan Study (PL PL ST) $0 $141,216 $141,216

3-02-0000-0S5-1994 9/27/1994 8/23/2000 Conduct State System Plan Study (PL PL ST) $0 $743,272 $743,272

3-02-0000-0S6-1995 6/2/1995 8/21/2000 Conduct State System Plan Study (PL PL ST) $0 $500,000 $500,000

3-02-0000-0S7-1995 8/9/1995 1/29/1999 Conduct State System Plan Study (PL PL ST) $200,000 $150,000 $350,000

3-02-0000-0S8-1995 9/19/1995 8/22/2000 Conduct State System Plan Study (PL PL ST) $421,875 $0 $421,875

3-02-0000-0S9-1996 8/22/1996 9/6/2000 Conduct State System Plan Study (PL PL ST) $0 $504,572 $504,572

3-02-0000-0SA-199 9/10/1997 9/24/2001 Conduct State System Plan Study (PL PL ST) $36,884 $0 $36,884

3-02-0000-0SB-199 9/10/1997 9/24/2001 Conduct State System Plan Study (PL PL ST) $252,494 $300,000 $552,494

3-02-0000-0SC-199 5/18/1998 9/12/2002 Conduct State System Plan Study (PL PL ST) $0 $79,687 $79,687

3-02-0000-0SD-199 9/10/1998 9/13/2002 Conduct State System Plan Study (PL PL ST) $175,000 $94,436 $269,436

3-02-0000-0SE-199 3/25/1999 9/9/2003 Conduct State System Plan Study (PL PL ST) $560,279 $0 $560,279

3-02-0000-0SF-2000 7/28/2000 8/26/2004 Conduct State System Plan Study (PL PL ST) $503,568 $0 $503,568

3-02-0000-0SG-200 9/15/2000 8/25/2004 Conduct State System Plan Study (PL PL ST) $564,531 $0 $564,531

3-02-0000-0SH-200 9/7/2001 8/10/2005 Conduct State System Plan Study (PL PL ST) $874,706 $0 $874,706

3-02-0000-0SI-2001 9/25/2001 8/25/2005 Conduct State System Plan Study (PL PL ST) $0 $273,033 $273,033

3-02-0000-001-2002 9/26/2002 2/21/2006 Update State System Plan Study (PL PL ST) $726,755 $0 $726,755

3-02-0000-002-2003 8/22/2003 8/21/2006 Update State System Plan Study (PL PL ST) $649,127 $0 $649,127

Monday, January 11, 2016 Page 108 of 124

Page 110: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0000-003-2004 Update State System Plan Study (PL PL ST) 8/20/2004 3/28/2008 $754,972 $0 $754,972

3-02-0000-004-2005 Update State System Plan Study (PL PL ST) 8/25/2005 6/17/2010 $1,633,686 $0 $1,633,686

3-02-0000-005-2006 Update State System Plan Study (PL PL ST) 9/5/2006 7/12/2011 $2,410,925 $0 $2,410,925

Update State System Plan Study (Anchorage Seaplane 9/5/2006 7/12/2011 $100,000 $0 $100,000 Base Economic Study) (PL PL ST)

3-02-0000-006-2007 Update State System Plan Study (PL PL ST) 8/20/2007 7/26/2012 $2,419,011 $0 $2,419,011

3-02-0000-009-2008 Update State System Plan Study (PL PL ST) 6/12/2008 5/20/2014 $2,035,406 $0 $2,035,406

3-02-0000-011-2009 Update State System Plan Study (PL PL ST) 8/17/2009 12/23/2014 $2,653,371 $0 $2,653,371

3-02-0000-014-2010 Update State System Plan Study (PL PL ST) 9/23/2010 $2,500,000 $0 $2,500,000

3-02-0000-016-2011 Update State System Plan Study system planning (PL 9/16/2011 $2,000,000 $0 $2,000,000 PL ST)

3-02-0000-017-2012 Conduct State System Plan Study Int'l System Plan, 7/23/2012 6/2/2015 $379,999 $0 $379,999 Phase 2 (PL PL ST)

3-02-0000-018-2012 Update State System Plan Study ongoing statewide 9/19/2012 $1,174,098 $0 $1,174,098 system plan study (PL PL ST)

3-02-0000-019-2013 Update State System Plan Study (PL PL ST) 9/10/2013 $2,000,000 $0 $2,000,000

3-02-0000-020-2014 Update State System Plan Study (PL PL ST) 9/11/2014 $1,600,289 $0 $1,600,289

3-02-0000-021-2015 Update State System Plan Study (PL PL ST) 8/27/2015 $2,000,000 $0 $2,000,000

$28,626,976 $3,772,026 $32,399,002

Various Locations in Alaska (*AKV)

3-02-0200-001-1990 Acquire Aircraft Rescue & Fire Fighting Safety 7/6/1990 11/15/1991 $176,390 $0 $176,390 Equipment P (ST EQ MS)

3-02-0200-003-1992 Acquire Snow Removal Equipment P (ST EQ SN) 8/25/1992 12/6/1994 $647,904 $0 $647,904

3-02-0200-004-1993 Acquire Snow Removal Equipment GA (ST EQ SN) 12/8/1992 8/8/1995 $292,694 $0 $292,694

3-02-0200-005-1993 Install Guidance Signs (SA OT SG) 5/5/1993 11/2/1994 $321,708 $6,481 $328,189

3-02-0200-006-1993 Install Guidance Signs PN (SA OT SG) 9/1/1993 7/14/1999 $0 $386,500 $386,500

Install Guidance Signs GA (SA OT SG) 9/1/1993 7/14/1999 $75,022 $0 $75,022

3-02-0200-007-1993 Acquire Snow Removal Equipment PN (ST EQ SN) 8/10/1993 9/25/1997 $0 $1,063,137 $1,063,137

Acquire Snow Removal Equipment GA (ST EQ SN) 8/10/1993 9/25/1997 $363,493 $0 $363,493

3-02-0200-008-1993 Install Guidance Signs PN (SA OT SG) 9/10/1993 6/12/2000 $64,506 $0 $64,506

Install Guidance Signs CS (SA OT SG) 9/10/1993 6/12/2000 $42,812 $0 $42,812

3-02-0200-010-1994 Acquire Snow Removal Equipment (ST EQ SN) 9/30/1994 4/18/2000 $0 $1,391,075 $1,391,075

3-02-0200-009-1995 Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $1,413,249 $3,550 $1,416,799

Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $360,083 $0 $360,083

Acquire Snow Removal Equipment (ST EQ SN) 2/24/1995 7/12/2000 $1,483,909 $0 $1,483,909

3-02-0200-011-1995 Acquire Snow Removal Equipment (ST EQ SN) 7/19/1995 10/26/1998 $1,160,181 $0 $1,160,181

3-02-0200-012-1996 Acquire Snow Removal Equipment (ST EQ SN) 8/2/1996 10/26/1998 $472,145 $0 $472,145

Acquire Snow Removal Equipment (ST EQ SN) 8/2/1996 10/26/1998 $683,625 $0 $683,625

3-02-0200-013-1996 Non primary development projects in state block grant 9/16/1996 $0 $0 $0 program (SB GP PP)

3-02-0200-014-1996 Acquire Aircraft Rescue & Fire Fighting Safety 7/24/1996 9/23/1998 $46,993 $0 $46,993 Equipment (ST EQ MS)

3-02-0200-015-1996 Improve Snow Removal Equipment Building (ST BD 9/27/1996 5/12/2000 $770,588 $45,104 $815,692 SN)

3-02-0200-016-1996 Acquire Snow Removal Equipment (ST EQ SN) 8/23/1996 7/14/1999 $583,848 $1,455 $585,303

3-02-0200-017-1996 Acquire Land For Approaches (ST LA SZ) 9/20/1996 7/14/1999 $163,846 $0 $163,846

Acquire Land for Development (ST LA DV) 9/20/1996 7/14/1999 $263,268 $0 $263,268

3-02-0200-018-1996 Acquire Aircraft Rescue & Fire Fighting Safety 9/27/1996 8/30/2000 $488,126 $0 $488,126 Equipment GA (ST EQ MS)

3-02-0200-019-1997 Acquire Aircraft Rescue & Fire Fighting Safety 9/29/1997 9/24/2001 $413,667 $0 $413,667 Equipment (ST EQ MS)

Monday, January 11, 2016 Page 109 of 124

Page 111: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-020-1998 Acquire Snow Removal Equipment (ST EQ SN) 9/10/1998 9/26/2001 $1,471,795 $0 $1,471,795

3-02-0200-021-1998 Acquire Snow Removal Equipment (ST EQ SN) 8/26/1998 4/17/2000 $424,269 $0 $424,269

3-02-0200-022-1998 Acquire Snow Removal Equipment (ST EQ SN) 9/28/1998 9/4/2001 $528,075 $0 $528,075

Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/28/1998 9/4/2001 $443,216 $0 $443,216 EQ RF)

3-02-0200-023-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/5/2001 $352,750 $0 $352,750

3-02-0200-024-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 1/26/2001 $402,393 $0 $402,393

3-02-0200-025-2000 Install Airfield Guidance Signs (ST OT SG) 9/6/2000 8/27/2003 $73,032 $0 $73,032

3-02-0200-026-2000 Rehabilitate Apron (RE AP IM) 8/30/2000 6/25/2003 $62,000 $0 $62,000

Rehabilitate Runway Various (RE RW IM) 8/30/2000 6/25/2003 $168,469 $0 $168,469

Rehabilitate Taxiway (RE TW IM) 8/30/2000 6/25/2003 $78,000 $0 $78,000

3-02-0200-027-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/13/2001 8/31/2004 $2,400,000 $107,599 $2,507,599

3-02-0200-028-2001 Acquire Snow Removal Equipment (ST EQ SN) 3/21/2001 8/3/2004 $975,546 $0 $975,546

3-02-0200-029-2001 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 8/30/2001 6/25/2003 $446,263 $0 $446,263 EQ RF)

3-02-0200-030-2001 Acquire Snow Removal Equipment (ST EQ SN) 6/25/2001 9/9/2003 $500,716 $0 $500,716

3-02-0200-031-2001 Rehabilitate Runway (RE RW IM) 8/16/2001 2/24/2005 $1,105,317 $0 $1,105,317

3-02-0200-032-2002 Security Enhancements (SE SE SE) 6/18/2002 2/14/2005 $0 $987,682 $987,682

3-02-0200-033-2002 Acquire Snow Removal Equipment Northern Region 9/12/2002 3/29/2005 $2,902,217 $0 $2,902,217 (ST EQ SN)

3-02-0200-034-2002 Acquire Handicap Passenger Lift Device (ST TE MS) 7/23/2002 3/30/2006 $1,577,513 $0 $1,577,513

3-02-0200-035-2002 Rehabilitate Runway Maintenance (RE RW IM) 8/27/2002 1/24/2006 $1,265,592 $0 $1,265,592

3-02-0200-036-2002 Security Enhancements (SE SE SE) 8/21/2002 8/1/2006 $0 $1,131,330 $1,131,330

3-02-0200-037-2002 Acquire Snow Removal Equipment Southeast Region 9/17/2002 2/23/2005 $2,094,659 $0 $2,094,659 (ST EQ SN)

3-02-0200-038-2002 Acquire Snow Removal Equipment Central Region (ST 9/12/2002 3/27/2006 $4,155,735 $0 $4,155,735 EQ SN)

3-02-0200-039-2003 Rehabilitate Runway Various (Maintenance) (RE RW IM) 7/7/2003 1/12/2007 $1,551,791 $0 $1,551,791

3-02-0200-040-2003 Modify Snow Removal Equipment Building (ST BD SN) 8/27/2003 1/12/2007 $1,475,073 $0 $1,475,073

3-02-0200-041-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/13/2003 3/13/2007 $3,149,527 $21,266 $3,170,792

3-02-0200-042-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/26/2003 1/12/2007 $1,180,345 $0 $1,180,345

3-02-0200-043-2003 Acquire Snow Removal Equipment (ST EQ SN) 8/27/2003 1/12/2007 $4,694,035 $0 $4,694,035

3-02-0200-044-2003 Acquire Friction Measuring Equipment (ST EQ SR) 8/27/2003 7/9/2007 $1,459,093 $0 $1,459,093

3-02-0200-045-2004 Rehabilitate Runway Various (RE RW IM) 7/1/2004 3/28/2008 $3,515,614 $0 $3,515,614

3-02-0200-046-2004 Acquire Snow Removal Equipment -Central Region (ST 8/26/2004 4/30/2008 $3,513,623 $0 $3,513,623 EQ SN)

3-02-0200-047-2004 Acquire Snow Removal Equipment -Southeast Region 6/28/2004 1/12/2007 $1,526,401 $0 $1,526,401 (ST EQ SN)

3-02-0200-048-2004 Acquire Snow Removal Equipment -Northern Region 8/26/2004 8/23/2007 $2,213,734 $0 $2,213,734 (ST EQ SN)

$55,994,847 $5,145,179 $61,140,026

Stebbins Stebbins (WBB)

3-02-0279-001-1995 Improve Snow Removal Equipment Building (ST BD 8/3/1995 9/21/2000 $280,210 $0 $280,210 SN)

Acquire Snow Removal Equipment (ST EQ SN) 8/3/1995 9/21/2000 $153,750 $0 $153,750

Extend Runway 05/23 (ST RW IM) 8/3/1995 9/21/2000 $725,520 $0 $725,520

Construct Apron (ST AP CO) 8/3/1995 9/21/2000 $95,437 $0 $95,437

Acquire Land For Approaches (ST LA SZ) 8/3/1995 9/21/2000 $193,922 $0 $193,922

Install Runway Lighting (ST RW LI) 8/3/1995 9/21/2000 $263,156 $0 $263,156

Monday, January 11, 2016 Page 110 of 124

Page 112: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)

$47,453 $0 $47,453

3-02-0200-066-2008 6/19/2008 6/10/2014 [Various Grnt] Rehabilitate Runway 05/23 (Maintenance) (RE RW IM)

$116,222 $0 $116,222

3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Stebbins (Dozer) (ST EQ SN)

$343,057 $0 $343,057

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 05/23 (+08J) Various Surface Preservation Maintenance: Stebbins -Surface Repair, Dust Control (RE RW IM)

$376,837 $0 $376,837

$2,595,564 $0 $2,595,564

Stevens Village Stevens Village (SVS)

3-02-0444-001-2001 9/5/2001 5/17/2005 Improve Snow Removal Equipment Building (ST BD SN)

$270,446 $0 $270,446

9/5/2001 5/17/2005 Acquire Snow Removal Equipment (ST EQ SN) $205,894 $0 $205,894

9/5/2001 5/17/2005 Construct New Airport (ST NA CO) $5,056,196 $0 $5,056,196

3-02-0444-002-2005 8/8/2005 8/28/2009 Construct New Airport Phase 2 (Surfacing) (ST NA CO) $6,107,808 $0 $6,107,808

8/8/2005 8/28/2009 Construct Snow Removal Equipment Building (ST BD SN)

$600,000 $0 $600,000

3-02-0000-007-2007 8/28/2007 1/28/2013 Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $131,410 $131,410

3-02-0200-074-2010 7/7/2010 2/25/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Stevens Village Loader (ST EQ SN)

$218,500 $0 $218,500

$12,458,844 $131,410 $12,590,254

Stony River Stony River 2 (SRV)

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 18/36 Various Surface Preservation (RE RW IM)

$212,800 $0 $212,800

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 18/36 Accomplish Various Airport Surface Preservation Maintenance (Stony River Improve Runway Drainage) (RE RW IM)

$42,000 $0 $42,000

$254,800 $0 $254,800

Takotna Takotna (TCT)

3-02-0284-001-1999 5/20/1999 9/13/2002 Conduct Airport Master Plan Study (PL PL MA) $80,852 $0 $80,852

3-02-0284-002-2000 8/24/2000 7/3/2007 Conduct Airport Master Plan Study (PL PL MA) $205,467 $0 $205,467

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 06/24 (Maintenance) (RE RW IM)

$23,408 $0 $23,408

3-02-0200-071-2009 9/17/2009 10/28/2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Central Region): Loader with Attachments and Grader with Attachments (ST EQ SN)

$613,548 $0 $613,548

3-02-0472-001-2009 8/10/2009 Construct New Airport phase 1 (ST NA CO) $10,050,000 $7,733,074 $17,783,074

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 04/22 Surface Preservation Maintenance (Takotna) (RE RW IM)

$168,000 $0 $168,000

$11,141,275 $7,733,074 $18,874,349

Monday, January 11, 2016 Page 111 of 124

Page 113: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Talkeetna Talkeetna (TKA)

3-02-0287-001-1986 Extend Runway 18/36 (ST RW IM) 9/11/1986 2/11/1991 $802,520 $0 $802,520

Rehabilitate Taxiway (RE TW IM) 9/11/1986 2/11/1991 $21,000 $0 $21,000

Expand Apron (ST AP IM) 9/11/1986 2/11/1991 $235,250 $0 $235,250

Install Apron Lighting (ST AP LI) 9/11/1986 2/11/1991 $80,000 $0 $80,000

3-02-0287-002-1995 Conduct Airport Master Plan Study (PL PL MA) 9/18/1995 9/24/2001 $281,250 $0 $281,250

3-02-0287-003-1996 Improve Snow Removal Equipment Building (ST BD 7/23/1996 8/23/2000 $620,279 $0 $620,279 SN)

Construct Taxiway (ST TW CO) 7/23/1996 8/23/2000 $1,866,312 $0 $1,866,312

Expand Apron (CA AP EX) 7/23/1996 8/23/2000 $100,000 $0 $100,000

Install Apron Lighting (ST AP LI) 7/23/1996 8/23/2000 $200,000 $0 $200,000

Improve Service Road (OT GT SV) 7/23/1996 8/23/2000 $50,000 $0 $50,000

Acquire Land for Development (ST LA DV) 7/23/1996 8/23/2000 $200,000 $0 $200,000

3-02-0200-050-2005 [Various Grnt] Acquire Snow Removal Equipment (U- 8/19/2005 12/19/2013 $20,321 $0 $20,321 Blade) (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 18/36 (Maintenance) 6/19/2008 6/10/2014 $26,000 $0 $26,000 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 18/36 (Various 8/20/2009 12/19/2014 $16,031 $0 $16,031 Surface Maintenance) (RE RW IM)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 18/36 Talkeetna 3/12/2010 12/9/2015 $106,685 $0 $106,685 Various Surface Maintenance (RE RW IM)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $63,000 $0 $63,000 Obstructions (Various - Ta keetna) (SA OT OB)

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 18/36 (+08J) 9/19/2014 $63,000 $0 $63,000 Various Surface Preservation Maintenance: Talkeetna - Pavement Markings and Crack Seal (RE RW IM)

3-02-0287-004-2015 Construct Taxiway (ST TW CO) 9/16/2015 $700,000 $0 $700,000

Remove Obstructions Remove trees & brush (ST OT 9/16/2015 $344,541 $0 $344,541 OB)

Rehabilitate Taxiway Phase 1 (RE TW IM) 9/16/2015 $573,038 $0 $573,038

Rehabilitate Runway 18/36 Phase 1 (RE RW IM) 9/16/2015 $701,094 $0 $701,094

Rehabilitate Apron Phase 1 (RE AP IM) 9/16/2015 $500,000 $0 $500,000

Construct Apron Construct transient and GA apron, 9/16/2015 $1,181,327 $0 $1,181,327 phase 1 (ST AP CO)

Construct Access Road (OT GT AC) 9/16/2015 $2,500,000 $0 $2,500,000

$11,251,648 $0 $11,251,648

Tanana Ralph M Calhoun Memorial (TAL)

3-02-0290-001-1985 Install Runway Lighting 6/24 (ST RW LI) 8/27/1985 9/22/1988 $162,187 $0 $162,187

Rehabilitate Runway 6/24 (RE RW IM) 8/27/1985 9/22/1988 $153,681 $923,560 $1,077,241

3-02-0290-002-2004 Expand Apron (ST AP IM) 9/1/2004 7/20/2010 $1,500,000 $0 $1,500,000

Extend Runway Safety Area 07/25 (ST RW SF) 9/1/2004 7/20/2010 $750,000 $4,329,215 $5,079,215

Rehabilitate Runway 07/25 (RE RW IM) 9/1/2004 7/20/2010 $5,300,000 $0 $5,300,000

Construct Snow Removal Equipment Building (ST BD 9/1/2004 7/20/2010 $764,840 $0 $764,840 SN)

3-02-0200-080-2011 [Various Grnt] Acquire Snow Removal Equipment 6/8/2011 11/12/2014 $370,500 $0 $370,500 Acquire Various SRE (Northern Region): Tanana (Grader with Plow and Wing) (ST EQ SN)

Monday, January 11, 2016 Page 112 of 124

Page 114: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-098-2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) 9/19/2014 $245,953 $0 $245,953 Various Surface Preservation Maintenance: Tanana -Surface Repair, Dust Control (RE RW IM)

$9,247,161 $5,252,775 $14,499,936

Tatitlek Tatitlek (7KA)

3-02-0342-001-1991 Conduct Airport Master Plan Study (PL PL MA) 9/5/1991 9/27/1999 $232,790 $0 $232,790

3-02-0342-002-1995 Improve Access Road (OT GT AC) 9/14/1995 9/12/2000 $264,063 $0 $264,063

Extend Runway 12/30 (ST RW IM) 9/14/1995 9/12/2000 $3,608,381 $0 $3,608,381

Extend Taxiway (ST TW IM) 9/14/1995 9/12/2000 $117,187 $0 $117,187

Expand Apron (CA AP EX) 9/14/1995 9/12/2000 $234,375 $0 $234,375

Improve Building (ST BD MS) 9/14/1995 9/12/2000 $468,750 $0 $468,750

Install Runway Lighting (ST RW LI) 9/14/1995 9/12/2000 $206,250 $0 $206,250

3-02-0342-003-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 6/7/2000 $110,114 $0 $110,114

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 12/30 (Maintenance) 6/30/2006 2/27/2012 $121,268 $0 $121,268 (RE RW IM)

3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $75,000 $0 $75,000 Obstruction Removal (Tatitlek) (ST OT OB)

3-02-0200-084-2012 [Various Grnt] Remove Obstructions Remove 7/23/2012 $20,681 $0 $20,681 Obstructions (Various - Tatitlek) (SA OT OB)

3-02-0200-088-2012 [Various Grnt] Conduct aeronautical survey for WAAS 9/19/2012 $0 $231,875 $231,875 approach (PL PL VI)

$5,458,859 $231,875 $5,690,734

Teller Teller (TER)

3-02-0333-001-1990 Improve Snow Removal Equipment Building (ST BD 2/28/1990 1/5/1994 $142,789 $0 $142,789 SN)

Acquire Snow Removal Equipment (ST EQ SN) 2/28/1990 1/5/1994 $142,167 $0 $142,167

Install Apron Lighting (ST AP LI) 2/28/1990 1/5/1994 $45,352 $0 $45,352

Install Runway Lighting (ST RW LI) 2/28/1990 1/5/1994 $233,251 $0 $233,251

Rehabilitate Taxiway (RE TW IM) 2/28/1990 1/5/1994 $260,767 $0 $260,767

Rehabilitate Runway 7/25 (RE RW IM) 2/28/1990 1/5/1994 $507,303 $67,051 $574,354

3-02-0333-002-1999 Extend Runway 7-25 (ST RW IM) 8/4/1999 6/4/2001 $759,973 $0 $759,973

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) 8/30/2005 6/9/2010 $190,000 $0 $190,000 (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $333,133 $0 $333,133 Acquire SRE (Dozer) (ST EQ SN)

$2,614,735 $67,051 $2,681,786

Tenakee Springs Tenakee (TKE)

3-02-0295-001-2005 Rehabilitate Seaplane Base (RE SB IM) 8/30/2005 1/26/2010 $1,209,759 $0 $1,209,759

$1,209,759 $0 $1,209,759

Tetlin Tetlin (4AK8)

3-02-0296-001-1992 Conduct Airport Master Plan Study (PL PL MA) 9/8/1992 8/30/2000 $277,513 $0 $277,513

Monday, January 11, 2016 Page 113 of 124

Page 115: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0467-001-2003 8/26/2003 1/12/2007 Construct New Airport (ST NA CO) $8,435,269 $0 $8,435,269

3-02-0467-002-2004 8/24/2004 6/7/2007 Construct Snow Removal Equipment Building (ST BD SN)

$457,010 $0 $457,010

3-02-0200-051-2005 9/2/2005 4/4/2008 [Various Grnt] Acquire Snow Removal Equipment (Motor Grader) (ST EQ SN)

$209,663 $0 $209,663

3-02-0000-007-2007 8/28/2007 1/28/2013 Conduct aeronautical survey for WAAS approach (PL PL VI)

$0 $146,000 $146,000

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 08/26 (Various Surface Maintenance) (RE RW IM)

$154,280 $0 $154,280

$9,533,735 $146,000 $9,679,735

Thorne Bay Thorne Bay (KTB)

3-02-0297-001-1991 8/27/1991 6/2/1999 Improve Airport Drainage (ST OT IM) $437,349 $0 $437,349

$437,349 $0 $437,349

Togiak Village Togiak (TOG)

3-02-0200-052-2005 8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

$50,000 $0 $50,000

8/30/2005 6/9/2010 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)

$50,000 $0 $50,000

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 10/28 (Maintenance) (RE RW IM)

$58,208 $0 $58,208

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 03/21 (Maintenance) (RE RW IM)

$214,928 $0 $214,928

3-02-0200-090-2013 9/19/2013 [Various Grnt] Conduct aeronautical survey for WAAS approach (PL PL VI)

$400,000 $0 $400,000

3-02-0200-104-2015 9/21/2015 [Various Grnt] Rehabilitate Runway 03/21 Accomplish Various Airport Surface Preservation Maintenance (Togiak Rehab Threshold Markings) (RE RW IM)

$4,620 $0 $4,620

$777,756 $0 $777,756

Tok Tok Junction (6K8)

3-02-0412-001-1987 9/21/1987 1/14/2000 Install Apron Lighting (ST AP LI) $60,757 $0 $60,757

9/21/1987 1/14/2000 Expand Apron (ST AP IM) $184,636 $0 $184,636

9/21/1987 1/14/2000 Improve Access Road (CA GT AC) $248,220 $0 $248,220

9/21/1987 1/14/2000 Construct Apron (CA AP CO) $448,222 $0 $448,222

3-02-0412-002-1999 8/4/1999 9/13/2002 Construct Taxiway (ST TW CO) $315,967 $0 $315,967

8/4/1999 9/13/2002 Construct Apron (ST AP CO) $200,000 $0 $200,000

3-02-0200-056-2006 6/30/2006 2/27/2012 [Various Grnt] Rehabilitate Runway 07/25 (Maintenance) (RE RW IM)

$384,893 $0 $384,893

3-02-0200-095-2014 9/22/2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

$70,125 $0 $70,125

3-02-0200-098-2014 9/19/2014 [Various Grnt] Rehabilitate Runway 07/25 (+08J) Various Surface Preservation Maintenance: Tok - Surface Repair (RE RW IM)

$515,625 $0 $515,625

$2,428,445 $0 $2,428,445

Monday, January 11, 2016 Page 114 of 124

Page 116: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Toksook Bay Toksook Bay (OOK)

3-02-0301-001-1994 Conduct Airport Master Plan Study (PL PL MA) 9/26/1994 1/26/2000 $282,162 $0 $282,162

3-02-0441-001-2001 Improve Snow Removal Equipment Building (ST BD 8/30/2001 9/2/2005 $374,000 $0 $374,000 SN)

Construct New Airport (ST NA CO) 8/30/2001 9/2/2005 $5,114,245 $363,592 $5,477,837

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 16/34 (Maintenance) 5/31/2007 8/6/2013 $211,736 $0 $211,736 (RE RW IM)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 16/34 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Toksook Bay) (RE RW IM)

$5,992,643 $363,592 $6,356,235

Tuluksak Tuluksak (TLT)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 5/31/2007 8/6/2013 $10,640 $0 $10,640 (RE RW IM)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 02/20 (Maintenance) 6/19/2008 6/10/2014 $113,500 $0 $113,500 (RE RW IM)

3-02-0484-001-2009 Construct New Airport Phase 1 (ST NA CO) 2/26/2009 $4,876,609 $0 $4,876,609

3-02-0484-002-2009 Construct New Airport Phase 2 (ST NA CO) 8/20/2009 $3,577,523 $13,925,000 $17,502,523

3-02-0200-075-2010 [Various Grnt] Acquire Snow Removal Equipment 9/3/2010 1/20/2015 $240,741 $0 $240,741 Acquire SRE (Central Region): Tuluksak (Loader with Attachments) (ST EQ SN)

3-02-0200-083-2011 [Various Grnt] Acquire Snow Removal Equipment 9/27/2011 3/10/2015 $174,000 $0 $174,000 Central Region Various SRE: Tuluksak - Grader with attachments (ST EQ SN)

$8,993,013 $13,925,000 $22,918,013

Tuntutuliak Tuntutuliak (A61)

3-02-0303-001-1998 Construct New Airport 05-23 (ST NA CO) 9/28/1998 9/27/2002 $4,206,000 $992 $4,206,992

3-02-0303-002-2006 Construct New Airport (Includes SREB) Phase 2 (ST 8/30/2006 7/9/2013 $18,571,444 $0 $18,571,444 NA CO)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $336,983 $0 $336,983 Acquire SRE: A61--Grader w/ attachments (ST EQ SN)

3-02-0200-087-2012 [Various Grnt] Rehabilitate Runway 02/20 Various 9/19/2012 $10,500 $0 $10,500 Surface Preservation Maintenance (Tuntutuliak) (RE RW IM)

$23,124,927 $992 $23,125,919

Tununak Tununak (4KA)

3-02-0486-001-2012 Construct New Airport (ST NA CO) 9/17/2012 $12,010,000 $2,990,000 $15,000,000

3-02-0486-002-2013 Construct New Airport Phase 2 (ST NA CO) 7/5/2013 $13,622,475 $0 $13,622,475

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $667,168 $0 $667,168 Acquire Various SRE (Tununak Grader and Loader) (ST EQ SN)

$26,299,643 $2,990,000 $29,289,643

Monday, January 11, 2016 Page 115 of 124

Page 117: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

Twin Hills Twin Hills (A63)

3-02-0356-001-1994 6/27/1994 7/14/1999 Improve Runway Safety Area 01/19 (SA RW SF) $1,125,858 $0 $1,125,858

6/27/1994 7/14/1999 Acquire Land For Approaches (ST LA SZ) $55,769 $0 $55,769

6/27/1994 7/14/1999 Acquire Land for Development (ST LA DV) $8,923 $0 $8,923

6/27/1994 7/14/1999 Improve Access Road (OT GT AC) $50,888 $0 $50,888

6/27/1994 7/14/1999 Improve Snow Removal Equipment Building (ST BD SN)

$220,450 $0 $220,450

6/27/1994 7/14/1999 Acquire Snow Removal Equipment (ST EQ SN) $139,875 $0 $139,875

6/27/1994 7/14/1999 Install Runway Lighting (ST RW LI) $134,480 $0 $134,480

6/27/1994 7/14/1999 Construct Taxiway (ST TW CO) $12,563 $0 $12,563

6/27/1994 7/14/1999 Construct Apron (ST AP CO) $218,050 $0 $218,050

3-02-0200-060-2007 5/31/2007 8/6/2013 [Various Grnt] Rehabilitate Runway 01/19 (RE RW IM) $3,192 $0 $3,192

3-02-0200-089-2013 9/18/2013 [Various Grnt] Remove Obstructions Various Obstruction Removal (Twin Hills) (SA OT OB)

$21,000 $0 $21,000

3-02-0200-101-2015 9/21/2015 [Various Grnt] Acquire Snow Removal Equipment Acquire Various SRE (Twin Hills Grader) (ST EQ SN)

$382,738 $0 $382,738

$2,373,786 $0 $2,373,786

Ugashik Ugashik (9A8)

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 06/24 Ugash k Various Surface Maintenance (RE RW IM)

$212,800 $0 $212,800

$212,800 $0 $212,800

Unalakleet Unalakleet (UNK)

3-02-0309-001-1995 9/12/1995 9/13/2000 Rehabilitate Runway 08/26 (RE RW IM) $0 $2,258,226 $2,258,226

9/12/1995 9/13/2000 Acquire Land For Approaches (ST LA SZ) $0 $112,500 $112,500

9/12/1995 9/13/2000 Improve Snow Removal Equipment Building (ST BD SN)

$0 $375,000 $375,000

9/12/1995 9/13/2000 Install Runway Lighting (ST RW LI) $0 $365,625 $365,625

9/12/1995 9/13/2000 Rehabilitate Apron (RE AP IM) $0 $328,125 $328,125

9/12/1995 9/13/2000 Rehabilitate Taxiway (RE TW IM) $0 $75,860 $75,860

3-02-0309-002-2005 9/2/2005 8/20/2010 Strengthen Runway 08/26 (Phase 1) (ST RW IM) $6,177,121 $194,142 $6,371,263

9/2/2005 8/20/2010 Strengthen Runway 14/32 (Phase 1) (ST RW IM) $6,177,126 $0 $6,177,126

3-02-0309-003-2006 7/25/2006 6/6/2012 Strengthen Runway 08/26 (phase 2) (ST RW IM) $4,313,625 $0 $4,313,625

7/25/2006 6/6/2012 Construct Apron (ST AP CO) $1,061,166 $0 $1,061,166

7/25/2006 6/6/2012 Strengthen Runway 14/32 (phase 2) (ST RW IM) $6,815,272 $0 $6,815,272

3-02-0200-058-2007 8/31/2007 12/7/2009 [Various Grnt] Acquire Snow Removal Equipment (ST EQ SN)

$233,536 $0 $233,536

3-02-0200-063-2008 6/16/2008 5/21/2010 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE - Unalakleet Sander (ST EQ SN)

$75,000 $0 $75,000

3-02-0309-004-2008 9/9/2008 5/4/2010 Acquire Snow Removal Equipment Acquire SRE: Unalakleet Towed Broom (ST EQ SN)

$288,615 $0 $288,615

3-02-0309-005-2009 8/20/2009 11/25/2014 Construct Snow Removal Equipment Building Construct SREB (ST BD SN)

$5,713,351 $0 $5,713,351

Monday, January 11, 2016 Page 116 of 124

Page 118: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 08/26 Various 9/16/2011 $78,589 $0 $78,589 Surface Preservation (RE RW IM)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $365,238 $0 $365,238 Acquire Various SRE (Unalakleet Grader) (ST EQ SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 15/33 Accomplish 9/21/2015 $51,703 $0 $51,703 Various Airport Surface Preservation Maintenance (Unalakleet RWYs and TWYs Marking) (RE RW IM)

$31,350,342 $3,709,478 $35,059,820

Unalaska Unalaska (DUT)

3-02-0082-001-1987 Extend Taxiway (ST TW IM) 9/10/1987 5/26/1992 $83,912 $108,304 $192,216

Improve Access Road (OT GT AC) 9/10/1987 5/26/1992 $0 $11,848 $11,848

Acquire Security Equipment (SA EQ SE) 9/10/1987 5/26/1992 $0 $5,385 $5,385

Extend Runway 12/30 (ST RW IM) 9/10/1987 5/26/1992 $69,286 $1,811,156 $1,880,442

Improve Access Road (OT GT AC) 9/10/1987 5/26/1992 $0 $75,396 $75,396

Install Runway Lighting (ST RW LI) 9/10/1987 5/26/1992 $157,934 $14,399 $172,333

Extend Runway 12/30 (ST RW IM) 9/10/1987 5/26/1992 $157,934 $219,045 $376,979

3-02-0082-002-1992 Extend Runway 12/30 (ST RW IM) 8/19/1992 12/8/1994 $2,869,254 $0 $2,869,254

Improve Airport Drainage (ST OT IM) 8/19/1992 12/8/1994 $80,406 $0 $80,406

3-02-0082-003-1992 Install Guidance Signs (SA OT SG) 9/28/1992 9/25/1997 $0 $55,000 $55,000

Acquire Security Equipment (SA EQ SE) 9/28/1992 9/25/1997 $0 $600,900 $600,900

3-02-0082-004-1995 Improve Runway Safety Area 12/30 (ST RW SF) 9/18/1995 9/15/2000 $0 $5,116,049 $5,116,049

Rehabilitate Runway 12/30 (RE RW IM) 9/18/1995 9/15/2000 $380,250 $219,750 $600,000

3-02-0082-005-1997 Rehabilitate Taxiway (RE TW IM) 7/16/1997 9/17/2001 $50,000 $0 $50,000

Expand Apron (ST AP IM) 7/16/1997 9/17/2001 $100,000 $0 $100,000

Rehabilitate Apron (RE AP IM) 7/16/1997 9/17/2001 $814,500 $136,965 $951,465

3-02-0082-006-1997 Improve Snow Removal Equipment Building (ST BD 6/18/1997 9/17/2001 $1,105,751 $0 $1,105,751 SN)

3-02-0082-007-2000 Conduct Airport Master Plan Study (PL PL MA) 8/24/2000 8/23/2004 $312,367 $0 $312,367

3-02-0082-008-2001 Expand Apron (ST AP IM) 9/18/2001 3/9/2007 $1,080,000 $0 $1,080,000

Improve Runway Safety Area (SA RW SF) 9/18/2001 3/9/2007 $847,178 $1,257,170 $2,104,348

3-02-0082-009-2003 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 7/7/2003 3/16/2007 $24,000 $615,671 $639,671 EQ RF)

3-02-0082-010-2003 Conduct Environmental Study Planning to Support EIS, 8/22/2003 5/22/2007 $0 $716,067 $716,067 Phase 1 (EN PL MA)

3-02-0082-012-2006 Conduct Environmental Study (Planning to Support 9/11/2006 7/19/2011 $439,950 $943,935 $1,383,885 EIS) (EN PL MA)

3-02-0200-055-2006 [Various Grnt] Acquire Snow Removal Equipment 8/17/2006 7/19/2013 $278,538 $0 $278,538 (Grader w/Nose Plow and Wind Attachment) (ST EQ SN)

3-02-0082-013-2008 Conduct Environmental Study (Phase 2 EIS) (EN PL 6/19/2008 5/29/2015 $1,677,058 $822,942 $2,500,000 MA)

3-02-0200-065-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 2/5/2014 $645,167 $0 $645,167 Acquire SRE: Snow Blower w/ attachments (ST EQ SN)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 12/30 (Various 8/20/2009 12/19/2014 $234,080 $0 $234,080 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $44,205 $44,205 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 12/30 Various 9/16/2011 $69,160 $0 $69,160 Surface Preservation (RE RW IM)

Monday, January 11, 2016 Page 117 of 124

Page 119: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0082-014-2012 Extend Runway Safety Area 12/30 extend RSA (incl. 7/20/2012 $2,334,251 $7,650,000 $9,984,251 road relocate) (SA RW SF)

Extend Runway 12/30 (CA RW EX) 7/20/2012 $0 $4,300,000 $4,300,000

Rehabilitate Runway 12/30 (RE RW IM) 7/20/2012 $0 $12,000,000 $12,000,000

3-02-0200-093-2013 [Various Grnt] Rehabilitate Runway 12/30 Surface 9/18/2013 $52,500 $0 $52,500 Preservation Maintenance (Unalaska) (RE RW IM)

3-02-0082-015-2015 Construct Snow Removal Equipment Building (ST BD 8/31/2015 $4,466,356 $0 $4,466,356 SN)

Construct Sand and Chemical Storage Building (ST BD 8/31/2015 $4,082,000 $0 $4,082,000 SN)

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 13/31 Accomplish 9/21/2015 $56,895 $0 $56,895 Various Airport Surface Preservation Maintenance (Unalaska Pavement Markings) (RE RW IM)

$22,468,727 $36,724,186 $59,192,913

Valdez Valdez Pioneer Field (VDZ)

3-02-0311-001-1984 Improve Access Road (OT GT AC) 9/13/1984 2/4/1988 $208,980 $0 $208,980

Improve Airport Drainage (ST OT IM) 9/13/1984 2/4/1988 $276,197 $0 $276,197

3-02-0311-003-1994 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/7/1994 10/24/1998 $365,625 $0 $365,625 EQ RF)

Improve Snow Removal Equipment Building (ST BD 9/7/1994 10/24/1998 $675,556 $0 $675,556 SN)

3-02-0311-004-1999 Improve Aircraft Rescue & Fire Fighting Building (SA 3/25/1999 9/18/2001 $303,459 $800,000 $1,103,459 BD EX)

3-02-0311-005-2000 Conduct Airport Master Plan Study (PL PL MA) 5/30/2000 8/25/2004 $436,463 $0 $436,463

3-02-0311-006-2004 Extend Runway Safety Area 06/24 (SA RW SF) 8/6/2004 6/16/2008 $0 $6,121,492 $6,121,492

Rehabilitate Runway 06/24 (RE RW IM) 8/6/2004 6/16/2008 $8,250,000 $797,303 $9,047,303

3-02-0311-007-2004 Construct Sand and Chemical Storage Building (ST BD 8/26/2004 4/25/2008 $1,172,825 $0 $1,172,825 SN)

3-02-0200-054-2006 [Various Grnt] Acquire Snow Removal Equipment 8/21/2006 7/20/2010 $577,064 $2,361 $579,425 (Acquire Rotary Snow Blower) (ST EQ SN)

3-02-0311-008-2007 Install Perimeter Fencing (ST EQ SE) 8/15/2007 3/7/2012 $33,000 $0 $33,000

Extend Runway Safety Area 06/24 (Phase 2) (SA RW 8/15/2007 3/7/2012 $0 $3,138,106 $3,138,106 SF)

3-02-0200-063-2008 [Various Grnt] Acquire Snow Removal Equipment 6/16/2008 5/21/2010 $428,595 $0 $428,595 Acquire Northern SRE - Valdez Towed Broom (ST EQ SN)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $95,306 $95,306 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 06/24 Various 9/16/2011 $104,785 $0 $104,785 Surface Preservation (RE RW IM)

3-02-0200-082-2011 [Various Grnt] Remove Obstructions Various 9/26/2011 $35,000 $0 $35,000 Obstruction Removal (Valdez) (ST OT OB)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment 9/19/2013 $311,670 $0 $311,670 Acquire SRE (Dump Truck) (ST EQ SN)

3-02-0311-009-2014 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA 9/17/2014 $696,387 $0 $696,387 EQ RF)

3-02-0200-101-2015 [Various Grnt] Acquire Snow Removal Equipment 9/21/2015 $438,285 $0 $438,285 Acquire Various SRE (Valdez Truck with Plow and Sander) (ST EQ SN)

Monday, January 11, 2016 Page 118 of 124

Page 120: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0200-104-2015 [Various Grnt] Rehabilitate Runway 06/24 Accomplish 9/21/2015 $65,146 $0 $65,146 Various Airport Surface Preservation Maintenance (Valdez RWY and TWY Marking) (RE RW IM)

$14,379,037 $10,954,569 $25,333,605

Venetie Venetie (VEE)

3-02-0312-001-1999 Acquire Snow Removal Equipment (ST EQ SN) 6/26/1999 7/17/2000 $177,911 $18,249 $196,160

3-02-0312-002-2000 Construct Snow Removal Equipment Building (ST BD 9/5/2000 8/31/2004 $30,000 $0 $30,000 SN)

Construct New Airport (ST NA CO) 9/5/2000 8/31/2004 $412,177 $0 $412,177

3-02-0312-003-2001 Acquire Snow Removal Equipment (ST EQ SN) 4/5/2001 9/27/2002 $236,710 $0 $236,710

3-02-0312-004-2001 Rehabilitate Runway 03/21 (RE RW IM) 5/22/2001 8/27/2003 $108,562 $0 $108,562

3-02-0439-001-2001 Construct New Airport (ST NA CO) 5/22/2001 8/31/2004 $407,330 $32,924 $440,254

3-02-0439-002-2003 Construct Snow Removal Equipment Building (ST BD 6/27/2003 7/5/2007 $1,300,000 $0 $1,300,000 SN)

Construct New Airport (ST NA CO) 6/27/2003 7/5/2007 $4,581,816 $0 $4,581,816

$7,254,506 $51,173 $7,305,679

Wainwright Wainwright (AWI)

3-02-0313-001-1997 Rehabilitate Runway 04 (RE RW IM) 9/26/1997 9/26/2001 $1,104,995 $0 $1,104,995

3-02-0200-064-2008 [Various Grnt] Conduct aeronautical survey for WAAS 6/18/2008 10/27/2014 $90,000 $110,000 $200,000 approach (PL PL VI)

3-02-0200-076-2010 [Various Grnt] Conduct aeronautical survey for WAAS 9/13/2010 $50,000 $0 $50,000 approach Conduct Aeronautical Survey, Phase II (PL PL VI)

3-02-0313-002-2015 Rehabilitate Runway 05/23 Resurface Runway (RE RW 8/28/2015 $2,024,737 $934,745 $2,959,482 IM)

Rehabilitate Apron Resurface Apron (RE AP IM) 8/28/2015 $0 $203,350 $203,350

Rehabilitate Taxiway Resurface Taxiway (RE TW IM) 8/28/2015 $0 $92,280 $92,280

$3,269,732 $1,340,375 $4,610,107

Wales Wales (IWK)

3-02-0337-001-1985 Construct Taxiway (ST TW CO) 8/27/1985 6/11/1992 $293,400 $0 $293,400

Construct Apron (ST AP CO) 8/27/1985 6/11/1992 $301,843 $0 $301,843

Acquire Snow Removal Equipment (ST EQ SN) 8/27/1985 6/11/1992 $86,000 $0 $86,000

Improve Snow Removal Equipment Building (ST BD 8/27/1985 6/11/1992 $325,540 $0 $325,540 SN)

Acquire Land for Development (ST LA DV) 8/27/1985 6/11/1992 $11,250 $0 $11,250

Remove Obstructions (SA OT OB) 8/27/1985 6/11/1992 $204,638 $0 $204,638

Extend Runway 1/19 (ST RW IM) 8/27/1985 6/11/1992 $1,193,485 $0 $1,193,485

3-02-0337-002-1991 Rehabilitate Runway 17/35 (RE RW IM) 9/27/1991 10/24/1998 $431,050 $0 $431,050

Acquire Snow Removal Equipment (ST EQ SN) 9/27/1991 10/24/1998 $111,200 $0 $111,200

Improve Snow Removal Equipment Building (ST BD 9/27/1991 10/24/1998 $112,510 $0 $112,510 SN)

Improve Airport Drainage (ST OT IM) 9/27/1991 10/24/1998 $88,960 $0 $88,960

3-02-0337-003-2002 Acquire Snow Removal Equipment Construct Snow 9/25/2002 1/24/2006 $1,194,820 $0 $1,194,820 Fence (ST EQ SN)

Monday, January 11, 2016 Page 119 of 124

Page 121: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0337-003-2002 9/25/2002 1/24/2006 Rehabilitate Snow Removal Equipment Building (ST BD SN)

$350,000 $109,841 $459,841

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 18/36 Wales Various Surface Maintenance (RE RW IM)

$175,560 $0 $175,560

3-02-0200-086-2012 9/11/2012 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Alaska Region): Wales (Dozer) (ST EQ SN)

$370,108 $0 $370,108

$5,250,364 $109,841 $5,360,205

Wasilla Wasilla (IYS)

3-02-0417-001-1988 9/22/1988 1/26/2000 Acquire Land for Development (ST LA DV) $2,056,280 $0 $2,056,280

3-02-0417-002-1990 7/25/1990 11/10/1993 Improve Access Road (OT GT AC) $466,854 $0 $466,854

7/25/1990 11/10/1993 Install Runway Lighting (ST RW LI) $331,120 $0 $331,120

7/25/1990 11/10/1993 Construct Apron (ST AP CO) $1,486,603 $0 $1,486,603

7/25/1990 11/10/1993 Construct Runway 3/21 (ST RW CO) $1,436,456 $0 $1,436,456

7/25/1990 11/10/1993 Construct Taxiway (ST TW CO) $80,652 $0 $80,652

3-02-0417-003-1991 9/24/1991 7/14/1999 Noise Mitigation Measures for Public Buildings (EN PB 75)

$925,850 $0 $925,850

3-02-0417-004-1992 9/11/1992 9/13/2000 Acquire Snow Removal Equipment (ST EQ SN) $283,825 $0 $283,825

9/11/1992 9/13/2000 Improve Snow Removal Equipment Building (ST BD SN)

$215,625 $0 $215,625

3-02-0417-005-1998 8/28/1998 6/8/2000 Construct Runway 03-21 (ST RW CO) $102,772 $0 $102,772

3-02-0417-006-1999 3/24/1999 7/19/2000 Install Perimeter Fencing (ST EQ SE) $270,983 $0 $270,983

3/24/1999 7/19/2000 Construct Runway 3-21 (ST RW CO) $721,624 $44,716 $766,340

3-02-0417-007-2001 4/10/2001 7/14/2005 Conduct Airport Master Plan Study (PL PL MA) $407,072 $0 $407,072

3-02-0417-008-2002 9/11/2002 5/14/2004 Install Perimeter Fencing (ST EQ SE) $264,110 $154 $264,264

3-02-0417-009-2003 9/8/2003 7/28/2006 Construct Apron (Design) Phase 1 (ST AP CO) $199,999 $0 $199,999

3-02-0417-010-2004 7/9/2004 6/7/2007 Expand Apron (ST AP IM) $1,894,486 $102,393 $1,996,879

3-02-0417-011-2005 5/19/2005 6/16/2008 Construct Apron (Design) (ST AP CO) $250,000 $37,440 $287,440

3-02-0417-012-2006 5/9/2006 12/7/2009 Construct Runway 03/21 (ST RW CO) $350,000 $0 $350,000

5/9/2006 12/7/2009 Construct Apron Construction, ph. 1) (ST AP CO) $3,507,985 $191,005 $3,698,990

3-02-0417-013-2007 6/21/2007 7/20/2010 Construct Taxiway (ST TW CO) $1,052,877 $7,453 $1,060,330

3-02-0417-014-2008 6/11/2008 5/21/2010 Install Perimeter Fencing (ST EQ SE) $411,240 $0 $411,240

6/11/2008 5/21/2010 Expand Snow Removal Equipment Building expand SREB (ST BD SN)

$929,255 $0 $929,255

3-02-0417-015-2009 7/28/2009 Conduct aeronautical survey for WAAS approach Airport Survey (PL PL VI)

$0 $200,000 $200,000

7/28/2009 Update Airport Master Plan Study (PL PL MA) $275,000 $0 $275,000

3-02-0417-016-2010 3/17/2010 6/25/2013 Construct Apron Construction, Apron D (Phase 1) (ST AP CO)

$1,016,148 $0 $1,016,148

3-02-0417-017-2011 3/1/2011 4/1/2013 Acquire Snow Removal Equipment Acquire SRE (ST EQ SN)

$770,850 $8,982 $779,832

3-02-0417-018-2011 6/7/2011 7/7/2014 Construct Apron Construction, Apron D (Phase 2) (ST AP CO)

$1,057,217 $116,517 $1,173,734

3-02-0417-019-2011 9/14/2011 2/10/2015 Conduct Environmental Study Environmental phase 1 (EN PL MA)

$189,420 $0 $189,420

3-02-0417-020-2014 6/25/2014 Acquire Safety Equipment and/or Fencing (SA EQ RF) $598,432 $0 $598,432

$21,552,735 $708,660 $22,261,395

Monday, January 11, 2016 Page 120 of 124

Page 122: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

White Mountain White Mountain (WMO)

3-02-0319-001-1991 Construct Apron (CA AP CO)

Construct Taxiway (CA TW CO)

Improve Access Road (CA GT AC)

Improve Snow Removal Equipment Building (ST BD SN)

Acquire Snow Removal Equipment (ST EQ SN)

Install Apron Lighting (ST AP LI)

Install Runway Lighting (ST RW LI)

Extend Runway 1/20 (ST RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 15/33 (Various Surface Maintenance) (RE RW IM)

3-02-0200-094-2013 [Various Grnt] Acquire Snow Removal Equipment Acquire SRE (Grader, Loader, and Blower) (ST EQ SN)

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

9/24/1991

8/20/2009

9/19/2013

9/26/1996 $137,527

9/26/1996 $164,158

9/26/1996 $119,415

9/26/1996 $166,008

9/26/1996 $130,000

9/26/1996 $42,349

9/26/1996 $158,802

9/26/1996 $1,945,534

12/19/2014 $198,968

$784,081

$3,846,842

$0

$0

$0

$0

$0

$0

$0

$208,856

$0

$0

$208,856

$137,527

$164,158

$119,415

$166,008

$130,000

$42,349

$158,802

$2,154,390

$198,968

$784,081

$4,055,698

Whittier Whittier (IEM)

3-02-0385-001-2001 Conduct Airport Master Plan Study (PL PL MA) 9/4/2001 8/3/2004 $72,631

$72,631

$0

$0

$72,631

$72,631

Willow Willow (UUO)

3-02-0320-001-1989 Acquire Land for Development (ST LA DV)

Improve Airport Drainage (ST OT IM)

Install Runway Lighting (ST RW LI)

3-02-0320-002-1999 Improve Snow Removal Equipment Building (ST BD SN)

3-02-0200-052-2005 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 13/31 (Maintenance) (RE RW IM)

3-02-0320-003-2009 Conduct Airport Master Plan Study (PL PL MA)

3-02-0200-095-2014 [Various Grnt] Remove Obstructions Various Obstruction Removal (+08J) (SA OT OB)

6/9/1989

6/9/1989

6/9/1989

3/25/1999

8/30/2005

5/31/2007

8/20/2009

9/22/2014

9/10/1992 $18,674

9/10/1992 $23,297

9/10/1992 $192,429

9/12/2003 $660,000

6/9/2010 $55,000

8/6/2013 $105,336

$167,340

$156,868

$1,378,944

$0

$0

$7,830

$4,418

$0

$0

$0

$0

$12,248

$18,674

$23,297

$200,259

$664,418

$55,000

$105,336

$167,340

$156,868

$1,391,192

Wrangell Wrangell (WRG)

3-02-0323-001-1982 Groove Runway 9/27 (SP RW FR)

Rehabilitate Apron (RE AP IM)

Rehabilitate Runway 9/27 (RE RW IM)

3-02-0323-002-1983 Improve Airport Drainage 9/27 (ST OT IM)

3-02-0323-003-1987 Groove Runway 9/27 (SP RW FR)

Extend Taxiway (ST TW IM)

3-02-0323-004-1988 Conduct Airport Master Plan Study (PL PL MA)

9/27/1982

9/27/1982

9/27/1982

9/26/1983

12/15/1986

12/15/1986

9/15/1988

1/17/1986 $137,760

1/17/1986 $6,455

1/17/1986 $1,028,492

1/29/1986 $389,857

11/8/1988 $222,975

11/8/1988 $4,688

5/7/1992 $67,628

$0

$0

$0

$0

$0

$0

$0

$137,760

$6,455

$1,028,492

$389,857

$222,975

$4,688

$67,628

Monday, January 11, 2016 Page 121 of 124

Page 123: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0323-005-1996 5/22/1996 1/6/1999 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

$0 $366,899 $366,899

3-02-0323-006-1996 7/9/1996 8/22/2000 Improve Aircraft Rescue & Fire Fighting Building (SA BD EX)

$86,983 $1,325,578 $1,412,561

3-02-0323-007-1997 4/30/1997 9/27/2001 Install Guidance Signs (SA OT SG) $9,375 $0 $9,375

4/30/1997 9/27/2001 Construct Taxiway (ST TW CO) $615,442 $70,368 $685,810

4/30/1997 9/27/2001 Construct Apron (ST AP CO) $462,497 $0 $462,497

4/30/1997 9/27/2001 Improve Access Road (OT GT AC) $553,430 $0 $553,430

4/30/1997 9/27/2001 Rehabilitate Apron (RE AP IM) $457,809 $0 $457,809

3-02-0323-008-2000 9/7/2000 4/27/2007 Conduct Airport Master Plan Study (PL PL MA) $295,552 $0 $295,552

3-02-0323-009-2002 5/24/2002 1/24/2006 Construct Snow Removal Equipment Building Sand & Chemical Storage Building (ST BD SN)

$1,672,217 $171,961 $1,844,178

3-02-0323-010-2004 8/24/2004 9/15/2008 Construct Parking Lot (OT OT PA) $400,000 $0 $400,000

8/24/2004 9/15/2008 Modify Access Road (OT GT AC) $2,332,485 $349,488 $2,681,973

3-02-0323-011-2005 9/8/2005 7/18/2011 Rehabilitate Runway 10/28 (Runway Safety Area, Phase 1) (RE RW IM)

$0 $2,823,191 $2,823,191

9/8/2005 7/18/2011 Rehabilitate Runway 10/28 (RE RW IM) $2,908,793 $0 $2,908,793

3-02-0200-053-2006 4/10/2006 7/20/2010 [Various Grnt] Acquire Snow Removal Equipment (Self-Propelled Broom) (ST EQ SN)

$382,489 $0 $382,489

3-02-0323-012-2006 5/30/2006 4/11/2012 Rehabilitate Runway 10/28 (Runway Safety Area, Phase 2) (RE RW IM)

$0 $19,794,364 $19,794,364

3-02-0200-069-2009 8/20/2009 12/19/2014 [Various Grnt] Rehabilitate Runway 10/28 (Various Surface Maintenance) (RE RW IM)

$90,440 $0 $90,440

3-02-0200-072-2009 9/24/2009 11/12/2014 [Various Grnt] Acquire Safety Equipment and/or Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

$0 $103,425 $103,425

3-02-0200-073-2010 3/12/2010 12/9/2015 [Various Grnt] Rehabilitate Runway 10/28 Wrangell Various Surface Maintenance (RE RW IM)

$42,560 $0 $42,560

3-02-0200-079-2011 9/16/2011 [Various Grnt] Rehabilitate Runway 10/28 Various Surface Preservation (RE RW IM)

$20,689 $0 $20,689

3-02-0200-087-2012 9/19/2012 [Various Grnt] Rehabilitate Runway 10/28 Various Surface Preservation Maintenance (Wrangell) (RE RW IM)

$81,668 $0 $81,668

3-02-0200-093-2013 9/18/2013 [Various Grnt] Rehabilitate Runway 10/28 Surface Preservation Maintenance (Wrangell) (RE RW IM)

$76,600 $0 $76,600

3-02-0323-013-2013 9/18/2013 Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3,000 Gallon ARFF Truck (Wrangell) (SA EQ RF)

$637,950 $0 $637,950

3-02-0200-096-2014 9/18/2014 [Various Grnt] Remove Obstructions (+08J) Various EDA/EAS Locations: Wrangell - Remove Obstructions (Cut brush in RSA and around ramp and taxiways (SA OT OB)

$62,067 $0 $62,067

9/18/2014 [Various Grnt] Rehabilitate Runway 10/28 (+08J) Various EDA/EAS Locations: Wrangell - Surface Preservations Maintenance_ Pavement Markings (RE RW IM)

$85,342 $0 $85,342

3-02-0200-102-2015 9/20/2015 [Various Grnt] Acquire Snow Removal Equipment EAS/EDA Various (Wrangell - Acquire SRE: Self-Propelled Broom) (ST EQ SN)

$614,822 $0 $614,822

9/20/2015 [Various Grnt] Rehabilitate Runway 10/28 EAS/EDA Various (Wrangell - Surface Preservation Maintenance -Markings on RWYs, TWYs, and Aprons) (RE RW IM)

$103,445 $0 $103,445

9/20/2015 [Various Grnt] Remove Obstructions EAS/EDA Various (Wrangell - Remove Obstructions - 86 Acres Brush Cutting around Ramp and TWYs) (SA OT OB)

$62,067 $0 $62,067

3-02-0323-014-2015 8/10/2015 Rehabilitate Taxiway (RE TW IM) $1,000,000 $1,000,000 $2,000,000

Monday, January 11, 2016 Page 122 of 124

Page 124: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0323-014-2015 Rehabilitate Apron (RE AP IM) 8/10/2015 $0 $174,952 $174,952

$14,912,577 $26,180,226 $41,092,803

Yakutat Yakutat (YAK)

3-02-0327-001-1984 Groove Runway 11/29 (SP RW FR) 9/17/1984 11/13/1986 $387,045 $0 $387,045

3-02-0327-002-1985 Improve Airport Drainage (ST OT IM) 9/24/1985 2/6/1991 $214,414 $98,424 $312,838

3-02-0327-003-1987 Acquire Security Equipment (SA EQ SE) 7/7/1987 3/7/1990 $90,574 $0 $90,574

3-02-0327-004-1987 Conduct Airport Master Plan Study (PL PL MA) 6/29/1987 5/12/1992 $77,962 $0 $77,962

3-02-0327-005-1989 Install Apron Lighting (ST AP LI) 9/25/1989 11/17/1992 $130,310 $2,317 $132,627

3-02-0327-006-1991 Extend Runway 02/20 (ST RW IM) 9/24/1991 11/29/1993 $0 $94,871 $94,871

3-02-0327-007-1993 Acquire Aircraft Rescue & Fire Fighting Vehicle (ST EQ 9/9/1993 1/10/1996 $364,301 $0 $364,301 RF)

3-02-0327-008-1993 Acquire Snow Removal Equipment (ST EQ SN) 7/14/1993 2/6/1995 $499,708 $0 $499,708

3-02-0327-009-1994 Remove Obstructions (SA OT OB) 8/26/1994 9/17/1996 $681,059 $0 $681,059

3-02-0327-010-1996 Improve Aircraft Rescue & Fire Fighting Building (SA 9/16/1996 8/22/2000 $149,440 $1,045,530 $1,194,970 BD EX)

3-02-0327-011-1998 Acquire Snow Removal Equipment (ST EQ SN) 6/23/1998 9/20/2001 $148,127 $0 $148,127

3-02-0327-012-1999 Acquire Snow Removal Equipment (ST EQ SN) 3/25/1999 9/4/2001 $252,472 $0 $252,472

3-02-0327-013-1999 Rehabilitate Runway Lighting 11-29 (RE RW LI) 3/31/1999 9/27/2002 $77,433 $1,271,044 $1,348,476

3-02-0327-014-2001 Conduct Airport Master Plan Study (PL PL MA) 9/5/2001 4/27/2007 $181,243 $0 $181,243

3-02-0327-015-2001 Improve Snow Removal Equipment Building (ST BD 9/27/2001 9/2/2005 $5,211,501 $947,206 $6,158,707 SN)

3-02-0445-001-2001 Improve Seaplane Base (ST SB CO) 8/20/2001 7/13/2005 $529,005 $0 $529,005

3-02-0327-016-2003 Construct Runway Safety Area 11/29 (SA RW SF) 9/5/2003 9/12/2007 $0 $4,490,000 $4,490,000

Remove Obstructions (Transitional Surface) (SA OT 9/5/2003 9/12/2007 $500,000 $0 $500,000 OB)

Rehabilitate Runway 11/29 (RE RW IM) 9/5/2003 9/12/2007 $3,000,000 $1,469,514 $4,469,514

Rehabilitate Taxiway (RE TW IM) 9/5/2003 9/12/2007 $2,500,000 $543,195 $3,043,195

Rehabilitate Apron (RE AP IM) 9/5/2003 9/12/2007 $1,500,000 $0 $1,500,000

3-02-0327-017-2004 Construct Runway Safety Area 11/29 Phase 2 (SA RW 8/26/2004 4/2/2008 $1,520,000 $35,829 $1,555,829 SF)

3-02-0200-056-2006 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/30/2006 2/27/2012 $79,088 $0 $79,088 (RE RW IM)

3-02-0200-060-2007 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 5/31/2007 8/6/2013 $114,920 $0 $114,920 (RE RW IM)

3-02-0200-062-2008 [Various Grnt] Acquire Snow Removal Equipment 6/12/2008 10/18/2011 $542,094 $0 $542,094 Acquire SRE (ST EQ SN)

3-02-0200-066-2008 [Various Grnt] Rehabilitate Runway 11/29 (Maintenance) 6/19/2008 6/10/2014 $66,200 $0 $66,200 (RE RW IM)

3-02-0200-069-2009 [Various Grnt] Rehabilitate Runway 11/29 (Various 8/20/2009 12/19/2014 $106,400 $0 $106,400 Surface Maintenance) (RE RW IM)

3-02-0200-072-2009 [Various Grnt] Acquire Safety Equipment and/or 9/24/2009 11/12/2014 $0 $103,425 $103,425 Fencing Acquire Water Rescue Plan Equipment (SA EQ RF)

3-02-0200-073-2010 [Various Grnt] Rehabilitate Runway 11/29 Yakutat 3/12/2010 12/9/2015 $70,240 $0 $70,240 Various Surface Maintenance (RE RW IM)

3-02-0327-018-2010 Acquire Aircraft Rescue & Fire Fighting Vehicle (SA EQ RF)

3/12/2010 1/7/2015 $702,707 $0 $702,707

3-02-0200-079-2011 [Various Grnt] Rehabilitate Runway 02/20 Various 9/16/2011 $201,719 $0 $201,719 Surface Preservation (RE RW IM)

Monday, January 11, 2016 Page 123 of 124

Page 125: Alaskan Region Airport AIP Program FY 1982

Obligated: Closed: Entitlement Discretionary TOTAL

3-02-0327-019-2012 Rehabilitate Runway 11/29 Accomplish Surface 8/8/2012 $455,160 $0 $455,160 Preservation Maintenance (Yakutat) (RE RW IM)

Remove Obstructions Remove Obstructions (Yakutat) 8/8/2012 $201,719 $0 $201,719 (SA OT OB)

3-02-0200-091-2013 [Various Grnt] Rehabilitate Runway 11/29 Surface 9/19/2013 $103,400 $0 $103,400 Preservation Maintenance (Yakutat) - Pavement Markings (RE RW IM)

3-02-0200-096-2014 [Various Grnt] Rehabilitate Runway 11/29 (+08J) 9/18/2014 $113,790 $0 $113,790 Various EDA/EAS Locations: Yakutat - Surface Preservations Maintenance _ Pavement Markings (RE RW IM)

3-02-0200-102-2015 [Various Grnt] Rehabilitate Runway 11/29 EAS/EDA 9/20/2015 $124,134 $0 $124,134 Various (Yakutat - Surface Preservation Maintenance - Marking on RWYs, TWYs and Aprons) (RE RW IM)

[Various Grnt] Remove Obstructions EAS/EDA Various 9/20/2015 $51,722 $0 $51,722 (Yakutat - Remove Obstructions - Brush Cutting around Ramp and TWYs) (SA OT OB)

3-02-0327-020-2015 Rehabilitate Runway 11/29 Rehabilitate 9/17/2015 $3,000,000 $11,604,319 $14,604,319 Runway/Improve Draining (RE RW IM)

$23,947,886 $21,705,673 $45,653,560