AJAY.MEmail- [email protected]: AJAY-REDDY/77/445/398

PROFESSIONAL SNAPSHOTPROFESSIONAL SNAPSHOT A Result oriented professional with over 3 years of Experience in pipeline laying, Hydro testing,

Project management, Mechanical & Fabrication.

Presently associated with Industrial services online Co.Ltd (ISOL), in chemical cleaning for Pre-commissioning of Sadara petro chemical plant.

Skilled at carrying out hydro testing, pigging of downstream gas pipeline. Exposure in planning of Installation & Operation Maintenance activities of onshore Pipeline. Conversant with handling fabrication and design activities entailing preparation drawings. Self starting, goal oriented Strategist. Highly imaginative with many innovative ideas.

In quest of career enrich assignment in Infrastructure, Oil & gas Industry with Lead Organization.

EDUCATIONEDUCATION PGD in Pipeline Design and engineering from STI under Maharashtra Technical Board, 2013.

I hereby state that I have done B.E IN Mechanical engineering. I have put 4yrs and within first class.

A B.E (Mechanical engineering) graduate from MVJ College of Engineering, Bangalore.(2012 passed out) (Affiliated to Vishweshvariaya Technological University)

PROFESSIONAL EXPERIENCE

PROJECT COVERED SCAN

Industrial services online Co.Ltd. (ISOL). Mar 2015 –May 2015

Isol is dedicated to do all types of industrial services like chemical cleaning, oil flushing, hydro jetting etc. Industrial services to the Saudi Arabian, Middle East market and beyond from strategically located at Al Jubail support industrial city

PROJECT TITLE: 1. Wasit gas Project (PKG#03 SRU 100 HP & LP Steam line, condensate, BFW line)

Scope: Pre commissioning plant work include supply of required skilled manpower, equipment, chemicals, supervision for temporary circuit preparation, Rinsing, degreasing, acid pickling, corrosion monitoring, Passivation, draining,Contractor : SK engineering & constructionLocation : Khursaniyah, KSAClient : Saudi AramcoDesignation : Mechanical Engineer

Roles & Responsibilities : Pre- Engineering Walk-down Preparation of circuit flow path and approval Finalization of cleaning, Monitoring and effluent

treatment. Provision of equipments cleaning, tools & tackles, temporary piping, joints, blinds etc.

Page 2: AJAY_RESUME

Execution of Cleaning works.

PROJECT TITLE: 2. AL WAHA Petrochemicals Company (heat exchanger, fin fan cooler chemical cleaning)

Scope: Shut down plant work includes supply of required skilled manpower, equipment, chemicals, supervision and engineering for temporary circuit preparation, Rinsing with tolvin solvent, drainingContractor: Plant tech ArabiaLocation : Al Jubail, KSAClient : Sahara petrochemical Designation : Mechanical Engineer

Ace Pipeline Contracts Pvt.Ltd. May 2012 – Mar 2015

Ace Pipeline Contracts Pvt.Ltd. Provides integrated design, engineering, procurement, construction and project management services in the energy and infrastructure sectors. With operations spread across the India, Ace Pipelines provides EPC services in hydro carbon pipelines.

PROJECT TITLE: 1. Bodighodi AMBARDI NATURAL GAS PIPELINE (BAPL) BAPL proposes to lay a pipeline from Bodighodi to Ambardi for transportation of Natural Gas. The project envisages installation and construction of a pipeline 46km.(12"ODx6.4mm,API5L X65 PSL2) CODE ASME B 31.8, APIRP1111, 12" HOT TAPPING ON 30" Natural Gas Bodighodi Ambardi Pipleline. Contractor : Ace Pipeline Contracts Pvt.Ltd. Location : Rajkut, Rajasthan, India Client : Gujrat state petro net limited (GSPL) EPCM Consultant : Valdel Engineers and Constructors Designation : Mechanical Engineer Reporting to : Project Manager

PROJECT TITLE: 2. Mangalore Hassan Mysore Solur LPG Pipeline Project (MHMSPL) HPCL intends to lay a LPG Pipeline from its LPG import facilities at Mangalore to BPCL receipt Terminal at Solur via Hassan and subsequently provide a spur line of 10” grade X52 from Hassan to Mysore via Kalibadi. The proposed LPG pipeline has a mainline length of 295.32Km from Mangalore to Solur. The pipeline has a tap off at Hassan, chainage 163.077Km and further extended to Mysore terminal, total length of spur line is 101.08Km.Cost of project 250cr. Total length of Project is 356Kms.

Contractor : Ace Pipeline Contracts Pvt.Ltd.Location : Saligrama, Karnataka IndiaClient : Hindustan Petroleum Corporation Limited (HPCL)EPCM Consultant : Mott Macdonald Pvt.Ltd. (MMPL)Designation : mechanical engineerResponsibility : Planning and Execution Engineer.Reporting To : Project Manager.

Roles & Responsibilities :

Page 3: AJAY_RESUME

Prepare project planning FEED studies. Conducting Hydro testing & pigging for gas pipeline activities. Preparation of documentation for hydro testing and gauge pigging. Put up study and analysis of the inputs from the client engineering deliverables. Prepare, conduct and attend Kick-Off-Meeting and Minutes of Meeting and its feedback. Prepare and review job procedures and getting approvals. Prepare Schedules for the intended activities prior to project commencement.

Coordinating with internal departments, client, PMC regarding project daily spread activities and reporting to the concerning HOD.

Documentation of QA/QC activities Reports (ROW, Clearing & Grading, Stringing, Welding, NDT Radiography, Manual Ultrasonic Testing, Joint Coating, Trenching, Lowering, Back filling).

Pipe-book Prepare for Lowering. Coordinating Contractor/Sub Contractor for project related work. Prepare Weld Repair Reports. Offering NDT Radiography, Manual Ultrasonic Testing and Joint Coating Request for ongoing

Construction Pipeline. Coordination with site people on daily basis (Daily Progress Report, Daily Activity Reports with Issues,

Verify and Inform if any wrong). Requirement Gathering, Project Structure Creation, quality control of progress records. Co-ordination with Client and consultant. Liaising with Subcontract department on preparation of Work orders,

KEY SKILLS IN PIPELINE DESIGN.KEY SKILLS IN PIPELINE DESIGN.

OFFSHORE ONSHORE1. Pipe Wall Thickness Verification – (DnV 81) 1. Pipe Wall Thickness Verification – (ASME B 31.4)2. Pipe Wall Thickness Verification – (DnV OSF 101) 2. Pipe Wall Thickness Verification – (ASME B 31.8) 3. Pipe Wall Thickness Verification – (API RP 1111) 3. Pipe Wall Thickness Verification – (API RP 1111) 4. Pipe Wall Thickness Verification – (ASME B 31.4) 4. Crossings of Pipelines – (API RP 1102)5. Cathodic Protection Design 5. Upheaval buckling – (DnV OSF 101/DnV RP F110)- (DnV RP B401/DnV RP F103) (OTC6335/SHELL DEP 31.40.10.16)6. on bottom stability – (DnV RP F 109)7. Free Span calculations – (DnV CN 30.5/DnV 81)8. Pipe Wall Thickness Verification – (ASME B 31.8)

Knowledge about subsea installation methods. Design of pipeline pig trap system. Aware of pipeline elements. Pipeline coatings. Alignment sheets preparation.

Page 4: AJAY_RESUME

Data Sheets preparation. Monel sheathing calculation. Nace requirement (MR0175/MR0177) Material selection. NDT Inspection for pipelines.

Student member of Indian institution of production engineering. Pro-E certification from cadd center.

PERSONAL DOSSIER

Name : AJAY.MPassport no : k7765384Gender : MaleMarital Status : SingleNationality : Indian ADDRESS : S/o venkatreddy.m Behind Samarth Car Care Center, Oddarahatti, Gangavathi (TQ), Koppal, Pin: 583227

DECLARATION

I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best of my knowledge and belief.

Date: 05/05/2015

Place: Al jubail. AJAY.M