Airports Runway
Incursion Mitigation
(RIM) Program
ACC
John R. Dermody, P.E. AAS-100
Steven Debban, P.E. AAS-100
Jesse Carriger, APP-520
July 17, 2015
Federal AviationAdministration
Data Mining/ Airport Safety Database
FAA Airport Tech R&D
Safety Database
NASA ASRS
NTSB Accident / Incident
FAA Runway Incursion
FAA ATQA
FAA SDRS
FAA Wildlife
= Public
= Internal
• The Office of Airports (ARP) Safety Data Mining effort collected 10 years
(2003-2013) of surface events and the analysis report identified the top
airport risks.
2
Federal AviationAdministration
6,704 Geopoints (locations) 1,649 points (approx. 25%) associated with at least one runway incursion
3
Complex
Taxiway Geometry
Safety Database
FY09
PTG
FY13/14
Problematic Taxiway Geometry Study
Federal AviationAdministration
5,099 Runway Incursions Events Geo-referencedData Mining effort collected 6+ years (2007-2013) of runway incursion data from towered airports.
4
Complex
Taxiway Geometry
Safety Database
FY09
PTG
FY13/14
Problematic Taxiway Geometry Study
Federal AviationAdministration
Problematic Taxiway Geometry Study
5
Complex Taxiway
Geometry
Safety Database
FY09
PTG
FY13/14
Federal AviationAdministration
Problematic Taxiway Geometry Study
11
Complex Taxiway
Geometry
Safety Database
FY09
PTG
FY13/14
Federal AviationAdministration
Problematic Taxiway Geometry Study
7
FAA Order 5200
FY00
Safety Database
FY09
PTG
FY13/14
Federal AviationAdministration
Runway Incursion Mitigation (RIM)
• FAA Office of Airports launched in 2015
– Addresses non-standard taxiway/runway geometry
• Risk-based decision making
– Identify, prioritize, mitigate
• Yearly analysis/update of database
– RIM inventory
8
Complex Taxiway
Geometry
Safety Database
FY09
PTG
FY13/14
RIM
FY15
Federal AviationAdministration
Current Status
• Alternatives Development
– ARP Field Offices, FAA LOBs, Airport Sponsors
– Capital Improvements
– Technology Based
– Operational
– Other
• Cost Estimation Exercise – 2015 only
– ARP Field Offices
– High level “order of magnitude”
9
Federal AviationAdministration
Future Endeavors
September, 2015 – HQ/ARP Field to draft estimated
program schedules and costs
Fall, 2015 – AGIS-based RIM management tool
FY 2016 and Beyond – Planning, Design and
Mitigation Implementation