airconditioning at cafetaria and supply of ......airconditioning at cafetaria and supply of...
TRANSCRIPT
AIRCONDITIONING AT CAFETARIA AND SUPPLY OF FURNITURESTATUS - 13.5 Tr OF A/C WORK BY SPLIT AIRCONDITIONER UNITS, COMPLETE WITH ELECTRICAL FITTINGS,
FIXTURES AND ACCESSORIES. ENERGISING FROM THE SUBSTATION AT A DISTANCE OF 350 M (Approx.)SUPPLY OF CANTEEN TABLES AND CHAIRS (TOTAL 12 GROUPS)
KUDOS TO 1981 BATCH AND THEIR CO-ORDINATOR Hr. SH. JAGMOHAN SALUJA FOR HAVING FUNDED THE INITIATIVE (APPROX. 7.5 LAKHS),COLLECTION OF MONEY AND EXECUTION
I SALUTE THE 1981 BATCH AND EACH INDIVIDUAL DONOR FOR THEIR BENEVOLENCE ON BEHALF OF THE EXECUTIVE COMMITTEE, ALUMNI ASSOCIATION - H.B.T.I. KANPUR