air conditioning -...

41
AIR CONDITIONING & MECHANICAL VENTILATION (ACMV) CLEANROOM & PROCESS UTILITES DATA CENTER SERVICE & MAINTENANCE www.critical-eng.com CRITICAL M&E ENGINEERING SDN BHD CRITICAL SALES & SERVICES SDN BHD CRITICAL POWER SYSTEMS SDN BHD

Upload: phungmien

Post on 08-Aug-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

AIR CONDITIONING & MECHANICAL VENTILATION (ACMV)

CLEANROOM & PROCESS UTILITES

DATA CENTER

SERVICE & MAINTENANCE

www.critical-eng.com

CRITICAL M&E ENGINEERING SDN BHD

CRITICAL SALES & SERVICES SDN BHD

CRITICAL POWER SYSTEMS SDN BHD

Page 2: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

The GROUP was established in 2011, the objective then was to fulfill

the needs of our growing buildings and manufacturing industries,

especially the Multinational Corporation (MNC).

Our core activities are in design, supply, installation, repair, service

and maintenance of Mechanical, Electrical and Process

(MEP)utilities works such as Air-Conditioning (AC) System,

Mechanical Ventilation (MV) System, Smoke Spill System, Process

Cooling Water System (PCW), Compressed Dry Air (CDA) System,

Clean Room Construction, Ducting Work, Piping Work, Electrical

Work, Service & Maintenance, including preventive and predictive

maintenance, and Building Automation System (BAS). And, we

provide consultancy and project management services related to

existing system upgrading.

Today, the GROUP is a unique Engineering Services firm that offers

unsurpassed critical facility support. The GROUP has extensive

experience in consulting, project and construction management

and services for critical facilities environments. This allows us to

extend our expertise and services throughout the region, providing

MEP solutions for critical facilities covering the following areas;

About Us

•Manufacturing Plants & Factories

•Data Centers

•Military

•Telecommunication Industries

•Hospitals & Medical Centers

•Laboratories

•Government Buildings & Educational Institutions

•Commercial Building & Complex

Apart from providing critical facilities solutions and supports, the GROUP emphasis on the efficiency of the

resources use – to achieve to GREEN, especially through detail study and design in the HVAC systems, which

contributes to the highest electricity power consumption.

The GROUP partners each have over 15 years of experience in supporting clients’ critical facility needs. The

company’s staff is comprised of dedicated professionals, encompassing all engineering disciplines, with specialized

knowledge in critical facility requirements.

Our experience allows the GROUP to understand clients’ needs to optimize and deliver services to meet our

clients’ specific needs, standards and requirements, by providing the highest level of professionalism and total

customer satisfaction.

The GROUP approach to each project is ‘LISTEN, UNDERSTAND, HANDS ON, DELIVER’, where we tailor our efforts

to the specific needs of the client.

The GROUP as an engineering firm incorporated in Malaysia, is registered with Construction Industry Development

Board Malaysia (CIDB), asGrade G7, which shall allow the company to participate to a more sizable project, which

is in the company forecasted pipeline.

Page 3: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

About Us

Vision

To be the leader in the critical facility industry.

Mission

A people oriented organization, team-up and share the common values, to provide unsurpassed solutions and

supports, to meet customer needs and expectations, with ZERO compromise to human safety.

Page 4: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Critical Facilities

Critical Facility is a term used by the industrial player to describe assets that are essential for the functioning of

business continuity.

Critical Facility Services is the GROUP’s primary business. The GROUP will assist to identify all the critical services

necessary to ensure customer’s business continuity, by properly designed and supported, so that the customer

can focus on its core business, and to fulfill its critical objectives.

Critical facilities namely the following areas;

- Manufacturing Plants & Factories

- Data Centers

- Military & Command Center

- Telecommunication Industries

- Hospitals & Medical Centers

- Laboratories

- Government Buildings & Educational Institutions

- Commercial Building & Complex

Which, any interruption to these operations will cause severe losses to the users.

Critical Facility Services and Support includes;

- Advance HVAC systems

o Capacity Elements - Consists of chillers, cooling towers, CRAC units, Air Handlers, Package DX

Systems, Chilled Water Pumps, Condenser Water Pumps, and associated building control systems

o Distribution/ Path Elements – Consists of refrigerant piping, chilled water piping, ducting, grills, and

associated building control systems

- Clean Room design and construction

- Data Center Architecture Electrical and mechanical system configurations designed for performance,

reliability and maintainability

- Main Electrical Systems Including utility coordination, service entrances and distribution systems

- Generator system

- Electrical transfer systems

- UPS Systems and Distribution

- Builder work includes of raised flooring system

- Fire Detection and Suppression Systems

- Data Center Grounding, Security and Communications Systems

- Commissioning and Failure Mode Testing and Acceptance

- Building Management System

- Services & Maintenance which 24x7x365 support

Page 5: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Company Introduction

Name of Company : Critical M&E Engineering Sdn. Bhd.

Company Registration No. : 946363-W

Paid Up Capital : RM1,000,000.00

Banker : Public Bank Berhad, Jalan Cantonment,

Pulau Tikus Branch, Penang.

Company Secretary : Lim Yong Chiat (MAICSA 7060553)

1772-B, Lorong Tiong,

05200 Alor Setar, Kedah.

Business Address : Penang

6&8 Cangkat Bukit Belah

11920 Bayan Lepas, Penang

Telephone No. : 604 – 649 6033

Fax No. : 604 – 649 3033

Business Address : KL

RK30A, Jalan Villa 3, Anggerik Villa, Off Jalan Semenyih

43500 Kajang, Selangor D.E.

Telephone No. : 603 – 8723 2033

Fax No. : 603 – 8724 2033

Email : [email protected]

Name of Company : Critical Sales & Services Sdn. Bhd.

Company Registration No. : 1079183-X

Paid Up Capital : RM300,000.00

Banker : Public Bank Berhad, Jalan Cantonment,

Pulau Tikus Branch, Penang.

Company Secretary : Lim Yong Chiat (MAICSA 7060553)

1772-B, Lorong Tiong,

05200 Alor Setar, Kedah.

Correspondence

Name of Company : Critical Power Systems Sdn. Bhd.

Company Registration No. : 1255506-W

Paid Up Capital : RM100,000.00

Banker : Maybank Berhad, Bayan Point,

Bayan Baru, Penang.

Company Secretary : Lim Yong Chiat (MAICSA 7060553)

1772-B, Lorong Tiong,

05200 Alor Setar, Kedah.

Page 6: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

PERAKUAN PENDAFTARAN

Adalah dengan ini diperakui bahawa kontraktor yang dinyatakan di bawah ini telah berdaftar denganLembaga mengikut Bahagian VI Akta Lembaga Pembangunan Industri Pembinaan Malaysia 1994.Pendaftaran ini adalah tertakluk kepada syarat-syarat yang telah ditetapkan bersama perakuan ini.

No. Pendaftaran : 0120140218-PP155237

Nama Kontraktor : CRITICAL M&E ENGINEERING SDN. BHD.

Alamat Berdaftar : 6 & 8 CHANGKAT BUKIT BELAH11920 BAYAN BARUPULAU PINANG

Daerah : BARAT DAYA

Tarikh Mula Berdaftar : 18/02/2014

GRED KATEGORI PENGKHUSUSAN

G7 B B04

G7 CE CE21

G7 ME M01 M02 M15 M18

Tarikh Mula Berkuatkuasa : 01/06/2018

Tarikh Habis Tempoh Perakuan : 07/06/2020

STATUS: AKTIF

Ketua Eksekutif

Lembaga Pembangunan Industri Pembinaan Malaysia

Tarikh: 01/06/2018

Page 7: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Critical Group of Companies

CEO

Critical M&E Engineering

MD

Finance Dept Account Exec

Project Dept

Project Manager

Project Engineer

Project Engineer

Project Engineer

Drafter

Admin Exec

Project Manager

Project Engineer

Project Engineer

Drafter

QS

Project Site Manager

Project

Engineer

Safety Manager

Sr. Admin Exec

Critical Sales & Services

MD

Corporate Affair &

Strategic Management

Corporate Advisor

Business Development

Dept

Business Development

Manager

Service DeptService

Manager

Service Engineer

Technician

Technician Technician

Sr. Technician

Technician

Technician

Technician

Sr. Technician

Technician

Technician

Admin Assist

KL OfficeService

Manager

Technician

Technician

Sr. Admin Exec

Critical Power Systems

GM

Sr. Sales Manager

Organization Chart

Page 8: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

THE DATA CENTER

Successful data center design build construction projectsrequire a balance that can only be maintained through adeep understanding of every element, process andrequirement of your data center infrastructure.

There’s no such thing as a “one-size-fits-all” solution• Before one piece of equipment is selected,• Before any topology is chosen,• Before the floor plan is envisioned,

we listen to your data center requirements, to produce aquality, constructible design that will help you achieveyour business goals.

A vendor neutral – meaning we’re not tied to any OEM,we select the right design, equipment, and partners forour client’s data center projects by putting their interestsfirst.

THE SOLUTIONS CYCLE

1 - POWER AVAILABILITY • UPS• GENSET

12 - SER`VICE & MAINTENANCE • PREVENTIVE/COMPREHENSIVE• SPARE PARTS• RECORDS KEEPING• 24X7X365 2 - POWER PROTECTION

• UPS• TVSS• EARTHING

10 - SECURITY• CARD ACCESS• CCTV

4 - POWER DISTRIBUTION • PDU

8 - FIRE SUPPRESSION• FM200• IG55

11 - REMOTE MONITORING• WEB BASED

SOFTWARE• EVENT TRENDING• REMOTE ON/OFF• SMS/EMAIL• ALARM ALERTING

5 - HEAT REMOVAL• CRAC• ACMV

6 - AIR DISTRIBUTION • HOT/COLD AISLE CONTAINMENT • PERFORATED RAISED FLOORING

9 - FIRE DETECTION• VESDA

7 - WATER PROTECTION • LEAK DETECTION SYSTEM

3 - BATTERY PROTECTION • BATTERY MONITORING

SYSTEM

Page 9: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

THE PLANT ROOMMany large buildings, campuses, and other facilities have plantsthat make chilled water and distribute it to air handling units andother cooling equipment. The design operation andmaintenance of these chilled water plants has a very largeimpact on building energy use and energy operating cost.

Not only do chilled water plants use very significant amounts ofelectricity (as well as gas in some cases), they also significantlycontribute to the peak load of buildings. During this peak event,chilled water plants are often running at maximum capacity.When temperatures are moderate, chilled water plants are shutdown or operated in stand-by mode. This variation in the rate ofenergy use is a major contributor to the peaks and valleys inenergy demand, which is one of the problems that must beaddressed by utility grid managers.

Most buildings and facilities that have chilled water plants havespecial utility rates where the cost of electricity depends onwhen it is used and the maximum rate of use. The price ofelectricity is several times higher during the summer on-peakthan it is during the off-peak periods.

In addition to new construction, the chilled water plants of manyexisting buildings are being replaced or overhauled. Older chilledwater plants have equipment that uses ozone-damagingrefrigerants. International treaties, in particular the MontrealProtocol, call for ozone damaging chemicals (in particular CFCs)to be phased out of production. As the availability of CFCs isreduced, the price will skyrocket, creating pressure for chilledwater plants to be overhauled or replaced.

Efficient and reliable utility systems are a criticalrequirement for the successful operation of your processfacility. Utilizing the appropriate technology to meet thenecessary regulatory requirements, CMEE developssolutions that are "right sized" to your application.

CMEE are experts in the design, testing and troubleshootingof utility systems for GXP facilities, including:

- Compressed Dry Air (CDA)- Oil Free Air (OFA)- Nitrogen Gas (N2)- Liquid Petroleum Gas (LPG)- Process Chilled Water (PCW)- Hot Water Piping- Steam Piping- RO/DI- Waste Water Piping- Helium Exhaust- General Exhaust- Acid Scrubber

PROCESS UTILITY SYSTEMS

Page 10: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

A cleanroom is a facility ordinarily utilized as a part of specialized industrial production or scientific research,including the manufacture of pharmaceutical items and microprocessors.

Cleanrooms are designed to maintain extremely low levels of particulates, such as dust, airborne organisms, orvaporized particles.

Cleanrooms typically have an cleanliness level quantified by the number of particles per cubic meter at apredetermined molecule measure.

THE CLEANROOM

US FED-STD-209E was a United States federal standard. It was officially cancelled by the General Services Administration on November 29, 2001,but is still widely used.

CLEANROOM CLASSIFICATION

Class Maximum Particles/ft3 ISO Equivalent

=> 0.1um => 0.2um => 0.3um => 0.5um => 5um

1 35 7.5 3 1 0.007 ISO3

10 350 75 30 10 0.07 ISO4

100 3,500 750 300 100 0.7 ISO5

1,000 35,000 7,500 3,000 1,000 7 ISO6

10,000 350,000 75,000 30,000 10,000 70 ISO7

100,000 3,500,000 750,000 300,000 100,000 830 ISO8

Page 11: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Data Center• Computer Room Air Conditioning (CRAC)• Uninterruptible Power Supply (UPS)• Batteries • Power Line Conditioner (PLC)• Water Detection System (WDS)• Aspirating Smoke Detection (ASD)• Transient Voltage Surge Suppressor (TVSS)• Automatic Transfer Switch (ATS)• Environmental Monitoring System (EMS)• Building Management System (BMS)

ACMV Plant Room • Chiller• Pump • Cooling Tower • AHU/MAU/FCU/ACSU

Process Utilities • Compressed Dry Air • Helium, N2, Hot Water, Steam

Cleanroom • Fan Filter Unit (FFU)• Dry Cooling Coil

WE SERVICE, MAINTAIN & SUPPORT

24 HOURS A DAY 7 DAYS A WEEK

365 DAYS A YEAR

Page 12: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Client Tele

Page 13: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Client Tele

Page 14: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Completion Dec 2018Type New Data CenterContract Sum RM3,600,000.00Scope Life TIEW III Data Center Design & Build upgrade, CSA & MEP supporting up to

600kW of server loading

DATA CENTER DELL APCC, Bayan Lepas FIZ, Penang

Page 15: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

SEMICONDUCTOR – CLEANROOM, PROCESS UTILITES, ACMVVAT, Batu Kawan Industrial Park (BKIP), Penang, Malaysia

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

VAT Manufacturing Plant - a precision valve manufacturing plant from Swiss.

BYG Projects Sdn Bhd

Apr 2018

Penang

RM7,000,000.00

Base Build

New factory expansion involving 170,000ft2 area ACMV set up, including of

55,000ft2 cleanroom (ISO6 & ISO8) c/w 15ft Height, walkable ceiling, 2 nos

Oil Free Air Compressor, Helium Exhaust, smoke spill system, Dry Cooling

Coil, 3 nos chiller, and other associated services

Page 16: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Compliance

Hacks Estagold Sdn BhdOct 2017PenangRM5,800,000.00Base Build New factory involving ACMV set up, production having 20degC 35%RH environment GMP certified

FOODS – CLEANROOM, PROCESS UTILTIES, ACMV Hacks, Juru Science Park, Penang, Malaysia

Page 17: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES, ACMV

Page 18: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES , ACMV Osram, Kulim Type Base BuildContract Amount RM1,300,000.00Scope New factory involving PCW set up, covering stainless

steel ducting, PP process piping, SCH80 PVC process piping

Page 19: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES , ACMV QDOS, Batu Kawan Industrial Park (BKIP), Penang, Malaysia

Completion May 2018Type Base BuildContract Amount RM8,000,000.00Main Con Kok Constructions Sdn BhdScope New ACMV, CDA, Cleanroom, Scrubber System, and other associated mechanical

services for the new factory set up

Page 20: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

MEDICALGleneagle Hospital, Penang

Completion July 2018Contract Sum RM2,000,000.00Type Upgarde & RetrofitScope Chiller plant room upgrading involving replacement of 3 nos water cooled chiller,

1000RT cooling tower, MCC, CHW & CW pump, chiller cooler insulation with PUc/w GI jacketing

Page 21: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

HOTELBayview Beach Resort, Batu Ferringhi, PenangCompletion May 2018Type UpgradingContract Amount RM2,000,000.00Scope Project involving chiller plant room upgrading, 3 nos (1VSD + 2 Fix Speed) water

cooled chiller, 3000Amp MCC panel, upgrading and associated work @ basement level

Page 22: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

CALL CENTERAIA – Strait Quay, PenangCompletion Jun 2018Type Base BuildContract Amount RM1,900,000.00Scope New Customer Service & Call Centre involving M&E services installation – Air

Conditoning & Ventilation, Fire, Electrical, incorporated into thein-house ID main con. design

Page 23: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

OIL & GAS Schlumberger, PKFZ, Port Klang, SelangorCompletion Jun 2015Type Base BuildContract Amount RM3,700,000.00Main Con Tialoc Sdn BhdScope Project involving supply, install, testing & commissioning ACMV, CDA, Desiccant Wheel

System, Smoke Spill System, Process Utility & BMS Certification LEED Certified by U.S Green Building Council

FM Global Approved

Page 24: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

GOVERNMENT – DATA CENTERJabatan Pengaliran & Saluran (JPS), Selangor

Completion Jun 2017Type New Data CenterContract Amount RM720,000.00Main Con ETE Sdn BhdScope New TIER III Data Center set up involving 3 nos DX Row Cooling, COdl Aisle

Containment, VESDA, EMS, 2 lots IG55, Water Detection System

Page 25: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

PHOTOVOLTAIC/SOLAR

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

First SolarApr 2016Kulim Hi-Tech Park, KedahRM1,035,000.00Retrofit Project Involving New Acid Scrubber System InstallationFM Global Approved

OwnerYear Completion LocationContract AmountType of Project Scope

TS SolartechJun 2016Penang Science ParkRM3,300,000.00New Installation Project involving supply, install, testing & commissioning UPS/FC system, having capacity up to 5.5MW

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

First SolarDec 2016Kulim Hi-Tech Park, KedahRM1,700,000.00Retrofit Project Involving KLM 1&2 T&R New ACMV InstallationFM Global Approved

Page 26: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

DATA CENTER

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Compliance

Western Digital Tialoc Sdn BhdDec 2015PenangRM570,000.00Retrofit Project involving new Data CenterinstallationFM Global Approved

Owner Year Completion LocationContract AmountType of ProjectScope

MotorolaAug 2015PenangRM620,000.00Retrofit Project involving 2 new Data Centerinstallation

OwnerYear Completion LocationContract AmountType of Project ScopeCompliance

DellFeb 2014APCC1 DC1 Penang RM340,000.00Retrofit Project involving Data Center ACMV Upgrading FM Global Approved

Owner Year Completion LocationContract AmountType of Project Scope

Compliance

First SolarJun 2015Kulim Hi-Tech Park, KedahRM775,000.00Retrofit Project Involving New Data CenterCRAC Upgrading (4 Data Centers)FM Global Approved

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

DellSep 2016APCC2 DC1 Bukit Minyak PenangRM800,000.00New Installation Project involving Data Center Battery Monitoring System (BMS) Installation FM Global Approved

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

DellJun 2017APCC1 DC3 PenangRM1,800,000.00New Installation Project involving new Tier III Data Center InstallationFM Global Approved

Page 27: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

DATA CENTER

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Jabatab Pengaliran & Saluran (JPS)ETE Sdn BhdSep 2017Ampang, SelangorRM720,000.00Retrofit New TIER III Data Center set up

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

DellFeb 2018APCC1 DC2 Penang RM3,600,000.00NEW DATA CENTER Project involving Data Center ACMV Upgrading FM Global Approved

OwnerYear Completion LocationContract AmountType of Project Scope

Compliance

DellFeb 2018APCC1 CEDAR LAB, Penang RM2,800,000.00NEW REGIONAL TRAINING CENTERProject involving Data Center CRAC, UPS, EMS, BMS installation FM Global Approved

Page 28: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

CALL CENTER

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

AIAFacility Link/ Ivana Deco 2018Straight Quey, Penang RM3,100,000.00New Call Center Set Up Project involving all M&E services

Page 29: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

SEMICONDUCTOR

Owner Year Completion LocationContract AmountType of Project Scope

Compliance

EntegrisNov 2015Kulim Hi-Tech Park, KedahRM950,000.00 Retrofit Project involving ACMV Upgrading, 3 nos air cooled chiller, associated mechanical work FM Global Approved

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Classified (Top Tier Semincon Player)Johnson ControlDec 2015PenangRM180,000.00 Retrofit Project involving chiller plant room upgrading, 1 nos 800RT water cooled chiller replacement

Owner Year Completion LocationContract AmountType of Project Scope

Compliance

Latexx (Semperit)Dec 2015Taiping, PerakRM4,700,000.00 Base BuildProject involving Process Utility pipe work, Boiler pipe work, Natural Gas pipe work, & mechanical Ventilation system FM Global Approved

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

VAT BYG Projects Sdn BhdMar 2016PenangRM380,000.00Retrofit Project involving new ISO6 & ISO8 cleanroom set up

Owner Year Completion LocationContract AmountType of ProjectScope

Osram Jan 2017Penang RM950,000.00RetrofitNew Oil Free Compressed Air System in Wafer Plant

Page 30: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

SEMICONDUCTOR

Owner Year Completion LocationContract AmountType of ProjectScope

Osram Aug 2017Penang RM800,000.00RetrofitNew PEN5 ISO8 Cleanroom set up

Owner Year Completion LocationContract AmountType of ProjectScope

CPI Oct 2017PenangRM1,800,,000.00Retrofit New ISO8 cleanroom set up, having total area of 32,000ft2. PU ducting instead of GI ducting deployed, to achieve to a better workmanship

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

TF-AMD Tialoc Sdn BhdOct 2017PenangRM4,000,000.00Base Build New factory set up involving total CHW, CW, CDA, Process Piping Work

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

VAT BYG Projects Sdn BhdJun 2018 PenangRM7,000,000.00Base Build New factory expansion involving 170,000ft2 area ACMV set up, including of 55,000ft2 cleanroom (ISO6 & ISO8), OFA, smoke spill system, DCC, 3 nos chiller, and other associated services

Owner Year Completion LocationContract AmountType of ProjectScope

CoherentMar 2018PenangRM1,000,000.00New Factory Extension As the main contractor for the entire project upgrading, that scope of the contract stretching from civil & structural upgrading, new mechanical (ACMV, Process Utility, Fire Protection) & electrical installation.

Page 31: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

SEMICONDUCTOR

Owner Year Completion LocationContract AmountType of ProjectScope

CPI 2018PenangRM1,200,,000.00Retrofit New ISO8 cleanroom set up, having total area of 20,000ft2

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

QDOSKOK CONSTRUCTION SDN BHDJAN 2018Batu Kawan Industrial Park, PenangRM8,000,000.00Base Build New factory set up involving total CHW, CW, CDA, Process Piping Work, and all equipment

Owner Year Completion Location

Contract AmountType of ProjectScope

QDOSDec 2018Phase 2, Penang Free Trade Zone, , PenangRM2,650,000.00UpgradingFactory upgrade involving total CHW, CW, CDA, Process Piping Work and all equipment

Owner Year Completion LocationContract AmountType of ProjectScope

Globetronics 2018PenangRM2,500,000.00New Factory Extension New 20,000ft2 class 10k cleanroom, inclusive of chiller plant room, ahu room, and necessary services

Owner Year Completion LocationContract AmountType of Project

ADI2018Free Trade Zone, Penang RM1,800,000.00New 20,000ft2 class 100k & 10k cleanroom

Page 32: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

SEMICONDUCTOR

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Osram Tialoc Sdn Bhd2018Kulim Hi-Tech Park, Kedah RM1,350,000.00RetrofitNew process utility system set up

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM2,300,000.00Re-trofitExisiting factory mechanical & electrical services dismantling

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM5,200,000.00Re-trofitACMV ducting, CHW & CW piping, and process utility piping installation

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM3,500,000.00Re-trofitACMV ducting, CHW & CW piping, and process utility piping installation

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Classified MNC JLL 2018Free Trade Zone, PenangRM1,100,000.00Re-trofitCDA upgrading consisting of air compressor c/w air dryer, filters and other associated services

Page 33: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

SEMICONDUCTOR

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Carsem (M) Sdn BHdYork (M) Sdn Bhd2018Jelapang, Ipoh, Perak RM900,000.00RetrofitACMV upgrading involving CHW & CW piping installation, pumps, and other necessary services

Page 34: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

PHARMACEUTICAL/FOOD/ MEDICAL

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Compliance

Hacks Estagold Sdn BhdOct 2017PenangRM5,800,000.00Base Build New factory involving ACMV set up, production having 20degC 35%RH environment GMP certified M&E services

Owner Year Completion LocationContract AmountType of ProjectScopeCompliance

Sun PhamaMar 2017Sg Petani, Kedah RM320,000.00RetrofitWater cooled chiller replacement GMP certified

Owner Main ConYear Completion LocationContract AmountType of ProjectScope

Compliance

Rembina Sdn BhdSouth Island Sdn BhdJan 2016Penang RM1,750,000.00 Base Build Project involving ACMV, CDA ISO8 Cleanroom, Smoke Spill System, BMS systemGMP Certified

Page 35: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

TELCO

Owner Year Completion LocationContract AmountType of ProjectScope

U MobileNov 2015Subang Hi-Tech, SelangorRM1,490,000.00Retrofit Project involving new TELCO ACMV upgrading, 7 nos CRAC, 2 nos 240kW Modular UPS, 3 sets CAC, and associated services

Owner Year Completion LocationContract AmountType of ProjectScope

MaxisNov 2016Subang Hi-Tech, SelangorRM450,000.00Retrofit Project involving new TELCO ACMV’s CRAC unit outdoor condenser total change-out

Owner Year Completion LocationContract AmountType of ProjectScope

MaxisJan 2018 NationwideRM6,200,000.00Retrofit Project involving new 900 nos TELCO outdoor free-cooling total change-out

Page 36: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

HEALTHCARE/HOSPITAL

Owner Year Completion LocationContract AmountType of ProjectScope

Pantai Hospital Sep 2015Sg Petani, KedahRM720,000.00 Retrofit Project involving 2 nos 300RT water cooled chiller replacement @ level 3 Sustainable Energy Development Authority Malaysia (SEDA)

Owner Year Completion LocationContract AmountType of ProjectScope

Pantai Hospital Oct 2017PenangRM1,800,000.00 Retrofit Project involving chiller plant room upgrading, 3 nos 300RT water cooled chiller, 2 nos 500Rt cooling tower, 2000Amp MCC panel, and associated work @ Level 6 roof top

Page 37: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

OIL & GAS

OwnerYear Completion Main ConLocationContract AmountType of Project Scope

Compliance

Schlumberger Jun 2015Tialoc Malaysia Sdn BhdPort Klang Free Zone (PKFZ), Klang, SelangorRM3,700,000.00Base Build Project involving supply, install, testing & commissioning ACMV, CDA, Desiccant Wheel System, Smoke Spill System, Process Utility & BMS LEED Certified by U.S Green (SEDA)

Page 38: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

GOVERNMENT/MILITARY

OwnerYear Completion Main ConLocationContract AmountType of Project Scope

TUDM (Air Force) Malaysia Jan 2015Sapura Defence Sdn BhdButterworth, Penang RM930,000.00RetrofitProject involving supply, install, testing & commissioning ACMV, 2*150RT air cooled chiller, CRAC, and BMS

OwnerYear Completion Main ConLocation

Contract AmountType of Project Scope

TUDM (Air Force) Malaysia Dec 2015Wekajaya Sdn BhdKota Samarahan, Kuching, Sarawak, MalaysiaRM2,900,000.00Base BuildProject involving supply, install, testing & commissioning ACMV, 2*300RT water cooled chiller, Smoke Spill System, and BMS

OwnerYear Completion Main ConLocation

Contract AmountType of Project Scope

TUDM (Air Force) Malaysia Dec 2016Wekajaya Sdn BhdGunung Ngili, Kuching, Sarawak, MalaysiaRM1,590,000.00Base BuildProject involving supply, install, testing & commissioning ACMV, UPS systems, BMS

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Thai Consulate Prestige ConstructionOct 2017PenangRM700,000.00Base Build New consulate building completed with full VRV system, and associated services

OwnerYear Completion LocationContract AmountType of Project Scope

Putrajaya Holding Oct 2017Putrajaya, SelangorRM1,050,000.00New Installation Project involving supply, install, testing & commissioning UPS system, having capacity up to 1.2MW (4 nos300kVA)

Page 39: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

COMPLETED PROJECTS

HOTEL/ SUITE/TEMPLE

Owner Year Completion LocationContract AmountType of ProjectScope

Bayview Beach ResortMay 2018Batu Ferringhi, Penang RM1,500,000.00Retrofit Project involving chiller plant room upgrading, 3 nos (1VSD + 2 Fix Speed) water cooled chiller, 3000Amp MCC panel, upgrading and associated work @ basement level

Owner Year Completion LocationContract AmountType of ProjectScope

ET Hospitality Sdn Bhd2017Georgetown, Penang RM480,000.00Base Built Boutique Hotel having new VRV installation for all the guest room, hall, and other associated services

Owner Year Completion LocationContract AmountType of ProjectScope

Persatuan Buddist Liulishan2018Tangjong Sepat, Sepang, SelangorRM1,020,000.00Base BuiltACMV cover entire building inclusive of rooms, by installing VRF system for energy efficient environment

Page 40: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

ON-GOING PROJECTS

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

Kedah State Government (TOURISM)

Jayasarana

Target 2019

Kuah Town, Langkawi

RM3,300,000.00

Base Built

ACMV by installing energy efficient

VRF system

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

Aemulus Corporation (SEMICON)

MLG Design & Construction Sdn Bhd

Target 2019

Free Trade Industrial Zone, Penang

RM1,500,000.00

Base Built

ACMV by installing energy efficient

VRF system

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

100 Suits+Residence (HOTEL)

LSH Construction Sdn Bhd

Target 2019

Bayan Baru, Penang

RM1,390,000.00

Base Built

ACMV cover air pressurization and

smoke venting system

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

Mahindarama Buddist Temple

Onice Bina Sdn Bhd

Target 2019

Georgetown, Penang

RM430,000.00

Base Built

ACMV cover aircond, air

pressurization and smoke venting

system

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

Global Tobacco Manufacturing Sdn

Bhd (HOTEL)

Main Construction (M) Sdn Bhd

Target 2019

Georgetown, Penang

RM330,000.00

Base Built

ACMV cover10 storey guest rooms

aircond, air pressurization and smoke

venting system

Owner

Main Con

Year Completion

Location

Contract Amount

Type of Project

Scope

Personal Distinction Sdn Bhd (F&B)

PW Construction

2019

KOMTAR, Penang

RM900,000.00

Base Built

ACMV involving air conditioning for

banquet hall, exhaust system for

kitchen system, smoke venting

system

Page 41: AIR CONDITIONING - critical-eng.comcritical-eng.com/wp-content/uploads/2019/03/cmee-profile-2019-01-compressed-2.pdf · Scope New TIER III Data Centerset up involving 3 nosDX Row

ON-GOING PROJECTS

Owner Year Completion LocationContract AmountType of ProjectScope

Bosch 2019Penang Free Trade ZoneRM780,000.00Re-trofitCompressed dry air system cover oil free air compressor, air dryer, filters, piping, wiring, and other necessary services

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

SOC II, TUDM Kuantan, PahangBumitegap Sdn BhdTarget 2019Kuantan, Pahang RM500,000.00Base Built 14 nos Precision Air Cond (PAC) installation

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Infineon KulimYork (M) Sdn BhdTarget 2019Kulim Hi-Tech Park, Kulim, Kedah RM480,000.00Re-trofitChiller condenser body insulation & AHU installation

Owner Main Con Year Completion LocationContract AmountType of ProjectScope

Pantai Hospital SPLK Design Sdn BhdTarget 2019SP, Kedah RM350,000.00Re-trofitNew ACMV installation cover AHU, FCU, for CDR room