airport design consult adc delhi international airport existing international terminal t2...

7
Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed plan Existing plan

Upload: kiersten-frizzle

Post on 31-Mar-2015

228 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

Airport Design Consult ADC

Delhi International Airport Existing International Terminal T2 Re-modelling

Proposed plan Existing plan

Page 2: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

Construction Phasing:Departures Phase 1(4 months)

•Decommission & demolish offices Area 1,2 and offices on upper mezzanineArea

2Area 1

•Reconfigure visitor centre. Construct new offices & retail

Week

0 16

Airport Design Consult ADCDelhi International Airport Existing International Terminal T2 Re-modelling

Page 3: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

•Construct new Clipper Lounge on mezzanine

Construction Phasing:Departures Phase 2(4 months)

•Construction check in desks and belts line 2•Construction check in desks and belts line 7•Demolish airside toilets

•Construct new outer check in desks and belts, landside retail, airside toilets, new transfer routes

Week

0 16 32

Airport Design Consult ADCDelhi International Airport Existing International Terminal T2 Re-modelling

Page 4: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

Construction Phasing:Departures Phase 3(3 months)

•Construct new 1st phase emigration, customs & security in sections•Decommission west transit

Week

0 44

•Demolish west retail and wall dividing pre departures from gates

16 32

Airport Design Consult ADCDelhi International Airport Existing International Terminal T2 Re-modelling

Page 5: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

Construction Phasing:Departures Phase 4(3 months)•Commission part completed emigration, customs & security and west transit route

•Decommission existing main security

•Construct remaining emigration, customs & security in sections

•Hoard off and demolish Clipper Lounge, east retail and wall dividing pre departures from gates

Week

0 4416 32 56

Airport Design Consult ADCDelhi International Airport Existing International Terminal T2 Re-modelling

Page 6: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

Construction Phasing:Departures Phase 5(2 months)•Commission remaining emigration, customs & security and east transit route

•Hoard off and construct new airside retail

Week

0 644416 32 56

Airport Design Consult ADCDelhi International Airport Existing International Terminal T2 Re-modelling

Page 7: Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan

OVERALL PROJECT SCHEDULE

DESIGN, DRAWINGS & SPECIFICATIONS

TENDERING & FINALIZING CONTRACTOR

CONSTRUCTION IN 5 PHASES

AUG-SEPT’ 06

OCT-NOV’ 06

DEC’ 06 – MAR’ 08