airport expansion - challenges

47
Airport Expansion: Impact on Countries Team B • Husain Baqer •Roya Ahmed • El Muthana Mohammed • Salem AlMutawa • Noor Abdulrahman

Upload: husain-baqer

Post on 23-Jan-2018

259 views

Category:

Documents


0 download

TRANSCRIPT

Page 2: Airport Expansion - Challenges

Searching

preparing

sharing

collecting Practice

Work flow

Page 3: Airport Expansion - Challenges

Growth

Airport Expansions

Economical Growth

Page 4: Airport Expansion - Challenges

Expansions

Runway Configuration

Terminal Development

Airside/Landside Development

Page 5: Airport Expansion - Challenges

Runway Configuration

• Expansion

• Additional Runways, Taxiways and Aprons

• Safety improvements

• Refurbishments

Page 6: Airport Expansion - Challenges

Increase in Flights

PAX

Cargo

Runway Configuration

Page 7: Airport Expansion - Challenges

Terminal Development

• Terminal Capacity

• Terminal Facilities & Systems

– Air bridges

– Baggage-handling system

• Car Parks

Page 8: Airport Expansion - Challenges

Terminal Development

Increase in Flights

PAX

Increase in Jobs

Non-Aeronautical

RevenueLease

Car Park Fees

Page 9: Airport Expansion - Challenges

Airside/Landside Development

• Airport Cities

• Operation Faculties (Cargo Storages, Fuel Farms) & Repair Overhaul Hangars)

• Stakeholders Offices

• Infrastructure Development (Connecting Railways to Airports)

Page 10: Airport Expansion - Challenges

Airside/Landside Development

Increase in Flights

PAX

Increase in Jobs

Commercial Revenues

Lease Maintenance

Cargo

Page 11: Airport Expansion - Challenges

PAX Growth

Page 12: Airport Expansion - Challenges

More Routes More Passengers

• Terminal 4 will be ready by 2017

• It will bring more airlines to operate

• Which means more routes

• More passengers!!!

Page 13: Airport Expansion - Challenges

Better Services

Page 14: Airport Expansion - Challenges

Modern Technology

Video

Page 15: Airport Expansion - Challenges

Impacts of PAX Growth

Page 16: Airport Expansion - Challenges

Integration of Public Transport

Page 17: Airport Expansion - Challenges

Level of Tourism Countries develop the tourism sector within the increase of the passengers:Ex. Bahrain

- Bahrain government started to organize Souq Muharraq and taking care of the traditional food

- Development of archaeological sites

- Ministry of culture programs

Page 18: Airport Expansion - Challenges

Airport Cities

Page 19: Airport Expansion - Challenges

Facilities Outside of the Airport Boundaries

Airport City – (Aerotropolis)

Page 20: Airport Expansion - Challenges

“ Airport Cities are economically efficient, globally competitive,

attractive, and sustainable”- John Kasarda

Page 21: Airport Expansion - Challenges

Airport City

• New urban form placing airports in the center,with cities growing around them.

• Distant travelers and locals alike can conductbusiness, exchange knowledge, shop, eat,sleep and be entertained.

• Less than 15 minutes from the airport.

What is an airport city?

Page 23: Airport Expansion - Challenges

Positive Impact

Local economic development - Enhance tourism

Creating more jobs for locals at airport facilities and tourism related activities

Attracting aviation- and tourism-linked investors

Permitting modernization and added value for the community

Easier accessibility to the world - increased flights and destinations

Page 24: Airport Expansion - Challenges

Creating Job Opportunities

Tamkeen provided support to the

tourism sector by providing

scholarships for tourism sector

students.

Page 25: Airport Expansion - Challenges

Gulf Aviation Academy

TahleeqTraining Program

Development of Aviation Education

Page 27: Airport Expansion - Challenges

Cargo Growth

Page 28: Airport Expansion - Challenges

World Air cargo forecast

Page 29: Airport Expansion - Challenges

World busiest airports-Passenger

Page 30: Airport Expansion - Challenges

World busiest airports-Cargo

Page 31: Airport Expansion - Challenges

Gist

Passengers and Cargo travel is growing

Cargo is independent from passenger

Airport expansion valid for Cargo

Airport expansion is a must

Page 32: Airport Expansion - Challenges

What to Expand

Storage area

Facilities Aircrafts parks

Cargo operations

Page 33: Airport Expansion - Challenges

Benefits

Increase national trade

Attract cargo company

Provide better services

Social benefits

Business investment

Economic growth

Page 34: Airport Expansion - Challenges

Examples

Page 35: Airport Expansion - Challenges

Heathrow Airport (LHR)

Page 36: Airport Expansion - Challenges

Heathrow Airport Expansion Plan Facts

Proposal A 3,500m runway constructed to the northwest of the existing airport

Extra Flights 260,000 a year for a total of 740,000

Disruption Compulsory purchase of 750 homes

Airport charges as a result of the expansion Peak at £27 per passenger. Drop to £20 by 2050

Cost £14.8bn to be privately funded and £1.2bn in government support for transport improvement

Completion Date 2025

New Jobs 179,800 by 2050

Page 37: Airport Expansion - Challenges

Pros & Cons of Heathrow Airport Expansion

Arg

um

en

t fo

rA

rgum

en

t Again

st

• UK will lose out on business competitiveness and tourism

• Cost Effective: Heathrow already had good transport links. A third runway would be the cheapest way to create additional capacity.

• Infrastructure• Employment• Air travel growth

• External Costs• There are better long-term

alternatives• 750,000 people are already

living under the flight path• Environmental

Page 39: Airport Expansion - Challenges
Page 40: Airport Expansion - Challenges
Page 41: Airport Expansion - Challenges
Page 42: Airport Expansion - Challenges
Page 43: Airport Expansion - Challenges

Abu Dhabi International Airport (AUH)

150Conventional

Countries

65Contact Stands

48Self check-in

Counters

14Remote Stands

Page 44: Airport Expansion - Challenges

Abu Dhabi International Airport Expansion Facts

Proposal construction of the Midfield Terminal Building (MTB), a new 56-gate, 700,000-m² passenger terminal

Aircraft Movements 500,000 aircraft movements annually

Purpose To maximize aircraft parking capacity and minimize walking distances for passengers

Extra Capacity

Cost Dh10.38 billion terminal that is being built by a three-way joint venture

Completion Date Fully operational by the end of 2017

New Jobs

20m

30m

Thousands

Page 45: Airport Expansion - Challenges

Recommendation

Environment and Energy

External Competition

Social Awareness

Transportation Projects

Page 46: Airport Expansion - Challenges

• http://www.icao.int/Meetings/wrdss2011/Documents/JointWorkshop2005/ATAG_SocialBenefitsAirTransport.pdf

• http://www.aci-na.org/content/airport-traffic-reports

• http://www.boeing.com/resources/boeingdotcom/commercial/about-our-market/cargo-market-detail-wacf/download-report/assets/pdfs/wacf.pdf

References

Page 47: Airport Expansion - Challenges

• http://www.railjournal.com/index.php/middle-east/delivering-the-gccs-integrated-railway.html

• http://www.mtt.gov.bh/en/about/projects/land-transportation-projects/gcc-railway

• https://en.wikipedia.org/wiki/Singapore_Changi_Airport_Terminal_4

• http://www.straitstimes.com/singapore/transport/terminal-4-to-be-ready-in-2017-5-things-about-changi-airport

• http://www.changiairport.com/en/airport-experience/attractions-and-services.html?terminal=T3

• http://www.lf.bh/docs/HCD-Travel-en-v2.pdf• http://culture.gov.bh/en/• http://www.mofa.gov.bh/Default.aspx?tabid=134

References